residential university redevelopment · residential medical campus potential redevelopment...
Embed Size (px)
TRANSCRIPT

EASTGATE Regional Council of Governments
+ MERCYHEALTH• YOUNGSTOWN
BUSINESS INCUBATOR
T><ECTTYOF
YOUNG STOW� Youngstown STATE UNIVERSITY
Ill EASTERN GATEWAY� COMMUNITY COLLEGE
� MILL(il CREEK
METROPARKS

D I S C O N N E C T E D A N D I N W A R D F A C I N G I N V E S T M E N T
Residential
PotentialRedevelopment
Medical CampusResidential
PotentialRedevelopment
University
Downtown
Riverfront Development
ConventionCenter
WickPark
Mill CreekMetroPark
T H E P RO B L E M
Considered a shrinking city, Youngstown has lost jobs, population and industrial base. Today the community envisions a new city which is smaller, with a different economic foundation.
Existing transportation infrastructure was built for a bigger city with different needs, resulting in: • Too much vehicular capacity exacerbates operation and maintenance costs• Current conditions do not support pedestrian and bicycle safety• Poor support for pedestrians - limited sidewalks and ADA issues• Almost no bike mode options• Limited transit options and no city center circulator
The existing urban development pattern has less density:• Extensive demolition of abandoned buildings• New investment has a lower density and its separation diminishes the effectiveness• New infill development has not replaced all that was lost• Appearance of decline in spite of recent investments
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET
Chill Can Manufacturing Development

YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET
T H E SOLUTION
The Youngstown SMART2 Network will connect Strategic & Sustainable, Medical & Manufacturing, Academic & Arts, Residential & Recreational, Technology & Training centers in the heart of the Mahoning Valley region, by enhancing mobility, improving safety, and integrating technology into a modern and efficient multimodal transportation system in Downtown Youngstown that responsive to adaptive to the needs of current and future users.
SMART2 will incorporate improved pedestrian and bicycle facilities, autonomous transit shuttles, transit waiting environments, green infrastructure, streetscaping, and wayfinding connecting major regional destinations that include Youngstown State University, Mercy Health, Youngstown Business Incubator, Eastern Gateway Community College, and WRTA Federal Station.

CONCEPT 2A – UPDATED GATEWAY AND MODIFIED PATTERNING ON SIGN BACKS
DOWNTOWN YOUNGSTOWN // WAYFINDING PROGRAM CONCEPT DESIGN©Studio Graphique, Inc. www.designwithdirection.com YNG1283 | JULY 2015
C H A R A C T E R R E F E R E N C E I M A G E S
Complete Street Shared Use Path with Bio-retention Cells Typical Transit Mini-Hub
Corridor SignageGateway Sculpture Corridor Intersection Enhancement
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET
YSU AthleticsStambaugh Auditorium
Public Library
SPONSORED BY
One Line Name Second Line Name
6" square poles Breakaway mounting
3'-6"
3'-2"
E12'-1"
2"5 1/2"
4 5/8"
2 7/8" Cap Ht.
T1 D
Sponsor area.Text provided
by owner.
1'-8"
8 1/2"
SPONSORED BY
One Line Name Second Line Name
SPONSORED BY
One Line Name Second Line Name
B2 - A
B2 - D

E X I S T I N G A N D P R O P O S E D A L O N G F I F T H A V E N U E
PROPOSED (LOOKING NORTH)
EXISTING (LOOKING NORTH)
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

F I F T H A V E N U E - T Y P I C A L S E C T I O N S
8’ 11’ 11’ 11’ VARIES8’15’ 16’
Drive Lane Landscaped Median Shared-Use PathDrive Lane
EXISTING (LOOKING NORTH)
PROPOSED GREEN AND COMPLETE STREET (LOOKING NORTH)Bus Drop-Off Bus Drop-OffWalk
12’ 12’ 12’ VARIESVARIES 12’ 12’
Drive LaneWalk WalkDrive Lane Shared Turn Lane Drive Lane Drive Lane75’
EX R/W
EX R/W
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

9’
9’
9’
9’
11’
11’
11
11
Travel Lane w/ Sharrow
Travel Lane w/ Sharrow
Travel Lane w/ Sharrow
Travel Lane w/ Sharrow
Parallel Parking
Parallel Parking
Parallel Parking
Parallel Parking
11’ 12’ 12’ 11’ 8’8’
Travel Lane Travel Lane Parking Lane
62’
Parking LaneWalk Walk
7’
7’
7’
7’
4’
4’
4’
4’
62’
62’
Walk
Walk
Walk
Walk
Tree Lawn.
A.S.
Tree Lawn
A.S.
Section Notes:1. Traffic lanes will be narrowed and re-
striped as a shared lane.2. Sharrows will support bike
connection between Fifth and SouthAve.
3. Parking lanes will be narrowed4. Street trees and lighting will be
added within the amenity strip
C O M M E R C E ( W E S T O F W A L N U T ) - T Y P I C A L S E C T I O N S
EXISTING (LOOKING WEST)
PROPOSED W/ TREE LAWN (LOOKING WEST)
PROPOSED W/ AMENITY STRIP (LOOKING WEST)
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

