reserve items are classified as items that are : the association’s responsibility have a limited...
TRANSCRIPT
Reserve Items are Classified as Items that are :
• The Association’s Responsibility
• Have a Limited Useful Life
• Have a Remaining Expected Useful Life
• Have a Replacement Cost Above $2,500
• Broken Down by Property Class– External Building
Components– Internal Building
Components– Service Components– Site Components– Pool Components– Other Components
What Level of Detail we Talking?
• 145 page Document
• 95 Components Reviewed in the Reserve Study in 6 Property Classes
• Example of Component Detail– Balcony Railings
For All Components• Estimated Quantity
& Replacement Cost• Component
Condition, Useful Life, Age, and Replacement Years
• Images with Comments/Special Conditions
• Schedule of Replacement Cost over 30 year period
Non-Reserve Items are Classified as Items that are :
• Operating Budget Components– Items funded through
operating budget– Items with replacement
cost less than $2,500
• Components Maintained by Others– Government, Utilities,
Other Vendors
• Long Lived Components– Components that have
Useful Life greater than 30 Years
• Unit Owner Resposibilities – Components in Their
Individual Units
Fully Funded Reserve : Year 1
•Reserve of $280,500 in Year 1
•Annual increase at 2.9% for inflation
•No Projected Special Assessments in 30 Year Term
•Monthly Increase/Unit2 BDRM - $121.533 BDRM - $127.93STUDIO - $97.51
Fully Funded Reserve : Year 1
Stepped Funding 5 Year Plan
•Reserve of $66,164 in Year 1•Annual increase at $25-$30 for 5 years then 2.9% for inflation•Projected Special Assessment
Year 2 ($50,000) &Year 3 ($40,000)
• Monthly Increase/Unit2 BDRM - $28.793 BDRM - $30.51STUDIO - $23.62
Stepped Funding 5 Year Plan
Comparison of Reserve FundingFully Funded Year 1
• Reserve of $280,500 in Year 1
• Annual increase at 2.9% for inflation
• No Projected Special Assessments in 30 Year Term
• Monthly Increase/Unit for Reserve Account– 2 BDRM - $121.53– 3 BDRM - $127.93– STUDIO - $97.51
Stepped Funded 5 Year Plan
• Reserve of $66,164 in Year 1• Annual increase at $25-$30
for 5 years then 2.9% for inflation
• Projected Special Assessment Year 2 ($50,000) &Year 3 ($40,000)
• Monthly Increase/Unit for Reserve Account– 2 BDRM - $28.79– 3 BDRM - $30.51– STUDIO - $23.62
2016 Budget Comparison 2015 Budget
2016 Budget Variance
Insurance-for Common Areas, including Personal Property, Casualty & Liability
65,000 84,000 19,000
Utilities-Electric, Water & Sewer, Gas and Telephone 525,000 535,000 10,000
Satellite Television 40,000 90,000 50,000
Landscape & Grounds Maintenance 77,000 85,000 8,000
Common Area Maintenance- deep cleaning, time and material 70,000 107,000 37,000
Office, Postage & Annual Meetings 1,600 1,356 (244)
Common Equipment- Contract (Elevator) 86,000 90,000 4,000
Security 30,000 30,000 -0-
Rubbish Removal 32,000 27,000 (5,000)
Parking Lot Maintenance, Repair (time and materials - including easement areas)
15,000 15,000 -0-
Pool Supplies and Labor 79,500 90,000 10,500
Reserve for Replacement- Common Areas 15,000 66,164 51,164
Indoor Amenity Fee 260,000 260,000 -0-
Association Management Fee and Legal 42,000 42,000 -0-
FF&E Reserve Study (2015) 6,200 (6,200)
Pest Remediation 15,000 15,000
Total Association Expenses $1,344,300 $1,537,536 $193,236
2016 Monthly Budget by Unit Type 3 BedroomDoble
2 BedroomGrande Studio
Insurance-for Common Areas, including Personal Property, Casualty & Liability
38.73 36.55 29.99
Utilities-Electric, Water & Sewer, Gas and Telephone 246.70 232.78 191.03Satellite Television 41.50 39.16 32.14Landscape & Grounds Maintenance 39.20 36.98 30.35Common Area Maintenance- deep cleaning, time and material 49.34 46.56 38.21Office, Postage & Annual Meetings 0.63 0.60 0.49Common Equipment- Contract (Elevator) 41.50 39.16 32.14Security 13.83 13.05 10.71Rubbish Removal 12.45 11.75 9.64Parking Lot Maintenance, Repair (time and materials - including easement areas)
6.92 6.53 5.36
Pool Supplies and Labor 41.50 39.16 32.14Reserve for Replacement- Common Areas 30.51 28.79 23.62Indoor Amenity Fee 119.89 113.13 92.84Association Management Fee and Legal 19.37 18.27 15.00FF&E Reserve Study (2015)
Pest Remediation 6.92 6.53 5.36
Total Association Expenses 709 669 549
Budget Variances 2015 v. 2016• Reserve For Replacement – Common Areas $66,164
– Increase from previous set reserve amount in 2015 to the 7 Year Stepped funding of the Reserve Study recommendations.
