Research on The Long Term Performance of Energy Piles®
(Field Installation)
Echo Ouyang, Kenichi Soga
Geotechnical and Environmental Research Group
Department of Engineering
University of Cambridge
Outlines
• Issues being raised from previous experience @ Lambeth College.
• Long term Energy Piles® monitoring programme set up for @ Bankside, London.
• Future prospects and challenges.
Issues to be explored…
• Energy aspect:
– Thermal properties of soil material.
– Efficiency of energy extraction.
• Geotechnical aspect:
– Influence of geothermal energy extraction to the changes in soil material and affects to the adjacent infrastructure.
– Long term thermal cycles to the geotechnical performance of energy piles group.
Long term
monitoring
Future
pro
spects
Field test
Long Term Monitoring Project @ Bankside
• Long term monitoring programme setup.
Pile Info Dry (ε) Wet (ε) Dry (T)
Dia (mm.) 1200
Pile length (m) 30 50 30
Load (kN) 4650 13000 700
No of energy loops 4 4 4
VWSG 20 24 -
OFS - ε(loops) 2 2 -
Thermistor 2 2 -
OFS – T (loops) 2 2Inst
rum
en
-ta
tio
n
Long term
monitoring
Future
pro
spects
field test
Instrumented EPs (Strain & Temperature)PPL = 0.3 mOD
Made Ground
Terrace Deposit
1280 dia.
13
00
50
00
London Clay
70
00
1200 dia.
A A15
00
01
20
00
8H40
-51.0 mOD
8H20
12
00
01
50
00
B B
VWSG * & Thermistor Set
Reinforcement bar
Geothermal tube
Clamped FOS-ε *
FOS-T *
* Vibrating Wire Strain Gauge (VWSG);
* Fibre Optic Sensor, Strain Cable (FOS-ε)
* Fibre Optic Sensor, Temperature Cable (FOS-T)
Section A-A: Cross section of
strain test pile No 203
Section B-B: Cross section of
strain test pile No 203
8H25
8H25
8H40
8H20
1200 dia.
1280 dia.
A A
71
00
-2.625 mOD
15
00
01
50
00
-31.5 mOD
8H40
8H40
500
B B
Section A-A
Section B-B
8H40
8H40
H12
Long term
monitoring
Future
pro
spects
field test
Instrumentations
Strain OFS
Temperature OFS
Optical Fibre Strain Sensors (OFS) Vibrating Wire Strain Gauge (VWSG) and Thermisters
Long term
monitoring
Future
pro
spects
field test
Schematic layoutLong term
monitoring
Future
pro
spects
field test
Pile InstallationLong term
monitoring
Future
pro
spects
field test
Pile Installation – The 50m long Energy Pile®Long term
monitoring
Future
pro
spects
field test
Challenges
• Long term thermal cyclic loading effects on energy piles group.
• Differential settlement control
Time evolution
Dif
fere
nti
al s
ettl
emen
t
Building tilting
Long term
monitoring
Future
pro
spects
field test
Acknowledgements