Resettlement and Ethnic Development Plan Project Number: 41924-014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s Democratic Republic) Resettlement and Ethnic Development Plan Updated Zone 2 Upper Reservoir (REDP-2UR) - Annex C Prepared by Nam Ngiep 1 Power Company Limited for the Asian Development Bank This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: others

Post on 09-Feb-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Resettlement and Ethnic Development Plan

Project Number: 41924-014 October 2016

Nam Ngiep 1 Hydropower Project (Lao People’s Democratic Republic) Resettlement and Ethnic Development Plan Updated Zone 2 Upper Reservoir (REDP-2UR) - Annex C

Prepared by Nam Ngiep 1 Power Company Limited for the Asian Development Bank This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Nam Ngiep 1 Hydropower Project REDP-Update

Annex C - Updated Consultations Documentation: provides

documentation of community consultation since the publication

of the main REDP.

Page 3: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

,ffi'%-#Eanlacrv5$ rJvqtffrJ;tm dsq€ua1o

5r.fiunu G€nsolcl rlcqrffdvtn canvulu Snrnvurqraer.

Ocxiunn

r€ilvfi r,r&Jaoaac0n$u6nnvaqrxtuuru Enfi rhr;tfiEumrcap

nelrJv4uc8ucruuvtuuru ae3tn3nruirl:u r crnUvqrflu e ui6ru, ren cff3eieu, c.0e3mt

trar rcacatqHuq.ru firvff nnvrff uarnfl r{cu.

. ?uiufi 1 tual 2014

6eo. tUCrJtn 3 (L&1 2014

"nn ullu.

'inn ulumlnFlJJne!,?nu ujJlnl.

!N 3 - o 3 3 onrluirrtnlnruir3;ur, rffl3ru 0afil clau &nrnvurquiu nlaQntJvfilnelUvarTufi3ii ji a, ^ O 'o3nuvFl taun:

r. cftuccu rcavilnarmrftsrfiffntariouilouarnrnrr.rQncf;ufir.rnvffutrntnlnlur*eutxJrtrrflr3lu r

z. cfiucro ccavEnarmr$ cenvsrufinrff ae3rJvqrel rfifin8unvfiuttntn3nrut&eutuJrtrrir3;u r.

s. rEurcu ccavEnarmrf; avucunruEe3qn.- "Z .La. tfiu:'rriuucrleUcneutunruftrlrenvarufiru{lna10nr]e3H1fiu, ccuu&nuvuleinnrurilutJ

,',crav &qun;cfiufi fi eulenrn.

tnunruriludvurunelrJvqu mru rtrr.0e1 r.0elnrtrnu nrccsnneSUvau ccac -Dfircfiuntc

cfruc, rnrStr3eltdEuccdlnrunruffnf;inrninrlyultr n;cfiutrc:un1t.rUuiiupelUvqrQl rdiea{1fi u

aa3ntunvfiu Trnnrui*r1cEeuir3;ur. nutfi a{ffi$Uvqriucfi3 uvluuruflncf;ucrnaucaumrutvfincf;ucruc?n, 0nilrusvqruficruc?o, ccavfiSo!nilurrJJUrrurJUnmysln cfi1riluurccs1fi1

tiiiecslf;r3ilornyurrRnqvfincru'r3 aUrJ arc. r.Jvuruna3rJvqr: nrcfitucr rEeuir3lurT vfrr3

ntccslurt3firu{uuvurnsur.itu;qrn ccav ?liruiravirlaruSulficcn UvqtQr avrutvq,ltJe3rnrtrnuo , .) of - f; e - ! , o^ I! s ttml rqu IJlJ1qu1, ulqu 2 rrn nluujnmvulellt8guacurtaorrnJJUunvlnu ullauscavucn c1

Page 4: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

nur^u

nUnBplg*npub:6ru::tptr[epu$rpguAnueuggtntnnl^ftrr tn[[unnr.uIutLQflFr 'E ILE]rTLcununbubannnr:n[un1 npubr6r *e:: nun[euu0fttuuLftLenueLuLBug'nunmrenruftLq]u? . y a

's.LtErHl

nIrb*6r:u:: nugIeuugrLuuLfiL6r.,tl:ptr[pnuppalHDLr^erumreuEp 'Iq:ruppnu)${rLu 'uung:

nueupIe;nLur(r]LpnLungctgrnttu;rnr.u[u1[eaurh[egr.q:a1gr:ntuuppr^trLTp1uftuu[u1[um

gtreE 'cr.u[pnunnl^ruur1ngn"gnfi, ^e]l

nLrrr^uerrrLeuffun QvZ*prryx L nt[unnr.u[u$ea

nb:ubnuunuunsurAunUr*un51u[$p C[uuuruu'oLnGrenLufienLntBAenuu 'rfr.brnuxrrl Blu . -a\ E ^? I o o s

Int'uuuufinreuff!gu:uuflruuerrrrnLeLg]u)u ^gl urrnlrtnttnpubn;rn'eqr nugIeuuCfiLuuLnLB-',\ a o - uP rr O ua , . X n1? u -

[r.tnggrg 'nnrunEuSE$ngue^pg::tptr[gcgn$:u!nrunlLuLuuSLt;IggnirpIQ]rEuLc.

ngauu$ignugfantrug[ea[geguuuuuu:Cgnuu .fl6ur^eqlxntrnuu[9,::uru^n ug Iea uueunur.ur.ungeIgg!rneItunleer,pnfrp .

ggp nuu[ggr rgun[npub:suto

^trulAtsueLeuBgtGUU(Lunn:uuu$nr;r:: nnil.ugntruLeu^utuLuLeueflLu .

g:n[:;ctmnuunCpn gnrug' nSSBLLI

glCIrpalneI]H]LnLmrLurnltgrfiti GngngrtgnuuiruIu1nu1nue.u$glnp:upnuuuuuq .rff?Lrpr, r FluHsg 'r

:gnir;tgnr.nS^6gl ngtgtegugnugnubetp't ntfurynuuIuitpIuu$

'ulcrxr grLg n!:u$uuuuL Bnqnlculplug

nuugreuq$nprbe;lptrutesuBLnu^a:e. ln[[r.qtnluIu1u:: 'ngIutpuu::[gLuLerrEAB 'nryen::eytg

nlu[u1'SenxplSfluu[u1 rg nru[u1nu&uuun]:ubnr.un(mntnplftLu^nfiLla'nLm^uengt[gug

AglluLroLBuneErplugfiLuBLnu^6f;unruIu1nuIngl[uur ^e]r rrEsLnnlu? ner]oeuLLrLegnluIu1

nl?Lt+ 'a1nel:n:untu[u$uur nglruu$ n$ub:pqr::ryuelf rn[fuqi[eanuu[ulp1 t'lolfiHuguar

uSLLJgl nun*l-rup[ur, 'LUl: z LU]Lguucrnnl^firT^&.nuu[u1 rlu*rrrerRftpur.e.*gtnru uxnng]Au

np u[.utr$u$ 'ngnru[BILUft? Lcufte$LuLe*e:: e2,tplgrplu-uftLunlnGI^rrr rnf[r.ryniu[u1 r.c

ugcLF .rLU?^nnLF 'ngnepl'rpirg:ugn'rtrnEugnLFuGrLuff ^ur n!rb:pu::grIuBnlAnfiunryrBr

nuu[upungu]r 'GLLoBB:g[gnp:u$nuunrhnl:n rT ^e]l n$:uftnrrLrG[r.unuuiulrung 'ug^ngn

utrnunetrupglnluIu1nqr rn[[unnruIui 'C[r.utgx*uuu^nrrLuL$Lnftm ^e]r ftnp:nr,uueb

Page 5: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

'n[[u^rnu3 6ca[uggr:epniu[uyptr'qreug[ebnu[ea nnt:nuu nftngn$epn[sIs1[p::megne!'e

; ncpnru[ulluugtrgoreanLnq]n eerLuLEGeryoeSglu HSenge( glryn6trfl HrrU

fluJunLnerk nn C[runrgsue]GLnfln r(LunLfirennr^Bftetilgur.to C fiLnnLfi umrrrec flLr, 'rI ru

'ptruprnlgnpp[pnr;r:: B nt1l [ea nrgegrpgt egneu

nr& nr.ger.bgl LEtBIcLB[u *un uryfnlug:[pugnebupgqt FL? Lg[o]re [lpepnuqn '?

'u.(msgfiXrrgryu$LglAmL? Lnnrr^ts u*ng 'r fiLltt t, UBUTUSUH

rep'iTLBnHng[pntr np: [$ng*e UUTnQUBU*tntu[u1[lugtlutF rflnLuntsr

ngreunEu$gr$ cgr:e,trp eg::ttpn0 rrgALrIol nbrufnr.u nr.u[u1[uurgluuB'c'uLLgr

q ng I r. nu :: r. ].1 E ift fi xrr [q I u Hrt L uVt e * u r. nn b r. b * n u ]- lu : u t-t :l L u p lu u ^

e.'c- -E--'---- -O-F- -2-r-o' -u6 d ', O Y

us r g u 'ur Lg un'ng ter;u$uggAnueuLm nuu[u1[tmeglnrytln$:u[nuu 'q

utrcn:rn!:up:unlu[u1[urt' u[0GB]t;ngALr

rtgq:x ft nrg [ea lg:r.gnrtr*5ruLf?qr 'Lu]neqrpuul-lueplr RLguLfr?[pnenug 'E

no:as:[pnA'ure

ipnefu;rtg:r,uueugrtr[tqua]n6anLp ([p[ggr ) lnng[pn'hLQrul]^B:Q(6urto'rn 'z

'rTLtrLeLcug[upnr.u[u1[uu' e nL?tE] Cuw'a Lf flltf]nB't ft LnLftAulumnru[eu:

a?plugAnfi Lut{ruF:01?aueg::pitglqr[-er:uec: cg::n3:u gglgrng

a r"rpl e ng:[qr::*un[: ruuuinnnnlrst cgnsu , gn.5,nL uUAe[ru6LnnxnLn0u-u

gnprLJ gteg: nutra rc:ae :rLnrrslcnr:u::u$: [m::uLnnuqn[6aftu]LU 'L

' ngn g nn' geEr IFuoIuHn anu p[tg IpulrnprenI n ur{: gua :n [ 6ruu p

r.g:ucmugrI cgxgfi6trcr.6:neqng6 s,r3n$:up! nugug6pug]u?trLcurTrrEnb:u$ngeIuru]^BurB

z nlrrr? 'ulg! rulLeuru rn([lqogr.!, 'n!:u$nr.ungetg[gneg] z nCCr.rylg$ r.k[pnlurcrrig

nSnLcuuAs, gip.L_r]n'LLl a,utrenl:na:uaeulcniuurl-: 'nrneik GLaueBLnLbrur:[p:ruuunlnY

nfitn rI618*nLaa tIa]Luha

Page 6: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

c. ilitn3:rrrqcl n*r3tftr..rnrlqlrrsrJv!1! 2 nr {urutr:til:,ntnatneu ttav*tinvarlltr,fir.

o. a : n ; r l iis i n r :: i r --? fr 1 m L [i i y .4 r :i,; e ! i i : inl i":. ei : {'r le. iiitnl:.::-rfralrar;irir.: 'jr,icrrjrri*. rlrf;r..;riu,lriauq rcr-.:::ir.u;iri

f. lBelirrpn so! x I -'g. inirvL,'erf;u?sir?#! Clqru ri*; iiIuisl3';rfiTli..uvneu?fictntnl::tln:uiSr3h. nrr.:fr niE,uI iJrd=un1u aintn3ni:..r

i. ayrfildrtnln.,r.rquflln5rlytuuru e {3nrriffnnvriurrurvciv3I:-,i -il a frlnrrBar.r

tfi Cnrirunellnin rr.i n*r1 avfr rrr f; urrua?n.

irtfiu eeljvqrf;u iruuJlnr

cfi:lft efi l&eriunu6uselnrufi nta eaStn3niu.

ui!n1un1unr.uri:;ruqrcirl errtr-r rfilffiitl nlrvRlJnluffnis. uv3UurJcar4!il&rIr.r-fi

ilrmrurUl'rjrr3iumrrnr3ilr:..rnvavcfi anr3tn3nrrillJU 1.

neulhluulurJvurllnaluvqrriuIfile5l.l ruav riudnur3ln firilrruuvqrfiu s 8rufifinfil^.ranvnunJU:

- ntr*rScfieutuJrtrrficrru{rrilr nr3fiuu.nuv5?s ee1 fin-inqvuru ttau nsluva!'(mufiltff a ccav s eel+lJnllfinrrr.ruriruuruav*irffiulycurorBr'ki*1.UcEr:cce3?uevurfinfi3ui',. arfiuA , - t ^ d, r a. s A o o .l -63s;nBe3r:ril3tilrrr.:rl;qrfrr.fifinrr;scrLt.Uscu.0 irtnlnruccavrfienvnSu {oltctiecvselBu

Uumr. rnJlJe!n1utlernyul fi s1.UEuff narcff r.

- utlnrl6nne3rJvqi; s r1rrlufi1fi rnrS6rurnnruilnnelrtnag0ru ttav rirrurJvqrflu Ifi?finruscr.rtir.8ciluJr1ff rrav rfiuffEuselrEr&ouucuarnrnruffnta aslln3nru:5r33u r rfi

O rO t oruurcu [un]u.

fi3ir.r, t3tfi5r1EnUurfinaviluficfreil3ilr i5rUufrnqru,

r.fre1nrrtnr, irvfr +l qlzo$

$[ufinna]dvau

^-o&"Utl:i &BraOIJ'it6)n

Page 7: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

2uR- o+6a1lr&ll.

!

1/

GP) 4ooo

:

A'a': q ffa5 IJU.JSY4IJ urarn[]rn$ail | oi.,,hgutsnq", rEtrnav5u I aruc{u

\

1L tl" frivuS.sA/X iSrqa ,or-z,.q,, j.BRr lVCf(

2 *. urrrl?q*n{,,ta tilty*t> tNU lrztl. 5}\tP>tldtt) !"ii!, ):); -B-3ur r. -sIr S.Lr,.-S r9c' a-a t. 1, S-r,*-r*l* a a --.:., ..

4rt tstars*Kds."g ,J-.J-4**efir> r*7$1 7

- /t-

/<n%frilDb*v 92..rir 3{5 y7.*/*ir"f,q,-t u/c{1Sui "y?-*' 59081$+ 1 46

/, -(lh z .l r^ti ---lL-4* ---1.-...- -, : - -,. ..' ',-- iu''':1 :.t:: -tt

7 A-JTtn olt, *rl- r+JE) eJ (s-, rs9-, V r, I lk s-,g

a

l/ t*'x)l-srt -raL1v, 't*egu>a

{'afsn:+9 .-.- t--?D ;i *rl t, ^rta1 -tli .tpi

-S-oz q rq,rTrv\ a ta a?jqla #t/44(rt

10 rAl'a4filt), r.a\t,{) -!//-

d?

--6)1LD uilltl A-err^*", I11 \A- U> lten* -+1- ztl/ z frl/L12 l**-*

.L

-u> -%--=

13 24 tlU- lu-- C*:..-...

14 n 9^ o-, -- ,t-i\irrt{-

15 1/l tlrl r"rr

i.b)

- <,2n - Fn \fu;-J

s-z n \-7i'lq h)r\ - ht**-.s

77 //V1

-

/'///tr- GA

18 il- / uta- "/) ------{ -,/h.

19 q-_e-t r)xj -r--

vd)-t;-

z0 )-n1?rh2t

{/L4 osq) 9-lA \t'

t;. b^) tl 11,[a/ttrfiIlJ

) .\{,l9.rJ22

lu/ar n 1)11

u

-// - -//-1- /7 -a // ici

e))r .s r r23

,LV

svqlu?Jl:............

Page 8: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

/'t aruficitErr*cunerUvqumufirfiotenfirthufniuit

a=qrrft:...,. {*ii{*ff ,.....!:.....dun I I4mWa rcas u1rj5v4u u1"1nu1nsail u!1msu(Jnagu :_-' - a'ruc{u

I ,il a\ rr ri)lntl , s ?R1?

2 7) r.l3r)

,\rl a 1

I I

,l, r,frt .f)a1

3)

,/ ott/)tl

,/, o, oV)

u)h4

)\l ,/ -{,

rf,,t. - , sl )

,l tl

5 a.7 dLI

.)r-,?-,- vt) e,

6o

r-a1 q.r^

ltol - o. q q ) sr-, rt:

7 L-2- ?A) 31

J \J -' z r zl 2-t J )\)

8 lqir q- rr a.\

(</, o, 97 9g'rt'sa

9 oCVr 9ra ={

tl!,\t iit -4,J:r <

10 lLs. rl l/11 - /-* sJ, * fi)

,|

t/t/l1

11 1/9l -r CrgJ l,b

i/^,].- t r ?.r\

s'/\]s I

LZ 21 \ )'r .G4) (?-' q\z s.I i\ 2\.Y)

13 L1 6 n1),'

,l -.r-eir 1l I nrl14

1-| an a. Att)

cJ: y-. rl L)rn9l n\i5 ao*)7\ 1--

tct-/ s z? ?-,

2) ?7)1-.:*:Ft

16 sJ u? /)Z_ ,f-3t?' 0<^NtrP

L7 ,.J ,Sf e>s 2- zfz3tles ,r 4-(" 9&18 7>- -932 -L--

4/A-19 z-> <> 2-\ - L/\* *L.\ z: 5z-:20 t) - .4).92 _----7.-.L* .z-->- t)-9L

?L , c)/ {1

^t 2>\ )ftz) -/ l- ,-l o-t

i \) /ii!.J7O

22" oa, tlil.9-rS K )q.r

4v-r J\ --.q r vr,jr 691

lp<I t.9rlf)!

23 M{u. Z tit ^=s;a ,NJ\lnre)o o\r^n,

(trso*c,(} ff

1,1

Page 9: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

ht

laL<,d-'{_<r

rBrBLe ing:euz1g: ]nebugn3st[n

":r:nt b:g

Page 10: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

5Yrl1iln:

E rav ulJa:lll .r-r"l'atnannsicl ,-- rir .iLa-* i1L':: .

I 9r ,n -\,,1 lf (a,\ -fl) :.r.rc-,

6l ":1.1'- ?lril "; .:' r i ,i -1 -1 t:j,.- )-\7

_/\, Cv

')\ :fr) ila\r\-:-rr ,l.rrrfr , CL-,rt-S\rl

J c/, t =r)l

)/1 C4.)

tta:

r, 1 3l)

4e ) *>, taau .Ll 9,

5 b .l? ,:r D.lI */- il J+

6 ?J AT,

I.5 5J)

t_"o (nt

7 I-) )ctI

:\ .3,tl eJ 9€)

B s: kp.2I

3 ).\) rr J*'9

o*\# u,xr {> <,,),

o-l m) .-rt- I t,&}J -fu10 r r oYt 1r,

T

-er '-,,rlc>-rt4<'t

11?'.

64 - 42p altt +-: -t- E"rrf'*r -

1Z 'r0l, 2/l ft<-

lht^

-t ,'1, Y13

el '1N' l+/ qi -1.r-Jt _ [*,f,

Lcl2n

L4 /F- --t-,

^lt> rtr.ll

15 - /L t,U/1l il -^t cll ls'- t,i -'{* -G*ne\ .{11

16i'l

tl. JJ

>/) JN -t-i'e i

77 I

)J.1Dj)\t

18 - '/)1" luttll L

-{t7 *t l2t1{/t

19 t,J l:-, d)

l---j-fl

*{- cr-/-rr D

20I

d*J I. (:14 .\I

ls-t

=lnf :t7l l(

-Lnl"t1\

&^-)

z7 It/ [,, !r 4l rl

-{ nr-rU/ -l t/' F1 ).t

{J N

23 ^t)-J ] -*, A) .\j/

L9

lt.

Page 11: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

..,iun . .../.,...41.*. Id/{t.r.J1?1nltJ1n*3}J oil1m5ufinq,su

yt.*t"(L9

i/ g, f'

I crav rllJErTlJ

a:u*rit*'tdarrnsrd gqunrui-ilff an&6ruic|*u

g. ptz,ur{lt*-!!..t, 1."5,: -*. Lt.i?; lrJnt

Page 12: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 1 of 3

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

Dissemination and Consultation And Entitlement Matrix

The meeting disseminated the NNP1 policies to three villages, upper reservoir (2UR), Thathom district,

Xaysomboon that will affected from the inundated.

1 April 2014 held at Pou village.

2 April 2014 held at Hatsamkhone village.

3 April 2014 held at Piengta village.

On behalf of the NNP1, the community relation and development team mentioned four purposes such as:

1. Disseminate and consult how to calculate the affected compensation unit rate from the NNP1.

2. Disseminate and entitlement matrix the affected compensation unit rate from the NNP1.

3. Disseminate and consult the grievance process.

4. To collect data to add in document on social safeguard, livelihood development plan and

vulnerable information.

A meeting chairman, Thathom district governor opened and had opinion mentioned the agreement

statement on movement plan of the NNP1 PAP. The compensation policies are advised to the villagers

how to compensate, resettle and all of that is strategic plan to develop economic of the Lao PDR. The

chairman mentioned the NNP1 will be natural resource and will gain revenue to the villagers, particularly,

there are five places in Thathom such as: Namsan 1, Namsan 2 but dam development can be negative and

positive on livelihood and agriculture production area. The NNP1 is the priority that Lao Gov. gave. The

other projects also had affected and compensated to the people and had policies, but the projects had

benefit for people and resettlement to other areas. The chairman mentioned the NNP1 had the

transparency and higher rate than the other projects. If the severely affected people, as known from

concession agreement (CA), the project will have better policies twice. The government defined new

relocations for the NNP1 if the PAP do not go with the project plan, the project will have condition,

appropriate and the project team, will explain calculations for discussion and agreed unity. Chairman

compared compensation to many projects. This project calculated like this, another one calculated like

that. So the rate is different, but the NNP1 will explain details to people know how to calculate.

1. Four ways of calculations.

Compensation rate that paid by other projects are under other conditions similarly

up dating based on inflation.

At current, Market study is proceeded free or research institute or NGO.

Information on statistic market rate of state informed each month.

Truth rate observation in the affected villages.

Page 13: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 2 of 3

From four resources will define the actual price for the affected people, this way, authority village with

people agree and said that it was fair transparent to people. Explanation policies, entities that the affected

got from compensation of the NNP1 is people have unity and agree to the policies, additionally, the

project presented the NNP1 grievance principles on grievance mechanism, conflict solution procedure

and people understand.

After explanation, discussed with village authorities and people they understood, realized that the NNP1

has policies that are fair and correct to the affected people.

Comment from Pou villagers

After listening from the morning till afternoon, villagers would like to ask how to compensate. As

remembered, it will be better than the previous one. After comparing to the NNP2, a little known from its

compensation. If the NNP1 is over the previous one, it will be happy. The second issue would like to

propose whether any compensation if not moved? We live in the house if we would like to change this

area. Agriculture job would like to changed, feeding animals for living:

1. Comments of Mr Thidpheng, village Front Line: would like to ask this agreement.

- Heritage law, three households in a house go to the bank, will money be divided into three parts?

- Compensated land, during dried period can the people go to do farming?

2. Mr Nouyengxiong: proposed dad grave (Chertongxiong) in the reservoir area to check the flooding

or not?

3. Mr Boungyung: Proposed

a. Some are not moved but wanted to stay in the same, not to leave Pou land but the result loss, the

project will compensate?

b. Compensation is the project and state conduct rightly supposed Mr. A has 1ha will calculate how

many meters, people wants to know the calculation is understand but some people do not understand.

c. Would like the project compensation appropriately, balance, satisfied the affected loss would like

the project takes a minute of the meeting.

4. Mr Touxiong proposed the company to intall electrical post and pull electrical cable for village

households of Pou village that not have electrical use.

Comments from Hatsamkhone villagers

1. Mr Jomphet, head of Hatsamkhone village proposed after explanation document the villagers

agreed on unit rate way but the village would like the project to assist:

a. Assist in repairmen primary school as model of ministry of education.

b. To build the Ou bridge to cross Namngiep.

c. Would like the project to make road with 2 kms within Hatsamkhone and make electrical network.

d. Expand village office bigger and make bus station and market.

e. Would like the project to make GRS water supply at Houaypakhae. GRS water supply is not

enough.

f. Weaving house 50 m x 8 m.

Page 14: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 3 of 3

g. New job development for men and women and to be labours for construction projects.

h. Loss compensation from the project.

i. Propose the project to assist policies research six affected houses, at current have four houses

moved before the construction project. How will it be compensated?

Comments from Piengta villagers

Agreed to calculation of the project.

After questionnaire with the villagers agrees calculating tables. At present, people have not any issues if

yes, the village will propose to the NNP1.

