resolution of proceedings, disposition of applications for ... · later than february 1 of each...
TRANSCRIPT
![Page 1: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/1.jpg)
REPORT TO THE LEGISLATURE
Resolution of Proceedings, Disposition of Applications for Rehearing, and
Commissioner Presence at Hearings
2017
Michael Picker President
Carla J. Peterman Liane M. Randolph Martha Guzman Aceves Clifford Rechtschaffen
Commissioners
Submitted: February 1, 2018
![Page 2: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/2.jpg)
kSTATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE
SAN FRANCISCO, CA 94102-3298
PUBLIC UTILITIES COMMISSION REPORT PURSUANT TO
PUBLIC UTILITIES CODE SECTION 910.1 Introduction
Pub. Util. Code Section 910.1 requires that the California Public Utilities Commission (Commission) report annually on the timeliness in resolving cases, information on the disposition of applications for rehearings, and the number of days that Commissioners presided in hearings. It further requires that the Commission submits the report to the Legislature no later than February 1 of each year. The Commission submits this report for the reporting period of calendar year 2017.
Pub. Util. Code Sections 1701.1 et seq. require that matters be resolved within certain time periods, depending on
the categorization of a proceeding. Effective January 1, 2017, adjudicatory matters must be resolved within 12 months and ratesetting and quasi-legislative matters are to be resolved within 18 months of initiation, unless a longer deadline is set by the assigned Commissioner’s scoping memo or Commission order extending the statutory time period. A proceeding has been resolved when the main issues have been decided such that the proceeding could usually be closed. At times, proceedings that have had all substantive issues decided may remain open or are “re-opened” because of other issues, such as petitions for modifications, various motions, or requests for intervenor compensation.
Prior to January 1, 2017, Pub. Util. Code Sections 1701.1 et seq., most notably the requirement for scoping memos
and the statutory deadlines, did not apply to proceedings that were not subject to evidentiary hearing. Senate Bill 215 (Leno, Stats. 2016, ch.807), amended Sections 1701.1 et seq. to extend its provisions to all proceedings regardless of whether they are subject to evidentiary hearing.
As described in this report, all of the proceedings resolved at the Commission during 2017, that were subject to
statutory deadlines were completed consistent with statutory timeframes, either due to resolution within the statutory deadlines, or because a scoping memo establishing a longer deadline or timely extension order was issued as permitted by law. This report provides details regarding whether proceedings were resolved in a timely manner with or without extension orders. More detailed information is contained in the attached Appendices A-I.
Appendix J reports the days that Commissioners presided in hearings, and Appendix K reports information on the
disposition of applications for rehearing.
![Page 3: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/3.jpg)
Public Utilities Commission Report Pursuant to Pub. Util. Code Section 910.1 Page 2
207092767
Description of Attached Appendices A-K Appendix A – Proceedings Initiated Before January 1, 2017, not Subject to Hearings, Active During 2017 (Resolved and not Resolved)
Appendix A lists 105 cases active during 2017 that were initiated prior to January 1, 2017, and not subject to hearings. Of the 105 cases, 74 were resolved during 2017. The remaining 31 proceedings are currently active and on schedule. Appendix B – Complaints Under the Expedited Complaint Procedure, Active During 2017
Appendix B lists 32 Expedited Complaint Proceedings (ECP) that are small complaint cases handled under special procedures analogous to “small claims” court. These proceedings are not subject to statutory deadlines. We are reporting these matters separately because the Commission has adopted more aggressive timelines for these cases than the statutory timelines for other proceedings. The Commission has established an informal 132-day target for this type of proceeding to be resolved.
During 2017, 23 of these 32 cases were resolved. Nine proceedings remain active. Appendix C – Proceedings Active During 2017 – Proceedings Resolved on Schedule
During 2017, the Commission timely resolved 60 proceedings, including 18 proceedings that were initiated prior to January 1, 2017, and subject to evidentiary hearings and 42 proceedings that were initiated after January 1, 2017. (11 Adjudicatory, 44 ratesetting, 2 quasi-legislative, and 3 proceedings resolved rehearing-related issues that were not categorized.)
![Page 4: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/4.jpg)
Public Utilities Commission Report Pursuant to Pub. Util. Code Section 910.1 Page 3
207092767
Appendix D – Proceedings Active During 2017 – Proceedings not Resolved but Still on Schedule
During 2017, there were 76 active, unresolved proceedings that were initiated prior to January 1, 2017, and subject to evidentiary hearings and 178 active, unresolved proceedings that we initiated after January 1, 2017. Of the 254 cases, 29 are adjudicatory, 14 are quasi-legislative, 1 is quasi-legislative/adjudicatory, 4 are quasi-legislative/ratesetting, and 201 are ratesetting. All of these cases are currently on schedule taking into account statutory deadlines, orders extending statutory timeframes, and scoping memos establishing deadlines that in some instances exceed statutory timeframes. Five proceedings are addressing rehearing related issues and categorization will be addressed as necessary if the Commission subsequently grants rehearing. Appendix E – Petitions for Rulemaking
Petitions for Rulemaking are statutorily mandated proceedings subject to the deadlines in Pub. Util. Code Section 1708.5. The Commission is mandated to issue a decision in this type of proceeding within six months. Appendix E shows that five such proceedings were active during 2017 and that the Commission has issued four timely decisions. One petition is active and currently on schedule. Appendix F – Citation Appeals and General Order 156 Appeals
The Commission, in Resolution ALJ-299, signed on June 26, 2014, established a Pilot Program Citation Appeal and General Order 156 Appellate Rules, effective January 1, 2015. Under this pilot program, these appellate records will be easily accessible, thus enhancing due process in these expeditious proceedings. Appendix F shows that ten such appeals were active during 2017 and that the Commission has issued five resolutions addressing the appeals. Five appeals are active.
![Page 5: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/5.jpg)
Public Utilities Commission Report Pursuant to Pub. Util. Code Section 910.1 Page 4
207092767
Appendix G – 60-90 Day Compliance for Adoption of Decision
The Legislature has also established guidelines for the length of time between the issuance of a proposed decision and the adoption of a final decision by the Commission, applicable to ratesetting and quasi-legislative proceedings requiring a hearing. The guidelines are either 60 or 90 days depending on certain circumstances.
During 2017, the Commission considered 13 proposed decisions in proceedings subject to these guidelines. The Commission adopted 12 final decisions in such proceedings. In 9 instances, the final decision was adopted within the guidelines and in four instances, the final decision was issued later than the period specified in the guidelines. One proposed decision was withdrawn. Appendix H – Issuance of Presiding Officer Decisions and Proposed Decisions
For proceedings that require a hearing, the Legislature has also established guidelines for the length of time between the submission of a matter for decision and the issuance of the proposed decision. During 2017, the Commission issued eight presiding officer decisions and 13 proposed decisions in such proceedings. Out of these 21 decisions, 13 were issued within the mandatory 60-day and 90-day timelines.
Appendix I – Issuance of Extension Orders and Scoping Memos The Legislature has also established a process for extending the statutory deadlines through issuance of an
extension order. During 2017, the Commission issued 46 extension orders in 31 separate proceedings (more than one extension order was issued in some proceedings), including proceedings which remained open at the end of 2017. Of the 165 proceedings resolved in 2017, 18 proceedings were subject to statutory deadlines and there were 4 proceedings where extension orders were issued.
The assigned Commissioners issued 149 scoping memos in 140 proceedings (more than one scoping memo was issued in some proceedings.)
![Page 6: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/6.jpg)
Public Utilities Commission Report Pursuant to Pub. Util. Code Section 910.1 Page 5
207092767
Appendix J – Commissioner Attendance Appendix G reports the Commissioner attendance at hearings during the period. The table shows that
Commissioners attended 53 days of hearings and presided during 31 of those 53 days. Appendix K – Information of Disposition of Application for Rehearing Appendix K reports information on the disposition of applications for rehearing in 2017.
Conclusion
In summary, this report, submitted in compliance with Pub. Util. Code Section 910.1, provides the public and the Legislature information on Commission action in formal proceedings. Specifically, 466 proceedings were active at the Commission during the 2017 reporting period. 166 of these proceedings were resolved during 2017. 100% of the proceedings subject to statutory deadlines were resolved consistent with statutory requirements taking into account scoping memos, which in some instances set deadlines longer than statutory timeframes, and orders extending the statutory timeframes adopted by the Commission, as permitted by statute. The Commission is committed to continuing to achieve full compliance with the statutory guidelines.
![Page 7: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/7.jpg)
Public Utilities Commission Report Pursuant to Pub. Util. Code Section 910.1 Page 6
207092767
Summary Table
Timeliness of Proceedings Resolved during 2017 Resolved
Timely with no Extension
Orders
Resolved With Extension
Orders
Resolved Late
Currently Active
Total
Initiated pre January 1, 2017, and not Subject to Hearing (Appendix A)
621 122 0 31 105
ECPs (Appendix B) 22 1 0 9 32 Resolved on Schedule (Appendix C) 56 4 0 0 60
Currently Active (Appendix D) 0 0 0 254 254
Petitions for Rulemaking (Appendix E) 4 0 0 1 5
Citation Appeals and General Order 156 Appeals (Appendix F)
5 0 0 5
10
Total 149 17 0 300 4663
1 These proceedings are initiated pre January 2017, therefore, not subject to the statutory deadlines.
2 In 11 of these proceedings, a scoping memo issued determining that evidentiary hearings were not needed; extension orders were issued although not required by statute. In 1 proceeding extension orders were necessary until the Commission determined in the decision resolving the matter that evidentiary hearings were not needed.
3 Total does not include reopened proceedings that were resolved in prior years.
![Page 8: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/8.jpg)
2017 Report 207092767
Page 1
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
1 A1305010*CYPRESS RIDGE OWNERS
ASSOCIATION - FOR REHEARING OF RESOLUTION W-4946
Ratesetting Not Assigned Rami Kahlon 57.2
ACTIVE D1408059 GRANTED LIMITED
RE-HEARING
2 A1306018
GOLDEN STATE WATER CO. - FOR PRE-APPROVAL OF POWER
PURCHASE AGREEMENTS WITH EDF TRADING NORTH AMERICA
Ratesetting Carla Peterman
Melissa K. Semcer 45.9 08/25/17 4/6/2017
D1704003 D1412003
WERE ISSUED - NO NEED
FOR HEARING
3 A1312017 TELECOM NORTH AMERICA INC. - NDIEC REGISTRATION Ratesetting Not Assigned Cynthia
Walker 49.9 ACTIVE
4 A1401001*CYPRESS RIDGE OWNERS ASSOC. - FOR REHEARING OF RESOLUTION W-
4968Ratesetting Not Assigned Rami Kahlon 49.5
ACTIVE SEE
A1305010
![Page 9: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/9.jpg)
2017 Report 207092767
Page 2
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
5 A1408018
IP NETWORK AMERICA LLC - FOR REGISTRATION AS AN
INTEREXCHANGE CARRIER TELEPHONE CORPORATION
PURSUANT TO THE PROVISIONS OF PUBLIC UTILITIES CODE SECTION
1013.
Ratesetting Carla Peterman Valerie Kao 30.0 2/6/2017 D1702003
6 A1505002 SDG&E – FOR REVIEW OF SAFETY MODEL ASSESSMENT PROCEEDING.
Quasi-legislative
Clifford Rechtschaffen
Colette Kersten 33.5 06/14/18
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED - NO NEED
FOR HEARING
7 A1505003 PG&E – FOR REVIEW OF SAFETY MODELS AND APPROACHES
Quasi-legislative
Clifford Rechtschaffen
Colette Kersten 33.5 06/14/18
ACTIVE - SEE
A1505002 - NO
NEED FOR
HEARING
![Page 10: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/10.jpg)
2017 Report 207092767
Page 3
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
8 A1505004SOCALGAS - FOR REVIEW OF SAFETY MODEL ASSESSMENT
PROCEEDING.
Quasi-legislative
Clifford Rechtschaffen
Colette Kersten 33.5 06/14/18
ACTIVE - SEE
A1505002 - NO
NEED FOR
HEARING
9 A1505005 EDISON – TO OPEN A 2015 SAFETY MODEL ASSESSMENT PROCEEDING
Quasi-legislative
Clifford Rechtschaffen
Colette Kersten 33.5 06/14/18
ACTIVE - SEE
A1505002 - NO
NEED FOR
HEARING
10 A1506015
PG&E - FOR A CPCN TO CONSTRUCT THE CONTRA COSTA-OAKLEY GENERATING STATION 230
Kv TRANSMISSION LINE
Ratesetting Clifford Rechtschaffen
Regina DeAngelis 28.7 04/08/18 10/26/2017
D1710012 NO NEED
FOR HEARING
11 A1507022
INTERSTATE 5 UTILITY CO., INC.- TO SELL WATER AND SEWER SYSTEMS
IN KERN COUNTY TO MC MOR CHLORINATION INC.
Ratesetting Michael Picker Gerald F. Kelly 22.1 5/11/2017
D1705006 D1608004
WERE ISSUED - NO NEED
FOR HEARING
![Page 11: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/11.jpg)
2017 Report 207092767
Page 4
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
12 A1509012
PG&E - FOR A PERMIT TO CONSTRUCT THE SANGER
SUBSTATION EXPANSION PROJECT PURSUANT TO G.O. 131-D
Ratesetting Carla Peterman
Eric Wildgrube 21.7 10/18/18 7/13/2017
D1707008 NO NEED
FOR HEARING
13 A1510003 LV.NET LLC - NDIEC REGISTRATION Ratesetting Carla Peterman Robert Haga 17.6 3/23/2017 D1703015
14 A1510014MARIN CLEAN ENERGY - FOR
APPROVAL OF THE 2016 ENERGY EFFICIENCY BUSINESS PLAN
Ratesetting Carla Peterman Julie A. Fitch 17.6 4/6/2017
D1704004 NO NEED
FOR HEARING
15 A1511009
LIBERTY UTILITIES (CalPeco Electric) LLC -FOR EXEMPTION FROM THE AFFILIATE TRANSACTION RULES FOR ITS TRANSACTIONS WITH
LIBERTY UTILITES SERVICES CORP.
Ratesetting Carla Peterman Peter V. Allen 22.9 04/13/18 9/28/2017 D1709022
16 A1512005
PG&E - FOR A PERMIT TO CONSTRUCT THE FULTON-FITCH MOUNTAIN RECONDUCTORING
PROJECT
Ratesetting Clifford Rechtschaffen
Michelle Cooke 24.7 12/14/2017
D1712012 NO NEED
FOR HEARING
![Page 12: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/12.jpg)
2017 Report 207092767
Page 5
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
17 A1602011
TELECOMMUNICATIONS SYSTEMS, INC. AND COMTECH
TELECOMMUNICATIONS CORP. AND TYPHOON ACQUISITIION CORP. -
FOR APPROVAL OF TRANSFER OF CONTROL OF
TELECOMMUNICATIONS SYSTEMS, INC.
Ratesetting Liane Randolph Patricia Miles 13.3 03/03/18 3/23/2017
D1703017 D1606048 D1607020
WERE ISSUED
18 A1602012 M5 NETWORKS, LLC - NDIEC REGISTRATION Ratesetting Carla
Peterman Robert Haga 12.7 3/2/2017 D1703004
19 A1602019
PG&E - FOR COMPLIANCE REVIEW OF GENERATION OPERATIONS,
ERRA ACCOUNT ENTRIES , CONTRACT ADMINISTRATION,
DIABLO CANYON SEISMIC STUDIES BALANCING ACCOUNT, AND OTHER
ACTIVITIES FOR YEAR 2015
Ratesetting Michael Picker Kelly A. Hymes 12.9 02/17/18 3/23/2017
D1703021 NO NEED
FOR HEARING
20 A1604017
TEKIFY FIBER, LLC - CPCN TO PROVIDE FULL FACILITIES-BASED
AND RESOLD COMPETITIVE LOCAL EXCHANGE SERVICES AND FULL-
FACILITIES-BASED INTEREXCHANGE SERVICES
Ratesetting Carla Peterman
Robert Haga/ALJ Pro Tem Sasha
Goldberg
10.4 2/9/2017 D1702009
![Page 13: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/13.jpg)
2017 Report 207092767
Page 6
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
21 A1604020 TIERZERO - NDIEC REGISTRATION Ratesetting Carla Peterman Sophia Park 17.1 9/14/2017
D1709003 D1608032 D1609001
WERE ISSUED
22 A1604021
AIRBUS DS COMMUNICATIONS, INC. - CPCN TO OPERATE AS A LIMITED
FACILITIES-BASED LOCAL EXCHANGE TELECOMMUNICATIONS
SERVICE PROVIDER
Ratesetting Carla Peterman
Robert Haga/ALJ Pro Tem Sasha Goldberg
13.1 5/25/2017 D1705022
23 A1605002
PACIFIC MARITIME FREIGHT, INC. AND CATALINA FREIGHT LINE, INC. - TO TRANSFER CATALINA FREIGHT
LINE, INC. CPCN
Ratesetting Liane Randolph
Karl Bemesderfer 12.4 08/02/18 5/11/2017
D1705002 NO NEED
FOR HEARING
24 A1605013
CAL.NET, INC - FOR A CPCN TO PROVIDE FACILITIES-BASED AND
RESOLD COMPETITIVE LOCAL EXCHANGE AND INTEREXCHANGE
SERVICE
Ratesetting Carla Peterman
Katherine MacDonald 8.9 2/9/2017 D1702008
25 A1605016
CALIFORNIA HIGH-SPEED RAIL AUTHORITY - TO CONSTRUCT
PROPOSED HIGH-SPEED TRACKS AND UNDERPASS GRADE
SEPARATION AT STATE ROUTE 145 (MP 169.99) WITHIN MADERA
COUNTY
Ratesetting Not Assigned Elizaveta I. Malashenko 8.0 1/19/2017 D1701008
![Page 14: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/14.jpg)
2017 Report 207092767
Page 7
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
26 A1606002
SDG&E - FOR APPROVAL OF CONTRACT ADMINISTRATION, LEAST-COST DISPATCH AND
POWER PROCUREMENT ACTIVITIES IN 2015 AND COST RELATED TO
THOSE ACTIVITIES IN ACCOUNTS FOR 2015
Ratesetting Michael Picker Eric Wildgrube 9.8 02/15/18 3/23/2017
D1703016 NO NEED
FOR HEARING
27 A1606005 SP LICENSES, INC. - NDIEC REGISTRATION Ratesetting Liane
Randolph Darcie Houck 8.9 04/14/18 3/2/2017 D1703005
28 A1606009SOCAL GAS - REGARDING YEAR
(2015-2016) OF ITS GAS COST INCENTIVE MECHANISM
Ratesetting Carla Peterman
Melissa K. Semcer 7.3 03/21/18 1/19/2017
D1701009 NO NEED
FOR HEARING
29 A1606014
ATHERTON FIBER LLC - FOR A CPCN TO PROVIDE FULL FACILITIES-
BASED AND RESOLD LOCAL EXCHANGE SERVICE
RatesettingMartha
Guzman Aceves
Dan Burchan 7.5 2/9/2017 D1702012
30 A1606016
BERKELEY GLASS & LIGHT - FOR A CPNC TO PROVIDE FULL FACILITIES-BASED AND RESALE COMPETITIVE
LOCAL EXCHANGE SERVICES
RatesettingMartha
Guzman Aceves
Darcie Houck 10.5 5/11/2017 D1705007
31 A1607003*CHARTER COMMUNICATIONS, INC. - FOR REHEARING OF RESOLUTION T -
17515.N/A Not Assigned Legal Division 13.2 8/10/2017 D1708018
![Page 15: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/15.jpg)
2017 Report 207092767
Page 8
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
32 A1607005
DEL ORO WATER CO., INC. AND LAKESPUR MEADOW WTR. CO. -
FOR AN ORDER AUTHORIZING THE SALE AND PURCHASE OF LAKSPUR
MEADOWS WTR. CO. AND TO ESTABLISH RATES FOR SERVICE
Ratesetting Clifford Rechtschaffen
Melissa K. Semcer 8.5 04/07/18 3/23/2017
D1703019 NO NEED
FOR HEARING
33 A1607008
DEL ORO WATER CO., INC. AND BENBOW WATER CO. - FOR AN
ORDER AUTHORIZING THE SALE AND PURCHASE OF BENBOW
WATER CO. AND TO ESTABLISH RATES FOR SERVICE
Ratesetting Clifford Rechtschaffen
Melissa K. Semcer 10.0 04/07/18 5/11/2017
D1705003 NO NEED
FOR HEARING
34 A1607015*EDISION, SDG&E, AND NATUJRAL RESOURCES DEFENSE COUNCIL - FOR REHEARING OF RES. E-4792
RatesettingMartha
Guzman Aceves
Jessica T. Hecht/ Valerie U. Kao/ Anne
E. Simon
18.5
ACTIVE D1705034
HAS BEEN
ISSUED
35 A1607016SDG&E - FOR A PERMIT TO
CONSTRUCT THE OCEAN RANCH SUBSTATION PROJECT (VOL. I OF II)
Ratesetting Carla Peterman S. Pat Tsen 14.3 9/28/2017
D1709029 NO NEED
FOR HEARING
36 A1608005 GODADDY COM, LLC - NDIEC REGISTRATION Ratesetting Liane
RandolphEric
Wildgrube 10.9 6/27/2017 D1706025
![Page 16: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/16.jpg)
2017 Report 207092767
Page 9
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
37 A1608008TEL-ONE NETWORK SERVICES, INC. -
FOR A CPCN TO OPERATE AS A COMPETITIVE LOCAL CARRIER
Ratesetting Liane Randolph S. Pat Tsen 11.0 7/13/2017 D1707009
38 A1608009
WEBPASS TELECOMMUNICATIONS, LLC AND GOOGEL FIBER INC. - FOR
APPROVAL OF A TRANSFER OF CONTROL OF WEBPASS
TELECOMMUNICATIONS, LLC
Ratesetting Liane Randolph
Adeniyi A. Ayoade 6.4 2/23/2017 D1703018
39 A1608011
BNSF RAILWAY CO. - FOR AN ORDER GRANTING THE EXEMPTION
FROM THE REQUIREMENT OF GENERAL ORDER 26-D
Ratesetting Not Assigned Elizaveta I. Malashenko 12.2 8/24/2017 D1708023
40 A1608012
CA TRANSMISSION NETWORK, LLC - TO OBTAIIN A CPCN AS A
TELEPHONE CORPORATION TO OPERATE AS A PROVIDER OF FULL
FACILITIES-BASED AND RESOLD LOCAL EXCHANGE SERVICES
Ratesetting Liane Randolph
ALJ Pro Tem Sasha
Goldberg / Katherine
MacDonald
11.4 7/27/2017 D1707015
41 A1608015 APPLICATION FOR PASSENGER STAGE CORPORATION CPCN Ratesetting Clifford
Rechtschaffen Patricia Miles 8.9 5/17/2017 D1705018
42 A1608018SLEEPBUS, INC. - FOR AUTHORITY
TO OPERATE AS A PSC AND TO ESTABLISH A ZORF
Ratesetting Not Assigned Nick Zanjani 4.2 1/3/2017 D1701001
![Page 17: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/17.jpg)
2017 Report 207092767
Page 10
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
43 A1608019 COMNET (USA), LLC - NDIEC REGISTRATION Ratesetting Carla
Peterman Dan Burcham 13.1 09/28/18 9/14/2017 D1709002
44 A1609002CURATEL, LLC - TO WITHDRAW
PROVISION OF LOCAL EXCHANGE AND INTEREXCHANGE SERVICES
Ratesetting Carla Peterman
Adeniyi A. Ayoade 9.6 6/15/2017 D1706010
45 A1609004
LUMACEL LLC - FOR A CPCN TO PROVIDE RESOLD AND FACILITY
BASED COMPETITION LOCAL EXCHANGE AND INTEREXCHANGE
SERVICE
Ratesetting Carla Peterman
ALJ Pro Tem Sasha
Goldberg/ Katherine
MacDonald
8.7 5/25/2017 D1705026
46 A1609007
SHIMMICK CONSTRUCTION CO., INC..- FOR A VARIANCE FROM G.O. 26D AND/OR THE APPLICATION OF
GO 143-B REQUIREMENTS FOR SIDE CLEARANCES
Ratesetting Liane Randolph Robert Haga 17.0 ACTIVE
47 A1609010
CALIFORNIA HIGH-SPEED RAIL AUTHORITY - TO CONSTRUCT
PROPOSED HIGH-SPEED TRACKS AND RAIL-RAIL GRADE SEPARATION
Ratesetting Not Assigned Elizaveta I. Malashenko 14.7 11/30/2017 D1711015
48 A1609011
CITY OF SACRAMENTO - FOR AN ORDER AUTHORIZING THE
CONSTRUCTION OF AN AT-GRADE RAILROAD CROSSING
Ratesetting Not Assigned Elizaveta I. Malashenko 4.2 1/19/2017 D1701014
![Page 18: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/18.jpg)
2017 Report 207092767
Page 11
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
49 A1609012
CITY OF SACRAMENTO - FOR AN ORDER AUTHORIZING THE
ALTERATION TO THE EXISTING GRADE SEPARATED CROSSING OF
THE SACRAMENTO REGIONAL TRANSIT DISTRICT LIGHT RAIL LINE
Ratesetting Not Assigned Elizaveta I. Malashenko 4.2 1/19/2017 D1701016
50 A1609013* SDG&E - FOR REHEARING OF RESOLUTION E-4874 N/A Not Assigned Legal Division 16.6 ACTIVE
51 A1609014
ACCESSLINE COMMUNICATIONS CORP., OAK HILL CAPITAL
PARTNERS III, L.P. ET AL. - FOR APPROVAL OF A HOLDING
COMPANY LEVEL TRANSFER OF ACCESSLINE COMMUNICATIONS CORP. AND CERTAIN FINANCING
ARRANGEMENTS
Ratesetting Carla Peterman
Gerald F. Kelly 3.9 1/19/2017 D1701010
52 A1609015
CITY OF MOUNTAIN VIEW - FOR AN ORDER AUTHORIZING
MODIFICATION OF AT GRADE VEHICULAR, PEDESTRIAN, AND
BICYCLE CROSSING OVER TRACKS OF THE SANTA CLARA VALLEY TRANSPORTATION AUTHORITY
Ratesetting Not Assigned Elizaveta I. Malashenko 7.9 5/25/2017 D1705021
![Page 19: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/19.jpg)
2017 Report 207092767
Page 12
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
53 A1610001
THE PONDEROSA TELEPHONE CO. - TO REVIEW INTRASTATE RATES
AND CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN
Ratesetting Liane Randolph
Adeniyi A. Ayoade 14.1 06/21/18 11/30/2017
D1711013 NO NEED
FOR HEARING
54 A1610008
TOURISMO EXPRESS, INC. - FOR A CPCN TO PROVIDE A REGULARLY
SCHEDULED PSC BETWEEN TIJUANA, SAN DIEGO, AND LOS
ANGELES INTERNATIONAL AIRPORTS AND SAN YSIDRO, AND
TO ESTABLISH A ZORF
Ratesetting Not Assigned Nick Zanjani 3.0 1/3/2017 D1701002
55 A1610010
CITY OF RANCHO CORDOVA - TO CONSTRUCT NEW TEMPORARY
CROSSING IMPROVEMENTS OVER THE MATHER FIELD SPUR AT THREE
LOCATIONS
Ratesetting Not Assigned Elizaveta I. Malashenko 15.8 ACTIVE
56 A1610011 VERITAS PREPAID PHONE CO., LLC - NDIEC REGISTRATION Ratesetting Liane
RandolphW. Anthony
Colbert 15.8 ACTIVE
57 A1610013
KANDU RIDES, LLC - FOR AUTHORITY TO OPERATE AS AN ON-
CALL, DOOR-TO-DOOR PSC FOR SERVICE FOR CHILDREN BETWEEN SCHEDULED PICK-UP AND DROP-
OFF LOCATIONS PRE-ARRANGED BY PARENTS AND TO ESTABLISH A
ZORF
Ratesetting Not Assigned Nick Zanjani 3.0 1/18/2017 D1701035
![Page 20: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/20.jpg)
2017 Report 207092767
Page 13
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
58 A1610014
GETGO COMMUNICATIONS LLC, GRASSHOPPER GROUP, LLC, CITRIX SYSTEMS, INC., AND LOGMELN, INC. -
.FOR AUTHORITY TO TRANSFER CONTROL OF GETGO
COMMUNICATIONS LLC
Ratesetting Liane Randolph Dan Burcham 7.0 5/11/2017 D1705008
59 A1610018 SDG&E - APPLICATION FOR MODIFICATION OF RES. E-4783 Ratesetting Liane
RandolphAnne E. Simon 15.3 ACTIVE
60 A1610022
PACIFIC LIGHTWAVE AND SIMON BOJKOVSKY - FOR APPROVAL OF
THE ACQUISITION OF CONTROL OF PACIFIC LIGHTWAVE
Ratesetting Liane Randolph
Eric Wildgrube/
ALJ Pro Tem Sasha
Goldberg
6.6 5/11/2017 D1705005
61 A1610023
CITY OF RANCHO CORDOVA - TO MODIFY AN EXISTING CROSSING
OVER THE MATHER SPUR AT MILLS STATION ROAD
Ratesetting Not Assigned Elizaveta I. Malashenko 6.0 4/27/2017 D1704028
62 A1611003
CALIFORNIA INTERNET, L.P. - CPCN TO OPERATE AS A COMPETITIVE
LOCAL CARRIER TO PROVIDE RESOLD AND LIMITED FACILITIES-
BASED LOCAL EXCHANGE BROADBAND SERVICES VIA FIBER-
OPTIC AND MICROWAVE FACILITIES
Ratesetting Carla Peterman
Adeniyi A. Ayoade 6.4 5/25/2017 D1705023
![Page 21: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/21.jpg)
2017 Report 207092767
Page 14
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
63 A1611004
DAS GROUP PROFESSIONALS, INC. - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED AND RESOLD COMPETITIVE LOCAL EXCHANGE
SERVICE, ACCESS AND INTEREXCHANGE SERVICE
Ratesetting Liane Randolph
Nilgun Atamturk 10.3 9/14/2017 D1709009
64 A1611006
DIGITAL WEST NETWORKS, INC. - FOR A CPCN TO PROVIDE
FACILITIES-BASED AND RESOLD COMPETITION LOCAL EXCHANGE
TELECOMMUNICATIONS SERVICES
Ratesetting Liane Randolph Sophia Park 9.7 8/24/2017 D1708027
65 A1611007NORTH AMERICAN NUMBERING
PLAN ADMINISTRATOR - FOR RELIEF OF THE 916 NUMBERING PLAN AREA
Ratesetting Liane Randolph
Adeniyi A. Ayoade 2.8 2/9/2017 D1702010
66 A1611008NORTH AMERICAN NUMBERING
PLAN ADMINISTRATOR - FOR RELIEF OF THE 805 NUMBERING PLAN AREA
Ratesetting Liane Randolph Robert Haga 6.3 5/25/2017 D1705019
67 A1612005NOTH AMERICAN NUMBERING PLAN ADMINISTRATOR - FOR RELIEF OF THE 619 NUMBERING PLAN AREA
Ratesetting Liane Randolph Robert Haga 4.4 4/27/2017 D1704027
![Page 22: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/22.jpg)
2017 Report 207092767
Page 15
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
68 A1612007
NOS COMMUNICATIONS, INC. - FOR AN EXPANSION OF ITS CPCN TO PROVIDE RESOLD AND LIMITED
FACILITIES-BASED COMPETITIVE LOCAL EXCHANGE AND LIMITED
FACILITIES-BASED INTEREXCHANGE SERVICES
RatesettingMartha
Guzman Aceves
Nilgun Atamturk 12.2 12/14/2017 D1712013
69 A1612009
LIBERTY UTILITIES (CALPECO ELCTRIC) LLC - FOR APPROVAL TO ACQUIRE, OWN, AND OPERATE THE
TURQUOISE SOLAR PROJECT, AUTHORIZE RATEMAKING, AND ISSUE AN EXPEDITED DECISION
Ratesetting Clifford Rechstchaffen
Katherine MacDonald 12.2 06/15/18 12/14/2017 D1712008
70 A1612011
SOCAL GAS - TO ESTABLISH A MEMORANDUM ACCOUNT TO
RECORD EXPENSES FOR SYSTEM RELIABILITY EFFORTS ASSOCIATED WITH EXPIRING RIGHTS-OF-WAY ON
MORONGO INDIAN RESERVATION
Ratesetting Carla Peterman
Rafael L. Lirag 13.7 06/16/18 ACTIVE
71 A1612013
PACIFIC COAST SHUTTLES, LLC - FOR A CPCN TO TRANSPORT PASSENGERS AND BAGGAGE
EXPRESS, ON AN ON-CALL, CITY-TO-CITY BASIS AND TO ESTABLISH A
ZORF
Ratesetting Not Assigned Nick Zanjani 2.1 2/21/2017 D1702018
![Page 23: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/23.jpg)
2017 Report 207092767
Page 16
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
72 A1612014
SANTA BARBARA COUNTY - TO CONSTRUCT A PEDESTRIAN AT-GRADE RAIL CROSSING, SANTA
CLAUS LANE, AT MILE POST 375.96, UNION PACIFIC RAILROAD
Ratesetting Not Assigned Elizaveta I. Malashenko 13.5 ACTIVE
73 A1612017
CITY OF ARCATA - TO CONSTRUCT NEW TEMPORARY CROSSING IMPROVEMENTS NORTH OF
GANNON SLOUGH
Ratesetting Not Assigned Elizaveta I. Malashenko 5.9 6/15/2017 D1706011
74 C1401006
UNITED ENERGY TRADING, LLC VS. PG&E - FOR RELIEF FROM
VIOLATION OF GAS RULES NOS. 11 AND 23
Adjudicatory Clifford Rechtschaffen
Karl Bemesderfer 41.5 12/10/17
6/7/17 - EXTENSION GRANTED
BY D1705032
ET AL.