5’ 11’ 11’ 10’ 11’ 11’ 5’ 5’5’
Travel LaneTravel Lane Grass Median or LTL
Travel Lane
74’
Tree Lawn
Travel Lane Tree Lawn
Walk Walk
5’
5’
5’
5’
11’
11’
10’
10’
11’
11’
5’
5’
8’
8’
11’
11’
8’
8’
Travel Lane
Travel Lane
Bike Lane
Bike Lane
LandscapeMedian or LTL
LandscapeMedian or LTL
Travel Lane
Travel Lane
74’
74’
Tree Lawn
A.S.
Bike Lane
Bike Lane
TreeLawn
A.S.
Walk
Walk
Walk
Walk
Section Notes:1. East portion of Commerce will
include 5’ bike dedicated lanes.2. Support bike continuity between
Fifth Ave and South Avenue3. On-street parking is not
incorporated due to buildingsetbacks
4. Median will reduce perceptionof expansive vehicular zone
C O M M E R C E ( E A S T O F W A L N U T ) - T Y P I C A L S E C T I O N S
EXISTING (LOOKING NORTH/WEST)
PROPOSED W/ TREE LAWN (LOOKING NORTH/WEST)
PROPOSED W/ AMENITY STRIP (LOOKING NORTH/WEST)
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

22’ 12’ 12’ 22’ 16’16’
Travel Lane Travel Lane
100’
Angle Parking with Bumpouts Angle Parking with BumpoutsWalk Walk
8’ 5’
5’
5’ 8’11’1120’
Travel LaneTravel Lane
100’
Parallel Parking
Parallel Parking
Walk
8’ 5’11’11’ 8’ 20’
20’
20’
Travel LaneTravel Lane
100’
LandscapeBumpouts
Landscape Bumpouts
Walk Walk
Walk
Section Notes:1. Angled parking will be eliminated to
improve safety and increase space forthe pedestrian zone, outdoor dining,shopping, etc.)
2. Landscape bumpouts incorporatedfor parking protection and shortenedpedestrian crossings
3. Dedicated bike lanes added insideparallel parking to support bicycleconnection from South Ave to SpringCommons Bridge.
5’
5’
5’
5’
A.S.
A.S.
A.S.
A.S.
F E D E R A L S T R E E T - T Y P I C A L S E C T I O N S
EXISTING (LOOKING WEST)
PROPOSED W/ LANDSCAPE OR GREEN INFRASTRUCTURE BUMPOUTS (LOOKING WEST)
PROPOSED W/ PARKING LANE (LOOKING WEST)
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

11’5’ 5’ 11’ 11’ 3’ 11’ 11’11’ 5’ 6’
Travel Lane Median Travel Lane
91’-105’
Travel LaneVariesVaries
Travel Lane Travel LaneTravel Lane TreeLawn
Walk
5’ 11’ 11’ 12’ 11’ 5’11’ 9’ min.5’ min.7’ min. 4’ min.
Travel Lane Median or Turn Lane
Travel Lane
91’ to 105’
Bike Lane
Travel Lane Bike Lane
Travel LaneWalk Tree Lawn
WalkTree Lawn
Section Notes:1. Remove two traffic lanes and replace
with dedicated bike lanes and turnlane/median.
2. Widened sidewalks along the campusside of Fifth Ave.
3. Dedicated bike lanes to supportconnection between YSU campus,downtown, and Metroparks
F I F T H A V E N U E - T Y P I C A L S E C T I O N S
EXISTING (LOOKING NORTH)
PROPOSED (LOOKING NORTH)
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

Section Notes:1. Remove two vehicular traffic lanes.2. Bidirectional and buffered bike lane
to support recreational connectionalong the Amphitheater and to theMetroparks.
3. Added on-street parking along northside.
4. On-street parking lane to transitionto landscaped bumpout at east endnear courthouse.
F R O N T - T Y P I C A L S E C T I O N S
11’ 11’ 11’ 11’ 10’ 6’6’
Parking Lane
66’
Travel Lane Travel Lane Travel Lane Travel LaneWalk Walk
EXISTING (LOOKING WEST)
PROPOSED (LOOKING WEST)
2’8’ 11’11’ 8’8’ 8’5’ 5’
Travel LaneTravel Lane
66’
Bidirectional Bike Lane
Parking LaneWalk WalkTreeLawn
TreeLawn
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

P H E L P S - B E F O R E / A F T E R
EXISTING (LOOKING SOUTH) PROPOSED (LOOKING SOUTH) - Image excerpted from MKSK/MS Consultants Amphitheater Master Plan
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

N O R T H S I D E T R A N S I T H U B A T M E R C Y H E A L T H C A M P U S - P R O P O S E D S E C T I O N
15’ 15’ 11’ 12’ 6’ 12’ 12’ 11’ 40’6’
Drive Lane Drive LaneDrop-Off Lane Drop-Off LanePlaza PlazaBikeLane
BikeLane
Landscape MedianLandscapeBed
SECTION A - A1
YOUNGSTOWN SMART2 NETWORK - PRELIMINARY DESIGN PACKET

R a y e n A v e n u e P e r s p e c t i v e R e n d e r i n g
Proposed
Existing

C o m m e r c e S t r e e t P e r s p e c t i v e R e n d e r i n g
Proposed
Existing