At the end, the president stress and some points to the villagers three affected villages:

Dam construction is in need of general vision of the state-government and 8th and 9th main meeting of the

party is aimed to build our nation strong and rich in the future. So the villagers are required to cooperate

with the project for preparation for receiving issues. Certainly, development must be better.

After meeting of three villages, the village authorities and people cooperated very well and agreed to

certify the rate unit from the NNP1.

Therefore, this is certified as evidence.

Thathom district, date 4/4/2014

Chairman Recorded

Somboon Sonlidthideth Bounmee

Page 15: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 16: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 17: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 18: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 19: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 20: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 21: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 22: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 23: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 24: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 1 of 3

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

Dissemination and Consultation And Entitlement Matrix

The meeting disseminated the NNP1 policies to three villages, upper reservoir (2UR), Thathom district,

Xaysomboon that will affected from the inundated.

1 April 2014 held at Pou village.

2 April 2014 held at Hatsamkhone village.

3 April 2014 held at Piengta village.

On behalf of the NNP1, the community relation and development team mentioned four purposes such as:

1. Disseminate and consult how to calculate the affected compensation unit rate from the NNP1.

2. Disseminate and entitlement matrix the affected compensation unit rate from the NNP1.

3. Disseminate and consult the grievance process.

4. To collect data to add in document on social safeguard, livelihood development plan and

vulnerable information.

A meeting chairman, Thathom district governor opened and had opinion mentioned the agreement

statement on movement plan of the NNP1 PAP. The compensation policies are advised to the villagers

how to compensate, resettle and all of that is strategic plan to develop economic of the Lao PDR. The

chairman mentioned the NNP1 will be natural resource and will gain revenue to the villagers, particularly,

there are five places in Thathom such as: Namsan 1, Namsan 2 but dam development can be negative and

positive on livelihood and agriculture production area. The NNP1 is the priority that Lao Gov. gave. The

other projects also had affected and compensated to the people and had policies, but the projects had

benefit for people and resettlement to other areas. The chairman mentioned the NNP1 had the

transparency and higher rate than the other projects. If the severely affected people, as known from

concession agreement (CA), the project will have better policies twice. The government defined new

relocations for the NNP1 if the PAP do not go with the project plan, the project will have condition,

appropriate and the project team, will explain calculations for discussion and agreed unity. Chairman

compared compensation to many projects. This project calculated like this, another one calculated like

that. So the rate is different, but the NNP1 will explain details to people know how to calculate.

1. Four ways of calculations.

Compensation rate that paid by other projects are under other conditions similarly

up dating based on inflation.

At current, Market study is proceeded free or research institute or NGO.

Information on statistic market rate of state informed each month.

Truth rate observation in the affected villages.

Page 25: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 2 of 3

From four resources will define the actual price for the affected people, this way, authority village with

people agree and said that it was fair transparent to people. Explanation policies, entities that the affected

got from compensation of the NNP1 is people have unity and agree to the policies, additionally, the

project presented the NNP1 grievance principles on grievance mechanism, conflict solution procedure

and people understand.

After explanation, discussed with village authorities and people they understood, realized that the NNP1

has policies that are fair and correct to the affected people.

Comment from Pou villagers

After listening from the morning till afternoon, villagers would like to ask how to compensate. As

remembered, it will be better than the previous one. After comparing to the NNP2, a little known from its

compensation. If the NNP1 is over the previous one, it will be happy. The second issue would like to

propose whether any compensation if not moved? We live in the house if we would like to change this

area. Agriculture job would like to changed, feeding animals for living:

1. Comments of Mr Thidpheng, village Front Line: would like to ask this agreement.

- Heritage law, three households in a house go to the bank, will money be divided into three parts?

- Compensated land, during dried period can the people go to do farming?

2. Mr Nouyengxiong: proposed dad grave (Chertongxiong) in the reservoir area to check the flooding

or not?

3. Mr Boungyung: Proposed

a. Some are not moved but wanted to stay in the same, not to leave Pou land but the result loss, the

project will compensate?

b. Compensation is the project and state conduct rightly supposed Mr. A has 1ha will calculate how

many meters, people wants to know the calculation is understand but some people do not understand.

c. Would like the project compensation appropriately, balance, satisfied the affected loss would like

the project takes a minute of the meeting.

4. Mr Touxiong proposed the company to intall electrical post and pull electrical cable for village

households of Pou village that not have electrical use.

Comments from Hatsamkhone villagers

1. Mr Jomphet, head of Hatsamkhone village proposed after explanation document the villagers

agreed on unit rate way but the village would like the project to assist:

a. Assist in repairmen primary school as model of ministry of education.

b. To build the Ou bridge to cross Namngiep.

c. Would like the project to make road with 2 kms within Hatsamkhone and make electrical network.

d. Expand village office bigger and make bus station and market.

e. Would like the project to make GRS water supply at Houaypakhae. GRS water supply is not

enough.

f. Weaving house 50 m x 8 m.

Page 26: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 3 of 3

g. New job development for men and women and to be labours for construction projects.

h. Loss compensation from the project.

i. Propose the project to assist policies research six affected houses, at current have four houses

moved before the construction project. How will it be compensated?

Comments from Piengta villagers

Agreed to calculation of the project.

After questionnaire with the villagers agrees calculating tables. At present, people have not any issues if

yes, the village will propose to the NNP1.

At the end, the president stress and some points to the villagers three affected villages:

Dam construction is in need of general vision of the state-government and 8th and 9th main meeting of the

party is aimed to build our nation strong and rich in the future. So the villagers are required to cooperate

with the project for preparation for receiving issues. Certainly, development must be better.

After meeting of three villages, the village authorities and people cooperated very well and agreed to

certify the rate unit from the NNP1.

Therefore, this is certified as evidence.

Thathom district, date 4/4/2014

Chairman Recorded

Somboon Sonlidthideth Bounmee

Page 27: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 28: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 29: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 30: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 31: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 32: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 33: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 34: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 35: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 36: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 1 of 3

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

Dissemination and Consultation And Entitlement Matrix

The meeting disseminated the NNP1 policies to three villages, upper reservoir (2UR), Thathom district,

Xaysomboon that will affected from the inundated.

1 April 2014 held at Pou village.

2 April 2014 held at Hatsamkhone village.

3 April 2014 held at Piengta village.

On behalf of the NNP1, the community relation and development team mentioned four purposes such as:

1. Disseminate and consult how to calculate the affected compensation unit rate from the NNP1.

2. Disseminate and entitlement matrix the affected compensation unit rate from the NNP1.

3. Disseminate and consult the grievance process.

4. To collect data to add in document on social safeguard, livelihood development plan and

vulnerable information.

A meeting chairman, Thathom district governor opened and had opinion mentioned the agreement

statement on movement plan of the NNP1 PAP. The compensation policies are advised to the villagers

how to compensate, resettle and all of that is strategic plan to develop economic of the Lao PDR. The

chairman mentioned the NNP1 will be natural resource and will gain revenue to the villagers, particularly,

there are five places in Thathom such as: Namsan 1, Namsan 2 but dam development can be negative and

positive on livelihood and agriculture production area. The NNP1 is the priority that Lao Gov. gave. The

other projects also had affected and compensated to the people and had policies, but the projects had

benefit for people and resettlement to other areas. The chairman mentioned the NNP1 had the

transparency and higher rate than the other projects. If the severely affected people, as known from

concession agreement (CA), the project will have better policies twice. The government defined new

relocations for the NNP1 if the PAP do not go with the project plan, the project will have condition,

appropriate and the project team, will explain calculations for discussion and agreed unity. Chairman

compared compensation to many projects. This project calculated like this, another one calculated like

that. So the rate is different, but the NNP1 will explain details to people know how to calculate.

1. Four ways of calculations.

Compensation rate that paid by other projects are under other conditions similarly

up dating based on inflation.

At current, Market study is proceeded free or research institute or NGO.

Information on statistic market rate of state informed each month.

Truth rate observation in the affected villages.

Page 37: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 2 of 3

From four resources will define the actual price for the affected people, this way, authority village with

people agree and said that it was fair transparent to people. Explanation policies, entities that the affected

got from compensation of the NNP1 is people have unity and agree to the policies, additionally, the

project presented the NNP1 grievance principles on grievance mechanism, conflict solution procedure

and people understand.

After explanation, discussed with village authorities and people they understood, realized that the NNP1

has policies that are fair and correct to the affected people.

Comment from Pou villagers

After listening from the morning till afternoon, villagers would like to ask how to compensate. As

remembered, it will be better than the previous one. After comparing to the NNP2, a little known from its

compensation. If the NNP1 is over the previous one, it will be happy. The second issue would like to

propose whether any compensation if not moved? We live in the house if we would like to change this

area. Agriculture job would like to changed, feeding animals for living:

1. Comments of Mr Thidpheng, village Front Line: would like to ask this agreement.

- Heritage law, three households in a house go to the bank, will money be divided into three parts?

- Compensated land, during dried period can the people go to do farming?

2. Mr Nouyengxiong: proposed dad grave (Chertongxiong) in the reservoir area to check the flooding

or not?

3. Mr Boungyung: Proposed

a. Some are not moved but wanted to stay in the same, not to leave Pou land but the result loss, the

project will compensate?

b. Compensation is the project and state conduct rightly supposed Mr. A has 1ha will calculate how

many meters, people wants to know the calculation is understand but some people do not understand.

c. Would like the project compensation appropriately, balance, satisfied the affected loss would like

the project takes a minute of the meeting.

4. Mr Touxiong proposed the company to intall electrical post and pull electrical cable for village

households of Pou village that not have electrical use.

Comments from Hatsamkhone villagers

1. Mr Jomphet, head of Hatsamkhone village proposed after explanation document the villagers

agreed on unit rate way but the village would like the project to assist:

a. Assist in repairmen primary school as model of ministry of education.

b. To build the Ou bridge to cross Namngiep.

c. Would like the project to make road with 2 kms within Hatsamkhone and make electrical network.

d. Expand village office bigger and make bus station and market.

e. Would like the project to make GRS water supply at Houaypakhae. GRS water supply is not

enough.

f. Weaving house 50 m x 8 m.

Page 38: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Page 3 of 3

g. New job development for men and women and to be labours for construction projects.

h. Loss compensation from the project.

i. Propose the project to assist policies research six affected houses, at current have four houses

moved before the construction project. How will it be compensated?

Comments from Piengta villagers

Agreed to calculation of the project.

After questionnaire with the villagers agrees calculating tables. At present, people have not any issues if

yes, the village will propose to the NNP1.

At the end, the president stress and some points to the villagers three affected villages:

Dam construction is in need of general vision of the state-government and 8th and 9th main meeting of the

party is aimed to build our nation strong and rich in the future. So the villagers are required to cooperate

with the project for preparation for receiving issues. Certainly, development must be better.

After meeting of three villages, the village authorities and people cooperated very well and agreed to

certify the rate unit from the NNP1.

Therefore, this is certified as evidence.

Thathom district, date 4/4/2014

Chairman Recorded

Somboon Sonlidthideth Bounmee

Page 39: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 40: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 41: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

flrmtro.et:nni n[ 4., 3 {X* t|,1r {aiAr a

ni) q^r,.rr 651:1:Rl6) ^f.T8r}1"

$::ltt:ulrr.! 6fa: er11l ceal'

t-o.uX vrg ,}f.TL{X ,(,,[ [S-q- eoq+ | lapl 0e:* *$ mrilararqli,r-qrhv'rqlrxosar '..h*flt"

rrr-ril,tsDu,,: 1frJ-"gfl yqrn , A?S{ ,*rq, ,,!t j\

ueq \,f"'^l.," 1f!'luo'19."'.,)"){'vt

*,i joq l"tr',r,.q- ^i,,r 4 rF: ,H '*vm s\ "t,+,. 4r T Tc"*,^r 'lJ "'t t'1"t]*)

*'\ .1 *T*;$*lil {'r},\*,3,'i1 o^r qh{ *tsnn-,}ur- r\-\fl**, rrzrl

4*\, ,lL "[ brivlonr-l ",T,

svirr:srrat qi' uio:t=b tbP; .t rr?JJrr',r"11rt ,, t]"f ,{iOu,,i r r,r1tn.ut arrttml .i,A*lirr, ur:xun11a

^1.!"E- *ItJ.,-l I sie-,ro:n'r.

^h srloi"l

$tr,t!.1i^: oltX ur,qTsrrrosal e 'isJ'' in] v"'" bb S, q M qn DrelA'sJ" J

6sst"xrt sh-o1"

,J,r ,rarari=n,k uo*loer..n #, 4f *,t.,Idlli 1rruf^:1;.,[ ",urr

"u*Sr,,r-,cJ.o,*,.r ,\l"l S"i+k t t I J Ir

I MQ - r\ .Otor txb or.co3 gdg rp!y[.1 .

^,t Dror ulAq [lo*l vrtsqo1u S yoo*,]/*L ih, ] T*]/-"anr.D€\3ur{,0<

"$o',1q1"1"1, ,f irr'-, rr*ll ,liyr-rli' .R.,,,V{S^ ; J,! WJffi6'"}

' Q | | -ro_' \ *r-' ^-* ' \ ^ ^ ^q.kg,sl .-tnpld,N:ulrr) urd sg{; t^r,u sJk,,.r"), ,i ,.1^ ,t*t ".*'r'- $o, ^,", # k! *t'oJlii. rloto, o'l nt *.,,$ rWr-* *S /*u [t-rl'or' snrr: ru'r rfff'

q r --L Mr\ ,U t n,. J :F tf {f Jprsn qec (*,i vYun',u a''"ll no'c-u'o *0 'h'6N qlE NI (n

,ro rsu*} /.-l,- o,r$ ,'ult X-{ J

- F:,,&,''* n%*n-.*1 (r={tq) },l1"*1"-ac.'Y itg*'' ttY 1'dGrtql 11p3$6'')

Q.f,,[r,,n," n]",^, "r 1oi)% '*r.*]* 615

- .*,*lG o-5"\ lar& a'\\rqrDtll -'u*' oT ^tt N*e*-^''' ".^l*,

/!ooo *P1^,3

riaY1r..u-u" ,""",f+'\ 1",S ; ,ll-,$J'o'l'" $,,"*--'!;"rx) 1\ ;11n"-y 'ftr* Vr.., ,l *,'tt "k Y! rg .'

a- r nruo *trt. /'^'t e''r t\ *' o ',U;

kS tit"\ n"^ f xr $ x'''" f_ Ot$ OaJ Fc,-1d- u F:l .

Page 42: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

tg*mng

' $oe (s--4

,+,G2\'

u, n't[g --

hrpa-t- sr/X' pnrs mt'd otru t'rtru ff

rteGfrt{ 0tt6tCu0- qrrfU CLl64

c..ch cr ry *,*:^ *A,,{fLi*'" ;,T IT#,; ;$ nls ks

'^fO'-|Q'l$656uLcrlrrr6 -t{lLscrrn Lo r-,t(, [*Jb F Aqt crccro cU 6]uofb tn'b { ,.k -;vhr'e

n[f ,;"*rcrt!{,rzrfbm tFk, "f H xbt,il,rff} ,ry'",$bt.3"c -eLc/f}r gt:N

nnct? csrb g{rtp[,rS d"f']frf,, R uA _[ ft' t3r,1. ronlrce,6vr)" 6rr ,l#

q*1, -!,n {*,3 r,.8

t^t r'oo .rm fls ts

f,\^**,.f"[^ *,*{*$.^,'5\s ^f

,65^"{t $, ffyf flbnt$orh

nTu

t [t. \s(,J\,l* *i* glo wud t

Page 43: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

fg*rungt ugtrrau

----zfs rnlC*4-{L:, ,qkaGo *e/ c-rt<-6ca<-\e ,..{- -G

s g-s^,.,...^.r 1 crr,' s'r f g a&/-"'";X' }f :T k- tr t<s''9

6SfiS- /ffju>'rn/"'f,? Xt ,(c<l-{ (^roc/ 'k

, qr;

" i;'@ ry/, * 7{' i i' :T^,:!1, i c/,^ .*.=-. Q l, /r*,-.qO g /*,n to7.' 'yff

ttt, /1/G,s6'Kl/= y/>( cv SQ /^e,* -d ybo( ca ',*

T/>( aaaq rAt Z':=o,h 'iz -(.'"," t<tz/

:rcn/,?,-^'-,orrr1/ y;*-4c* r *X6{* '/,>X,,*g:s-'aY /9V#'i*

*,,*:4! ,'1r{rz ) <,+t/ t'1t vsszzto/ Jngttl ?f/o-rtl

"*rrg o.v+{u 4ttF*j*(\<YLGn/ v) { - n---) A - t -^)^.' -1 ,rv/l,1L.fi -l ,lrlA-,--lO' {^/( :*-{f/-gfi " X o-}4 i*t-f',rCi--^b[ *, ;'f" -efsrt T' t';i*' : zF

) r , . -._)\ rlLrff, t/

__>_ , r:"

-

1-4,u/qf u(r n^/2:r-?-<\.1 @Lt -gS" -T,t/\/ kg/---z-5q9 nlev sAA

q. * A* tf luLt wKv F L-rX :,5,I0Z .V, ^ru7vTx-u5]4 \/€A

Page 44: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAf\4 NGIEPlPOVI'EP. CCIIPANY

Nam Ngiep 1 Power Company Co., Ltd House No 236, Unit 16, Phonsinuan Village, Sisattana District,Vientiane Capital ; Teiephone ; + 85 62126 1.25 1-; F ax: + 85 6212 61252

\l+

)rl-*-;ill;l1,."j#,,.,=6ffitrnav*u: o21-2612s1;ntn, or,-r[${' -fi].." - );

.\,crJm {.s. .1.<142014. s_avq rrrn..... r.z:t*/:. {Y*.lt1, ) ..r:-r oI o>-l

fiaineldv?r, u,Ir...ffi LelDeJ&JJ lU

a/n o_.GqcravrJl.rJRvrlljlr G+ ^

G-i,'t'14 c- r zs (v

IUI'MA;RU\ o 1-,4 "tP,R../

a1utzurFI

( / t z o-.

1 1 '., l-i JWr: tr|erl'lt, cn)1t)5

.\n&{ k yl Uz/u ?utt-w+

'-l. , '\/*zzt)2 fi v Cfl,"\n tl Du*ar

^/ NNI P1 D-rr3 tr 2+ Uilil%J

9n -el xl otr ,t^ t ,fbi 4< e-J >t q,a\rrz u_4 /',

6$ 'x)c/ fb q;Az r ); lt \x1 \fi^r_

6

>,", / *-' -?'rtS R 9 >>r-( < '-'9.,_,6

. -s-u. .,= ' {'> \-q /,> Zt 4< E4qCN)

q_lL-@

7

501 ,-t ; ^./ (./ 1 u b)tuE

o ))lJr,--*TbU ,| A^_--I ry <:e, /,, o', q/t, <??99 f. *k7

(Z'^,4 qr, , >

'10- r',/ /:l

t

?t'l' *t>{/r-rI-T ;I (// y',/ -v- -

\Y I Eg f€q ,u.'/11

?./7. ^t>qrn Yv o Lt ^//- e a) aqqzb 4 \1^/A,n

12 'ur 4n.ft-qD.y1-., 19lr'L

Il-<- <514b',L6(T A---/'iz/

'13 ,, =,J, qq.(^^ p) "* .;4-i c,tA O t

14(

,l-,,^=u) - /

*z Q,A2 O,o-tl, /" /n'an--15 l./ ,'l

Q.) Qtt tl I e/r t7

.7,r'./. tt-?,KS %?t t , r

16/'l

9, l>crt-ltx -1 - \-/

<qila.zee --rL l-.u,*t.17

r'/so^ ',.e z* q \4 6A ,il.r- .ffi-

1B .cv6n { /'Jk)

r')l t {i''l o )rt

Jot nan Qtat d-AL.41,0 61^ tgu-?-

lratnurnsal6)

A)', rn^tF -Abg>

,,n- l- .-lA4 , tl? u o /' I

Page 45: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

r ': ?uaRn ([JuilJl]JU1 ?1ner.

tsgLrteltt: 236. o]alr' 16.

iLnavRU: a21-261251: itur: 021-26

ruAM NGIEPlDftrrrtrtr f'f-r) IFAl'.1 v-I L.'\'! L.' '. !,' '\rr r\.;

5urff ./lS .t.g.lzot+.R v q 1 u?ff . . 01s1-x,ar .ci r[.Ul l 6l . il.I1r gsaJ

fi aEn e:uv ?r, 8;-lo,qI.,xl-".'. ;i r,sn..rrn. r.r ril.( ,I q^-udc ,LU LU ldodU

ia,'l-a'- v

z!'lc Fz: ?fift{

,"r -.?701

15"). \

i ;ir^a yogz

0 0p x. ?u?{ TfPt@lJFn

NamNgrep'l Pcri'elConrpanyCo., l-ldilcuseNo236,-Unit i6,Phcnsrnuant/iiiage,SisatialtaDistrict,Vierrtian e Capi tai ; Teiepi-tone : + 85 6212612 5 i ; Fax: " 85 6ZiZ 6i252

A14

xsz

Page 46: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Iv/G

ZSZI7ZTZ7SB+ :xeC ltSZtgZtZggg+ :auoqdalal :1e1rdeJ auenuafn'1crr1sr6 euepesrs'a8elll uenursuoqd 'gI llun'9tZ oN asnoH p1"l "oJ {ueduo3 Ja^ od 1 da€p rueSg

tl t!

r",u o'[wl-ffi\tt f" L:L\a rQ ' ut

BtLl-J t 6r

7, 19-LgL --$,, w LL

\-t-r IY\,'z */fr\ \h[ r- '\\'4 uL

ot

.O7@?'crg'

-l

e/r,-/. / ,lu (bLEa cy '(n

,/ 9tf +sr u F\-6'

--l

* ,1, rt(, [*czcets'vt2-t vt

('*,tB"'/ l)'rc5256*"K' \u 1 L*u,

XT.L 7r Zht* d' /-r'u' Z'

ryF '//o Atg{ t(r "- L ut

'LQAt/D u/ n k-\3 4

{:z- t I 6erfl 0r*c'-dtuJ6?,e--+J '-r l/*

7 Jtcl- I*"Es 'uz6

r6-'b- " I 6 ", J," oU

Gs | ,-(. - o/,/1l 8nl L,U t r LU(r

T.\S 'L4-v, v//_ IotL Y;uL I-qt </P

t-l .( h7 ,) I 'C)/TI ''1, II Y

1r"6,-zQ ..ff.'1\vr 'lo /* ue,l, ,YGc (Y

vQ<St lt\Y 't v/ f q,tL; '\ ( -/l I6

("({cry (z-y(,\ , o<tt l=

Z

t67 EtA'\ -z 'r/ ( {ieC,\,p s€tl}

L

nb:nuu nBzeLnlnl rIeBuLmuLuLff n&agnlm*u::k u/e

rccvmgu i ulq runr:+Lq rnnut:,*e'rlozl'-f,"/'-yr Srg

AiriVdi'\iC3 ufllioa

@ dt

f YrTl?eLT'ctl-t'g'rurclo1'glfi {rfr""':tr8"n-[6UEeE

gZ-LeO :U8I :tgZLga-Ld,O :nB:eurt'uu-r:uuss[eff r'rtetraEm1ruLa

'9! :TlCnQ'gee :nug)l!as)'uur.u rn[[rnurun: utsun

* k' 1

Ld=l3N t/llVN

Page 47: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

! ,- :uaRC (aJajrullJul ?lnel.rSerrarfr: e:e . r{al re .

r': 1t- :-*'^ ;'-.,.i-e.FFn:y.-":trnavftl: ozi-2612si. refin: oer-eo

NAM ruGIEPIPCV!'ER CC[lpAl!v-

5rfi .{,S. .t.{..tzot+. .

n v q 1 }]lff . .4r'h1-. yn)-\ .? ;. !:t r n.x # n.. u{$$$r}r'v*

a/n drr^ae4LIdu! lJdu] lLl JJlAlnUllnRA! riltrnavHu alUrelJ

1 O\z{J t, AQt / /A}o^ I , )8s .l 9

0t ./ ,lr:-o.I

a-i. //2t// / .X,t, M J,Zv'7

./,/zt ,rzJ /df /

//,{J' /A / -a) ) W, 4&,-) /-,,,//,1 "",4

4 /_,. /' F/'-> "/,//o I r|-rs ,/t) ltr ,,<', rtgg,! l/fh \-

lz-J )l |'t, /z-> /^r*-J

,(,7 7r>'? lN "1196

'tn. ,rlrt- ?{ 3 { /1-I."

r*r^^1 q\l

7 .w4?ft. )l *l

uv-

nAr -Yolo

0. Ors"T U*,r..=il$ t* 0folP^ Q r l'l tr, ii {R ,:--rq {ilf9 n r,f,rs7 ,r N P4 fl"8tL?t !4^10

4-oppz,,tS finr.-l, NNfl ?C '2231831 Z?ry'1-11

'iA - ,ia qQx- R Mtj *.r J.i ?-s-9 rKyt #/1/)IL /-

o/1 - c.c? ^^:afl* )., \,.3 n9 OL2*q L{Y tu

13

14

4tr,IJ

to

17

1B

l,,lani Ngrep 1 Po'ot'er Companl,'Co., i-tC Hcuse Nc 236, rJnrt 15, Fhcnsrnuan r/iliage, Sisattana Distriit,

4l+

Vientiane Capital; Teiephone: +85621261251; Fax: +B5621261252

Page 48: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People's Democratic Republic

Peace lndependence Democracy Unity Prosperity ,f NAM NGIEPl-,/ POWER COMPANY

Minute of Meeting

The Consultation Meeting with Hatsamkhone Villagers

On 15 July 2014 from 1 3.00, at Hatsamkhone village, Thathom district, Xaysomboun province,the consultation meeting was held at Hatsamkhone villagers to discuss the following issue:

Consultation on Compensation Unit Rate for PAPs' assets

The participants in the meeting included:

. Total of participants: 66 people

. Number of females: 1'1 people

. GoL: '. 4 people (RMU: Mr Khamsing Saiphouvong; Mr ThongsayBuathong ; Mr Phonexay Tanovanh; Thathom District Thongpheng Ounyahuk; DistrictE&M: Mr Phouthajark).

