RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Request for Tender - Consultants
Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Request for Tender: Lead Architectural Consultancy Services for the
Margaret River Cultural Centre Redevelopment (HEART)
Project
Deadline: 12 Noon (AWST) Monday 20 March 2017
Delivery
Requirements:
The Submission is to be transmitted by email to the
Chief Executive Officer at
RFT Number: COR / 28 – 05/17
![Page 2: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/2.jpg)
Table of Contents
RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Contents Contents ................................................................................................................................................. 2
Executive Summary .............................................................................................................................. 4
1 Conditions of Tendering ............................................................................................................... 5
1.1 Definitions ................................................................................................................................ 5
1.2 Request for Tender Confidentiality ......................................................................................... 6
1.3 Tender Documents .................................................................................................................. 6
1.4 How to Prepare Your Tender .................................................................................................. 6
1.5 RFT Timescales and Milestone............................................................................................... 7
1.6 Contact Persons ...................................................................................................................... 7
1.7 Prequalification Requirements ................................................................................................ 8
1.8 Tender Briefing/Site Inspection ............................................................................................... 8
1.9 Lodgement of Tenders and Delivery Method .......................................................................... 8
1.10 Rejection of Tenders ............................................................................................................... 9
1.11 Late Tenders ........................................................................................................................... 9
1.12 Acceptance of Tenders ........................................................................................................... 9
1.13 Disclosure of Contract Information .......................................................................................... 9
1.14 Tender Validity Period ............................................................................................................. 9
1.15 Precedence of Documents .................................................................................................... 10
1.16 Alternative Tenders ............................................................................................................... 10
1.17 Tenderers to Inform Themselves .......................................................................................... 10
1.18 Alterations ............................................................................................................................. 11
1.19 Risk Assessment ................................................................................................................... 11
1.20 Period of Contract and Review ............................................................................................. 11
1.20.1 Contract Term ............................................................................................................... 11
1.20.2 Options to Extend Contract Term.................................................................................. 11
1.20.3 Contract Review ............................................................................................................ 12
1.21 Evaluation Process ............................................................................................................... 12
1.21.1 Selection Criteria ........................................................................................................... 12
1.22 Price Basis ............................................................................................................................ 14
1.22.1 General Price Requirements ........................................... Error! Bookmark not defined.
1.22.2 Contract Term Prices .................................................................................................... 14
1.22.3 Extension Period(s) to Contract Prices ........................... Error! Bookmark not defined.
1.23 Principal’s Policies & Guidance That May Affect Selection .................................................. 14
1.23.1 Regional Price Preference Policy .................................................................................. 15
1.23.2 Statement of Purchasing Ethics .................................................................................... 15
1.24 Foster Local Economic Prosperity ........................................................................................ 15
1.25 Disclosure of Sub-contracting ............................................................................................... 15
1.26 Ownership of Tenders ........................................................................................................... 15
![Page 3: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/3.jpg)
Table of Contents
RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
1.27 Canvassing of Officials .......................................................................................................... 16
1.28 Identity of the Tenderer ......................................................................................................... 16
1.29 Costs of Tendering ................................................................................................................ 16
1.30 Tender Opening .................................................................................................................... 16
1.31 In House Tenders .................................................................................................................. 17
1.32 Notification of Outcome ......................................................................................................... 17
1.33 Payment ................................................................................................................................ 17
2 Specification ................................................................................................................................ 18
2.1 Introduction .............................................................................. Error! Bookmark not defined.
2.2 Background Information .......................................................... Error! Bookmark not defined.
2.3 Scope of Work ....................................................................................................................... 18
2.4 Specific Requirements of the Contract ................................... Error! Bookmark not defined.
2.5 Implementation Program ......................................................... Error! Bookmark not defined.
3 Conditions of Contract ............................................................................................................... 45
3.1 General Conditions of Contract ............................................................................................. 45
3.2 Special Conditions of Contract .............................................................................................. 50
3.2.1 Period of Contract and Review ....................................... Error! Bookmark not defined.
3.2.2 Insurances ....................................................................... Error! Bookmark not defined.
3.2.3 Disability Access and Inclusion Plan Consultant Reporting .......................................... 51
3.2.4 Consultant Performance ................................................. Error! Bookmark not defined.
3.2.5 Project Handover Pack ................................................... Error! Bookmark not defined.
3.2.6 Demonstrated Application of Regional Price Preference Error! Bookmark not defined.
3.2.7 Termination ..................................................................... Error! Bookmark not defined.
3.3 Purchase Order Terms and Conditions of Purchase ...................................................... 55
4 Tenderer’s Offer .......................................................................................................................... 59
4.1 Form of Tender...................................................................................................................... 59
4.2 Selection Criteria ................................................................................................................... 60
4.2.1 Compliance Criteria ....................................................................................................... 60
4.2.2 Qualitative Criteria ......................................................................................................... 60
4.2.3 Price ................................................................................ Error! Bookmark not defined.
4.2.4 Summary of weighted criteria .......................................... Error! Bookmark not defined.
4.3 Price Information ................................................................................................................... 65
4.3.1 Price Basis .................................................................................................................... 65
4.3.2 Price Schedule ................................................................ Error! Bookmark not defined.
4.3.3 Price Discount ............................................................................................................... 67
5 Appendices .................................................................................................................................. 68
5.1 Statement of Purchasing Ethics (April 2016) ........................................................................ 68
5.2 General Conditions of Contract ............................................... Error! Bookmark not defined.
![Page 4: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/4.jpg)
Part 1 READ AND KEEP THIS PART
Page 4 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Executive Summary
The Principal has a requirement to engage an appropriately qualified and experienced Lead
Architectural Consultant for the provision of “turn-key” architectural and specialist consultancy
services for the design, documentation and superintendence of the redevelopment of the Margaret
River Cultural Centre.
The Principal’s vision is to create a vibrant Hub for Entertainment, Arts and Regional Tourism
(HEART) that will enrich the quality of community life and strengthen and diversify the Margaret River
Region’s economy.
The HEART project is a high priority transformational project developed initially under the SuperTown
Program. It involves a major redevelopment of the 33-year-old Margaret River Cultural Centre and the
adjoining 37-year-old squash court and basketball facilities. The HEART project will expand and
refurbish these ageing facilities into a transformed multipurpose conference, meetings, performance,
exhibition and events venue.
This is a Request for Tender (RFT). The RFT is the second stage of a two stage process. Following
the determination of the Expression of Interest (EOI) the Principal has determined that four
Architectural firms are acceptable Tenderers to provide the very specialized services required to
effectively deliver a regional performing arts centre and conferencing/convention facilities and are
invited to submit an RFT to supply the required architectural services. The firms deemed to be
acceptable Tenderers following the EOI process are listed in alphabetical order as follows:
Bollig Design Group
Christou Design Group
Gresley Abas Pty Ltd
Peter Hunt Architect
A full statement of the Services required appears in the Specification in Part 2 of this RFT.
Tenderers are required to address the selection criteria including the production of preliminary design
concepts.
Tender submissions are required by 12 Noon (AWST) Monday 20 March 2017.
Mandatory presentations/interviews will be required to be delivered on Tuesday 21 March 2017 at
WALGA Offices, 170 Railway Parade Leederville.
![Page 5: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/5.jpg)
Part 1 READ AND KEEP THIS PART
Page 5 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
1 Conditions of Tendering
1.1 Definitions
Below is a summary of some of the important defined terms used in this Request:
Attachments: The documents you attach as part of your Tender.
Consultant:
Means the person or persons, corporation or corporations who’s Tender is accepted by the Principal, including the executors or administrators, successors and assignments of such person or persons, corporation or corporations.
Contract: Means the final agreement between the Principal and Consultant for the execution of the Requirement including any documents referenced therein.
Conditions of Contract:
Means all terms and conditions specified within Part 3 and contained therein.
Deadline: The deadline for lodgement of your Tender as detailed on the front cover of this Request.
General Conditions of Contract:
Means the Australian Standard AS 4122-2010 General Conditions of Contract for Consultants as nominated in Part 3.
Offer: Your offer to supply the Requirements (and any agreed amendments).
Principal: Shire of Augusta Margaret River.
Principal’s Responsible Officer:
Is the person(s) named as such in Part 1 of this document or any replacement person notified to the Tenderer.
Purchase Order: Means a purchase order number or purchase order document from the Principal to the Consultant requiring the supply of the Requirements under the Contract.
Region: Means the entire geographical area encompassed within the boundaries of the Shire of Augusta Margaret River.
Request OR RFT OR Request for Tender:
This document.
Requirement: The services requested by the Principal.
Selection Criteria: The Criteria used by the Principal in evaluating your Tender.
Special Conditions: Means the additional contract terms, documents and Requirements listed in Part 3 and any other guidelines, rules, requirements or site specific conditions which the Principal makes available to the Consultant.
Specification: The Statement of Requirements that the Principal requests you to provide if selected.
![Page 6: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/6.jpg)
Part 1 READ AND KEEP THIS PART
Page 6 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Tender: The Tenderer’s full response to the RFT including completed Offer Form, response to Selection Criteria, Pricing requirements and any other Attachments or related documents.
Tenderer: Someone who has or intends to submit an Offer to the Principal.
1.2 Request for Tender Confidentiality
This Request is the property of the Principal. The information contained herein is commercially
confidential to the Principal and shall not, therefore, be copied or disclosed to any other third party
without the written consent of the Principal. The information contained herein shall only be disclosed
to those of the Tenderer’s employees and sub-consultant/contractor(s) who are directly involved with
the Tender response to this Request.
1.3 Tender Documents
This Request is comprised of the following parts:
Part 1 – Conditions of Tendering (read and keep this part).
Part 2 – Specification and/or plans/drawings (read and keep this part).
Part 3 – Conditions of Contract (read and keep this part).
Part 4 – Tenderer’s Offer (complete and return this part).
Appendices – (read and keep this part)
Separate Documents
a) Addenda and any other special correspondence issued to Tenderers by the Principal.
b) Any other policy or document referred to but not attached to the Request.
1.4 How to Prepare Your Tender
a) Carefully read all parts of this document;
b) Ensure you understand the Requirements;
c) Submit any questions to the Principal before the question cut-off date outlined in Part 1 of this
Request;
d) Attend any Tender Briefing or Site Inspection where it is stated as compulsory;
e) Complete and return the Offer (Part 4) in all respects and include all Attachments;
f) Make sure you have signed the Offer form and responded to all of the Selection Criteria; and
g) Lodge your Tender before the Deadline.
![Page 7: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/7.jpg)
Part 1 READ AND KEEP THIS PART
Page 7 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
1.5 RFT Timescales and Milestone
The table below details the Request for Tender response timescales and anticipated timing of
appointment of the successful Tenderer.
Table 1: RFT Timescales and Milestone
Activity Completion Date
Restricted RFT to short listed Architects by Principal following EOI Process
Tuesday 7 February 2017
Non mandatory site visit 11am (AWST) Thursday 23 February 2017
Cut-off date for Tenderers’ Questions and Clarifications
to Principal’s Responsible Officer(s)
4pm (AWST) Tuesday 28 February 2017
Cut-off date for Principal’s Responsible Officer(s) to
answer Questions and Clarifications
4pm (AWST) Tuesday 7 March 2017
RFT response Deadline 12 noon (AWST) Monday 20 March 2017
Shortlisted Tenderer presentations to Selection Panel
Venue: Wattle Meeting Room Level 1, WALGA 170
Railway Pde West Leedervile WA 6007
Tuesday 21 March 2017
(Tenderers to be notified of appointment
times at a later date)
Recommendation on Preferred Tenderer to Council for
decision to award Tender
Wednesday 29 March 2017
Anticipated Contract Commencement April 2017
1.6 Contact Persons
Tenderers should not rely on any information provided by any person(s) other than the person(s)
listed as the Principal’s Responsible Officer(s) below:
Table 2: Contact Persons
Principal’s Responsible Officer(s):
Gary Evershed, CEO
Tel: 08 9780 5201
Email: [email protected]
All questions and clarifications regarding the RFT shall be directed by email to the Principal’s
Responsible Officer(s) named above and copied to Clare Hamilton (Project & Procurement Officer)
No clarifications or questions from Tenderer will be accepted after 4pm (AWST) Tuesday 28
February – as per table above in Part 1.5.
The Principal’s Responsible Officer(s) will endeavour to provide a written response to questions within
the timescale indicated above in Part 1.5. Where not commercially sensitive, a copy of the questions
received and the response will be provided to all Tenderers.
No communication with respect to the RFT shall be undertaken with any other Officer, Manager,
Director or Elected Councillors of the Principal other than the nominated persons specified above,
![Page 8: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/8.jpg)
Part 1 READ AND KEEP THIS PART
Page 8 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
unless authorised to do so by the Principal’s Responsible Officer(s) or the Project & Procurement
Officer. This shall apply during the period between issue of the RFT by the Principal, receipt of
Tenders and notification from the Principal as to the success, or otherwise, of the Tenderer.
1.7 Prequalification Requirements
To be eligible for selection, Tenderers must have been successfully short listed from the Expression
of Interest stage of the Tendering process.
1.8 Tender Briefing/Site Inspection
Attendance at this meeting is not compulsory.
Tenderers are requested to attend a Briefing and Site Inspection on Thursday 23 February 2017 at
11am.
The location of the meeting is Main Break Meeting Room, Shire of Augusta Margaret River Offices, 41
Wallcliffe Road, Margaret River.
Please register your attendance with Megan Smith ([email protected] or 08 9780 5200)
no later than 3pm (AWST) Wednesday 22 February 2017.
Attendees will meet in the Main Break Meeting Room at the Shire’s Administration Centre and receive
a short presentation on the project by the Shire CEO or delegate. Following the briefing a guided site
inspection will be undertaken at the site of the proposed building, immediately adjacent to and west of
the existing Margaret River Civic and Administration Centre on Wallcliffe Road, Margaret River.
The briefing/site inspection will provide Tenderers with the first opportunity to clarify any uncertainties
with the contact person prior to the closing of the RFT and to inspect the premises.
1.9 Lodgement of Tenders and Delivery Method
The Tender must be lodged by the Deadline. The Deadline for this request is 12 noon (AWST)
Monday 20 March 2017.
The Tender is to be transmitted by email to the Chief Executive Officer at
[email protected] including a note of the RFT reference number and title in the email
subject. The email Response should be marked for the attention of the Chief Executive Officer.
Tenderers must also ensure that:
a) files are in PDF format and combined into one document where possible;
b) the Price Schedule is submitted with the full Tender documentation, however it should be
included as a separate electronic file to the main Tender documentation and clearly marked
as ‘Price Schedule’; and
c) they follow up with provision of one (1) signed ‘original’ hard paper copy (bound) of its Tender
within 5 business days of the Deadline, for the Principal’s records.
![Page 9: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/9.jpg)
Part 1 READ AND KEEP THIS PART
Page 9 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
It is the Tenderers responsibility to allows sufficient time to ensure that their Tender has been
successfully emailed by the Deadline and to follow up that the Principal has received all documents.
All pages must be numbered consecutively and the Tender must include an index.
Any brochures, pamphlets or appendices must be included in all document copies.
Tenders provided by Facsimile will not be accepted.
1.10 Rejection of Tenders
A Tender will be rejected without consideration of its merits in the event that:
a) It is not submitted before the Deadline; or
b) It is not submitted at the place specified in the Request; or
c) It may be rejected if it fails to comply with any other requirements of the Request.
1.11 Late Tenders
Tenders received:
a) After the Deadline; or
b) In a place other than that stipulated in this Request;
will not be accepted for evaluation.
1.12 Acceptance of Tenders
Unless otherwise stated in this Request, Tenders may be for all or part of the Requirements and may
be accepted by the Principal either wholly or in part. The Principal is not bound to accept the lowest
Tender and may reject any or all Tenders submitted.
1.13 Disclosure of Contract Information
Documents and other information relevant to the contract may be disclosed when required by law
under the Freedom of Information Act 1992 or under a Court order.
1.14 Tender Validity Period
All Tenders will remain valid and open for acceptance for a minimum period of ninety (90) days from
the Deadline or forty-five (45) days from the Principal’s resolution for determining the Tender,
whichever is the later unless extended on mutual agreement between the Principal and the Tenderer
in writing.
![Page 10: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/10.jpg)
Part 1 READ AND KEEP THIS PART
Page 10 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
1.15 Precedence of Documents
In the event of there being any conflict or inconsistency between the terms and conditions in this
Request and those in the final Contract between the Principal and the successful Consultant, the
terms and conditions appearing in the final Contact will have precedence. The order of precedence of
documents that form the final Contract will be set down in the associated Letter of Award issued on
appointment of the Contract.
1.16 Alternative Tenders
All Alternative Tenders must be accompanied by a conforming Tender.
Tenders submitted as Alternative Tenders or made subject to conditions other than the General and
Special Conditions of Contract must in all cases be clearly marked “Alternative Tender”.
