resilience excellence in power & utilities
TRANSCRIPT
Resilience Excellence in
Power & Utilities
Rooman Latif - Corporate Strategy, Risk &
Resilience
2
The Visionary
Sheikh Mohammed bin Rashid Al Maktoum, Vice President
and Prime Minister of the United Arab Emirates, and ruler of
the Emirate of Dubai.
“One must be dynamic and able to
change and adapt to lead and grow”
3
Strategic Context
4
DEWA’s Resilience Journey
Establishment of Enterprise Risk Management (ERM) and resilience architecture
Implementation of Business Continuity Management (BCM) and Crisis Management
System enablement and automation (SAP GRC) of risk
Risk and resilience infrastructure
Convergence of ERM, BCM and Crisis Management
Enablement of Crisis Command Center for risk and resilience intelligence
Pioneering risk and resilience standardization with PAS 60518:2020
Digitization of risk and resilience via real-time SAP GRC Mobility and Dashboard
Alignment with DEWA Strategy and Stakeholders
1. Risk & Resilience Foundation
2. Risk & Resilience Transformation
3. Risk & Resilience Innovation
Initiating Progressing Optimizing Leading Pioneering
5
Risk & Resilience Continuum
Resilient Utility
6
Critical National Infrastructure
7
Digitization and Automation Journey
Sr. No Rank Risk Impact Likelihood Risk Score
1 1
Lack of clarity around organizational
charts: Few cases are there where 4.20 4.70 19.74
13 1
Loss of water through leaking pipes,
fittings, valves 4.20 4.70 19.74
4 3
KPI’s not achieved due to delays in
Municipality approval process for civil 4.18 4.45 18.63
20 4
Distribution pipelines damage due to
adjacent building works, pipe
breakages and material failure due to 4.22 4.30 18.16
18 5
Transmission pipelines (550mm dia
above) damage due to adjacent 4.30 4.20 18.06
16 6 Breakage of inlet/outlet pipes, 3.80 3.90 14.82
12 7
Administration delays from other
government departments e.g. NOC 3.90 3.60 14.04
42 8 SAP implementation challenges 3.64 3.82 13.88
6 9
Limited list of approved vendors /
contractors 4.00 3.45 13.82
19 10
Distribution pipelines (up to 450 mm
dia) illegal tapping, illegal 3.55 3.55 12.57
48 11 Poor safety standards with contractors 3.73 3.36 12.54
17 12
Material failure due to age,
degradation and corrosion, old 3.60 3.45 12.44
5 13
Failure to meet KPI of 1 week to resolve
all complaints 2.91 4.27 12.43
10 14
Breach of security malicious tamper of
water source/Illegal 4.27 2.90 12.39
2 15 High reliance on desalination plants 3.82 3.18 12.15
9 16
Stagnation of water when pipes are
end capped/Dead ends. 3.27 3.70 12.11
14 17
Key Vendors unable to provide HDPE
piping 4.00 2.89 11.56
43 18 Failure of SCADA system 4.36 2.64 11.50
26 19
Health and safety risks e.g. Risk of
electric shock in pump room, Noise risk 3.82 3.00 11.45
29 20
Price driven tender selection can
adversely affect quality 4.00 2.78 11.11
21 21 Time consuming procurement process 3.00 3.70 11.10
46 22 Failures due to manufacturer defects. 3.91 2.82 11.02
3 23
Non availability of state of the art
equipment for surveying, software 3.27 3.27 10.71
8 24 Risk of failure in pumping from reservoir 4.36 2.45 10.71
7 25
Lack of in house skill to work with High
Density Poly pipes 3.20 3.20 10.24
30 26
Failure to initiate projects due to
breach of budgets 3.20 3.10 9.92
40 27
PPE not being used as inappropriate
for the working conditions 3.40 2.90 9.86
11 28
Risk of scissor cutting procedures during
tender/contract preparation. 2.91 3.20 9.31
22 29
Human error in control of pumping
station 4.00 2.30 9.20
39 30 Heavy load- manual handling risk 3.50 2.56 8.94
15 31 Loss of JAPS production eg. Oil slick 5.44 1.64 8.91
44 32
Reliance on well plants in a crisis- water
quality 3.91 2.27 8.88
25 33
Risk of injury by … due to location of
water assets 3.18 2.70 8.59
37 34
New regulations affecting efficiency eg
Working Time Directive for contractors 3.09 2.64 8.15
47 35
Lack of professional Project
Managers/Certified PMP’s involved to 3.00 2.70 8.10
28 36
Lack of ability to benchmark market
costs for materials and services due to 2.78 2.90 8.06
31 37
Need for emergency procurement due
to lack of DEWA in-house resource 3.00 2.64 7.91
27 38
lack of random sampling to check
water quality 3.70 2.10 7.77
38 39 Working at heights 3.30 2.30 7.59
24 40
Communication issue with customers
due to language barriers 2.64 2.80 7.38
45 41
Water not regularly tested at point of
consumption: Compare the 3.27 2.18 7.14
34 42
Earthquake may cause fissures/cracks
in reservoirs and partial settlement can 3.02 2.36 7.14
35 43
Health issues from damaged asbestos
pipes e.g. During cutting/grinding at 3.36 2.09 7.03
41 44
Outdated software- using MS Project V
Primavera 2.78 2.44 6.79
32 45
Risk of failure to resolve billing
complaints before cycle period 2.57 2.63 6.75
36 46 Lone working and unsafe man entry. 2.80 2.40 6.72
33 47
Loss of access to Al Quoz office due to
fire / flood / act of God 3.70 1.50 5.55
Risk #
Impact
Risk assessment
Controls Implemented
OwnerTarget completion
dateStatus
Likely (3)
Date ImplementedDetails
Control / Treatment Plans in progress
Target ScoreSignificant (2.7) Likelihood
Risk Treatment Template - [Div is ion Name]
Risk Title
DetailsRisk description
Risk owner
Risk Champion
Date prepared Risk Category
Risk Score
⁃Risk # will be the risk reference number assigned by ERM
⁃Risk Title should be a very short description of the risk
⁃Risk Descr iption will be the details of the risk including causes and impact
⁃Risk Category - to be filled by ERM
⁃Target Score is the risk score desired post implementation of controls
⁃Current controls in place - provide a short description of the current controls in place to mitigate this risk
⁃Control Strategy - provide the control strategy to be implemented to further mitigate the risk
T reatment P lan behind schedule
Control / Treatment Plan
T reatment P lan o n target
T reatment P lan behind schedule
T reatment P lan o n target
The SAP Mobility Project consists of 5 applications accessible on DEWA enabled smart devices
Smart Risk
Dashboard
Collaborative Risk
Assessment
Risk Review and
MitigationsRisk Fact Sheet Risk Proposal
1. Manual Processes 2. SAP GRC 10.1 3. SAP Mobility & Smart Risk Dashboard
8
PAS 60518:2020 – Enterprise Risk & Resilience in Utilities Standard
DEWA has pioneered the development of
the first risk and resilience specific
standard.
Developed in partnership with the British
Standards Institution (BSI) and other
leading global Utilities.
Seeks to address some of the gaps in
existing standards and link the necessary
disciplines to enhance overall utility
resilience.
Will be a global reference across the
Power & Utilities sector once published in
January 2020.
PAS Development Process
9
Thank You