. NNP1 PC: : 4 people

. Number of PAPs: 58 people

Obiectives:

Consultation on Compensation Unit Rate for PAPs' Possession

:

l. Land type rate

- The rate of common field and clear a rice field was so much different rate 7,000 Kip/m2and 3,500 Kip/m2. ln fact, a new clear rice field use a machine currently. There was not muchstump wood (Tree root). Condition and quality were different. So it should be considered moreto be closed to each other. For the common field rate was suitable 7,000 Kip/ m2.

- Building either closed to the road or not closed to the road. There was so much differentrate between 20,000 Kip and 10,000 Kip/m2

- Question: What was the compensation of Road land (Road) which the villagers sharedand constructed? lt was necessary to be considered owing to its investment.

- Fish pond land saw its compensation based on construction value; the proposed ratewas 15,OOO Kip/m3. For the villagers made fish pond far from the road (no facility to use amachine). lf the compensation rate used, it was still low and required to propose to themanagement team.

The garden land rate 1,500 Kip/m2 was low, proposed to be more such as corn could be plantedtwo seasons.

ll. Building Unit price

The villagers still had no comments in the meeting.

Page 49: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Proposal from Hatsamkhone

Proposal of Hatsamkhone Authority

Subject. Compensation for the PAPs

Dear GRM of NNP1,

Chief of NNPl

l, the head of Hatsamkhone village, Thathom district, Xaysomboun province, agreed withthe villagers on compensation proposal as follows:

1. Annual paddy field rate 7,000 Kip/m2 was not appropriate we were not resettling, so itwas requested 10,000 Kip/m2.

2. New clear paddy field rate 3,500 Kip/m2.3. The building land between the land near road 1 D and outside of the road required the

similar rate as it looked like so much ditferent.4. Moreover, it was seen the other land types request more.

Therefore, it was requested to you for high consideration.

Yours faithfully,

Head of Hatsamkhone village

Chomphet Thipphavong

Page 50: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 51: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 52: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 53: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 54: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 55: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 56: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 57: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 58: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 59: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 60: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

The Consultation Meeting with Pou Villagers

On 15 July 2014 from 08:30 am, at the temple of Pou village, Thathom district,

Xaysomboun province, the consultation meeting was held at Pou villagers to discuss the

following issue:

Consultation on Compensation Unit Rate for PAPs’ assets

The participants in the meeting included:

Total of participants: 95 people

Number of females: 30 people

GoL: : 5 people (RMU: Mr Thongsay Buathong ; Mr Phonexay

Tanovanh; Deputy Thathom District Thongpheng Bounyahuk; Secretary village party,

Sousaleum Sommany, District E&M: Mr Phouthachack).

NNP1 PC: : 4 people

Number of PAPs: 86 people

Objectives:

Consultation on Compensation Unit Rate for PAPs’ Possession Main questions/opinions by PAPs and Main answers:

I. Land type rate

The villagers had not got any comments so proposed to the villagers thinking more and

sending it to the team to during working in Thathom in two days.

II. Building Unit price

Noticed that everybody agreed with the unit rate proposed in the meeting, but the

villagers had a question on the risky accommodation because it was flooded in the previous

year. The house was out of the marking, flooding zone or the nature or due to the project

affected and listed the name (the risky house) for the project for study more.

III. The rate of industrious Tree – Fruit tree

The coconut tree rate was proposed more as a result of the low rate

IV. Seasonal plant

The villagers commented that seven (7) sugarcanes per pile requesting more because of the

fact. The large pile had fifteen (15) sugarcanes. The middle pile had six (6) sugarcanes.

The banana was proposed more consideration.

V. Custom and tradition

Page 61: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Proposed the village to list the graves that would be flooding and its performance of religious

rites, then sending to the project.

VI. Addition comments

- Adding more rate of paddy field land from 7,000 Kip / m2 to 10,000 Kip / m2.

- Proposed to add more compensation of fish pond because of the low rate in truth. It cost

two million kip if compensated as the proposed rate over one million; it seemed a low rate and

considered more. (There was no information of the size of the pond in line with their request)

- Requested to separate personal grass land type and the village’s one because of around

forty (40) hectares grass lands. If there was policy, it would like to be considered for the village’s

land.

- This issue would be land type if fixed one made a fence around some points would not

get compensation. For support from the project would have many types such as: Public health

work, education and others based on the grass land policy which would be consulted more if

possible, it would define a new area.

The meeting ended at 11:10 am; some issues were not consulted, proposed in this

occasion was handed over to the village’s consultation immediately and proposed more.

Therefore, this meeting minutes is created as reference for the implementation in the

future.

At Pou village, on 15 July 2014 Chairman Pou village Summarized by

Chomphet Thipphavong Khamouan

Translated by Khamluang Baramy

Page 62: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 63: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 64: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

0

gu c"!to tt ''6 99r:wrre - G$ar [a ,,^* f{'h# [J'l-cs$r'uuYts

'[L

-ry,tu uo{t!, nfl fjjir^ ur(crrcrr4 S,r, 3rsfl^

- ruri-.erwsrrre F{$'']t''xcdr ocu hrll .{ ,,S f q,\- It f fl c'ro"i'k

\*dpls GruSfi n1 JK a r

".F*fi; m .'r L r,-': ;Hr F" Til:fl.ff ,, T ; I"fl ::i.^ ,I :";: i,f::: f ) r fl I

:ffi;;, i'"":'f"n;h^jfi$,-"1p" \r"'I # t"5.T it:

'1.:y_q,kf *,, t^ 5'i* "Jt Tloul X" ,ql vcl {o cvrctsor{ .$tq,P ,1rbffr.kffrt$r€g Ct/b.< iffr"&y rurrr laads s't,& :qlHr*,*,us{t\ql,N

q:hS tt ,"\. t"-tl' \,^ ti fuos ro1s9 ts q*GL ,n1ts re h\lutn to ru tesr f^of T c rk ',l

t(91u

qnrsr ["r,o r,er^,]-y!!nct[ dt.yG"fl ttf *fgk tutvr;raeurr

t gi psrg rancr goPo'cnLv YP hl ty W :i ,-h r"cr:lle ttolulon

q,ft *,k I ,o, i*E"Elxrre t,"*,u ' v c',t[ 9e 1*$a p,\,mN,oo 'tUr 6Q l,.r',, Gt t"es Csls

'olr5ol.L,, $tsl**t* $,-{n:Ql trrlbP'Dt{DNtL^:(t-'vl'a;Nlr> t1^esGo f gn n{u ' o1ugskL

1"r,," "-4.it+, . :t,*i ,^r,o*f l*'G'"',, f Ah 'l'''5uG*'*boi'sl

5^] , llo Nrus*irg5f tF

o1* s)* ro.c f[ts\n..[ [". hri^r r*l:Snu \^F) ecn"r ;qr t"*lU n" ifyt5l tr *5*r*h\r.u4.LsLeL,rft+t -T,sln ^,i q"-"i, ;' $ld, q" &,Iohqorl **ul

0

lo-1rr -r111, I"rrt uol,lc^ rrlo-v,n.ru^hl,06r oe,i uo.r / trotr h ql tE" "bc'1.$*" oSp gi)

s.6o1Lu.-r,ngo 9ssr5:ut(s) ^ryjgi"k'S DrU:xrss9 O,ntu6 $

" ^ sVrk .l gJ g'c!p gu'":dr.uutg.

f i6'r'ry4'nfr

l-^i't xtl\ I -

,*Jvb r [l*-r\ it O ,, btUf

T,,t iY teta\O

Page 65: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

teuenbl ffrlnte

t *^$ 1", rn^lhg,*qcib\r{

nYsl,-k-qt dAo tut\hn X'/o fi' r )

ttT *\p,"b tNA'n k'P'*t\:* s^Tt revr\\\'r\rr

of" *^ \ee,cru$Stsso r'* I 6lg"3ol'e 1$ "'k Lo H' 8"'u5>

ocvls -[ :bJ:'

***:T'*L{ ** on{s'{bFS*'* -[c1 o'o:0] rccl (:cbL'gl'xL rki\sw

-4Uf rr rc\\^ fiff? N" *:v-rvf, 9,Ge?.s iLr..o *'h' h rceLo$$

69 *tq-kFtr'"

jEr\ o (c- *;-;, tiE' ql^'.^-* f " qL fl{ ut ffAk Acts

, f T' otl"qv -

-\r,', prcn crq^ 'S I [^cc^ nrt 5t^ IXf ic.rt

nn '^'' \to -,-s'F f r.6lXI Ld

g3 hs Nr!.-.^l^S\ ..\to 5$ r*o crcr\r 5 o ?.,rr"t" ' Ien

'btctuec\'ra $bF :q\ wt

\c e:BI

lte L.ru rso rg.r^1r tt ,f! :rnot'J P011 n't'srk' 'o kp'sl^'^ ere 'r8f ,kL Xnfbt€cr c'r\r

* Jt,n [r.r"5 fbre"T g5s \,oy*.i. x*?k yncrk5r wrd 0crqsro uean te!$--{bJ

gsYr

,G>\

e

Page 66: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People's Democratic Republic

Peace lndependence Democracy Unity Prosperity il NAM NGIEP 1,/ PowER COMPANY

Minutes of Meeting

The Consultation Meeting with Piengta Villagers

On 16 July 2014 from 08:30 am, at Piengta village, Thathom district, Xaysombounprovince, the consultation meeting was held at Piengta villagers to discuss the following issue:

Consultation on Compensation Unit Rate for PAPs' assets

The participants in the meeting included:

r Total of participants. 73 people. Number of females: 14 people. GoL: : 6 people (RMU: Mr Thongsay Buathong ; Mr PhonexayTanovanh; Deputy Thathom District Thongpheng Bounyahuk; Secretary village party,Sousaleum Sommany, District E&M: Mr Phouthachack, Mr Souvanxay).. NNP1 PC: : 4 people. Number of PAPs: 63 people

Obiectives:

Consultation on Compensation Unit Rate for PAPs' Possession

Main questions/opinions bv PAPs and Main answers:

l. Land type rate

The villagers commented seven million (70) per hectare was a low rate. lf the paddy fieldwas flooded, use compensation money in purchasing a new place would be insufficient. Further,Garden and building lands were the same issues, they were proposed for consideration.

Question: Would each common land near the asphalt road and far from it be the same rate?

Answer: lt was the same rate due to the productive land would not be identified beautiful or notbeautiful or near - far.

ll. Building Unit price

The villagers had no comment. Generally, they agreed with the proposal.

lll. The other trees

About the tree unit rate was no comment.

lV, Garden plant rate

No comment.

V. Custom and tradition

There was no affected grave in the village.

Page 67: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

- Unit rates that the villagers had no comment during the meeting was handed over to thevillage authority and the PAPs consulted more and sent later. Consultation revision wasbased on draft agreement. And then it was required to send to the team after that.

The meeting ended at 10:00 am. Therefore, this meeting minutes is created as referencefor the implementation in the future.

Piengta

Sainane Sayagong

At Piengta village, on 16 July 2014Summarized by

Khamouan

rranstated by q.hdmltury &araruy

Page 68: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

.1 NAh4 NGIEP I.r pnr.r,,f F C.C 1,, P I f..1 "

,:5Xn torflri,33ur irfin'rEe:lrarfr: z:0. r'lal: lerlr:.l}u'1fi i:c',.1, l"ile3ifr nr:il::- :::;aelrlala;ii'^ltrnavftI: a21-261251 etilr; ozt-zotzsz

arufl6cErsarneltjv?!

7^

ftN 1!

ltc

,Tltrat \atucil,)yy3:1""'- |

fluar:lrlavnl

-

| , Q,..t I *''n nr1 iw'i o-,L W,r rrt

t..tratnutn*cl-J

(-\/1

tq b)r'rnu

cStrTavHu

1 Ztg2,t*,bffiT O r.4f;"- r

RH u (vtg ?->\\€ue2 _c,(--fr.*-^5.3U2trya"r - - l" / J

oJtn. uJhf il rn\Y tA

a

furlvep;( ZLa/t 2-,e-WJ

4)-G- L,

.-q^aQ7,'z-Otr

l.' t

,rr-n1-

It

6!' - .:

! .L_

*:-t'1.t*-t()

.* l ,,')7

oU

J\n-u. ^A )tn, r it.;-J

t._t +. , Inx 4 j \ )I l, -.,11 ?10'Lr- A-ctl,f)A.*t

U.'10

i- t - 1*1 :a"/ :Z h-11 N ^.,,.r-\z,Yj

eW T:L'', ./ / .', ./ -7:

)'; ., ,\,==!12 .".,r) \kS*r,?6K /td ta-13 V t-l -t

.z'.frt.) )7.\OL'

tr-\' *-r\r ujD14 I

I

I

I

15

t̂o

*tt

a{n. o1}n ,, r\ O[,:'':lc G"lJ.

q:: ';:-\ \*\1-

-$/" t4tt ot Ql - -t-.t "' /"/(,n^= €f-- \i-lo

A'I I t,l,flrTvt

r1

Viilage' Sisalia*a Disirict'

vi e rr ri aire Ca p i rai ; -; .J"oi' o

" "' +85 6ZiZ a iZS' t ; ? a:<: - E5 (tZlZ 6 iZii

C ,0,,

;:Lri /6. .t.l..rzot+- \qYn11,r7 vl6.n".u. 1.4'. m2

Page 69: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEPIDn l^,ED ant, lDn hrvI a t\ I

\ ,-, :,uaao (tjujlulllu1 ?1no.(setta:-lz.l: 236. mau: 16. Suri .1[. .1.\.lzott.

('"

irrturffrar-r, rriel$Hnn:rrn, rvaeuga3cl3i, Rrqrlrf . ..g.qg,l*f .S.jiil -flff,.O4vf '1

Iznav5u: o21-2612sl, ctiln'. oztzatzsz. ii-i, \

, r a€4{cEtscuneluv?l'Jw rvqwtE reY-' tY rv--1-

ri aEnetu v aiJ ; . . . corlal.. mro.r,algh . nr E. rri.o. nraxl

14, [4r"rf ,,tln^v, NilA 22LZq8Nam Ngiep 1 Power Company Co., Ltd-House No 236, Unit 16, Phonsinuan Village, Sisattana District,

l?rlL't

l.'"

r!

1rorn

Y

6(

G\4" -i

a/n fice avrr.uxv4r JJlAlnUllnRALlos

LU LU ldudU arurir

llJ

ts

rlI

1(

nL

t

q

1 {;q'fteVt

'l/1' 11 -. r c)lrh a4rlln, -Y1 -^ )

Zr,1, ,a qa5. ''a 'l SL

ut

?1. 1;Tl rtl ?? ";?oa

oA trr-t TCL)TI

1t q,Al f1 t an4

4)

tt, s^rA €l/, il. tt:'> {tA o

^u \ q*i t xzt (r, r ni \/): (

gt

,, ll o,tt ^ '7

r- A^il,ln \ A'.c-. VZ^

6,,,1 .*, 6Xo1

/-1"'l?tt 7^)) (Y1

a\va-l {t

7 n,t,,'!rt 68Y-A/

l) r r^r\l i41///

^'r /rTq).,bffi N, 1",,\

^ \ ;'))9 r) ,rr,([*( ,,ij]!

L r/t/

lraJl c,-:) I r.-r,r -)) lrl ?

10

"I J... t*# !t, ,,';t m'tt

-

t,/

1J r ))fi clr'o.-

1A I r^j-c-)12

) LJ ?JS€N 1 ) t,3X1 Cr r\ 1 ,O-

13 )--qa lll:rl z ) " u11,,((Y\

l:-er,r . /1 PT)

14ll

A-'cn. vfY2?{\ Lr715 qn,46Dqffi'51 zz-lo V%q) 4W16 vt uq)P cq Rhv t) S,il,i t tfi6\YS17

r\./CI " &i scal Uq rlu! Mu,., o'tNP. Pc, 030 qstgSED <W

,18

a,t I\IN Fi s-fs-3 Y 77WryL,

k 37 'r=Vientiane Capital; Telephone: +85621261,25i-; Fax: +85621,267252

B

,\n U.,oko,{- }r^n1

Page 70: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

rEelra:iff: 236. uLau: 16

i:rtatlFlai, ltlelEHnr:ilr:r' l:aer:qaia;1ir:lrna: ht : 021-261251 t'Lr

" oztzaezz'

NAf\4 NGIEPlPCWER CCtliPA.l!Y

Srri .ll&. '1.\"tzot+' vav qrrri. . u{-'zuaJ.uttr''.U t !' {f}Yv)

,y

tl

b)l-

laid

aru46tErd;aunsldY?u.ril6.ril4il.

U la-,5nsrr Jyz "rJ :....... CIt.Ii .$I).\o..{7d.016rl

cStrnavftu atucil rty,,,,y4

o

JJlAlnuJlnRC)Jfltcavltr.isvqtl

-r'/l,t -J1L )r sil ^ ')

U^ ?-r-", -;-)* b:

--t* (fltr.-:L,- v") I ev4/11

h^ J-^r Jt"L -,*-U-2

nryD4170 -4L-< \./?il 5ru,r-r: zi -7) -

_?7 _

2

^-$ur*-4 b iar, 6t i.,7t1

)-2"r-)

I A -^.\ n\)"e

zr.*-z)

)

3

',.1

-d-q ?4 03>67

l

tr,

*b-A1, q 44%T66

7

-Ttr--/--2,<, A)l

-T- -ffif.o 7 -, -) K-

A <2-"5 ztP.toU(j ).x oT, f,i"{ ,,!l!="

xl , oW_I )/),--^

ov

,t f)AJ 'L,is#

wq "rrr€tl:'10 fi.,^:r; {l ;il;lnq-t/l,<t/

zL;i*7't I n'11

-a /)

qL, *,er!-dIZ.,

t ,'1 t{

^ a-"5 i^.'l'./ 1:\t#d 4Fll r- n,af,tfin /rZ4') @

Ir Sa\,t f 4 6.rnBt---l/.14 /n LS-r

c' / r+-zlft/ 4"4{C ttt4//- 4e -i'' '4"-.15

ffi -)-"'-t6.\q.^-on

1.1 -16 nL:} lf(}^ Pt

J

e{c DT-----'T-I q Fr '' 'l-l

I Uo f t-{ 1rln )J k)\Fq2-'rt7)61tt17

lo

(i

4,?-

-_ ; till"ge' Sisarta'na Districi'

liieirtiatre Ca;oitai;-t.;;pl;;;;t' -r85(tZ1261ZSi'' Faxr +8552iZtEiZ*rZ rT\ [f@td

1

v

(

!l '

l!

-l

t'

1/-fL7T t

Page 71: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

.1 NAhrt ftJGtEP 1i oCVlEp COluaPANlv---

il5io talilrrir33u'r irfier'rserra:rff: ege . ulal: to

irr.ltul*lai.,;, c.!slHHnn:l'ir, lvner.lr1a3a;;itl

Iuav5u: c,21-261251. t{ln" oztzeesz'

'[*l

lvfr .lb.l..l.'lzot+ ,

a, q rui... .olre!. x ral.+rh''uil ra4 "n

*AaluA6cAlscrnsldvAr

6tt.uu'trjl ( r-o r' carlr{ia.q:,rirup.})Fr$.lAo arucfll

,

)caJ taJ luuasr..."'

flteavulavql

91 od9J

\,.1 =. r A

!tatnuJtnRal'l=-_D---==

UTl., ?'J)) 6-D

tk--

cDturavftua/n

Y1 tlrr1

DLJ-\-a-2

h _\LS-Qrrzr W_

&l tt p"G)rzn I t ztlu-4

q<,1372Y 1t ?)?J*-tr

6

."ry* 6 I,' 1v

in r,e )0VL-2r/

U te)-4La< o@t'<C/ ah,-JrL

_L7 :lr- ')(1 '/d-a'

?J1- z@-------w\- nrB

.\ r??-.- ll1 ) -3't" ,-ry----E N' Z4e9 '1 ,.. ?*a1 I tr"rm >ilrl,

StrxtDf--"-,-url,uJI6l( ;W'10 t

] tll aS$,t rli$l TI

u,L̂da'-

11 ffi g u-77-,t/

-

qr?x;<8/12 LL.1/1 a? o.3

I

,.) ' , i

J-tt )-t*13 oA r. Aqa) 9) t/4Ax=-z14 aZ- " y'fla ",lc

?"a4/- 2.%9d49-<115

/ltA 2 2, /;3 _>) 7212!_16'5-

c.r f1 IL) -/-( L-' -;H I rnpI I p**4I z f .:lo 8(&?

4-7II {t pp , -,,}2nilPl1B n, /utt

lage' Sisattana District'

Vientiane Capital;ftitpt'"""' +8562L251251; Fax: +85621261252 .^- Ltp/@

Page 72: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People's Democratic Republic

Peace lndependence Democracy Unity Prosperity il NAM NGIEP 1,/ PowER COMPANY

Minutes of Meeting

The Consultation Meeting with Piengta Villagers

On 16 July 2014 from 08:30 am, at Piengta village, Thathom district, Xaysombounprovince, the consultation meeting was held at Piengta villagers to discuss the following issue:

Consultation on Compensation Unit Rate for PAPs' assets

The participants in the meeting included:

r Total of participants. 73 people. Number of females: 14 people. GoL: : 6 people (RMU: Mr Thongsay Buathong ; Mr PhonexayTanovanh; Deputy Thathom District Thongpheng Bounyahuk; Secretary village party,Sousaleum Sommany, District E&M: Mr Phouthachack, Mr Souvanxay).. NNP1 PC: : 4 people. Number of PAPs: 63 people

Obiectives:

Consultation on Compensation Unit Rate for PAPs' Possession

Main questions/opinions bv PAPs and Main answers:

l. Land type rate

The villagers commented seven million (70) per hectare was a low rate. lf the paddy fieldwas flooded, use compensation money in purchasing a new place would be insufficient. Further,Garden and building lands were the same issues, they were proposed for consideration.

Question: Would each common land near the asphalt road and far from it be the same rate?

Answer: lt was the same rate due to the productive land would not be identified beautiful or notbeautiful or near - far.

ll. Building Unit price

The villagers had no comment. Generally, they agreed with the proposal.

lll. The other trees

About the tree unit rate was no comment.

lV, Garden plant rate

No comment.

V. Custom and tradition

There was no affected grave in the village.

Page 73: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

- Unit rates that the villagers had no comment during the meeting was handed over to thevillage authority and the PAPs consulted more and sent later. Consultation revision wasbased on draft agreement. And then it was required to send to the team after that.

The meeting ended at 10:00 am. Therefore, this meeting minutes is created as referencefor the implementation in the future.

Piengta

Sainane Sayagong

At Piengta village, on 16 July 2014Summarized by

Khamouan

rranstated by q.hdmltury &araruy

Page 74: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 75: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 76: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 77: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 78: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 79: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 80: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 81: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 82: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 83: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 84: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 85: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 86: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 87: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 88: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 89: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 90: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 91: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 92: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 93: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 94: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 95: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 96: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 97: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 98: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 99: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 100: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 101: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 102: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 103: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 104: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 105: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 106: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 107: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 108: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 109: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 110: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 111: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 112: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 113: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 114: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 115: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 116: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 117: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 118: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 119: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 120: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 121: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 122: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 123: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 124: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 125: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 126: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 127: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 128: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 129: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 130: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 131: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 132: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 133: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 134: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 135: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 136: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 137: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 138: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 139: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 140: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 141: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 142: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 143: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 144: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 145: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 146: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Krm"lauLySa tlvz,tfrUyt m r-Jvqrflrara

5lfiuqr.r rsnyar6l tjvqlfrrJuln ["gnv&ru Snmvlrrlraer.***********

UNULUN

n e I r.J y p J U y e"q e r fi n s i ll fi'u a y l r yir u u n 1 ! fi n m u ! ., *tl,,ia r.'l

5-"J. ULU]'ltru,l6't"116-11.