The Principal may in its absolute discretion reject any Alternative Tender as invalid.
Any printed “Conditions of Contract” shown on the reverse of a Tenderer’s letter or Offer will not be
binding on the Principal in the event of a Contract being awarded unless the Tender is marked as an
Alternative Tender.
1.17 Tenderers to Inform Themselves
Tenderers will be deemed to have:
a) examined the Request and any other information available in writing to Tenderers for the
purpose of tendering;
b) examined all further information relevant to the risks, contingencies, and other circumstances
having an effect on their Tender which is obtainable by the making of reasonable enquires;
c) satisfied themselves as to the correctness and sufficiency of their Tenders including tendered
prices which will be deemed to cover the cost of complying with all the Conditions of
Tendering and of all matters and things necessary for the due and proper performance and
completion of the work described therein;
d) acknowledged that the Principal may enter into negotiations with a chosen Tenderer and that
negotiations are to be carried out in good faith;
e) satisfied themselves they have sought clarification to any questions or queries from the
Principal before the cut-off date for clarifications as outlined in Part 1.5; and
f) satisfied themselves they have a full set of the Request documents and all relevant
attachments.
![Page 11: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/11.jpg)
Part 1 READ AND KEEP THIS PART
Page 11 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
1.18 Alterations
The Tenderer must not alter or add to the Request documents unless required by these Conditions of
Tendering.
The Principal will issue an addendum to all registered Tenderers where matters of significance make
it necessary to amend or supplement the issued Request documents before the Deadline.
1.19 Risk Assessment
The Principal may have access to and give consideration to:
a) any risk assessment undertaken by any credit rating agency;
b) any financial analytical assessment undertaken by any agency; and
c) any information produced by the Bank, financial institution, or accountant of a Tenderer;
so as to evaluate that Tender and may consider such materials as tools in the Tender evaluation
process.
Tenderers may be required to undertake to provide to the Principal (or its nominated agent) upon
request all such information as the Principal reasonably requires to satisfy itself that Tenderers are
financially viable and have the financial capability to provide the Services for which they are
submitting and meet their obligations under any proposed Contract. The Principal reserves the right to
engage (at its own cost) an independent financial assessor as a nominated agent to conduct financial
assessments under conditions of strict confidentiality. For this assessment to be completed, a
representative from the nominated agent may contact you concerning the financial information that
you are required to provide.
The financial assessment is specifically for use by the Principal for the purpose of evaluating
Tenderers and will be treated as strictly confidential.
1.20 Period of Contract and Review
1.20.1 Contract Term
The proposed Contract term is for a period of approximately 30 months from the Contract start date to
the Post Construction and Defects Liability Close Out Certification. The Contract date for completion
is anticipated to be September 2018 once the Cultural Centre is fully operational. The completion
date will be agreed with the successful Consultant and outlined in the Letter of Award and final
Contract.
1.20.2 Options to Extend Contract Term
The Principal reserves the right to exercise options to extend the Contract term for up to a maximum
period of 12 months.
![Page 12: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/12.jpg)
Part 1 READ AND KEEP THIS PART
Page 12 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
The maximum extension period shall be implemented as one extension option for that entire period.
Any option to extend will only be exercised following the Principal’s review of the Contract, Principal
approval of any price or rates variation and written notification from the Principal to the Consultant to
proceed.
1.20.3 Contract Review
The Principal will formally review the performance of the Contract with the Consultant including
performance of the Consultant’s obligations under the Contract at the Contract review date by way of
meeting or other method agreed with the Principal. The review panel shall consist of representatives
from the Consultant and the Principal.
The Contract review date will occur at least one month prior to the date of completion of the Contract.
1.21 Evaluation Process
This is a Request for Tender.
Your Tender will be evaluated using information provided in your Tender supported by a formal
presentation and interview.
The following evaluation methodology will be used in respect of this Request:
a) Tenders are checked for completeness and compliance as per the Compliance Criteria in Part
4 of this RFT. Tenders that do not contain all information requested (e.g. completed Offer
form and Attachments) may be excluded from evaluation.
b) Tenders are evaluated against the Qualitative Criteria included in Part 4 of this Request.
Contract costs are also evaluated (e.g. tendered prices) and other relevant whole of life costs
are considered.
c) All Tenderers will be required to make a presentation and participate in an interview as a
clarification process of their Tender, and in order that Tenderers can more fully demonstrate
and explain the design solutions offered to meet the architectural design concepts
Requirements.
d) Referees will be contacted prior to the selection of the successful Tenderer.
A Contract may then be awarded to the Tenderer whose Tender is considered the most
advantageous Tender to the Principal.
1.21.1 Selection Criteria
The Contract may be awarded to a sole Tenderer who best demonstrates the ability to provide quality
services at a competitive price. Tenders will be evaluated on the basis of the following selection
criteria:
![Page 13: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/13.jpg)
Part 1 READ AND KEEP THIS PART
Page 13 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Compliance Criteria (non-scored criteria – assessed on a pass/fail basis);
Qualitative Criteria (scored criteria); and
Price (scored criteria).
The Principal will seek best value for money in its approach to this Request and evaluation of
Tenders. This means that, although Qualitative Criteria and price are scored, the Tender containing
the lowest price will not necessarily be accepted, nor will the offer ranked the highest on the
Qualitative Criteria.
1.21.1.1 Compliance Criteria
These criteria are detailed within Part 4 of this document and will not be point scored. Each Tender
will be assessed as a Pass or Fail. The Tenderer is required to answer Yes or No to each compliance
criterion, the answer provided forming the basis as to whether the criterion is satisfactorily met.
1.21.1.2 Qualitative Criteria
A weighted selection criteria system will be used as part of the Tender evaluation process. A prime
consideration will be that the Tender, in the Principal’s opinion, represents the best value for money.
In determining the most advantageous Tender, the Principal’s evaluation panel will score each Tender
against the Qualitative Criteria.
Qualitative Criteria are detailed within Part 4 of this Request and are weighted to indicate the relative
degree of importance that the Principal places on the technical aspects of the services being
purchased. It is essential that the Tenderer addresses each Qualitative criterion as information that
you provide addressing each Qualitative criterion will be point scored by the evaluation panel.
Failure to provide the specified information may result in elimination from the evaluation process or a
low score.
The extent to which the Tenderer demonstrates greater satisfaction of the Qualitative Criteria will
result in a greater score. Unless otherwise stated, a Tender which provides all the information
requested will be assessed as satisfactory.
1.21.1.3 Price
The weighted price method will be used to score the Tender price quoted. Price is weighted to
indicate the relative degree of importance that the Principal places on the price of the services
required. The weighting is detailed in Part 4 of this Request.
1.21.2 Presentation/Interview
Compulsory Tenderer presentations and interview will be undertaken at the Wattle Room Level 1 of
the West Australian Local Government Association (WALGA) 170 Railway Parade, Leederville on 21
March 2017.
![Page 14: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/14.jpg)
Part 1 READ AND KEEP THIS PART
Page 14 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Presentations and interviews will not be scored, however will be utilised to ensure clarity of
information provided in Tenders, assist the Evaluation Panel in its ability to more accurately score
Qualitative Criteria and also ensure accurate understanding of pricing submitted should there be any
uncertainties or clarification required with regard the written Tender information provided.
Tenderer presentation requirements include:
Detailed presentation of information that was submitted in your Tender in response to
Qualitative Criteria A and B; and a brief summary with regards Qualitative Criteria C.
Qualitative requirements are outlined in Part 4 of this RFT;
Presentations are limited to 40-45 minutes maximum, and
Responding to post presentation questions from the selection panel directly realted to the
Selection Criteria.
Tenderer interview requirements include:
Tenderer will require to answer a series of set questions aimed at clarifying various relevant
details related to the Qualitative Criteria.
Appointment times will be advised at a later date
Please note that this process is for clarification only in order to resolve any uncertainties and inform
the evaluation process. It will not be used by any party as a mechanism for negotiation on Tender
pricing.
1.22 Price Basis
1.22.1 Contract Term and Extension Period Prices
All prices and rates for services offered under this Request are to be fixed for the Contract term and
any extension period(s).
The fixed prices and rates offered will also be used as the basis for calculation of prices for any
services that arise that are additional to or a variation of the scope of work.
1.23 Principal’s Policies & Guidance That May Affect Selection
The following policies and guidance may affect this selection:
Policy 5.2.9 Purchasing Policy (November 2015)
Policy 5.2.8 Regional Price Preference Policy (January 2016)
Statement of Purchasing Ethics (April 2016)
Policy 4.3 Occupational Safety and Health (January 2013)
![Page 15: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/15.jpg)
Part 1 READ AND KEEP THIS PART
Page 15 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Shire of Augusta Margaret River – Terms and Conditions of Purchase (September 2014
amended 2016) (relevance to the Purchase Order).
A copy of the above is available on the Principal’s website: http://www.amrshire.wa.gov.au/
1.23.1 Regional Price Preference Policy
The Shire’s Regional Price Preference Policy will not apply to these tenders. Tenderers for the
contract will therefore not be afforded a preference in accordance with Regulation 24(A-G) of the
Local Government (Functions and General) Regulations and the Principal’s 5.2.8 Regiona l Price
Preference Policy January 2016.
1.23.2 Statement of Purchasing Ethics
The Principal requires Tenderers to have read, accept and agree to be bound by the standards set
out in the Principal’s Statement of Purchasing Ethics (April 2016) as part of their engagement with the
Principal. A copy of the Statement is included as Appendix 1.1 of this Request.
On signature and return to the Principal of the Offer form contained within Part 4 of this Request the
Tenderer acknowledges agreement to be bound by the standards of the Statement of Purchasing
Ethics (April 2016).
Tenderers must note that improper or unethical conduct as outlined in the Statement could lead to the
rejection of Tenders, the Contract not being awarded, termination of Contracts or loss of future work
with the Principal.
1.24 Foster Local Economic Prosperity
The Principal is committed to ensuring support for local business development in all purchasing. The
Principal through its procurement policies and procedures, where possible, encourages the use of
suppliers, goods, services and staff sourced from within the Region. Tenders in response to this
Request are required to demonstrate a regard for the local economy and a supply chain that supports
local business development where possible.
1.25 Disclosure of Sub-contracting
Tenderers must indicate if they intend any person (or organisation) who is not an employee to perform
work on services or provision of goods, and they must provide their details.
The Contract with the successful Tenderer will require the Principal’s prior written approval for any
changes to these arrangements, and any further sub-contracting.
1.26 Ownership of Tenders
All documents, materials, articles and information submitted by the Tenderer as part of or in support
of the Tender will be become upon submission the absolute property of the Principal and will not be
![Page 16: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/16.jpg)
Part 1 READ AND KEEP THIS PART
Page 16 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
returned to the Tenderer at the conclusion of the Tender process PROVIDED that the Tenderer be
entitled to retain copyright and other intellectual property rights therein, unless otherwise provided by
the Contract.
1.27 Canvassing of Officials
If the Tenderer, whether personally or by an agent, canvasses any of the Principal’s Councillors or
Officers (as the case may be) with a view to influencing the acceptance of any Tender or the
evaluation and determination of any tender made by it or any other Tenderer, then regardless of such
canvassing having any influence on the acceptance, evaluation or determination of such Tender, the
Principal may at its absolute discretion omit the Tenderer from consideration.
1.28 Identity of the Tenderer
The identity of the Tenderer and the Consultant is fundamental to the Principal. The Tenderer will be
the person, persons, corporation or corporations named as the Tenderer and whose execution
appears on the Offer Form in Part 4 of this Request. Upon acceptance of the Tender, the Tenderer
will become the Consultant.
1.29 Costs of Tendering
A once off payment of $7,500 EX GST will be paid in arrears to Tenderers who submit a conforming
Tender and participate in the mandatory presentation and interview. The Principal will not be liable
for payment to the Tenderer for any additional costs, losses or expenses incurred by the Tenderer in
preparing their Offer.
1.30 Tender Opening
The Principal will ensure that any Tender submitted is kept in safe custody, ensuring that it remains
confidential. Tenders will not be opened, examined, or evaluated until after the Deadline.
All Tenderers and members of the Public may attend or be represented at the opening of Tenders. No
discussions will be entered into between Tenderers, the Public and the Principal’s Officers present or
otherwise, concerning the Tenders submitted.
The names of the persons who submitted the Tender by the due Deadline will be read out at the
Tender Opening and recorded in the Principal’s Tender Register thereafter. There is no obligation to
disclose or record tendered prices at the tender opening, and price information may be kept as
confidential to the Principal until the conclusion of the Tender process and awarding of the Contract
when the total value of consideration for the accepted Tender will be entered into the Principal’s
Tender Register.
Should a recommendation on the preferred Tender require to be provided to Council, in order to
maintain commercial-in-confidence the value of the preferred Tender will not be disclosed until after
![Page 17: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/17.jpg)
Part 1 READ AND KEEP THIS PART
Page 17 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
acceptance by Council. The tender value will thereafter be published in the minutes of the Ordinary
Council Meeting following acceptance, and recorded in the Tender Register.
The Tender Opening will be held on or as soon as practicable after the Deadline at the Shire of
Augusta Margaret River, 41 Wallcliffe Road, Margaret River.
1.31 In House Tenders
The Principal does not intend to submit an In House Tender.
1.32 Notification of Outcome
All Tenderers will be given particulars (name and offer value) of the successful Tenderer following the
conclusion of the Tender process or be advised that no Tender was accepted.
There is no obligation to disclose the successful Tenderer’s Offer value until conclusion of the Tender
process and Contract award; or following acceptance by Council and published in the minutes of the
Ordinary Council Meeting, and thereafter recorded in the Principal’s Tender Register.
A de-briefing opportunity will be provided on request from an unsuccessful Tenderer where the
Principal can explain the reasons why their Tender did not succeed and provide guidance for future
submissions. Only the Tender provided by that Tenderer will be discussed; details of the other
Tenders (both successful and unsuccessful) in terms of specific information provided within those
Tender and their specific evaluation will not be disclosed or discussed.
1.33 Payment
The Principal will issue a Purchase Order to the successful Tenderer which is to be quoted on all tax
invoices submitted to the Principal. Following submission of valid invoices detailing the works
completed, works invoiced will be verified and payment authorised by the Principal.
Payment during the Contract to the successful Tenderer will be remitted by Electronic Funds Transfer
to the Tenderer’s nominated bank account. The Principal will use all reasonable endeavours to
ensure payment is made in accordance with the payment terms agreed with the Tenderer and under
any Contract.
![Page 18: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/18.jpg)
Part 2 READ AND KEEP THIS PART
Page 18 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
2 Specification
2.1 Purpose of Lead Architectural Consultancy Services
The Principal has a requirement to engage an appropriately qualified and experienced Lead
Architectural Consultant for the provision of “turn-key” architectural and specialist consultancy
services for the design, documentation and superintendence of the redevelopment of the Margaret
River Cultural Centre. The key aspects of the Scope of Work under the Contract are separated into
Phases and will include, but not be limited to the following:
STAGE 1 PROJECT INCEPTION
STAGE 2 CONCEPT DESIGN REVIEW AND FINALISATION
STAGE 3 DETAILED DESIGN
STAGE 4 CONSTRUCTION DOCUMENTATION
STAGE 5 CONSTRUCTION TENDER
STAGE 6 CONSTRUCTION CONTRACT ADMINISTRATION
STAGE 7 POST CONSTRUCTION AND DEFECTS LIABILITY
2.2 Project Background
The Principal’s vision is to create a vibrant Hub for Entertainment, Arts and Regional Tourism
(HEART) that will enrich the quality of community life and strengthen and diversify the Margaret River
Region’s economy. The multipurpose complex will be designed to simultaneously host a range of:
Cultural events, performing arts and festivals; Visual arts displays and exhibitions;
Cinema screenings and premieres;
Business meetings, expos and conventions;
Satellite events in conjunction with major Iconic Events such as the Drug Aware Surf Pro,
Gourmet Escape and Cinéfest Oz Festivals, and other major regional tourism events;
Indigenous, multicultural and historical events and exhibitions;
Community gatherings, events, celebrations and meetings;
Support services when required to be used as an emergency evacuation centre for the Margaret
River town site catchment, as occurred during the November 2011 Margaret River fires.
