requirements for bias, low voltage and control signal ... › ... › tms_cables_apr2016_v1.pdf ·...

21
Requirements for Bias, Low Voltage and Control Signal Distribution Theresa Shaw [email protected] 21 April 2016 Single Phase ProtoDUNE Warm Interface Board Working Meeting 4/21/2016 1

Upload: others

Post on 06-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Requirements for Bias, Low Voltage and Control Signal Distribution

Theresa [email protected]

21 April 2016

Single Phase ProtoDUNEWarm Interface Board Working Meeting

4/21/20161

Page 2: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Cable Requirements

Important Aspects of Cables and Connectors• Must conform to Grounding/Shielding Plan

– Review by Grounding/Shielding Committee

• Must conform to Safety Standards– Cables and Connectors should be rated/tested for conditions

• Cold Cables should be tested in Materials Test Stand

• Other aspects– Cable strain relief

– Mechanical fit

– “Easy” to Install

– Robustness

4/21/20162

Page 3: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Shielding Cable Penetrations

4/21/20163

Page 4: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

ProtoDUNE Infrastructure Grounding

Documentation gathered in dune docdb 879

4/21/20164

Page 5: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

4/21/20165

Page 6: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

ProtoDUNE Grounding

4/21/20166

Page 7: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

ProtoDUNE Grounding Points

4/21/20167

Page 8: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

List of Cables which Penetrate Cryostat

APA Readout (6 APAs in ProtoDUNE)• 20 FE Signal/Control Cables• 20 FE Power Cables• 10 PD Readout Cables

Other• Wire Bias Cables (HV)• Drift HV• Camera System

• Calibration systems

• Purity Monitors

4/21/20168

Page 9: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Cold FE Board Cables

Each FE Board will require two cables• Signal/Control Cable

– 12 Differential Signal Pairs• Will carry high speed data and control signals

• Power Cable– Will carry power to FE Analog Mother Board and FPGA Mezzanine

• 14 wire (7 Voltage/Return Pairs)

• 20 AWG

4/21/20169

Page 10: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Current Design

10

Input connectors on the back of the box (straight connector from the FEM).

Bottom edge of the box leak tight to trap and divert boil off gas

Box opening in line with the data cable to minimize cable bending

Right angle power connector to reduce box thickness

Plugged in

BNL

Page 11: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

4/21/201611

BNL

Carries Data/Control

Page 12: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Low Voltage Cable

4/21/201612

BNL – From Matt

Page 13: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Photon Detector Cables

Plan for ProtoDUNE• Use multi‐conductor twisted pair with individual shield,

Teflon jacket, CAT6A • The cable has 4 twisted pairs in one jacket • Plan to read out gang of 3 SiPM

4/21/201613

Page 14: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

4/21/201614

Page 15: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

A Combined TPC + PD Nozzle

14” CF flange for the cold electronics and bias cables from TWO APAs

10” CF flange for the PD cables from TWO APAs plus 4 DB15 connectors

10” pipe, 12” CF flange for the cryostat nozzle

Lifting the field cage panels through these ports remains possibility.

15

BNL

Page 16: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Integrated Cable Strain Relief and Baffle

Simple baffle plate to create local high velocity purging flow

16

Baffle plug pushed into the crossing tube to create high velocity gas flow over extended distance

BNL

Page 17: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

CE Signal Feedthrough Flange Construction

The flange is constructed from a standard 14” CF flange, sliced into two halves, with a PCB glued in between.

The PCB has 40 power connectors and 40 data connectors on the cold side. On the warm side, 10 edge connectors supply the power, and 10 connectors link the data lines.

12 SHV ceramic feedthroughs are welded on the flange. They provide the bias voltages for the wire planes and the electron diverters.

The ribs on the flange keep the deformation of the PCB due to cryostat pressure minimal.

17

BNL

Page 18: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

High Voltage

4/21/201618

Page 19: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

APA Bias Schematic Diagram

19

BNL – From Bo Yu

Wire Bias

Page 20: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

Wire Bias Cables

Wire Bias Cables• SHV connectors

• HV filter should be incorporated on APA CR Boards

• At feedthrough port we want to follow grounding/shielding guidelines

4/21/201620

Page 21: Requirements for Bias, Low Voltage and Control Signal ... › ... › tms_cables_APR2016_v1.pdf · 21 April 2016. Single Phase ProtoDUNE. Warm Interface Board Working Meeting. 1 4/21/2016

HV System Schematic Diagram

21

BNL – From Bo Yu

HV Cable