D1706001 NO NEED
FOR HEARING
75 C1507004
ATKINSONS VS PG&E - FOR RELIEF FROM EXCESIVE NOISE CREATED
BY INEFFECTIVE SOUND BARRIERS INSTALLED BY PG&E
Adjudicatory Carla Peterman
Kimberly Kim/ Katherine
MacDonald 18.6 01/31/17
1/10/17 EXTENSION GRANTED
BY D1609057
ET AL.
D1701005 NO NEED
FOR HEARING
76 C1605003CALIFORNIA STAT LABORATORIES
VS. EDISON - DISPUTE ON EXCESSIVE BILLINGS
Adjudicatory Michael Picker Gerald F. Kelly 8.2 05/09/17 01/09/17
D1701015 NO NEED
FOR HEARING
![Page 24: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/24.jpg)
2017 Report 207092767
Page 17
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
77 C1605005GORIAS VS.. SDG&E - FOR RELIEF FROM IMPROPER BILLING DUE TO
TARIFF RULES VIOLATIONAdjudicatory Liane
Randolph Patricia Miles 9.1 05/09/17 02/06/17
D1702004 NO NEED
FOR HEARING
78 C1606008
CITY OF OJAI VS. GOLDEN STATE WATER COMPANY - FOR RELIEF
FROM ALLEGED VIOLATION OF GO 103-A
Adjudicatory Clifford Rechtschaffen Patricia Miles 15.2 12/14/17
9/14/17 EXTENSION GRANTED
BY D1708031
ET AL.
D1709008 NO NEED
FOR HEARING
79 C1606011OTAY LANDFILL GAS, LLC . VS
SDG&E - FOR RELIEF ROM DENIAL OF SERVICE
Adjudicatory Carla Peterman Robert Mason 19.6 06/22/18
EXTENSION GRANTED
BY D1712028
ET AL.
ACTIVE NO NEED
FOR HEARING
80 C1606018
SAN ANTONIO REGIONAL HOSPITAL VS. FRONTIER CA FKA VERIZON CA - FOR RELIEF FROM OVERBILLING IN
THE SUM OF $25,962.60 PLUS TAXES, SURCHARGES AND
INTEREST
Adjudicatory Carla Peterman
W. Anthony Colbert 7.4 06/28/17 02/06/17
D1702002 NO NEED
FOR HEARING
81 C1606019J. BOGGERI & CO., AKA BOGGERI SALES & MARKETING VS. AT&T - FOR RELIEF FROM OVERBILLING
Adjudicatory Carla Peterman S. Pat Tsen 12.6 06/29/17 07/13/17
D1707004 NO NEED
FOR HEARING
![Page 25: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/25.jpg)
2017 Report 207092767
Page 18
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
82 C1607012DC UNIVERSAL, LLC VS. CAL-AM
WATER CO. - FOR A REFUND DUE TO BILLING ERRORS
Adjudicatory Clifford Rechtschaffen
Adeniyi A. Ayoade 14.0 02/14/18
9/6/17 EXTENSION GRANTED
BY D1706029
ET AL.
D1709001 NO NEED
FOR HEARING
83 C1612008
WAVE COMMUNITY NEWSPAPERS, INC. VS U.S. TELEPACIFIC CORP. -
FOR REFUND OF OVERBILLED CHARGES
AdjudicatoryMartha
Guzman Aceves
Michelle Cooke/ W. Anthony Colbert
10.0 12/01/17 09/28/17
D1709021 - NO
NEED FOR
HEARING
84 I1405012CPUC - OII TO ADDRESS
INTRASTATE RURAL CALL COMPLETION ISSUES
Quasi-legislative
Clifford Rechtschaffen
Legal Division/
Robert Mason 45.2 09/05/18
EXTENSION GRANTED
BY D1612068
ET AL.
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
85 I1511006
CPUC - OII INTO THE OPERATIONS AND PRACTICES OF EDISON,
NOTICE OF HEARING, AND ORDER TO SHOW CAUSE WHY FINES AND
SANCTIONS SHOULD NOT BE IMPOSE FOR THE HUNTINGTON BEACH UNDERGROUND VAULT
INCIDENT
Adjudicatory Liane Randolph Kimberly Kim 20.1 09/04/17
6/29/17 EXTENSION GRANTED
BY D1704040
D1706028 NO NEED
FOR HEARING
![Page 26: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/26.jpg)
2017 Report 207092767
Page 19
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
86 I1607007
CPUC - OII INTO THE OPERARTIONS AND PRACTICES OF EDISON,
NOTICE OF OPPORTUNITY FOR HEARING AND ORDER TO SHOW
CAUSE FOR OUTAGES IN THE CITY OF LONG BEACH IN JULY AND
AUGUST 2015
Adjudicatory Michael Picker Michelle Cooke 14.7 10/26/17
9/28/17 EXTENSION GRANTED
BY D1707010
D1709024 NO NEED
FOR HEARING
87 I1610015
CPUC - OII INTO THE NOVEMBER 2016 SUBMISSION OF RISK
ASSESSMENT AND MITIGATION PHASE BY SAN DIEGO GAS &
ELECTRIC COMPANY
Ratesetting Clifford Rechtschaffen
Rafael L. Lirag 15.3 04/28/18 ACTIVE
88 I1610016
CPUC - OII INTO THE NOVEMBER 2016 SUBMISSION OF RISK
ASSESSMENT AND MITIGATION PHASE BY SOUTHERN CALIFORNIA
GAS COMPANY
Ratesetting Clifford Rechtschaffen
Rafael L. Lirag 15.3 04/28/18
ACTIVE SEE
I1610015
89 R0901020
CPUC - OIR TO CONSIDER ROADWAY WORKER PROTECTIONS
BY TRANSIT AGENCIES IN CALIFORNIA
Quasi-legislative
Clifford Rechtschaffen Kimberly Kim 107.6 03/29/19 11/30/2017
D1711017- SEVERAL DECISIONS
WERE ISSUED
![Page 27: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/27.jpg)
2017 Report 207092767
Page 20
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
90 R1103013
CPUC - OIR REGARDING REVISIONS TO THE CALIFORNIA UNIVERSAL TELEPHONE SERVICE (LIFELINE)
PROGRAM
Quasi-legislative
Martha Guzman Aceves
Katherine MacDonald/
Legal Division 83.5 04/23/18
EXTENSION GRANTED
BY D1710022
ET AL.
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
91 R1211005
CPUC - OIR REGARDING POLICIES, PROCEDURES AND RULES FOR THE CALIFORNIA SOLAR INITIATIVE, THE
SELF-GENERATION INCENTIVE PROGRAM AND OTHER
DISTRIBUTED GENERATION ISSUES
Quasi-legislative
Clifford Rechstchaffen
Regina DeAngelis/
Michelle Cooke/ Legal
Division
63.6 12/15/18
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
92 R1301010
CPUC - OIR TO CONDUCT A COMPREHENSIVE EXAMINATION OF
THE CALIFORNIA TELECONNECT FUND
Quasi-legislative
Carla Peterman Sophia Park 61.1 12/02/18
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
93 R1303008
CPUC - OIR TO ADD SPEECH GENERATING DEVICES TO THE
DEAF AND DISABLED TELECOMMUNICATIONS PROGRAM
Quasi-legislative
Clifford Rechtschaffen
Regina DeAngelis 59.2
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
![Page 28: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/28.jpg)
2017 Report 207092767
Page 21
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
94 R1311006
CPUC - OIR TO DEVELOP A RISK-BASED DECISION-MAKING
FRAMEWORK TO EVALUATE SAFETY IMPROVEMENTS AND REVISE THE GENERAL RATE CASE PLAN FOR
ENERGY UTILITIES
Quasi-legislative
Clifford Rechstchaffen John S. Wong 51.3 09/16/18
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
95 R1312011
CPUC - OIR TO PROMOTE A PARTNERSHIP FRAMEWORK
BETWEEN ENERGY INVESTOR OWNED UTILITIES AND THE WATER
SECTOR TO PROMOTE WATER-ENERGY NEXUS PROGRAMS
Quasi-legislative
Martha Guzman Aceves
Michelle Cooke 48.5 04/23/18
12/14/17 EXTENSION GRANTED
BY D1710019
ET AL.
D1712010 - SEVERAL DECISIONS
WERE ISSUED
96 R1410003
CPUC - OIR TO CREATE A CONSISTENT REGULATORY
FRAMEWORK FOR THE GUIDANCE, PLANNING, AND EVALUATION OF
INTEGRATED DEMAND SIDE RESOURCE PROGRAMS
Ratesetting Michael Picker Kelly A. Hymes 40.5 03/03/18
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
97 R1410010
CPUC - OIR TO OVERSEE THE RESOURCE ADEQUACY PROGRAM,
CONSIDER PROGRAM REFINEMENTS, AND ESTABLISH ANNUAL LOCAL AND FLEXIBLE
PROCUREMENT OBLIGATIONS FOR THE 2016 AND 2017 COMPLIANCE
YEARS
Ratesetting Liane Randolph Peter V. Allen 32.9 03/15/18 6/29/2017
D1706027 - SEVERAL DECISIONS
WERE ISSUED
![Page 29: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/29.jpg)
2017 Report 207092767
Page 22
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
98 R1411001
CPUC - OIR TO IMPROVE PUBLIC ACCESS TO PUBLIC RECORDS
PURSUANT TO THE CALIFORNIA RECORDS ACT
Quasi-legislative Michael Picker Rafael L.
Lirag 39.4 10/28/18
ACTIVE - SEVERAL DECISIONS
HAVE BEEN
ISSUED
99 R1501008
CPUC - OIR TO ADOPT RULES AND PROCEDURES GOVERNING
COMMISSION-REGULATED NATURAL GAS PIPELINES AND FACILITIES TO REDUCE NATURAL GAS LEAKAGE CONSISTENT WITH SENATE BILL
1371
Quasi-legislative
Clifford Rechtschaffen
Colette Kersten 37.0 09/20/19
EXTENSION GRANTED
BY D1706030
ACTIVE D1706015
HAS BEEN
ISSUED
100 R1503010
CPUC - OIR TO IDENTIFY DISADVANTAGED COMMUNITIES IN
THE SAN JOAQUIN VALLEY AND ANALYZE ECONOMICALLY FEASIBLE OPTIONS TO INCREASE ACCESS TO
AFFORDABLE ENERGY IN THOSE DISADVANTAGED COMMUNITIES
Quasi-legislative
Martha Guzman Aceves
Darcie Houck 34.7 12/06/19
ACTIVE D1709032 D1705014
HAVE BEEN
ISSUED
101 R1503011
CPUC - OIR TO CONSIDER POLICY AND IMPLEMENTATION
REFINEMENTS TO THE ENERGY STORAGE PROCUREMENT FRAMEWORK AND DESIGN
PROGRAM AND RELATED ACTION PLAN OF THE CALIFORNIA ENERGY
STORAGE ROADMAP
Quasi-legislative
Carla Peterman
Michelle Cooke 34.7 04/09/18
EXTENSION GRANTED
BY D1709037
ET AL.
ACTIVE SEVERAL DECISIONS
HAVE BEEN
ISSUED
![Page 30: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/30.jpg)
2017 Report 207092767
Page 23
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
102 R1506009
CPUC - OIR FOR REGULATION OF PHYSICAL SECURITY FOR THE
ELECTRIC SUPPLY FACILITIES OF ELECTRICAL CORPORATIONS AND TO ESTABLISH STANDARDS FOR
DISASTER AND EMERGENCY PREPAREDNESS PLAN
Quasi-legislative
Clifford Rechtschaffen
Gerald F. Kelly 32.1 03/10/19 ACTIVE
103 R1512006
CPUC - OIR TO CONSIDER STAFF PROPOSAL CONCERNING REVISION OR REPEAL OF GENERAL ORDERS
AND UTILITY REPORTING REQUIREMENTS
Quasi-legislative Michael Picker Sophia Park 21.7 03/10/18 9/14/2017 D1709006
104 R1512012
CPUC - OIR TO ASSESS PEAK ELECTRICITY USAGE PATTERNS
AND CONSIDER APPROPRIATE TIME PERIODS FOR FUTURE TIME-OF-USE
RATES
Ratesetting Michael Picker Michelle Cooke 13.3 11/02/17 1/19/2017
D1701006 SEVERAL DECISIONS
WERE ISSUED - NO NEED
FOR HEARING
![Page 31: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/31.jpg)
2017 Report 207092767
Page 24
APPENDIX APROCEEDINGS INITIATED BEFORE JANUARY 1, 2017, NOT SUBJECT TO HEARINGS, ACTIVE
DURING YEAR 2017 (RESOLVED AND NOT RESOLVED)
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
105 R1612001CPUC - OIR TO CONSIDER
SPECIFIED AMENDMENTS TO RULE 18 OF GENERAL ORDER 95
Quasi-legislative Michael Picker Timothy
Kenney 14.2 06/02/18 ACTIVE
* This is an Application for Rehearing of a Resolution dealing with an informal advice letter. This application for rehearing is assigned a formal application number and is assigned to Legal Division for a determination of whether the Commission's
resolution contains legal error. If the Commission subsequently grants rehearing of the resolution, the Commission will undertake a proceeding in this application and will address categorization and need for hearing as necessary at that time.
(END OF APPENDIX A)
![Page 32: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/32.jpg)
2017 Report207092767 Page 25
APPENDIX B
COMPLAINTS UNDER THE EXPEDITED COMPLAINT PROCEDURE ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
1 C1604007(ECP) GREBE VS. PG&E - FOR
RELIEF FROM CHARGES RELATED TO SMART-METER-OPT-OUT
Martha Guzman Aceves
Karl J. Bemesderfer 14.4 10/08/17
6/15/17 EXTENSION
GRANTED BY D1704018
D1706013
2 C1608004(ECP) GABOS VS. EDISON - FOR BILL
ADJUSTMENT AND REFUND FOR OVERCHARGES
Liane Randolph Kimberly Kim 6.1 08/10/17 02/09/17 D1702011
3 C1610017
(ECP) CHILDRENS' CARDIOLOGY OF THE BAY AREA, INC. VS. PREFERRED LONG DISTANCE, INC. DBA TELPLEX -
FOR REFUND OF IMPROPER CHARGES
Carla Peterman Kimberly Kim 6.2 10/25/17 04/28/17 D1704046
4 C1612015 (ECP) HANSELL VS. SOCAL GAS - FOR RELIEF FROM OVERBILLING
Liane Randolph
W. Anthony Colbert 3.5 12/27/17 04/12/17 D1704023
5 C1612016(ECP) ELYMELECH VS. SOCAL GAS - FOR RELIEF FROM UNAUTHORIZED
CHARGES
Liane Randolph
W. Anthony Colbert 8.0 12/28/17 08/24/17 D1708028
6 C1703011 (ECP) DANN VS PG&E - FOR RELIEF FROM INACCURATE BILLING
Martha Guzman Aceves
Rafael L. Lirag 4.6 03/24/18 08/10/17 D1708007
![Page 33: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/33.jpg)
2017 Report207092767 Page 26
APPENDIX B
COMPLAINTS UNDER THE EXPEDITED COMPLAINT PROCEDURE ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
7 C1703012
(ECP) SCHANER VS SPRINT PSC - FOR RELIEF FROM UNAUTHORIZED
EQUIPMENT UPGRADE AND IMPROPER BILLING
Martha Guzman Aceves
W. Anthony Colbert 3.9 03/27/18 07/21/17 D1707013
8 C1703014
(ECP) BETTENCOURT, JR. VS. SIERRA PARK WATER CO. - FOR
REFUND FOR EXCESS BILLING AND IMPROPER COLLECTION PRACTICES
Martha Guzman Aceves
Gerald F. Kelly 4.6 03/29/18 08/14/17 D1709004
9 C1703015(ECP) BUSTARD VS. VERIZON
WIRELESS - FOR RELIEF FROM CALL BLOCK SERVICES
Martha Guzman Aceves
Kimberly Kim 10.2 03/30/18 ACTIVE
10 C1704011
(ECP) ALLIANCE FINISHING & MANUFACTURING VS. EDISON - FOR
RELIEF FROM EXCESSIVE AND UNNECESSARY DEPOSIT
Martha Guzman Aceves
W. Anthony Colbert 2.0 04/11/18 06/09/17 D1706002
11 C1704013(ECP) MILLER VS. SDG&E - FOR
RELIEF FROM UNAUTHORIZED AND IMPROPER CHARGES
Martha Guzman Aceves
Katherine MacDonald 4.0 04/12/18 08/10/17 D1708005
12 C1704014
(ECP) SWANSON VS. U.S. TELEPACIFIC CORP. - FOR RELIEF
FROM PORTING DISPUTE AND REASSIGNMENT OF TELEPHONE
NUMBER
Martha Guzman Aceves
Kimberly Kim 5.6 04/12/18 09/28/17 D1709031
![Page 34: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/34.jpg)
2017 Report207092767 Page 27
APPENDIX B
COMPLAINTS UNDER THE EXPEDITED COMPLAINT PROCEDURE ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
13 C1704022
(ECP) NG VS. SOCAL GAS - FOR RELIEF FROM INACCURATE BILLING ASSOCIATED WITH THE LEVEL PAY
PLAN
Martha Guzman Aceves
W. Anthony Colbert 1.8 04/28/18 06/21/17 D1706021
14 C1705018
(EPC) MILLER VS SDG&E - FOR A REFUND FOR GAS AND ELECTRIC
SERVICE FOR THE PERIOD BETWEEN SEPTEMBER 15, 2016 TO
JANUARY 7, 2017
Clifford Rechtschaffen Gerald F. Kelly 5.0 05/30/18 10/26/17 D1710016
15 C1706010
(ECP) TELECOMCEPTS, INC. VS. AT&T MOBILITY WIRELESS
OPERATIONS HOLDING, INC. - FOR RELIEF FROM OVERCHARGES FOR
DATE USAGE
Liane Randolph
W. Anthony Colbert 5.8 06/08/18 11/30/17 D1711022
16 C1706011(ECP) WALDENBERG VS. EDISON -
FOR A REFUND OF THE SUM OF $1,992.38
Liane Randolph
W. Anthony Colbert 7.9 06/08/18 ACTIVE
17 C1706012(ECP) DONAHUE VS. SOCAL GAS - FOR A REFUND OF THE SUM OF
$193.13
Liane Randolph
W. Anthony Colbert 2.2 06/09/18 08/15/17 D1708019
18 C1706022
(ECP) ROADRUNNER MANAGEMENT SERVICES, INC. DBA CALIFORNIA SHUTTLE AND LIMOUSINE - FOR
REINSTATEMENT OF OPERATING AUTHORITY FOR TCP-28858A
Liane Randolph Kimberly Kim 5.6 06/28/18 12/14/17 D1712011
![Page 35: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/35.jpg)
2017 Report207092767 Page 28
APPENDIX B
COMPLAINTS UNDER THE EXPEDITED COMPLAINT PROCEDURE ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
19 C1707005 (ECP) BIZHKO VS. PG&E - FOR RELIEF FROM INACCURATE BILLING
Liane Randolph Gerald F. Kelly 4.7 07/11/18 11/30/17 D1711024
20 C1708009
(ECP) BANNER COMMUNITY GUILD, F/K/A BANNER GRANGE 627 VS.
PACBELL DBA AT&T CALIFORNIA - FOR RELIEF FROM IMPROPER BILLING AFTER COMPLAINANT
REQUESTED SERVICE DISCONNECTION
Liane Randolph
Katherine MacDonald 1.5 08/09/18 09/22/17 D1709019
21 C1708013
(ECP) MOORE VS. AT&T MOBILITY WIRELESS OPERATIONS HOLDINGS,
INC.- FOR A REFUND FOR OVERBILLING AND LATE-FEES CHARGED FROM NOV. 17, 2016
THROUGH MAY 16, 2017, PLUS ANY ADDITIONAL FEES SINCE THAT TIME
Liane Randolph
W. Anthony Colbert 4.0 08/23/18 12/21/17 D1712031
22 C1708014
(ECP) DUBOSE AND UNIFINITY, INC. VS. T-MOBILE WEST, LLC - FOR A
REFUND AND RELIEF FROM UNAUTHORIZED AND IMPORPER
CHARGES
Liane Randolph Rafael L. Lirag 2.6 08/23/18 11/08/17 D1711005
![Page 36: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/36.jpg)
2017 Report207092767 Page 29
APPENDIX B
COMPLAINTS UNDER THE EXPEDITED COMPLAINT PROCEDURE ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
23 C1709003
(ECP) ALAN HERMAN & ASSOCIATES, INC. VS. U.S. TELEPACIFIC CORP.
DBA TELEPACIFIC COMMUNICATIONS - FOR RELIEF FROM EARLY
TERMINATION CHARGES
Carla Peterman Gerald F. Kelly 1.7 09/12/18 11/01/17 D1711002
24 C1709008
(ECP) SIERRA VIEW DAIRY VS. EDISON - FOR RELIEF FROM
IMPROPER BILLING RELATED TO NET ENERGY METERING
Martha Guzman Aceves
Gerald F. Kelly 4.6 09/14/18 ACTIVE
25 C1709009
(ECP) BROWN VS. SDG&E - FOR RELIEF FROM EXCESSIVE CHARGES FROM DECEMBER 2016 TO JANUARY
2017
Michael Picker Kimberly Kim 3.4 09/11/18 12/22/17 D1712030
26 C1709011
(ECP) BONNETTE VS. PG&E - FOR RELIEF FROM OVERCHARGES FOR
2014, 2015, 2016, 2017 AND RELATED RELIEF
Liane Randolph Gerald F. Kelly 1.6 09/15/18 11/02/17 D1711003
27 C1709012
(ECP) CARLSON VS. SAN JOSE WATER COMPANY - FOR RELIEF
FROM MAJOR EXCESS BILLING FOR WATER SERVICE
Martha Guzman Aceves
Kimberly Kim 4.5 09/18/18 ACTIVE
![Page 37: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/37.jpg)
2017 Report207092767 Page 30
APPENDIX B
COMPLAINTS UNDER THE EXPEDITED COMPLAINT PROCEDURE ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
28 C1709016
(ECP) DOBBS VS. FRONTIER COMMUNICATIONS OF AMERICA, INC. - FOR RELIEF FROM OVERBILLING OF
THE A PROJECT
Liane Randolph
W. Anthony Colbert 4.5 09/18/18 ACTIVE
29 C1710005
(ECP) PRAGER VS. FRONTIER COMMUNICATIONS OF AMERICA, INC.
- FOR RELIEF FROM IMPROPER BILLING
Martha Guzman Aceves
W. Anthony Colbert 3.9 10/05/18 ACTIVE
30 C1710006(ECP) HINSON VS. SOCAL GAS - FOR
RELIEF FROM FAILURE TO CREDIT ACCOUNT
Liane Randolph
W. Anthony Colbert 3.9 10/05/18 ACTIVE
31 C1710014
(ECP) GELFAND AND MISCH VS. EDISON - FOR AN ORDER THAT
DEFENDANT REPLACE THE SMARTMETERS
Michael Picker Kimberly Kim 3.5 10/16/18 ACTIVE
32 C1712015
(ECP) FRIEDMAN VS. FRONTIER CALIFORNIA, INC. - FOR RELIEF
FROM EXCESSIVE AND UNWARRANTED BILLINGS AND FOR RECONNECTION OF THREE LINES
Martha Guzman Aceves
Rafael L. Lirag 1.5 12/15/18 ACTIVE
* These are accelerated proceedings under Pub. Util. Code Section 1702.1 where the amount of money claimed does not exceed the jurisdictional limit of the small claims court. The Commission has set a 132 day resolution target in Resolution ALJ-163. The
Prescribed Resolution Date is considered under the SB 960 12-month timeline.
(END OF APPENDIX B)
![Page 38: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/38.jpg)
2017 Report207092767 Page 31
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
1 A1411003
SDG&E - FOR AUTHORITY TO INCREASE RATES AND CHARGES FOR ELECTRIC AND GAS SERVICE
EFFECTIVE JANUARY 1, 2016
Ratesetting Michael Picker
John S. Wong/
Rafael L. Lirag
26.6 01/20/18 1/19/2017
D1701012 SEVERAL DECISIONS
WERE ISSUED
2 A1411004
SOCAL GAS - FOR AUTHORITY TO UPDATE ITS GAS REVENUE
REQUIREMENT AND BASE RATES EFFECTIVE JANUARY 1, 2016
Ratesetting Michael Picker
John S. Wong/
Rafael L. Lirag
26.6 01/20/18 1/19/2017CLOSED -
SEE A1411003
3 A1411016
EDISON - FOR APPROVAL OF THE RESULTS OF ITS 2013 LOCAL
CAPACITY REQUIREMENTS REQUEST FOR OFFERS FOR THE MOORPARK
SUB-AREA
Ratesetting Michael Picker
Regina DeAngelis/
Legal Division
34.6 03/11/18
9/28/17 EXTENSION GRANTED
BY D1708032
D1709034 SEVERAL DECISIONS WERE ISSUED
4 A1503003
EDISON - TO CONSTRUCT ELECTRICAL SUBSTATION FACILITIES
WITH VOLTAGE OVER 50 kV: MESA 500 kV SUBSTATION PROJECT
Ratesetting Liane Randolph Gerald F. Kelly 23.3 05/16/18 2/9/2017 D1702015
5 A1504012SDG&E – TO UPDATE MARGINAL COSTS, COST ALLOCATION AND
ELECTRIC RATE DESIGNRatesetting Michael Picker Michelle
Cooke 28.8 10/19/17 8/24/2017 D1708030
![Page 39: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/39.jpg)
2017 Report207092767 Page 32
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
6 A1506020 SOCAL GAS AND SDG&E - TO REVISE THEIR CURTAILMENT PROCEDURES Ratesetting Michael Picker Gerald F.
Kelly 21.2 11/17/17 3/23/2017
D1703020 SEVERAL DECISIONS WERE ISSUED
7 A1508025
CYPRESS RIDGE SEWER CO. - FOR A CPCN TO PROVIDE SEWER UTILITY SERVICE TO THE CYPRESS RIDGE
DEVELOPMENT IN SAN LUIS OBISPO
RatesettingMartha
Guzman Aceves
Karl Bemesderfer
/ Rafael L. Lirag
26.4 11/26/17 10/26/2017 D1710013
8 A1509010
SDG&E - TO RECOVER COST RELATED TO THE 2007 SOUTHERN
CALIFORNIA WILDFIRES RECORDED IN THE WILDFIRE EXPENSE MEMORANDUM ACCOUNT
Ratesetting Liane Randolph
S. Pat Tsen /ALJ Pro
Tem Sasha Goldberg
26.6 04/11/18
11/30/17 EXTENSION GRANTED
BY D1709038
D1711033
9 A1512015
RURAL WATER CO. AND/OR CHARLES M. BAKER - FOR AUTHORITY TO
TRANSFER A PUBLIC UTILITY ASSET TO CYPRESS RIDGE SEWER CO.