The HEART project is a high priority transformational project developed initially under the SuperTown
Program. It involves a major redevelopment of the 33-year-old Margaret River Cultural Centre and the
adjoining 37-year-old squash court and basketball facilities. The Cultural Centre was opened in 1983
by Premier Ray O’Connor and is the Shire’s primary venue for the performing arts and community
![Page 19: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/19.jpg)
Part 2 READ AND KEEP THIS PART
Page 19 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
events. It is constructed from some of the last wood fired bricks produced in Western Australia and
the auditorium features jarrah flooring and a mezzanine balcony. The dark surfaces and poor lighting
contribute to the general uninviting nature of the facilities. The Cultural Centre is tired and lacks
contemporary comfort, ambience, technology and disabled access. A photograph and site plan of the
current facilities is shown in Figure 1 and 2 below:
Figure 1 Current Facilities - the 33 to 37-year-old buildings clad in asbestos sheeting at the end of their useful
life
Figure 2 Site Plan – Existing Civic, Cultural and Recreation Centre Precinct
The HEART project will complement the adjacent Australian Institute of Architects 2012 award-
winning Civic and Administration Centre and leverage the significant investment in buildings and
landscaping already made at this site.
![Page 20: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/20.jpg)
Part 2 READ AND KEEP THIS PART
Page 20 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
The HEART project will expand and refurbish these ageing facilities into a transformed multipurpose
conference, meetings, performance, exhibition and events venue. This will attract new business
tourism events to the region as well as servicing the expanding local population and supporting
SuperTown growth objectives. Currently, both public and private meetings, incentives, exhibition and
conference (MICE) facilities in the region are not of a sufficient capacity, variety or (in some cases) of
an acceptable standard to meet latent and future demand. This will be addressed through this project.
Furthermore, the facilities will act as an essential emergency evacuation centre for the Margaret River
town site catchment.
Through the design and construction contracts for external and internal building and refurbishment
works, there will be a focus on compatible and appealing aesthetics and streetscape presentation.
Design will reflect the local character of the Shire and utilise local natural materials.
Design is required to take into consideration general principles of sustainability, and current and best
practice architectural principles relating to solar passivity, water sensitivity, accessibility, equity,
safety, energy and operational cost efficiency should be applied.
The Principal has identified the project as a high priority transformational project under the
SuperTown program and other strategic and tourism development planning processes. The
redevelopment will complement the adjacent $13.2 million architecturally award winning Civic Centre
and complete the important Civic, Cultural and Recreational precinct of the townsite, revitalizing the
central business district of Margaret River, which is the state’s premier regional tourist destination for
interstate and international visitors. The project will also support the state’s $65 million investment in
the Busselton Margaret River Regional Airport by providing excellent facilities for interstate
conferencing and tourist related events.
2.2.1 Current Usage
Despite these shortcomings, the Cultural Centre is a multipurpose facility and recorded over 30,000
users in 2015. It is effectively Margaret River’s only public hall for major events, larger cultural activity
and public gatherings, and contains the town’s only indoor movie screening capability. It is used for
dance classes and other private functions and was used as an emergency evacuation centre during
the 2011 Margaret River bushfires. Table 3 and 4 below show figures of visitation and current users:
Table 3 Margaret River Cultural Centre Attendance by Type, 2015[1]
2015 Figures for Visitation Users
Community Hire 10,841
Commercial Hire 1,878
Arts Margaret River Entrepreneurial Shows 6,995*
Cinema Patrons 6,261
Exhibitions attendance 3,060
Visitors to the venue (enquiries, visitors, purchase of tickets, etc.)* 2,500*
TOTAL 31,535
Base Case Figures Used Based on 2014 Figures 25,000
1 Arts Margaret River Inc., figures for 2015
![Page 21: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/21.jpg)
Part 2 READ AND KEEP THIS PART
Page 21 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
* NB: Some events conducted by Arts Margaret River are held off site so the figures exclude the Cowaramup Sundowners held off site. To avoid any double counting a conservative figure of 25,000 will be used as an estimate of annual attendance figures for the purposes of the base case which is the 2014 figure used by the SGS Economics Group as a base year calculation for their Cost Benefit Analysis.
Some 56 community based organisations have used the facility in the past three years. Examples are:
Table 4 Current Users of the Margaret River Cultural Centre (2013, 2014, 2015)[2]
Leeuwin College of Performance Montessori School
Outloud Dance academy Cinéfest OZ
South West Academy of Dance Arts Margaret River
AMR Historical society Rotary Club of Margaret River
Margaret River Chamber of Commerce Lions - Margaret River District 201W2
Agricultural Society Margaret River Dance Club
St Thomas More Primary School AMR Filipino Community
Margaret River Primary School Bunbury Repertory club
Karridale Primary school Oz Swim WA
Cowaramup Primary School Southwest Opera Company
Autism WA Seniors Recreation - Southwest Branch
Acting up Theatre group Blackwood Dance
Breast screen Van Margaret River Concert Band
Osteoporosis Van Qi Gong
Community Arts Network Margaret River Ballroom Dance
2.2.2 Current Condition
Theatre consultant Richard Stuart was commissioned in 2013 to conduct a full review of the theatre
(the Stuart Report). In summary, the Stuart Report found:
“Generally, the theatre and associated spaces are in good condition in terms of building fabric
although technical systems are in urgent need of upgrade and/or replacement to bring them up to
current benchmark and technological standard in the regional venue marketplace….to provide its
audience with high levels of comfort and amenity and its hirers with the best current and emerging
technology, ensuring shows can be staged to high standards and with speed and efficiency.”3
Additional major deficiencies highlighted by the Stuart Report and architectural review of the centre
that will be redressed by the proposed HEART project redevelopment are summarized:
Outdated general ambience and presentation. The centre is in dire need of a major
refurbishment and redevelopment. The auditorium needs to be softened to make it more
welcoming, appealing and comfortable for audiences and requires acoustic treatment to improve
sound quality. The lack of hanging space is sub-optimal in presenting art works and for hosting
larger exhibitions and permanent displays in the foyer, which is exacerbated the dark and
uninviting nature of the foyer. The façade of the Cultural Centre and the adjacent squash court
section of the Recreation Centre are poorly presented from an aesthetic viewpoint and detract
from the new Civic and Administration Centre and the public space between the two buildings.
Lack of climate control. Efficient heating and cooling need to be installed throughout the
building to meet contemporary patron comfort expectations. The building is cold in winter which is
when visitation needs to be boosted to offset the seasonal downturn for tourists.
2 Arts Margaret River Inc. supplied figures 2013,2014 & 2015 3 Review of Theatre Infrastructure and Equipment, Richard Stuart Theatre Consultant, August 2013
![Page 22: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/22.jpg)
Part 2 READ AND KEEP THIS PART
Page 22 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Figure 3 Photos showing the poor general condition of the Asbestos Roofing and Gutters
Unacceptable disability access arrangements. Disability access arrangements for access and
egress to and within the venue is inadequate, including the absence of automatic opening entry
doors, toileting/parenting facilities and a lift to the upper floor. Redevelopment will aim for full
compliance with the BCA in terms of universal access requirements.
Inadequate and poorly located bar, kitchen and catering facilities. The current kitchen opens
into the main auditorium to allow catering for functions of a cabaret style. There is no sound lock
from the kitchen to the auditorium so noise penetrates into the theatre. To service the expanded
HEART complex, a new strategically located commercial kitchen will be incorporated into a
central or readily accessible area. This will enable food to be prepared and delivered to all
sections of the facility. Bar facilities will likewise be reoriented to service the new connecting foyer.
The new connecting foyer will become an area to host pre-event functions or for functions in its
own right.
Asbestos requiring removal. The side wall
cladding of the Cultural Centre, squash courts and
basketball court are constructed from corrugated
asbestos cement sheeting, as is the roofing of the
Cultural Centre (refer Figure 3). Overall the
condition of the asbestos is rated as ‘poor’ to ‘fair’
and there are visible signs of wear and tear
indicating that replacement in preference to
sealing will be required in the near future. The
safe removal and replacement of asbestos cement
sheeting is the highest priority from a community
and venue user health and safety viewpoint.
Outdated toilet and washroom facilities. The toilet facilities at the Cultural Centre and squash
courts are tired and need a major refurbishment including the replacement of pans, cisterns, tiling
and wash basins.
Inadequate office accommodation. The Cultural Centre was originally constructed with a single
box office. A general office of 2.5m x 4m was created as a temporary measure several years ago
to meet the needs of Arts Margaret River Inc. Office space has been created in an ad hoc fashion
and is inadequate to service the existing centre and planned upgraded complex. There is no
dedicated staff room and shower/change room facilities and no area for volunteers to relax or
change.
Inadequate storage. Currently storage is inadequate to meet the centre’s future needs and an
increase in storage is factored into the project.
![Page 23: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/23.jpg)
Part 2 READ AND KEEP THIS PART
Page 23 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
2.2.3 Project Budget
The $8.75 million total project is funded by a cash contribution of $8.55 million (ex GST) with all grant
funding now confirmed plus a Shire cash contribution of $1.8 million and an In Kind contribution of
$200,000. The project budget is outlined in Table 5 below. Tenderers should refer to the Quantity
Surveyor estimates by Wilde and Woollard included as Appendix 2.1 for a full itemised breakdown of
costs. Other additional cost estimates by the Principal and Richard Stuart Theatre consultant are
included in Appendix 2.1.
Table 5: Project Budget Funding Profile for HEART Project
Total Project Cost Estimates Cost
HEART Project Estimates from Wilde and Woollard Stage 1 – $4,737,931 Stage 2 -$3,393,210
$8,131,141
Provision for additional Equipment and Fit Out Stage 1
$168,859
Additional Stage 1 Lotterywest Sound Shell Installation and Landscaping $250,000
Shire Project Managemnt $200,000
Total Estimated Project Costs $8,750,000
Income Sources
Federal National Stronger Regions Fund (Confirmed) $1,800,000
State Lotterywest (Confirmed) Stage 1 - $1,150,000 Sound Shell and Landscaping $250,000
$1,400,000
State RfR Regional Venues Improvement Fund (Confirmed) Stage 1 - $365,000 Stage 2 - $135,000
$500,000
Shire of Augusta Margaret River Stage 1 - $285,000 Additional Stage 1 Works, Equipment and Fit Out - $1,316,000 Stage 2 - $197,000
$1,800,000
State RfR “Growing the South” (Funding confirmed awaiting finalisation of contract with SWDC)
$3,050,000
Total Income Available (Cash) $8,550,000
Project Budget including Shire “In Kind” of $200,000 $8,750,000
2.3 Architectural Design Development to Date
The Council has established a Cultural Centre Redevelopment Working Party which has met on a
regular basis over the past two years to provide community and stakeholder feedback into the
concept designs. A wide range of community stakeholders including Arts Margaret River
representatives and people with a disability on the Disability Access and Inclusion Committee have
been involved in an iterative process on the design concepts for the complex.
![Page 24: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/24.jpg)
Part 2 READ AND KEEP THIS PART
Page 24 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Conceptual plans and schematic designs have been developed to date and presented to the
Cultural Centre Redevelopment Working Group. The concepts developed by Willcox and
Associates are the latest plans and are included in the attachments for the purposes of
providing general guidance for tendering architects in reviewing the concept plans and
looking for fresh solutions to the functional requirements of the proposed complex (refer
Design Concept Brief under Qualitative Assessment Section in Part 4)
The project has three (3) distinct Stages which can be progressed independently, which will add
considerable value and functionality to the existing facilities at each Stage. Stages 1 & 2 are the
subject of this RFT. The Stages are identified in figure 4 below.
Figure 4 Overall Staged Master Plan - Three Separate Stages and Indicative Works Program
Stages 1 and 2 (the subject of this RFT) are required to be undertaken sequentially to allow for
continuous use of the facility with minimal disruption of the performances, meetings, events and
functions currently booked for the theatre which can be held in the completed Stage 1 multipurpose
space once Stage 2 commences.
Stages 1 and 2 cater for an anticipated 30-year demand – resulting from projected population growth
demands and commercial hires and events usage. Stage 1 and 2 constructions will only result in a
minor increase in the footprint of the existing buildings of approximately 400-500 m2. The major focus
is on the adaptive reuse and refurbishment of existing facilities with better amenities, aesthetics,
connection and servicing to deliver maximum value for state and Shire investment.
NB: Stage 3 does not form part of this RFT and may never be required or approved due to the
need to remove vegetation in the forecourt and the location of key underground services. A
stand-alone Stage 1 and 2 building should be considered as the prime objective with the
![Page 25: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/25.jpg)
Part 2 READ AND KEEP THIS PART
Page 25 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
development of future Stage 3 as a secondary objective and should not compromise the
functionality and design of the overall redevelopment.
2.4 Survey Information to Date
No extensive survey of the site has been undertaken to date by the Principal.
The Principal has appointed a Consultant to review the Shire’s buildings which have asbestos in order
to determine removal and reinstatement costs and the Cultural Centre is included in this review. The
information from this survey will be made available to the successful Consultant appointed following
an RFT process.
2.5 Scope of Work
2.5.1 General Requirements
The Lead Architectural Consultant (hereafter referred to as the ‘Consultant’) is expected to manage
the design, documentation and Contract administration for this project through a planned and
coordinated approach in order to successfully deliver architectural (and other design services) and act
as the Superintendent’s Representative (to the Principal’s Superintendent) for the Construction
Contract.
The general requirements with regard key project Phases are set out below. These Phases provide a
general guide as to the likely requirements of the project and key deliverables. Tenderers in their
Tender to this RFT are encouraged where they consider appropriate to make alternative
recommendations or alterations to the content of the Scope of Work, should they deem an alternate
methodology to be appropriate.
2.5.1.1 PHASE 1 PROJECT INCEPTION
The Consultant shall coordinate, arrange and attend a start-up meeting with the Principal. Other key
personnel from the sub-consultant design team may require to be present.
The aim of this meeting is to ensure all parties fully understand the requirements, roles and
responsibilities of the project from the outset.
At this Phase the Consultant will also be required to compile inception documentation to be
maintained throughout the project duration, as relevant to project Phase. This will include but not be
limited to a:
Project Programme
Design and Construction Management Plan
The intention is for this to be developed at the outset and thereafter utilised and maintained
as a working document developed to include relevant information at each Phase. The
document is required to outline how the Consultant will manage both the design phase as
![Page 26: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/26.jpg)
Part 2 READ AND KEEP THIS PART
Page 26 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Lead Consultant and the construction phase as the Superintendent’s Representative. The
Plan shall address as a minimum, the following:
a) Quality Assurance - how all sub-consultants during the design phase, and the
Construction Contractor (and all other sub-contractors) during construction phase will be
managed to ensure Quality Assurance. A Quality Assurance Register to record
compliance will be development and maintained.
b) Programme of Services/Works - the scope, sequence and coordination of design and
construction activities
c) Schedule of Regulatory Requirements - the relevant codes, standards, specifications and
regulatory requirements at the design and construction phases.
d) Review, Test and Inspection Plan – produce a schedule which identifies where each
review, verification, test or hold point is located in the design and construction activity
sequence. This is to ensure the satisfactory delivery and commissioning of the facility.
Any review, test or inspection is to be recorded in this document also.
e) Consultation and Approvals - where in the sequence of activities approvals are to be
sourced from, or consultations are to be held with regulatory authorities; and any
consultations/approvals recorded. Upon being awarded the contract the appointed
architect will be required to meet with the Principal, Councillors, the Redevelopment
Working Group and the current managers of the Cultural Centre Arts Margaret River Inc.
f) Communication Register - to record requests for information from sub-consultants at the
design phase and the Construction Contractor (and all other sub-contractors or
contractors) and actions required.
g) Drawing/Reports Register - development and maintenance of a register so that the latest
version of the drawing or report is readily identifiable and available. The register shall
record whom each version has been peer reviewed by, issued to and approved by and
dated.
h) Key Performance Indicator (KPI) Register – the KPI, as agreed with the Principal, that will
be used to measure and monitor the performance of:
a. Sub-consultants during the design phase
b. Construction Contractor (and any other contractor) during the construction phase.
And how this will be reviewed and recorded by the Consultant in liaison with the Principal.
The Consultant is required to manage and maintain the KPI Register, in liaison with the
Principal.
i) Risk Register – development, review and maintenance of a register to include design
risks (conceptual and detailed design) and construction risks.
![Page 27: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/27.jpg)
Part 2 READ AND KEEP THIS PART
Page 27 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Design Risk
With regard design risk, designers are in a unique position to reduce the risks that arise
during construction work. The Scope of Works requires the designs to develop from initial
concepts through to a detailed design specification, involving different teams and people
at various stages. At each stage, designers from all disciplines can make a significant
contribution by identifying and eliminating hazards, and by reducing the remaining risks.
Designers' earliest decisions can fundamentally affect construction health and safety.
These decisions influence later design choices. Considerable work may be required if it is
necessary to unravel earlier inappropriate decisions, so it is vital to address health and
safety at the outset.
As Designer, the Consultant must reduce foreseeable risks to health and safety, based
on the information available when the design is prepared or modified. The greater the
risk, the greater the weight that must be given to eliminating or reducing it. The
Consultant must not produce designs that cannot be constructed safely.
Where risks remain, the Consultant must provide the information needed to ensure that
authorities, other designers, technical specialist and contractors are aware of them and
can take account of them.
