Request for Proposals
Site Planning for the Marietta Trailhead
Date Issued: March 21, 2018
Updated: March 29, 2018
Proposals to be Submitted to:
Justin Eby, Director Housing & Community Development Lancaster County Redevelopment Authority
28 Penn Square, Suite 200 Lancaster, PA 17603
Proposals are Due: Monday April 9th by 4:00 PM
Marietta Trailhead Site Planning RFP
Page 2
Table of Contents
Project Introduction ........................................................................ 3
Selection Terms ............................................................................... 3 Site Description ............................................................................... 3 Design Considerations ..................................................................... 4 Scope of Work ................................................................................. 4
Deliverables .................................................................................... 5 Format of Proposals (Required Submittals) ..................................... 5
Evaluation Criteria........................................................................... 5 FAQ ................................................................................................. 6
Appendices
• Appendix A - Site Map of the three parcels
• Appendix B - Northwest River Trail Map
• Appendix C - Zoning Map
• Appendix D - Redevelopment Authority Stakeholder Meeting
• Appendix E – Non- Discrimination/Sexual Harassment Clause
Marietta Trailhead Site Planning RFP
Page 3
Introduction
The Lancaster County Redevelopment Authority is soliciting proposals from qualified professionals to design a new trailhead facility in Marietta, PA along the Northwest River Trail (Attachment A). The funding for this project is provided by the Lancaster County Redevelopment Authority and the Susquehanna Riverlands Conservation Landscape Initiative Mini Grant Program. The Northwest Lancaster County River Trail is a fourteen-mile, multi-use, recreation trail along the Susquehanna River. The trail spans five municipalities on land owned by several local governments and agencies. Communities along the trail are responsible for the development of trail heads. Besides providing access to the trail, the trailheads serve as vital community links that invite visitors into downtown and village areas by displaying maps and information about nearby local services. Steps from the trail in the river town of Marietta are beautiful historic buildings and many great restaurants, pubs, and shops. Redevelopment Authority has conducted some preliminary public outreach, including during the public comment periods of Borough Council Meetings. The Redevelopment Authority also conducted a stakeholder meeting on November 3rd, 2017 to discuss the proposed trailhead in Marietta Borough.
Selection Terms
Selection of a consultant will be based on consideration of responsiveness to the RFP, firm qualifications, and price. The Authority reserves the right to negotiate with the selected firm to refine the scope of work or costs. The Authority also reserves the right to turn down all proposal if none, in the Authority’s judgment, are suitable for the project.
Site Description This project involves three (3) parcels:
1. 28 Perry Street: (Parcel ID #420-48216-0-0000) The parcel is privately owned. The historic depot building on the site will be renovated by the owner and is not covered by this RFP. However, the balance of the parcel, exclusive of the building, is covered and should be incorporated seamlessly into the overall design. All concessions and restroom facilities to be located inside the building are not covered by this RFP.
Marietta Trailhead Site Planning RFP
Page 4
2. 421 West Market Street: (Parcel ID #420-08797-0-0000) Located at the Southeast Corner of South Bridge Street and Hazel Avenue is an open parcel. Amenities planned for the parcel are covered by this RFP. The Redevelopment Authority has conducted a Phase I and II study and will be enrolling the site into the Act 2 Program. All remediation measures will be conducted after the trailhead planning is completed.
3. South Bridge Street Right-of-Way: Borough owned rail crossing, located at the termination of South Bridge Street.
Design Considerations:
• Green storm water management/ best management practices
• Lighting and public safety
• Inclusive design for individuals of all ages and abilities
• Pedestrian access
• Public parking
Scope of Work: (Updated 3/29) The following Scope of Work anticipated for this project is as follows: Phase 1 – Surveying, Feasibility Study, Conceptual Design and Land Development
• Surveying Services (boundaries and utilities) o Geo-technical o Boundary Survey / Utility Locating Services
• Feasibility Study Services o Post-Construction Stormwater Management (PCSM) Design o Erosion and Sediment Control Design
• Conceptual Design Services
• Preliminary/Final Land Development Plan Services
• Meetings o Orientation Meeting with Redevelopment Authority and Project Partners o Stakeholder Meeting to discuss Conceptual Design o Planning Commission Meeting(s) for Land Development Plan o Borough Council Meeting(s) for Land Development Plan
Phase 2 – Contract Drawing Services (Construction Documents)
• Contract Drawing Services o Detailed Construction Specifications are unknown until Phase 1 is completed.