€ u sr gu a e 1 fi u 3 r r..r t zu ff u-o a ir r fr 3 t o 0 rh'r.r ilu q 5u r fi e

fi n q "

riq ff t o 3 n m, ri".j"y u t d t fr e f rn c u r u t u e .r fi o .

R"lutilc0lJ "tRlJ,

m:lm'lJn.t!un [2 I 6t au [uo,a

{nne !LJua!5n nqflo lHurfiaul ejuarer r-.1g e.:!n r u a u euiiie v fO-{fUSE tyQfu d} ui'r.

{ofrSnaSUvausJlri'u{r eeuts!, q.rcuiiu, eSerqtm Era" rirndutenrntumn5frrurfra:-r' r--u <i o - o - - - ^^.-.;tnunl2tJlJ PHA fl.tf)clau(o?o21Jtuc:.iln 5-/ nlut zu15 lJ.

$ao,r - , f o o -)ar rtft?rfrrilrfiurfri:-rurlr$3r..rrerfiuru?rfrnu{nfr3#u$frrSn e u,rynqL{nfi'3ze3ee ria"drr

- [- "<u"luLnu t2"lau8 I cnl Dnuno?unet.<,)

NAM NGIEPPO\IER COIIPAI.I

oi-l,otume!r?rza35rfi 15 r1rur 2015, ffurruJ:sr.r rnr3fil1rrzo38ft#eirir3"JLlfiL;udr qo I

^ L- .itije3arrdr'lt ereYnneSLJveJErs;jl,{uovrvficmv:-rrfllldrlaal3drrfftei3u6unvrhuqrnt o3n.l)-j

a'r:rfre:tu]u]ti"r3";ut, frdru Ll, ri,rL uno&c)JJ6ra! eras Jru uU:mr.

t err,frnu rirsdlaaS znrr 53fru e,runff , taa rfrnnvrt drrsrnqt:rirr-iunrc";:t a,

"i"oXnv!sulnmyu"r{ruuri3 3 rju eravfil'3rree3ri5*'nilr3-1u1rJsci'rrl,'slmrth'leErsar-r.

. uln5o t url!

. cr"r3uil,r"rnrif;#erri"r3";u1. 5 ur,ru

. sir:lretnu-rrlnna3Jrl

. flv!vfrerl,rvlrtiru'.iaJ"tnec!s:J:....

, o o-.< '; o( uaruaoe2rsalnerfin ,y' '{

1 . fiai ra"enuvS'raarna"lljveJ- r - +i

- d.rffufi'a{[avT erljv$'restnelljera!liJt-, ur"uJ drfiu teiriraordi9

2. rluulfitdunlzsda.di o ' , \ voo o O - - "t

, d ,(aaSaocl"lJrrLqn iquml3: irul-J t(]uuuJ.rl-ruEsuLnuEU tunat!eomJ Iavujqn&cL]urryaes3

SUSAU9tO[tAC.s(J

4.

5.

Page 147: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

fteL?ft&,em Luu(Joo

gLgz Goftlr gt gn4: 'r,rGfm ruun

unn r.l ntrnu Gu fe ug g ap GL^: o€ ft Guft lfibt-1u$ng:eg: -e\$ngaeunrupugGr,eotrGu aen 9r: L L beetupulnhapGeu'ngG;l

'GBuBft,bL(rSnFrJl^e.mnfsugruftpuprnul ruburu.(el"unBnung^eLfimIuGcnnrrnugn.cuf.'eglre6rIn]1 o/o0 L GeUGg'bg3

uemGear"6:gSfieLrruLa€^pr,g:uiin&gurnnpG$:Gu::Br,nr,gruhnuun;refunubc[bLn6uup

'u g: uft nlrmInE nS'LrEft buft sr]rte&,

Page 148: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP]POWER COMPANY

Name and Sure Name

2CAvU6luHsnu

Position ci.ruuut Signature

a1u(a!

Nam Ngiep I Porver Clompany LirnitedBan Phonesinuarr, House No.236, Unit 16, Sisattanak Disrrict, VientianeTel: +856 21 261251, Fax: +856 21261252

RegistrationName of Activities f;ffcrnvrir.. ...... lopl nckv) -lt'c: \),i+dvu.Location u"q.rfi...... G" .f,1Date d,lfi.. .....15.1.q /eA.(6

From

r.iqsqnuJqnsic!

9

10

Page 149: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

?-

a1uI vq 1u di...............iln a r ur r 5.........*(.,

U

r$.

G#9ffi,ffiJ

'*x-

l1l2

J

4

5

6

7

B

10

11

12

13

L4

15

Itt1B

19

20

21

26i27

28

?9

30

31

32

CIS

Page 150: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Weekly meeting with board of village development commissioners

In the morning of 15th September 2015, the NNP1-Thathom district team organized the weekly meeting

with board of village development commissioners at Phiengta village. The participants are from 3 affected

villages by the Project include: B. Pou, Hardsamkhone and Phiengta.

The meeting attend by Mr. Vongphanh DABOUTHDEE; village part ’ se retariat of Thaviengxay village

group, 3 board of village development commissioners and the NNP1-Thathom district team such as:

Representative from Government 1;

NNP1-Thathom district team 5;

Village authorized…; Board of Village develop e t o issio ers…; Others. (See the annex)

1. Meeti g’s O je tive a d titles

- The Meeti g’s Objective and titles present by Mr. Luangthip.

2. Activities implemented

- Clarified the pensions rate to involve local authorizations and other involve parts to deeply

acknowledge of the pensions rate.

3. Pending issue

- Risk Assessment Team’s e uip e t is not sufficient.

4. Activities implementing within this week

- Water supply survey;

- Rice and mushroom monitoring;

- Organized the weekly meeting with board of village development commissioners.

5. Next weekly activity plan

- To organize the monthly meeting with local women, youth, seniors and disadvantaged group at

the end of the each month;

- PRA data collection; expect to start in 5-7 September 2015;

- Ask for fish cat monitoring team to addition explain more to local authorizations of each affected

village to deepl u dersta d a out tea ’s a tivities; - To organize the Mushroom planting workshop;

- Request for Rice Expert to e plai to the far ers’ current planting rice issues that their rice plant

about 70% are Leaf smutted;

- Ask for Edu atio tea to additio e plai ore a out the s holarship’s o ditio .

Therefore, the meeting closed at 11:45AM and minute of meeting are written for next procedure

At: B. Pou, 15 Sep 2015

Meeting chairman Village______________ Meeting taker

Vongphanh DABOUTHDEE Tikkham Phachanthon

Note: Unofficial translation by KPV

Page 151: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 152: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 153: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

s,xr"la u!v#o t-JvqrfirJvt er rJvqrflialoff1fi u,ru tgnva.rr) tJvqrfi r;vt ri [snyuJ 6lu a-erarv:.: tqlae:.:.

='rr NAM NGIEFi********** : 1/ POWER CO filPAN

Sorf:lfin

np3.qrugUdvnl"rorfi osirfr 'Uerv:,r-rnlllynrlrl-om"lr#u:i,u.t

trcrare{rea3c-uri 22 fryur 2015, firirr d znr3firluaa3i5#orir3"lutfiurd"r qo 6 \--u ;i - & - *,r-- ^il'a3urrhl I nn"nnasUveuHusc:-ri'uncuufrnrnv!qa-:-ruuzal3rirl&iI oBueiunvdiuelnla3nw

S'qrfre3tu,dtir3";ut, "Sriru U, dru rnloarufler.l saz dru uJlflr.

tererfin"r::s6rsireo3 znru 53frr nrunft, roaqrfneryu"drus'rnqrrni-,rjuuirc.J3ta,

auuurlerlnv:-rrduduri'3 3 d.rr anvfir3rr:aa305*'oG3;u'1r-lvehr$eSrn.rfi'ur6rsil.

. Itjlnon 1 u'llJ- oov i. tr)l3ul6ls'lnuA-"1OUq3JU1. b UrLi

. titr.r"ror'rrurTnoa3d"ru

. oYiJYfinu"urtiq!

. U1n&aUAU: ...

.l- x( rjooiuggtt2"lEcJJm(l6'1o )' '{

1 . rfr'cdu n"sorJy $''lae "rnsq Ljyeu--- dqffufi'cderavenr.ivs'3zo3na3Uvqr:er:-ru znr:.: {rfiu I eirlra" nft

- ui"rl urLB td*vcn3,,,rrft,rnfio"n-u.irrrefrrdu?r.llseaurh'3 3 rirr^o"As2. fi n q orirrn t n r n "l!,.irr t u\ 6r fr a rtu c ur 1€,.r tu g1fi o.

- finnrunuUnrffinsavt{'r$

- ftr3ruSnarS'3urefiurirdgu:-,ns"yrfi6'u,:7 ifisn-ns$e:rcr?CIcvtd5ufir:Sre$ue.rniSffo

- urcal"rurJy;i3td8n6u$liiurfiurir{prrnruriv.ri3ao3ri,rr tnerff rirr J to ur"i!, rjq,r 4

uit.r. rirr uU:sr1 o r4ru, tnrijir.:8f;f;'oavure3slJuneLrR",uu,t*i1,il r*r.; , 3:, Eu

u-ufin, uuuuleuffom''lJJ [[cv rirrauEaor 70,000 fiutirfra:..r^ -A - ,J . ov o ; -3. er05Lnqilft u tzru!0"u9n81uufl Un LLmUI6l.

-*" _:

- o uuv nt!un ruufltnvu vu tu 2 9 SmS fi .]JJU 6)Lj6r CU (EO gl lcl uAU ULlr CJnz A l ( m [a 3rltu BJJ

- anr38S#nncunuryJJn"rmvnl1eU:-rrulF"ra"lc

- rlr Jr er {n rre3uvqrForit rJ e;rn?efr mejuSw $r&ry t=u 3,iu, urtiu 1 uUr ee av f; ilr.il$'3l.lro ;t ' u o " a- ;

suur u ru el urycnu n oeunllnu JU ur! aY [[ a J

- orn?rn'r'*:33nq"t,aJ3rn,'rririreolSnslUuau?lehn?urtrd:5ffe v{vquewtvu-u{rtfii\r.l, o lu -; , "i ^ .;

tujlv clu atJut-l6trlurcLU'tIJJ-JU.IU ( cnau t n t[ rjJmJfluauu9n']3

Page 154: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

:.ta

- Kvtffiauunsuffaldrrlarfi3ltiuriarrir::sarraoo A.- HurrftBUunst.lftahrUu?rirnd3n"rueerauoo-o ^ ^ O o O- .io o - .lt- &vrur tuLJnguSrJ tlnluulIa elgrJ[urfl[cayEr[J.JcIu]t 13u,viln3"tu9oqu[uBoc"]lu&uocn

1 t.ln r:-r r]v a rtl 3,uJ s ijlrYL

fi':,ir, na3uvqrtdEoscaq 1 2:00 etav {:terair:Snrirfrnayriufitd efroeUr.rfrno - .1 , ov o J -!'t! [un"]u?om3uvmuocJnS"lu tumux.].

rjrr.i g, Yyfi ZZ fiusr 2015

c{rfdufrnnayJvqun--\r

C-'.-.-=\.'= -

-

\ --'->1Oomn6tl UJU?ume!

Uumrune3Uuql

/W33rl^l ilnuo6

Vongphrnh DABOUD

Page 155: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

-*ry r^r'\qr-'iinl vO( ]-r':ir t"t''.)

.L- i( , va1uaqr215aumCIfl uuvflnfl 1

gg, q. PO'lS

a.o1

rL3

4

ciihnil' 61uri-- c r? D-1-f-ti-

u?tr,r1 rt !-l-s

qp-6e-*j*a4-e+*.\e$r/(L)e\ --. --v+

7

B

9

10

11

72

13

14

15

16

17

25

26

27

2B

Page 156: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Weekly meeting with board of village development commissioners

In the morning of 22th September 2015, the NNP1-Thathom district team organized the weekly meeting

with board of village development commissioners at Phiengta village. The participants are from 3 affected

villages by the Project include: B. Pou, Hardsamkhone and Phiengta.

The eeti g atte d Mr. Vo gpha h DABOUTHDEE; village part ’ se retariat of Thavie g a village group, 3 board of village development commissioners and the NNP1-Thathom district team such as:

Representative from Government 1;

NNP1-Thathom district team 6;

Village authorized…; Board of Village develop e t o issio ers…; Others.(See the annex)

1. Meeti g’s O je tive a d titles

- The Meeti g’s O je tive a d titles present by Mr. Luangthip;

- Mr. Bounmy show the map that will be increased flooding in 3 affected villages.

2. Activities implementing within this week

- Rice and mushroom planting monitoring;

- Data collection of final year of high school(year 7) for screening who will be met scholarship

condition by Education Team;

- Fisheries data collection workshop for village representative such as: B. Pou 10, B. Hardsamkhone

4 and B. Phiengta 6 by Fisheries team. The NNP1 will support budget and equipment as follow:

scale, book, monitoring form, and salary 70,000 kip per month per person.

3. Next activity plan

- The board of 3 village development commissioners should create their own work schedule;

- NNP1 will prepare schedule in Lao version;

- If organize next meeting, request for Education and Fishery Team to join to addition explain more

about their activities;

- Should inform meeting date earlier, in case head of village group is not available so he/she has

more time to delegate other to join;

- Request for sport equipment for each village of 3 and some other areas;

- Request for necessary materials for 3 villages office;

- Request for computer and internet (email) workshop to focus village staff, due to easier in

coordination.

Therefore, the meeting closed at 12:00AM and minute of meeting are written for next procedure.

At: B. Pou, 22 Sep 2015

Meeting chairman Village______________ Meeting taker

Vongphanh DABOUTHDEE Tikkham Phachanthon

Note: Unofficial translation by KPV

Page 157: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 158: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 159: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

&rmlavLyf;'n rJvqrfftlyt n rJvqrflr.rarc

#ufiuqu [enyalo Uaq.rfiUvtn rsnuu]qu Sermylrqrco:..1.,' NAM NGIEP*********** y' PowEn COMPAI',I

Oorfufin

ngg-rlyauUveheqfi osiun-u6'ry!qrirrrynq:ruiouruldJldq,J

oAlrlnerrQrae3Sufi 23 f,ltrq 2015, fidru d rnr3fiu3rlee3Ef;*'orjr3"Ju1firive'l q

rffogrnrri';.ltein-crne3rJuql$usirfru:1;-rodulenro,qlqq:erq,quarorrylerarriurerj83ao3rhS 3

- Ar-_ ^ s ! - ruuutio#ui,:rnvthuernt613nu;i'r3rfre3tuLuirri,r3";u1, ffdqu q, tir:.r ur"ro&c)ll6'ls! eeao Jrluulm'1.

\o;qLtoulJnlu[2"15cu2a3 u"tu o"roIsa3,e,JfllJUl]"lra2"luinfiurJUU91J3.rnrilunuu"lum1cJ3Iq,e.i-vooA

a vuyrfomvu raluu rurh'3 3 ricu er avfi u3'ru e e r 05 S'n d'r I 1 u 1 rJv d'r r"De3mlfi'u rA 1 scu.

. u"ln5o t urfu

. sr"l3uilarnrif;#o:.ir3;u1, 3 urru

. dqr:ron.rlrTnoo3J"ru

. SlYlJYl!OmirLl'lU6lLJI o. uJln&CUBU:...,

:,- x( rTaroflqtErscufi crer'o )

1 . ri'odaarlnrJv$"lea Snel.tJvqu

- d"|ffufi'c&ravanUv$'3a.arnasrJvqueruu ui'ru {lfiu tdriravnfr- eeartdcf3eirqru 1 :.irX;ur mur:urer'3 ) ytrntrriar6'!ftcd.rsiumeur(auue"rufi'ufiaruqo

nsutdtrdri5iffrjuffrlehucrurderfieirit6'rtqdq ri'r3;ur uuurneil, ,',nrflu',3 uiru {ro 3t - o iMU N I OgUIIU"IU [[UUI.J1U:

2. n ruuL,1s-q-6irfi o qir r& ue$rryfguee: $ si a!a!- "1 - o o - A- A- Ll"lnlurnqSuaaoaomJna)?un.tte,5u6te.lnoilvuJUnq:-le6lsu?91i tut[nnu6'r!u2u2€J']lJuJdlzJly

uv reav e8€J erui6riSl€J ae 1dr rau ff cr

ooy cov o ^ - .i, r- flu[ffihnrnr:if;#oqdumsu&vuueSqUynerffa.lpe3nuq"]curuuru"(r 3 uru suietlfr

sE e r6'lt 6im $L,ff a q rra riq3lnu'r eaufi o. ovo ! L o' L ," * ^

i- €.lrn"(ui.rhque03ure.;aaluSei"rraave"lLrt!'(Liffinqufli c[r-r:nruUd3:Tug3a'rusnymaiaeu!

- gqn?til85*'erqie;fireh:-rar.lrfr3 e frsuaurv#nar*"tyadlrsrJ3Sei rurrvoro.lcfrrnrgfiu3ru

u rju rj r ? {5er r U r u d r U v q r,r se a "

u e ! r B n o"1 n s c ufiu q r o d r u e o a r S'3 t B o o"; n s i u rYu r-ir u

Page 160: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Ovoau.jrLooolPomq3sl"l3uuleoRJJfle6u1J ilIUAROmOUFUUXOJnA9!.rU3Ue AAqtnOJ (manOQun.rS3 (etUSU

UJ6]U

eJ"ln?fiayuu a3 ttuafiuUurS; :? aiure 3aaud"r:.r

Urn?fi855orir rBrfi crevrirurtu'qrcurrt 53 efisei€rtfi qrarirufifrScrn.r! sUu gfiff Eund.l

(n'l

rluur r$srfr unrut nr 5r "r aarfi'r a dru?u ff Erincr efr "r9J

el "rntfi frtfira "

trui"mr ! dqLfru[rnquJ.rncnriu6iufi n.rlt a3

{ofi'erasr vSn ar?fi ;5r5ufl!fi n.r! t ou& u [tr"reoA-,3.ouol-IeJln"luau [uum?uso fl 3_u umuo [umuu.l.

oo-u , o ' "lo--ft u Iulj tul [,8O$ qm U A q ! 2 I3n9]U uqU t! tt fl eufl 3 tul (UUuJ rR.lA I c-.i^"irooue-er fi'3no 3 Uv ?u!ll 6"u fi'3 n I auln: r fr eu'(:.l 5:-r 23 a e 3 m n: r fi s!

A^ d - i .i r , " ;caq ff r.]!m2 3 [2 ouRUoulJqqv 2u t uR u [6C)3 tuq"]cu.lu [u9

fi'rtr, ne3rJvqutciEocaa"r 1 1:45 reau E:tcia'rf8crUuftnaudu:5t5 e&psUuf,no u .7 , ov o 6 -r|"rlj (un1)J!CImSuuC',lUocJn 3.lu tlJ mnii.

url rJ, 51fi Zg rYlur 20'15

rJvrnrunesUvqi.r U'I1J

<--*oomna"t uJY9umgL

maGq SuUu$oBaoht urn g SOlv{lAl,ll,f

Page 161: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

lr,:

'll

NGEEP.tCOMPANY

Registration Form f ?u5:uvUJU:

l;i *$*-. *::R *s i* r J +9p /t*r'r\-*

Name and Sure

, nameq ccc; uruScIU

No,)/a

Page 162: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Weekly meeting with board of village development commissioners

In the morning of 23rd September 2015, the NNP1-Thathom district team organized the weekly meeting

with board of village development commissioners at Pou village. The participants are from 3 affected

villages by the Project include: B. Pou, Hardsamkhone and Phiengta.

The meeting attend Mr. Vo gpha h DABOUTHDEE; village part ’ se retariat of Thavie g a village group, 3 board of village development commissioners and the NNP1-Thathom district team such as:

Representative from Government 1;

NNP1-Thathom district team 3;

Village authorized…; Board of Village develop e t o issio ers…; Others. (See the annex)

1. Meeti g’s O je tive a d titles

- The Meeti g’s O je tive a d titles prese t Mr. Lua gthip; - And setup the question(what is NNP1?) many participants can answer this question, but there are

some do not know NNP1. So, Mr. Luangthip brief again about this case.

2. Next activity plan

- Request NNP1 disseminate traffic road law to local people and affected from drug abuse;

- Request NNP1 to support sport materials to youth of 3 villages, in case it helps them to avoid drug

abuse;

- Request NNP1 to disseminate about sanitation to community as: how to protect malayria and

others;

- Should inform meeting date earlier, in case head of village group is not available so he/she has

more time to delegate other to join;

- Request for NNP1 to rebuild the temple because NNP1 use the temple to be workplace with local

people;

- The focus villages request for camera to use for taking photo when running activities;

- Request for fish species to the village public pond;

- Request to urgent implement about livelihood program to improve life living of people;

- Improve 3 villages infrastructure;

- Request for doctor specific in disability as soon as possible;

- Disability study tour

3. Next activity plan

- Propose to meeting agenda in Lao version;

- To fix the date of meeting in 23rd of monthly;

- Show plan about flood increased map to local people.

Therefore, the meeting closed at 11:45AM and minute of meeting are written to be reference for next

procedure.

At: B. Pou, 23 Sep 2015

Meeting chairman Village______________ Meeting taker

Vongphanh DABOUTHDEE Tikkham Phachanthon

Note: Unofficial translation by KPV

Page 163: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 164: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 165: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

. I NAM NGIEP 1..I POTVTR COMPANY

fi r[0qavuvSor-luA.]fi Ust mrJuqr{rar o

#!fi u'ru (an va tertJve lfi LJut m tgn uLi "ru5nLns,:Jlqla aL.t****l*t***

6v6uhrfufrnnattJY4p.rS.aq;rqi4rJvt"1e1&en-unulg-rJginlp3f U&,irl.l'.,---

t::5ufi _29_rfreuO9 E_201S_roar _9:30-Iuj u"r _1 1:00 _, fi d"rl u,to&"ruflelr

r$e3-uirtlrrr-, tt2cJ-t q*'uq!