Construction Risk
With regard construction risk, initial risks can be included and developed in more detail as
the Contract approaches the construction phase. It will be important to identify
construction risks and how these should be managed in relation to the requirements of
the detailed design ahead of construction start, with risks reviewed and monitored during
and post construction.
Risk register will require to be maintained and reviewed at regular intervals by the
Consultant in liaison with the Principal; and the Construction Contractor as appropriate.
2.5.1.2 PHASE 2 CONCEPT DESIGN REVIEW AND FINALISATION
The Consultant is required to critically review and refresh the current concept designs and those
developed through the RFT process with a view to further develop these where required and finalise
the design in accordance with the Principal’s requirements.
A concept site plan, floor plan and elevations have already been prepared that reflect the Principal’s
requirements and have been used as the basis for community consultation and applications to grant
funding bodies. Changes to the concept design to reflect operational, functional and aesthetic
benefits are encouraged but will require the approval of the Principal.
The Consultant as a minimum is required to:
![Page 28: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/28.jpg)
Part 2 READ AND KEEP THIS PART
Page 28 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Critically review the current concept design and further iterations developed during the RFT
process and make any recommendations for amendments or alteration. Allowance should be
made to develop the final concept design within a further two (2) to three (3) design iterations
if required.
any recommended amendments are to be presented to the Principal in the form of Concept
Design Drawings.
Concept Design Drawings will be the subject of stakeholder consultation with Centre
management represetatives from Arts Margaret River, the Cultural Centre Redevelopment
Working Group and the Elected Members of Council.
Once the concept design is agreed and finalised a Concept Design Report is to be issued to
the Principal. This should include as a minimum detail on the development of the concept
design, through to finalisation (including all relevant associated drawings, plans and
information).
Review and update the Design and Construction Management Plan including population of all
associated registers and monitoring documents.
2.5.1.3 PHASE 3 DETAILED DESIGN
Following Principal approval of the concept design the Consultant will develop the detailed design in
liaison with the Principal and provide all relevant information (drawings, plans and reports) to
adequately explain the design evolution. Allowance should be made for a minimum of three (3)
detailed design iterations.
As a minimum the Consultant is required to:
develop a Schedule of Finishes and Materials including interior and exterior finishes, colour
schemes and materials selection;
produce Detailed Design Drawings including sites plans, floor plans, elevations, sections and
including all standard details;
produce detailed Cost of Design against budget and update as required with any design
iterations;
prepare and finalise a Detailed Design Report to include information on the development of the
design from concept, through to detailed design and finalisation (including all relevant associated
drawings, plans, information, schedules, cost of design).
prepare and finalise a Design Approval Package which will include the preparation of
documentation for a Development Approval (DA) application and a Building License Application.
obtain a Certificate of Design Compliance.
![Page 29: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/29.jpg)
Part 2 READ AND KEEP THIS PART
Page 29 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
review and update the Design and Construction Management Plan including population of all
associated registers and monitoring documents.
2.5.1.4 PHASE 4 CONSTRUCTION DOCUMENTATION
The documentation below will be included in a formal Request for Tender by the Principal to appoint a
Construction Contractor under separate Contract. It is therefore required to be in a format agreed with
the Principal for inclusion in its RFT documentation.
The Consultant shall prepare detailed documentation for construction including:
Construction Drawings - plans, elevations and sections (including standard details).
Technical Specifications and Schedules – outlining specifications and standards of construction
based on the detailed design and to be followed for each element of the proposed building. These
are required to be to a standard to enable statutory approval to construct and commission the
facility.
Design and Construction Management Plan – ensure this is reviewed and up to date with
construction specific requirements. The intention of inclusion of this document in the RFT is to
identify the intended management and recording processes to the Construction Contractor at the
outset in order to set expectations and allow the Contractor to integrate their own management
processes with overall requirements.
2.5.1.5 PHASE 5 CONSTRUCTION TENDER
The formal Request for Tender process to appoint the Construction Contractor will be managed by
the Principal, including any required advertising, the issue of documents, communication with
Tenderer, closing of Tenders, assessment of submissions, selection of preferred supplier and
Contract appointment.
The Consultant (together with the design team sub-consultants) is however required to:
act as an advisory member (non-voting) to the Principal’s Tender Evaluation Panel during the
evaluation of Construction Tenders and assist on shortlisting and selection of a Preferred
Tenderer.
assist in drafting any responses to Tender clarifications and advise on addendum information if
necessary.
attend Evaluation Panel meetings where required.
work within deadlines and timescales set by the Principal in order to successfully complete the
Tender process within anticipated timescales.
2.5.1.6 PHASE 6 CONSTRUCTION CONTRACT ADMINISTRATION
The Consultant will be responsible for the administration of the Construction Contract taking the role
of the Superintendent’s Representative (the Principal managing the overall Contract as the
![Page 30: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/30.jpg)
Part 2 READ AND KEEP THIS PART
Page 30 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Superintendent). As the Superintendent’s Representative the Consultant will be responsible for, but
not limited to the following (also refer to Table 6 below):
assisting the Principal’s Superintendent with on-site coordination, inspections and monitoring of
the Construction Contractor to ensure design requirements and specifications are achieved and
the Construction Contractor (and other sub-consultants or contractors) is performing according to
the Specification and KPI. At this Phase the Design and Construction Management Plan is
required to be reviewed and updated to include any information relevant to construction and
maintained thereafter.
issue documentation to Construction Contractor - issue of any ‘for-construction’ drawings and
documentation to the Contractor awarded the Contract, as directed by the Principal.
Site Visits – as agreed between the Principal and the successful Tenderer. More frequent visits
will be required during more complex/critical parts of the project to observe the conformance of
the construction works.
Site Meetings - arrange, attend and record site meetings at regular intervals and circulate minutes
as required.
Digital Photographic and Site Status Record - undertake a fortnightly digital photographic and site
status record of the works. This may need to occur more frequently during major construction
activities. This record will be maintained for the duration of construction in a report and used for
the purpose of assessing claims and the like. The final report of all photographs is to be provided
to the Principal at practical completion.
Communication Management - assisting the Principal’s Superintendent with review and response
to submissions, information and documentation provided by the Construction Contractor during
the construction Contract. This is to be recorded in the Communication Register within the Design
and Construction Management Plan.
Assisting the Principal’s Superintendent - assessment and determination of the Construction
Contractor’s progress claims, variations or extensions of time.
Production, finalisation or obtainment of the following documents to allow the satisfactory delivery
towards completion and commission of the facility:
o Design and Construction Management Plan (including all associated documents);
o As Constructed Drawings;
o Warranties and Maintenance; and
o Operating Manuals.
And submit the documents for review and approval by the Principal.
![Page 31: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/31.jpg)
Part 2 READ AND KEEP THIS PART
Page 31 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
provision of all information required by an Independent Building Surveyor/assessor (to be
appointed by the Principal) to comply with the Building Code of Australia and in order to allow a
Building Permit to be obtained.
obtain a Certificate of Construction Compliance
along with the Principal’s Superintendent assess and determine Practical Completion; and ensure
the Construction Contractor has provided the Principal with all documentation to determine
Practical Completion.
instruct the Construction Contractor in regard to incomplete work and rectification of any defects.
preparation of a Defects Notification Report that details a schedule of any defects identified.
undertake a project review with the Principal. Prepare the Project Close-out Report (refer to Table
4 for content), including confirmation that all defects identified are rectified in the correct manner
(Defects Rectification Report), project evaluation report and that all financial responsibilities are
completed.
2.5.1.7 PHASE 7 POST CONSTRUCTION AND DEFECTS LIABILITY
Should defects not be rectified in the Phase above, the Consultant shall during the defects liability
period (also refer to Table 6):
assist the Principal with the management of defects to allow commissioning, compliance and
testing of the building towards final completion.
instruct the Construction Contractor in regard to incomplete work and rectification of any
defects. If required, advise the Principal and coordinate the procedure for the rectification of
any defective works by others.
carry out defects liability period inspections and follow up with the Construction Contractor for
project close-out submittals/outstanding documentation due to the Principal.
following Practical Completion of the building, the fit out will commence. To enable a smooth
transition, it will be necessary for the Consultant and their sub-consultants to engage and
liaise with the team responsible for fit out.
undertake full re-commissioning review and inspection at the end of the defects liability period
and issue confirmation to the Principal in a notice titled Re-Commissioning Review. This is a
review of the building against the original Specification and must confirm that all defects have
been rectified.
follow up with Construction Contractor for a further review of all documentation in the Close-
out Report (refer to Table 6 for content) due to the Principal and make updates to capture
confirmation of rectification of defects.
along with the Principal’s Superintendent assess and determine Final Completion.
![Page 32: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/32.jpg)
Part 2 READ AND KEEP THIS PART
Page 32 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
The Principal will issue the Final Certificate.
![Page 33: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/33.jpg)
Part 2 READ AND KEEP THIS PART
Page 33 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Table 6 Final Inspections and Close Out
Activity Deliverables
Inspection with Contractor to assess Practical Completion
Identify defects and agree on date for rectification
Obtain a Certificate of Construction Compliance
Produce and issue the Defects Notification Report
Produce and issue the Defects Rectification Report (to Practical Completion)
Determine Practical Completion and Principal issue of Certificate of Practical Completion
Submit all Quality Assurance documentation to the Principal including: Design and Construction Management Plan (including all associated documents); As Constructed Drawings; Warranties and Maintenance; and Operating Manuals
Review Project Complete the project Close-out Report including:
a) Certificate of Practical Completion;
b) Defects Notification Report;
c) Defects Rectification Report;
d) Recommissioning Review (if required);
e) Certificate of Final Completion;
f) Design and Construction Management Plan;
g) As Constructed Drawings;
h) Warranties;
i) Maintenance and Operating Manuals; and
j) Project evaluation including lessons learnt, what worked well, what could be done better and recommendations.
Final Certificate Post Construction and Defects Liability:
Monitor the Contractor completing items on any outstanding defects
Determine Final Completion Principal issue of Certificate of Final Completion
Review and update of Close-out Report and issue final to Principal
2.5.2 Design Team - Key Consultants
The Consultant is responsible for the engagement of a suitable design consultant team to prepare all
required project services through the design and construction phases, documentation and ongoing
Contract administration. The Consultant is:
to provide details of sub-consultants proposed for the project in their Submission to this RFT.
responsible for the management and coordination of all sub-consultants throughout the
project duration.
responsible for the peer review and compilation of documentation from sub-consultants for
provision to the Principal for review and approval.
![Page 34: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/34.jpg)
Part 2 READ AND KEEP THIS PART
Page 34 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
responsible for the preparation of a Design and Construction Management Plan at the outset
of the project which outlines how the design team will be managed effectively.
Each consultancy discipline within the design team is expected to provide the regular standard of
service normally provided by that discipline in accordance with their governing body or registration
board. Nominations for the sub-consultant’s services are to include a clear scope of their works to be
included in the service to be provided. Key details to be provided include company profile and
experience, key resources and confirmation of availability for the likely duration of the project. In
addition to the Consultant the key consultants are:
Structural Engineer
Civil Engineer
Mechanical/Fire Services Engineer
Electrical Engineer
Hydraulic Engineer
Acoustics Consultant
Landscaping Architect
Quantity Surveyor
Geotechnical Engineer
Certification of design compliance
Certification of construction compliance
Access Auditing
Theatre Consultant (the Principal will employ a theatre consultant to act on our behalf,
however Tenderers will require to employ their own sub-consultant expertise to inform the
design)
An Independent Building Surveyor/assessor to certify the design documentation necessary to
obtain a Building Permit and to certify the construction at Practical Completion of the works is
in accordance with the Building Act 2011.
2.5.3 Other Consultants
The Principal reserves the right to appoint an independent Quantity Surveyor (or any other technical
expert deemed necessary) to work concurrently with the Architectural consultancy and specialist
consultancy team.
![Page 35: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/35.jpg)
Part 2 READ AND KEEP THIS PART
Page 35 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
2.5.4 Experience of Consultant’s Superintendent
The Superintendent shall be a qualified registered architect with the Architects Board of Australia or
similar institution, employed by the Consultant with significant experience in design and
superintending construction projects of similar size and complexity, and who has significant
knowledge of the design, development and documentation of this type of project.
2.5.5 Liaison with Stakeholders
The Consultant is required to liaise as necessary throughout the project duration with all third parties,
Government Departments, Authorities, Public Utilities and General Public, as these stakeholders may
affect/be affected by both design and construction of the project. Feedback from stakeholders will also
require to be incorporated into the design where required and any construction processes on site.
2.5.6 Approvals Permits and Licences
In liaison with the Principal, prepare documents required for submissions and obtain all required
approvals, permits and licences from all relevant statutory authorities or independent assessor (pre
and post construction). This includes the Design Approval Package and all building license
applications.
2.5.7 Survey Required
Tenderers are to advise on any surveys of the site deemed necessary to inform the design and
construction process, and identify where in which Phase of the Scope of Works these should occur.
The appointed Consultant will be responsible for the organisation and management of any survey
required, in liaison with the Principal.
2.5.8 Engagement with and Progress Reporting to the Principal
Engagement with and reporting to the Principal is a necessary part of this project and all costs and
expenses related to this should are expected to be incorporated by the Tenderer within the overall
costs of the scope of work outlined above.
2.5.8.1 General
The Principal will work closely with the appointed Consultant on all aspects of the project and will
provide guidance, direction and peer review as required.
It is anticipated that the Principal and the Consultant will be in regular dialogue via email and phone
call.
The Principal may request a meeting with the Consultant at any time during the project or after a key
project milestone.
![Page 36: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/36.jpg)
Part 2 READ AND KEEP THIS PART
Page 36 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
2.5.8.2 Progress Reporting
Reporting to the Principal, the Consultant shall provide an overview of progress relating to all aspects
of the work for which they are responsible throughout the duration of the project. This shall be
achieved via fortnightly emailed progress reports.
This should include, but not be limited to:
progress to date;
a two (2) week task ‘look ahead’;
new issues that have arisen;
issues requiring decisions/input from the Principal;
consultation undertaken;
budget and financial control tracker – identifying spend to date and target spend as per
agreed milestone percentages or hold points (unexpected expenditure requires to be
highlighted to and agreed with the Principal);
any Health & Safety incidents or near misses;
the updated project programme with percentage complete against each task, and notification
of any potential programme delays or alterations (to be agreed with the Principal)
any other update relevant to the project i.e. Risk Registers, Design Registers etc.
information as requested by the Ptincipal required to satisfy funding agreements with the
project funding bodies.
2.5.9 Hold Points
The outcomes from the key Phases outlined in the Scope of Work shall be subject to Hold Points e.g.
delivery of reports, review, comment, Principal inspection etc. Services will only be permitted to
continue once Principal review and/or inspection has taken place and the services are to the
satisfaction of the Principal; and after receiving written approval from the Principal to proceed.
Tenderers are required in their Tender submission to recommend the timing of Hold Points in this
regard. Hold Points can be established based on the program provided as part of your Tender, please
therefore indicate Hold Points in the program provided.
Hold Points will be agreed/finalised by the Consultant and Principal and written into the final Contract
prior to execution.
![Page 37: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/37.jpg)
Part 2 READ AND KEEP THIS PART
Page 37 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
2.5.10 Project Programme
The Principal requires timely completion of the project and key milestones. It is anticipated that the
Cultural Centre will be renovated and fully operational by September 2018, with an anticipated
construction timeframe of 13 months following the appointment of a construction contractor.
Tenderers are required to provide an updated and more detailed program with their Tender to accord
with all requirements of the Scope of Works.
The Consultant appointed under this RFT process will then be required under that Contract to develop
and maintain the project program in the form of a Gantt Chart or similar that identifies a full
breakdown of the timing and completion of key milestones; and that identifies progress against key
tasks within these milestones. The programme will require to be maintained by the Consultant
throughout the project duration to ensure progress is monitored and timing issues identified/rectified.