Marietta Trailhead Site Planning RFP
Page 5
Deliverables The consultant will prepare a bound, full color report, with digital copies, that includes the fulfillment of the Scope of Work.
Format of Proposals (Required Submittals)
Please submit one hard copy and one electronic copy of the proposal. Proposals are to be delivered electronically to Justin Eby at [email protected]. Profile of the Firm/Team
• Statements of credentials for all consultants proposed for the project.
• Portfolio summaries of similar projects or other projects the proposer feels are relevant to this project.
• At least three references regarding relevant projects. Explanation of Work
• The proposal shall include a detailed description of the methods and procedures the firm will use to perform the work.
Proposed Cost (Updated 3/29)
• A detailed statement of the fee summary for items in Phase 1 of the Scope of Work.
• A Range of Fees associated with Phase 2 which would be completed by the selected firm upon completion of Phase 1 of the Scope of Work.
Work Schedule
• Target Dates for Scope Elements
Evaluation Criteria Proposals will be accepted from single consulting firms or from teams of consultants working through a prime consultant. In those cases, the prime will be responsible for all contracting and payments to the subs. Consultants must demonstrate:
• A strong background in land planning and design.
• Experience designing public spaces.
• Clarity and completeness of the work to be performed.
Marietta Trailhead Site Planning RFP
Page 6
FAQ (Updated 3/29)
Q: Can the Site Development Plan be submitted as one? A: Although the feasibility and design planning are to indicate one cohesive site, the assumption is that because of two different ownerships, there will have to be two separately recorded plans. Q: Will any other amenities be included in the design of the site besides what has been provided in the Stakeholder Meeting (i.e. additional structures)? A: Additional program elements may be added during the design process. Firms responding to this RFP are to submit proposals with fees based on the amenities identified in Appendix D. The Depot Building (Parcel 1) will contain the public restrooms and information/guest services and is not part of this RFP. As of the issuance of this RFP, a structure is not being proposed for the vacant lot (Parcel 2). Q: Site Lighting is noted as a design consideration; will electric power come from the Depot Building (Parcel 1) or another source? A: Design of the site will have to consider two separate power sources for lighting, as each property will have separate meters. Q: Do you have an overall/target budget or range that you are looking at for this RFP? Do you have to choose the Firm with the Lowest Fees? A: The Redevelopment Authority will negotiate a budget with the selected firm, to contract for planning services, as well as a range for subsequent design and construction services based on the outcome and findings of the Phase 1 planning. The Redevelopment Authority will review proposals and select a firm based on the responsiveness to the RFP, firm qualifications, and fees (Proposed Cost) as noted in the Selection Terms and Format of Proposals sections of this RFP.
S u s q u e h a n n a Ri v e r
S u s q u e h a n n a R i v e r
Stonemill
Drive
River Road
Second Street
River Road
Ande
rson
Ferr
y Ro
ad
Marietta Pike
Maytow
n Roa
d
Mayto
wn
Road
Main Street
Main Street
Turnpike Road
Keener Road
Bair Road
Amosite Road
Chickies H
ill Road
Ore
Min
e Ro
ad
Water Street
Front Street
Wrights Ferry Bridge
Lancaster Avenue
Shocks MillRR Bridge
Stacktown Road
Doneg
al Springs Road
Beat
tys
Tollg
ate
Road
Vinegar Ferry Road
Old
Col
ebro
ok R
oad
Kames H i ll R
oad
Kin
der
hook
Roa
d
3rd Street
Walnut S
treet
Race Street
teertS r ut aceD
Front Street
Furnace Road
Colu mbia Pike
Falmouth
Maytown
Columbia
Mount Joy
Marietta
Bainbridge
30
30
462
462
462
23
23
230
230
772
772
241
743
743
241
441
441
441
441
441
441
283
1
2
3
5
6
7
8
9
10
11
12
13
14
4
Bainbridge Road
Ely Island
Haldeman Island
York Haven Dam
York HavenHydro Station
Brunner Island
King’s River HavenCampgrounds*
Steam ElectricStation
Conoy Creek
Little Chiques C
reek
Snitz Creek
Conewago Creek
Strickler Run
Shawnee Run
Donegal Creek
Chiques Creek
HaldemanRiffles
LCSWMAWaste-to-Energy
Facility
ConoyCanal Park
East Donegal TownshipRiverfront Park
HaldemanMansion
White Cliffsof Conoy
BreezyviewOverlook
Columbia-Wrightsville Bridge
(Veterans Memorial Bridge)
PA Fish & Boat CommissionFalmouth Access