Y dffo n e 3 r.l v q I a a l fru o v r v tJ v fi u.r 3 r a':u n; c fru 6 o e r ri r a a 3 t sr J n "l L

t 5 rs a u st=:-r tJ" zn r r ? r n a 3 t-Ju q :L #3 ff t o u ct u u ur.r u-53 aYr: o ru fi

ii- o- orau ranij53i:Wn q3ufi rs qn8 f; #nt alu; rrir I 1 u t, cier r 3 uilrn rn rfrs l_, ei.ru qn-i-{i-

nruSnara3dru_3dru- eeav Uvqrfli

" "f,. doruc:.le,:rDrsalrI3rrilr'r: _19_6'rl. e"lirar68r: 2 flu

. ejrerffcr '. _1- flr: (urrl-r-53fr:t orqofioou L,y ;'. u5fr'olujUj"ril.rrtU 1: 5 tiu

. q6l:lAlqqau"lll: ALa,- -( as I TelJJa6)U2 6't On f) )

fineSuya jJ err3r,rirtln-t er:rr:..lt uriluj"r3"1u t t eiriraSorJvfi''3

c, rff l3r ueeluv crunf; J fi JJav JJlf, J JJeJ rl enelrnt tmli, fil3ruaol(tnnruii. fily:l 6uUr

e o 3 n a 3tju qu,fifi': a r u *r o"1 er ai i:S,

a. nrlS3nru [[av nlLtnnlLb, rrvilnllunlunumln eelutfi*ru1n[[5c, e]1npycua1fllJJlnc$JaJntfi

nlJrffeL qR1 E 2015

Page 166: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

ruumanuitota!

ftt[} fteButm ura. neLl 2u1l rTrh ']Cneuu;o.uo. 'o

O

inr?e[8ar[nnurTLeBfiCI]*tr'psntue3 pue 3OIA 0ur1aey1 AUetLgtEUn 'i.l

[en':uuxeu ngu[eus]{-(tlt - ug[tgnuu[u1 '0

u+elrup ']

n8qlutfiLCIAa

uu*ernunaaugnru ^E

l: ak:nxn gr[eu ee:: rir;l[6auF I nft uIsu'aIca[o.:d u]ooiqsnt J /Ugtlggt[ru[u1 [eaupngffre6'p

raruhftru[ur IeaunnnurTreB'c'*'\ao

rCirrulmun Eft Lrrnl^Btfl ^8.ff

esrcFI gn unna [eau natnupnu [rr^rrn rumr:[ue' q

ftr.pru^areu[ftrtrAn^ft3ung nLn[eaugcfts]r 2err mr^trr[I rnnk nu[nu 'e

rTescieB[rrknpIaa S t,:ruBrruuuugIrtngft*irum'crur;lft^a rrrhrBAr]^rtf;u IsaLffftrt?urgLsu[enrr::uuuBE^n'+

ftru8 6sres 6$:p1[3ry:r7nqu:cuk ngnk:p 'a

net=runm1rur,[nenn[ea rueua;16'pnun:t-rupnuri<G[l-rru[g *u:r [enrnp ruu[nue:p*rrABnu rrk*p'c9?? o

[er:n^a n[enueu[eungruu[nr,nnurikep'qo3o

Ientn?ruu[rruxrpannu[ea Zg uumul;r.*pnk*;i'enun*Lruurumem fiL[ffm 'q

r"a: nu[nm '^rU

uruelneu nu[n'u: 't]l

ANVdr,I03 UfMOdL d]I9N TIVN

Page 167: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

(JB8ncbrnnrTJl eral^"t-- '

---r

1ml Co.r^&.

hnu nna nt"G fi b tr a n e ft eu nL(u trlG e u &,\^fb !n rR I n t, e Ls p $--u inC eg rub r.rr 6 n ft^a ftAtc fu G u n 3' v

nunnu uCeneeui x ft I u,,rGnnelrauung ft e?r G glr0[g?i uB 0

rre ^

p c ;u ;r- S * -. zu *p "-gi

t c u n b c n u e -

^ *, n g ng c-t. :: n uS t -n$

^ e rr n3u e

,,tf,u?grrl-spluBuBnGurtsnrinaengnaerubuftruBLnBleftftruga] esbffbEuBrrbCrigm&nnte€ 'Z

uFeug:nuufgnemnn]ree:: nl,riGearubu[rcliJ *en ul'emein nuGar,eGueemuu:Gueirbuftlnsagupr ftGugm1m]^B '

L

: re u n Cu EG e arJffi h r" p lm4i u.rs

ANVd!^lOO U3,!\OdL d3tgN ll'lvN i|

: Ge a e (-uu ne e uu mut u ne ulu t tJ ,Y r '

Page 168: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP IPOWER COMPANY

::fiuej, u rfir.;5, rDr?e,Sufi ieaysr?ur":.tr?_rf,Utcr"td5'r ua, $rj,raar5finqr: tn3nq:Jm1!gre.l:Jdoqu ff nu ri,.uj

erfi Stuaverfi aa:ariarurnGc:-,?-,i;r1rt,fr ,i.r,*.anv [u1'sfiUiutiulrr:

nE3UBertdEora&1 _i 1 :00 u av 63 t eisi'r30nf r fr :-r a vrjuffy J rUliiinqr:;?r.:nr:l e-o #1Uvff riera 1n 3 rl? rLei au r.

drr*urnarrrsrerr-.-, JLff_zglo glzo1 5

dYrnr:.lne3Uvqr,r

-4: 4-'

fi/N-ui,rr S3ffrl erruoff

UJ1J

uiq! eeuefin

r{ue,iu-lfrnneSUuqu

uiru rJr$"r eeierS

r-luznl::ti

Page 169: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP]POWER COMPANY

Name and Sure

, nameq cccv uruic4u

/-/t ti-

lD number.-ur-.,\4-.I rE>-.

Positiono"rccur.il

Fromu101,1

ulrn:iou

Telephoneqfffut3vJu

o:oor)

Signatu re

crerc{u

6EL-rU ut'* ri\-.

++y

Ll.tltt:

Page 170: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Weekly meeting with board of village development commissioners

On 29th September 2015, time: 9:30 to 11:00 AM at B. hatsamkhone, Thathom village, Xaysomboun

Province.

The meeting attended Mr. Vo gpha h DABOUTHDEE; village part ’ se retariat of Thavie g a village group, 3 board of village development commissioners, NNP1-Thathom district team and local people such

as:

Total participant 19;

Female 2;

Representative from Government 1(Mr. Vongphanh DABOUTHDEE);

NNP1 5;

People.

(See the annex)

At the meeting the representative from NNP1 present to meeting objective as below detai:

a. Administration and management;

b. Already done interview the Marketing staff, expect t start working at the middle of the

month;

c. Social management team will visit Thathom district;

I. Social management team;

II. Fish cat team;

III. Disadvantage team;

IV. Rice team.

B. Government relation

a. Quarterly II meeting in district relation;

b. Meeting with Risk team at district level;

c. Meeting with District Relation team and Non Profit Organisation;

d. Equipment for Flood team;

e. Meeting with youth/women/seniors/ disability family;

f. re-implement the Village Relation team activities of last week.

C. Improve Livelihood engagement

a. Fish cat team present their activities to Village relation team;

b. Recently engagement plan to develop 3 villages;

c. Progressing of Rice Plant Project;

Page 171: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

d. Progressing of mashroom Project;

e. Village save fund and credit and small enterprise development;

f. Handicraft;

g. Livestock-activity with DAFO;

h. Meeting MCC and Caritus

D. Progress activities of 3 villages:

a. Other activities;

b. Ask and Answer

Speech by chairman____________________________________________________________________

After that_________________________________________________

Comment and question from villager

1. Request to train on how to create activity plan schedule and village activity plan and methodology;

2.Request for Education team to addition explain more about scholarship condition and update

progressing every month in the meeting;

3. Request for flood increasing map to post on each village office;

4. Identify procedure of compliant or justice system;

5. Monthly meeting change from 1 time to 2 times per month, the NNP1 will inform later.

The answer from involve part

Conclusion (Chairman close mark) (agree, disagree, understand, continue negotiating in the next

meeting)

Chairman comment in the meeting to identify more detail about project activity plan and propose to

mediation on time about the compliant and ask for increase the budget of meeting on village relation.

Therefore, the meeting closed at 11:00AM and minute of meeting are written to be reference for next

procedure.

At: B. Pou, 29 Sep 2015

Meeting chairman Village______________ Meeting taker

Vongphanh DABOUTHDEE Tikkham Phachanthon

Note: Unofficial translation by KPV

Page 172: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 173: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 174: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

el ^En

L€rfiHruergu:rgnkRBru$nuu[eauee]AGUlnHtB'v

uLLuer euL68'rugrrHzQ.rT[ru^0.uu

^,lrrr '4,u, nu$rgug&,uu[pr0 3E]l ePxr]luPlLF91urulr$^r,uguq$n1 rLn sell [eg:npnu[

nrBAnArAurpletungnp:muInue *u:: nfiaegrtrn[0]ABglnutnglglr.gAa.uuAur,:xu.:rugrye

rrLG ^ux

Iep:rupnuInLBAnArr^uHUuLrrulAurr]xLE44?

aFnEennr,uIuenuuuILH Aex rue]^RulugugIer; rntIuryupppeg:nuuIu1[eanutnuee;rp 'z

egilruLnuG^uAmrrumLInueap$ ee:: uCeeurruue[, 'iguS?LrplIeg:npnutnuee;r$ 'r

:!:u[.[unnru]ulnLU?An ruLLo ^allu P n'\

L[01:r6Ur e rL AUn unnur,rg[gnrutrnLm Lu^e.uuAaqxrrr.ongrrLeunSetqe.trug: Aex uftp]

'nhnebl [ea::

'rrupp Ieg:[eaep:uum[u1[ueua:plgre.uueep::[eaupq:rTlrsu] e rr;Brmnm::[ue *u:: rffrTrr.]g

[ryne Lu2uuuaEr;::nft^e,;prgnpn(n*unanuIngl ^ex

uLu6lnep 'tupIp1nut:.nm'unLB 'LtruB

'nmluqn[eg':1.':ugepnr,Inu :u rn[[uqrr,p*1nri,rC,r1[eanuInrn^sLJ:]uL&,rfloIuu 'n&epIeuu

(upuppnuenuIe:u)

ng rL :r nttuqrr,ppluggg o

(neryungugflLtrAuer uuriuu nrytg nutp 'uul:uzuemee nftng nuqz) ng ee : upnrf: .ftu or. :[g$nenug o

ftV vt :una[glrepug:pnenug .

rTeFL€lftLB

:e:: fen:npnu[nue*p^rTA$ure.L[n[uu$ 'rn[[LgrE1nluHEq:uuo.up[uu$g[gguen ^B]r

uurgruu

nes nrinE rtprTrynnulg[gnknp[eurtrLm*nrprffesr€: 'rn[[upJnpreg:nuuful ^e]r

ugu[rueputm [leu*eruuhLeAnflLuuea As]r r[opftegr e Lu;uua.ftn:: 'umnuprueg] e Anstrrqrze ua.

nu[u[eunuuan[uuqnuu[ea e uuLrrLJlLa.^nuruLeugnEnpteu nEn;l[euuuuprfrngal tea::-o'?.

nuluqn[egrnLro^urT6sffi*Bg] 'oo:zrLu [n1 oe:eo rue] eroz g neu[n rau] zr SflgrLrnttrpllgragrrrrutuS sur ug

ugrreF ulrdugurunu[nrs:nnLuuea Atrx L[ore]nsgr e LgIAE u.r.nr:::'unrumrteu] e AntrlLrJ^E uun?Eaorb

nu[u[euguun;r[Eugnru6ea e Ul uLnulLe,:n SLLoLtsugnkap[eu

L

u56'frii$ft4ffi ,o-

' neeub,urueuruenrm^u;;;-ApuLuau6r nLmurg

euenkub* nul A nmLbl fiuuAft *uLrnrts

Page 175: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

5. nluEnr5enneuffuqnrfinfie3.BnrucfinBnB.u?fi ccav nruc[lunsuffofiar.urnuvincflrcfin

tfi6. *rinrsneuffarfifi n8unvrffuorntnlnrusvUuflrutugt?a?

i & , L,o .5 u--nluu, nelrJvqrtfiEnccar 12:oo ccav 61tfif;r18nlrurfinsvilufiti cfieclJufrnqru?unrn-3.ovaf,usnnlu vnunc Jnllu 1ucluu1.

fi&e3svt"r.rHeurnvmluc.Selrnrtnu, 5rfi 12 "illnsu 2016

c{u{UurfinnsJduau

.F-rrWmru ilc$r cuerl

UvnruneJdvau

Suql aerr5offsoc)

Page 176: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 177: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 178: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

pg. 1 Translated By KL

Lao People’s De o rati Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

The Quarter III Consultation Meeting

On 12 Jan 2016 from 08:30 to 12:00, in Thathom district Military Hall, Xaysomboon province, the

consultation meeting was held Thathom district Military Hall to discuss the following issue:

Previous Quarter and Next Quarter activity meeting

The participants in the meeting included:

Total of participants: 44 people

Number of females: 10 people

GoL: : 33 people (Mr Somboon Sonlidthideth, Vo gpha Da outdee…).

NNP1 PC: : 11 people

Number of PAPs: people

In the meeting, the representative of the NNP1, Thathom team, education, health, infrastructure,

vunerable and asset registration team summarized annual report and plan next three - month activities

in the upper reservoir in Thathom district, Xaysomboon province.

1. District coordinator agreed, informed in a detail.

2. The NNP1 coordinator has defined the period and made the meeting schedule quartly for

village and district coordinators.

3. All activity report must be the same as village and district coordinators to acknowledge

which complete or incomplete and when complete.

4. For shrot and quick period of asset compensation.

5. HHs Selection of Mushroom plantation aimed at training and can make production.

6. Where will 15 PAP HHs resettle?

Therefore, the meeting ended at 12:00 pm and this meeting minutes is created as reference for

the implementation in the future.

At Thathom district military hall, on 12 Oct 2016

Chairman Recored by

Signed Signed

Somboon Sornlithideth Polor Yiachou

Page 179: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 180: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 181: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 182: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

======000========

Minutes of Meeting

on

The resolution of the new proposal of 137 graves at Ban Pou.

On January 13rd 2016 by 9:00 to 11:30 at Pou village, Thathom District, Xaysomboun Province. The

consultation meeting on the resolution of the new proposal of 137 graves at Ban Pou and Participants as

:

Total number of Participants: 16 Persons

Number of Woman: 02 Persons

Government staff: 05 Persons

Representative of NNP1 : 03 Persons

Number of Villager: 08 Persons

The meeting was chaired by Madam Phonesy THIPHANTHAVONG, President of LFNC of Thathom

District, She explained all issues and inquired the elders and tribe heads as: the number of 195 old

graves became 137 graves. These buried in one place or many places, the village authorities certified

that 137 graves had selected and had the real data. After that, the Thathom District authorities and

Secretariat of Xaysomboun Province studied, considered and agreed unanimously in the meeting as : It

agreed the project to continue surveying and collecting data in this number, After the completion of

data collection, the meeting will be organized once more during the compensation and ritual.

Therefore the meeting was closed by 11:30, it made this MoM as evidence to implement further.

At Pou village, date January 13rd 2016.

Certified by the president of Thathom District LFNC Certified by Pou village head Recorder

Phonesy THIPHANTHAVONG Lemthong Yangneng

Page 183: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

rrol'-ul a.lg-a.>

jg.s'tn G*-Fr')r'ffi

nEa;r6euugftBp'stozftolet sng '8nuF

' u gn p i'r trru 6[ Err r B ^

u 6 ] e e:: nr, hu ffi r Br sm I g trS n B ^

tr u m n B u g I u g g tr

[ g'., f [H

,' I o. n u e u n rt a a e lt n u [,t u ffi n n n n rl ri rt u t &. u 6 t-I t e u n u n' E

" 2, ^o ? ' 2

a;rIeuug:utrtS]ucmGq{:r.,:1ncryn[uuu un"ffincnuo,fltnslrptgrrl]r-l'Trr-rbncurutrAnAr.-3Ar"l: 'r.t'rTlrn Zet nCntg

,!"nn::[o.egunUingIpnffitgrTH]rr[rr1;nugr,rtrnr,uAff[u^r'rAuIeaueprugrruurq] ae:: nli sornente,nttrTnn::xn$ukAFrrrmurtrBAuB]ruucuutrfirr]rnrgngn'rrr,rtlnruArruuATtAu[uu 'l

: nEgnffi eeps$repngpryrEap[eunun

-*"l.1 efl tG.ft rT ]tflnl t [Tnan trL mff t]CI ru?1A trft tu

'(]uuraU

:n[u nrun:]nururftruaemH ?- '\

' (gnegrun"ugug pnuunufe*enue) nu:1uu:[en: gnup'nugrEr?urulAr*u[eanepra]nrunul r ne[uryupfntrn6E3 nuu[u1[ea ngraumg[.9 npuka;:n":r7 ' '1qnfea ng[pnffinu:u1nuu nE*;r[eu ugrpl rjnrfn [n1 oe:a uue: gioz lrc I il SrqruL

nfrngkltea:: nmluqrr[eg: gruuggr mf[ur;ruy3mlnea:nuu[u$ea

ng[pn&ng:qqnutuCegi*r*ugrtuunEen[eu

Gt,!a\,

+++++tF+++++$++,L

'neeub*n*uue nrm*uer r^ll*l-rgrLk*p uue*u6r nrmLlruH

eueru$uk*p up1-rtnuke;r ueeft AtsuJ?rB

' ru$uka;rqr::qnuuunffi sor .L

.4t

Page 184: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

i!a, r-r: ci ,.\cr:i\ri-iies #,fin'a:n',. ,

Lccation fi:Tl"rljijl:

UC {-I3 .JJJU I

ito

an

.i--

l'iamie anei Sune !*i;n,*

2[tayi 11!f,ynu

.Pe,sitiom

firuenL3

r--*Lril,llt!

li1"1ntJ"1nHJil

ii_* l."nh ni: c

IL!iI1h,ei'1

ru].rnr;*unnn

\ ioii =1.1 I i.:

't"lijIZj-t

(T*r-n?t,wt l(Ajuu r{pL1w& ADs U"'/ oZoAS{98o I J^4)/t ^ // D?^-t )y)l.r*, h;^ 't Frr.u:Dii Of

^-//)- d, -q.C, ?-,n^ ,Y .F yr.r, tl tJ.,>

tltat4 I

/ /2/?. x)') t€r}

">) -? l)2)lrI rr

Y). -9^./ ,r,frrn,A ^rr"a+SU-+J--I212, Jt*l J*t

ta/r/lJ't o llJliul /

o-. 5{I'1-

-lrr-'tu Q xs

7 {). d, \1L

aG5, -:,-I .A)av ?

<, t/{1 ttttS 1 1) La-: eqiF-I

r*) ->.9-,\,1 f <l '.u "r)*tYfua

gg-a-r -?-<!

?/'1. .gil .J-,t

o).

1'n L

4,4rL._-

_irlam Ngiep 1 Po',,'rer Corr;,:an;,r l-in-ilreolEan Phonesiuan, Fiouse l'1o.236, Unit i6, Sisaiianal,l Distr-ict, 1./ieniianeTei: +855 ZI 261251, Fa><: +p,56 21 Z5TZSZ

tvv

Page 185: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

Grave Mediation of the NNP1

On 13 Jan 2016 at 8:30, at Pou village, Thathom district, Bolikhamxay province, the consultation

meeting was to discuss the following issue:

Mediation Subject as follows:

1. Propose new 195 graves from the villagers

After the meeting considered as follows:

1. Mediation committees checked document that villagers proposed 195 graves and Pou

village committee consideration actually seen 137 graves.

2. The village mediation committees saw collect graves that our mediation opened the

meeting besides there is no evidence and true data.

Therefore, this is used as reference for the implementation in the future.

Pou village, date 13/01/2016

Head of Pou Village Meeting recorder

Translated by KL

Page 186: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP 1POWER COMPANY

a"rLn6la vu ufferUv q "rff UvY nrJv q"r{u a rc

#u fi u'r u r e n v a "r o tJv q r ff rJvt n e sn v zJ r u 5er u u u I Tl q c I u .

tiotiufrnnsqUveune3tJuquUvshefrsufi'uouuuuua.ruglufuri'ru (d.ru tj, uloalu uav ur"JSnl)

lu5ufi 2Tefror.rrigneuE zotGsaa.r 09:30 tul rn'r11:30, fi riru r-1, e$e3m"rtmu, reac3 ta$'u

UU

tcit'oneguvqunesUvqurJvefrau fi'uovrvrJyaruduriru esa" e6.rserieeualsuee3 s rj"rur[afi'u- X , o "i<5seemar6erevrirae3 3 u.r!.eE"rsourUutJvznl::tuno3Uvqufi3ff'terueeuuurru53uYu erquoerreUu

r o L ^ .i- - oou[aa"]uln8qnq6tlnuu'lLmqaJl, ru93 n"} tmu, ff2a9 (aFUUlJ[cav :.J9nuu3u[{s]"]3u'u1s1nuafie)

t ululrrii3"Ju t , e5nr3uilrq.rndruqnnruSnero3J6rlJ rrau 6'rvuvtJva"ru3rududru sdqsau,

. dquar{e6",saufi'guilei: 22fiu

. e".ruau{81: 03 6'u

. u.)eJ$c): lElu (ut"lucStuu o"tuoo9, mlu o"t6e.5u ttaJauu]c"t3 ltau Ln"lu ucta guuv6 .f,.- -caR"ruqoomuluJ9u)

s)

. O$#otulul'rrirrru 1: 56'lr-OOUO(aY9JOUA6rUAelOmO)

2. mu3luCqln"lu

fine3rJvqu, err3frernla3nrutuluitll3"iur znru Eehr eejugtdri.rcerc"ruffuuil"rea3ruru1rrfr3

efreueiil!uqz o3nasrJveurJve?"r efr er;'f fr ,

1. uiqunquffoznuuq{u?u- darefiao3ervuvrJrarugru{urirrtunaguoeutuSuft 30t12t2015 (an.ru qufr eeav

znlu S'uff n t cifr ee e r o a ru sd r?fi a ou vrJv a ru 9 ru aruzJru 1

- t deEerno3uvqrUveht sruqn:iuErvr.ryrJyRqu3rrdr e"8er hJufi Qtol t2o16J9'

- ff u3 ru efi uril$'u$u evS'3ur efi u d"ruauS'uftt da r effi ur?ur't er ln ruo.o

- ftr3ruefiu{uHu eeav floef;uevuree{3a.reln.r!f,ufirJ $av nru{otE€JU"ruhefreunLjuJ.t

- an&rnl rirr u53nrsrtd#un.ruri'oueeUg esav $'3r$urfre3ffgu"neln"r!r[uroeent a 3n ru eEaut uuitji3"y u t

Page 187: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP 1POWER COMPANY

ffr3,r:rdaulanqn evureirpro eeav efiurirSurtrru airffu2 flug]dqLl; fieiaSnrutu{!J;t q ^ o o Au -A s .i t "

efro3rl3ur, flrfin'rr i! rauS3erviitoS'3rH'unln'tnJnlurEeLtululrdr3";u1re So ee av

e"r a u 6Tc da €r ) e n I 6r e "Y

i#u n r r.r fr u uJ EB o n r u e U u E-i{'{. fiu3qufruqrrtei3aiT3:

- :i'aureLJ3aoOuriif; r:rhudd.r rher uJa- zJuUrav0u:.i.rSL?rl 3 zl"rL d?r.rfunslnrueireff:.r{- nrrrlueaoarRurilfievn'au 320 gtav UueBr tdesu5rfji 27t01t2016

3. nruEunIESon.ru cUuaa3Uuqle!oeo- 6'tClUelUUU"t293n93UUU"tU - 1J13 mn6t"lo- fl49u6]uux6t293 nlumvp.toznlL o.]agu

- aceufruuilrze3 nrlfrr{E3ernrueUr{(airlarerYd) / ur1 Starua!o , o y t d r 6- 6ta9JJ6'.lUUnJ12A3 n6)SvndlnlUUiOmuU6)O6tun"tilUnuJO/ m"tu a.lSJJC

$rrn:fuor3uilrernt o3n,rut ulri'rriigu r ui'ru qufi 6oUuErq t cirilo sfr3 r souv6\luJouluuluuq9u t o3a13.

1 . ur'e3nr::riu q frqj?uerouiurJvurueeSa

2. anara"rdru uJgml seuuqo#eureUg eeav S'3r$ugri"neln"ruG[u,o

3, Saqjdrurji3"Jul froa"ru$usa3$otqurtr.Jurauocn rar tar3nrueysnarorsau"ruTul0E

fl'3e.rna'rutUui.r

4 . qifinn vfi'u q v Onel"r€r t Ut a ? er Ju riv a ru S"ufi'ufi'u etu efi 3 a e g u.rn ;i au 5os': ' - I lO

^ O ^ J oL-5. znl3 iatJrqrueJlu ee CIu!UtJvuu,t [Gm!.]c"rus:.J'(u3ttrJvu,ru0pruauroav rur.r i o

6. rii5! a ard"ruJt ci;i'e! eer;9t u ee Jc, a r8uriisrqlaeuae J a rir!?riai"r sH o?uE zo t o

oocuei16 o6i1 sff u pe j o u1J urJu aru 3 lu f,udru

1. nruri'rrTereaerffuui'ln.rLs:r5o#riirjto{auza3rJvqrflurJru u"loa"rufleu tdri.rforaoljrauuSaufiauq.rue")a

2. nqurilfoeaofiuui.rnruesosofidiStdriauasluvqr{urjru J asefi?finvfiri're"fro3

fio3n"rr {uruvurnau eeav 53eeaoSou {craquraofil seu:rracrEecrlriieee ,. r*r,n',3

Dl ({o#rrUueaoS;3#o eeay tsurucJg) eeav ;lafr 2 reu! seoueoder./^ o ^ o o o o o" Ju -3. nluriqrToeeeriiuuien"rueivSou{rirulerq'auaesUvqrflurj"ru uJ3m"r tdriqfoeeo nr"r3 D1

-![2e) u90u9uu"tucl1Ju]clo&1ua91J, [20u90u]9u9 [tav u]cuo,o.iu',o4. iiuLq eBe eaoul! n'ro a'ru"rou;r ff rrJv sruer5ut drlz efr aqvt dzfr'o esrnueir asSru?rn'

Uvq'r{u

Page 188: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

ffiav e t aln"ruavuluurutluBuE esav eJ'rd'r#oqflo(?uruov5oavo ee 53

Es a v .Du v t €J u I €J a v ufu a ruru efr u efi uhn'S'u eur o $'u6u .

ff u ulr o g U'r e v fler r fr e.r ee u u ? er 0 t ei rffi r: gu o ) u u r u n q r 4o s flera

NAM NGIEP'IPOWER COMPANY

frnruUnurrnlu)

6

7.o - o o L- l- .i u o o , jr- -- f -oljlJ"l295lUlCm.tRUU"l:.' UilJmlffmngLuUU"l9lJzumvUILJaUeLqffASC"lU (O!n]J6lqCU $mJq

UoSUr fiu3rr r1ufr'nrruru320 tfevffurudrevffnn'auB. t rn't a :n "rut rx duh3;u 1 i ae.r efi e ffu uqri'u deu}.J 5o J"ru J

o X o l- o q o.i r--3.effirff seav sDr'(e,fitiuernavtilu1'[unq]Jun&qul5rau eeav znqu Uvnquterarieaautm'aryuvr-Jvar:..r

glupe3tflgnqu eeas, Uvaru3"ruzoSriru {rurrniq .Dairq"rurnrru"rnaiautotfrduurEnarurr$rYuv"tvvooo-A-^uun"loln"ta ffav agnul.tfl"lm9u. &"taonlusoFUOUm.tnqu0Suaom99ao&!&y(uJ1vo5lnlneJU

nvuu[uclu]J.