2.5.11 Deliverables
The key deliverables of this project include, but are not limited to:
PHASE 1 PROJECT INCEPTION
Project Programme
Development and Implementation of Design and Construction Management Plan:
a) Quality Assurance Register
b) Programme of Services/Works
c) Schedule of Regulatory Requirements
d) Review, Test and Inspection Plan
e) Consultation and Approvals
f) Communication Register
g) Drawing/Reports Register
h) Key Performance Indicator Register
i) Risk Register
PHASE 2 CONCEPT DESIGN REVIEW AND FINALISATION
Concept Design Drawings
Concept Design Report
Review and update the Design and Construction Management Plan
PHASE 3 DETAILED DESIGN
Schedule of Finishes and Materials
![Page 38: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/38.jpg)
Part 2 READ AND KEEP THIS PART
Page 38 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Detailed Design Drawings
Cost of Design
Detailed Design Report
Design Approval Package (for Development Approval (DA) application and a Building License
Application)
Certificate of Design Compliance
Review and update the Design and Construction Management Plan
PHASE 4 CONSTRUCTION DOCUMENTATION
Construction Drawings
Technical Specifications and Schedules
Review and update the Design and Construction Management Plan (updated to include
construction specific requirements)
PHASE 5 CONSTRUCTION TENDER
Advice and assistance on evaluation of Construction Tenders
PHASE 6 CONSTRUCTION CONTRACT ADMINISTRATION / PHASE 7 POST
CONSTRUCTION AND DEFECTS LIABILITY
Issue documentation to Construction Contractor
Site Visits (as agreed by negotiation with the Principal)
Site Meetings (as required)
Digital Photographic and Site Status Record
As Constructed Drawings;
Warranties and Maintenance;
Operating Manuals
Certificate of Construction Compliance
Review and update the Design and Construction Management Plan
Close-out Report:
a) Certificate of Practical Completion;
b) Defects Notification Report;
c) Defects Rectification Report;
d) Recommissioning Review (if required);
![Page 39: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/39.jpg)
Part 2 READ AND KEEP THIS PART
Page 39 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
e) Certificate of Final Completion;
f) Design and Construction Management Plan;
g) As Constructed Drawings;
h) Warranties;
i) Maintenance and Operating Manuals; and
j) Project evaluation including lessons learnt, what worked well, what could be done
better and recommendations.
As outlined previously, Tenderers in their Tender submission to this RFT also need to identify any
surveys required, these will also be included as deliverable at the relevant Phase of the Scope of
Work. Once agreed the Specification will be updated to include the relevant surveys ahead of
inclusion in the final Contract between the Contractor and Principal.
All project reports/documents/drawings will be provided to the Principal electronically (either email,
USB or CD) in both pdf and original format e.g. word, excel, CAD, GIS etc.
In compilation of all reports and documents, allowance should be made for a minimum of two (2) draft
and one (1) final version.
2.5.12 Principal Management of Consultant Performance
The Consultant shall perform all work to the satisfaction of the Principal. All services rendered under
that Contract shall conform to the Specification and the standards specified.
The performance of the Consultant’s obligations may be monitored by the following criteria:
assessment against Key Performance Indicator (KPI). KPI will be identified, discussed and
agreed and written into the final Contract prior to execution. regular review, assessment or
inspections of work being undertaken by the Principal or an appointed representative.
assessment against progress with regards key milestones detailed in the Specification.
ongoing and ad hoc review of work progress.
any other performance management monitor specified by the Principal during the project.
2.5.13 Project Handover Pack
Following completion of the Contract, the Consultant will be required to provide a Project Handover
Pack to the Principal. All relevant material must be archived throughout the project duration by the
Consultant and should be provided to the Principal either on CD, DVD or USB within two (2) weeks of
completion of the Contract or when otherwise asked for by the Principal.
The Handover Pack will include all relevant project documents and information, such as:
all reports (including draft and final).
![Page 40: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/40.jpg)
Part 2 READ AND KEEP THIS PART
Page 40 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
all drawings and drawing electronic files created through the project process.
all photographs.
where relevant, all documents submitted to any approval authorities and associated
submission responses/approvals.
any significant correspondence with consultees or stakeholders including emails, any
telephone records of conversations and meeting minutes; and other relevant project
correspondence information.
any other information specified by the Principal as relevant for inclusion.
All reports and drawings are to be in both pdf and original formats e.g. Excel, Word, CAD, GIS etc.
2.6 Specific Requirements
Further to the general requirements outlined above the specific requirements of the scope of works
include the following.
2.6.1 Stage 1 Indicative Works - New Multipurpose Space, Expo Upgrade,
Central Foyer, Kitchen and Bar
As a stand-alone component, the completion of Stage 1 works will greatly enhance the facility and
achieve many of the economic, social and environmental goals targeted. Works in Stage 1 will include
the following indicative features which will be reviewed by the successful Consultant. The Schematic
Designs for Stage 1 by Willcox and Associates are included below as Figure 5:
Creation of a Multipurpose Performance and Convention flat floor space will result from
converting the squash courts into flat floor space of approximately 250 m2 divisible by two or three
by retractable acoustic walls. A combined fire wall and acoustic wall will be constructed between
the new space and basketball court. A solution is required to fix the current ad hoc roofing design
possibly by re-pitching the squash court and toilet change room roofs, removing industrial box
guttering and replacing the asbestos roof with Solar Span insulated roof panels or similar suitable
acoustic treatments. Install new retraceable seating for 169 patrons. It is desirable to retain
wooden flooring due to the revenue earned form dance classes by Centre management.
Construction of a Central Foyer (300 m2 approx) between the existing theatre and the new
multipurpose space. The foyer will host pre and post event functions and smaller functions.
Creation of a new Commercial Kitchen to service all areas from a strategic location and to cater
for up to 500 dinner guests hosted in the basketball court space.
Creation of an internal Courtyard which has an al fresco feel. The inclusion of all-weather
roofing should be considered as the long winter months render this area unusable.
![Page 41: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/41.jpg)
Part 2 READ AND KEEP THIS PART
Page 41 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Creation of an Expo Area, Conference Hall, Dinner Function Area, and Evacuation Centre
with aspirational Recital Hall acoustics from the existing basketball court. Replace asbestos
roof and all wall surfaces. Line internally with acoustic panelling. Upgrade electrical systems to
meet audio-visual requirements. The basketball court will remain as a multi-purpose space
including continued use as a sporting venue in addition to the community, cultural and
business activites.
Toilets and Back-of-House Areas. Renovate toilet area and construct new universally
accessible toilet, create green room, storeroom and rehearsal/conference breakout room and
possible future office accommodation area.
Renovate Courtyard by providing al fresco style roof coverage replacing asbestos verandah
roofs with colorbond, extend veranda, reclad basketball court façade and create new universally
accessible entry to the theatre along the old veranda on the north side of the courtyard with an
additional disabled toilet.
Construct Covered Walkway to the rear carpark.
Installation of PVC Solar Panels on the basketball court roof.
Full technical and audio visual equipment fit out for Stage 1 works will include the capacity for
full theatre operations and to host events and functions in the multi-purpose space, the new foyer
and basketball court.
External sound shell and landscaping funded by Lotterywest grant funds to cater for outdoor
performances in the courtyard between the Civic and Administration Centre and the Cultural
Centre complex. It may be desirable to investigate the incorporation of this feature into the
building design itself to take provide access to a green room and toilet facilities
In Stage 1, the new central foyer and new commercial kitchen and bar will greatly enhance theatre
pre and post event functions and create a venue for events in its own right. The new multi-purpose
performance and convention space will add versatility to the available spaces and the ability to host
events.
![Page 42: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/42.jpg)
Part 2 READ AND KEEP THIS PART
Page 42 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Figure 5 Schematic Designs for Stage 1 by Willcox and Associates showing indicative floor plan
![Page 43: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/43.jpg)
Part 2 READ AND KEEP THIS PART
Page 43 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
2.6.2 Stage 2 Indicative Works – Auditorium Refurbishment, Foyer Expansion
and New Façade to Wallcliffe Road
Stage 2 will bring the existing auditorium up to modern standards of accessibility, comfort, technology
and ambience (the Schematic Design for Stage 2 by Willcox and Associates is included below as
Figure 6). Indicative works will include:
The installation of permanent Tiered Theatre-Style Seating for 310-340 patrons (or more if
feasible within cost parameters). The successful Consultant will be requested to investigate the
feasibility of planning for the installation of an upper floor of approximately 120 seats
Construction of a wider Theatre Foyer and new Northern Façade to Wallcliffe Road providing
an architectural “wow factor”.
Refurbishment of Toilets and construction of new universally accessible toilet.
The creation of new Office Spaces, Staff and Volunteer Room, Ticket Booth and Theatre
Shop in the foyer and in the old kitchen with independent external access doors.
Installation of climate controlled Air Conditioning to theatre auditorium.
Replacement of Asbestos Roofing to auditorium and fly tower with colorbond roofing and
insulation.
Installation of PVC Solar Panels on auditorium roof if funding available. (Second priority to
Basketball Court)
Installation of new technology. Stage 2 works will refurbish the existing auditorium and install
new technology.
![Page 44: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/44.jpg)
Part 2 READ AND KEEP THIS PART
Page 44 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Figure 6 Schematic Designs for Stage 2 by Willcox and Associates
![Page 45: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/45.jpg)
Part 3 READ AND KEEP THIS PART
Page 45 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
3 Conditions of Contract
The Conditions of Contract are as set out below in order of precedence and include:
General Conditions of Contract;
Special Conditions of Contract; and
Purchase Order Terms and Conditions of Purchase
The General Conditions of Contract and the Special Conditions of Contract are included below in draft
form and will be agreed and finalised (with any further variations) during drafting and completion of
the final Contract between the Principal and successful Consultant.
The Purchase Order Terms and Conditions of Purchase are standard and in final form.
3.1 General Conditions of Contract
The General Conditions of Contract shall be those set out in Australian Standard 4122-2010 General
Conditions of Contract for Consultants, copies of which are available for purchase on the SAI Global
website at the following address – http://www.saiglobal.com
It is the Tenderer’s responsibility to ensure they have obtained, read and understood AS 4122 – 2010
General Conditions of Contract for Consultants.
The Australian Standard shall be read in conjunction with Annexure Part A and variations to the
requirements of the Australian Standard are set out in Annexure Part B. These Annexure are included
below in draft form and are to be agreed and finalised during drafting and completion of the final
Contract.
AS 4122-2010 Annexure Part A Item
Item 1
(Clause 1.1)
The Client
(or Principal) is:
Client Name: Chief Executive Officer, The Shire of
Augusta Margaret River
Address: The Shire of Augusta Margaret River
PO Box 61
Margaret River WA 6285
ABN: 13 643 296 019
Is the Client acting as an agent of another person?:
NO
Item 2
(Clause 1.1)
The Consultant is: [Insert before Contract execution]
Consultant Name:
Address:
ABN:
![Page 46: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/46.jpg)
Part 3 READ AND KEEP THIS PART
Page 46 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Item 3
(Clause 1.1)
The Contract Documents are:
The Letter of Award (including appendices); The Scope (the Specification); These General Conditions of Contract; The Special Conditions of Contract; The Purchase Order Terms and Conditions of Purchase (and the purchase Order); The Consultant’s Response to the Principal’s RFT (and any alterations thereafter); and The Principal’s Request for Tender (RFT).
Item 4
(Clause 1.1)
The Scope is:
Outlined in Part 2 of this document as the
Specification.
Item 5
(Clause 5.1)
The purpose(s) for which the Services
will be suitable are:
Lead Architectural services for the design,
documentation and superintendence of the
redevelopment of the Margaret River Cultural
Centre.
Item 6
(Clause 6.1)
The Client’s representative is:
Gary Evershed, CEO
The Shire of Augusta Margaret River
PO Box 61
Margaret River WA 6285
Item 7
(Clause 6.2)
The Consultant’s Representative is: [Insert name and address on before Contract
execution]
Item 8
(Clause
10.1)
Claims for payment must be made on
the following basis:
[Payment option to be confirmed and information inserted before Contract execution] GST inclusive: Yes/No
Lump sum: $to be inserted Claims for Payment of the above lump sum will be made on the following basis:
% of total lump sum
Time for payment claims
TBA TBA TBA TBA TBA TBA TBA TBA TBA TBA
Rates included: Yes/No (delete as appropriate on Contract appointment) Role/Task: Rate$/per hour & day (insert before Contract execution)
Item 9
(Clause
10.2)
Disbursements for which the
Consultant may claim payment:
Not used.
Item 10
(Clause
10.3)
Time to claim payment is no later
than:
The last business day of each month.
Item 11
(Clause
10.6)
The time for payment is no later than:
30 calendar days after service of a payment claim All tax invoices must include reference to: The Contract Reference Number and Title (noted in the
![Page 47: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/47.jpg)
Part 3 READ AND KEEP THIS PART
Page 47 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Letter of Award), Purchase Order number; Quantity; Price per unit; description of work undertaken; and Total invoice value.
All Tax Invoices MUST be sent or supplied by the
Seller to: - Accounts Payable Officer
Shire of Augusta Margaret River
PO Box 61
Margaret River WA 6285
Failure by the Consultant to comply with this may delay payment.
Item 12
(Clause
10.9)
The rate of interest for overdue
payment is:
Not used.
Item 13
(Clause
12.1)
The date or the period after
commencement of this Contact, by
which the Services must be
completed is:
September 2018
Item 14
(Clause 12.3
(c))
Other causes of delay for which the
Consultant may notify an extension of
time:
Not used.
Item 15
(Clause
13.2)
The Approvals to be obtained by the
Consultant are:
As detailed in the Specification.
Item 16
(Clause 18)
The key personnel are:
Name: [insert before Contract execution] Role to be performed: [insert before Contract execution]
Item 17
(Clause
19.2)
Existing conflicts of interest:
[Insert detail of any known conflict of interest that
exists or is likely to arise before Contract execution]
Item 18
(Clause
21.3)
Copyright and other Intellectual
Property Rights, the Alternative that
applies is:
Refer to Annexure B.
Item 19
(Clause 21.3
Alternative
2)
List excluded Intellectual Property
Rights:
Not applicable.
Item 20
(Clause 21.4
Alternative
2)
The additional amount payable to the
Consultant for granting of Intellectual
Property Rights to the Client is:
Not used.
Item 21
(Clause
22.1)
Does clause 22 (Moral Rights) apply?
If yes, the author is:
(for example, the name of the relevant
consultant)
No
Not applicable.
Item 22 The following Documents are All Concept and Schematic Design Drawings by
![Page 48: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/48.jpg)
Part 3 READ AND KEEP THIS PART
Page 48 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
(Clause
23.1)
confidential:
Willcox and Associates, All QS Costings by Wilde and
Woollard.
Item 23
(Clause
24.4)
Maximum period for which Client may
suspend the Services at any one
time, after which the Consultant may
terminate:
No time limit.
(Clause
29.1)
The Consultant’s liability is limited to:
Contract price; or For liability arising out of events or circumstances in
respect of which insurance proceeds are available
under an insurance policy required to be effected by
the Consultant under this Contract, the proceeds
available under those policies, up to the limits of such
insurances as are required by this Contract.
Item 25
(Clause
30.2)
The amount of public liability
insurance is: $20,000,000 in respect of any one occurrence and for an unlimited number of claims.
(The Consultant shall ensure that it has adequate public liability insurance with reputable insurers to cover the liabilities accepted by it under this Contract and for the period of this Contract, and thereafter for a period of 36 months; and shall provide written evidence of this to the Client with their Response).
Item 26
(Clause
30.4)
The amount of the professional
indemnity insurance is: $10,000,000 in respect of any one occurrence and $10,000,000 in the aggregate.
(The Consultant shall ensure that it has adequate professional indemnity insurance with reputable insurers to cover the liabilities accepted by it under this Contract, and shall provide written evidence of this to the Client.)
Item 27
(Clause
30.4)
The professional indemnity insurance
must be maintained for the following
period:
The professional indemnity insurance policy and
cover shall be maintained until the Consultant
completes carrying out the Services required and
thereafter for a period of 7 years.
Item 28
(Clause
30.7)
The Client must effect the following
insurances and maintain them for the
following periods:
As per items 25 to 27; and
Workers’ Compensation Insurance - The
Consultant shall ensure that it has adequate Worker’s
Compensation Insurance to cover the liabilities
accepted by it under this Contract and for the period
of this Contract, and shall provide written evidence of
this to the Principal with their Response. The
insurance will adequately protect the Consultant and
the Principal in respect of liability for payment of
compensation to any Employee of the Consultant or
of a Subcontractor/consultant of the Consultant under
the Workers' Compensation and Injury Act 1981 or at
Common Law of no less than $50,000,000. The
Workers’ Compensation Insurance policy and cover
shall be maintained until the Consultant completes
carrying out the Services required and thereafter for a
![Page 49: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/49.jpg)
Part 3 READ AND KEEP THIS PART
Page 49 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
period of 36 months.
Item 29
(Clause
33.1)
The address for the service of notices
is:
The Client:
Chief Executive Officer
The Shire of Augusta Margaret River
PO Box 61
Margaret River WA 6285
The Consultant:
[Insert before Contract execution]
Item 30
(Clause 35)
The law governing this Contract is: Western Australia
Item 31 Has this Contract been amended from
its original form?
Yes – see Annexure B
AS 4122-2010 Annexure Part B – Deletions, Amendments and Additions
1. The following clauses or parts of clauses have been deleted from the General Conditions in AS 4122—2010: None.
2. The following clauses have been amended and differ from the corresponding clauses in AS 4122-2010:
Clause 21 Copyright and Other Intellectual
Property Rights
Clause 21.1
Add:
The Consultant shall only be entitled to use any such
Intellectual Property Rights licensed to the Client for the
purposes of providing the services and shall cease to use the
same on the termination or expiry of the Contract.
