Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, UNHSC Dan Bourdeau, Geosyntec Maine Stormwater Conferense 11/17/2015

Upload: dolien

Post on 06-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Research and BMP Installation Considerations at a Municipal Snow Dump Facility

James Houle, UNHSCDan Bourdeau, Geosyntec

Maine Stormwater Conferense11/17/2015

Page 2: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Special Thanks

City of Portsmouth, NH

• Brian Goetz

• Peter Britz

UNHSC

• Tim Puls

• Tom Ballestero

Geosyntec

GISCC Team

Page 3: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Water in the solid phase

Page 4: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Snowfall (in) SWE

1/27/2015 14.28 1.19

1/30/2015 2.52 0.21

2/2/2015 4.56 0.38

2/5/2015 2.04 0.17

Totals 23.4 1.95

Page 5: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 6: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 7: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 8: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 9: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 10: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 11: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Portsmouth Snow Dump

Page 12: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 13: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 14: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 15: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 16: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Snow LoadingAnnual Snow Loading Estimate:

• 59.9 inches of snow per year 1981-2011 (NCDC, 2015)

• 33 Acres of road surface

• 7.1M CF (164 AC FT) snow exported from the city streets

• 5.31 SWE gallons

Page 17: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Snow Loading

• TSS Load in Snow based on EMCs from a Alaskan DEC study (CH2M Hill, 2006).

• Limited DataRange TSS EMC (mg/L) TSS (lb/year)

Low estimate 30 13,400

High estimate 1398 622,600

Page 18: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Bioretention Design

Page 19: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Bioretention Design

Hydraulic and Pollutant Loading

– Pretreatment

– Static sizing due to unknown nature of a snow and pollutant load

– Meet NH DES design criteria for WQV (1 inch)

Page 20: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Bioretention Design

Pretreatment • Dual chambered pretreatment tank

• Concrete apron around inlet

• Accessible location during snow stockpile activities

Page 21: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Bioretention DesignBioretention Cell• Filter Area = 1280 SF• Media Depth = 1.25 FT• Salt tolerant vegetation• Site location to keep bioretention from snow stockpile

Page 22: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Bioretention Design

Maintenance Frequency– 260 cubic feet per year sediment loading

– 130 cubic feet of sediment pretreatment capacity

– Biannual cleaning

– Biweekly inspections during snow stockpiling activities

– Hooded outlets to trap floatables and debris

– Easy access during snow stockpiling activities

Page 23: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Results

Page 24: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Pile Volume (ft3) Water Equiv (gal)

Ave Annual Total 793,108 3,747,827

Project Totals (Ave Annual)

Page 25: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

2014 Winter

Page 26: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

2015 Winter

Page 27: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 28: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible
Page 29: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

TSS Zn Cu TN TP Cl

Ave Annual Total 42,570 21 5 143 28 22,034

Total Remaining 36,044 17 4 116 23 16,709

Total Exported 6,526 4 1 27 5 16,709

Total Exported w/ BMP 848 1 0 11 2 16,709

Total Removed w/ BMP 5,678 4 1 16 3 0

Total Removed 41,722 20 4 132 26 5,324

%RE Snow Dump only 85% 80% 81% 81% 82% 24%

%RE Snow Dump w/ BMP 98% 97% 98% 92% 92% 24%

% Export Rate 15% 20% 19% 19% 18% 76%

*%RE = Percent Removal Efficiency; BMP = Best Management Practice (Bioretention System in this example)

Project Totals (Ave Annual) Kg

Page 30: Research and BMP Installation Considerations at a ... … · 17.11.2015 · Research and BMP Installation Considerations at a Municipal Snow Dump Facility James Houle, ... •Accessible

Conclusions

• Snow management in a urban area is a BMP!

• Simple runoff management strategies for snow dump areas can increase pollutant load reductions dramatically