L "i , L -o, .1, u -- 6 e o - .iu - .i q 6 v oifr3u-u, ne3Uvguto8toecaq 12:00 eeav "i3toar38oriutiinavuu!(a ruJeruLpnTllll1Ln"rL{ofi'l. ou o J -uYuuocIn6l"llJ tumuu.t.

q

rJvununas{uqu

fi jntin, ,j, }ufrztto1t2o1o

DuatAuqdumnnelrJu?u

,.--)-/--

----Muiqu 0shq slierq

v-51* t"

Page 189: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

&IE&/E ruGIEF"€POWER COMPANY

No,ela

Name and Surename

q cccv ulIJSYDU4

lD number Positio nCIlcct Ul

FromJJ1Olr)

unn=iou

Telephoneo(\cuiLncvSu

o:c,)or,

Signaturecre-rc{u

4 U" Svtf tJ,gUJ

lPz-ltNn UtP obctfi|Btol 'si&_ tD. l/D') ,t: W€') \- ./ 5 2? 14- qQ a\+o t> %n/ ?n n{_# n2,(-li,Y-a)lL-

-Lv- d, fl rtc>Y-a

-----=,-{F

,1 o). .", Q --4- r' p n /! QA,*tnQ/t 4'^

T';l ,n, q,,*, )\.'t +t ivr r.b .

'(-4) -9n,1-c

;tl!) tO rrqn. h'i-1, fl7t-- - - r - t . t-f

aa eo-r4* ) /") -\r1 . ( ,\---, ilu., )-s,n 4 >r, liq i*.ar-1 tn'.-.//y -'L7

rn1 I l-[-ftc hr^fr ;. $ii^ L,,, W;-,{r- :r{ ,n t k-.8+ 'z-i-{{,tc Jh.zan

.tn h^ x-ra\ l/e-',a, / srq ql \'lL/ / , ^^,/ > \V(.v/m 7W-7httl,l 2ztm.,., AB

-!l -Ait tD, Aa /rLr-Z ( (; "rt9-,;:g-+

,, ?- U sAtF, {zirt-- Ntnp, ri*rr) W119\ .r.- a{*oa .}- dVr- -^^ r lnl Dz gs?d+k)/Z- a ,l z.

' /''JlttatELDA r/

/ a ar.=tLJ

JP- x --l -r;A -yt .,*- --Y -, l-s r ,ra^G elQa ., /-

I EE tETElq -l -r r z{-rrth ' G ,oa-a A*r'n do a?Al l-te-cP 'l :r' .irl/\ i

, ,v J, --Aktlt'b.a (-\-z \ \\/-\.

l1 - ,.-- ,.-. -l 1til* 2 7 4r^t^t< #-...la 81 ,,,3 ,nbwi ,-4 J^t^ o\o4hilOr tC ffi.,A9

I 6 l\./,i/l .€-n 1c,J(

.v/)r1 rt^l r tie.q)

'/q\-r: ^Y9i i aq rqqqi e\ cL '' /,%uh.)1-t,

.<n .\.s-r+ /ltkl ,lefrb> ?tt/1) ^9rr/\5.92-

lt l'<424Bn q,-#-g

(/onorU )D ,.rn C

,'./ /1Q,T-/ l,)/h

' t/ ^Sl-ey, lAtl4)ttAit?N^

), ./ ".i,/fIN- rn-.,1t1-te^frid]

7.7 -u //t>u - -z1A t\,t" r

'1 lv )T ^-),4i r?t t N'A'J | {--Jr. flVrff*r - LA-

I.r, ./-f __r r) ::::",/rt - ot

.t- r/)- ee- , ).2--E/rJa /rr-<r n *a1" E6

..18 tA. 1., t F).QL) ^\ z- r-nvi.",/t '^:X,;n;-' i-/*---)

lrf 'r'\-lr-t 6 t //, pL t e i, ir-n'fr t t4/) t u.st 1)J'"J") ,.nw7n v1 ,..7-4'6 ;-(^u. 2t3ta .r't

-r'/,nA^ 1 f). tl ,dt

1*

Page 190: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NA&r'EPOWER

NGIEPICOMPANY

Registration Form / ?u5tmvuJU:

, l , .--- L'- c .@Name of Activity / Hffoo=nr,........d..1y..n7-O;P-;..,.vlprr.r,:.ri+.r:,r?..g).:.11.h:....

o

No,elc)

Name and Sure

, nameq cccY urusvQU

lD number Positionorccmil

FromJJ101n

ulrn=icu

Telephoneqfi[63vJu

.:

r)oc')

Signatu recrerc{u

-qJ5;-

?o.?At,l ,t7 .l.n-lr, n€tcEl.4. ^ n-o-*oLn ,4,AP FOk tnp (raL ntio/ r' ./ - t-y'

),\f,c1\\62 ^a-QT

Page 191: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

P a g e 1 | 2

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

Monthly Meeting with village Coordination Committee (Piengta, Hatsamkhone and

Piengta)

On 27 Jan 2016, at Pou village, Thathom district, Bolikhamxay province, the consultation meeting

was to discuss the following issue:

The participants in the meeting included:

Total of participants: 22 people

Number of females: 3 people

GoL:: 1 person

NNP1 PC: : 5 people

Number of PAPs: people

1. Development Part

- Village Coordinator in the meeting on 30/12/2015( Mr Bounmy and Mr Somneuk)

indicatethe understanding village coordination)

- Open the 3rd meeting with district coordination on 12/1/2016

- The team collect the grave data based on the proposal.

2. The technical team

- Asset Registration and compensation team will inform asset items in Feb.

- Public health Piengta village will get maintenance and medical kit support from the NNP1.

- Vulnerable team will interview and recollect two villagers as required ear aids, vulnerable

person from the NNP1 and the household from livelihood re-habitation

Infrasture team:

- Water supply at Pou.

- Update three villages under proceeding step.

- Update the area where 320 m and post on 27/01/2016.

3. Livelihood

- The village trust fund- Tikkham

- The progress of the market-Mr Davone

- The progress of activities development on crop plantation /Mr Vangmua

After that, the NNP1 Mr Bounmy Chitpanya mentioned the infrastructure.

1. Village office Pou, in the budget plan.

2. Piengta village public health will repair and support medical kit.

3. Ou Bridge cross Namngiep 1 will ensure tractors passing conveniently and the project

will maintain within 10 years after electricity sale.

Page 192: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

P a g e 2 | 2

4. Where will the PAPs resettle? Coordinate with above state.

5. Road to the cemetery is not in the budget plan but it is not much in the budget, proposal

can be made.

6. Complete water supply (GFS) at Pou village, permanent GFS of three villages complete in

2016.

Comment-Village Coordination committee

1. Agriculture land determination where not inundated, Hatsamkhone village is reserved

forest at Hatsaykhao

2. Agriculture land determination where not inundated, Pou village proposed district

agriculture, environment and natural office, zone 1 is Namche zone to road D1 (Animal

and paddy field rotate) and zone 2 is Pou water.

3. Agriculture land determination where not inundated, Piengta village, zone D1,

Hatsamkhone, Houayou and Houaydou.

4. Paddy field at Kao, can change to the new land type? To repay village labour.

5. Propose the project fertilizer and pesticide ( in the dry production such as water melon)

as appropriate policies.

6. How will fish pond land get compensated? Not seen in the compensate policy.

7. Tamlee paddy field at Piengta before there is no asset registration not inundated area

but now, there will be inundated at 320 m marking.

8. The NNP1 project assist soil to cover at Pou temple.

Summary

It is agreeable and understandable to each issue in the discussion and chairperson

steered the project coordination committee and village coordination if any questions,

come and discuss with the issue and find solution. For agriculture arranged land, should

arrange the PAPs only.

Therefore, the meeting is closed at 12:00 and as reference for the implementation in the

future.

Chairman Record taker

Vongphanh Daboudy Polor Yiaju

Translated by Khamluang

Page 193: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 194: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 195: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

frnSCs!

ne-l#d lg

WUV*u(,nbrp[euugtq$np:

'ugapnlnut

uteupgaptFugflLunLrutruSnp:egr E:lrnB^tsugrngugGup;:1[e. eu:: 0€:tI LeeiuB!,1rrba,pleu'r,[[H

nuu[uluuungraungu$gr ruLBE flLugAmrrLuLpfiUua:uetiup[g ft18 ^ex

[egrnpnu[ugem

[p[r,r::auee 6eg: [eanu6ruueeprnauplpprLu^n ftLp ^un

gguoLBuBfiruft]ngp'e.Lrgr Aen Uftpr

(gf OaZO) umnfineg:nupntr[e,::b:u[eg:[uur' 1

nCtuqrugggngr,oler.g[gSftBneffftrunpug 'u6.E IEnnnnLFnfopUH^ugrnEuen$91[en:[umu: ue&ugnuunerurrrrEserrtr.0]AELrruIumee:nueIuunuoru: Ien:Iuu11 , o - d1

Iegrnpnu[nrs*nnnnu[eanpruJuglpuu[[m flLn :fieunrtsuLo ftL? :B nug :nLB E ua:pnrplug[Au$rgngetuguuueug

9I OZ tZO I I n r 9r Lpl Fl n g:nueuue &LBrr;urllrrrs:;e,u? rC[.fi[eaeanluft[b: rusruunrnnuuneb:aum6eaeglnu:Ir,r.neeJno]Ats

(f a ru ru)tt ptulnutrngnltng

:nnptpgnr,olrLrEeu gft $ua: :ng[eg:ueDugpl

:.r;lrugBegrtr$rueernge[unungeBeL.uplLuBlIol ftu/a lntturyupplnuu[u1uue.u4o[t u 'nb:p[eug

ftUS :I nC[uqruppluEgq .(nuDnh nLp

^ux rirng[m:: niraang nuqn) ng Z : ugcLp .

ng4 :ugo[grnepug:$nenrg .

' 1 n[[uqrupEluHE(luLuLqntuupgtpguen :eunft ng

b1 [ea::'ffupp [eg:'nu&nh nuyr :(CCo) fung[rn:: nheunE rLf0rrynnulgtpmknnteurlrLu]^l-trrgrreFLplnglaungu$gnup[ea fulLrJEsu$rngue&ug ae:: lugeeuurr$ua]Lun1!:re$:auCbl geg

re::[utnng:ue&lgnru [eaugre.ugngefqrgurnreugeg:[egflAfiLts^ft^ft*tsnu nb;yz[eunbrftCeuugpl

nftnga1 [ea:r 'nn1up[eg: 'ne[uqrnuu[eF$ '[n1 gE:]I-g€:EI LEel 9I0Z I urnntr neg: z SrgftL

4

(nuppteg:) teg:npnu[nre:p:neungnbap[au

ffi ,6A9

***********' neeLbunemugnLmAue:u1eJ-luub^nuLeAu6r nLmEfl H

erenpub:;rulepgtb:pue^naurmLts

ANVdnO3 U3fi10dt d3l9N ylvN

nB*p[eununr;r

Page 196: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s Demo rati Repu li

Peace Independence Democracy Unity Prosperity

Minute of Meeting

District Coordination Committee Meeting (Thathom District)

On 02 Feb 2016, Time: 13:30-14:30 at NNP1 Thathom Office, Thathom district, Xaysomboun province,

there was a Consultation Meeting with the District Coordination Committee to discuss the road survey and

bridge which combine to agriculture area and new area for agriculture zone for Villages that affected by

Project. The meeting was chaired by Mr. Chanthaboun Phengsomphou and Mr. Bounlay (DCC), Thathom

District, Xaysomboun Province and NNP1 representative:

Participants detail:

Total of participants: 7 people

GoL:: 2 person

NNP1 PC: : 5 people

At the meeting, the NNP1 representative by Mr. Tomioka (NNP1 infrastructure Team) was explained about

the basic survey for road, bridge and new agriculture zone as follow:

- Set up the date on 08/02/2016to start survey for road and bridge that connect to new agriculture land;

- Discuss about new agriculture land at 3 villages: Pou, Hatsamkhone, Piengta.

District Coordination Committee Comment:

- Agreed on date to start survey for road and bridge;

- Provided 3 points in the map for new agriculture lands and authorized those areas to NNP1 for respond,

the District Coordination Committee will explain more detail at the end of Feb 2016.

Summary by chairman

The chairman Agreed with consultation meeting and gave advice DCC to appoint the district and village

staff level together with NNP1 staff to survey new agriculture land for 3 villages that affected by project.

The meeting was closed at 14:30 and created this minutes of meeting to be reference for the next meeting.

Meeting Chair Minutes of Meeting Taker

Chanthaboun Phengsomphou Porlor

Head of District Office

Page 197: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 198: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 199: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

iM.iir

Page 200: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

i

-

iiT-T-J-ittlT_T T--iI

1

I

ll-i-ft1-*

Page 201: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

LI*+-tiiir!

Page 202: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

======000========

Thathom District

Pou village No. 46/VH

Date 11/02/2016

Minutes

On the grave relocation

- In reference to the study of the elders and village authorities who are responsible for the ritual

on the grave relocation of the old cemetery to the new one.

So it agreed unanimously to the following detail as below:

- Defined the Lao Loum cemetery in the south of the village but it is 800 m far from the village

- Defined the Hmong cemetery in the north of the village but it is 1km far from the village

- The grave of each ethnic group in the old cemetery will not be exhumed.

- The relocation will be relocated by the ritual as the elder believed in the past time

The ritual of each ethnic group is as below:

1. Lao Loum ritual:

4 sweet and sour food types

5 pairs and 8 pairs of candle

One pig

one shaman of the village

6 elders of the village

2. Hmong ritual:

11 prophesiers will be prophesied, who will be relocated spirit. 1 prophesier can relocate

spirit of 1 grave per day.

Materials for the ritual based on the selected prophesier as:

-incense

-candle

-big animal

-small animal

Therefore, it made this minutes to certify the ritual for the project and came into effect

since the signature.

At Pou village, February 11th 2016

Pou village head

Mr. Khamfeun Douangmala

Page 203: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

@ Nau NGIEPIWjl powea CoMPANY

&.rLn.r R y:.J uSer r.lu q qfi Uvt nUv q "rflu a la*'ufizu"lu eanyatouvqrfi rJvtm[snuuJ6]u Serznvrrqrceu.

t"

rioflufrnnsqUYau

nsgrJveuUvehsfrsufi'uovuvrJua"ru3"rufud.ru (ri.ru rj, uqoalu aav u13or)s' c)

?ll5rfi 24 efiau n:rull E zolOeaar 09:30 tl3 urtt2:00, fi rj.ru u.roalu6reu, e.8e3nrrtnru,9

L^rrzca (2euqu

L-u , o " f,toe-one3z-lvquneldvquUvefrou fi'uervrvrJvaruflLJ.r! eeav efireenesuo'tsuae3 s rjuri;arTu" X o "l .is ^ urenarfioqyrirze3 3 urr.rHrsaueUrUvuul::nogUvqufi'3ffIerueeururrSSfir orqooleUr.r

I e ' \ L ^ <i- - oouraaqfrnslnqruqrrJrurnra;1, sffel urtmu, ffpo3 tq$'uqueeav uanfr53fre5sr"r3u!.rs1nu5ffo

t uluTrrii3"yu t , e5nrSufrrq.rntiurern"rutSnoo3Jqu ffiau ovuvtJvFqu3lrfudlu e drsrr,

. ehuauqirS"rsaufi'3rfro: 20 6u{

. ehuau{03: o5 fi'r.r

. eiluf;'o : 3 6'u (uiru53r.Uu o.luoo6r, ur"lu {umvuu eeuS$'ut{ eeau uru Oata BurnvJr- -aJa"luq6romu6tuJ9u)

oou L ,.i f. u5*'otujuJ"ni"r3;u 1: 9 fii(nva;cr.Darerfrfi'ofio)

A \ \ " A I L-, o .ifinegUvqu, m"rsrnqaqnla3nrutuJuith3;ut rnqu [lrHr euugtdnraaaufiuuurao3uiruhrfi3oo'

sissueJ"ruu"reo 3no 3UvauUvdr sfrsud3ff:

1 . uiq€Jnluffomrrul{u?uo"o"io-A- iavrfiao3ovuvrJvaruSrufluuruTunesrJvqu'tu5lfi 2710112016 (mru uu.D ffotJuer"r seao ui"ru S'ufin tdfrueraa"rurdrtrlr'er"uvuvaruSruduzJ"runjafr'uuvterulernru4netrfir:rrue3rJ'r)

2. nqufiuuJflSonqu sUuea3UuEleuo"o- 6rCc)u6ruux.l29Jng3muu"tlJ - u13 mn6"t6l

- oa9ufruuilrae3 nlumvp"roui'ru olaeu- era"rufruuireoS nrufru{E5ern"rueUuql(#r3arutci; / ur3 Stau.rerl

- Era"rufruuiraoS ffoevriqn.rufrouvr.rrcirr.rnruUnfrol enrt: drtliaca (?3. UrUSlUcAqnG|U

o.. sl. mr,Stuujuq"tLtel3alJ:

Page 204: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP'IPOWER COMPANY

- nlurluuSrii5uao3arudrutdu'fifiotussda fr: q]'rjru { #euauStuerda 12 sa,A[(uun.lu&su c[u3ac6l"]a

- uouUut{gnraouaa3ar0uu'i$u d.r!. Jo o o o^o mtmUCJ"lUn!UimuCJ'lU.l- o-u' .1, v . ao fi5r3er3efiurirtr.nuffgqo (avuuro 4reIo x 4milo x 1.SuUo eQ3auro

o-L'uusuee ei z+.ooo 5n.9

o sfiuziirii.ruruAeqnfi efrqtuzn'rdrr efiurilYuru, ee av effuernd"r3 efiuriltuznreol- u-ir-, o

n a "rt n er I qrj 1 t Lnu, iria a 3 e.r'rcfi'g rI'u o 2, 500 esl o.J9

L- u "o fidr3qot{riqtuushrlau 1oqer, tuuouejezerala6iu Sqo, raoaqal-Tl 51e)

- Eer,lrJu{SnraoreoSart)uri-r$u dqu. uJlm"l. o gstYr.i"luqo"luehucu 2en.

o "3 { o"o' ^ o -otuju]qgeuu#omsuu-o.o 01cls13u"tu9 t&C[may?o tGauayuu6tcu6,]unluuocu e

" rfiuriiriis"rn1ou ler crut r;urrdr3 efi urir rfr r "Baa"ruer.rafi fi':rnfo 1 55 af o.l-o ria"r3e"ro"ruuduqi eteiarSourerrl.tl

- nrurYnfrnuruqutdd"reHotueeda?uehuo! 180fr'n ae3d.rucufi'lu.lio 250 S'n;tauvui"r3eeriav$nrJuuuu 100eeIer; ai"rSuqa3ftffuurleffiuevteiesuS'ntrieeavznls

eeo3, touruir3 SOeeUo.@ ,7 r;i d J- o.- nluana"ttFutnlg Eau 2o9te"tul"tt2oaJumnuEin")

o e*uur3.froa'ruet"ra?h3uJ:Jo 2,400 seIo.,Ao trlctJ0t6tlJraofi'3u"r ejlc 629 [[Io

lo ^o [z6}qu (OCllUU 9?e)Jq

" €adfrnaquu6)o 110 eslo

ooovdo qo oa 1 tu:.J 2 93 o UutruuF 6)u

3"111 2 uu 6)u

1 . fiur.r'r s$e ea otjqu nlc a.rurou;ufi urJv euo$ut citu rfr esvt dfi'o esmueir ees3rutir'

rJvq'rflu^.i't. ra ornevuu u ")ereo #'u?u€.itu 3 ri'ru eeriueit az${

3. eeoffr:nv$riraa3 3 riqr errjuejtaz

4 . znnff o aa38 5 #o eie 3 {o sUuuayuvHo drff oevrirSulooaqus, e*uriau fi 0'r5. 6'tvuvtJv&"tl3rudud"rl rav n'r3uil"tsqnovuyrJoa",u3",rdur$e3fr'n53effiufiS'rlflcg

drurli3"lulfi,rnq.ounuri'ruuroa6lucreu eeav Jlu ruJSm.rfierfi'u erav rffirffmnr,rnftL "otofi6tuaoulffaa

Page 205: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEPIPOWER COMPANY

effiuff erav e 5",?e,An-use riavUuu"r?rinruEnaeurr5fr se av ai.)#uddoStnae3r-Jyqrflufiavs?fttrn'

mlSneStaar uriael3r1r0nejlu6'n#uee aaltqS'uuu?ussda"ne3uvqueiruurc{e3?rn'urfrse er?u'UYqr{u

fi'3rfu, ne3r/vqutciEo(aa"r 12:00 ray 4rtcia'rrriou-ufrnavriufrti rfbaeUrfi'nq,rr?unru{og3Uvfifroa.Jn3rr?ufiufr.

fi Soriqu g, c-rfi 24t02t2016

r{uciriufrnnogUyqu

53fiu oqgofiVongphanh DABOUDY

tJuununa3UYqu

Page 206: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

))NAM NGIEP'IPOWER COMPANY

Form

rut^t PtBa, Phonesinuan, House No.236, unit 16, Sisattanak District, vientianeTel: +856 21 261251, Fax: +856 2t 261252

4

f.{2b

> ts+ lr9>>z-Z->?+ t /d\

Name and Sure Name

2EAUU1UEUNil't

a30?tIiazet

fi. u-k8o*lia

Jr i lv. r-Jt;t1 ter,

?uS'3urName of Activities / frffereyrir. . ,Vfr CLocation /

uate /c!zn.

^, q.Y.i zAl6^;d141'fl.-", r.rt ̂Nti,, *"F5-

Page 207: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Weekly meeting with board of village coordination ( Pou, Hatsamkhone and Piengta)

On 24 Feb 2016, 09:30-12:00, at Hatsamkhone, Thathom district, Xaysomboon province

The eeti g atte d Mr. Vo gpha h DABOUTHDEE; village part ’ se retariat of Thavie g a village group, 3 board of village development commissioners and the NNP1-Thathom district team such as:

The participants in the meeting included:

Total of participants: 26 people

Number of females: 5 people

GoL:: 3 person( Vongphan Daboudda, Chanthaboon Phengsomboon and

Boualay Inthavong)

NNP1 PC: : 9 people

Number of PAPs: people

1. Development Part

- Village Coordination at the meeting 27/01/2016 ( Mr Bounmee Chitpanya and Somneuk

indicates village Coordination about fish pond compensation policies)

2. Livelihood

- The progress of The village trust fund- Tikkham

- The progress of the market-Mr Davone

- The progress of livelihood activities / Revenue / Sykhayphone

- The progress of activities development on crop plantation /Mr Vangmua

3. The technical team

Infrastructure team:

- Improvement GFS of three villages in complete such as Pou village, 12 temporary maintain

points.

- Permanent GFS Improving Plan – Pou village.

o Adding the water block

o Construct a new tank (4mx4mx1.5m contains water 24,000)

o Install new water pipes connected from old ones to a new tank, and connecting from

the water tank 10 points, in Laoloum zone 5 points, Lao Hmong zone 5 points.

- Permanent GFS Improving Plan – Piengta village.

o Drilling well 2 points.

o Install pump each points and On/Off control system

Page 208: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

o Install pipes from the well to the previous tank in length 155 m

o Build small hut each well.

- Ou bridge in length 110 meters.

Comment-Village Coordination committee

1. Unclear Paddy field at Kao village can change to another type or not? For villager

labour compensation.

2. Where is a new resettlement of three villages?

3. Where is an agriculture land of three villages?

4. Set priorities of the company.

5. Village Coordination committee and representative district Coordination

committee.

Summary

It is agreeable and understandable to each issue in the discussion and for people that

proposed to RMU, Xaysomboon province RMU in the previous meeting, have to indicate

people.

Therefore, the meeting is closed at 12:00 and as reference for the implementation in the

future.