RatesettingMartha
Guzman Aceves
Karl Bemesderfer
/ Rafael L. Lirag
22.9 11/26/17 10/26/2017CLOSED -
SEE A1508025
10 A1601002
SAN GABRIEL VALLEY WATER CO. - FOR AUTHORITY TO INCREASE RATES CHARGES FOR WATER SERVICE IN ITS LOS ANGELES
COUNTY AND FONTANA W ATER DIVISIONS FOR YEARS 2017-2019
Ratesetting Liane Randolph S. Pat Tsen 17.6 11/02/17 6/15/2017 D1706008
![Page 40: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/40.jpg)
2017 Report207092767 Page 33
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
11 A1603006PG&E - APPLICATION IN ITS 2015 NUCLEAR DECOMMMISSIONING COST TRIENNIAL PROCEEDING
RatesettingMartha
Guzman Aceves
Darcie Houck 15.0 01/14/18 5/25/2017 D1705020
12 A1610003
SIERRA TELEPHONE CO., INC. - TO REVIEW INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN
Ratesetting Liane Randolph Patricia Miles 14.1 07/29/18 11/30/2017 D1711016
13 A1701002
SILVERADO STAGES, INC. - TO EXPAND PSC AUTHORITY TO
OPERATE AS A SCHEDULED PSC TO INCLUDE POINTS IN BAKERSFIELD AND LA INTERNATIONAL AIRPORT
AND TO ESTABLISH A ZORF
Ratesetting Not Assigned Nick Zanjani 3.4 07/08/18 4/18/2017 D1704024
14 A1701004*CHARTER COMMUNICATIONS, INC. - APPLICATION FOR REHEARING OF
RESOLUTION T-17514.N/A Not Assigned Legal
Division 7.2 07/07/18 8/10/2017 D1708015
15 A1701024
WILD GOOSE STORAGE, LLC AND LODI GAS STORAGE, LLC - FOR AN
ORDER TO EXCEMPT FROM COMMISSION AUTHORIZATION THE ENCUMBRANCE OF THE ASSETS OF
WILD GOOSE AND LODI GAS
Ratesetting Clifford Rechtschaffen
Rafael L. Lirag 9.1 07/27/18 10/26/2017
D1701014 NO NEED
FOR HEARING
![Page 41: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/41.jpg)
2017 Report207092767 Page 34
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
16 A1701026
EDISON - FOR AN ORDER AUTHORIZING THE SALE AND
CONVEYANCE OF CERTAIN ELECTRIC STREETLIGHT FACILITIES IN
PALMDALE
Ratesetting Clifford Rechstchaffen
Karl Bemesderfer 3.8 10/12/18 5/25/2017 D1705025
17 A1701027
EDISON - FOR AN ORDER AUTHORIZING THE SALE AND
CONVEYANCE OF CERTAIN ELECTRIC STREETLIGHT FACILITIES IN RANCHO
CUCAMONGA
Ratesetting Clifford Rechstchaffen
Karl Bemesderfer 3.8 09/23/18 5/25/2017 D1705024
18 A1702004
ABDOLKARIM NOURANIAN - TO TRANSFER PSC AUTHORITY TO
ABDOULRAHIM DANESHNIA AND TO ESTABLISH A ZORF
Ratesetting Not Assigned Nick Zanjani 2.5 08/19/18 5/2/2017 D1705001
19 A1702010
CITY OF UNION CITY - TO INSTALL ONE NEW PEDESTRIAN AT-GRADE CROSSING, ACROSS AN OVER THE
TRACK OF THE UNION PACIFIC RAILROAD OAKLAND SUBDIVISION
AND THE CLOSURE OF ONE EXISTING AT-GRADE CROSSING
Ratesetting Clifford Rechtschaffen Robert Haga 9.2 08/29/18 11/30/2017
D1711014 NO NEED
FOR HEARING
20 A1703006
CITY OF EMERYVILLE - TO CONSTRUCT THE SOUTH BAYFRONT PEDESTRIAN BICYCLE BRIDGE OVER NINE RAIL TRACKS OWNED BY THE
UNION PACIFIC RAILROAD CO.
Ratesetting Liane Randolph Patricia Miles 6.3 09/09/18 9/14/2017 D1709010
![Page 42: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/42.jpg)
2017 Report207092767 Page 35
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
21 A1703007
SUN MICROWAVE, INC. - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED
AND RESOLD COMPETITIVE EXCHANGE SERVICE
Ratesetting Liane Randolph Adeniyi A. Ayoade 9.2 09/12/18 12/14/2017 D1712019
22 A1703008
MARK VAN HOOMISSEN - APPLICATION TO MODIFY
RESOLUTION W-4941 TO COMPLY WITH ARTICLE X OF THE STATE
CONSTITUTION
RatesettingMartha
Guzman Aceves
Gary Weatherford 9.1 09/15/18 12/14/2017
D1712002 NO NEED
FOR HEARING
23 A1703010*KERMAN TELEPHONE CO. -
APPLICATION FOR REHEARING OF RESOLUTION T-17531
N/A Not Assigned Legal Division 8.6 09/15/18 11/30/2017 D1711036
24 A1703016
BROADWING COMMUNICATIONS, LLC, GLOBAL CROSSING LOCAL
SERVICES, INC, GLOBAL CROSSING TELECOMMUNICATIONS, INC. ET AL. -
FOR APPROAL OF TRANSFER OF CONTROL OF THE LEVEL 3
OPERATING ENTITIES
RatesettingMartha
Guzman Aceves
Regina DeAngelis 6.8 09/21/18 10/12/2017
D1710003 NO NEED
FOR HEARING
25 A1703017 USNIX CORP. - NDIEC REGISTRATION Ratesetting Not Assigned Cynthia Walker 3.0 09/22/18 6/21/2017 D1706020
26 A1704007
FUHRMANN DBA SHERPAMAX - TO OPERATE AS AN ON-CALL, DOOR TO DOOR, PSC BETWEEN THE TOWNS OF MOJAVE AND INDEPENDENCE
Ratesetting Not Assigned Nick Zanjani 2.7 10/06/18 6/27/2017 D1706022
![Page 43: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/43.jpg)
2017 Report207092767 Page 36
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
27 A1704015
EDISON - FOR APPROVAL OF ITS PROPOSAL TO IMPLEMENT
RESIDENTIAL DEFAULT TIME-OF-USE RATES
Ratesetting Michael Picker Sophia Park 4.4 10/14/18 8/24/2017
D1708024 NO NEED
FOR HEARING
28 A1704016
SDG&E - FOR APPROVAL OF ITS 2018 ELECTRIC PROCUREMENT REVENUE
REQUIREMENT FORECASTS AND GHG-RELATED FORECASTS
RatesettingMartha
Guzman Aceves
Gerald F. Kelly 8.1 10/14/18 12/14/2017
D1712014 NO NEED
FOR HEARING
29 A1704018
EDISON, PG&E, AND SDG&E - FOR APPROVAL OF THE PORTFOLIO
ALLOCATION METHODOLOGY FOR ALL CUSTOMERS
Ratesetting Carla Peterman Anne E. Simon 2.2 10/25/18 6/29/2017 R1706026
30 A1704020
RGT UTILITIES OF CALIFORNIA, INC. AND ROCKEFELLER GROUP INTRERNATIONAL, INC. AND CONVERAGEONE, INC. - FOR
APPROVAL TO TRANSFER CONTROL OF RGT UTILITIES OF CALIFORNIA,
INC.
RatesettingMartha
Guzman Aceves
Jessica T. Hecht 5.0 10/17/18 9/14/2017 D1709011
31 A1704026
CABIN TECHNOLOGIES, INC. - FOR AUTHORITY TO ADD SERVICE POINTS
AND REVISE RATES AND THE ZORF FOR PSC SERVICE BETWEEN POINTS
IN COUNTIES OF SAN FRANCISCO, SAN DIEGO, AND LOS ANGELES
Ratesetting Not Assigned Nick Zanjani 2.5 10/28/18 7/11/2017 D1707002
![Page 44: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/44.jpg)
2017 Report207092767 Page 37
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
32 A1705006EDISON - FOR APPROVAL OF ITS
FORECAST 2018 ERRA PROCEEDING REVENUE REQUIREMENT
RatesettingMartha
Guzman Aceves
Patricia Miles 7.6 10/31/18 12/14/2017
D1712018 NO NEED
FOR HEARING
33 A1705011
SCRS ACQUISITION CORP., SECURUS INVESTMENT HOLDINGS, LLC,AND SECURUS TECHNOLOGIES, INC. - FOR APPROVAL OF TRANSFER OF INDERECT CONTROLOF SECURUS
TECHNOLOGIES, INC.
Ratesetting Liane Randolph Patricia Miles 3.3 11/15/18 8/24/2017 D1708029
34 A1705012
SDG&E - EXPEDITED APPLICATION UNDER THE ENERGY RESOURCE RECOVERY ACCOUNT TRIGGER
MECHANISM
RatesettingMartha
Guzman Aceves
Eric Wildgrube 2.8 11/16/18 8/10/2017 D1708006
35 A1705017WEST CORPORATION, AND OLYMPUS
HOLDINGS II, LLC - TO AUTHORIZE THE TRANSFER OF CONTROL
Ratesetting Clifford Rechtschaffen
Kelly A. Hymes 4.2 11/23/18 9/28/2017 D1709030
36 A1706001*MICHAEL J. AGUIRRE - APPLICATION FOR REHEARING OF RESOLUTION L-
522N/A Not Assigned Legal
Division 3.0 11/24/18 8/24/2017 D1708033
![Page 45: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/45.jpg)
2017 Report207092767 Page 38
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
37 A1706003
SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT - TO CONSTRUCT
A GRADE-SEPARATED RAIL OVER/UNDER CROSSINGS AT 12
INTERSECTIONS IN PITTSBURG AND ANTIOCH CITIES, COUNTY OF
CONTRA COSTA
Ratesetting Liane Randolph Peter V. Allen 6.1 12/01/18 11/30/2017
D1711025 NO NEED
FOR HEARING
38 A1706004
SAN FRANCISCO BAY AREA TRANSIT DISTRICT - TO CONSTRUCT ONE NEW GRADE-SEPARATED CROSSING FOR
THE WEST ACCESS BRIDGE AND PLAZA PROJECT TO THE WARM
SPRINGS/SOUTH FREMONT BART STATION
Ratesetting Liane Randolph Peter V. Allen 6.1 12/01/18 11/30/2017
D1711023 NO NEED
FOR HEARING
39 A1706014ROLLA SHUTTLE - FOR A CPCN TO PROVIDE REGULARLY SCHEDULED
PSC AND TO ESTABLISH A ZORFRatesetting Clifford
RechtschaffenKimberly
Kim 3.3 12/12/18 9/19/2017
D1709018 NO NEED
FOR HEARING
40 A1706018
WAVE HOLDCO, LLC, ASTOUND BROADBAND, LLC, AND RADIATE HOLDINGS, L.P. - FOR EXPEDITE
APPROVAL OF TRANSFER OF CONTROL OF ASTOUND BROADBAND
PURSUANT TO PU CODE SECTION 854(a)
Ratesetting Michael Picker Robert Haga 5.6 12/14/18 11/30/2017
D1711026 NO NEED
FOR HEARING
![Page 46: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/46.jpg)
2017 Report207092767 Page 39
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
41 A1706021
EDISON - FOR AUTHORITY TO LEASE SUBSURFACE LAND AND MINERAL
RIGHTS TO SIGNAL HILL PETROLEUM, INC.
Ratesetting Clifford Rechtschaffen
Hallie Yacknin Zita
Kline 3.7 12/27/18 10/17/2017
D1710009 NO NEED
FOR HEARING
42 A1706032
COX CALIFORNIA TELCOM, LLC - FOR WAIVER TO PROVIDE ACCESS TO
INTEREXCHANGE CARRIERS WHEN OFFERING BASIC SERVICE AND CALIFORNIA LIFELINE WIRELINE
SERVICE
RatesettingMartha
Guzman Aceves
Patricia Miles 5.6 12/30/18 12/14/2017
D1712015 NO NEED
FOR HEARING
43 A1707003
YUBA BUS, LLC - FOR AUTHORITY TO OPERTE AS A SCHEDULED PSC
BETWEEN POINTS IN NEVADA CITY AND SOUTH YUBA RIVER - 49
CROSSINGS STATE PARK
Ratesetting Not Assigned Nick Zanjani 2.4 01/09/19 9/19/2017
D1709017 NO NEED
FOR HEARING
44 A1707006
CITY OF SAN MATEO - FOR AN ORDER AUTHORIZING
CONSTRUCTIONS OF TWO NEW GRADE SEPARATED VEHICULAR
UNDERPASSES AND ONE PEDESTRIAN UNDERPASS IN THE
CITY OF SAN MATEO
Ratesetting Liane RandolphAdeniyi A.
Ayoade Zita Kline
4.0 01/12/19 11/9/2017
D1711007 NO NEED
FOR HEARING
![Page 47: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/47.jpg)
2017 Report207092767 Page 40
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
45 A1708005
PACIFICORP - FOR APPROVAL OF ITS 2018 ENERGY COST ADJUSTMENT CLAUSE AND GREENHOUSE GAS-
RELATED FORECAST AND RECONCILIATION OF COST AND
REVENUE
RatesettingMartha
Guzman Aceves
Eric Wildgrube Katherine
MacDonald
4.5 01/31/19 12/14/2017
D1712017 NO NEED
FOR HEARING
46 A1709022
APPLICATION OF DAMARIS EXPRESS, INC. (PSG36953) FOR AUTHORITY TO
OPERATE AS AN ON-CALL PASSENGER STAGE CORPORATION
Ratesetting Not Assigned Nick Zanjani 2.4 03/27/19 12/5/2017 D1712001
47 C1605010
WHITE, THE POOLE, AVALOS, SULLIVAN, FURNAS, CHARIST, ROSH, SINDLINGER, CHISM, GALLARDO, AND TENHET VS. CA WATER SERVICE CO. - RELIEF FROM IMPROPER CHARGES FOR CONSTRUCTION OF A WATER
MAIN EXTENSION
AdjudicatoryMartha
Guzman Aceves
Dan Burcham 15.3 11/17/17
8/18/17 EXTENSION GRANTED
BY D1704041
D1708020 D1702005
WERE ISSUED
48 C1606007
STARLINE TOURS OF HOLLYWOOD, INC. VS. EHM PRODUCTIONS, INC.,
DBA TMZ ET AL. - FOR AN IMMEDIATE CEASE AND DESIST ORDER FOR OPERATING WITHOUT PROPER
LICENSES OR PEMITS
Adjudicatory Liane Randolph Hallie Yacknin 11.7 06/07/17 05/25/17 D1705027
![Page 48: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/48.jpg)
2017 Report207092767 Page 41
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
49 C1610005
VARVAYANIS VS. ODD FELLOWS SIERRA RECREATION ASSOC. -
RELIEF FROM SEEKING REFUND ORDERED BY DECISION 16-01-047
Adjudicatory Clifford Rechtschaffen
Eric Wildgrube 8.4 10/06/17 06/15/17 D1706014
50 C1611009SHILBERG VS. SDG&E - FOR RELIEF
FROM INACCURATE BILLING AND REQUEST FOR METER CALIBRATION
Adjudicatory Clifford Rechtschaffen
Katherine MacDonald/
Kimberly Kim
11.8 11/30/17 11/20/17 D1711012
51 C1705001POCO POWER, LLC VS. PG&E - FOR
RELIEF FROM INAPPROPRIATE APPLICATION OF REMAT TARIFF
Adjudicatory Carla Peterman Regina DeAngelis 7.8 05/01/18 12/21/17
D1712032 NO NEED
FOR HEARING
52 C1705002
TARA BROADCASTING, LLC VS. EDISION - FOR RELIEF THAT THE
BILLING CORRECTIONS FOR NOVEMBER 1, 2013 THROUGH APRIL
4, 2017 BE VACATED AND CANCELLED
Adjudicatory Clifford Rechtschaffen
Gerald F. Kelly/ Sasha
Goldberg 3.4 05/01/18 08/10/17
D1708008 NO NEED
FOR HEARING
53 C1705020AMERICAS STYRENICS VS. EDISON -
FOR RELIEF FROM MONTHLY FACILITIES CHARGES
AdjudicatoryMartha
Guzman Aceves
Eric Wildgrube/
ALJ Pro Tem Zita
Kline
2.3 05/30/18 08/07/17
D1708001 NO NEED
FOR HEARING
![Page 49: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/49.jpg)
2017 Report207092767 Page 42
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
54 C1706019
CALIFORNIA COMMERCIAL SOLAR, INC. VS. EDISON - FOR RELIEF FROM
RULE 2 COST OF OWNERSHIP CHARGES PERTAINING TO THE
INSTALLATION OF A DISTRIBUTION RISER POLE AND A NEW
TRANSFORMER
Adjudicatory Clifford Rechtschaffen
Regina DeAngelis 3.4 06/23/18 10/2/2017
D1710002 NO NEED
FOR HEARING
55 C1708001
CIRCLE DRIVE PROPERTIES, LLC VS. SOCAL GAS - FOR AN ORDER
SCHEDULING REINSTALLATION OF A GAS METER AND THE REACTIVATION
OF SERVICE
AdjudicatoryMartha
Guzman Aceves
Gerald F. Kelly 3.4 07/21/18 11/1/2017
D1711001 NO NEED
FOR HEARING
56 C1708004
GABRIS VS. PG&E - FOR RELIEF FROM DEFENDANT'S FAILURE TO
FOLLOW SERVICE LINE EXTENSION REQUIREMENTS
Adjudicatory Michael Picker Patricia Miles 2.4 08/08/18 10/19/2017
D1710011 NO NEED
FOR HEARING
57 C1709002BRANDT VS. PG&E - FOR RELIEF
FROM IMPROPER BILLING RELATED TO NET ENERGY METERING
Adjudicatory Michael Picker Rafael L. Lirag 1.4 09/05/18 10/17/2017
D1710010 NO NEED
FOR HEARING
![Page 50: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/50.jpg)
2017 Report207092767 Page 43
APPENDIX CPROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS RESOLVED ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
58 I1506008
CPUC - OIR TO ESTABLISH A LIST FOR THE FISCAL YEARS 2016-2017
AND 2017-2018 OF EXISTING CROSSING AT GRADE OF CITY
STREETS/ COUNTY ROADS/ STATE HIGHWAYS IN NEED OR REPARATION
OR RECONSTRUCTION
Quasi-legislative
Martha Guzman Aceves
Valerie Kao/ Dan
Burcham 25.0 06/29/17
D1706023 D1606012
WERE ISSUED
59 R1309011
CPUC - OIR TO ENHANCE THE ROLE OF DEMAND RESPONSE IN MEETING THE STATE RESOURCE PLANNING
NEEDS AND OPERATIONAL REQUIREMENTS
RatesettingMartha
Guzman Aceves
Nilgun Atamturk/
Legal Division/ Kelly A. Hymes
49.9 11/11/18
10/26/17 EXTENSION GRANTED
BY D1703012
AND SCOPING
MEMO
D1710017 ACTIVE - SEVERAL DECISIONS
WERE ISSUED
60 R1706015
CPUC - OIR TO IMPLEMENT DAIRY BIOMETHANE PILOT PROJECTS TO
DEMONSTRATE INTERCONNECTION TO THE COMMON CARRIER PIPELINE
SYSTEM IN COMPLIANCE WITH SENATE BILL 1383.
Quasi-legislative
Clifford Rechtschaffen
Michelle Cooke 6.1 12/15/18 12/14/17
D1712004 NO NEED
FOR HEARING
(END OF APPENDIX C)
![Page 51: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/51.jpg)
2017 Report207092767 Page 44
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
1 A0909022
EDISON - TO CONSTRUCT ELECTRICAL FACILITIES WITH
VOLTAGES BETWEEN 50KV AND 200KV OR NEW OR UPGRADED SUBSTATIONS WITH HIGH SIDE VOLTAGES EXCEEDING 50 KV: ALBERHILL SYSTEM PROJECT
RatesettingMartha
Guzman Aceves
Hallie Yacknin 101.5 12/19/18 ACTIVE
2 A1204019
CAL-AM WATER CO. - FOR APPROVAL OF THE MONTEREY
PENINSULA WATER SUPPLY PROJECT AND AUTHORIZATION TO RECOVER ALL PRESENT AND
FUTURE COSTS IN RATES
Ratesetting Liane Randolph
Legal Division/
Gary Weatherford
70.3 06/30/18
ACTIVE - D1609021 D1307048 D1210030
HAVE BEEN ISSUED
3 A1402008
PG&E - FOR COMPLIANCE REVIEW OF UTILITY OWNED GENERATION OPERATIONS,
ELECTRIC ENERGY RESOURCE RECOVERY ACCOUNT ENTRIES
ET AL.
RatesettingMartha
Guzman Aceves
Stephen C. Roscow 47.7 05/05/18
EXTENSION GRANTED
BY D1710021 ET
AL. AND REVISED SCOPING RULING
ACTIVE
4 A1501014EDISON - FOR A COMMISSION
REASONABLENESS REVIEW OF 2014 SONGS 2 AND 3 EXPENSES
RatesettingMartha
Guzman Aceves
Darcie Houck 36.5 03/23/19 ACTIVE
![Page 52: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/52.jpg)
2017 Report207092767 Page 45
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
5 A1502001
SOWEST GAS CORP. - FOR APPROVAL OF LOW-INCOME
PROGRAMS AND BUDGETS FOR PROGRAM YEARS 2015-2017
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 36.4 12/02/18
EXTENSION GRANTED
BY D1705033 ET
AL. AND SCOPING
MEMO
ACTIVE
6 A1502002
GOLDEN STATE WATER CO. ON BEHALF OF ITS BEAR VALLEY ELECTRIC SERVICE DIVISION - FOR APPROVAL OF THE 2015-
2017 CARE AND ENERGY SAVINGS ASSISTANCE
PROGRAMS AND BUDGETS
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 36.4 12/02/18
EXTENSION GRANTED
BY D1705033 ET
AL. AND SCOPING
MEMO
ACTIVE - SEE
A1502001
7 A1502003
LIBERTY UTILITIES (CalPeco Electric) LLC - FOR APPROVAL OF
LOW-INCOME ASSISTANCE PROGRAMS AND BUDGETS FOR
PROGRAM YEAR 2015-2017
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 36.4 12/02/18
EXTENSION GRANTED
BY D1705033 ET
AL. AND SCOPING
MEMO
ACTIVE - SEE
A1502001
8 A1502006
SDG&E- FOR A REASONABLENESS
DETERMINATION AND RECOVERY OF ITS 2014 OPERATIONS AND
MAINTENANCE AND NON-OPERATIONS AND MAINTENANCE
SONGS COSTS
RatesettingMartha
Guzman Aceves
Darcie Houck 36.5 03/23/19
ACTIVE - SEE
A1501014
![Page 53: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/53.jpg)
2017 Report207092767 Page 46
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
9 A1502013
PACIFICORP - FOR APPROVAL OF THE CARE AND ENERGY SAVINGS
ASSISTANCE PROGRAMS AND BUDGETS FOR YEARS 2015-2017
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 36.4 12/02/18
EXTENSION GRANTED
BY D1705033 ET
AL. AND SCOPING
MEMO
ACTIVE - SEE
A1502001
10 A1502024
WEST COAST GAS CO. - FOR APPROVAL OF PROGRAM YEARS
2015-2017 LOW INCOME ASSISTANCE PROGRAM
BUDGETS
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 36.2 12/02/18
EXTENSION GRANTED
BY D1705033 ET
AL. AND SCOPING
MEMO
ACTIVE - SEE
A1502001
11 A1503004
ALPINE NATURAL GAS OPERATING CO. NO. 1, LLC - FOR
APPROVAL OF THE CARE AND ENERGY SAVINGS ASSISTANCE
PROGRAMS AND BUDGET
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 35.0 12/02/18
EXTENSION GRANTED
BY D1705033 ET
AL. AND SCOPING
MEMO
ACTIVE - SEE
A1502001
12 A1504013 EDISON - FOR A CPCN FOR THE RTRP TRANSMISSION PROJECT Ratesetting Liane
RandolphHallie
Yacknin 34.0 ACTIVE
13 A1507002 EDISON - FOR APROVAL OF ITS DISTRIBUTION RESOURCES PLAN
Ratesetting TRACK II/
Quasi-legislative
TRACK I and TRACK III
Michael PickerPeter V.
Allen/ Robert Mason
31.5 01/26/18ACTIVE -
SEE R1408013
![Page 54: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/54.jpg)
2017 Report207092767 Page 47
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
14 A1507003 SDG&E - FOR APPROVAL OF DISTRIBUTION RESOURCE PLAN
Ratesetting TRACK II/
Quasi-legislative
TRACK I and TRACK III
Michael PickerPeter V.
Allen/ Robert Mason
31.5 01/26/18ACTIVE -
SEE R1408013
15 A1507005PACIFICORP - SETTING FORTH ITS DISTRIBUTION RESOURCE
PLANRatesetting Michael Picker
Peter V. Allen/ Robert
Mason 31.5 01/26/18
ACTIVE D1706012 D1702007
HAVE BEEN ISSUED
16 A1507006PG&E - FOR ADOPTION OF ITS
ELECTRIC DISTRIBUTION RESOURCES PLAN
Ratesetting TRACK II/
Quasi-legislative
TRACK I and TRACK III
Michael PickerPeter V.
Allen/ Robert Mason
31.5 01/26/18ACTIVE -
SEE R1408013
17 A1507007
LIBERTY UTILITIES (CALPECO ELECTRIC) LLC - FOR APPROVAL
OF ITS DISTRIBUTION RESOURCES PLAN
Ratesetting Michael PickerPeter V.
Allen/ Robert Mason
31.5 01/26/18ACTIVE -
SEE A1507005
18 A1507008
GOLDEN STATE WATER CO. ON BEHALF OF ITS BEAR VALLEY ELECTRIC SERVICE DIVISION -
FOR APPROVAL OF ITS DISTRIBUTION RESOURCE PLAN
Ratesetting Michael PickerPeter V.
Allen/ Robert Mason
31.5 01/26/18ACTIVE -
SEE A1507005
![Page 55: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/55.jpg)
2017 Report207092767 Page 48
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
19 A1507019
CALIFORNIA-AMERICAN WATER CO. - FOR AUTHORITY TO MODIFY CONSERVATION AND RATIONING
RULES, RATE DESIGN, AND OTHER RELATED ISSUED FOR
MONTEREY DISTRICT
Ratesetting Liane Randolph
Gary Weatherford 31.0 06/23/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
20 A1508006
SDG&E - FOR A PERMIT TO CONSTRUCT THE TIE LINE 649
WOOD-TO STEEL REPLACEMENT PROJECT
Ratesetting Liane Randolph
Eric Wildgrube 30.1 ACTIVE
21 A1508027
NEXTERA ENERGY TRANSMISSION WEST, LLC - FOR
A CPNC FOR THE SUNCREST DYNAMIC REACTIVE POWER
SUPPORT PROJECT
Ratesetting Liane Randolph
Colette Kersten 29.4 08/26/18 ACTIVE
22 A1509001
PG&E - FOR AUTHORITY TO INCREASE RATES AND CHARGES
FOR ELECTRIC AND GAS SERVICE EFECTIVE ON JANUARY
1, 2017.
Ratesetting Michael Picker Stephen C. Roscow 29.4 02/09/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
23 A1509007
PACIFICORP - FOR AUTHORITY TO SELL CERTAIN MINING
ASSETS IN ACCORDANCE WITH PU. CODE SECTION 851.