Fisherman’s WharfRiver and Trail Access Area
ConoyArea
Access
Bainbridge Access
Riverfront Park Access
Decatur Street Access
Prescott Road
Kings Road
Shocks MillRR Bridge Walkway
Chiques CreekBridge
Point RockTunnel
Trail ServicesBuilding
Marietta Access
ColumbiaRiver Park Access
(Southern Trailhead)
(Northern Trailhead)
To Wrightsville
To York
East DonegalTownship
WestHempfieldTownship
ConoyTownship
Chickies Rock
Koser Park
County Park
Governo
rs
St
ab
le R
oad
ToMiddletown
PARKINGONLY
To WashingtonBoro
River Road
To Lancaster
Collins Road
Perry
retroP
Front Street
Market Street
Brid
ge S
tree
t
M
Roa
d
441
441
Chickies RockCounty Park
3
4 2
Wat
erfo
rd A
venu
e
Bank Street
River Road
Dec
atur
Str
eet
Marietta Access
441
Furnace Road
772
23
PARKINGONLY
Vesta FurnaceOffice
Decatur Street Access
Current & ProposedTrail Route
0 10.50.25 Mile
0 1 Kilometer
DO NOT TURN HERE
FurnaceRoad
TrailheadParking
MariettaChiques Creek
Bridge
(for trailhead parking)TURN HERE
NORTH0 1 2 3 4 50.5 Miles
0 2 4 6 81 Kilometers
NORTH
LancasterCounty Chester
York
BerksLebanon
Dauphin
Pennsylvania
TRAIL LOCATION
Legend
* Two days advance reservations required. Phone 717-367-2981.
Community
Rivertown Community
River/Lake/Stream
Park
8 Mile Marker
Feature
River Access Point
Downtown Route
Undeveloped/ProposedTrail
Trail
Services
Wheelchair Accessible
Picnic
Parking
Restrooms
Boat Launch
Canoe/Kayak Launch
Bike Trail
Walking/Hiking Trail
Camping
Drinking Water
Northwest Lancaster County
RIVER TRAIL Trail Access GuideNorthwest Lancaster County River Trail
10/2
8/20
14 9
:27
AM
ARTICLE II: Form and Function
5
Map 1: Form-Based Zoning Map
ARTICLE II: Form and Function
6
Map 2: Street Typologies Map
Marietta Trailhead Community Stakeholders Meeting Discoveries and Follow-Up
On Friday, November 3rd, 2017, from 3:00PM- 4:30PM, a community stakeholders meeting was held to discuss
the proposed trailhead in Marietta Borough. The meeting began with a site visit to the trailhead and was
followed by a discussion at the Marietta Community House. With 30 participants in attendance, a guided
discussion was led by the staff of the Lancaster County Redevelopment Authority.
The Lancaster County Redevelopment Authority was awarded a Susquehanna Riverlands Mini-Grant to
complete a land planning assessment for the Marietta Trailhead site. The Authority will hire a consultant to
conduct the assessment. An integral part of the planning process is to elicit and understand the needs of the
community and stakeholders of the site. The information gathered during this meeting will be utilized by the
consultant and incorporated into the final plan.
Participants were placed in small groups and asked to discuss the following questions:
1. What do you view as the most important opportunity produced from the development of the trailhead in
connecting trail users into downtown?
2. What challenges do you foresee in advancing this opportunity?
3. Who are the stakeholders affected by this development?
4. What are the top five (5) priorities of your group when thinking about the development of this site?
This report identifies the outcomes and discoveries of the group discussions.
Question One: What do you view as the most important opportunity produced from the development of the
trailhead in connecting trail users into downtown?
• Enhancing the economic benefits of the downtown business district; the site can serve as a gateway to
the existing business district
• Tourism; introduction to Marietta
• New business development; attract new ventures which support trail activities and support the
Borough’s economy
• Information; the site can be used a platform to guide visitors through the Borough and promote its
offerings
• Place for necessities; restrooms, guest services, and sustenance
• Main access point to the downtown district and the Northwest River Trail
• Gathering place; a “hub” for community activity
Question Two: What challenges do you foresee in advancing this opportunity?
• Parking
• Funding
• Ownership; site, building, and trail
• Culture; inclusive and may be averse to outsiders
• Public-private partnership; agreements concerning operations, maintenance, and funding
• Maintenance; on-going upkeep of the facilities, communication efforts, and informational materials
• Communication: among residents, businesses, community associations, and local government
• Sustainability: mitigating environmental risks (namely flooding) and green infrastructure practices
Question Three: Who are the stakeholders affected by this development?