At: B. Pou, 24 Feb 2016

Chairman Village______________ Meeting taker

Vongphanh DABOUTHDEE Polor Yiaju

Note: Unofficial translation by KHAMLUANG

Page 209: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 210: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 211: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP 1POWER COMPANY

a 9u6ra vuusorJv q'rff r.Jvt ei rJv q "rflua "ra

#ufiul.ru egnvaqnlJvqrfiUvtn[snuuJ.lu Seruvrrqrcou.*********l*

AU6UOUUUNNAlUUzIJ

na3UvquEnarur5n"ufiuny$riq ualz 6utJnS'r3ao3t5osu6'a (dru rj, u"roa.ru aau ul"lleir)

tu5ufi 29 efrslr ,Jlrur.r E zorc raar 13:30 tu3 rir.r15:30, fi ziagntnli3;ur, e.8e3uirturu,

eraa3 ta$'uqr

L-u or ov J o o oIoe"crnesrJvquna3UvquEnarur5:YuavrvrJvalupur.Sgg c[av ei'ru'ronqu8nfls]agi 3 u.ru.X , o "i.ts q ' X o or2l5Al)ruljuvLnlLtlJnS3uvqUc]SLeetut6UL Zn"rU UlJrrglJ uUttnC S93[""]tU93 [JJ93 t]"r6UU,

esaaS ta$'uuu, fi'ouirneSrae"r uuaullu{rJngJnlu0ntltufinffr ctaal tq$'uulr ffau r-,enfer3.Boov L

e,5nr3uilrornOS #ot ulrilrrjr3; u 1,

o "X qe'"ruauqearsaufi'3uilo: 11 fi'u

. eJr€Jf;'o : 1 eir (ui"ru uumeu flueefic, uiru Eire8s eea3aouairS eear m"ru rlata Su.lr- -uva3aru{aioeiurzrou)

oou L ,Y f. u5*'erlujujrrirqru 1: 3 fi'r. rffouilnelraal uuaulru{lneJnlu8nelrutnf;u ffpcltqf;lqu

.L- -(au9IOUAlUA6lnmO)

fineSrJvqu, uiquUvrnqutdausri'r1fid"ru'ronruSnera3ae3 3 dru, ?an'riqrfosaofiertrJairuan

ea er fi unvfi rir ff av ff ur;n$'"r31fr 1 5 s'r eu fla #leu€Jlu re oriifi frnt1'al.rfr :

1. nqurilfneaoffr-rnvHrirae3J'ruJfr: eeos'uee surre*'urn.r31D sray eaoefi3eraori",rr]

2. n"ruri"lfoeaoffunvFrilae3d"rru"roaruasufr: eeofi'3e5cr eeau &luumJerqrua"rcoooe@3. nqlnlrJnraoounv&n6ta9IullJtuJ3e1"lgl: taouIou]cuo

4 . nruriqrio eaoff ur-Jn5r3ej ezcr ffra aurjru ee 3 rj"ruli

, "i o 6 . 6 ;,"iurtutJvznrut ere e n3fi'3ovuyriruvnru53ai"ruaofiufifi'3n'rasaufi'uno3 e aer uuauStl{lnelnru0nelrutnfir ceecltq$r.rqunfi :

1 . ui rr {rm ru r eeru 3 S'lr4 eUlfi'ctrfirrlio3 a.rn.rr8na e 3 r"Se 3ui'rt rnur ' ou A - o/-. ucD.J FuJUogu uaux"rtj"uauJ'ru9ln ugJnluquuJvulngu ffau e3[Gaoagu6ijrgS

3. urru eeaau"fr fi'auilllrucergr:rd"rt.rj ernur'o3nru nvHriq eeor rjrt"rie.8a3

4. u're;6'ruee3 3 rirr.r eea" u]auciaulnuu'l'nJ 2 nqu

6

Page 212: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEPlPOWER COMPANY

lun'rrs3si",paohot3frteiri,rrier t0 "$ rsueeriSr 0i103/2016eUu$utri sea" flserneJrunrudrpaoeeda znr3d"rnruEnerogrjru eeav r.Sa3ortdean{fr'n5'3tu'zn.r3r}5*'o tuluiqdiX;u1S3tr,J;5"r

<i - oo o . - Lpoo12oujUznnusne t6av ouunfl1]elln"lc

-.i . \e6.fi'3:5u, nesuvqltdEoraa.'! '15:30 eeav 63tcia'rS0ouufrnavuufftJ efrslUufi'nq"rutu

n r:: {er d3 Uv fi tYo a"Jn 3 "rL ? u fi uil.1.

ih uro3nuiiSJul untrn u, }ufrzgto2t2o1o

r{uciriufrnnogUvqu

. ",4zn"lu utafl

Bounthone PANKEO

UvnlunagdYqu

CUE'qa

qxutsu uuafio,rl

Page 213: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Generated by CamScanner

Page 214: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Agriculture and construction of 15 House hold (HHs) (Pou, Hatsamkhone and Piengta)

On 29 Feb 2016, 13:30-15:30, at Namngiep1, Thathom district, Xaysomboon province

The meeting attend by Mr.Bounthone Pankeo; secretariat of Thaviengxay village group, 3 board of village

development commissioners and the NNP1-Thathom district team such as:

The participants in the meeting included:

Total of participants: 11 people

Number of females: 5 people

GoL:: 1 person (Bounthon Pankeo, Khampheuy Sengsavang and Boualay

Inthavong)

NNP1 PC: : 3 people

Number of PAPs: people

1. Determination on Pou village zone: Sopche zone to Road 1 D and Pou water zone.

2. Agriculture land of Hatsamkhone village such as: Thongleuth zone and Mountainnous

Houaysaikhao.

3. Determination on Agriculture land of Piengta village such as Houaydou top zone

4. Determination on Agriculture land of Piengta village such as general village land.

Chairman nominated survey committee to inspect area joining Xaysomboon RMU such as:

1. Mr Chanthaboon Phengsomphou, Head of Thathom district Authorities.

2. Mr Siphandone, Head of team from district Natural and Environment office

3. Mr Veomany, Head of Forest unit, from district Agriculture and Forest office.

4. Heads of three villages and 2 soldiers.

Ten day survey from 1 Mar 2016 onwards, then after survey, village and district authority will

issue the agreement for the NNP1 survey.

Therefore, the meeting is closed at 15:30 and as reference for the implementation in the

future.

At Thathom, 29 Feb 2016

Chairman Meeting taker

Bounthone Pankeo Polor Yiaju

Note: Unofficial translation by KHAMLUANG

Page 215: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

:ft[uunuAnIuue.em:

rlunrm^u6rftn][rf]ff82p[eu[eangnfieeuunuxIgnEa;ruu 'Ie snn:::u[g *u:: etLnLBunrtufttq]

' I (zmuo.)z tnueuneft rug:

e8r tuB:uLft^mumua:nq: g:[Urua] tgrueergruBrg rug sL :nefttu up[mnesuptqn$"Z;1tg ('a:(iu:uL) l uusuneftftnremr tLI?

BAurftar'tlumuarmnr c.rnH 7;tnuurtr uarLgru6urg[Hrrua ftuLzL:rterrt&. up[uznesug:pnpuk:pg ('u6 ^ u'ro

:oa1 z HryolLu5Aufiuuar[84[lsrun:::utg'z

l[rn:rz nunn'ug [eanln:uftnu?rumuarril n[[ur-rnupeA[uErJF)-unB]Ln mBLr :ftertq unn[qrmesua:pru$ubepg' ('au su o o 2, a s d o a ou ^ Y

l[ur::r ruunnue [eanu?^uftmurftmua]nt ne[unnupeg[uquptrunm]uz ftg?st :fleftte, unn[qlnesupqnQub;pg. ('u

- uU u (, e 4.dou

:r n[[LnnLa6ea[ueunuu'r

: uTrrn e [ean$*ungu$p1rynQubz7tngn-attqitrAunuuar :Er L n([uryn'u;geg[urygruuunque[eenn:::ufg Ae]r EtlnLtru;rfttufltn

' nur A urUns g 19ru $r" b e p[ e a pn q: nuu

uqpftngnuunuIu[eru1uarn'[u:uem] rug^uu?en:ueffiug[gftrufiUnn]*xg1[g Fu6rr Au]t trrntnzneirtrLarzBGU:$ u6,z [uggtpluupna::urulukan fteueff]ft1[k 'eg{,ugufttuftn]lftr:aeglnE:;lul

'(gn"epunuuug$nue) ftgezl uga[F t(mnery

fupnesua: r ne[uryuryfnluHe?ure.rp[uuryg't6nuen 'nringk$ea:t pnp:nuuuglrttrig au]r rutruu

nupugnuu[*u.rgni[.,.nnuau:[euu4ne$ nqrlrlu eprem ftru.? f 'nuluqa[en'] ue-u4Luulunrr:nr*=1,'Ien:umuaurIes ur;neurr:cub Iemruu ruruz rrr]rnu1gIgnk*pIeuntrnuuarrflB]rresta: 'nune Iean$aurumutr$nluba;r ABrr rTs1efl::u:ruU.: '(uu[emruun ^*, ljntg 'r-IeuffLtruLrnnug) nrgJ ntrnr*[euupr(ruurnr6nu ne IuqrnupAegIuguuguunuu Au]r mLruB^urtuua:ngee r.,reuuueupnEapIeuue,u1

nrin'sk1[ea:: 'n'u1uq:[eff] 'fteuffLxuruftrn Ln 'urruog:zL - oo:60 reer slozleo/ol Lnmgftt

'nfingblieax'mulLF[Bn]

'Unz nu^ur8uat I n[[immuaqegtupgugLufiLu Aur] ryo]Lu5^urluuarnge[ggurauxugn*r;r[eu

TIMRRURal, a \t

+++++*+++++

'necuhun=mue ntm;ue: uluubep utuAuBl ntmuflH

eLsruELbAF ul^purLb*p ug*nABLulLts

'. .::. -.:.. ::r ..: i

Page 216: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

bt3rue{rllebb Ceu?ft_E-o-----'--- - a

-a-rTaAnLSUUUfiftm

'gtoelea,or sftg 'rueuffLBuLl0ftrn L0

'rflnuru1 nr[u[eunuAn[uue ftrun] nrt-lumrunr6mr er flnnAtruutftnun[tBUl [0. 'nnIuo ^o , o ^ ? -1? 441 o 2 ?

'rutrsunrurnsmumunmuall-1n] zBU6.rgrtJ]Lrur^trtJ 'ff8:Lfi0lffLeu8"? LuluLttJtr:uu]ru8

uemrgqlrcnUilurunLrr lnune nkuk:ir[earuBzu[ftALnuqua]rtn] e,rnE ipnrurt mnmualt6ll-1 'z. aa . o -

'nrbn3ftr? e ruLGrm ru$uk*pqr::qr :e:: [euupruuuufueLn1

ktrunnuuntrurrTrEUr6rTueuue:mu6.flIuABrflrrTLCIteFrruHrrtr nefunnup6egnn]lu6suuo.IF e'ri utrunpletn upr$ugrptrurrtBgr rute pluprrn=urrtu,,i .gnn,,u6sf L :znnn11 z'r

In[gnEap["unltor**uqrnuutulunn]rnffr :Lnanll L't2" ' ou

: ;tIU uBtrr[ruf ruArbat-rrpL6E]?" o o

nn')12 nQr[qoxeann]ru6ereung[u1ptrp]38 Aur 'rrtu[ul[eauemtryfituu6,nuu uu[emnup

Aur nGu[TrBUra[Ln [eanur:nuk[ueLn:up[k 'Imr:[nnnenre n[[tryrrtpeg[uryruuu[uitptrunql: 't

&.nn: ug:1':

#ffi

$lttlu7r7,K9k

Page 217: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

j

&',*:, a\. i ,/\ ii !. n i : * t;.- i..t '

t.+J4.!l ,\{ \rr. \vru-,trl.* jL ,\r,- '.'r-'; . . r ,-r '..\.i

i-eo ie.c,:,ir', Lci',',:,cia'i.;c ii,,r:,..,,:

peace indep'* ::*=l=:::'.,i

iv prcsperii.;,

Minutes

of

The consulta'iion rneeting on the new agriculture zone ancj deierrnination of suspension bridge crossingthe NamNgiep River in the affected area 2UR, Thathom Disirict, )(aysomboun Province.

On March 10th 2016, by 09:00 tc 12:50, at Hatsamkhone village, Thathorn District, XaysombounProvince. lt was organized the consultation meeting on ihe new agriculture zone and determination ofsuspension bridge crossing the Namngiep River vuith 3 villages authoritres( Hatsamkhrone, Pou andPiengta villages), eiders , PAPs of 3 villages, Mr.Phonexay TANOVAN, head of RMU of XaysombounProvince and ihe representative of NNPl PC , The chairrnan of the meeting was Mr. KheunthongXAOVENEKHATV, Districi Pariy comrniitee, President of Par-iy audit of Thathom District, the participantstotalized 173 Persons (As the list of participants attached herewith).

At the meeting, it proposed the bridge construction plan, in the past time, the villagers proposedto construct 2 bridges and besides this, it proposecl the result of the agriculture area survey io preparefor the livelihood restoration of PAPs.

Through the consultation meeting and voteforthe suspension bridge construction crossingNamNgiep River and new agriculture zone with PAPs of 3 villages as:

1. The suspension bridge construction:A). the total participan'is: 154 Pei'sons agreeci to construct 1 bridge crossingthe NamNgiepriver at the affecteci area of 3 villages;B). the total participants: 11, Persons agreed io construci 2 bridges crossing the NamNgiepriver at the affected area of 3 villages;

2. The vote for the 2 new agriculture zones as:

A). the tolal participants: i21 Persons agreed to select Phoudanpor/ Sopchae as

the agriculture Development Zone , 1't prioriiy (Zone 1).

B). the total participants; 15 Persons agreed to select The Thongleu zone as theAgricu ltu re Developme n I Zone, 2"d Priority (Zorre 2);

Through the consultation meeting and vote, the meeting could summarize the result ofthe meeting unanimously to implement as:

Page 218: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

L. Ii agreed to constrLlct 1 suspension bridge, crossing the Namhlgiep river, which iocates on'rhe bcli'der'netween Haisanrkhone- and Piengta villages as the point surveyecl b,vthe project..-.- ,. ---.-a^.,...-i?,,.,'r^i,,. rnrr:cirr,.',,.'.'.;r' i<... 1-,o:..r r,iic.i,r:li,,a..l .iil...tc.. ---,crrJ '! F,'vFiu-\Eu L'r. i]J'ujLLL (uLlLrtr

t.r- rvrocrei r: is i.r-re nlooei propo5ecr r.ry r(re pioJecr iri Liiis i','ieeting1.2 Model 2: it should cesign the maximum load of bridge of about 3 tons and can be used

by FIYUNDAltruck;1.3 After designed the suspension bridge compleiely, it should present the special capability

of use to ihe village authorities and villagers of 3 villages2. lt consiclered ihe Phouclanpor/ Sopchae area as the agriculture Development Zcne of

villagers of 3 villages; but it seemed that the 1-'t survey area was not suitable for theagriculture Development zone, so it proposed the 2nd one as the agriculture DevelopmentZone.

Therefore, i't macie this minures as evidence in implementing in the i'r,tture.

Ai Flatsami<hone village, dare 1OlO312016.

Hatsanrkhone rriilage heac Recorder

Mr. Porlor Yiachou

Pou Viilage head Piengia village head

Chairman of ihe rneeiing RIiIU cf )(aysom,-hourn Prcrrince

Page 219: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 220: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 221: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

{VACNVI Aexeuoqd ryftgru\tH hqnern

irtYrfT*lfiliChB 6eulr4i

w*.g;""tC*io"-'%

n'Eep[euugrs*p'srczleo/ez uzng 'gnug

' unn u:n t n n I n ft t E A ua ] ee :: n u [-r uffi ft n ] Bm r e r Tin n A tr uLn Tr n un[u e u r [e.' n n [uO b,^ o aau ^ u a6a o

' n ktu $ru uu ru tr u g rem r[q ru Qub*stg:1nungr:eIgep]rL€ruHmue.rgrU?tftTlleeliutrIrHagrutrunHf pn&runanueIqrnn:*e 'e

4i

try?t; rtlft 6e,: :u k tnu u u u:Ln 1 rJ : o, : um :n k :

u$g:1nn:: urnr Lo ngnftumnatTtnnure, n'et-rureua:neauue.[[xnueun"u:ng[pnffina::e 'z*^'nmlo/nu ooo'ooo'e ru 'sLoz/ao4z gng[g nk'ae.7eoor Lautr] na^E[ea::uu:O t

^ G r a ; ___

4

nr.r-n[ea[uuUFrrruunuAFFLgftB]ftnr:ngIpnffig$re $uk:pn::m Ael] riaGulutr^rueuIum 'r

:g[gnft*eprygnEapIeu epxuHiretruffir"eug ^e]l

ftLB^u6:mr.ngtrUl[pnum

'ruuuIu1rumi]rrru^8trtrftn:nk:ukao.nuuIu1[r,mu:neIf:nftnk:u$nuungetuIg.:: 'r'( nr,pneeuprnftRr ) nqer"eupupnp:nnx[pn'ffin$:u$nuungee+eulnrtrul3pi'z

' nro. 1", 1r" Srrg[g mnm'rrc./ser Lnutr]nn^tr

nniuLnIe[.r :-[en'tue.:ruuqnIeangIpnffinInenne nau]ruaunTrruee uruuuIg.::ftrtrAu6]ftrqJUl 'L\'uoX,ur^

:nIuruueAu6lrTtnutrn$apIeu 'nekumnsn'ucun'Ir,p nuuIulnHnmee uSnueau6]GrGrtnruuuIpngn'k*;l[euneFug:ELntru]r gtrftrmnu1n'Eep[euug:er+g1 nEnp[eun'e9ftrrr:An nurp IeLnnum

'(gneryunuuu; knuenu[eaenue)[tmnep[r,pnept€] uutQ. L netuqr r11pl uHg?urmfuu

^*,, n*G"nrGucrtru^rTuueneuuaer[eu

Ien':nueIeaIeaee uLnnr"uukeneunep Ien':Inn"]rTrmALnAtrr-iuuIeLn 'Ien:uuk[ugeueerir:nuuIemuqn[uupn"[p r-([u6ft 'nm1um[emsuuurirruueuftrman l,en:upuae:[es uuem:leuk IeLnnunuun[ea rutu2Apftn]fttut-Jtntm i ne[uqruryru1ru6a] nuu[u1[ea nrg*unr:l-rn rukuk*pn::m[ea ne.A[pnftngnfiknnruanuu nk*;r[eu ugrpl 1.rnu*n [n1 oe:e rue] eroz I to lez mrgrt

*

?nfrngb$ea:: nmluqrr[69l Bft LBS rnt[ugru gp fnlneE:nuu6ul[ea

n g6gnihn p:u$ruuEuteermrtru gruunEa;rteu

umrununo F u

++*++++++++*++ +++++

'neeuben*mue nrmauer ulaprnukefi ureAu6l ntmuftB

eueru$uk*p ulapuuk*p ue*fieeru*tr

Page 222: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

,.-._.i:::i,

* .rj. :\r 'i' ,

il,;gi+ri'eii*ii F*, iir ?u$ilxir-;ndnrY.^.'l

- ; - - aiar \'r' .l Iirams c{ Ac.iirrii)ie s f;fina::i.'. ,?3ri4 u -t't1t-.&* U, ,9y2t * 16t ilUr}rfJ,Locarioir Eril'rJri: ....U.F..{ ,"1 ,f .7n.c...0*J)r,^f>-r:f . ..

, ,i.:, -: ;: i i': : ,r: '..1 ::: .:: .=:,':' .

';a: l:..:' ;:' i:-,:-:.,

'I - -:.--: -. -.

*F'(eL{u}*? litrr

try-u*

lo+3I tUt"lf.rA:rEunnnI

-'ia'= )

t-

,tT F-l

| *.8 9#-r .l4f

c*

i'jam Ngiep 1 Ps?yerCcr:pany l-in"litedBarr Phonesiuan, tiouse lrlo.Z36. Lrnit 't6, Sisatr-anak District, trrientianeTei: +855 21, 261Zg!, Fax: -r 856 21,261Z32

eox-f{€flo t

9i ,a

,t*t *xt

ani

.,

z.

i stt'ri.a?\i-

zoluu$'r.* L?.€ir},f ',

rl

Page 223: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Agriculture and construction of 15 House hold (HHs) (Pou, Hatsamkhone and Piengta)

On 23 Mar 2016, 08:30 at Pou village, the meeting is open the grave registration of the NNP1 PAPs.

The meeting attends by Mr.Kinthong Veokham; deputy district Party secretariat of Thathom district Party-

State inspector, district Front line, district Women Union and also three districts and RMU as well as the

NNP1.

Document dissemination as follows:

1. Disseminated Close grave registration document – 355/Thathom. On 21/03/2016.

2. Discussed on grave registration of Lao Loum ( Village grave )

3. Declared on grave compensation as the project planned.

After documentation dissemination and Summary:

1. The Mediation committee and villagers that grave agrees to conduct as governor ref.no

1003/Gov.XB 21/08/2015. 3.000.0000 Kip/Grave.

2. Request grave risk from inundated from water to the grave 1 meter will be

compensated due to next erosion.

3. Propose on grave, complete collection as GPS and explain to people for understand

compensation.

Therefore, this is as reference for the implementation in the future.

At Pou, 23 Mar 2016

Chairman Meeting taker

Khampheun Lemthong Thavisak

Note: Unofficial translation by KHAMLUANG

Page 224: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP 1POWER COMPANY

a"rLn6la vu ufferUv q "rff UvY nrJv q"r{u a rc

#u fi u'r u r e n v a "r o tJv q r ff rJvt n e sn v zJ r u 5er u u u I Tl q c I u .

tiotiufrnnsqUveune3tJuquUvshefrsufi'uouuuuua.ruglufuri'ru (d.ru tj, uloalu uav ur"JSnl)

lu5ufi 2Tefror.rrigneuE zotGsaa.r 09:30 tul rn'r11:30, fi riru r-1, e$e3m"rtmu, reac3 ta$'u

UU

tcit'oneguvqunesUvqurJvefrau fi'uovrvrJyaruduriru esa" e6.rserieeualsuee3 s rj"rur[afi'u- X , o "i<5seemar6erevrirae3 3 u.r!.eE"rsourUutJvznl::tuno3Uvqufi3ff'terueeuuurru53uYu erquoerreUu

r o L ^ .i- - oou[aa"]uln8qnq6tlnuu'lLmqaJl, ru93 n"} tmu, ff2a9 (aFUUlJ[cav :.J9nuu3u[{s]"]3u'u1s1nuafie)

t ululrrii3"Ju t , e5nr3uilrq.rndruqnnruSnero3J6rlJ rrau 6'rvuvtJva"ru3rududru sdqsau,

. dquar{e6",saufi'guilei: 22fiu

. e".ruau{81: 03 6'u

. u.)eJ$c): lElu (ut"lucStuu o"tuoo9, mlu o"t6e.5u ttaJauu]c"t3 ltau Ln"lu ucta guuv6 .f,.- -caR"ruqoomuluJ9u)

s)

. O$#otulul'rrirrru 1: 56'lr-OOUO(aY9JOUA6rUAelOmO)

2. mu3luCqln"lu

fine3rJvqu, err3frernla3nrutuluitll3"iur znru Eehr eejugtdri.rcerc"ruffuuil"rea3ruru1rrfr3

efreueiil!uqz o3nasrJveurJve?"r efr er;'f fr ,

1. uiqunquffoznuuq{u?u- darefiao3ervuvrJrarugru{urirrtunaguoeutuSuft 30t12t2015 (an.ru qufr eeav

znlu S'uff n t cifr ee e r o a ru sd r?fi a ou vrJv a ru 9 ru aruzJru 1

- t deEerno3uvqrUveht sruqn:iuErvr.ryrJyRqu3rrdr e"8er hJufi Qtol t2o16J9'

- ff u3 ru efi uril$'u$u evS'3ur efi u d"ruauS'uftt da r effi ur?ur't er ln ruo.o

- ftr3ruefiu{uHu eeav floef;uevuree{3a.reln.r!f,ufirJ $av nru{otE€JU"ruhefreunLjuJ.t

- an&rnl rirr u53nrsrtd#un.ruri'oueeUg esav $'3r$urfre3ffgu"neln"r!r[uroeent a 3n ru eEaut uuitji3"y u t

Page 225: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NAM NGIEP 1POWER COMPANY

ffr3,r:rdaulanqn evureirpro eeav efiurirSurtrru airffu2 flug]dqLl; fieiaSnrutu{!J;t q ^ o o Au -A s .i t "

efro3rl3ur, flrfin'rr i! rauS3erviitoS'3rH'unln'tnJnlurEeLtululrdr3";u1re So ee av

e"r a u 6Tc da €r ) e n I 6r e "Y

i#u n r r.r fr u uJ EB o n r u e U u E-i{'{. fiu3qufruqrrtei3aiT3:

- :i'aureLJ3aoOuriif; r:rhudd.r rher uJa- zJuUrav0u:.i.rSL?rl 3 zl"rL d?r.rfunslnrueireff:.r{- nrrrlueaoarRurilfievn'au 320 gtav UueBr tdesu5rfji 27t01t2016

3. nruEunIESon.ru cUuaa3Uuqle!oeo- 6'tClUelUUU"t293n93UUU"tU - 1J13 mn6t"lo- fl49u6]uux6t293 nlumvp.toznlL o.]agu

- aceufruuilrze3 nrlfrr{E3ernrueUr{(airlarerYd) / ur1 Starua!o , o y t d r 6- 6ta9JJ6'.lUUnJ12A3 n6)SvndlnlUUiOmuU6)O6tun"tilUnuJO/ m"tu a.lSJJC

$rrn:fuor3uilrernt o3n,rut ulri'rriigu r ui'ru qufi 6oUuErq t cirilo sfr3 r souv6\luJouluuluuq9u t o3a13.