Ratesetting Carla Peterman
Katherine MacDonald 28.8 05/30/18
EXTENSION GRANTED
BY D1711011
ACTIVE NEED FOR HEARING
![Page 56: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/56.jpg)
2017 Report207092767 Page 49
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
24 A1509013SDG&E AND SOCAL GAS - FOR A CPCN FOR THE PIPELINE SAFETY
& RELIABILITY PROJECTRatesetting Liane
RandolphColette Kersten 28.4 06/23/18 ACTIVE
25 A1511005
PACIFICORP - FOR A PERMIT TO CONSTRUCT THE LASSEN
SUBSTATION PROJECT PURSUANT TO GENERAL ORDER
131-D
Ratesetting Carla Peterman Robert Haga 27.3 ACTIVE
26 A1512007
EDISON - FOR A PERMIT TO CONSTRUCT ELECTRICAL FACILITIES WITH VOLTAGE
BETWEEN 50 KV AND 200 KV CIRCLE CITY SUBSTATION AND
MIRA LOMA-JEFFERSON SUBTRANSMISSION LINE
PROJECT
Ratesetting Michael Picker Kimberly Kim 26.3 04/25/19 ACTIVE
27 A1603004
EDISON AND SDG&E - APPLICATION FOR THE 2015
NUCLEAR DECOMMISSIONING COST TRIENNIAL PROCEEDINGS
RatesettingMartha
Guzman Aceves
Darcie Houck 23.3 03/23/19
ACTIVE - SEE
A1501014
28 A1603009
CRIMSON CALIFORNIA PIPELINE L.P. (PLC-26) - FOR AUTHORITY TO INCREASE RATES FOR ITS
CRUDE OIL PIPELINE SERVICES
Ratesetting Clifford Rechtschaffen Patricia Miles 23.0 01/06/19 ACTIVE
![Page 57: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/57.jpg)
2017 Report207092767 Page 50
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
29 A1604001
EDISON - FOR A FINDING THAT ITS PROCUREMENT-RELATED AND OTHER OPERATIONS FOR
THE PERIOD JANUARY 1 THROUGH DECEMBER 31, 2015, COMPLIED WITH ITS ADOPTED
PROCUREMENT PLAN
RatesettingMartha
Guzman Aceves
S. Pat Tsen 22.3 03/17/18 ACTIVE
30 A1604006 CERETEL INCORPORATED - NDIEC REGISTRATION Ratesetting Carla
Peterman Sophia Park 22.1 06/29/18ACTIVE
NEED FOR HEARING
31 A1604018
SDG&E - FOR APPROVAL OF ITS 2017 ELECTRIC PROCUREMENT
REVENUE REQUIREMENT FORECASTS AND GHG-RELATED
FORECASTS
RatesettingMartha
Guzman Aceves
S. Pat Tsen 21.8 03/10/18
ACTIVE D1612053 HAS BEEN
ISSUED
32 A1604022
SDG&E - FOR A PERMIT TO CONSTRUCT THE TIE LINE (TL)
695 AND TL 6971 RECONDUCTOR PROJECT
Ratesetting Carla Peterman
Dan Burcham 21.5 05/17/19 ACTIVE
33 A1604023
PG&E - FOR A PERMIT TO CONSTRUCT THE SOUTH OF
PALERMO 115 kV POWER LINE REINFORCEMENT PROJECT PURSUANT TO G.O. 131-D
Ratesetting Carla Peterman S. Pat Tsen 21.4 ACTIVE
![Page 58: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/58.jpg)
2017 Report207092767 Page 51
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
34 A1605001
EDISON - FOR APPROVAL OF ITS FORECAST 2017 ERRA
PROCEEDING REVENUE REQUIREMENT
RatesettingMartha
Guzman Aceves
S. Pat Tsen 21.3 02/04/18
ACTIVE D1612054 HAS BEEN ISSUED -
SEE A1604018
35 A1606003
PG&E - FOR ADOPTION OF ELECTRIC REVENUE
REQUIREMENT AND RATES ASSOCIATES WITH ITS 2017 ERRA
AND GENERATION NON-BYPASSABLE CHARGES
FORECAST AND GREENHOUSE GAS FORECAST REVENUE AND
RECONCILIATION
RatesettingMartha
Guzman Aceves
S. Pat Tsen 20.3 02/18/18
ACTIVE D1612038 HAS BEEN ISSUED -
SEE A1604018
36 A1606013PG&E - TO REVISE ITS ELECTRIC
MARGINAL COSTS, REVENUE ALLOCATION AND RATE DESIGN
Ratesetting Carla Peterman
Nilgun Atamturk/ Michelle Cooke
19.3
ACTIVE D1709035 D1706004
HAVE BEEN ISSUED
37 A1607002
CALIFORNIA AMERICAN WATER CO. - FOR AUTHORITY TO
INCREASE ITS REVENUES FOR WATER SERVICE FOR YEARS
2018 AND 2019
Ratesetting Michael Picker
Eric Wildgrube/ Rafael L.
Lirag/ Sophia Park
19.3 07/15/18 ACTIVE
![Page 59: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/59.jpg)
2017 Report207092767 Page 52
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
38 A1607017WEST COAST GAS CO. - TO REVISE ITS GAS RATES AND
TARIFFSRatesetting Carla
Peterman Robert Haga 18.3 05/12/18 ACTIVE
39 A1608006
PG&E - FOR APPROVAL OF THE RETIREMENT OF DIABLO CANYON
POWER PLANT, IMPLEMENTATION OF THE JOINT PROPOSAL, AND RECOVERY OF
ASSOCIATED COSTS
Ratesetting Michael Picker Peter V. Allen 17.9 05/20/18 ACTIVE
40 A1608010
SDG&E - FOR A PERMIT TO CONSTRUCT THE ARTESIAN
230kV SUBSTATION EXPANSION PROJECT
Ratesetting Liane Randolph
Melissa K. Semcer 17.7 ACTIVE
41 A1609001
EDISON - FOR AUTHORITY TO INCREASE ITS AUTHORIZED
REVENUES OF ELECTRIC SERVICE IN 2018 AND REFLECT
THAT INCREASE IN RATES
Ratesetting Michael Picker
Eric Wildgrube
/Stephen C. Roscow
17.2 06/03/18
ACTIVE D1709007 HAS BEEN
ISSUED
42 A1609003EDISON - FOR APPROVAL OF ITS
2016 RATE DESIGN WINDOW PROPOSALS
Ratesetting Michael Picker Stephen C. Roscow 17.2 09/20/18 ACTIVE
43 A1609005
SOCAL GAS AND SDG&E - TO RECOVER COSTS RECORDED IN
THE PIPELINE SAFEY AND RELIABILITY MEMORANDUM
ACCOUNTS, THE SAFETY ENHANCEMENT EXPENSE
BALANCING ACCOUNTS ET AL.
Ratesetting Carla Peterman
Robert Mason 17.2 10/24/18 ACTIVE
![Page 60: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/60.jpg)
2017 Report207092767 Page 53
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
44 A1610002
CALAVERA TELEPHONE CO. - TO REVIEW INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN
Ratesetting Carla Peterman Robert Haga 16.1 08/09/18 ACTIVE
45 A1610004
CAL-ORE TELPHONE CO. - TO REVIEW INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN
Ratesetting Carla Peterman
Darcie Houck 16.1 07/29/18 ACTIVE
46 A1610012 DCR TRANSMISSION, LLC - FOR A
CPCN FOR THE TEN WEST LINK PROJECT
Ratesetting Liane Randolph
Katherine MacDonald 15.8 08/04/19
ACTIVE NEED FOR HEARING
47 A1610019
PG&E - TO RECOVER COSTS RECORDED IN THE
CATASTROPHIC EVENT MEMORANDUM ACCOUNT PURSUANT TO P.U. CODE
SECTION 454.9
Ratesetting Carla Peterman
Hallie Yacknin 15.2 12/29/18 ACTIVE
48 A1610020
SAN PABLE BAY PIPELINE CO., LLC - FOR AUTHORITY TO INCREASE ITS RATES FOR
PIPELINE TRANSPORTATION SERVICES
Ratesetting Clifford Rechtschaffen
Karl Bemesderfer / Robert W.
Haga
15.3 08/02/18 ACTIVE
![Page 61: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/61.jpg)
2017 Report207092767 Page 54
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
49 A1611002
EDISON - FOR APPROVAL OF THE RESULTS OF ITS SECOND
PREFERRED RESOURCES PILOT REQUEST FOR OFFERS
Ratesetting Carla Peterman Patricia Miles 15.1 10/21/18 ACTIVE
50 A1611005
EDISON, SDG&E, AND PG&E - JOINT APPLICATION TO
ESTABLISH NON-BYPASSABLE CHARGE FOR ABOVE-MARKET
COSTS ASSOCIATED WITH TREE
RatesettingMartha
Guzman Aceves
Anne E. Simon 14.7 ACTIVE
51 A1612002
EDISON AND SDG&E - FOR COST RECOVERY OF THE WHEELER
NORTH REEF EXPANSION PROJECT MARINE MITIGATION
COSTS
Ratesetting Clifford Rechtschaffen
Darcie Houck 14.2 06/02/18 ACTIVE
52 A1612010
SOCAL GAS - FOR REAUTHORIZATION OF THE
CUSTOMER INCENTIVE PROGRAM
RatesettingMartha
Guzman Aceves
Karl Bemesderfer
/ Nilgun Atamturk
13.5 06/22/18ACTIVE
NEED FOR HEARING
53 A1701001SUBURBAN WATER SYSTEMS - TO INCREASE RATES CHARGES IN YEARS 2018, 2019, AND 2020
RatesettingMartha
Guzman Aceves
Katherine MacDonald/
Gary Weatherford/
Darcie Houck
13.1 07/05/18 ACTIVE
![Page 62: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/62.jpg)
2017 Report207092767 Page 55
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
54 A1701003*
COX COMMUNICATIONS CALIFORNIA, LLC - APPLICATION
FOR REHEARING OF RESOLUTION T-17514.
N/A Not Assigned Legal Division 13.0 07/07/18 ACTIVE
55 A1701005
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONSTRUCT
TWO LIGHT-RAIL VEHICLE TRACKS GRADE SEPARATED
ABOVE I-5 (SOUCH), I-5 (NORTH) AND GRADE SEPARATED BELOW
I-8, SR-52 IN THE CITY OF SAN DIEGO
Ratesetting Clifford Rechtschaffen
Gerald F. Kelly 13.0 07/06/18 ACTIVE
56 A1701006
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONSTRUCT
TWO LIGHT-RAIL VEHICHLE TRACKS GRADE SEPARATED ABOVE OCEAN BEACH BIKE
PATH, FRIARS ROAD, BALBOA AVENUE, ET AL. IN THE CITY OF
SAN DIEGO
Ratesetting Clifford Rechtschaffen
Gerald F. Kelly 13.0 07/06/18
ACTIVE - SEE
A1701005
57 A1701007
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONSTRUCT
TWO LIGHT-RAIL VEHICLE TRACKS GRADE SEPARATED
ABOVE NOBEL DRIVE ET AL.AND GRADE SEPARATED BELOW
TECOLOTE RD. ET AL IN THE CITY OF SAN DIEGO
Ratesetting Clifford Rechtschaffen
Gerald F. Kelly 13.0 07/06/18
ACTIVE - SEE
A1701005
![Page 63: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/63.jpg)
2017 Report207092767 Page 56
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
58 A1701008
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONSTRUCT
TWO LIGHT-RAIL VEHICLE TRACKS GRADE SEPARATED
ABOVE THE LOS ANGELES SAN DIEGO-SAN LUIS OBISPO RAIL
CORRIDOR TRACKS IN THE CITY OF SAN DIEGO
Ratesetting Clifford Rechtschaffen
Gerald F. Kelly 13.0 07/06/18
ACTIVE - SEE
A1701005
59 A1701009
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONTRUCT TWO LIGH-RAIL VEHICLE TRACKS
GRADE SEPARATED ABOVE GILMAN DRIVE (SOUTH), SIXTH
LANE, ET AL IN THE CITY OF SAN DIEGO
Ratesetting Clifford Rechtschaffen
Gerald F. Kelly 13.0 07/06/18
ACTIVE - SEE
A1701005
60 A1701010
SUBURBAN WATER SYSTEMS - TO AUTHORIZE A MEMORANDUM
ACCOUNT TO RECORD ASBESTOS LITIGATION
EXPENSES
RatesettingMartha
Guzman Aceves
Darcie Houck/ Gary Weatherford
13.0 07/08/18 ACTIVE
61 A1701012
PG&E - FOR APPOVAL OF DEMAND RESPONSE PROGRAMS,
PILOTS AND BUDGETS FOR PROGRAM YEARS 2018-2022
RatesettingMartha
Guzman Aceves
Kelly A. Hymes/ Nilgun
Atamturk
12.6 07/19/18
ACTIVE D1712003 HAS BEEN
ISSUED
![Page 64: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/64.jpg)
2017 Report207092767 Page 57
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
62 A1701011
XYN COMMUNICATIONS OF CALIFORNIA, LLC AND XYN
HOLDING INTERNATIONAL, INC. ET AL - FOR APPROVAL OF AN
INDIRECT TRANSFER OF CONTROL
Ratesetting Liane Randolph Valerie Kao 12.9 07/11/18 ACTIVE
63 A1701013EDISON - FOR APPROVAL OF
ENERGY EFFICIENCY ROLLING PORTFOLIO BUSINESS PLAN
Ratesetting Carla Peterman
Julie A. Fitch/
Valerie Kao 12.6 07/19/18 ACTIVE
64 A1701014SDG&E - TO ADOPT ENERGY
EFFICIENCY ROLLING PORTFOLIO BUSINESS PLAN
Ratesetting Carla Peterman
Julie A. Fitch/
Valerie Kao 12.6 07/19/18
ACTIVE - SEE
A1701013
65 A1701015
PG&E - FOR APPROVAL OF 2018-2025 ROLLING PORTFOLIO
ENERGY EFFICIENCY BUSINESS PLAN AND BUDGET
Ratesetting Carla Peterman
Julie A. Fitch/
Valerie Kao 12.6 07/19/18
ACTIVE - SEE
A1701013
66 A1701016
SOCAL GAS - FOR ADOPTION OF ITS ENERGY EFFICIENCY
ROLLING PORTFOLIO BUSINESS PLAN
Ratesetting Carla Peterman
Julie A. Fitch/
Valerie Kao 12.6 07/19/18
ACTIVE - SEE
A1701013
![Page 65: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/65.jpg)
2017 Report207092767 Page 58
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
67 A1701017MARIN CLEAN ENERGY - FOR APPROVAL OF ITS ENERGY
EFFICIENCY BUSINESS PLANRatesetting Carla
Peterman
Julie A. Fitch/
Valerie Kao 12.6 07/19/18
ACTIVE - SEE
A1701013
68 A1701018EDISON - FOR APPROVAL OF ITS 2018-2022 DEMAND RESPONSE
PROGRAMSRatesetting
Martha Guzman Aceves
Nilgun Atamturk/ Kelly A. Hymes
12.6 07/19/18ACTIVE -
SEE A1701012
69 A1701019
SDG&E - FOR APPROVAL AND FUNDING FOR 2018-2022 DEMAND
RESPONSE PORTFOLIO IN COMPLIANCE WITH DECISION 16-
09-056
RatesettingMartha
Guzman Aceves
Nilgun Atamturk/ Kelly A. Hymes
12.6 07/19/18ACTIVE -
SEE A1701012
70 A1701020SDG&E - FOR APPROVAL OF SB
350 TRANSPORTATION ELECTRIFICATION PROPOSALS
Ratesetting Carla Peterman
Michelle Cooke/ ALJ
Sasha Goldberg
12.5 07/22/18 ACTIVE
71 A1701021EDISON - FOR APPROVAL OF ITS
2017 TRANSPORTATION ELECTRIFICATION PROPOSALS
Ratesetting Carla Peterman
Michelle Cooke/ ALJ
Sasha Goldberg
12.5 07/22/18ACTIVE -
SEE A1701020
![Page 66: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/66.jpg)
2017 Report207092767 Page 59
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
72 A1701022
PG&E - FOR APPROVAL OF ITS SENATE BILL 350
TRANSPORTATION ELECTRIFICATION PROGRAM
Ratesetting Carla Peterman
Michelle Cooke/ ALJ
Sasha Goldberg
12.5 07/22/18ACTIVE -
SEE A1701020
73 A1701023
NEXTERA ENERGY TRANSMISSION WEST, LLC AND
PG&E - TO CONSTRUCT THE ESTRELLA SUBSTATION AND
PASO ROBLES AREA REINFORMENT PROJECT
Ratesetting Clifford Rechtschaffen
Adeniyi A. Ayoade 12.3 07/27/18 ACTIVE
74 A1701025
SONOMA-MARIN AREA RAIL TRANSIT DISTRICT - TO
AUTHORIZE A PUBLIC AT-GRADE PEDESTRIAN CROSSING AT THE
SANTA ROSA DOWNTOWN STATION AT 4TH STREET
Ratesetting Clifford Rechstchaffen
Dan Burcham 12.3 07/28/18 ACTIVE
75 A1702001
EDISON - TO LEASE CERTAIN FIBER OPTIC CABLES TO CELLCO
PARTNERSHIP DBA VEIRIZON WIRELESS UNDER THE MASTER DARK FIBER LEASE AGREEMENT
PURSUANT TO PU CODE SECTION 851
Ratesetting Clifford Rechtschaffen
Hallie Yacknin 12.0 08/05/18 ACTIVE
![Page 67: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/67.jpg)
2017 Report207092767 Page 60
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
76 A1702003
GILL RANCH STORAGE, LLC, NORTHWEST NATURAL GAS CO., ET AL. - FOR A CHANGE OF LEGAL
OWNERSHIP AND CONTROL OF GILL RANCH STORAGE, LLC THROUGH A CORPORATE
REORGANIZATION
Ratesetting Clifford Rechtschaffen Patricia Miles 11.8 08/12/18 ACTIVE
77 A1702005
PG&E - FOR COMPLIANCE REVIEW OF UTILITY OWNED GENERATION OPERATIONS,
ELECTRIC ENERGY RESOURCE RECOVERY ACCOUNT ENTRIES
AND OTHER ACTIVITIES FOR THE PERIOD OF JANUARY 1 THROUGH
DECEMBER 31, 2016
RatesettingMartha
Guzman Aceves
Kelly A. Hymes 11.2 08/30/18 ACTIVE
78 A1702007
SIGCA HOLDINGS, LLC - FOR A CPCN TO PROVIDE FULL
FACILITIES-BASED AND RESOLD COMPETITION LOCAL EXCHANGE SERVICE AND FULL FACILITIES-
BASED INTEREXCHANGE SERVICES
RatesettingMartha
Guzman Aceves
Adeniyi A. Ayoade 11.3 08/26/18 ACTIVE
79 A1702008SDG&E - FOR AUTHORITY TO
IMPLEMENT ECONOMIC DEVELOPMENT RATES
RatesettingMartha
Guzman Aceves
Katherine MacDonald 11.3 08/26/18 ACTIVE
![Page 68: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/68.jpg)
2017 Report207092767 Page 61
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
80 A1702009
CRIMSON CALIFORNIA PIPELINE L.P. (PLC-26) - TO INCREASE RATES FOR ITS CRUDE OIL
PIPELINE SERVICES
Ratesetting Clifford Rechtschaffen Patricia Miles 11.2 08/29/18
ACTIVE - SEE
A1603009
81 A1703003
CITY OF SAN RAFAEL - TO CONSTRUCT A NEW A-GRADE
CROSSING AT PUBLIC CROSSING ON SMART RAIL LINE WHICH IS A SUBPROJECT OF THE LARKSPUR
EXTENSION PROJECT
Ratesetting Liane Randolph
Dan Burcham 11.1 09/02/18 ACTIVE
82 A1703005
BURLINGTON NORTHERN SANTA FE RAILWAY CO. - TO ADD A
THIRD TRACK AND CONNECT TO THE EXISTING THIRD TRACK
NORTHWEST AND SOUTHEAST OF THE INTERSECTION OF
ROSECRANS AND MARQUARDT AVENUES
Ratesetting Liane Randolph
Katherine MacDonald 10.9 09/07/18 ACTIVE
83 A1703018
SONOMA MARIN AREA RAIL TRANSIT - TO CONSTRUCT A
NEW AT-GRADE CROSSING ON SMART RAIL LINE WHICH IS A
SUBPROJECT OF THE LARKSPUR EXTENSION PROJECT
Ratesetting Liane Randolph
Adeniyi A. Ayoade/ Dan
Burcham 10.4 09/22/18 ACTIVE
![Page 69: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/69.jpg)
2017 Report207092767 Page 62
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
84 A1703019
SDG&E - FOR WAIVER OF CERTAIN AFFILIATE
TRANSACTION RULES FOR INTERACTIONS WITH
UNREGULATED SUBSIDIARY
Ratesetting Clifford Rechtschaffen Robert Haga 10.2 09/29/18 ACTIVE
85 A1703020EDISON - FOR RECOVERY OF
ALISON CANYON UTILITY OWNED ENERGY STORAGE COSTS
Ratesetting Carla Peterman
Melissa K. Semcer 10.2 09/29/18 ACTIVE
86 A1703021
SOCAL GAL AND SDG&E - FOR APPROVAL OF THE FORECASTED
REVENUE REQUIREMENT ASSOCIATED WITH CERTAIN
PIPELINE SAFETY ENHACEMENT PLAN PROJECTS, RATE
RECOVERY, MODIFY AND CREATE CERTAIN BALANCING
ACCOUNTS
Ratesetting Clifford Rechtschaffen
Adeniyi A. Ayoade 10.2 09/29/18 ACTIVE
87 A1704001
SAN JOSE WATER CO. - FOR AUTHORITY TO ADJUST ITS COST OF CAPITAL AND TO REFLECT IT
IN RATES FOR THE PERIOD FROM JANUARY/2018 THROUGH
DECEMBER/2020
RatesettingMartha
Guzman Aceves
Karl Bemesderfer 10.1 10/03/18 ACTIVE
![Page 70: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/70.jpg)
2017 Report207092767 Page 63
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
88 A1704002
GOLDEN STATE WATER CO. - FOR AUTHORITY TO ESTABLISH
ITS AUTHORIZED COST OF CAPITAL AND RATE OF RETURN FOR UTILITY OPERATIONS FOR
2018 - 2020
RatesettingMartha
Guzman Aceves
Karl Bemesderfer 10.1 10/03/18 ACTIVE
89 A1704003
CALIFORNIA-AMERICAN WATER CO. - FOR AUTHORITY TO
ESTABLISH ITS AUTHORIIZED COST OF CAPITAL FOR THE
PERIOD FROM JANUARY/ 2018 THROUGH DECEMBER/2020
RatesettingMartha
Guzman Aceves
Karl Bemesderfer 10.1 10/03/18 ACTIVE
90 A1704004
EDISON - FOR FINDING THAT ITS PROCUREMENT-RELATED AND OTHER OPERATIONS FOR THE
PERIOD OF JANUARY THROUGH DECEMBER 2016 COMPLIED IWTH
PROCUREMENT PLAN, ET AL.
RatesettingMartha
Guzman Aceves
Eric Wildgrube 10.1 10/03/18 ACTIVE
91 A1704005
PACBELL DBA AT&T CALIFORNIA - TO WITHDRAW FROM THE
CENTRALIZED CREDIT CHECK SYSTEM
Ratesetting Carla Peterman Robert Haga 10.1 10/03/18 ACTIVE
92 A1704006
CALIFORNIA WATER SERVICE CO. - FOR AUTHORITY TO ESTABLISH
ITS AUTHORIZED COST OF CAPITAL FOR THE PERIOD FROM JANUARY 2018 TO JANUARY 2020
RatesettingMartha
Guzman Aceves
Karl Bemesderfer 10.1 10/03/18 ACTIVE
![Page 71: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/71.jpg)
2017 Report207092767 Page 64
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
93 A1704008
LEGACY LONG DISTANCE INTERNATIONAL, INC. AND JAIL EDUCATION SOLUTIONS, INC. - FOR APPROVAL OF TRANSFER
OF CONTROL PURSUANT TO PUB. UTIL. CODE SECTION 854(a)
Ratesetting Carla Peterman
Robert Haga/ ALJ Pro Tem
Sasha Goldberg
10.0 10/05/18 ACTIVE
94 A1704010
PG&E - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED AND
RESOLD COMPETITIVE LOCAL EXCHANGE SERVICE
Ratesetting Liane Randolph
Jessica T. Hecht 10.0 10/06/18 ACTIVE
95 A1704012
PROPER SIGHTSEEING CORP. - FOR AUTHORITY TO OPERATE AS
A PSC WITH HOP ON/HOP OFF SERVICE ON FIXED ROUTES AND
TO ESTABLISH A ZORF
Ratesetting Clifford Rechtschaffen
Hallie Yacknin 9.9 10/07/18
ACTIVE NEED FOR HEARING
96 A1704017
SDG&E - FOR APPROVAL OF THE RESULTS FROM ITS 2016 TRACK
IV LOCAL CAPACITY REQUIREMENT PREFERRED
RESOURCES REQUESTS FOR OFFERS
Ratesetting Michael Picker Anne E. Simon 9.5 10/19/18 ACTIVE
97 A1704023
PACIFICORP - TO RECOVER COSTS RECORDED IN THE
CATASTROPHIC EVENT MEMORANDUM ACCOUNT
Ratesetting Carla Peterman
Melissa K. Semcer 9.2 10/28/18 ACTIVE
![Page 72: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/72.jpg)
2017 Report207092767 Page 65
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
98 A1704024
MESA-CREST WATER CO. AND LIBERTY UTILITIES (PARK WATER) CORP. - FOR AUTHORITY TO SELL AND TO PURCHASE THE UTILITY ASSETS OF MESA-CREST WATER
CO.
RatesettingMartha
Guzman Aceves
Gerald F. Kelly/ ALJ Pro Tem Sasha
Goldberg
9.4 10/24/18 ACTIVE
99 A1704025
CITY OF SARATOGA - FOR AN ORDER AUTHORIZING THE CONSTRUCTION OF AN AT-GRADE PEDESTRIAN, AND
BICYCLE CROSSING OVER THE TRACKS OF UNION PACIFIC
Ratesetting Liane Randolph Valerie Kao 9.5 10/20/18 ACTIVE
100 A1704027
SDG&E - FOR AUTHORITY TO IMPLEMENT THE CUSTOMER
INFORMATION SYSTEM REPLACEMENT PROGRAM
Ratesetting Carla Peterman
Rafael L. Lirag 9.2 10/28/18 ACTIVE
101 A1704028
PG&E - FOR APPROVAL OF ITS 2018-2020 ELECTRIC PROGRAM
INVESTMENT CHANGE INVESTMENT PLAN
RatesettingMartha
Guzman Aceves
Stephen C. Roscow 9.2 10/28/18 ACTIVE
102 A1704029*VELOCITY COMMUNICATIONS,
INC. - FOR REHEARING OF RES. T-17548.