Clause 21.3
Alternatives 1 & 2 have been deleted and replaced with the
following:
The Consultant hereby assigns to the Client absolutely and
irrevocably from any encumbrances or security interests the
Intellectual Property Rights in and to any services or items
developed, written, prepared or produced by the Consultant
(including without limitation the Consultant’s employees,
agents, sub-consultants and subcontractors) in the course of
the services to the extent that they or any part of them are
developed, designed or created for the Client for use in the
Client’s business and all modifications and amendments to the
same which have been or are at any time in the future made by
or on behalf of the Consultant pursuant to the Contract.
The following text is retained:
To the extent the Intellectual Property Rights in or relating to
the Deliverables are not capable of being vested in the Client
![Page 50: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/50.jpg)
Part 3 READ AND KEEP THIS PART
Page 50 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
because the Consultant does not own the Intellectual Property
Rights, the Consultant must obtain an irremovable licence for
the Client to use those Intellectual Property Rights, except for
those rights stated in Item 19.
3. The following clauses have been added to those of AS 4122-2010:
None
3.2 Special Conditions of Contract
Special Conditions of Contract are included below. These conditions are provided in addition to the
General Conditions of Contract above and provide further guidelines, rules and requirements to which
the Consultant will require to adhere under the Contract.
3.2.1 Insurances
The Consultant and its sub-contractors (if any) shall be required to effect and maintain the following
insurance policies:
Public Liability– the sum of at least twenty million dollars ($20,000,000) in respect of any one
occurrence and for an unlimited number of claims.
Professional Indemnity - the sum of at least ten million dollars ($10,000,000) in respect of any one
occurrence and ten million dollars ($10,000,000) in the aggregate.
Worker’s Compensation – the Consultant shall ensure that it has adequate Worker’s Compensation
Insurance (and/or personal accident insurance) to cover the liabilities accepted by it under this
Contract and for the period of this Contract. The insurance will adequately protect the Consultant and
the Principal in respect of liability for payment of compensation to any Employee of the Consultant or
of a sub-contractor/consultant of the Consultant under the Workers' Compensation and Injury Act
1981 or at Common Law of no less than fifty million dollars ($50,000,000).
The Consultant is to provide the Principal with certificates of currency and/or a copy of the policy
wording that the above insurance policies are in place for the entire Contract period.
3.2.2 Occupational Safety and Health
The Consultant (and any sub-contractor/consultant) shall observe all requirements of the
Occupational Safety and Health Act 1984 and the Occupational Safety and Health Regulations 1996
and any amendments that may be made to these from time to time. The Consultant shall also observe
the requirements of the Principal’s Occupational Safety and Health Policy (January 2013) including all
safety rules and guidelines provided prior to commencement of work. The Consultant will be required
to undergo an induction process and acknowledge receipt and understanding of the Principal’s safety
requirements as deemed applicable to the nature of works to be undertaken.
![Page 51: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/51.jpg)
Part 3 READ AND KEEP THIS PART
Page 51 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
3.2.3 Disability Access and Inclusion Plan Consultant Reporting
The Principal’s Disability Access and Inclusion Plan (DAIP) 2014-2016 seeks not only to meet
legislative requirements but to strategically address access and inclusion issues to the benefit of all
community members making the Shire a people friendly place to live, work and visit.
Section 29B of the Disability Services Act (1993) states:
“a public authority that has a disability access and inclusion plan must take all practicable
measures to ensure that the plan is implemented by the public authority and its officers,
employees, agents or contractors”.
The Disability Services Act (1993) sets out the minimum reporting requirements for public authorities
in relation to DAIP’s. The Principal will report on the implementation of its DAIP through its annual
report and on the prescribed proforma to the Disability Services Commission by 31 July each year,
outlining:
its progress towards the desired outcomes of its DAIP;
the progress of its agents and Consultants towards meeting the eight desired outcomes of the
DAIP; and
the strategies it used to inform its agents and Consultants of its DAIP.
As such, Disability Access and Inclusion Plan reporting by the Consultant is required when Contracts
involve the supply of services to the public, and where these are new Contracts or Contract variations.
The requirement for reporting from the Consultant does not apply to services provided directly
to the public authority itself, such as cleaner and rewiring of telephones.
If the Contract involves the supply of services to the public, then the Consultant will:
(i) to the extent practicable, undertake the Contract in a manner consistent with the Principal’s
Disability Access and Inclusion Plan prepared under the Disability Services Act 1993; and
(ii) provide a report to the Principal by the end of the Contract or 15 June in each year of the
Contract Term reporting on the extent to which the Consultant has implemented the
Principal’s Disability Access and Inclusion Plan.
A link to the Principal’s Disability Access and Inclusion Plan and a Guide to Disability Access and
Inclusion Plans for Local Government Consultants can be accessed from the Principal’s website at
www.amrshire.wa.gov.au.
3.2.3.1 Reporting Requirements
The following reporting sheet assists Consultants to record activities consistent with the desired
outcomes of the Principal’s Disability Access and Inclusion Plan (DAIP) 2014 – 2016.
It is noted that not all outcomes will be applicable to the services you provide on behalf of the
Principal.
![Page 52: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/52.jpg)
Part 3 READ AND KEEP THIS PART
Page 52 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Once a year you are required to forward a reporting sheet to the Principal indicating what outcomes
your company has implemented with a brief summary of activities undertaken.
This sheet also serves as a quick reference for all Consultants’ staff about how to provide a more
accessible service.
Reporting Sheet
Ways to provide access for people with disabilities
Making contracted services accessible need not be expensive or complex. Agents and Consultants
should undertake activities that are broadly consistent with the seven desired DAIP outcomes. It
does not necessarily mean that Consultants will replicate every access strategy that the contracting
local government is undertaking in its DAIP.
Examples of accessible services related to each outcome area provided by agents and Consultants
include:
1. People with disability have the same opportunities as other people to access services
and events.
Produce clear and easy-to-read invitations and flyers for events that include contact details.
Ensure that events are held in an accessible venue. Use the Accessible Events Checklist
located on the Disability Services Commission website www.disability.wa.gov.au.
Read the Shire’s Disability Access and Inclusion Plan.
Develop and promote accessible and inclusive events and activities.
2. People with disability have the same opportunities as other people to access
buildings and other facilities.
Provide clear access ways free of boxes, displays and other obstructions.
Use buildings that are accessible - if there is no lift make sure all direct service points are
located on the ground floor.
Avoid abrupt vertical changes of level (kerbs, steps, ruts, gutters) to ensure a continuous
accessible path of travel.
Provide adequate space into doorways and within rooms to allow for wheelchair dimensions
and turning circles.
Place colour contrast strip on steps.
Provide surface finishes that are slip-resistant, evenly laid and free of hazards to minimise
risk of injury.
Provide signage with clear lettering and good colour contrast.
![Page 53: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/53.jpg)
Part 3 READ AND KEEP THIS PART
Page 53 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Provide an appropriate number of ACROD accessible parking bays.
3. People with disability receive information in a format that will enable them
to access information as readily as other people are able to access it.
Be prepared, if requested, to provide information in alternative formats, such as a larger
sized font for brochures.
Provide clear and easy to read information by using a san serif font such as Arial or
Helvetica in a minimum size of 12 point.
Use text of a dark colour to significantly contrast with the background.
Display important information in bold font, avoid using upper case text only, use a minimum
of italics.
Design websites to meet accessibility guidelines developed by W3C.
Provide Auslan interpreters when requested by people who are Deaf or have a hearing
impairment.
Incorporate captioning in DVD and TV advertisements.
Provide business cards with good colour contrast and easy-to-read font size.
4. People with disability receive the same level and quality of service from
staff as other people receive.
Make the DAIP information available to all staff.
Provide staff with information about the needs of people with disabilities and where to
locate extra resources.
Provide disability awareness training for staff who deal with the public.
Improve staff awareness of accessible information needs and how to obtain information
in other formats such as large print, Braille or audio tape.
5. People with disability have the same opportunities as other people to make
complaints.
Accept complaints in a variety of formats such as by telephone, email, written, in person
or with a carer.
6. People with disability have the same opportunities as other people to
participate in any public consultation.
Provide media releases and advertisements about public consultation in both print
and electronic media, including Information on Radio and the website.
Consult people with disabilities in a range of different consultation mediums, for example
![Page 54: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/54.jpg)
Part 3 READ AND KEEP THIS PART
Page 54 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
focus groups, interviews, surveys.
Request information about access requirements from participants prior to
attending consultations.
Hold consultations in accessible buildings.
7. People with disability and from diverse backgrounds have the same opportunities as
other people to be employed by our company.
During recruitment processes comply with the legislative requirements of the WA
Equal Opportunity Act and the Federal Disability Discrimination Act.
Review/audit physical access to work sites for existing/potential employees.
Identify employment barriers and remove where possible.
3.2.4 Consultant Performance
3.2.4.1 Satisfactory Performance of Work
The Consultant shall perform all work under this Contract to the satisfaction of the Principal.
All services rendered shall conform to the Specification and the standards therein.
If the Consultant does not perform the work or any part thereof pursuant to the Contract to the
standards specified, the Principal may exercise any or all of the following options:
Engage another Consultant to perform the work not carried out to the specified standards.
Any monies expended by the Principal under this sub-paragraph shall be recoverable from
the Consultant and may be deducted from any monies payable to the Consultant under the
Contract.
Assess the fair and reasonable cost of performance of the work in respect of which default
has been made and deduct that sum from any monies payable to the Consultant under the
Contract.
Withhold any payment or payments under the Contract until such time as the work or any part
thereof has been carried out by the Consultant to the standards specified.
3.2.4.2 Performance Management
There are three (3) forms of Contractor performance management for this project:
1. Progress Report - as outlined in the Specification the Contractor will be required to submit a
detailed progress report (and updated Project Program of Works) on a fortnightly basis and
issue this to the Superintendent via email;
2. Performance Review Meetings – the Principal may request a meeting with the Consultant at
any time during the project or after a key project milestone;
![Page 55: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/55.jpg)
Part 3 READ AND KEEP THIS PART
Page 55 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
3. Contract Review Date - performance review will also be undertaken at the Contract review
date.
3.2.4.3 Performance Monitoring Methods
The performance of the Consultant’s obligations under this Contract may be monitored by the
following criteria:
Completion of Hold Points and Principal approval (as per the Hold Points agreed between the
Consultant and Principal and identified in the Project Program).
Performance against Key Performance Indicator (KPI) (as per the KPI agreed between the
Consultant and Principal and identified in the Letter of Award).
Regular review, assessment or inspections of work being undertaken by the Principal or an
appointed representative.
Assessment against progress with regards key milestones detailed in the Specification.
Ongoing and ad hoc review of work progress.
Any other performance management monitor specified by the Principal during the project.
3.2.4.4 Failure to Meet Performance Standards
If any review, assessment or inspection as described above discloses a failure by the Consultant to
meet the standards required by the Principal under this Contract, then, without prejudice to the
exercise of any other of the Principal’s rights, the Consultant must take such steps as the Principal
may require to improve the performance or provision of that service to the agreed standard.
3.2.5 Termination
Subject to provisions of the Conditions of Contract in the event of the Consultant failing in any manner
to carry out the Contract to the Principal’s satisfaction, the Principal may forthwith terminate the
Contract and any variations by giving written notice to the Consultant.
3.3 Purchase Order Terms and Conditions of Purchase
In addition to the above, the Consultant will also require to adhere to the Principal’s Purchase Order
Terms and Conditions of Purchase. These are included below:
![Page 56: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/56.jpg)
Part 3 READ AND KEEP THIS PART
Page 56 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
![Page 57: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/57.jpg)
Part 3 READ AND KEEP THIS PART
Page 57 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
![Page 58: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/58.jpg)
Part 3 READ AND KEEP THIS PART
Page 58 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
![Page 59: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/59.jpg)
Part 4 COMPLETE AND RETURN THIS PART
Page 59 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
4 Tenderer’s Offer
4.1 Form of Tender The Chief Executive Officer Shire of Augusta Margaret River PO Box 61 Margaret River WA 6285
I/We (Registered Entity Name): (BLOCK LETTERS)
of: (REGISTERED STREET ADDRESS)
ABN ACN (if any)
Telephone No: Facsimile No:
E-mail:
In response to RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
I/We agree that I am/We are bound by, and will comply with this Request and its associated schedules, attachments, all in accordance with the Conditions of Tendering contained in this Request signed and completed.
The tendered price is valid up to ninety (90) calendar days from the date of the Tender closing or forty-five (45) days from the Council’s resolution for determining the Tender, whichever is the later unless extended on mutual agreement between the Principal and the Tenderer in writing.
I/We agree that there will be no cost payable by the Principal towards the preparation or submission of this Tender irrespective of its outcome.
The tendered consideration is as provided under the schedule of rates of prices in the prescribed format and submitted with this Tender.
Dated this day of 20
Signature of authorised signatory of Tenderer:
Name of authorised signatory (BLOCK LETTERS):
Position:
Telephone Number:
Authorised signatory Postal address:
Email Address:
![Page 60: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/60.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 60 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
4.2 Selection Criteria The following checklists have been provided to assist you with your Tender and should be completed
and returned to the Principal. Where it is necessary to provide additional information please ensure
that all documents are clearly marked with the relevant attachment title to assist the evaluation panel
with their assessment.
4.2.1 Compliance Criteria
Please select with a “Yes” or “No” as relevant and in relation to each compliance criteria:
Table 7 Description of Compliance Criteria
A. Accordance with Conditions of Responding
Tenderers are to provide acknowledgment that you have submitted in accordance with the Conditions of Responding contained in this RFT, including completion of the Offer Form.
Yes / No
B. Licences, memberships and accreditations
Do the details of the licences, memberships and accreditations remain as per those you identified during the EOI process?
If No, and any alterations have occurred Tenderers require to identify this in an attachment labelled “Licences, memberships and accreditations”.
Yes / No
“Licences,
memberships &
accreditations”
Tick if
attached
C. Compliance with the Specification
Tenderers are to provide acknowledgment that your Tender complies with the Specification in Part 2 of this RFT.
Yes / No
D. Compliance with Qualitative Criteria and completion of part 4.2.2
Tenderers are to provide acknowledgment that your Tender is compliant with the Qualitative requirements for this RFT.
Yes / No
E. Compliance with Price Information and completion of part 4.2.3 and 4.3
Tenderers are to provide acknowledgment that your Tender is compliant with the Price requirements for this RFT and that a Price Schedule has been submitted in the format required by the Principal.
Yes / No
F. Compliance with the Delivery Date and Delivery Method.
Tenderers are to provide acknowledgment that your Tender is compliant with the Delivery Date and Delivery Method requirements for this RFT.
Yes / No
G. Business Structure
Do the details of your Business Structure and independent Referees as identified during the EOI process remain applicable and up to date for
Yes / No
![Page 61: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/61.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 61 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
this RFT stage?
If No, please provide updated information in an attachment labelled “Business Structure”
“Business
Structure”
Tick if
attached
H. Financial Capacity
Do the details of your Financial Capacity as identified during the EOI process remain applicable and up to date for this RFT stage?
If No, please provide updated information in an attachment labelled “Financial Capacity”
Yes / No
“Financial
Capacity”
Tick if
attached
I. Conflict of Interest
Tenderers require to confirm that their response to this criterion remains as per the response in the EOI process.
Should any conflict have arisen the Tenderers is required to identify this in an attachment labelled “Conflict of Interest”
Yes / No
“Conflict of
Interest”
Tick if
attached
J. Insurance Requirements
Do the details of your insurance coverage as identified during the EOI process remain applicable for this RFT stage?
If No, please provide updated information in an attachment labelled “Insurance”
For the avoidance of doubt the following insurance requirements continue to apply:
Public Liability Insurance: the sum of at least twenty million dollars
($20,000,000) in respect of any one occurrence and for an unlimited number of claims.
Professional Indemnity: the sum of at least ten million dollars
($10,000,000) in respect of any one occurrence and ten million dollars ($10,000,000) in the aggregate.
Workers Compensation: the Tenderer shall ensure that it has
adequate Worker’s Compensation Insurance (and/or personal accident insurance) to cover the liabilities accepted by it under a Contract. The insurance will adequately protect the Tenderer and the Principal in respect of liability for payment of compensation to any Employee of the Tenderer or of a sub-contractor/consultant of the Tenderer under the Workers' Compensation and Injury Act 1981 or at Common Law of no less than fifty million dollars ($50,000,000).
Yes / No
“Insurance” Tick if
attached
K. General Conditions of Contract
Tenderers should note that acceptance of the Conditions of Contract (as detailed in Part 3 of this Request) will form an important part of the evaluation criteria. Please therefore indicate acceptance through selection of yes or no opposite.