• Satellite Television & Internet $90,000– Installed Access Points in Individual Units, 3 year lease on equipment
which includes all service, maintenance, and 24-hour support.– This breaks down to $12 per Key per Month.
• Common Area Maintenance $107,000– General Increase based on the Operating Expenses of the Common
Area.– Staying with the Reserve Study Recommendations can help limit
future increases. If items aren’t replaced in their useful life, this may grow.
Major Contibuting Factors• Pest Remediation $15,000
– The Association Board voted to add this budget line item. CVR Management and the Association are spliting the cost of treatments.
• Pool Supplies and Labor $90,000– Increase in Costs of the Pool Supplies and More Labor necessary to
Maintain the 10 Year Old Pools. This was based off 2015 Actuals.
• Utilities –Elec., Water/Sewer, Gas & Telephone $535,000– City of Wisconsin Dells Utility Commission is expecting a 2-3% increase
in Utilities pricing in 2016.– This budget is also effected by the number of “degree” days for both
the Heating and Air Conditioning seasons.
5 Year Plan Reserve Study Cashflow
Reserve Study Expenses Year 1-5• 2016 $31,791 Expense
– Railings Refinishing $14,149– Water Softening System
$15,435– Sports Area Paint/Repair
$2,207• 2017 $187,460 Expense
– Hallway Carpet Replacement (Phased) $86,560
– Paint/Stain Lobby/Hallways (Phased) $16,343
– Wall Coverings Replacement (Phased) $34,696
– Wavepool Waterfall Resurfacing $2,647
– Pool Resurfacing of Wavepool Pool Floor $28,536ProTile Waterline $18,678
• 2018 $188,168 Expense– Carpet Hallway/Lobby
(Phased) $89,070– Paint/Stain Lobby/Hallways
(Phased) $16,817– Wall Coverings Replacement
(Phased) $35,702– Pool Resurfacing of
Activity/Kiddie River Pool Floors $41,021
– Update Reserve Study $5,557
Reserve Study Expenses Year 1-5 (cont.)• 2019 $215,080 Expenses
– Balconies/Railings Refinishing $26,176
– Carpet Hallway/Lobby (Phased) $91,654
– Lobby Furnishings $16,414– Paint/Stain Lobby/Hallways
(Phased) $17,305– Wall Coverings Replacement
(Phased) $36,737– Landscaping $8,409– Pool Heaters
Activity/Kiddie River $9,193WavePool $9193
• 2020 $96,154 Expense– Luggage Carts $5,001– Wave Pool Audio System
$1,661– Water Heater Wavepool Bath
House $9,229– Concrete Sidewalk/Patio
Replacement (Partial) $ 31,477– Pool Furniture Wave Pool
$34,644
Review
2016 Chula Vista Condominium Unit Owners Association Budget
handout
Review
2015 Manager’s Report
Mike Kaminski