N/A Not Assigned Legal Division 9.4 10/24/18 ACTIVE
![Page 73: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/73.jpg)
2017 Report207092767 Page 66
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
103 A1705003
CALIFORNIA ENERGY COMMISSION - FOR APPROVAL
OF ELECTRIC PROGRAM INVESTMENT CHARGE
PROPOSED 2018 THROUGH 2020 TRIENNIAL INVESTMENT PLAN
RatesettingMartha
Guzman Aceves
Stephen C. Roscow 9.1 10/31/18 ACTIVE SEE
A1704028
104 A1705004
GOLDEN STATE WATER COMPANY ON BEHALF OF ITS
BEAR VALLEY ELECTRIC SERVICE DIVISION - FOR APPROVAL AND
RECOVERY OF COSTS AND AUTHORITY TO INCREASE RATES
AND OTHER CHARGES FOR YEARS 2018 THROUGH 2021
Ratesetting Clifford Rechtschaffen
Adeniyi A. Ayoade 9.1 10/31/18
ACTIVE D1711008 HAS BEEN
ISSUED
105 A1705005
EDISON - FOR APPROVAL OF ITS 2018-2020 TRIENNIAL
INVESTMENT PLAN FOR THE ELECTRIC PROGRAM
INVESTMENT CHARGE
RatesettingMartha
Guzman Aceves
Stephen C. Roscow 9.1 10/31/18 ACTIVE SEE
A1704028
106 A1705007
SOCAL GAS CO. - FOR APPROVAL TO EXTEND THE MOBILEHOME
PARK UTILITY UPGRADE PROGRAM
Ratesetting Clifford Rechtschaffen
Melissa K. Semcer 9.0 11/04/18 ACTIVE
![Page 74: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/74.jpg)
2017 Report207092767 Page 67
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
107 A1705008SDG&E - FOR APPROVAL TO
EXTEND THE MOBILEHOME PARK UTILITY UPGRADE PROGRAM
Ratesetting Clifford Rechtschaffen
Melissa K. Semcer 9.0 11/04/18 ACTIVE
108 A1705009
SDG&E - FOR APPROVAL OF ELECTRIC PROGRAM
INVESTMENT CHARGE TRIENNIAL PLAN FOR YEARS 2018-2020
RatesettingMartha
Guzman Aceves
Stephen C. Roscow 9.1 10/31/18 ACTIVE SEE
A1704028
109 A1705013
NORTH AMERICAN NUMBERING PLAN ADMINISTRATOR, ON
BEHALF OF THE CALIFORNIA TELECOMMUNICATIONS
INDUSTRY - FOR RELIEF OF THE 510 NUMBERING PLAN AREA
Ratesetting Liane Randolph
Jessica T. Hecht 8.5 11/18/18 ACTIVE
110 A1705014
CALIFORNIA HIGH SPEED RAIL AUTHORITY - TO CONSTRUCT
PROPOSED HIGH-SPEED TRACKS AND RAIL-RAIL GRADE
SEPARATION AT THE EXISTING SPUR TRACKS OF BNSF RAILWAY
COMPANY
Ratesetting Liane Randolph
Melissa K. Semcer 8.6 11/17/18 ACTIVE
![Page 75: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/75.jpg)
2017 Report207092767 Page 68
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
111 A1705015 CITY COMMUNICATIONS, INC. - NDIEC REGISTRATION Ratesetting Carla
Peterman
Katherine MacDonald/ ALJ Pro Tem
Zita Kline
9.6 10/18/18 ACTIVE
112 A1705016
CITY COMMUNICATIONS, INC. - FOR A CPCN TO PROVIDE
RESOLD AND LIMITED FACILITIES-BASED LOCAL EXCHANGE
TECOMMUNICATIONS SERVICES
Ratesetting Carla Peterman
Katherine MacDonald/ ALJ Pro Tem
Zita Kline
8.6 11/17/18 ACTIVE
113 A1705019*MARK VAN HOOMISSEN -
APPLICATION FOR REHEARING OF RESOLUTION W-5135
N/A Not Assigned Legal Division 8.3 11/25/18 ACTIVE
114 A1705021
TOWN OF TRUCKEE - FOR AN ORDER AUTHORIZING THREE
NEW PUBLIC AT-GRADE CROSSINGS OF UNION PACIFIC
RAILRAOD COMPANY
Ratesetting Liane Randolph Robert Haga 8.5 11/18/18 ACTIVE
115 A1705022
CAL WATER SERVICE CO. - FOR A CPCN TO PROVIDE WATER
SERVICE TO TRAVIS AIR FORCE BASE AND TO ESTABLISH RATES
Ratesetting Carla Peterman Julie A. Fitch 8.1 11/30/18 ACTIVE
![Page 76: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/76.jpg)
2017 Report207092767 Page 69
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
116 A1706005
PG&E - FOR ADOPTION OF ELECTRIC REVENUE
REQUIREMENTS AND RATES ASSOCIATED WITH ITS 2018
ENERGY RESOURCE RECOVERY ACCOUNT AND GENERATION NON-BYPASSABLE CHARGES
FORECAST
RatesettingMartha
Guzman Aceves
S. Pat Tsen 8.1 12/01/18 ACTIVE
117 A1706006
SDG&E - FOR APPROVAL OF CONTRACT ADMINISTRATION, LEAST-COST DISPATCH AND
POWER PROCUREMENT ACTIVITIES IN 2016
RatesettingMartha
Guzman Aceves
Kelly A. Hymes 8.1 12/01/18 ACTIVE
118 A1706007
CRIMSON CALIFORNIA PIPELINE L.P. - FOR AUTHORITY TO INCREASE RATES FOR ITS
CRUDE OIL PIPELINE SERVICES
Ratesetting Clifford Rechtschaffen Patricia Miles 8.1 12/01/18 ACTIVE
119 A1706008
UNITI FIBER LLC - FOR CPCN TO PROVIDE FULL FACILITIES-BASED
AND RESOLD COMPETITIVE LOCAL EXCHANGE SERVICE AND
NON-DOMINANT INTEREXCHANGE SERVICE
Ratesetting Liane Randolph
Katherine MacDonald/ ALJ Pro Tem
Zita Kline
8.1 12/02/18 ACTIVE
![Page 77: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/77.jpg)
2017 Report207092767 Page 70
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
120 A1706013
SILICA NETWORKS - FOR A CPCN TO PROVIDE FULL FACILITIES-
BASED AND RESOLD COMPETITIOVE LOCAL
EXCHANGE SERVICE AND INTEREXCHANGE SERVICE
Ratesetting Michael Picker Hallie Yacknin 7.7 12/14/18
ACTIVE NO NEED FOR HEARING
121 A1706016
SOCAL GAS CO. - APPLICATION REGARDING YEAR 23 (2016-2017)
OF ITS GAS COST INCENTIVE MECHANISM
Ratesetting Carla Peterman
W. Anthony Colbert/ Timothy Kenney
7.6 12/15/18 ACTIVE
122 A1706017*
CALAVERAS TELEPHONE CO., CAL-ORE TELEPHONE CO., AND
DUCOR TELEPHONE CO. - APPLICATION FOR REHEARING
OF RESOLUTION T-17559
N/A Not Assigned Legal Division 7.7 12/14/18
ACTIVE D1709016 HAS BEEN
ISSUED
123 A1706020
NORTH AMERICAN NUMBERING PLAN ADMINISTRATOR - FOR
RELIEF OF THE 909 NUMBERING PLAN AREA
Ratesetting Liane Randolph
Adeniyi A. Ayoade 7.4 12/23/18 ACTIVE
124 A1706029
SDG&E - FOR A PERMIT TO CONSTRUCT THE TL674A
RECONFIGURATION AND TL666D ROMOVAL PROJECT
Ratesetting Clifford Rechtschaffen
Gerald F. Kelly Sasha
Goldberg 7.2 12/28/18 ACTIVE
![Page 78: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/78.jpg)
2017 Report207092767 Page 71
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
125 A1706030EDISON - TO ESTABLISH
MARGINAL COSTS, ALLOCATE REVENUES, AND DESIGN RATES
Ratesetting Carla Peterman
Michelle Cooke 7.1 12/30/18 ACTIVE
126 A1706031PACIFICORP - FOR APPROVAL OF
ITS 2017 TRANSPORTATION ELECTRIFICATION PROGRAMS
Ratesetting Carla Peterman
Sasha Goldberg Michelle Cooke
7.1 12/30/18ACTIVE NO NEED FOR HEARING
127 A1706033
LIBERTY UTILITIES (CALPECO ELECTRIC) LLC - FOR APPROVAL OF ITS 2017 TRANSPORTATION ELECTRIFICATION PROPOSALS
Ratesetting Carla Peterman
Sasha Goldberg Michelle Cooke
7.1 12/30/18
ACTIVE SEE A1706031 NO NEED
FOR HEARING
128 A1706034
GOLDEN STATE WATER CO. ON BEHALF OF ITS BEAR VALLEY ELECTRIC SERVICE DIVISION - FOR APPROVAL OF ITS 2017
TRANSPORTATION ELECTRIFICATION PROPOSALS
Ratesetting Carla Peterman
Sasha Goldberg Michelle Cooke
7.1 12/30/18
ACTIVE SEE A1706031 NO NEED
FOR HEARING
![Page 79: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/79.jpg)
2017 Report207092767 Page 72
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
129 A1707001
LIBERTY UTILITIES (CALPECO ELECTRICAL) LLC - FOR
AUTHORITY TO UPDATE RATES PURSUANT TO ITS ENERGY COST
ADJUSTMENT CLAUSE EFFECTIVE JANUARY 1, 2018
RatesettingMartha
Guzman Aceves
Robert Haga 7.0 01/02/19 ACTIVE
130 A1707004
SYNERGEM TECHNOLOGIES, INC. - FOR A CPCN TO PROVIDE
RESOLD AND LIMITED FACILITIES-BASED COMPETITIVE LOCAL
EXCHANGE AND 911 CALL TRANSPORT
TELECOMMUNICATIONS
Ratesetting Clifford Rechtschaffen Patricia Miles 7.1 12/30/18
ACTIVE NO NEED FOR HEARING
131 A1707008
SQF, LLC - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED
LOCAL EXCHANGE AND INTEREXCHANGE
TELECOMMUNICATIONS SERVICES
Ratesetting Liane Randolph
Nilgun Atamturk 6.7 01/12/19
ACTIVE NO NEED FOR HEARING
132 A1707009
PENINSULA CORRIDOR JOINT POWERS BOARD - FOR AN
ORDER AUTHORIZING CONSTRUCTION OF A NEW
GRADE SEPARATED PEDESTRIAN UNDERPASS IN THE CITY OF
SOUTH SAN FRANCISCO
Ratesetting Liane Randolph
Gerald F. Kelly 6.7 01/11/19
ACTIVE NO NEED FOR HEARING
![Page 80: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/80.jpg)
2017 Report207092767 Page 73
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
133 A1707010
GOLDEN STATE WATER CO. - FOR AN ORDER AUTHORIZING IT
TO INCREASE RATES FOR WATER SERVICE IN YEARS 2019 -
2021
RatesettingMartha
Guzman Aceves
Gerald F. Kelly 6.5 01/18/19 ACTIVE
134 A1707011
PG&E - FOR AUTHORITY TO ESTABLISH THE WILDFIRE EXPENSE MEMORANDUM
ACCOUNT
Ratesetting Liane Randolph
Colette Kersten 6.3 01/25/19 ACTIVE
135 A1708010
ROI NETWORKS, LLC - TO OBTAIN A CPCN AS A TELEPHONE
CORPORATION TO OPERATE AS A PROVIDER TO LIMITED
FACILITIES-BASED AND RESOLD LOCAL EXCHANGE SERVICE
Ratesetting Clifford Rechtschaffen Patricia Miles 5.5 02/17/19 ACTIVE
136 A1708012* APPLICATION FOR REHEARING OF RESOLUTION TL-19125. N/A Not Assigned Legal
Division 5.6 02/13/19 ACTIVE
137 A1708016
PACIFICORP - FOR AN EXPEDITED ORDER
AUTHORIZING SPECIAL CHARGES AND TARIFFS FOR SMART METER
OPT-OUT AND PRIVACY/DATA RELEASE PROGRAMS
Ratesetting Liane Randolph
Karl Bemesderfer 5.8 02/09/19 ACTIVE
![Page 81: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/81.jpg)
2017 Report207092767 Page 74
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
138 A1708017
SDG&E - FOR AUTHORITY TO ISSUE DEBT SECURITIES IN AN
AGGREGATE PRINCIPAL AMOUNT UP TO $750 OF DEBT CAPITAL,
ISSUE ROLL-OVER DEBT SECURITIES AND RELATED
ACTIONS
Ratesetting Michael Picker Rafael L. Lirag 5.7 02/10/19
ACTIVE NO NEED FOR HEARING
139 A1708018
CAL-AM WATER CO. - TO ISSUE, SELL AND DELIVER DEBT
SECURITIES CONSISTING OF LONG TERM NOTES AND OTHER
RELATED REQUESTS
RatesettingMartha
Guzman Aceves
Robert Haga 5.7 02/10/19 ACTIVE
140 A1708019
CALIFORNIA HIGH-SPEED RAIL AUTHORITY - TO CONSTRUCT
PROPOSED HIGH-SPEED TRACKS AND UNDERPASS GRADE
SEPARATION WITHIN THE CITY OF FRESNO
Ratesetting Carla Peterman Zita Kline 5.3 02/22/19
ACTIVE NO NEED FOR HEARING
141 A1708021
PLANT HOLDINGS, INC. AIRBUS DS COMMUNICATIONS, INC., AND
MOTOROLA SOLUTIONS, INC. - FOR APPROVAL OF THE
TRANSFER OF CONTROL OF PLANT HOLDINGS, INC.
RatesettingMartha
Guzman Aceves
Sasha Goldberg/ Rafael L.
Lirag
5.3 02/22/19ACTIVE NO NEED FOR HEARING
![Page 82: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/82.jpg)
2017 Report207092767 Page 75
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
142 A1708022
CITY OF VICTORVILLE - TO CONSTRUCT AN OVERHEAD
GRADE-SEPARATION STRUCTURE FOR GREEN TREE
BLVD. IN THE CITY OF VICTORVILLE
Ratesetting Liane Randolph Zita Kline 5.1 03/02/19
ACTIVE NO NEED FOR HEARING
143 A1708023
BROADWING COMMUNICATIONS, LLC - FOR A CPCN TO PROVIDE LIMITED FACILITIES-BASED AND RESOLD COMPETITIVE LOCAL
EXCHANGE SERVICE
Ratesetting Carla Peterman Robert Haga 5.1 03/02/19 ACTIVE
144 A1708024
METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION AUTHORITY - TO CONSTRUCT TWO LIGHT RAIL TRACKS AT SEVEN GRADE-SEPARATED
CROSSINGS IN THE CITIES OF GLENDORA, SAN DIMAS, LA
VERNE AND MONTCLAIR
Ratesetting Michael Picker Robert Mason 5.3 02/22/19 ACTIVE
145 A1708025
METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION
AUTHORITY - TO CONSTRUCT 8 AT-GRADE AND 4 GRADE-SEPARATED PEDESTRIAN
CROSSINGS IN GLENDORA, SAN DIMAS, LA VERNE, POMONA,
CLAREMONT, AND MONTCLAIR
Ratesetting Michael Picker Robert Mason 5.3 02/22/19 ACTIVE
![Page 83: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/83.jpg)
2017 Report207092767 Page 76
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
146 A1709005
SDG&E - FOR AUTHORITY TO IMPLEMENT RATE RELIEF AND INCREASE SPEND IN SUPPORT
OF THE SAN DIEGO UNIFIED PORT DISTRICT'S ENERGY
MANAGEMENT PLAN
Ratesetting Michael Picker Regina DeAngelis 4.6 03/15/19 ACTIVE
147 A1709006PG&E - TO REVISE ITS GAS RATES AND TARIFFS TO BE
EFFECTIVE OCTOBER 1, 2018Ratesetting Clifford
Rechtschaffen
Stephen C. Roscow
Adeniyi A. Ayoade
4.6 03/16/19 ACTIVE
148 A1709007
BANDWIDTH .com CLEC, LLC - TO TRANSFER CONTROL TO DAVID A. MORKEN PURSUANT TO PU
CODE SECTION 854(a)
Ratesetting Liane Randolph Zita Kline 4.6 03/15/19 ACTIVE
149 A1709010
PACIFICORP - TO CONTINUE ITS ENERGY EFFICIENCY PROGRAMS AND THE SURCHARGE TO FUND PUBLIC PURPOSE PROGRAMS
Ratesetting Carla Peterman
Valerie Kao Julie A. Fitch 4.6 03/17/19 ACTIVE
150 A1709013
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONSTRUCT
A MULTI-USE BICYCLE/PEDESTRIAN PATHWAY AT TWO LOCATIONS BELOW AN
ELEVATED MTS RAIL STRUCTURE WITHIN THE CITY OF SAN DIEGO
Ratesetting Liane Randolph Kimberly Kim 4.4 03/22/19 ACTIVE
![Page 84: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/84.jpg)
2017 Report207092767 Page 77
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
151 A1709015
TRITON NETWORKS, LLC - FOR A CPCN TO PROVIDE LIMITED
FACILITIES-BASED AND RESOLD LOCAL EXCHANGE SERVICES
Ratesetting Clifford Rechtschaffen Zita Kline 4.5 03/20/19 ACTIVE
152 A1709017
CALIFORNIA HIGH-SPEED RAIL AUTHORITY - FOR APPROVAL TO CONSTRUCT TWO NEW GRADE SEPARATED CROSSINGS OVER THE PROPOSED HIGH-SPEED
RAIL TRACKS
Ratesetting Michael Picker Zita Kline 4.3 03/24/19 ACTIVE
153 A1709018
EDISON - FOR AN ORDER AUTHORIZING THE SALE AND CONVEYANCE OF CERTAIN
ELECTRIC STREETLIGHT FACILITIES
Ratesetting Michael Picker Patricia Miles 4.2 03/27/19 ACTIVE
154 A1709019
EDISON - FOR AN ORDER AUTHORIZING THE SALE AND CONVEYANCE OF CERTAIN
ELECTRIC STREETLIGHT FACILITIES
Ratesetting Michael Picker Patricia Miles 4.2 03/27/19 ACTIVE
155 A1710002
SOCAL GAS AND SDG&E - FOR FEASIBILITY OF INCORPORATING
ADVANCED METER DATA INTO THE CORE BALANING PROCESS
Ratesetting Michael Picker Julie A. Fitch 4.0 04/03/19 ACTIVE
![Page 85: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/85.jpg)
2017 Report207092767 Page 78
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
156 A1710003
DUCOR TELEPHONE CO. - TO REVISE INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN, AND MODIFY SELECTED
RATES
Ratesetting Liane Randolph Patricia Miles 4.0 04/03/19 ACTIVE
157 A1710004
FORESHILL TELEPHONE CO. - TO REVEW INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENEW
REQUIREMENT AND RATE DESIGN, AND MODIFY SELECTED
RATES
Ratesetting Liane Randolph Patricia Miles 4.0 04/03/19 ACTIVE
158 A1710007
SDG&E - FOR AUTHORITY TO UPDATE ITS ELECTRIC AND GAS REVENUE REQUIREMENT AND
BASE RATES EFFECTIVE JANUARY 1, 2019
Ratesetting Liane Randolph
Rafael L. Lirag 3.9 04/07/19 ACTIVE
159 A1710008
SOCAL GAS - FOR AUTHORITY TO UPDATE ITS GAS REVENUE
REQUIREMENT AND BASE RATES EFFECTIVE ON JANUARY 1, 2019
Ratesetting Liane Randolph
Rafael L. Lirag 3.9 04/07/19 ACTIVE
160 A1710009
UNION PACIFIC RAILROAD CO. - TO ALTER, RELOCATE, OR CLOSE
THE COUNTY ROAD 32A RAILROAD GRADE CROSSING IN
YOLO COUNTY
Ratesetting Liane Randolph
Sasha Goldberg Zita Kline
3.9 04/06/19 ACTIVE
![Page 86: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/86.jpg)
2017 Report207092767 Page 79
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
161 A1710015
MECCA TOURS, LLC, - FOR A CPCN TO TRANSPORT
PASSENGERS AND BAGGAGE EXPRESS, ON AN ON-CALL, CITY-
TO-CITY BASIS AND TO ESTABLISH A ZORF
Ratesetting Liane Randolph Valerie Kao 3.5 04/17/19 ACTIVE
162 A1710016
CAL-AM WATER CO. AND COOK ENDEAVORS DBA FRUITRIDGE
VISTA WTR. CO. - FOR AN ORDER AUTHORIZING THE SALE AND PURCHASE OF THE WATER UTILITY ASSETS OF COOK
ENDEAVORS
Ratesetting Carla Peterman Patricia Miles 3.3 04/24/19 ACTIVE
163 A1710018
LIBERTY UTILITIES (CALPECO ELECTRIC) LLC. - FOR
AUTHORITY TO RECOVER COSTS RECORDED IN ITS
CATASTROPHIC EVEN MEMORANDUM ACCOUNT
RatesettingMartha
Guzman Aceves
Melissa K. Semcer 3.2 04/26/19 ACTIVE
164 A1710019
SAN PABLO BAY PIPELINE CO., LLC (PLC-29) - FOR AUTHORITY PURSUANT TO PUB. UTIL. CODE SECTION 455.3 TO INCREASE ITS
RATES FOR PIPELINE TRANSPORTATION SERVICES
Ratesetting Michael Picker Karl Bemesderfer 3.0 05/02/19 ACTIVE
![Page 87: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/87.jpg)
2017 Report207092767 Page 80
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
165 A1711001
CITY OF MODESTO - TO CONSTRUCT ONE NEW GRADE SEPARATED CROSSING BELOW
ONE ELEVATED RAIL LINE OPERATED BY THE UNION
PACIFIC CO.
Ratesetting Liane Randolph Patricia Miles 2.9 05/05/19 ACTIVE
166 A1711004
GHOLAMREZA ASKARI, DBA R TRANSPORTATION - FOR
AUTHORITY TO OPERATE AS A PSC ON-CALL, DOOR-TO-DOOR SERVICE IN THE COUNTIES OF
SAN DIEGO, LOS ANGELES, ORANGE, AND RIVERSIDE, AND
TO ESTABLISH A ZORF
Ratesetting Not Assigned Nick Zanjani 2.9 05/05/19 ACTIVE
167 A1711005
SDG&E AND CITIZENS ENERGY CORP. - FOR AUTHORITY TO
LEASE TRANSFER CAPABILITY RIGHTS TO CITIZENS SYCAMORE-
PENASQUITOS TRANSMISSION LLC PURSUANT TO PU CODE
SECTION 851
Ratesetting Michael Picker Kelly A. Hymes 2.6 05/15/19 ACTIVE
168 A1711006
TITAN NETWORKS LLC AND MODUS NETWORKS, LLC - FOR
APPROVAL OF INDIRECT CONTROL OF MODUS
NETWORKS, LLC PURSUANT TO PU CODE SECTION 854
Ratesetting Carla Peterman Patricia Miles 2.7 05/11/19 ACTIVE
![Page 88: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/88.jpg)
2017 Report207092767 Page 81
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
169 A1711007 JIVE COMMUNICATIIONS, INC. - NDIEC REGISTRATION Ratesetting Not Assigned Cynthia
Walker 2.6 05/15/19 ACTIVE
170 A1711008
SONIC SYSTEMS, INC., DBA SONIC COMMUNICATIONS - FOR
A CPCN TO PROVIDE RESOLD AND LIMITED FACILITIES BASED
COMPETITIVE LOCAL EXCHANGE AND INTEREXCHANGE SERVICE
Ratesetting Liane Randolph
Dan Burcham 2.6 05/15/19 ACTIVE
171 A1711009
PG&E - APPLICATION PROPOSING COST OF SERVICE AND RATES FOR GAS TRANSMISSION AND STORAGE SERVICE FOR THE
PERIOD 2019-2021
Ratesetting Clifford Rechtschaffen
Stephen C. Roscow 2.5 05/19/19 ACTIVE
172 A1711010
SDG&E - FOR A PERMIT TO CONSTRUCT THE TIE LINE 6975 SAN MARCOS TO ESCONDIDO
PROJECT
Ratesetting Carla Peterman
Michelle Cooke 2.5 05/17/19 ACTIVE
173 A1711011
OPENFIBER - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED
AND RESOLD COMPETITIVE LOCAL EXCHANGE SERVICE AND
TO PROVIDE FULL FACILITIES-BASED AND RESOLD
NONDOMINANT INTEREXCHANGE SERVICES
RatesettingMartha
Guzman Aceves
Patricia Miles 2.5 05/19/19 ACTIVE
![Page 89: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/89.jpg)
2017 Report207092767 Page 82
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
174 A1711013
CALIFORNIA HIGH SPEED RAIL AUTHORITY - TO CONSTRUCT
PROPOSED HIGH-SPEED TRACKS AND UNDER PASS GRADE
SEPARATIONS AT GARCES ROAD, POND ROAD, AND PETERSON
ROAD IN KERN COUNTY
Ratesetting Michael Picker Dan Burcham 2.3 05/24/19 ACTIVE
175 A1711014
LIBERTY UTILITIES (CALPECO ELECTRIC) LLC - FOR APPROVAL
TO CONSTRUCT A BATTERY ENERGY STORAGE SYSTEM IN
ALPINE COUNTY
RatesettingMartha
Guzman Aceves
Adeniyi A. Ayoade 2.3 05/23/19 ACTIVE
176 A1711015
EDUCATION NETWORK OF AMERICA AND TQCI HOLDCO II, LLC - FOR APPROVAL FOR THE
ACQUISITION OF CONTROL PURSUANT TO PUB. UTIL CODE
SECTION 851 AND 854
Ratesetting Carla Peterman
Karl Bemesderfer 2.3 05/24/19 ACTIVE
177 A1711016
TURN - APPLICATION FOR AN AWARD OF INTERVENOR
COMPENSATION FOR SUSTANTIAL CONTRIBUTIONS TO
RES E-4878
Ratesetting Liane Randolph
Melissa K. Semcer 2.1 05/29/19 ACTIVE
![Page 90: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/90.jpg)
2017 Report207092767 Page 83
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
178 A1711017
LA COUNTY METROPOLITAN TRANS. AUTHORITY - FOR AN
ORDER AUTHORIZING THE CONSTRUCTION OF A FOUR-
TRACK AT-GRADE PEDESTRIAN CROSSING FROM WILLOWBROOK AVE. EAST TO THE METRO BLUE
LINE PLATFORM ET. AL.
Ratesetting Liane Randolph
W. Anthony Colbert 2.1 05/31/19 ACTIVE
179 A1712001 ORIGIN NETWORKS, LLC - NDIEC REGISTRATION Ratesetting Clifford
Rechtschaffen Robert Haga 2.7 05/11/19 ACTIVE
180 A1712002
EDISON - FOR APPROVAL OF THE RESULTS OF ITS 2016 ENERGY STORAGE AND DISTRIBUTION
DEFERRAL REQUEST FOR OFFERS
Ratesetting Carla Peterman
Michelle Cooke 2.0 06/02/19 ACTIVE
181 A1712003
PG&E - FOR APPROVAL OF AGREEMENTS RESULTING FROM ITS 2016-2017 ENERGY STORAGE
SOLICITATION AND RELATED COST RECOVERY
Ratesetting Carla Peterman
Michelle Cooke 2.0 06/02/19 ACTIVE
![Page 91: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/91.jpg)
2017 Report207092767 Page 84
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
182 A1712004
PINNACLES TELEPHONE CO. - TO REVIEW INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN, AND MODIFY SELECTED
RATES
RatesettingMartha
Guzman Aceves
Robert Haga 2.0 06/02/19 ACTIVE
183 A1712006
CALIFORNIA-AMERICAN WTR. CO., RIO PLAZA WTR. CO., INC. ET
AL. - FOR AN ORDER AUTHORIZING THE SALE OF ALL
SHARES OF RIO PLAZA WTR. CO., INC AND RELATED MATTERS
Ratesetting Liane Randolph Sophia Park 2.0 06/02/19 ACTIVE
184 A1712007
GALAXENET LLC - FOR A CPCN TO PROVIDE RESOLD AND LIMITED FACILITIES BASED
COMPETITIVE LOCAL EXCHANGE AND INTEREXCHANGE SERVICE
Ratesetting Liane Randolph
Gerald F. Kelly 1.9 06/06/19 ACTIVE
185 A1712008
EDISON - TO ISSUE, SELL, AND DELIVER ONE OR MORE SERIES
OF DEBT SECURITIES AND GUARANTEE THE OBLIGATION OF
OTHERS IN RESPECT OF THE ISSUANCE OF DEBT SECURITIES
ET AL.
Ratesetting Carla Peterman
Karl Bemesderfer 1.8 06/07/19 ACTIVE
![Page 92: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/92.jpg)
2017 Report207092767 Page 85
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
186 A1712009
HICHAM LALEJ DBA CITYLOOP AND LIMO - FOR AUTHORITY TO
OPERATE AS A PASSENGER STAGE CORPORATION AND TO
GRANT A ZORF
Ratesetting Not Assigned Nick Zanjani 2.3 05/23/19 ACTIVE
187 A1712010
PG&E - FOR A PERMIT TO CONSTRUCT THE RAVENSWOOD-
COOLEY LANDING 115 KV RECONDUCTORING PROJECT
Ratesetting Liane Randolph
Robert W. Haga 1.5 06/16/19 ACTIVE
188 A1712011
PG&E - FOR APPROVAL OF ITS RESIDENTIAL RATE DESIGN
WINDOW PROPOSALS, RESIDENTIAL DEFAULT TIME-OF-
USE RATE ET AL
Ratesetting Michael Picker S. Pat Tsen/ Sophia Park 1.4 06/21/19 ACTIVE
189 A1712012
EDISON - FOR AUTHORITY TO IMPLEMENT RESIDENTIAL
DEFAULT TIME-OF-USE RATES AND INCREASE FIXED CHARGES
Ratesetting Michael Picker S. Pat Tsen/ Sophia Park 1.3 06/22/19 ACTIVE
190 A1712013
SDG&E - FOR AUTHORITY TO UPDATE ELECTRIC RATE DESIGN
REGARDING RESIDENTIAL DEFAULT TIME-OF-USE RATES
AND FIXED CHARGES
Ratesetting Michael Picker S. Pat Tsen/ Sophia Park 1.4 06/21/19 ACTIVE
![Page 93: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/93.jpg)
2017 Report207092767 Page 86
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
191 A1712016
MAGIC.JACK VOCALTEC LTD,, B. RILEY FINANCIAL, INC. AND YMAX COMMUNICATIONS CORP. - FOR
AUTHORITY TO TRANSFER CONTROL OF YMAX
COMMUNICATIONS, CORP
Ratesetting Carla Peterman
Katherine MacDonald 1.6 06/14/19 ACTIVE
192 A1712017
HIDALGO TRANSPORTATION, LLC, - FOR PASSENGER STAGE
AUTHORITY TO TRANSPORT PASSENGERS AND BAGGAGE
EXPRESS, ON AN ON-CALL, COUNTY-TO-COUNTY FARE BASIS
AND TO ESTABLISH A ZORF
Ratesetting Not Assigned Nick Zanjani 1.5 06/16/19 ACTIVE
193 A1712018
CATALINA CLIPPER, LLC - FOR AUTHORITY TO OPERATE AS A SCHEDULED VESSEL COMMON CARRIER BETWEEN NEWPORT BEACH AND AVALON AND TO
ESTABLISH A ZORF
Ratesetting Clifford Rechtschaffen
W. Anthony Colbert 1.5 06/16/19 ACTIVE
194 A1712019
PACIFICORP - FOR APPROVAL OF A TAX REFORM MEMORANDUM ACCOUNT EFFECTIVE JANUARY
1, 2018
Ratesetting Carla Peterman
Katherine MacDonald 1.1 06/29/19 ACTIVE
![Page 94: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/94.jpg)
2017 Report207092767 Page 87
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
195 A1712020
AMERICAN DARK FIBER, LLC - FOR A CPCN TO PROVIDE
RESOLD AND LIMITED FACILITIES-BASED LOCAL EXCHANGE TELECOMMUNICATIONS
SERVICES
Ratesetting TO BE ASSIGNED
TO BE ASSIGNED 1.1 06/30/19 ACTIVE
196 A1712021
PG&E - FOR A CPCN AUTHORIZING THE
CONSTRUCTION OF THE EGBERT SWITCHING STATION PROJECT
Ratesetting TO BE ASSIGNED
TO BE ASSIGNED 1.1 06/29/19 ACTIVE
197 C1010010
HETHERINGTONS VS PG&E - DISPUTE ON RELOCATION OF
SMART METER AND REFUND OF RELATED OVERCHARGES
AdjudicatoryMartha
Guzman Aceves
Stephen C. Roscow/
Legal Division
88.9 04/13/18
EXTENSION GRANTED
BY D1710006 ET
AL.