If no, any proposed amendments to the conditions must be clearly identified in an attachment labelled “Conditions of Contract – Proposed Amendments”.
For the avoidance of doubt, unless expressly agreed in writing by the
Yes / No
![Page 62: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/62.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 62 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Principal, any proposed condition amendments accompanying or shown in the Tender (or any of the documents comprised in it) shall not apply at any time, either before or after acceptance of the Tender.
“Conditions of Contract – Proposed Amendments”
Tick if
attached
L. RFT addendums signed and returned (where applicable)
Tenderers are to provide acknowledgment that your Tender is compliant with any addendums issued by the Principal; and that you have ensured your Tender is compliant with the information contained within by way of signature and return of addendum.
Yes / No / Not applicable (no
addendum issued by Principal
4.2.2 Qualitative Criteria
Before responding to the following Qualitative Criteria, Tenderers must note the following:
a) All information relevant to your answers to each criterion are to be contained within your
Tender;
b) Tenderers are to assume that the evaluation panel has no previous knowledge of your
organisation, its activities or experience;
c) Tenderers are to provide full details for any claims, statements or examples used to address
the Qualitative Criteria; and
d) Tenderers are to address each issue outlined within a Qualitative Criterion and any
associated appendix.
Table 8 Description of Qualitative Criteria
A. Preliminary Design Concept
Tenderers must prepare Preliminary Design Concept Drawings (including supporting explanatory notes) for the proposed project and include information in this regard in their Tender submission.
Tenderers must, as a minimum, address the following information and provide in an attachment labelled “Preliminary Design Concept”.
Weighting
60%
The Preliminary Design Concept Drawings should address the design principles, as outlined in ‘Building Creative Environments’ (Department of Culture and the Arts, 2013). Relative weightings of the selection criteria are listed in the brackets, but all items are considered essential irrespective of their weightings.
1. Sustainability and durability (10%)
2. Comfort and Security (5%)
3. Functionality (10%)
4. Flexibility and Adaptability (10%)
5. Accessibility and Legibility (5%)
6. Stimulating and Inspiring (15%)
7. Sensitive and Responsive to the Context (5%)
Mandatory deliverables to be included in your response to this criterion include:
1. A site master plan showing the footprint for stages 1-3 and adjoining
“Preliminary
Design Concept”
Tick if
attached
![Page 63: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/63.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 63 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
buildings scale 1:500 @ A3
2. Preliminary Floor Plans for Stages 1 and 2; scale 1:200 @ A3
3. A south, east and north elevation, scale 1:200 @ A3
4. A minimum of three perspective drawings or artist impressions of the building;
5. Annotated sketches and concept diagrams that clearly articulate how the design has been arrived at and how it will address requirements of this qualitative criteria.
6. An outline specification of proposed materials and finishes.
Further detailed information in this regard and elements that require to be addressed by Tenderers in response to this criterion is provided in Appendix 4.1 of this RFT,
and should be read in conjunction with the background information provided elsewhere in the RFT and the previous EOI.
B. Demonstrated Understanding
Tenderers must provide a detailed response on the process they intend to use to achieve the Requirements of the Specification and therefore demonstrate their understanding. Key factors that require to be demonstrated in your Tender response include:
Value for Money (4%) – the project has an important obligation to the funding bodies
and to the community to deliver excellent value for money within the allocated budget
Continuous Use (4.5%) - Stages 1 and 2 are required to be undertaken sequentially
as much as is realistically possible to allow for continuous use of the facility with minimal disruption to the performances, meetings, events and functions currently booked for the theatre.
Project Timing and Scheduling (4%) – a project of this scale requires effective
program management and sequencing in order to be successfully delivered on time, to budget and to the standard required.
Tenderers must, as a minimum, address the following information and include their response to this criterion in an attachment labelled “Demonstrated Understanding”.
Weighting
12.5%
a) Value for Money:
A preliminary QS Cost Estimate of the concept design provided as a requirement under Criteria A.
How you will provide excellent value for money from within the allocated budget and include detailed commentary in this regard with reference to the Preliminary QS Cost Estimate derived under Criteria A; and overall cost of services for the project.
b) Continuous Use:
The process/methodology for the delivery of the services and in particular evidence of planning to ensure continuity of community use with minimal closure of the complex and the removal of asbestos cement sheeting; and
How you will stage the project to achieve continuous use of the centre with minimal closure of the whole complex.
c) Project Timing and Scheduling:
How you will deliver effective sequencing of deliverables and key milestones in the project program to meet realistic timeframes and to effectively manage potentially controversial elements of the demolition, such as asbestos cement sheeting removal;
“Demonstrated
Understanding”
Tick if
attached
![Page 64: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/64.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 64 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
A revised project program and Gantt Chart; and
Phasing diagrams that indicate how the concept design can be delivered via a phased construction programme, with minimal disruption to the use of the facilities.
Further detailed information in this regard and elements that require to be addressed by Tenderers in response to this criterion is provided in Appendix 4.2 of this RFT,
and should be read in conjunction with the background information provided elsewhere in the RFT and the previous EOI.
C. Key Personnel Skills and Experience
Material and information previously supplied through the EOI process should be resubmitted with the emphasis on demonstrating the relevant experience and qualifications of the personnel to deliver this project and how they will be deployed.
Tenderers are required to also submit an updated and revised list of personnel and sub-contractors to be engaged on the project and to advise how they will be deployed by way of an organisational chart.
Tenderers must, as a minimum, address the following information for key personnel in an attachment and label it “Key Personnel Skills and Experience”.
Weighting
12.5%
a) Their role in the performance of the Contract;
b) Curriculum vitae;
c) Membership to any professional or business associations;
d) Qualifications, with particular emphasis on experience of personnel in projects of a similar requirement;
e) Skills and experience of key personnel for any sub-Contractors/Consultants; and
f) Any additional information.
“Key Personnel
Skills and
Experience”
Tick if
attached
4.2.3 Price
As detailed in Part 1 of this Request the weighted price method is used for evaluation of Tenders and
price will therefore be weighted in the overall scoring including the Qualitative Criteria outlined above.
The weighting allocated to price is indicated below.
Price
Weighting
15%
4.2.4 Summary of weighted criteria
A summary of the weighted qualitative and price criteria is provided below.
Table 9 Summary of Weighted Criteria
Criteria Weighting
A Preliminary Design Concept 60 %
B Demonstrated Understanding 12.5 % C Key Personnel Skills & Experience 12.5 % Price 15 %
Total Weighting 100%
![Page 65: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/65.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 65 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
4.3 Price Information
The ability of the Tenderer to present clear pricing information in the format required is critical, and
unclear / ambiguous presentation or pricing will severely disadvantage a Tenderer during the Tender
evaluation process.
Tenderers must complete the following sections including the “Price Schedule”. Before completing,
Tenderers should ensure they have read this entire Request.
4.3.1 Price Basis
Please select with a “Yes” or “No” below and provide any further information deemed necessary to
support your Tender:
Are you prepared to offer a fixed price and rates for the term of the Contract for and any
Contract extension period(s)? Yes / No
4.3.2 Price Schedule
The Tenderer is required to complete the Price Schedule as per the spreadsheet in Attachment A
and provide any details and justifications as necessary. The Price Schedule requires a Lump Sum
which will form the fixed price basis for the Contract term. Details of personnel hourly/daily rates also
require to be populated.
The lump sum unit costs and key personnel rates provided will also be used as the basis for
calculation of prices for any service that arise during the Contract term or during any extension period
(as relevant), that are additional to or a variation of the scope of work.
The Price Schedule should be submitted with the full Tender documentation as per Part 1 of this RFT,
however it should be included as a separate electronic file to the main Tender documentation and
clearly marked as ‘Price Schedule’.
Before completing, the Tenderer should ensure it has read this entire document and understands the
Requirements.
For the purposes of your Tender to this RFT and provision of Tender pricing, the following
assumptions should be applied:
a) The Tenderer is required to show the indicative price for Stage 1 and Stage 2 in the separate
price schedules, and also provide a combined total of Stage 1 and Stage 2; as contained within
Attachment A.
b) It is acknowledged that a definite cost split for Stage 1 and 2 will be difficult to achieve with regard
‘Phase 2 Concept Design Review and Finalisation’. The Tenderer should therefore distribute
costs for this Phase of the Scope of Work across both stages allocating 60% of total cost to Stage
1 and 40% to Stage 2.
![Page 66: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/66.jpg)
Part 3 READ, COMPLETE AND RETURN THIS PART
Page 66 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
c) Any sub-consultants/contractor(s) and associated costs are also to be identified Attachment A
and included in the overall indicative price.
d) The Tenderer should set this out to clearly to identify how price relates to each separate element
or Phase of the Scope of Work.
e) The Tenderer is required to provide indicative daily and hourly rates of key personnel proposed to
undertake the project as per Attachment A.
f) The Tenderer must include all costs involved in the supply of the services to the Principal, which
are known to the Tenderer at the time of submission. This shall include, but not be limited to,
permits, goods, services, materials, labour rates, levies, duties, taxes, inspection cost, hire of
equipment, delivery fees, including risks and obligations arising from or implied therein.
g) Expenses (including travel, accommodation, subsistence, mileage etc.) should be identified
separately and reflected as a percentage of the resource cost, as set out in Attachment A.
h) All pricing shall be in Australian Dollars shown both exclusive and inclusive of GST.
i) The Tenderer is required to provide a separate list that clearly describe any assumptions made by
the Tenderer in arriving at the indicative price for the work. The Tenderer is also required to
identify any cost overlaps or savings that can be gained between the two stages.
j) Items against which no rate or price is entered in the Tender shall be deemed to be covered by
the other rates and prices shown in the Tender.
k) Costs incurred by the Tenderer in preparing its Tender submission (including, for the avoidance of
doubt, any supporting documentation or information comprised in it) shall be exclusively for the
Tenderer’s own account with the exception of the once off payment of $7,500 for provision of a
Preliminary Design Concept as per Qualitative Criteria A (Part 4).
Any charge not stated in the Tender, as being additional will not be allowed as a charge for any
transaction under any resultant Contract.
![Page 67: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/67.jpg)
Part 4 COMPLETE AND RETURN THIS PART
Page 67 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
4.3.3 Price Discount
The Tenderer is requested to indicate whether it is prepared to offer a price discount by selecting
either “Yes” or “No” below.
Are you prepared to offer a price discount? Yes / No
For the avoidance of doubt, whilst price is a competitive consideration, it is only one aspect of the
Tender evaluation process. The Tender offering the lowest price may not necessarily be successful.
If selecting Yes, the Tenderer is required to specify a percentage discount of the lump sum total
outlined in the Price Schedule. Please complete the tables below to specify the percentage discount
applied and the final lump sum total following discount. Should you require to provide any further
supporting information please include in a separate attachment and label as “Price Discount”.
% Discount to be applied to lump sum total
Total cost (ex
GST)
GST Total cost (inc
GST)
Final Lump Sum Total (including
discount)
![Page 68: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/68.jpg)
Appendices READ AND KEEP THIS PART
Page 68 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendices
Contents
Appendices to Part 1
Appendix 1.1 - Statement of Purchasing Ethics
Appendices to Part 2
Appendix 2.1 - Wilde and Woollard Quantity Surveyor Estimates and other Principal/Richard Stuart
cost estimates
Appendices to Part 3
None
Appendices to Part 4
Appendix 4.1 - Qualitative Criteria A Additional Information
Appendix 4.2 – Qualitative Criteria B Additional Information
Appendix 4.3 - Concept Drawings by Willcox and Associates
Appendix 4.4 - Concept drawings and cost estimates associated with the Soundshell
Appendix 4.5 - Reduced list of technical fit out and audio visual requirements for Stage 1
(Wilde and Woollard Feb 2016)
Attachment A - Price Schedule
![Page 69: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/69.jpg)
Appendices READ AND KEEP THIS PART
Page 69 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
![Page 70: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/70.jpg)
Appendices READ AND KEEP THIS PART
Page 70 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendices to Part 1
Appendix 1.1 - Statement of Purchasing Ethics (April 2016)
![Page 71: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/71.jpg)
Appendices READ AND KEEP THIS PART
Page 71 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
![Page 72: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/72.jpg)
Appendices READ AND KEEP THIS PART
Page 72 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendices to Part 2
Appendix 2.1 - Wilde and Woollard Quantity Surveyor Estimates
and other Principal/Richard Stuart Cost Estimates
![Page 73: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/73.jpg)
Appendices READ AND KEEP THIS PART
Page 73 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendices to Part 4
Appendix 4.1 Qualitative Criteria A Additional Information
Purpose of this Information
The information below is included to assist Tenderers in compilation of their response to Qualitative
Criteria A – Preliminary Design Concept.
Each Tenderer will each receive a once off contribution of $7,500 (ex GST) paid in arrears following
the close of the RFT Tender Deadline and participation in the mandatory presentation to offset costs
associated with preparing and delivering these concepts.
The Tenderer deemed to provide the best quality concept design outcome and greatest overall value
for money, supported by appropriately qualified, skilled and experienced staff and sub-contractors will
be appointed by Council decision to undertake this iconic project.
Supporting Information
In addition to the background information provided in the RFT document itself included as RFT
Appendices is the following material marked “Commercial in Confidence”:
Concept drawings previously completed by Willcox and Associates (Appendix 4.3);
QS Estimates based on the Willcox concept drawing by Wilde and Woollard and other
additional cost estimates by the Shire and Richard Stuart Theatre consultant (Appendix 2.1);
Concept drawings and cost estimates associated with the Soundshell (Appendix 4.4); and
Reduced list of technical fit out and audio visual requirements for Stage 1 (Wilde and Wollard
Feb 2016) (Appendix 4.5).
NB: The material provided above is to be regarded as highly confidential and is not to be
distributed or disclosed to any other parties and must be used for its sole intended purpose
which is to complete the RFT Response.
Project Vision
Council is looking to create an innovative, distinctive, welcoming and highly functional building that
provides good value for money and will foster local arts, entertainment and tourism industries. The
Shire of Augusta Margaret River’s vision is to create a vibrant Hub for Entertainment, Arts and
Regional Tourism (HEART) that will enrich the quality of community life and strengthen and diversify
the Margaret River Region’s economy. The multipurpose complex will be designed to simultaneously
host a range of:
![Page 74: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/74.jpg)
Appendices READ AND KEEP THIS PART
Page 74 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Cultural events, performing arts and festivals;
Visual arts displays and exhibitions;
Cinema screenings and premieres;
Business meetings, expos and conventions;
Satellite events in conjunction with major Iconic Events such as the Drug Aware Surf Pro,
Gourmet Escape and Cinéfest Oz Festivals, and other major regional tourism events;
Indigenous, multicultural and historical events and exhibitions;
Community gatherings, events, celebrations and meetings; and
Support services when required to be used as an emergency evacuation centre for the
Margaret River town site catchment, as occurred during the November 2011 Margaret River
fires.
Project Budget
A total project cash component of $8.55 million (ex GST) (plus Shire in kind administration and project
management support of approximately $200,000) will be made available for the project. This total
budget cannot be exceeded, but the project architect will have a degree of flexibility within the budget
to identify savings and reallocate resources to priority areas. In particular an audit of technical and
audio visual requirements should be undertaken to reassess the technical and audio visual fit out
requirements which currently constitute $1,026,899 of the estimated building costs (ie Stage 1
$492,599 in Stage 1 – Item 160 of Wilde and Woollard QS and Stage 2 $534,300 from Item 276 of
Wilde and Woollard QS Appendix 2.1. (See also notes below table)
A summary of the Wilde and Woollard QS in Appendix 2.1 is provided below:
Wilde and Woollard, Stuart and Shire Cost Estimates (See Appendix 2.1 for detail) Budget Item Cost $ Ex GST
Stage 1 Estimated Building Cost
3,534,643
Furniture and Equipment 260,000
Professional Fees 477,422
Escalation
465,866
MULTI USE SPACE (STAGE 1) TOTAL 4,737,931
Additional Furniture and Kitchen Equipment Excluding Commercial Items (Shire Estimates – See Appendix 2.1)
$258,642
Additional Kitchen Fit Out (Shire Estimates – See Appendix 2.1)
$80,000
Lotterywest Soundshell and Landscaping Contribution 250,000
Total Stage 1 and Soundshell and Landscaping $5,326,573
Stage 2 Estimated Total Building Cost $ 2,679,282
Furniture and Equipment $0
![Page 75: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/75.jpg)
Appendices READ AND KEEP THIS PART
Page 75 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Professional Fees 360,798
Escalation 353,129
AUDITORIUM (STAGE 2) TOTAL 3,393,210
GRAND TOTAL $8,719,783
FUNDING AVAILABLE (Cash) $8,550,000
NB: For the purposes of seeking funding a modified Stage 1 proposal for a reduced scope of works
was developed for the National Stronger Regions Funding (NSRF) application to meet a funding cap
of $3.6 million. The provision for new electrical services, including infrastructure and theatre
equipment was reduced to $290,000 – See Appendix 4.5 Wilde and Woollard Feb 2016. A further list
of equipment has been prepared by Phill Bebb, Technical Manager of Arts Margaret River and
included in the attachments indicating that a reduced level of equipment purchasing may be
undertaken for Stage 1. There is therefore the opportunity to trade off a reduced spending on theatre
equipment and audio visual requirements if hard infrastructural needs can be accommodated.