1 . ur'e3nr::riu q frqj?uerouiurJvurueeSa

2. anara"rdru uJgml seuuqo#eureUg eeav S'3r$ugri"neln"ruG[u,o

3, Saqjdrurji3"Jul froa"ru$usa3$otqurtr.Jurauocn rar tar3nrueysnarorsau"ruTul0E

fl'3e.rna'rutUui.r

4 . qifinn vfi'u q v Onel"r€r t Ut a ? er Ju riv a ru S"ufi'ufi'u etu efi 3 a e g u.rn ;i au 5os': ' - I lO

^ O ^ J oL-5. znl3 iatJrqrueJlu ee CIu!UtJvuu,t [Gm!.]c"rus:.J'(u3ttrJvu,ru0pruauroav rur.r i o

6. rii5! a ard"ruJt ci;i'e! eer;9t u ee Jc, a r8uriisrqlaeuae J a rir!?riai"r sH o?uE zo t o

oocuei16 o6i1 sff u pe j o u1J urJu aru 3 lu f,udru

1. nruri'rrTereaerffuui'ln.rLs:r5o#riirjto{auza3rJvqrflurJru u"loa"rufleu tdri.rforaoljrauuSaufiauq.rue")a

2. nqurilfoeaofiuui.rnruesosofidiStdriauasluvqr{urjru J asefi?finvfiri're"fro3

fio3n"rr {uruvurnau eeav 53eeaoSou {craquraofil seu:rracrEecrlriieee ,. r*r,n',3

Dl ({o#rrUueaoS;3#o eeay tsurucJg) eeav ;lafr 2 reu! seoueoder./^ o ^ o o o o o" Ju -3. nluriqrToeeeriiuuien"rueivSou{rirulerq'auaesUvqrflurj"ru uJ3m"r tdriqfoeeo nr"r3 D1

-![2e) u90u9uu"tucl1Ju]clo&1ua91J, [20u90u]9u9 [tav u]cuo,o.iu',o4. iiuLq eBe eaoul! n'ro a'ru"rou;r ff rrJv sruer5ut drlz efr aqvt dzfr'o esrnueir asSru?rn'

Uvq'r{u

Page 226: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

ffiav e t aln"ruavuluurutluBuE esav eJ'rd'r#oqflo(?uruov5oavo ee 53

Es a v .Du v t €J u I €J a v ufu a ruru efr u efi uhn'S'u eur o $'u6u .

ff u ulr o g U'r e v fler r fr e.r ee u u ? er 0 t ei rffi r: gu o ) u u r u n q r 4o s flera

NAM NGIEP'IPOWER COMPANY

frnruUnurrnlu)

6

7.o - o o L- l- .i u o o , jr- -- f -oljlJ"l295lUlCm.tRUU"l:.' UilJmlffmngLuUU"l9lJzumvUILJaUeLqffASC"lU (O!n]J6lqCU $mJq

UoSUr fiu3rr r1ufr'nrruru320 tfevffurudrevffnn'auB. t rn't a :n "rut rx duh3;u 1 i ae.r efi e ffu uqri'u deu}.J 5o J"ru J

o X o l- o q o.i r--3.effirff seav sDr'(e,fitiuernavtilu1'[unq]Jun&qul5rau eeav znqu Uvnquterarieaautm'aryuvr-Jvar:..r

glupe3tflgnqu eeas, Uvaru3"ruzoSriru {rurrniq .Dairq"rurnrru"rnaiautotfrduurEnarurr$rYuv"tvvooo-A-^uun"loln"ta ffav agnul.tfl"lm9u. &"taonlusoFUOUm.tnqu0Suaom99ao&!&y(uJ1vo5lnlneJU

nvuu[uclu]J.

L "i , L -o, .1, u -- 6 e o - .iu - .i q 6 v oifr3u-u, ne3Uvguto8toecaq 12:00 eeav "i3toar38oriutiinavuu!(a ruJeruLpnTllll1Ln"rL{ofi'l. ou o J -uYuuocIn6l"llJ tumuu.t.

q

rJvununas{uqu

fi jntin, ,j, }ufrztto1t2o1o

DuatAuqdumnnelrJu?u

,.--)-/--

----Muiqu 0shq slierq

v-51* t"

Page 227: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

&IE&/E ruGIEF"€POWER COMPANY

No,ela

Name and Surename

q cccv ulIJSYDU4

lD number Positio nCIlcct Ul

FromJJ1Olr)

unn=iou

Telephoneo(\cuiLncvSu

o:c,)or,

Signaturecre-rc{u

4 U" Svtf tJ,gUJ

lPz-ltNn UtP obctfi|Btol 'si&_ tD. l/D') ,t: W€') \- ./ 5 2? 14- qQ a\+o t> %n/ ?n n{_# n2,(-li,Y-a)lL-

-Lv- d, fl rtc>Y-a

-----=,-{F

,1 o). .", Q --4- r' p n /! QA,*tnQ/t 4'^

T';l ,n, q,,*, )\.'t +t ivr r.b .

'(-4) -9n,1-c

;tl!) tO rrqn. h'i-1, fl7t-- - - r - t . t-f

aa eo-r4* ) /") -\r1 . ( ,\---, ilu., )-s,n 4 >r, liq i*.ar-1 tn'.-.//y -'L7

rn1 I l-[-ftc hr^fr ;. $ii^ L,,, W;-,{r- :r{ ,n t k-.8+ 'z-i-{{,tc Jh.zan

.tn h^ x-ra\ l/e-',a, / srq ql \'lL/ / , ^^,/ > \V(.v/m 7W-7httl,l 2ztm.,., AB

-!l -Ait tD, Aa /rLr-Z ( (; "rt9-,;:g-+

,, ?- U sAtF, {zirt-- Ntnp, ri*rr) W119\ .r.- a{*oa .}- dVr- -^^ r lnl Dz gs?d+k)/Z- a ,l z.

' /''JlttatELDA r/

/ a ar.=tLJ

JP- x --l -r;A -yt .,*- --Y -, l-s r ,ra^G elQa ., /-

I EE tETElq -l -r r z{-rrth ' G ,oa-a A*r'n do a?Al l-te-cP 'l :r' .irl/\ i

, ,v J, --Aktlt'b.a (-\-z \ \\/-\.

l1 - ,.-- ,.-. -l 1til* 2 7 4r^t^t< #-...la 81 ,,,3 ,nbwi ,-4 J^t^ o\o4hilOr tC ffi.,A9

I 6 l\./,i/l .€-n 1c,J(

.v/)r1 rt^l r tie.q)

'/q\-r: ^Y9i i aq rqqqi e\ cL '' /,%uh.)1-t,

.<n .\.s-r+ /ltkl ,lefrb> ?tt/1) ^9rr/\5.92-

lt l'<424Bn q,-#-g

(/onorU )D ,.rn C

,'./ /1Q,T-/ l,)/h

' t/ ^Sl-ey, lAtl4)ttAit?N^

), ./ ".i,/fIN- rn-.,1t1-te^frid]

7.7 -u //t>u - -z1A t\,t" r

'1 lv )T ^-),4i r?t t N'A'J | {--Jr. flVrff*r - LA-

I.r, ./-f __r r) ::::",/rt - ot

.t- r/)- ee- , ).2--E/rJa /rr-<r n *a1" E6

..18 tA. 1., t F).QL) ^\ z- r-nvi.",/t '^:X,;n;-' i-/*---)

lrf 'r'\-lr-t 6 t //, pL t e i, ir-n'fr t t4/) t u.st 1)J'"J") ,.nw7n v1 ,..7-4'6 ;-(^u. 2t3ta .r't

-r'/,nA^ 1 f). tl ,dt

1*

Page 228: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

NA&r'EPOWER

NGIEPICOMPANY

Registration Form / ?u5tmvuJU:

, l , .--- L'- c .@Name of Activity / Hffoo=nr,........d..1y..n7-O;P-;..,.vlprr.r,:.ri+.r:,r?..g).:.11.h:....

o

No,elc)

Name and Sure

, nameq cccY urusvQU

lD number Positionorccmil

FromJJ101n

ulrn=icu

Telephoneqfi[63vJu

.:

r)oc')

Signatu recrerc{u

-qJ5;-

?o.?At,l ,t7 .l.n-lr, n€tcEl.4. ^ n-o-*oLn ,4,AP FOk tnp (raL ntio/ r' ./ - t-y'

),\f,c1\\62 ^a-QT

Page 229: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

P a g e 1 | 2

Lao People’s Democratic Republic

Peace Independence Democracy Unity Prosperity

*******

Minute of Meeting

Monthly Meeting with village Coordination Committee (Piengta, Hatsamkhone and

Piengta)

On 27 Jan 2016, at Pou village, Thathom district, Bolikhamxay province, the consultation meeting

was to discuss the following issue:

The participants in the meeting included:

Total of participants: 22 people

Number of females: 3 people

GoL:: 1 person

NNP1 PC: : 5 people

Number of PAPs: people

1. Development Part

- Village Coordinator in the meeting on 30/12/2015( Mr Bounmy and Mr Somneuk)

indicatethe understanding village coordination)

- Open the 3rd meeting with district coordination on 12/1/2016

- The team collect the grave data based on the proposal.

2. The technical team

- Asset Registration and compensation team will inform asset items in Feb.

- Public health Piengta village will get maintenance and medical kit support from the NNP1.

- Vulnerable team will interview and recollect two villagers as required ear aids, vulnerable

person from the NNP1 and the household from livelihood re-habitation

Infrasture team:

- Water supply at Pou.

- Update three villages under proceeding step.

- Update the area where 320 m and post on 27/01/2016.

3. Livelihood

- The village trust fund- Tikkham

- The progress of the market-Mr Davone

- The progress of activities development on crop plantation /Mr Vangmua

After that, the NNP1 Mr Bounmy Chitpanya mentioned the infrastructure.

1. Village office Pou, in the budget plan.

2. Piengta village public health will repair and support medical kit.

3. Ou Bridge cross Namngiep 1 will ensure tractors passing conveniently and the project

will maintain within 10 years after electricity sale.

Page 230: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

P a g e 2 | 2

4. Where will the PAPs resettle? Coordinate with above state.

5. Road to the cemetery is not in the budget plan but it is not much in the budget, proposal

can be made.

6. Complete water supply (GFS) at Pou village, permanent GFS of three villages complete in

2016.

Comment-Village Coordination committee

1. Agriculture land determination where not inundated, Hatsamkhone village is reserved

forest at Hatsaykhao

2. Agriculture land determination where not inundated, Pou village proposed district

agriculture, environment and natural office, zone 1 is Namche zone to road D1 (Animal

and paddy field rotate) and zone 2 is Pou water.

3. Agriculture land determination where not inundated, Piengta village, zone D1,

Hatsamkhone, Houayou and Houaydou.

4. Paddy field at Kao, can change to the new land type? To repay village labour.

5. Propose the project fertilizer and pesticide ( in the dry production such as water melon)

as appropriate policies.

6. How will fish pond land get compensated? Not seen in the compensate policy.

7. Tamlee paddy field at Piengta before there is no asset registration not inundated area

but now, there will be inundated at 320 m marking.

8. The NNP1 project assist soil to cover at Pou temple.

Summary

It is agreeable and understandable to each issue in the discussion and chairperson

steered the project coordination committee and village coordination if any questions,

come and discuss with the issue and find solution. For agriculture arranged land, should

arrange the PAPs only.

Therefore, the meeting is closed at 12:00 and as reference for the implementation in the

future.

Chairman Record taker

Vongphanh Daboudy Polor Yiaju

Translated by Khamluang

Page 231: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 232: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 233: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

91

'rplruttr[rerugftA6uar fnr$ 'r6Hug[g rum]r[^a.[69'r[Lu Ae]r rumu'TrLrflru^Q.uu

rufr]ruutrEr-rLnL!-lr-ruufir.rx hftrqB nEuqrngeu[p::nep[ugunuu :neun[uglr.ruee fZ' ^o'4oo h a\ a 2 - 'uc(tttplgiar.rr.r

"tur"1cu=nr*n*,ngnp:u$[ea nuuu$ Ae]r Grnntarunuunk:u$nuupgn:esnpubap euu[png:[uun[pu$rnngngr6 -

^ u,, u e

^ m n r u r $ u e * r n u s : r

" u ru s,,. * Ht:ff : IJf lff : ffi : LHil i, ffi ;?n

s u $ s s e s :

:[ue[uyruhnpnu[u[e *:nIpuppml nuIu[eupge;l[pugeg] ftunrm^ual

np:[Eug;:1 eu:: un[gn1[g[up rprLt;'uuLuneuAFftlrr6tsplnkep[euneFrg]uarr7'uuuenu[uee g'1'ueueruu[ufe;'1

'nggngnpnu[uee g'1'nkuk*pIeaprup:nuuuepIpnpnuIuee 7'1

'[ue[ulnubng[upgnu[u(e 1'1:n[p u[euptuftf?rrneu*pCbt nu[ngeeur:nebumnp$[ea [o,r:k 'nrGnnflLunut (gtOZ

79) unnupnegr I ^cetrftt ruAG.uuu3u:p[pugnuunmnu[nuenuu[glngulnk*p[eu' 1

:;r[u ruguen)-eJ-trJt ^e]l ^urerrLUnl

ft$lruulnkaF[eutl 1 o ? o u 644'ftrrp Z [g 'nuu Zl flL3fiAnr"[nueep*nau

'rrrr-? I Ig 'nuqn y n[[urynuu[u1uue.un'fttql I [eeuunnupnl]nub.uusumAfiAu

rtrt.a Z pnp:nuuueEfTtr6$ Aei] fttsu&.nunugnu[nepnuauruae:[eu:reeurmura,Ln ft[ftt 'fiLrI t [en 'nuqo 61 up[pnesrg]uax[[k: [eg:np 1 ne[uryuqnpi

nep:[ugqrnuuIu1 n$ubap[eapnp:nuuuqkfitn91 Ae]r ftBU&.GLGuGruru^rrLuAfi^u nuInueep*rueup - ? s e h oo, )p ^ a

Lpega [eg:ug:[es '[em:ugruau:[es eg::np neunh nuqo [earuuLn^nruB]flruptrnrmnul 'I dNNnuu[u1[ea nulutc[eg] nrfinrglftril S rL F upue;l[pug$ uq.rre.uurufl FUBHap[pugnuunernngrnk*p[euugptr nuoiupa[egt 'pnup uErrrereuF'gtOz lS tgz unng[ea 0t:I ree]rt

'LrT[LpU]rT6Ur I AGeln1 ruuu[u1[eauqr*o,uuu;lgap[pugnLuftt Igegug:ugftn

^s]l nuurusr::[umum nuuIg -

1 ne[unuglmlnegl[uglp muu[ul[6agl0z /S mB g, r G.An Lu* G.u SUB B *n [p ug.nu ufi e n nU? nb * p Ceu

uurruBuG

neeuh*n*lnu^e nrmAuet uleppub*n ureAuB, nLmpfiFereEBrb*n ul*n$rb^n ug*msernrB

Page 234: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

- ?urluir av0uflriuaelriru urnOarrrnrlr?{tei, Uelcfinfinnruri#r3 c{u: nrr.rir4cn-eenrruu, flr0u;p ff Urur$u3 nrrfiuvqrfrrtdfi3if;1?std, urltn3nrrerirfisefiIamunarref,u6s.

* a;n{uf,urffffu:L.t ffurirrnrc: .ueu?ui RMU cf,u?anr1 f;lrhufiuavecuulnrufinSadel, 85f,n, 6rrrn

nru8nne361u ffav neuficr6reelfiu innruEnarmr5, rhumcrE4rffu?uu ecav fir5l8cUu5riav\,6 - . ! .t A^ o d o , ; . -

"-r o.. , v a ye3navcc61, fie1tdf;1cfiurit*.ro'lae1filfifiat3frl?urt ecicrirerrflLccfl Ea'(riarcin ccay 5urJyfr:-r'(6finoruffnfio1, aonnel nrrffnuuru rrav ifinrfifiriln.

- *riu 4 neufic fiO1rir;rtn5laruc{rcc61flu3:.r eeru?rfiirjrfirngusrnnrllfiaravur fiffu3nrirrnlcneu.

2,1 iirnvFfir: urunruiruane0eSfilr.fil 3 3n crfirar canfilnraccrrSuerql?rcanrJrFvurlciJ, r-lrrJe3fiu c.Delav:'rrr)ncrJu3nfrnlnvrJl, 6n5r?riiuvqrflr.rrfirnruuvf;n ccav criufi?riavccrm l n r u n 3 o d e 1 S r riu fi u ri.u I r r a e 3 I 3 fi n f; I * r g a n e I I fi u ri m c t I .

3./ *rf;u B neuffcritfisuHnlunrufrncflucBelqerta: r-ieu?fr RMU cflu?anr3 f;lfiuA.fiuavcerrulnruffn;cEel, 05f;n, 6turnntrrlnneSriru ccav nsuficulcnnJc innrrEnsrurS, ir

rurn cfilnar"ufielnrrfict1?l$uecuunrr.rflncf;u ar fie3nru{uccuuccua?n?.* a;nr)u rf 3{5 onrru tflur):- ffnavfirfiturfinqvrit: rir3rrLsvuluftvuuu (cne1 erav tnSnru) Sllrqnq eJrn?uiavcfi

cc63?risrurnnru8nnelriruSu$frr ccav UuurarnrcrfirarUleirtrun, reu?ritn1nrufruficrfru?uu.

fi1fir, tltfirlerfir #rt0nUuffnticUuuerSl?rnruinfr1uvfir)na3n1rrL?reiuir.

fi 8ru{, lufizot 05/ 2016.o

{Uuurnneldvqu

€ \ PoRL{B

Ho's591 r"lrlJgllnl tur!(Uvurunel{vqu)

neJrael (RMU)

t i/'2l,tl ;$1 ,

UuafioBounthone PANKEO

Page 235: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

erEe'lla:,fi. z:e . i-,-rcu: .'e .

r"r':rll.rt'-,r€:,a'- i. r.[ie1FFr,r.:'- r::- : r:r'e:.t'4n11;1i:-r

tua:5u: o2i-2612st. ttil'r''. c.21-261252.

fiaineru;zrl:........

5"rrn .,. ...l.....lzota.eduso,(,!i6Ja tll!Ur'

a. ,a-,-z -,-_rc c. '.- , , ti) lL L az. '

.. '

l.^^ud-. Iru !u ldvdu d lUtirrJJ' I i"r"iniuiniicl"qiiavijiJsvl'!

Ii

1Ii

I

Zd\J

r .<-)g) t>) tqr19. .r .

7)a lz/ {<2t l^t l2- [il.,,,,.--,

u u*9 A.{)quvu) Uijfrtt. 160f9 t4 UrJ q-m. trnA *^r,fu Rt{r.r ? 24. 'i5G'o7 M

.<-tn. A"t^ A u$3 z-1il \r uJ\A 0.nt 6rraerel{ D"9 /r=6

tA" ai 51()t

ufil r7 X s-A .-]Ar/tx \ 7"/.).7

, -lt l<-I ( q,iI.-I> | rrr \

/cP/r. ^A4

h,2/naYr. t*tra9 / t

8I

\)) -

, lh *-'t .)>ACnaQ/r:12 Z"L9

tf .z* ,=o ,h''--v7-

axrcoz* l5z Gt ,z10 U,6lrpfio ,"ryrV | "--s1t* L)d lq?,bR c) {frrtl €))n - /-t"-vu='

.*? ) 9l

I

<1A ?* r'-Aoq azU-€l r12

U.figr Ln lr rYd 1,r. t["9< o r

13 ('rd. rru rrr6s.J =&",;,$st 22-ato +7A -T*14 €- 0 a-->9. a.\- ^S

I

I/N PI gqTWqz m-15

- N.S-r^ri f'oatSj hr"t ttr ff. b>sz+ud 4frU16

I/), u)) nbD il:..rri - rl a- il^tr?D f , tnt^l ez ar:olLv* 2Lzcfrwf /?>a

17 [on 1 tln s lzx$ laq Qt- q-

2,N ZDI z\ oqrq$ z40to u

,, I i{ ,ai ) ilq>eJ

--------a-

n-P ll ,;rYt o*Qz or ./4'r't .HNam Ngiep 1 Power CcmPanYVientiane Capita!; TelePhone:

co" Ltd H"-* N o 236, Unit 16, Phonsinuan village, Sisattana District,+85 62125'!25 1,; F ax +85621261252

tltrs} jL.*'i t* I t\i t{": t ?. 1....'

frtAM NtIi..I}L':!JF!-. i"i'

Page 236: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

f{Af,.4 ruGtf,$} 1

.*-..,, ---.';. - - - .-: -.,, .-I-Y]i (,: JJI, ZJC, CJLU IE,

ir. :-,hr'-,E'-,c: r. r.ii=1FFr-,r.r: r.,r'-ryslg',511:=1i:-l

irnav*u: a21-2r.125i: uiJr'. ozt-zatzsz.

j{

.! . . ...lzt''i+...-JU I

qLrdv! IUdvr"l! j't?"iIUinstL aru:i",;

r\I^'.-- i'.1 -:^.- I llnrrra'- -^r.r-^n., l-.. i-irl Ljntca lin ^t-2C I init i 4. ,Dhnrrcj;rtt:ir '-iil:oo Qic:t'i:tr: j-liciri.r;,'\'r?r.i::r!-r?'--:p:ral iel:plroler +8r5..i!a:.:a -l !=:-: t8aar 1l.S;7F,?

,L' t4il(8e r ,

.. tl a^^4d. \tU !U IdUdU

20' rh c

Page 237: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s

Lao People’s De o rati Repu li

Peace Independence Democracy Unity Prosperity

=====000=====

Minute of Meeting

Review activity implement May 2016 of the NNP1

With reference to plan and true result in the implementation of the project in the previous month.

On 26 May 2016, 01:30 at Pou village, Thathom district held the activity implementation review meeting,

of three villages, Thathom district of the NNP1. Under Mr.Bounthone Panhkeo; deputy district Party

secretariat and deputy governor of Thathom district and RMU as well as the NNP1.

The participants in the meeting included:

Total of participants: 19 people

Number of females: 3 people

GoL:: 1 person (Bounthon Pankeo)

NNP1 PC: : 4 people

Number of PAPs: 12 people

The meeting context as follows:

1. The meeting gets report implementation result in the previous month(5/2016) by explanation,

indication from each responsible team which contributed as follows:

1.1 Infrastructure construction work.

1.2 Livelihood work

1.3 Land asset work

1.4 Education work

1.5 Health work

2. The meeting is contributed openly and agree unity for implementation as follows:

Infrastructure work:

1. Road work: The Company agreed road survey proposal to the agriculture area and affected

area as requested from Piengta.

- For the affected land, the villagers proposed loss policies compensation from the NNP1.

2. GFS: GFS maintenance construction at Pou village, agree the company plan and the district

will have arranged, habitation and reserved tank again.

In the future, GFS of the village, construction technique such as: survey-design, insufficient water

or other issues as the villagers’ suspect, the NNP1 solves the issues as truth.

Land asset work:

1. The village land: Handover to RMU as central integrated with the related section, company,

village authority and land owners managed to discuss, review and if not clear, requires to

recollect data and solve correctly as law and regulation.

- For four families that not registered the asset they have to wait for the answer.

2. Agriculture land: At first, three points are seen that areas aren’t reserved forest, the district

define development land.

3. For eight HHs received compensation: RMU as central integrated with the company team.

Livelihood updating work

- Handicraft activities: supported from the district and the project. Consider the low unit rate.

Therefore, this is as reference for the implementation in the future.

At Pou, 26 May 2016

RMU NNP1 Meeting taker

Phalikham Bounmee Polor

Chairman /Bounthone Pankeo

Note: Translation by KHAMLUANG

Page 238: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s
Page 239: Resettlement and Ethnic Development Plan Nam Ngiep 1 ...Resettlement and Ethnic Development Plan Project Number: 41924- 014 October 2016 Nam Ngiep 1 Hydropower Project (Lao People’s