ACTIVE - SEVERAL
DECISIONS HAVE BEEN
ISSUED
198 C1604009BB'S DELI, LLC VS. SDG&E - FOR
AN ORDER THAT DEFENDANT VIOLATED TARIFF RULE 12
AdjudicatoryMartha
Guzman Aceves
Patricia Miles 21.9 04/12/18
EXTENSION GRANTED
BY D1710005 ET
AL.
ACTIVE
199 C1610009MEIJER VS. SPRINT TELEPHONY
PCS, LP - FOR A REFUND ORDERED BY D10-04-016
Adjudicatory Liane Randolph
Dan Burcham 15.6 04/18/18
EXTENSION GRANTED
BY D1710007
ACTIVE
![Page 95: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/95.jpg)
2017 Report207092767 Page 88
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
200 C1610021
GILDRED BUILDING CO. DBA THED GILDRED COMPANIES AND
OCOTILLO SOLAR LLC VS. EDISON
Adjudicatory Liane Randolph
Regina Deangelis 15.5 04/21/18
EXTENSION GRANTED
BY D1710008
ACTIVE
201 C1611001
CITY OF HAYWARD VS. PG&E - FOR RELIEF FOR FAILURE TO
ALLOCATE RELOCATION CREDITS PER PG&E TARIFF RULE 20A
Adjudicatory Liane Randolph
Dan Burcham/
Karl Bemesderfer
15.1 05/04/18
EXTENSION GRANTED
BY D1710020
ACTIVE
202 C1612004
DEJONG BROTHERS FARMING, ROBERT WINTERS, TRUSTEE OF
THE WINTERS REVOCABLE TRUST, ET AL VS PG&E - FOR AN
ORDER THAT PG&E BE ENJOINED/RESTRAINED FROM
REMOVING ALMOND TREES BENEATH TRANSMISSION LINES
Adjudicatory Carla Peterman
Karl J. Bemesderfer 13.6 06/19/18
EXTENSION GRANTED
BY D1712026
ACTIVE
203 C1612012
PARKS, SALISBURY, SHERILL, ET AL. VS. MESA DUNES MOBILE HOME ESTATES, LLC - FOR
RELIEF PURSUANT TO PUB. UTIL. CODE SECTION 2705.6 TO
DETERMINE WHETHER THE RATES CHARGED ARE JUST AND
REASONABLE
Adjudicatory Liane Randolph
Dan Burcham 13.6 06/19/18
EXTENSION GRANTED
BY D1711035
ACTIVE
![Page 96: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/96.jpg)
2017 Report207092767 Page 89
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
204 C1612018
NOMAD VILLAGE MOBILE HOME PARK HOMEOWNERS VS. LAZY LANDING MOBILE HOME PARK AND WATERHOUSE MGMNT CORP - FOR RELIEF FROM
VIOLATIONS OF SUB-METERING RULES AND PUC §739.5
AdjudicatoryMartha
Guzman Aceves
Robert Mason 13.7 06/16/18
EXTENSION GRANTED
BY D1712025
ACTIVE
205 C1706009
RITA BENTON, JAGI SHAHANI, BOBBIE MORRISON ET AL VS. SAN JOSE WATER COMPANY - FOR OVERCHARGES ON THE
SERVICE CHARGE RATES AND RELATED CLAIMS
Adjudicatory Carla Peterman
Karl Bemesderfer 7.9 06/07/18 ACTIVE
206 C1708002
FIGERAS FKA TAMMY GIBSON VS. PG&E - FOR IMMEDIATE RELIEF IN HAVING POWER RESTORED, FOR
REIMBURSEMENT OF ALL KWH GENERATED BY COMPLAINANTS'
SOLAR SYSTEM, AND FOR REFUND OF OVERBILLING
Adjudicatory Clifford Rechtschaffen Patricia Miles 6.0 08/02/18 ACTIVE
![Page 97: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/97.jpg)
2017 Report207092767 Page 90
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
207 C1708003
PACBELL DBA AT&T VS. TRUCONNECT
COMMUNICATIONS, INC. FKA TELSCAPE COMMUNICATIONS
INC., AND BLUE CASA TELEPHONE, LLC - DISPUTE
OVER UNPAID CHARGES FOR UNEs AND RESALE SERVICES,
AND RELATED RELIEF
Adjudicatory Clifford Rechtschaffen Robert Haga 6.0 08/03/18 ACTIVE
208 C1708006
CITY OF ROLLING HILLS VS. CALIFORNIA WATER SERVICE CO. - DISPUTE ON BASE ALLOCATION
FOR PARCELS OF RESIDENTS FOLLOWING DECEMBER 31, 2012
AND RELATED RELIEF
Ratesetting Liane Randolph
Gerald F. Kelly 5.8 08/09/18 ACTIVE
209 C1708007
RADIANT BMT, LLC, VS. SOUTHERN CALIFORNIA EDISON
COMPANY - FOR A DETERMINATION THAT
COMPLAINANT'S PROJECTS 1, 2, 3 AND 4 ARE ELIGIBLE FOR THE
AS-AVAILABLE NON-PEAKING PRODUCT TYPE
Adjudicatory Carla Peterman
Regina DeAngelis 5.8 08/08/18
ACTIVE NO NEED FOR HEARING
![Page 98: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/98.jpg)
2017 Report207092767 Page 91
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
210 C1708008
RODNEY AND ALICE WILSON FAMILY REVOCABLE TRUST OF
1999, MICHAEL WILSON, TRUSTEE VS. PACBELL DBA AT&T - FOR
RELIEF FROM IMPROPER PLACEMENT OF FACILITIES
OUTSIDE OF UTILITY EASEMENT
Adjudicatory Clifford Rechtschaffen Zita Kline 5.6 08/14/18 ACTIVE
211 C1708011
ATHANASIOUS VS. PG&E - FOR RELIEF FROM REFUSAL AND FAILURE TO INSTAL A NEW ELECTRIC METER AT THE
PERMITTED LOCATION
Adjudicatory Carla Peterman
Rafael L. Lirag 5.5 08/18/18 ACTIVE
212 C1708015
MANNAR INVESTMENT COMPANY, LP, VS. PG&E - FOR RELIEF FROM
FAILURE TO PROVIDE SERVICE UNDER ITS TARIFF RULE 16(f)
Adjudicatory Carla Peterman Zita Kline 5.3 08/25/18 ACTIVE
213 C1708020
GRANITE TELECOMMUNICATIONS, LLC - VS
PACBELL DBA AT&T - FOR AN ORDER THAT DEFENDANT'S
PRACTICES THREATEN COMPETITION AND THAT THE
CURRENT RATES ARE DISCRIMINATORY, UNJUST AND
UNREASONABLE.
Adjudicatory Clifford Rechtschaffen
Regina DeAngelis 6.1 08/01/18 ACTIVE
![Page 99: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/99.jpg)
2017 Report207092767 Page 92
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
214 C1709001
MARTINEZ MASONIC TEMPLE ASSOC. VS. PG&E - FOR AN
ORDER TO MOVE THE POWER LINES TO A SAFE DISTANCE FROM 700 MASONIC STREET
WITH NO COST TO COMPLAINANT TO ALLOW MAINTENANCE OF
BUILDING
AdjudicatoryMartha
Guzman Aceves
Zita Kline 5.0 09/01/18 ACTIVE
215 C1709023
PAC BELL DBA AT&T CALIFORNIA VS. VAYA TELECOM, INC. - TO
ENFORCE DECISION 14-01-006 AN RELATED RELIEF
Adjudicatory Liane Randolph Zita Kline 4.1 09/29/18 ACTIVE
216 C1710013
COUNTY OF ORANGE VS EDISON - FOR A REFUND BECAUSE THE STANDBY DEMAND WAS TOO HIGH AND RELATED RELIEF
Adjudicatory Clifford Rechtschaffen
Melissa K. Semcer 3.6 10/13/18 ACTIVE
217 C1710017
GO PRINTING, INC., DBA EXPRESS LAUNDRY CENTER VS.
PG&E - FOR RELIEF FROM VIOLATION OF TARIFF SCHEDULE
G-PPPS
Adjudicatory Carla Peterman
Rafael L. Lirag 3.2 10/26/18 ACTIVE
![Page 100: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/100.jpg)
2017 Report207092767 Page 93
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
218 C1711002
CALIFORNIA CABLE & TELECOMMUNICATIONS ASSOC. VS SDG&E - FOR RELIEF FROM
THE IMPOSITION OF UNREASONALBE CHARGES FOR THE USE OF ITS UTILITY POLES
Adjudicatory Clifford Rechtschaffen
Hallie Yacknin 2.8 11/06/18 ACTIVE
219 C1712014
O1 COMMUNICATIONS, INC. VS MCI COMMUNICATIONS
SERVICES, INC AND VERIZON SELECT SERVICES, INC - FOR AN
ORDER THAT VERIZON PAY TO O1 FOR SERVICES RENDERED
AND RELATED RELIEF
AdjudicatoryMartha
Guzman Aceves
Adeniyi A. Ayoade 1.8 12/08/18 ACTIVE
220 I1506018
CPUC - OIR INTO THE OPERATION AND PRACTICES OF MESA-CREST WATER CO. WITH RESPECT TO A
SERIES OF FINANCIAL TRANSACTIONS AND POSSIBLE THREATS TO THE HEALTH AND SAFETY OF ITS RATEPAYERS
Adjudicatory Clifford Rechtschaffen
W. Anthony Colbert 31.7 09/01/18
EXTENSION GRANTED
BY D1708014
ET AL.
ACTIVE D1701011 HAS BEEN
ISSUED
221 I1508019
CPUC - OII TO DETERMINE WHETHER PACIFIC GAS AND
ELECTRIC COMPANY AND PG&E CORPORATION’S
ORGANIZATIONAL CULTURE AND GOVERNANCE PRIORITIZE
SAFETY.
Ratesetting Michael Picker Regina DeAngelis 29.6 05/08/19 ACTIVE
![Page 101: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/101.jpg)
2017 Report207092767 Page 94
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
222 I1511015
CPUC - OII AND ORDERING PG&E TO APPEAR AND SHOW CAUSE
WHY IT SHOULD NOT BE SANCTIONED FOR VIOLATIONS
OF ARTICLE 8 AND RULE 1.1 AND PUB. UTIL. CODE SECTIONS
1701.2 AND 1701.3
Adjudicatory Michael Picker Robert Mason 26.8 06/29/18
EXTENSION GRANTED
BY D1711034
ET AL.
ACTIVE
223 I1606010
CPUC - OII INTO THE FATAL ACCIDENT ON THE LINE OF BAY AREA RAPID TRANSIT DISTRICT BETWEEN THE WALNUT CREEK AND PLEASANT HILL STATIONS
ON OCTOBER 19, 2013
Adjudicatory Liane Randolph Kimberly Kim 19.5 06/23/18
EXTENSION GRANTED
BY D1712027
ACTIVE
224 I1702002
CPUC - OIR PURSUANT TO SB 380 TO DETERMINE THE FEASIBILITY
OF MINIMIZING/ELIMINATING ALISO CANYON NATURAL GAS
STORAGE FACILITY IN THE COUNTY OF L.A. WHILE
MAINTANING ENERGY AND ELECTRIC RELIABILITY
Ratesetting Liane Randolph
Melissa K. Semcer 11.8 08/11/18 ACTIVE
![Page 102: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/102.jpg)
2017 Report207092767 Page 95
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
225 I1703002
CPUC - OII TO DETERMINE WHETHER THE ALISO CANYON
NATURAL GAS STORAGE FACILITY HAS REMAINED OUT OF
SERVICE AND EXPENSES SHOULD BE DISALLOWED FROM
THE RATES OF SOCAL GAS
Ratesetting Liane Randolph
Gerald F. Kelly 11.1 09/01/18 ACTIVE
226 I1704009
CPUC - OIR TO IMPOSE FINES AND SANCTIONS AGAINST
RASIER-CA LLC FOR VIOLATING THE COMMISSION'S D13-09-045,
SAFETY REQUIREMENT D BY FAILING TO COMPLY WITH THE ZERO TOLERANCE RULES/ PUB.
UTIL. CODE 5831
Adjudicatory Liane Randolph
Robert Mason 10.0 04/06/18 ACTIVE
227 I1704019
CPUC - OII TO DETERMINE WHETHER PACIFICORP ENGAGES IN LEAST-COST PLANNING ON A
CONTROL AREA BASIS AND WHETHER ITS INTER-JURISDICTIONAL COST
ALLOCATION PROTOCOL RESULTS IN REASONABLE RATES
Ratesetting Liane Randolph
Jessica T. Hecht 9.3 10/27/18 ACTIVE
![Page 103: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/103.jpg)
2017 Report207092767 Page 96
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
228 I1704021
CPUC - OII INTO THE BILLING PRACTICES OF SOCAL GAS CO. AND ORDER TO SHOW CAUSE
WHY RULE NO. 14 SHOULD NOT BE REVISED, IMPOSE PENALTIES, AND/OR OTHER REMEDIES FOR EXTENDING BILLING PERIODS
Adjudicatory Clifford Rechtschaffen
Adeniyi A. Ayoade 9.3 04/27/18 ACTIVE
229 I1706025
CPUC - OII FOR THE PURPOSE OF EXTABLISHING A LIST FOR THE FISCAL YEARS 2018-2019 AND
2019-2020 OF EXISTING CROSSINGS AT GRADE OF CITY STREETS, COUNTY ROADS OR STATE HIGHWAYS IN NEED OF
SEPARATION
Quasi-legislative
Martha Guzman Aceves
Valerie Kao 7.2 12/29/18 ACTIVE
230 I1706027
OII INTO THE CREATION OF A SHARED DATABASE OR
STATEWIDE CENSUS OF UTILITY POLES AND CONDUIT.
Quasi-legislative Michael Picker
Robert Mason/ Timothy Kenney
7.2 12/29/18 ACTIVE SEE R1703009
231 I1709004
CPUC - OII AND ORDERING NETFORTRIS ACQUISITION CO.,
INC TO SHOW CAUSE WHY IT SHOULD NOT BE SANCTIONED FOR VIOLATIONS OF THE LAWS
BY MONITORING AND RECORDING EMPLOYEE
TELEPHONE CONVERSATIONS
Adjudicatory Carla Peterman
Sasha Goldberg/
Kimberly Kim 4.6 09/14/18 ACTIVE
![Page 104: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/104.jpg)
2017 Report207092767 Page 97
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
232 I1709021
CPUC - OII INTO THE LONG TERM DEBT FINANCING PRACTICES OF
LAKE ALPINE WATER CO. AND ORDER TO SHOW CAUSE WHY
THE COMMISSION SHOULD NOT IMPOSE PENALTIES
Adjudicatory Carla Peterman
Sasha Goldberg/
Regina DeAngelis
4.1 09/29/18 ACTIVE
233 I1711003
CPUC - OII INTO THE NOVEMBER 2017 SUBMISSION OF PACIFIC
GAS AND ELECTRIC COMPANY'S RISK ASSESSMENT AND
MITIGATION PHASE
Ratesetting Clifford Rechtschaffen
Stephen C. Roscow 2.7 05/11/19 ACTIVE
234 R1111007CPUC - OIR INTO THE REVIEW OF
THE CALIFORNIA HIGH COST FUND-A PROGRAM
Quasi-legislative
Martha Guzman Aceves
Legal Division/ W.
Anthony Colbert
75.8 04/04/19
EXTENSION GRANTED
BY D1701033
ET. AL.
ACTIVE - SEVERAL
DECISIONS HAVE BEEN
ISSUED - NEED FOR HEARING
235 R1206013
CPUC - OIR TO CONDUCT A COMPREHENSIVE EXAMINATION OF INVESTOR OWNED ELECTRIC
UTILITIES’ RESIDENTIAL RATE STRUCTURES, THE TRANSITION TO TIME VARYING AND DYNAMIC RATES, AND OTHER STATUTORY
OBLIGATIONS.
Quasi-legislative Michael Picker
S. Pat Tsen/ Sophia Park/
Jeanne McKinney
68.3 07/25/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
![Page 105: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/105.jpg)
2017 Report207092767 Page 98
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
236 R1212011
CPUC - OIR ON REGULATIONS RELATING TO PASSENGER
CARRIERS, RIDESHARING, AND NEW ONLINE-ENABLED
TRANSPORTATION SERVICES
Quasi-legislative/
Adjudicatory OSC PHASE II
Liane M. Randolph
Legal Division/ Robert Mason
62.2 04/27/18
EXTENSION GRANTED
BY D1410016
AND REVISED SCOPING
MEMO
ACTIVE - SEVERAL
DECISIONS WERE
ISSUED - OSC PHASE II WENT TO HEARING
237 R1311005
CPUC - OIR CONCERNING ENERGY EFFICIENCY ROLLING
PORTFOLIOS, POLICIES, PROGRAMS, EVALUATION, AND
RELATED ISSUES
Ratesetting Carla Peterman
Valerie Kao/ Julie A. Fitch 51.3 05/04/18
ACTIVE - SEVERAL
DECISIONS HAVE BEEN
ISSUED
238 R1311007
CPUC - OIR TO CONSIDER ALTERNATIVE-FUELED VEHICLE
PROGRAMS, TARIFFS, AND POLICIES
Quasi-legislative
Carla Peterman
John S. Wong 51.3 03/28/19
EXTENSION GRANTED
BY D1709039
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
239 R1403002
CPUC - OIR TO IMPLEMENT REGISTRATION OF THIRD PARTY NATURAL GAS PROCUREMENT
SERVICE PROVIDERS TO REGULATE NON-RATE MATTERS AND MINIMUM STANDARDS OF
CONSUMER PROTECTION
Quasi-legislative
Carla Peterman
John S. Wong 47.3 08/30/18
ACTIVE D1508022 D1408043
HAVE BEEN ISSUED
![Page 106: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/106.jpg)
2017 Report207092767 Page 99
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
240 R1407002
CPUC - OIR TO DEVELOP A SUCCESSOR TO EXISTING NET
ENERGY METERING TARIFFS AND TO ADDRESS OTHER ISSUES
RELATED TO NET ENERGY METERING
RatesettingMartha
Guzman Aceves
Jessica T. Hecht/ Legal
Division/ Anne E. Simon
43.3 03/31/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED NEED FOR HEARING
241 R1408013
CPUC - OIR REGARDING POLICIES, PROCEDURES AND
RULES FOR DEVELOPMENT OF DISTRIBUTION RESOURCES
PLANS PURSUANT TO PU CODE SECTION 769
Ratesetting TRACK II/
Quasi-legislative
TRACK I and TRACK III
Michael PickerPeter V.
Allen/ Robert Mason
42.2 01/26/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
242 R1502012
CPUC - OIR TO CONSIDER THE ANNUAL REVENUE
REQUIREMENT DETERMINATION OF THE CALIFORNIA
DEPARTMENT OF WATER RESOURCES AND RELATED
ISSUES
Ratesetting Clifford Rechtschaffen
Stephen C. Roscow 36.1 04/07/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
243 R1502020
CPUC - OIR TO CONTINUE IMPLEMENTATION AND ADMINISTRATION, AND CONSIDER FURTHER
DEVELOPMENT OF, CALIFORNIA RENEWABLES PORTFOLIO
STANDARD PROGRAM
Ratesetting Clifford Rechtschaffen
Robert Mason/ Anne
E. Simon/ Legal
Division
35.6 02/04/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
![Page 107: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/107.jpg)
2017 Report207092767 Page 100
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
244 R1505006CPUC - OIR TO DEVELOP AND
ADOPT FIRE-THREAT MAPS AND FIRE-SAFETY REGULATIONS
Ratesetting Michael PickerValerie Kao/
Timothy Kenney
33.3 01/14/18
ACTIVE SEVERAL
DECISIONS HAVE BEEN
ISSUED
245 R1602007
CPUC - OIR TO DEVELOP AN ELECTRICITY INTEGRATED
RESOURCE PLANNING FRAMEWORK AND TO
COORDINATE AND REFINE LONG-TERM PROCUREMENT PLANNING
REQUIREMENTS
Ratesetting Liane Randolph Julie A. Fitch 24.0 05/26/18 ACTIVE
246 R1703009
CPUC - ORDER GRANTING PETITION 16-08-016 AND OIR TO
CONSIDER AMENDMENTS TO THE REVISED RIGHT-OF-WAY RULES
ADOPTED BY DECISION 16-01-046
Quasi-legislative Michael Picker Timothy
Kenney 10.4 09/22/18
ACTIVE D1707001 HAS BEEN
ISSUED
247 R1705010CPUC - OIR TO CONSIDER
REVISIONS TO ELECTRIC RULE 20 AND RELTED MATTERS
Quasi-legislative Michael Picker Jessica T.
Hecht 8.8 11/10/18
ACTIVE D1707003 HAS BEEN
ISSUED
![Page 108: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/108.jpg)
2017 Report207092767 Page 101
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
248 R1706023
CPUC - OIR TO CONSIDER WHETHER TEXT MESSAGING SERVICES ARE SUBJECT TO PUBLIC PURPOSE PROGRAM
SURCHARGES
Quasi-legislative
Carla Peterman
Zita Kline/ Regina
DeAngelis 7.2 12/29/18 ACTIVE
249 R1706024
OIR EVALUATING THE COMMISSION'S 2010 WATER ACTION PLAN OBJECTIVE OF
ACHIEVING CONSISTENCY BETWEEN CLASS A WATER
UTILITIES' LOW-INCOME RATE ASSISTANCE PROGRAMS,
PROVIDING RATE ASSIST. TO ALL IOUS
Quasi-legislative
Martha Guzman Aceves
Darcie Houck 7.2 12/29/18 ACTIVE
250 R1706026
CPUC - OIR TO REVIEW, REVISE, AND CONSIDER ALTERNATIVES
TO THE POWER CHARGE INDIFFERENCE ADJUSTMENT
Quasi-legislative
Carla Peterman
Anne E. Simon/
Stephen C. Roscow
7.2 12/29/18 ACTIVE
251 R1706028
CPUC - OIR INTO ACCESS BY COMPETITIVE COMMUNICATIONS
PROVIDERS TO CALIFORNIA UTILITY POLES AND CONDUIT,
CONSISTENT WITH THE COMMISSION'S SAFETY
REGULATIONS
Quasi-legislative Michael Picker
Robert Mason/ Timothy Kenney
7.2 12/29/18 ACTIVE SEE R1703009
![Page 109: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/109.jpg)
2017 Report207092767 Page 102
APPENDIX D
PROCEEDINGS ACTIVE DURING YEAR 2017 - PROCEEDINGS NOT RESOLVED BUT STILL ON SCHEDULE
PROCEEDING NUMBER SHORT TITLE CATEGORY CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
PRESCRIBED RESOLUTION
DATE
DATE RESOLVED
DECISION NUMBER
252 R1707007
CPUC - OIR TO CONSIDER STREAMLINING
INTERCONNECTION OF DISTRIBUTED ENERGY
RESOURCES AND IMPROVEMENTS TO RULE 21
Quasi-legislative Michael Picker Kelly A.
Hymes 6.7 01/12/19 ACTIVE
253 R1709020
CPUC - OIR TO OVERSEE THE RESOURCE ADEQUACY
PROGRAM, CONSIDER PROGRAM REFINEMENTS, AND ESTABLISH ANNUAL LOCAL AND FLEXIBLE PROCUREMENT OBLIGATIONS
FOR THE 2019 AND 2020 COMPLIANCE YEARS
Ratesetting Liane Randolph
Peter V. Allen 4.1 03/30/19 ACTIVE
254 R1710010CPUC - OIR TO CONSIDER
AMENDMENTS TO GENERAL ORDER 95
Quasi-legislative Michael Picker
Sasha Goldberg/
Robert Mason
3.7 04/13/19 ACTIVE
(END OF APPENDIX D)
![Page 110: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/110.jpg)
2017 Report207092767 Page 103
APPENDIX E
PETITIONS TO ADOPT, AMEND, OR REPEAL A REGULATIONPURSUANT TO PUB. UTIL. CODE SECTION 1708.5
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
* LENGTH OF PROCEEDING
OPEN IN MONTHS
SIX MONTHS DATE
DATE RESOLVED
DECISION NUMBER
1 P1607009
CALIFORNIA CABLE & TELECOMMUNICATIONS ASSOC. - PETITION TO ADOPT, AMEND, OR REPEAL GENERAL ORDER 95 PURSUANT TO PUB. UTIL. CODE
SECTION 1708.5
Michael Picker
Timothy Kenney 7.0 1/13/2017 2/9/2017 D1702006
2 P1608016
WIRELESS INFRASTRUCTURE ASSOCIATION - PETITION TO ADOPT, AMEND, OR REPEAL GENERAL ORDER 95 PURSUANT TO PUB.
UTIL. CODE SECTION 1708.5
Michael Picker
Timothy Kenney 6.9 2/27/2017 3/23/2017 R1703009
3 P1702006
CTIA - THE WIRELESS ASSOC. - PETITION TO ADOPT, AMEND, OR REPEAL A REGULATION
PURSUANT TO PUB. UTIL. CODE SECTION 1708.5.
Michael Picker
Karl J. Bemesderfer 4.1 8/28/2017 6/29/2017 R1706023
4 P1703004
SAFETY AND ENFORCEMENT DIVISION - PETITION OF THE SAFETY AND
ENFORCEMENT DIVISION TO ADOPT, AMEND, OR REPEAL GENERAL ORDER 95 PURSUANT
TO PUB. UTIL. CODE SECTION 1708.5.
Michael Picker
Timothy Kenney 7.3 9/5/2017 10/12/2017 R1710010
![Page 111: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/111.jpg)
2017 Report207092767 Page 104
APPENDIX E
PETITIONS TO ADOPT, AMEND, OR REPEAL A REGULATIONPURSUANT TO PUB. UTIL. CODE SECTION 1708.5
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
* LENGTH OF PROCEEDING
OPEN IN MONTHS
SIX MONTHS DATE
DATE RESOLVED
DECISION NUMBER
5 P1710011
QUAD KNOPF, INC., DBA QK - TO ADOPT, AMEND, OR REPEAL A REGULATION
PURSUANT TO PUB. UTIL. CODE SECTION 1708.5
Michael Picker Robert Mason 3.7 4/11/2018 ACTIVE
(END OF APPENDIX E)
![Page 112: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/112.jpg)
2017 Report207092767 Page 105
APPENDIX F
CITATION APPEALS AND GENERAL ORDER 156 APPEALS ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
DATE RESOLVED
DECISION NUMBER
1 K1609006
J &I TRANSPORTATION, LLC - APPEAL FROM CITATION FC-834 ISSUED BY THE TRANSPORTATION ENFORCEMENT SECTION, CONSUMER PROTECTION AND ENFORCEMNT
DIVISION
N/A Gerald F Kelly 4.4 01/19/17 RES ALJ-335
2 K1610006
CROSSROADS INVESTMENTS INC., DBA AMERICAN LIMOUSINE SERVICES - APPEAL FROM CITATION FC-839
ISSUED BY THE TRANSPORTATION ENFORCEMENT SECTION, CONSUMER PROTECTION AND ENFORCEMENT
DIVISION
N/A Gerald F Kelly 4.7 03/02/17 RES ALJ-338
3 K1612003VICKI RATTO AND INDUSTRIAL CONTROL AND DESIGN, INC. - APPEAL FROM SUPPLIER CLEARINGHOUSE VERIFICATION
ORDER NUMBER 16000025N/A Katherine
MacDonald 6.8 05/25/17 RES ALJ-343
4 K1612006 SOCAL GAS COMPANY - APPEAL FROM CITATION NO. E-4550-01 N/A Timothy Kenney 5.9 05/25/17 RES
ALJ-339
5 K1706002RANDALL LEE ROGERS, DBA BIG BEAR MOVING &
REDLANDS MOVING - APPEAL FROM CITATION CFP-5215 ISSUED ON MARCH 9, 2017, CASE NO. HHG 2483
N/A Katherine MacDonald 5.4 11/10/17 RES
ALJ-348
6 K1707002SOUTHWEST GAS CORPORATION - APPEAL FROM
CITATION NO. D16-09-055 G.17-05-001 ISSUED BY THE SAFETY AND ENFORCEMENT DIVISION
N/A Katherine MacDonald 7.1 ACTIVE
![Page 113: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/113.jpg)
2017 Report207092767 Page 106
APPENDIX F
CITATION APPEALS AND GENERAL ORDER 156 APPEALS ACTIVE DURING YEAR 2017*
PROCEEDING NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATE
LENGTH OF PROCEEDING
OPEN IN MONTHS
DATE RESOLVED
DECISION NUMBER
7 K1710001QUASAR COMMUNICATIONS, INC. - APPEAL FROM
CITATION FORFEITURE NO.897-1307 ISSUED BY THE CONSUMER PROTECTION AND ENFORCEMENT DIVISION
N/A Regina DeAngelis 4.1 ACTIVE
8 K1710012
MOVING COMPANY LOS ANGELES, LLC - APPEAL FROM CITATION F-5385 ISSUED ON SEPTEMBER 29, 2017 BY THE TRANSPORTATION ENFORCEMENT SECTION, CONSUMER
PROTECTION AND ENFORCEMENT DIVISION
N/A Katherine MacDonald 3.3 ACTIVE
9 K1711012
LONDON ROSE TOURS LLC - APPEAL FROM CITATION F-5380 ISSUED ON OCTOBER 31, 2017 BY TRANSPORTATION ENFORCEMENT BRANCH, CONSUMER PROTECTION AND
ENFORCEMENT DIVISION
N/A Katherine MacDonald 2.1 ACTIVE
10 K1712005
KEVIN PECK, DOING BUSINESS AS ROCK N ROLL WINE TOURS - APPEAL FROM CITATION F-5387 ISSUED BY
TRANSPORTATION ENFORCEMENT SECTION, SAFETY AND ENFORCEMENT DIVISION
N/A Adeniyi A. Ayoade 1.9 ACTIVE
* The Commission, in Resolution ALJ-299, signed on June 26, 2014, established a Pilot Program Citation Appeal and General Order 156 Appellate Rules, effective January 1, 2015. Under this pilot program, these appellate records will be easily accessible,
thus enhancing due process in these expeditious proceedings.