In response to Qualitative Criteria A Tenderers will need to incorporate the following additional items
which have emerged from stakeholder feedback since the Willcox and Associates concept drawings
were completed. The items will also need to be identified as individual cost items for the purpose of
the budget and decisions will be made at later date as to whether they will be included in the detailed
drawings for the construction tender:
1. All weather covering for the courtyard but still maintaining airflow and an al fresco feel
2. Provision for an improved stage functioning with trap doors and other improvements
3. Consideration as to whether infrastructure could be provided to allow for additional seating for
100-120 people on an upper floor level at a later date when funding became available and to
meet future population growth
4. Consideration as to whether the sound shell is a separate feature or whether it is an integral
extension of the multi-purpose space
Design Concept Brief
Tenderers will require to critically examine and review the concept designs created by Willcox and
Associates with a view to developing an inspirational and functional design solution which addresses
the following principles of good design, as outlined in ‘Building Creative Environments’ (Department of
Culture and the Arts, 2013).
1. sustainability and durability
2. comfort and security
3. functionality
![Page 76: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/76.jpg)
Appendices READ AND KEEP THIS PART
Page 76 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
4. flexibility and adaptability
5. accessibility and legibility
6. stimulating and inspiring
7. sensitive/responsive to context.
These principles as applied to the HEART project are expanded upon in the text below.
Possibilities and Constraints
Tenderers are to take a flexible approach to the project by being aware of the following possibilities
and constraints:
Encroachment onto the existing nutrient stripping rain garden area for siting the sound shell is
possible as the rain garden may be partially decommissioned and reduced in size due to
rising dampness in the adjacent basketball courts possibly caused by underground stream
flow exacerbated by the rain garden.
The creation of a multi-purpose space should not be compromised and constrained by the
rigid re-use of the squash courts if it is more cost effective and creates greater functionality by
partial or full demolition of the courts and adjoining wet areas. However, the use of wooden
flooring suitable for dance classes is desirable to be retained if possible within the facility as
dance provides an important income stream contributing to the ongoing viability of the
complex. Strong consideration should be given to recycling materials on site in the case of
any demolition.
The implementation of Stage 3 which is a convention space at the front of the existing cultural
centre is a long term concept which has little political support at this time. The size of the
convention room will be constrained by services such as Telstra and water along the front
boundary line as well as the location of the existing landscaping and public art. The
community also highly values the mature gum trees, melaleuca and grassed area at the front
of the cultural centre. The concept design should not be constrained by encroachment onto
the grassed area at the front or in providing an inspirational architectural statement to
Wallcliffe Road and the civic square. The design should deliver a stand-alone Stage 1 and 2
complex with Stage 3 to be considered unlikely to occur in the future.
The location of the kitchen should be critically examined. The kitchen is required to produce
food to serve to the central foyer, multi-purpose space and to the basketball court when used
for dinners of up to 500 people. The ability to deliver meals without conflicting with patrons is
vitally important and requires further development and careful consideration in the siting of the
kitchen.
A considerable amount of money has been spent on back of stage areas following the Stuart
Report with lighting upgrades, lighting bar systems, flytower system, reconfigured loading
dock, stage curtains and cyclorama, green rooms etc. It is envisaged that a minimal amount
![Page 77: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/77.jpg)
Appendices READ AND KEEP THIS PART
Page 77 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
of time will be spent on revisiting the works completed to date in the back stage area with the
focus on the refurbishment and renovation of the theatre. Improving the functionality of the
stage itself is to be considered if not cost prohibitive.
The location of a disabled toilet in the courtyard area will probably decrease the functionality
of the courtyard area and may be able to be catered for already in the existing wet area
locations with unisex facilities. The courtyard can be made into a feature of the project and a
key stakeholder has requested the Principal consider some form of weather protection as the
cold and wet winter months render the space unusable.
Wherever possible the existing landscaping should be incorporated into the project with
rework minimised albeit the rock stream and rain garden are likely to be impacted.
Required Improvements (Repeated from Previous Section)
Tenderers require to address identified major deficiencies highlighted by the Stuart Report and the
architectural review of the centre as summarized below:
Outdated general ambience and presentation. The centre is in dire need of a major
refurbishment and redevelopment. The auditorium needs to be softened to make it more
welcoming, appealing and comfortable for audiences and requires acoustic treatment to improve
sound quality. The lack of hanging space is sub-optimal in presenting art works and for hosting
larger exhibitions and permanent displays in the foyer, which is exacerbated the dark and
uninviting nature of the foyer. The façade of the Cultural Centre and the adjacent squash court
section of the Recreation Centre are poorly presented from an aesthetic viewpoint and detract
from the new Civic and Administration Centre and the public space between the two buildings.
Lack of climate control. Efficient heating and cooling need to be installed throughout the
buildings to meet contemporary patron comfort expectations. The building is cold in winter which
is when visitation needs to be boosted to offset the seasonal downturn for tourists.
Unacceptable disability access arrangements. Disability access arrangements for access and
egress to and within the venue is inadequate, including the absence of automatic opening entry
doors, toileting/parenting facilities and a lift to the upper floor. Redevelopment will aim for full
compliance with the BCA in terms of universal access requirements.
Inadequate and poorly located bar, kitchen and catering facilities. The current kitchen opens
into the main auditorium to allow catering for functions of a cabaret style. There is no sound lock
from the kitchen to the auditorium so noise penetrates into the theatre. To service the expanded
HEART complex, a new strategically located commercial kitchen will be incorporated into the
design. This will enable food to be prepared and delivered to all sections of the facility. Bar
facilities will likewise be reoriented to service the new connecting foyer. The new connecting foyer
will become an area to host pre-event functions or for functions in its own right.
![Page 78: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/78.jpg)
Appendices READ AND KEEP THIS PART
Page 78 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Photos showing the poor general condition of the Asbestos Roofing and Gutters
Asbestos requiring removal. The side wall
cladding of the Cultural Centre, squash courts and
basketball court are constructed from corrugated
asbestos cement sheeting, as is the roofing of the
Cultural Centre (refer Figure 3). Overall the
condition of the asbestos is rated as ‘poor’ to ‘fair’
and there are visible signs of wear and tear
indicating that replacement in preference to
sealing will be required in the near future. The
safe removal and replacement of asbestos
cement sheeting is the highest priority from a
community and venue user health and safety viewpoint.
Outdated toilet and washroom facilities. The toilet facilities at the Cultural Centre and squash
courts are tired and need a major refurbishment including the replacement of pans, cisterns, tiling
and wash basins.
Inadequate Office accommodation. The Cultural Centre was originally constructed with a single
box office. A general office of 2.5m x 4m was created as a temporary measure several years ago
to meet the needs of Arts Margaret River Inc. Office space has been created in an ad hoc fashion
and is inadequate to service the existing centre and planned upgraded complex. There is no
dedicated staff room and shower/change room facilities and no area for volunteers to relax or
change.
Inadequate storage. Currently storage is inadequate to meet the centre’s future needs and an
increase in storage is factored into the project.
Design Principles
Tenderers are required to address the design principles, as outlined in ‘Building Creative
Environments’ (Department of Culture and the Arts, 2013). Relative weightings of the sub-
components of Qualitative Criteria A are listed in the brackets, but all items are considered essential
irrespective of their weightings.
1. Sustainability and durability (10%)
Tenderers are required to demonstrate their Green Credentials by demonstrating how ESD
Applications and Whole of Life Cost Minimisation has been applied and incorporated into the
design concept. Tenderers require to identify how any or all of the following elements will be
incorporated:
A. Energy and water savings;
B. Thermal Mass;
C. Air flow;
![Page 79: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/79.jpg)
Appendices READ AND KEEP THIS PART
Page 79 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
D. Solar Energy Systems;
E. Storm water capture and nutrient stripping rain gardens
F. Orientation;
G. Shading; and Lighting;
H. Use of recycled materials including details of which existing building structures will be
retained or modified and how they will be incorporated into the new design;
I. Use of robust low maintenance materials and reduced whole of life costs; and
J. Designing spaces efficiently to minimise staffing supervision costs.
2. Comfort and Security (5%)
The HEART facilities will need to be attractive, inclusive and safe for users and the general public.
Tenderers require to demonstrate a design that will cater for:
A. Patron comfort and ambiance;
B. Climate control;
C. All hour access for day and night time usage;
D. All seasons comfort especially during the bleaker winter weather months;
E. High level security and passive surveillance requiring minimal staffing; and
F. Clear separation of front of house and back of house activity.
3. Functionality (10%)
The HEART facilities will require a high level of multi-purpose functionality. Tenderers are
required to demonstrate a well advanced consideration of building functionality including:
A. Effective acoustic treatments to eliminate noise emanating from separate functions, from
heavy rain falling on the roofs and walls and to enhance the patron listening experience from
performances and presentations;
B. Lighting systems;
C. Communication systems;
D. Front of house and foyer facilities including box office & reception, admin and staff/ volunteer
facilities, pre and post event functions with adaptability for art exhibitions and stand-alone
functions (Provision should be made to accommodate up to 10 staff and 20 volunteers at any
one time, although some large functions will require more casual and contract staff.
Accommodation will be required both front of house and back of house);
E. Food and beverage servicing and facilities including the location of commercial kitchen and
bar facilities, distribution of food and beverage to avoid or minimise conflict with patrons;
![Page 80: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/80.jpg)
Appendices READ AND KEEP THIS PART
Page 80 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
F. Proscenium theatre refurbishment with permanent seating and stage improvements;
G. Multi-purpose space (old squash courts conversion);
H. Enhanced multi-purpose basketball area;
I. Outdoor spaces – Internal courtyard, Sound shell and landscaping;
J. Backstage operations;
K. Centre servicing access and egress for supplies, food, beverage, waste management,
scenery and props, exhibitions etc;
L. Plant location e.g. air conditioning, electrical etc.; and
M. Universal accessibility for patrons, actors, visitors and staff.
4. Flexibility and Adaptability (10%)
The HEART complex is required to be flexible and adaptable as community needs and social and
economic circumstances and technology change over time. Tenderer require to consider this in
developing a fresh design concept.
Spaces will need to be multi-purpose and multi-functional to create the flexibility and adaptability
over the life of the facilities to achieve the Principal’s vision for the complex (see Project VIsion).
The complex will also need to be designed to maximise a commercial return from food and
beverage sales, hosting conferences and events, community and commercial hires, cinema
screenings and user pays activities.
The venues will need to cater for a variety of audience size, different seating configurations for
various functions, visual art exhibitions, winter and summer usage, day and night activities, indoor
and outdoor activities, people with arrange of different abilities, etc. Technological systems such
as lighting, sound, audio visual and mechanical devices need to be flexible to cater for the range
of activities and configurations. For additional information refer to page 93 of the “Building
Creative Environments” publication on the DCA Website Appendix 1.
5. Accessibility and Legibility (5%)
Tenderer are required to factor into the design concept:
excellent universal access and inclusion for people with the full range of disabilities
including but not limited to mobility and sensory impairment for both patron and staff
areas;
excellent access for seniors, nursing mothers and parents with children;
clear legibility and ease of navigation both physically and conceptually from the street and
car parking areas, along pathways and within and through the complex to various
facilities and venues;
![Page 81: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/81.jpg)
Appendices READ AND KEEP THIS PART
Page 81 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
ease of access for embarking and disembarking patrons being dropped off at the
complex; and
accessibility for loading and unloading sets and exhibitions, managing waste, handling
deliveries etc. without conflict with patrons.
6. Stimulating and Inspiring (15%)
The Principal’s expectation is that this building should be a landmark creative and inspirational
architectural statement which is at the cutting edge of design but at the same time fully functional,
user friendly and delivered within budget.
A Shire “Percent for Art” policy will apply but it is expected that a higher percentage of art will be
incorporated into the design of the building itself given that it is an arts centre.
Consideration should be given to the use of the fly tower as space for art, creative lighting effects
or the general promotion of the facility.
Margaret River is a prestigious international brand for premium wines, surfing, gourmet food,
creative industries and a beautiful natural environment. Many fine examples of architecture are to
be found in local wineries and resorts. The building should showcase the Margaret River brand
and the creative energy of its people and be a statement of which we can all be proud.
7. Sensitive and Responsive to the Context (5%)
The redevelopment will complement the adjacent $13.2 million architectural award winning Civic
and Administration Centre and complete the important Civic, Cultural and Recreational precinct of
the townsite. It will help in revitalizing the central business district of Margaret River, which is the
state’s premier regional tourist destination for interstate and international visitors.
The project will also support the state’s $65 million investment in the Busselton Margaret River
Regional Airport by providing excellent facilities for interstate conferencing and tourist related
events.
The Principal does not want to see a mirror image of the existing civic centre building but a fresh
design which will both complement and contrast with the adjacent Civic and Administration
Centre. The HEART project needs to be a unique building because it has a completely different
and independent function from the civic centre with a strong mix of commercial, cultural and
community uses.
![Page 82: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/82.jpg)
Appendices READ AND KEEP THIS PART
Page 82 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendix 4.2 Qualitative Criteria B Additional Information
Purpose of this Information
The information below is included to assist Tenderer in compilation of their response to Qualitative
Criteria B – Demonstrated Understanding.
Tenderer will need to have a clear understanding of the project and in particular the following
requirements:
1. Value for Money (4%)
2. Continuous Use (4.5%)
3. Project Timing and Scheduling (4%)
Relative weightings of the sub-components of Qualitative Criteria B are listed in the brackets, but all
items are considered essential irrespective of their weightings.
Value for Money (4%)
The project has an important obligation to the funding bodies and to the community to deliver
excellent value for money.
Provision of the preliminary QS Cost Estimate is a mandatory requirement of this Qualitative Criteria
in relation to the Preliminary Design Concept developed under Criteria A.
The final design concept produced by the successful Consultant once under Contract will be required
to be costed by a suitably qualified and experienced Quantity Surveyor engaged by the Consultant to
indicate how the budget will be allocated to achieve a fully functional building with a number of multi-
purpose venues, to meet all professional fees, contingencies, furniture and fit out, technical
equipment and cost escalations.
Continuous Use (4.5%)
Stages 1 and 2 are required to be undertaken sequentially to as much as is realistically possible allow
for continuous use of the facility with minimal disruption to the performances, meetings, events and
functions currently booked for the theatre.
Once Stage 1 is completed and opened, it is envisaged that patrons will be able to access the
facilities constructed in Stage 1 while the theatre is fully renovated and Stage 2 is undertaken. The
goal will be to achieve minimal closure of the whole complex by maintaining at least one part of the
facilities open for the public to access.
![Page 83: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/83.jpg)
Appendices READ AND KEEP THIS PART
Page 83 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Tenderers are required to explain how this will be planned and achieved and what are the likely
impacts and issues which this requirement will throw up.
Project Timing and Scheduling (4%)
Tenderers will have a much greater understanding of the project having completed the EOI process
and are required to resubmit their project program accompanied by a Gantt Chart highlighting the key
milestones and referencing the tasks required to be undertaken from inception to close out.
The Principal has made a commitment to the State Government that asbestos removal will be
undertaken if possible during the school holidays given that the St Thomas More Primary School is
directly across the road from the Cultural Centre. It is anticipated that a closure of 3-4 weeks will
occur during the 2017-18 school holidays to remove and replace the majority if not all of the asbestos
cement sheeting from the complex. 292
![Page 84: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/84.jpg)
Appendices READ AND KEEP THIS PART
Page 84 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendix 4.3 Concept Drawings by Willcox and Associates
![Page 85: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/85.jpg)
Appendices READ AND KEEP THIS PART
Page 85 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendix 4.4 - Concept drawings and cost estimates associated
with the Soundshell
![Page 86: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/86.jpg)
Appendices READ AND KEEP THIS PART
Page 86 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Appendix 4.5. - Reduced list of technical fit out and audio visual
requirements for Stage 1 (Wilde and Woollard Feb 2016)
![Page 87: Request for Tender - Consultants · The Principal has a requirement to engage an appropriately qualified and experienced Lead Architectural Consultant for the provision of “turn-key”](https://reader034.vdocument.in/reader034/viewer/2022052020/6033b13c8e1e6f60e5273854/html5/thumbnails/87.jpg)
Appendices READ AND KEEP THIS PART
Page 87 of 87 RFT COR/28 – 05/17 Architectural Services for the Margaret River Cultural Centre (HEART) Redevelopment Project
Attachment A – Price Schedule