• Norfolk Southern; train operators
• Neighbors; residents, property owners, business owners
• Borough Leadership; councils and committees
• MABA; Marietta Area Business Associations
• National Parks
• LCRA; Lancaster County Redevelopment Authority
• Building Tenants
• Police
• River Trail Groups
• Zoning
• Trail Users
• Other Rivertowns located along Northwest River Trail and neighboring trails
Question Four: What are the top five priorities of your group when thinking about the development of this site?
• Beautification
• Bathroom facilities
• Connection to the river
• Connection to Marietta
• Parking
• Flooding and other environmental factors
• Tourist information and destination services
• Placemaking
• Gateway marking trail entry and wayfinding signage
• Commercial activity
• Lighting and public safety
• Bike safety and education
• Sustainability and Green Infrastructure
This Event was Supported by Our Gracious Partners
NONDISCRIMINATION/SEXUAL HARASSMENT CLAUSE The Grantee agrees: 1. In the hiring of any employee(s) for the manufacture of supplies, performance of work, or
any other activity required under the grant agreement or any subgrant agreement, contract, or subcontract, the Grantee, a subgrantee, a contractor, a subcontractor, or any person acting on behalf of the Grantee shall not discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the Pennsylvania Human Relations Act (PHRA) and applicable federal laws, against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.
2. The Grantee, any subgrantee, contractor or any subcontractor or any person on their
behalf shall not in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, against or intimidate any of its employees.
3. The Grantee, any subgrantee, contractor or any subcontractor shall establish and maintain
a written nondiscrimination and sexual harassment policy and shall inform their employees in writing of the policy. The policy must contain a provision that sexual harassment will not be tolerated and employees who practice it will be disciplined. Posting this Nondiscrimination/Sexual Harassment Clause conspicuously in easily-accessible and well-lighted places customarily frequented by employees and at or near where the grant services are performed shall satisfy this requirement for employees with an established work site.
4. The Grantee, any subgrantee, contractor or any subcontractor shall not discriminate by
reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, against any subgrantee, contractor, subcontractor or supplier who is qualified to perform the work to which the grant relates.
5. The Grantee and each subgrantee, contractor and subcontractor represents that it is
presently in compliance with and will maintain compliance with all applicable federal, state, and local laws and regulations relating to nondiscrimination and sexual harassment. The Grantee and each subgrantee, contractor and subcontractor further represents that it has filed a Standard Form 100 Employer Information Report (“EEO-1”) with the U.S. Equal Employment Opportunity Commission (“EEOC”) and shall file an annual EEO-1 report with the EEOC as required for employers’ subject to Title VII of the Civil Rights Act of 1964, as amended, that have 100 or more employees and employers that have federal government contracts or first-tier subcontracts and have 50 or more employees. The Grantee, any subgrantee, any contractor or any subcontractor shall, upon request and within the time periods requested by the Commonwealth, furnish all necessary employment documents and records, including EEO-1 reports, and permit access to their books, records, and accounts by the granting agency and the Bureau of Diversity, Inclusion and Small Business Opportunities for the purpose of ascertaining compliance with the provisions of this Nondiscrimination/Sexual Harassment Clause.
6. The Grantee, any subgrantee, contractor or any subcontractor shall include the provisions
of this Nondiscrimination/Sexual Harassment Clause in every subgrant agreement, contract or subcontract so that those provisions applicable to subgrantees, contractors or subcontractors will be binding upon each subgrantee, contractor or subcontractor.
7. The Granter’s and each subgrantee’s, contractor’s and subcontractor’s obligations
pursuant to these provisions are ongoing from and after the effective date of the grant agreement through the termination date thereof. Accordingly, the Grantee and each subgrantee, contractor and subcontractor shall have an obligation to inform the Commonwealth if, at any time during the term of the grant agreement, it becomes aware of any actions or occurrences that would result in violation of these provisions.
8. The Commonwealth may cancel or terminate the grant agreement and all money due or to become due under the grant agreement may be forfeited for a violation of the terms and conditions of this Nondiscrimination/Sexual Harassment Clause. In addition, the granting agency may proceed with debarment or suspension and may place the Grantee, subgrantee, contractor, or subcontractor in the Contractor Responsibility File.
Based on Management Directive 215.16 Amended (5/11/17)
DCNR-2018-Gen Gen-GPM – 1 Rev. 5/18