(END OF APPENDIX F)
![Page 114: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/114.jpg)
2017 Report207092767 Page 107
APPENDIX GPUB. UTIL. CODE SECTIONS 1701.3(j) AND 1701.4(e)
60 TO 90-DAY COMPLIANCE FOR ADOPTION OF DECISION
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEPD ISSUED
DATE
DATE OF FINAL
DECISION
TIME ELAPSED
BETWEEN PD AND FINAL DECISION
APPLICABLE PERIOD
DECISION NUMBER
1 A1411016
EDISON - FOR APPROVAL OF THE RESULTS OF ITS 2013
LOCAL CAPACITY REQUIREMENTS REQUEST
FOR OFFERS FOR THE MOORPARK SUB-AREA
Michael Picker Regina DeAngelis 04/07/17 09/28/17 174 Days 60 Days D1709034
2 A1503003
EDISON - TO CONSTRUCT ELECTRICAL SUBSTATION FACILITIES WITH VOLTAGE OVER 50 kV: MESA 500 kV SUBSTATION PROJECT
Liane M. Randolph Gerald F. Kelly 01/20/17 02/09/17 20 Days 60 Days D1702015
3 A1504012
SDG&E – TO UPDATE MARGINAL COSTS, COST
ALLOCATION AND ELECTRIC RATE DESIGN
Micahel Picker Michelle Cooke 05/18/17 08/24/17 98 Days 60 Days D1708030
4 A1508025 A1512015
CYPRESS RIDGE SEWER CO. - FOR A CPCN TO PROVIDE
SEWER UTILITY SERVICE TO THE CYPRESS RIDGE
DEVELOPMENT IN SAN LUIS OBISPO
Martha Guzman Aceves
Karl J. Bemesderfer/ Rafael L. Lirag
09/19/17 10/26/17 37 Days 60 Days D1710013
5 A1509001
PG&E - FOR AUTHORITY TO INCREASE RATES AND
CHARGES FOR ELECTRIC AND GAS SERVICE EFECTIVE ON
JANUARY 1, 2017.
Micahel Picker Stephen C. Roscow 02/27/17 05/11/17 73 Days 90 Days
D1705013 PRES.
PICKER'S ALT SIGNED
![Page 115: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/115.jpg)
2017 Report207092767 Page 108
APPENDIX GPUB. UTIL. CODE SECTIONS 1701.3(j) AND 1701.4(e)
60 TO 90-DAY COMPLIANCE FOR ADOPTION OF DECISION
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEPD ISSUED
DATE
DATE OF FINAL
DECISION
TIME ELAPSED
BETWEEN PD AND FINAL DECISION
APPLICABLE PERIOD
DECISION NUMBER
6 A1509010
SDG&E - TO RECOVER COST RELATED TO THE 2007
SOUTHERN CALIFORNIA WILDFIRES RECORDED IN THE
WILDFIRE EXPENSE MEMORANDUM ACCOUNT
Liane M. Randolph
S. Pat Tsen/ Sasha Goldberg 08/22/17 11/30/17 100 Days 60 Days D1711033
7 A1601002
SAN GABRIEL VALLEY WATER CO. - FOR AUTHORITY TO
INCREASE RATES CHARGES FOR WATER SERVICE IN ITS LOS ANGELES COUNTY AND FONTANA W ATER DIVISIONS
FOR YEARS 2017-2019
Liane M. Randolph S. Pat Tsen 05/12/17 06/15/17 34 Days 60 Days D1706008
8 A1603006
PG&E - APPLICATION IN ITS 2015 NUCLEAR
DECOMMMISSIONING COST TRIENNIAL PROCEEDING
Martha Guzman Aceves
Darcie Houck 04/20/17 05/25/17 35 Days 60 Days D1705020
9 A1604001
EDISON - FOR A FINDING THAT ITS PROCUREMENT-RELATED AND OTHER OPERATIONS FOR
THE PERIOD JANUARY 1 THROUGH DECEMBER 31, 2015, COMPLIED WITH ITS ADOPTED
PROCUREMENT PLAN
Martha Guzman Aceves
S. Pat Tsen 10/26/17 01/11/18 77 Days 60 Days WITHDRAWN
![Page 116: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/116.jpg)
2017 Report207092767 Page 109
APPENDIX GPUB. UTIL. CODE SECTIONS 1701.3(j) AND 1701.4(e)
60 TO 90-DAY COMPLIANCE FOR ADOPTION OF DECISION
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEPD ISSUED
DATE
DATE OF FINAL
DECISION
TIME ELAPSED
BETWEEN PD AND FINAL DECISION
APPLICABLE PERIOD
DECISION NUMBER
10 A1610003
SIERRA TELEPHONE CO., INC. - TO REVIEW INTRASTATE RATES AND CHARGES,
ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN
Liane M. Randolph Patricia B. Miles 10/30/17 11/30/17 31 Days 60 Days D1711016
11A1701012 A1701018 A1701019
PG&E - FOR APPOVAL OF DEMAND RESPONSE
PROGRAMS, PILOTS AND BUDGETS FOR PROGRAM
YEARS 2018-2022
Martha Guzman Aceves
Nilgun Atamturk/ Kelly A. Hymes 11/09/17 12/14/17 35 Days 60 Days D1712003
12
R1408013 A1507002 A1507003 A1507005 A1507006 A1507007 A1507008
CPUC - OIR REGARDING POLICIES, PROCEDURES AND
RULES FOR DEVELOPMENT OF DISTRIBUTION RESOURCES
PLANS PURSUANT TO PUBLIC UTILITIES CODE SECTION 769 -
TRACK 2 PROJECT.
Micahel Picker Peter V. Allen 01/10/17 02/09/17 30 Days 60 Days D1702007
13
R1408013 A1507002 A1507003 A1507005 A1507006 A1507007 A1507008
CPUC - OIR REGARDING POLICIES, PROCEDURES AND
RULES FOR DEVELOPMENT OF DISTRIBUTION RESOURCES
PLANS PURSUANT TO PUBLIC UTILITIES CODE SECTION 769 -
TRACK 2 PROJECT.
Micahel Picker Peter V. Allen 05/19/17 06/15/17 27 Days 60 Days D1706012
(END OF APPENDIX G)
![Page 117: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/117.jpg)
2017 Report207092767 Page 110
APPENDIX H
PRESIDING OFFICER DECISIONS AND PROPOSED DECISIONS ISSUED DURING YEAR 2017
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEFILED DATE
SUBM- DATE
PD OR POD
ISSUED DATE
TIME ELAPSED BETWEEN
SUBMISSION AND PD OR
POD
APPLICABLE PERIOD
1 A1411016
EDISON - FOR APPROVAL OF THE RESULTS OF ITS 2013 LOCAL
CAPACITY REQUIREMENTS REQUEST FOR OFFERS FOR THE MOORPARK
SUB-AREA
Michael Picker Regina DeAngelis 11/26/14 12/15/16 04/07/17 113 Days 90 Days
2 A1503003
EDISON - TO CONSTRUCT ELECTRICAL SUBSTATION FACILITIES
WITH VOLTAGE OVER 50 kV: MESA 500 kV SUBSTATION PROJECT
Liane M. Randolph
Gerald F. Kelly 03/13/15 12/28/16 01/20/17 23 Days 90 Days
3 A1504012SDG&E – TO UPDATE MARGINAL COSTS, COST ALLOCATION AND
ELECTRIC RATE DESIGNMicahel Picker Michelle
Cooke 04/13/15 02/17/17 05/18/17 90 Days 90 Days
4 A1508025 A1512015
CYPRESS RIDGE SEWER CO. - FOR A CPCN TO PROVIDE SEWER UTILITY SERVICE TO THE CYPRESS RIDGE
DEVELOPMENT IN SAN LUIS OBISPO
Martha Guzman Aceves
Karl J. Bemesderfer/
Rafael L. Lirag
08/25/15 05/25/17 09/19/17 117 Days 90 Days
5 A1509001
PG&E - FOR AUTHORITY TO INCREASE RATES AND CHARGES FOR ELECTRIC AND GAS SERVICE
EFECTIVE ON JANUARY 1, 2017.
Micahel Picker Stephen C. Roscow 09/01/15 10/31/16 02/27/17 119 Days 90 Days
![Page 118: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/118.jpg)
2017 Report207092767 Page 111
APPENDIX H
PRESIDING OFFICER DECISIONS AND PROPOSED DECISIONS ISSUED DURING YEAR 2017
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEFILED DATE
SUBM- DATE
PD OR POD
ISSUED DATE
TIME ELAPSED BETWEEN
SUBMISSION AND PD OR
POD
APPLICABLE PERIOD
6 A1509010
SDG&E - TO RECOVER COST RELATED TO THE 2007 SOUTHERN
CALIFORNIA WILDFIRES RECORDED IN THE WILDFIRE EXPENSE MEMORANDUM ACCOUNT
Liane M. Randolph
S. Pat Tsen/ Sasha
Goldberg09/25/15 07/06/17 08/22/17 47 Days 90 Days
7 A1601002
SAN GABRIEL VALLEY WATER CO. - FOR AUTHORITY TO INCREASE RATES CHARGES FOR WATER SERVICE IN ITS LOS ANGELES
COUNTY AND FONTANA W ATER DIVISIONS FOR YEARS 2017-2019
Liane M. Randolph S. Pat Tsen 01/04/16 12/23/16 05/12/17 140 Days 90 Days
8 A1603006PG&E - APPLICATION IN ITS 2015 NUCLEAR DECOMMMISSIONING COST TRIENNIAL PROCEEDING
Martha Guzman Aceves
Darcie Houck 03/01/16 10/31/16 04/20/17 171 Days 90 Days
9 A1604001
EDISON - FOR A FINDING THAT ITS PROCUREMENT-RELATED AND OTHER OPERATIONS FOR THE PERIOD JANUARY 1 THROUGH
DECEMBER 31, 2015, COMPLIED WITH ITS ADOPTED PROCUREMENT PLAN
Martha Guzman Aceves
S. Pat Tsen 04/01/16 01/06/17 10/26/17 293 Days 90 Days
![Page 119: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/119.jpg)
2017 Report207092767 Page 112
APPENDIX H
PRESIDING OFFICER DECISIONS AND PROPOSED DECISIONS ISSUED DURING YEAR 2017
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEFILED DATE
SUBM- DATE
PD OR POD
ISSUED DATE
TIME ELAPSED BETWEEN
SUBMISSION AND PD OR
POD
APPLICABLE PERIOD
10 A1610003
SIERRA TELEPHONE CO., INC. - TO REVIEW INTRASTATE RATES AND
CHARGES, ESTABLISH A NEW INTRASTATE REVENUE
REQUIREMENT AND RATE DESIGN
Liane M. Randolph
Patricia B. Miles 10/03/16 06/16/17 10/30/17 136 Days 90 Days
11A1701012 A1701018 A1701019
PG&E - FOR APPOVAL OF DEMAND RESPONSE PROGRAMS, PILOTS AND
BUDGETS FOR PROGRAM YEARS 2018-2022
Martha Guzman Aceves
Nilgun Atamturk/ Kelly A. Hymes
01/17/17 11/03/17 11/09/17 6 Days 90 Days
12 C1605010
WHITE, THE POOLE, AVALOS, SULLIVAN, FURNAS, CHARIST, ROSH, SINDLINGER, CHISM, GALLARDO, AND TENHET VS. CA WATER SERVICE CO. - RELIEF FROM IMPROPER CHARGES FOR CONSTRUCTION OF A WATER
MAIN EXTENSION
Martha Guzman Aceves
Dan H. Burcham 05/17/16 05/16/17 06/30/17 45 Days 60 Days
![Page 120: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/120.jpg)
2017 Report207092767 Page 113
APPENDIX H
PRESIDING OFFICER DECISIONS AND PROPOSED DECISIONS ISSUED DURING YEAR 2017
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEFILED DATE
SUBM- DATE
PD OR POD
ISSUED DATE
TIME ELAPSED BETWEEN
SUBMISSION AND PD OR
POD
APPLICABLE PERIOD
13 C1606007
STARLINE TOURS OF HOLLYWOOD, INC. VS. EHM PRODUCTIONS, INC.,
DBA TMZ ET AL. - FOR AN IMMEDIATE CEASE AND DESIST ORDER FOR OPERATING WITHOUT PROPER
LICENSES OR PEMITS
Martha Guzman Aceves
Hallie Yacknin 06/07/16 02/23/17 03/27/17 32 Days 60 Days
14 C1610005
VARVAYANIS VS. ODD FELLOWS SIERRA RECREATION ASSOC. -
RELIEF FROM SEEKING REFUND ORDERED BY DECISION 16-01-047
Clifford Rechtschaffen
Eric Wildgrube 10/06/16 02/09/17 03/22/17 41 Days 60 Days
15 C1610021 GILDRED BUILDING CO. AND OCOTILLO SOLAR LLC VS. EDISON
Liane M. Randolph
Regina DeAngelis 10/21/16 07/26/17 08/30/17 35 Days 60 Days
16 C1611009SHILBERG VS. SDG&E - FOR RELIEF
FROM INACCURATE BILLING AND REQUEST FOR METER CALIBRATION
Clifford Rechtschaffen
Katherine MacDonald 11/30/16 09/29/17 10/17/17 18 Days 60 Days
![Page 121: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/121.jpg)
2017 Report207092767 Page 114
APPENDIX H
PRESIDING OFFICER DECISIONS AND PROPOSED DECISIONS ISSUED DURING YEAR 2017
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEFILED DATE
SUBM- DATE
PD OR POD
ISSUED DATE
TIME ELAPSED BETWEEN
SUBMISSION AND PD OR
POD
APPLICABLE PERIOD
17 C1612004
DEJONG BROTHERS FARMING, ROBERT WINTERS, TRUSTEE OF THE WINTERS REVOCABLE TRUST, ET AL
VS PG&E - FOR AN ORDER THAT PG&E BE ENJOINED/RESTRAINED FROM REMOVING ALMOND TREES BENEATH TRANSMISSION LINES
Carla J. Peterman
Karl J. Bemesderfer 12/19/16 08/11/17 10/05/17 55 Days 60 Days
18 C1708008
RODNEY AND ALICE WILSON FAMILY REVOCABLE TRUST OF 1999,
MICHAEL WILSON, TRUSTEE VS. PACBELL DBA AT&T - FOR RELIEF FROM IMPROPER PLACEMENT OF FACILITIES OUTSIDE OF UTILITY
EASEMENT
Clifford Rechtschaffen Zita Kline 08/14/17 11/17/17 12/13/17 26 Days 60 Days
19 I1606010
CPUC - OII INTO THE FATAL ACCIDENT ON THE LINE OF BAY AREA RAPID TRANSIT DISTRICT
BETWEEN THE WALNUT CREEK AND PLEASANT HILL STATIONS ON
OCTOBER 19, 2013
Liane M. Randolph Kimberly Kim 06/23/16 09/07/17 10/06/17 29 Days 60 Days
![Page 122: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/122.jpg)
2017 Report207092767 Page 115
APPENDIX H
PRESIDING OFFICER DECISIONS AND PROPOSED DECISIONS ISSUED DURING YEAR 2017
DOCKET NUMBER SHORT TITLE CMMR ALJ/EXAM/
APPELLATEFILED DATE
SUBM- DATE
PD OR POD
ISSUED DATE
TIME ELAPSED BETWEEN
SUBMISSION AND PD OR
POD
APPLICABLE PERIOD
20
R1408013 A1507002 A1507003 A1507005 A1507006 A1507007 A1507008
CPUC - OIR REGARDING POLICIES, PROCEDURES AND RULES FOR
DEVELOPMENT OF DISTRIBUTION RESOURCES PLANS PURSUANT TO
PUBLIC UTILITIES CODE SECTION 769 - TRACK 2 PROJECT
Micahel Picker Peter V. Allen 08/14/14 08/26/16 01/10/17 137 Days 90 Days
21
R1408013 A1507002 A1507003 A1507005 A1507006 A1507007 A1507008
CPUC - OIR REGARDING POLICIES, PROCEDURES AND RULES FOR
DEVELOPMENT OF DISTRIBUTION RESOURCES PLANS PURSUANT TO
PUBLIC UTILITIES CODE SECTION 769 - REVISED TRACK 2 PROJECT
Micahel Picker Peter V. Allen 08/14/14 05/10/17 05/19/17 9 Days 90 Days
*Due to significant turn over during the past year, judges have had to process several high profile proceedings at the same time which has resulted in the delay in the resolution time for some proceedings.
(END OF APPENDIX H)
![Page 123: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/123.jpg)
2017 Report207092767 Page 116
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
1A0701031; A0704028; A0909022
06/19/17EDISON - TO CONSTRUCT ELECTRICAL
FACILITIES WITH VOLTAGES BETWEEN 50 KV AND 200 KV
Martha Guzman Aceves Hallie Yackin 0 1
2
A1208007; A1208008; A1208009; A1208010
06/20/17PG&E - FOR APPROVAL OF 2013-2014
STATEWIDE MARKETING, EDUCATION AND OUTREACH PROGRAM AND BUDGET
Carla J. Peterman
Stephen C. Roscow 0 1
3 A1402008 D1710021
PG&E - FOR COMPLIANCE REVIEW OF UTILITY OWNED GENERATION OPERATIONS,
ELECTRIC ENERGY RESOURCE RECOVERY ACCOUNT ENTRIES ET AL.
Martha Guzman Aceves
Stephen C. Roscow 1 0
4 A1410015 10/24/17
AVALON FREIGHT SERVICES, LLC. - FOR A CPCN TO TRANSPORT FREIGHT BY VESSEL
ON A SCHEDULED BASIS BETWEEN PORT OF LOS ANGELES AND THE SANTA CATALINA
ISLAND
Clifford Rechtschaffen
Karl J. Bemesderfer 0 1
5 A1411016 D1708032
EDISON - FOR APPROVAL OF THE RESULTS OF ITS 2013 LOCAL CAPACITY REQUIREMENTS REQUEST FOR OFFERS FOR THE MOORPARK
SUB-AREA
Michael PickerRegina
DeAngelis/ Legal Division
1 0
![Page 124: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/124.jpg)
2017 Report207092767 Page 117
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
6A1501014; A1502006; A1603004
3/23/2017; 6/16/2017; 8/10/2017
EDISON - FOR A COMMISSION REASONABLENESS REVIEW OF 2014 SONGS 2
AND 3 EXPENSES
Martha Guzman Aceves
Darcie L. Houck 0 3
7
A1502001; A1502002; A1502003; A1502013; A1502024; A1503004
D1701034; D1703027; D1705033
06/02/17SOWEST GAS CORP. - FOR APPROVAL OF
LOW-INCOME PROGRAMS AND BUDGETS FOR PROGRAM YEARS 2015-2017
Clifford Rechtschaffen
W. Anthony Colbert 3 1
8 A1507019 11/21/17
CALIFORNIA-AMERICAN WATER CO. - FOR AUTHORITY TO MODIFY CONSERVATION AND
RATIONING RULES, RATE DESIGN, AND OTHER RELATED ISSUED FOR MONTEREY DISTRICT
Liane M. Randolph
Gary Weatherford 0 1
9 A1508027 02/24/17NEXTERA ENERGY TRANSMISSION WEST, LLC -
FOR A CPNC FOR THE SUNCREST DYNAMIC REACTIVE POWER SUPPORT PROJECT
Liane M. Randolph
Colette E. Kersten 0 1
10 A1509007 D1711011PACIFICORP - FOR AUTHORITY TO SELL
CERTAIN MINING ASSETS IN ACCORDANCE WITH PU. CODE SECTION 851.
Carla J. Peterman
Katherine MacDonald 1 0
![Page 125: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/125.jpg)
2017 Report207092767 Page 118
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
11 A1509010 D1709038
SDG&E - TO RECOVER COST RELATED TO THE 2007 SOUTHERN CALIFORNIA WILDFIRES RECORDED IN THE WILDFIRE EXPENSE
MEMORANDUM ACCOUNT
Liane M. Randolph
S. Pat Tsen/ Sasha
Goldberg1 0
12 A1509012 04/18/17PG&E - FOR A PERMIT TO CONSTRUCT THE
SANGER SUBSTATION EXPANSION PROJECT PURSUANT TO G.O. 131-D
Carla J. Peterman Eric Wildgrube 0 1
13 A1512007 10/24/17
EDISON - FOR A PERMIT TO CONSTRUCT ELECTRICAL FACILITIES WITH VOLTAGE BETWEEN 50 kV AND 200 kV CIRCLE CITY
SUBSTATION AND MIRA LOMA-JEFFERSON SUBTRANSMISSION LINE PROJECT
Michael Picker Kimberly H. Kim 0 1
14 A1603009; A1702009 07/07/17
CRIMSON CALIFORNIA PIPELINE L.P. (PLC-26) - FOR AUTHORITY TO INCREASE RATES FOR
ITS CRUDE OIL PIPELINE SERVICES
Clifford Rechtschaffen
Patricia B. Miles 0 1
15 A1604022 11/15/17SDG&E - FOR A PERMIT TO CONSTRUCT THE
TIE LINE (TL) 695 AND TL 6971 RECONDUCTOR PROJECT
Carla J. Peterman Dan Burcham 0 1
![Page 126: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/126.jpg)
2017 Report207092767 Page 119
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
16 A1605002 01/31/17PACIFIC MARITIME FREIGHT, INC. AND
CATALINA FREIGHT LINE, INC. - TO TRANSFER CATALINA FREIGHT LINE, INC. CPCN
Liane M. Randolph
Karl J. Bemesderfer 0 1
17 A1607002 01/13/17CALIFORNIA AMERICAN WATER CO. - FOR
AUTHORITY TO INCREASE ITS REVENUES FOR WATER SERVICE FOR YEARS 2018 AND 2019
Michael Picker Sophia J. Park 0 1
18 A1608019 03/29/17 COMNET (USA), LLC - NDIEC REGISTRATION Carla J. Peterman Dan Burcham 0 1
19 A1609003 03/21/17 EDISON - FOR APPROVAL OF ITS 2016 RATE DESIGN WINDOW PROPOSALS Michael Picker Stephen C.
Roscow 0 1
20 A1609005 4/20/2017; 4/24/2017
SOCAL GAS AND SDG&E - TO RECOVER COSTS RECORDED IN THE PIPELINE SAFEY
AND RELIABILITY MEMORANDUM ACCOUNTS, THE SAFETY ENHANCEMENT EXPENSE
BALANCING ACCOUNTS ET AL
Carla J. Peterman Robert Mason 0 2
![Page 127: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/127.jpg)
2017 Report207092767 Page 120
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
21 A1610002 02/07/17
CALAVERA TELEPHONE CO. - TO REVIEW INTRASTATE RATES AND CHARGES,
ESTABLISH A NEW INTRASTATE REVENUE REQUIREMENT AND RATE DESIGN
Carla J. Peterman
Robert W. Haga 0 1
22 A1610003 01/27/17
SIERRA TELEPHONE CO., INC. - TO REVIEW INTRASTATE RATES AND CHARGES,
ESTABLISH A NEW INTRASTATE REVENUE REQUIREMENT AND RATE DESIGN
Liane M. Randolph
Patricia B. Miles 0 1
23 A1610004 01/27/17
CAL-ORE TELPHONE CO. - TO REVIEW INTRASTATE RATES AND CHARGES,
ESTABLISH A NEW INTRASTATE REVENUE REQUIREMENT AND RATE DESIGN
Carla J. Peterman
Darcie L. Houck 0 1
24 A1610012 08/04/17 DCR TRANSMISSION, LLC - FOR A CPCN FOR THE TEN WEST LINK PROJECT
Liane M. Randolph
Katherine MacDonald 0 1
25 A1610019 1/9/2017; 06/29/2017
PG&E - TO RECOVER COSTS RECORDED IN THE CATASTROPHIC EVENT MEMORANDUM
ACCOUNT PURSUANT TO P.U. CODE SECTION 454.9
Carla J. Peterman Hallie Yackin 0 2
![Page 128: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/128.jpg)
2017 Report207092767 Page 121
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
26 A1610020 01/31/17SAN PABLE BAY PIPELINE CO., LLC - FOR
AUTHORITY TO INCREASE ITS RATES FOR PIPELINE TRANSPORTATION SERVICES
Clifford Rechtschaffen
Karl J. Bemesderfer/
Robert W. Haga
0 1
27 A1611002 04/21/17EDISON - FOR APPROVAL OF THE RESULTS OF ITS SECOND PREFERRED RESOURCES
PILOT REQUEST FOR OFFERS
Carla J. Peterman
Patricia B. Miles 0 1
28 A1612002 04/04/17EDISON AND SDG&E - FOR COST RECOVERY OF THE WHEELER NORTH REEF EXPANSION
PROJECT MARINE MITIGATION COSTS
Clifford Rechtschaffen
Darcie L. Houck 0 1
29 A1612009 06/21/17
LIBERTY UTILITIES (CALPECO ELCTRIC) LLC - FOR APPROVAL TO ACQUIRE, OWN, AND
OPERATE THE TURQUOISE SOLAR PROJECT, AUTHORIZE RATEMAKING, AND ISSUE AN
EXPEDITED DECISION
Clifford Rechtschaffen
Katherine MacDonald 0 1
30 A1612010 07/19/17 SOCAL GAS - FOR REAUTHORIZATION OF THE CUSTOMER INCENTIVE PROGRAM
Martha Guzman Aceves
Nilgun Atamturk/
Karl J. Bemesderfer`
0 1
![Page 129: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/129.jpg)
2017 Report207092767 Page 122
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
31 A1612011 07/10/17
SOCAL GAS - TO ESTABLISH A MEMORANDUM ACCOUNT TO RECORD EXPENSES FOR
SYSTEM RELIABILITY EFFORTS ASSOCIATED WITH EXPIRING RIGHTS-OF-WAY ON
MORONGO INDIAN RESERVATION
Carla J. Peterman Rafael L. Lirag 0 1
32 A1701001 04/14/17SUBURBAN WATER SYSTEMS - TO INCREASE RATES CHARGES IN YEARS 2018, 2019, AND
2020
Martha Guzman Aceves
Darcie L. Houck/ Gary Weatherford/
Katherine MacDonald
0 1
33
A1701005; A1701006; A1701007; A1701008; A1701009
04/25/17
SAN DIEGO ASSOC. OF GOVERNMENTS - TO CONSTRUCT TWO LIGHT-RAIL VEHICLE TRACKS GRADE SEPARATED ABOVE I-5
(SOUCH), I-5 (NORTH) AND GRADE SEPARATED BELOW I-8, SR-52 IN THE CITY OF
SAN DIEGO
Clifford Rechtschaffen Gerald F. Kelly 0 1
34 A1701010 03/30/17SUBURBAN WATER SYSTEMS - TO AUTHORIZE
A MEMORANDUM ACCOUNT TO RECORD ASBESTOS LITIGATION EXPENSES
Martha Guzman Aceves
Darcie L. Houck/ Gary Weatherford
0 1
![Page 130: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/130.jpg)
2017 Report207092767 Page 123
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
35A1701012; A1701018; A1701019
03/15/17PG&E - FOR APPOVAL OF DEMAND RESPONSE
PROGRAMS, PILOTS AND BUDGETS FOR PROGRAM YEARS 2018-2022
Martha Guzman Aceves
Nilgun Atamturk/ Kelly A. Hymes
0 1
36
A1701013; A1701014; A1701015; A1701016; A1701017
04/14/17EDISON - FOR APPROVAL OF ENERGY
EFFICIENCY ROLLING PORTFOLIO BUSINESS PLAN
Carla J. Peterman
Julie A. Fitch/ Valerie U.
Kao0 1
37A1701020; A1701021; A1701022
04/13/17SDG&E - FOR APPROVAL OF SB 350
TRANSPORTATION ELECTRIFICATION PROPOSALS
Carla J. Peterman
Michelle Cooke/ Sasha
Goldberg0 1
38 A1701024 05/22/17
WILD GOOSE STORAGE, LLC AND LODI GAS STORAGE, LLC - FOR AN ORDER TO EXCEMPT
FROM COMMISSION AUTHORIZATION THE ENCUMBRANCE OF THE ASSETS OF WILD
GOOSE AND LODI GAS
Clifford Rechtschaffen Rafael L. Lirag 0 1
39 A1701026 04/12/17
EDISON - FOR AN ORDER AUTHORIZING THE SALE AND CONVEYANCE OF CERTAIN ELECTRIC STREETLIGHT FACILITIES IN
PALMDALE
Clifford Rechtschaffen
Karl J. Bemesderfer 0 1
![Page 131: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/131.jpg)
2017 Report207092767 Page 124
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
40 A1701027 03/24/17
EDISON - FOR AN ORDER AUTHORIZING THE SALE AND CONVEYANCE OF CERTAIN ELECTRIC STREETLIGHT FACILITIES IN
RANCHO CUCAMONGA
Clifford Rechtschaffen
Karl J. Bemesderfer 0 1
41 A1702001 4/27/2017; 9/11/2017
EDISON - TO LEASE CERTAIN FIBER OPTIC CABLES TO CELLCO PARTNERSHIP DBA
VEIRIZON WIRELESS UNDER THE MASTER DARK FIBER LEASE AGREEMENT PURSUANT
TO PUB. UTIL. CODE SECTION 851
Clifford Rechtschaffen Hallie Yackin 0 2
42 A1702003 05/18/17
GILL RANCH STORAGE, LLC, NORTHWEST NATURAL GAS CO., ET AL. - FOR A CHANGE OF
LEGAL OWNERSHIP AND CONTROL OF GILL RANCH STORAGE, LLC THROUGH A
CORPORATE REORGANIZATION
Clifford Rechtschaffen
Patricia B. Miles/ Peter V.
Allen0 1
43 A1702005 05/08/17
PG&E - FOR COMPLIANCE REVIEW OF UTILITY OWNED GENERATION OPERATIONS,
ELECTRIC ENERGY RESOURCE RECOVERY ACCOUNT ENTRIES AND OTHER ACTIVITIES FOR THE PERIOD OF JANUARY 1 THROUGH
DECEMBER 31, 2016
Martha Guzman Aceves
Kelly A. Hymes 0 1
![Page 132: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/132.jpg)
2017 Report207092767 Page 125
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
44 A1702007 06/02/17
SIGCA HOLDINGS, LLC - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED AND
RESOLD COMPETITION LOCAL EXCHANGE SERVICE AND FULL FACILITIES-BASED
INTEREXCHANGE SERVICES
Martha Guzman Aceves
Adeniyi A. Ayoade 0 1
45 A1702010 10/19/17
CITY OF UNION CITY - TO INSTALL ONE NEW PEDESTRIAN AT-GRADE CROSSING, ACROSS AN OVER THE TRACK OF THE UNION PACIFIC RAILROAD OAKLAND SUBDIVISION AND THE
CLOSURE OF ONE EXISTING AT-GRADE CROSSING
Clifford Rechtschaffen
Robert W. Haga 0 1
46 A1703005 11/20/17
BURLINGTON NORTHERN SANTA FE RAILWAY CO. - TO ADD A THIRD TRACK AND CONNECT TO THE EXISTING THIRD TRACK NORTHWEST AND SOUTHEAST OF THE INTERSECTION OF
ROSECRANS AND MARQUARDT AVENUES
Liane M. Randolph
Katherine MacDonald 0 1
47 A1703006 05/15/17
CITY OF EMERYVILLE - TO CONSTRUCT THE SOUTH BAYFRONT PEDESTRIAN BICYCLE
BRIDGE OVER NINE RAIL TRACKS OWNED BY THE UNION PACIFIC RAILROAD CO.
Liane M. Randolph
Patricia B. Miles 0 1
![Page 133: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/133.jpg)
2017 Report207092767 Page 126
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
48 A1703007 05/24/17SUN MICROWAVE, INC. - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED AND
RESOLD COMPETITIVE EXCHANGE SERVICE
Liane M. Randolph
Adeniyi A. Ayoade 0 1
49 A1703016 08/15/17
BROADWING COMMUNICATIONS, LLC, GLOBAL CROSSING LOCAL SERVICES, INC, GLOBAL CROSSING TELECOMMUNICATIONS, INC. ET
AL. - FOR APPROAL OF TRANSFER OF CONTROL OF THE LEVEL 3 OPERATING
ENTITIES
Martha Guzman Aceves
Regina DeAngelis 0 1
50 A1703018 06/08/17
SONOMA MARIN AREA RAIL TRANSIT - TO CONSTRUCT A NEW AT-GRADE CROSSING ON
SMART RAIL LINE WHICH IS A SUBPROJECT OF THE LARKSPUR EXTENSION PROJECT
Liane M. Randolph
Adeniyi A. Ayoade/ Dan H. Burcham
0 1
51 A1703020 06/30/17 EDISON - FOR RECOVERY OF ALISON CANYON UTILITY OWNED ENERGY STORAGE COSTS
Carla J. Peterman
Melissa K. Semcer 0 1
![Page 134: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/134.jpg)
2017 Report207092767 Page 127
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
52 A1703021 08/28/17
SOCAL GAL AND SDG&E - FOR APPROVAL OF THE FORECASTED REVENUE REQUIREMENT
ASSOCIATED WITH CERTAIN PIPELINE SAFETY ENHACEMENT PLAN PROJECTS, RATE
RECOVERY, MODIFY AND CREATE CERTAIN BALANCING ACCOUNTS
Clifford Rechtschaffen
Adeniyi A. Ayoade 0 1
53
A1704001; A1704002; A1704003; A1704006
06/22/17
SAN JOSE WATER CO. - FOR AUTHORITY TO ADJUST ITS COST OF CAPITAL AND TO
REFLECT IT IN RATES FOR THE PERIOD FROM JANUARY/2018 THROUGH DECEMBER/2020
Martha Guzman Aceves
Karl J. Bemesderfer 0 1
54 A1704004 07/12/17
EDISON - FOR FINDING THAT ITS PROCUREMENT-RELATED AND OTHER
OPERATIONS FOR THE PERIOD OF JANUARY THROUGH DECEMBER 2016 COMPLIED IWTH
PROCUREMENT PLAN, ET AL.
Martha Guzman Aceves Eric Wildgrube 0 1
55 A1704010 07/13/17PG&E - FOR A CPCN TO PROVIDE FULL
FACILITIES-BASED AND RESOLD COMPETITIVE LOCAL EXCHANGE SERVICE
Liane M. Randolph
Jessica T. Hecht 0 1
![Page 135: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/135.jpg)
2017 Report207092767 Page 128
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
56 A1704012 08/08/17
PROPER SIGHTSEEING CORP. - FOR AUTHORITY TO OPERATE AS A PSC WITH HOP ON/HOP OFF SERVICE ON FIXED ROUTES AND
TO ESTABLISH A ZORF
Clifford Rechtschaffen Hallie Yackin 0 1
57 A1704016 08/01/17
SDG&E - FOR APPROVAL OF ITS 2018 ELECTRIC PROCUREMENT REVENUE
REQUIREMENT FORECASTS AND GHG-RELATED FORECASTS
Martha Guzman Aceves Gerald F. Kelly 0 1
58 A1704017 09/25/17
SDG&E - FOR APPROVAL OF THE RESULTS FROM ITS 2016 TRACK IV LOCAL CAPACITY REQUIREMENT PREFERRED RESOURCES
REQUESTS FOR OFFERS
Michael Picker Sophia J. Park 0 1
59 A1704020 08/02/17
RGT UTILITIES OF CALIFORNIA, INC. AND ROCKEFELLER GROUP INTRERNATIONAL, INC. AND CONVERAGEONE, INC. - FOR APPROVAL
TO TRANSFER CONTROL OF RGT UTILITIES OF CALIFORNIA, INC.
Martha Guzman Aceves
Jessica T. Hecht 0 1
60 A1704023 08/18/17PACIFICORP - TO RECOVER COSTS
RECORDED IN THE CATASTROPHIC EVENT MEMORANDUM ACCOUNT
Carla J. Peterman
Melissa K. Semcer 0 1
![Page 136: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/136.jpg)
2017 Report207092767 Page 129
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
61 A1704024 08/14/17
MESA-CREST WATER CO. AND LIBERTY UTILITIES (PARK WATER) CORP. - FOR
AUTHORITY TO SELL AND TO PURCHASE THE UTILITY ASSETS OF MESA-CREST WATER CO.
Martha Guzman Aceves
Gerald F. Kelly/ Sasha
Goldberg/ Katherine
MacDonald
0 1
62 A1704025 10/04/17
CITY OF SARATOGA - FOR AN ORDER AUTHORIZING THE CONSTRUCTION OF AN AT-
GRADE PEDESTRIAN, AND BICYCLE CROSSING OVER THE TRACKS OF UNION
PACIFIC
Liane M. Randolph Valerie U. Kao 0 1
63 A1704027 08/01/17SDG&E - FOR AUTHORITY TO IMPLEMENT THE
CUSTOMER INFORMATION SYSTEM REPLACEMENT PROGRAM
Carla J. Peterman Rafael L. Lirag 0 1
64
A1704028; A1705003; A1705005; A1705009
08/18/17PG&E - FOR APPROVAL OF ITS 2018-2020
ELECTRIC PROGRAM INVESTMENT CHANGE INVESTMENT PLAN
Martha Guzman Aceves
Stephen C. Roscow 0 1
![Page 137: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/137.jpg)
2017 Report207092767 Page 130
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
65 A1705004 08/25/17
GOLDEN STATE WATER COMPANY ON BEHALF OF ITS BEAR VALLEY ELECTRIC SERVICE
DIVISION - FOR APPROVAL AND RECOVERY OF COSTS AND AUTHORITY TO INCREASE RATES
AND OTHER CHARGES FOR YEARS 2018 THROUGH 2021
Clifford Rechtschaffen
Adeniyi A. Ayoade 0 1
66 A1705006 07/24/17EDISON - FOR APPROVAL OF ITS FORECAST
2018 ERRA PROCEEDING REVENUE REQUIREMENT
Martha Guzman Aceves
Patricia B. Miles 0 1
67 A1705011 07/31/17
SCRS ACQUISITION CORP., SECURUS INVESTMENT HOLDINGS, LLC,AND SECURUS TECHNOLOGIES, INC. - FOR APPROVAL OF
TRANSFER OF INDERECT CONTROLOF SECURUS TECHNOLOGIES, INC.
Liane M. Randolph
Patricia B. Miles 0 1
68 A1705012 07/07/17SDG&E - EXPEDITED APPLICATION UNDER
THE ENERGY RESOURCE RECOVERY ACCOUNT TRIGGER MECHANISM
Martha Guzman Aceves Eric Wildgrube 0 1
69 A1705014 09/13/17
CALIFORNIA HIGH SPEED RAIL AUTHORITY - TO CONSTRUCT PROPOSED HIGH-SPEED
TRACKS AND RAIL-RAIL GRADE SEPARATION AT THE EXISTING SPUR TRACKS OF BNSF
RAILWAY COMPANY
Liane M. Randolph
Melissa K. Semcer 0 1
![Page 138: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/138.jpg)
2017 Report207092767 Page 131
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
70 A1705015 09/22/17 CITY COMMUNICATIONS, INC. - NDIEC REGISTRATION
Carla J. Peterman
Zita Kline/ Katherine
MacDonald0 1
71 A1705016 09/21/17
CITY COMMUNICATIONS, INC. - FOR A CPCN TO PROVIDE RESOLD AND LIMITED FACILITIES-
BASED LOCAL EXCHANGE TECOMMUNICATIONS SERVICES
Carla J. Peterman
Zita Kline/ Katherine
MacDonald0 1
72 A1705017 08/14/17WEST CORPORATION, AND OLYMPUS
HOLDINGS II, LLC - TO AUTHORIZE THE TRANSFER OF CONTROL
Clifford Rechtschaffen
Kelly A. Hymes 0 1
73 A1705022 9/19/2017; 11/15/2017
CAL WATER SERVICE CO. - FOR A CPCN TO PROVIDE WATER SERVICE TO TRAVIS AIR FORCE BASE AND TO ESTABLISH RATES
Carla J. Peterman
Julie A. Fitch/ Katherine
MacDonald0 2
74 A1706003 10/17/17
SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT - TO CONSTRUCT A GRADE-
SEPARATED RAIL OVER/UNDER CROSSINGS AT 12 INTERSECTIONS IN PITTSBURG AND
ANTIOCH CITIES, COUNTY OF CONTRA COSTA
Liane M. Randolph Peter V. Allen 0 1
![Page 139: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/139.jpg)
2017 Report207092767 Page 132
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
75 A1706004 10/17/17
SAN FRANCISCO BAY AREA TRANSIT DISTRICT - TO CONSTRUCT ONE NEW GRADE-
SEPARATED CROSSING FOR THE WEST ACCESS BRIDGE AND PLAZA PROJECT TO THE
WARM SPRINGS/SOUTH FREMONT BART STATION
Liane M. Randolph Peter V. Allen 0 1
76 A1706005 08/04/17
PG&E - FOR ADOPTION OF ELECTRIC REVENUE REQUIREMENTS AND RATES ASSOCIATED WITH ITS 2018 ENERGY
RESOURCE RECOVERY ACCOUNT AND GENERATION NON-BYPASSABLE CHARGES
FORECAST
Martha Guzman Aceves S. Pat Tsen 0 1
77 A1706006 08/18/17
SDG&E - FOR APPROVAL OF CONTRACT ADMINISTRATION, LEAST-COST DISPATCH
AND POWER PROCUREMENT ACTIVITIES IN 2016
Martha Guzman Aceves
Kelly A. Hymes 0 1
78 A1706007 10/10/17CRIMSON CALIFORNIA PIPELINE L.P. - FOR AUTHORITY TO INCREASE RATES FOR ITS
CRUDE OIL PIPELINE SERVICES
Clifford Rechtschaffen
Patricia B. Miles 0 1
![Page 140: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/140.jpg)
2017 Report207092767 Page 133
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
79 A1706008 09/21/17
UNITI FIBER LLC - FOR CPCN TO PROVIDE FULL FACILITIES-BASED AND RESOLD
COMPETITIVE LOCAL EXCHANGE SERVICE AND NON-DOMINANT INTEREXCHANGE
SERVICE
Liane M. Randolph
Zita Kline/ Katherine
MacDonald0 1
80 A1706013 11/15/17
SILICA NETWORKS - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED AND RESOLD
COMPETITIOVE LOCAL EXCHANGE SERVICE AND INTEREXCHANGE SERVICE
Michael Picker Hallie Yackin 0 1
81 A1706016 09/06/17SOCAL GAS CO. - APPLICATION REGARDING
YEAR 23 (2016-2017) OF ITS GAS COST INCENTIVE MECHANISM
Carla J. Peterman
W. Anthony Colbert/ Timothy Kenney
0 1
82 A1706018 11/09/17
WAVE HOLDCO, LLC, ASTOUND BROADBAND, LLC, AND RADIATE HOLDINGS, L.P. - FOR EXPEDITE APPROVAL OF TRANSFER OF
CONTROL OF ASTOUND BROADBAND PURSUANT TO PUB. UTIL. CODE SECTION
854(a)
Michael Picker Robert W. Haga 0 1
83 A1706030 11/22/17 EDISON - TO ESTABLISH MARGINAL COSTS, ALLOCATE REVENUES, AND DESIGN RATES
Carla J. Peterman
Michelle Cooke 0 1
![Page 141: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/141.jpg)
2017 Report207092767 Page 134
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
84A1706031; A1706033; A1706034
10/25/17PACIFICORP - FOR APPROVAL OF ITS 2017
TRANSPORTATION ELECTRIFICATION PROGRAMS
Carla J. Peterman
Michelle Cooke/ Sasha
Goldberg0 1
85 A1706032 8/31/2017; 9/1/2017
COX CALIFORNIA TELCOM, LLC - FOR WAIVER TO PROVIDE ACCESS TO INTEREXCHANGE
CARRIERS WHEN OFFERING BASIC SERVICE AND CALIFORNIA LIFELINE WIRELINE SERVICE
Martha Guzman Aceves
Patricia B. Miles 0 2
86 A1707001 12/20/17
LIBERTY UTILITIES (CALPECO ELECTRICAL) LLC - FOR AUTHORITY TO UPDATE RATES
PURSUANT TO ITS ENERGY COST ADJUSTMENT CLAUSE EFFECTIVE JANUARY 1,
2018
Martha Guzman Aceves
Robert W. Haga 0 1
87 A1707004 09/22/17
SYNERGEM TECHNOLOGIES, INC. - FOR A CPCN TO PROVIDE RESOLD AND LIMITED FACILITIES-BASED COMPETITIVE LOCAL EXCHANGE AND 911 CALL TRANSPORT
TELECOMMUNICATIONS SERVICES
Clifford Rechtschaffen
Patricia B. Miles 0 1
![Page 142: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/142.jpg)
2017 Report207092767 Page 135
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
88 A1707006 09/28/17
CITY OF SAN MATEO - FOR AN ORDER AUTHORIZING CONSTRUCTIONS OF TWO NEW
GRADE SEPARATED VEHICULAR UNDERPASSES AND ONE PEDESTRIAN
UNDERPASS IN THE CITY OF SAN MATEO
Liane M. Randolph
Adeniyi A. Ayoade/ Zita
Kline0 1
89 A1707008 10/13/17
SQF, LLC - FOR A CPCN TO PROVIDE FULL FACILITIES-BASED LOCAL EXCHANGE AND INTEREXCHANGE TELECOMMUNICATIONS
SERVICES
Liane M. Randolph
Nilgun Atamturk 0 1
90 A1707009 12/07/17
PENINSULA CORRIDOR JOINT POWERS BOARD - FOR AN ORDER AUTHORIZING
CONSTRUCTION OF A NEW GRADE SEPARATED PEDESTRIAN UNDERPASS IN THE
CITY OF SOUTH SAN FRANCISCO
Liane M. Randolph Gerald F. Kelly 0 1
91 A1707010 12/29/17GOLDEN STATE WATER CO. - FOR AN ORDER
AUTHORIZING IT TO INCREASE RATES FOR WATER SERVICE IN YEARS 2019 - 2021
Martha Guzman Aceves Gerald F. Kelly 0 1
![Page 143: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/143.jpg)
2017 Report207092767 Page 136
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
92 A1708005 11/03/17
PACIFICORP - FOR APPROVAL OF ITS 2018 ENERGY COST ADJUSTMENT CLAUSE AND
GREENHOUSE GAS-RELATED FORECAST AND RECONCILIATION OF COST AND REVENUE
Martha Guzman Aceves
Katherine MacDonald/
Eric Wildgrube0 1
93 A1708010 12/20/17
ROI NETWORKS, LLC - TO OBTAIN A CPCN AS A TELEPHONE CORPORATION TO OPERATE
AS A PROVIDER TO LIMITED FACILITIES-BASED AND RESOLD LOCAL EXCHANGE SERVICE
Clifford Rechtschaffen
Patricia B. Miles 0 1
94 A1708017 11/22/17
SDG&E - FOR AUTHORITY TO ISSUE DEBT SECURITIES IN AN AGGREGATE PRINCIPAL
AMOUNT UP TO $750 OF DEBT CAPITAL, ISSUE ROLL-OVER DEBT SECURITIES AND RELATED
ACTIONS
Michael Picker Rafael L. Lirag 0 1
95 A1708019 11/03/17
CALIFORNIA HIGH-SPEED RAIL AUTHORITY - TO CONSTRUCT PROPOSED HIGH-SPEED
TRACKS AND UNDERPASS GRADE SEPARATION WITHIN THE CITY OF FRESNO
Carla J. Peterman Zita Kline 0 1
![Page 144: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/144.jpg)
2017 Report207092767 Page 137
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
96 A1708021 11/22/17
PLANT HOLDINGS, INC. AIRBUS DS COMMUNICATIONS, INC., AND MOTOROLA
SOLUTIONS, INC. - FOR APPROVAL OF THE TRANSFER OF CONTROL OF PLANT
HOLDINGS, INC.
Martha Guzman Aceves
Sasha Goldberg/
Rafael L. Lirag0 1
97 A1708022 10/30/17
CITY OF VICTORVILLE - TO CONSTRUCT AN OVERHEAD GRADE-SEPARATION STRUCTURE
FOR GREEN TREE BLVD. IN THE CITY OF VICTORVILLE
Liane M. Randolph Zita Kline 0 1
98 A1709007 11/17/17BANDWIDTH .com CLEC, LLC - TO TRANSFER CONTROL TO DAVID A. MORKEN PURSUANT
TO PUB. UTIL. CODE SECTION 854(a)
Liane M. Randolph Zita Kline 0 1
99 A1709015 11/17/17TRITON NETWORKS, LLC - FOR A CPCN TO PROVIDE LIMITED FACILITIES-BASED AND
RESOLD LOCAL EXCHANGE SERVICES
Clifford Rechtschaffen Zita Kline 0 1
100 A1709017 11/30/17
CALIFORNIA HIGH-SPEED RAIL AUTHORITY - FOR APPROVAL TO CONSTRUCT TWO NEW GRADE SEPARATED CROSSINGS OVER THE
PROPOSED HIGH-SPEED RAIL TRACKS
Michael Picker Zita Kline 0 1
![Page 145: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/145.jpg)
2017 Report207092767 Page 138
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
101 C1010010 D1704019; D1710006
HETHERINGTONS VS PG&E - DISPUTE ON RELOCATION OF SMART METER AND REFUND
OF RELATED OVERCHARGES
Martha Guzman Aceves
Stephen C. Roscow 2 0
102 C1401006 D1705032UNITED ENERGY TRADING, LLC VS. PG&E -
FOR RELIEF FROM VIOLATION OF GAS RULES NOS. 11 AND 23
Clifford Rechtschaffen
Karl J. Bemesderfer 1 0
103 C1604007 D1704018(ECP) GREBE VS. PG&E - FOR RELIEF FROM CHARGES RELATED TO SMART-METER-OPT-
OUT
Martha Guzman Aceves
Karl J. Bemesderfer 1 0
104 C1604009 D1704020; D1710005
BB’S DELI, LLC VS. SDG&E - FOR AN ORDER THAT DEFENDANT VIOLATED TARIFF RULE 12
Martha Guzman Aceves
Patricia B. Miles 2 0
105 C1605010 D1704041
WHITE, THE POOLE, AVALOS, SULLIVAN, FURNAS, CHARIST, ROSH, SINDLINGER, CHISM, GALLARDO, AND TENHET VS. CA
WATER SERVICE CO. - RELIEF FROM IMPROPER CHARGES FOR CONSTRUCTION OF
A WATER MAIN EXTENSION
Martha Guzman Aceves Dan Burcham 1 0
![Page 146: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/146.jpg)
2017 Report207092767 Page 139
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
106 C1606008 D1705031; D1708031
CITY OF OJAI VS. GOLDEN STATE WATER COMPANY - FOR RELIEF FROM ALLEGED
VIOLATION OF GO 103-A
Clifford Rechtschaffen
Patricia B. Miles 2 0
107 C1606011 D1706017; D1712028 01/31/17 OTAY LANDFILL GAS, LLC . VS SDG&E - FOR
RELIEF FROM DENIAL OF SERVICECarla J.
Peterman Robert Mason 2 1
108 C1607012 D1706029 DC UNIVERSAL, LLC VS. CAL-AM WATER CO. - FOR A REFUND DUE TO BILLING ERRORS
Clifford Rechtschaffen
Adeniyi A. Ayoade/
Kimberly Kim1 0
109 C1610009 D1710007 MEIJER VS. SPRINT TELEPHONY PCS, LP - FOR A REFUND ORDERED BY D10-04-016
Liane M. Randolph Dan Burcham 1 0
110 C1610021 D1710008 03/29/17 GILDRED BUILDING CO. AND OCOTILLO SOLAR LLC VS. EDISON
Liane M. Randolph
Regina DeAngelis 1 1
111 C1611001 D1710020 03/14/17CITY OF HAYWARD VS. PG&E - FOR RELIEF FOR FAILURE TO ALLOCATE RELOCATION
CREDITS PER PG&E TARIFF RULE 20A
Liane M. Randolph
Karl J. Bemesderfer/ Dan Burcham
1 1
![Page 147: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/147.jpg)
2017 Report207092767 Page 140
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
112 C1611009 04/25/17SHILBERG VS. SDG&E - FOR RELIEF FROM INACCURATE BILLING AND REQUEST FOR
METER CALIBRATION
Clifford Rechtschaffen
Kimberly H. Kim/ Katherine
MacDonald0 1
113 C1612004 D1712026 03/23/17
DEJONG BROTHERS FARMING, ROBERT WINTERS, TRUSTEE OF THE WINTERS
REVOCABLE TRUST, ET AL VS PG&E - FOR AN ORDER THAT PG&E BE
ENJOINED/RESTRAINED FROM REMOVING ALMOND TREES BENEATH TRANSMISSION
LINES
Carla J. Peterman
Karl J. Bemesderfer 1 1
114 C1612012 D1711035 10/11/17
PARKS, SALISBURY, SHERILL, ET AL. VS. MESA DUNES MOBILE HOME ESTATES, LLC - FOR
RELIEF PURSUANT TO PUB. UTIL. CODE SECTION 2705.6 TO DETERMINE WHETHER
THE RATES CHARGED ARE JUST AND REASONABLE
Liane M. Randolph Dan Burcham 1 1
115 C1612018 D1712025
NOMAD VILLAGE MOBILE HOME PARK HOMEOWNERS VS. LAZY LANDING MOBILE HOME PARK AND WATERHOUSE MGMNT
CORP - FOR RELIEF FROM VIOLATIONS OF SUB-METERING RULES AND PUC §739.5
Martha Guzman Aceves Robert Mason 1 0
![Page 148: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/148.jpg)
2017 Report207092767 Page 141
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
116 C1705001 10/03/17POCO POWER, LLC VS. PG&E - FOR RELIEF
FROM INAPPROPRIATE APPLICATION OF REMAT TARIFF
Carla J. Peterman
Regina DeAngelis 0 1
117 C1708006 11/01/17
CITY OF ROLLING HILLS VS. CALIFORNIA WATER SERVICE CO. - DISPUTE ON BASE
ALLOCATION FOR PARCELS OF RESIDENTS FOLLOWING DECEMBER 31, 2012 AND
RELATED RELIEF
Liane M. Randolph Gerald F. Kelly 0 1
118 C1708007 11/03/17
RADIANT BMT, LLC, VS. SOUTHERN CALIFORNIA EDISON COMPANY - FOR A DETERMINATION THAT COMPLAINANT'S
PROJECTS 1, 2, 3 AND 4 ARE ELIGIBLE FOR THE AS-AVAILABLE NON-PEAKING PRODUCT
TYPE
Carla J. Peterman
Regina DeAngelis 0 1
119 C1708011 11/17/17
ATHANASIOUS VS. PG&E - FOR RELIEF FROM REFUSAL AND FAILURE TO INSTAL A NEW
ELECTRIC METER AT THE PERMITTED LOCATION
Carla J. Peterman Rafael L. Lirag 0 1
![Page 149: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/149.jpg)
2017 Report207092767 Page 142
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
120 C1709001 11/21/17
MARTINEZ MASONIC TEMPLE ASSOC. VS. PG&E - FOR AN ORDER TO MOVE THE POWER
LINES TO A SAFE DISTANCE FROM 700 MASONIC STREET WITH NO COST TO
COMPLAINANT TO ALLOW MAINTENANCE OF BUILDING
Martha Guzman Aceves Zita Kline 0 1
121 C1709023 12/28/17PAC BELL DBA AT&T CALIFORNIA VS. VAYA
TELECOM, INC. - TO ENFORCE DECISION 14-01-006 AN RELATED RELIEF
Liane M. Randolph Zita Kline 0 1
122 I1405012 03/06/17 CPUC - OII TO ADDRESS INTRASTATE RURAL CALL COMPLETION ISSUES
Clifford Rechtschaffen Robert Mason 0 1
123 I1506018 D1703013 D1708014
CPUC - OIR INTO THE OPERATION AND PRACTICES OF MESA-CREST WATER CO.
WITH RESPECT TO A SERIES OF FINANCIAL TRANSACTIONS AND POSSIBLE THREATS TO
THE HEALTH AND SAFETY OF ITS RATEPAYERS
Clifford Rechtschaffen
W. Anthony Colbert 2 0
124 I1508019 05/08/17
CPUC - OII TO DETERMINE WHETHER PACIFIC GAS AND ELECTRIC COMPANY AND PG&E
CORPORATION’S ORGANIZATIONAL CULTURE AND GOVERNANCE PRIORITIZE SAFETY.
Michael Picker Regina DeAngelis 0 1
![Page 150: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/150.jpg)
2017 Report207092767 Page 143
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
125 I1511006 D1704040
CPUC - OII INTO THE OPERATIONS AND PRACTICES OF EDISON, NOTICE OF HEARING,
AND ORDER TO SHOW CAUSE WHY FINES AND SANCTIONS SHOULD NOT BE IMPOSE
FOR THE HUNTINGTON BEACH UNDERGROUND VAULT INCIDENT
Liane M. Randolph
Kimberly H. Kim 1 0
126 I1511015 D1705016; D1711034
CPUC - OII AND ORDERING PG&E TO APPEAR AND SHOW CAUSE WHY IT SHOULD NOT BE
SANCTIONED FOR VIOLATIONS OF ARTICLE 8 AND RULE 1.1 AND PUB. UTIL. CODE
SECTIONS 1701.2 AND 1701.3
Michael Picker Robert Mason 2 0
127 I1606010 D1706018; D1712027
CPUC - OII INTO THE FATAL ACCIDENT ON THE LINE OF BAY AREA RAPID TRANSIT DISTRICT
BETWEEN THE WALNUT CREEK AND PLEASANT HILL STATIONS ON OCTOBER 19,
2013
Liane M. Randolph
Kimberly H. Kim 2 0
128 I1607007 D1707010
CPUC - OII INTO THE OPERARTIONS AND PRACTICES OF EDISON, NOTICE OF
OPPORTUNITY FOR HEARING AND ORDER TO SHOW CAUSE FOR OUTAGES IN THE CITY OF
LONG BEACH IN JULY AND AUGUST 2015
Michael Picker Michelle Cooke 1 0
![Page 151: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/151.jpg)
2017 Report207092767 Page 144
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
129 I1610015; I1610016 01/11/17
CPUC - OII INTO THE NOVEMBER 2016 SUBMISSION OF RISK ASSESSMENT AND MITIGATION PHASE BY SAN DIEGO GAS &
ELECTRIC COMPANY
Clifford Rechtschaffen Rafael L. Lirag 0 1
130 I1702002 06/20/17
CPUC - OIR PURSUANT TO SB 380 TO DETERMINE THE FEASIBILITY OF
MINIMIZING/ELIMINATING ALISO CANYON NATURAL GAS STORAGE FACILITY IN THE
COUNTY OF L.A. WHILE MAINTANING ENERGY AND ELECTRIC RELIABILITY
Liane M. Randolph
Melissa K. Semcer 0 1
131 I1703002 07/21/17
CPUC - OII TO DETERMINE WHETHER THE ALISO CANYON NATURAL GAS STORAGE
FACILITY HAS REMAINED OUT OF SERVICE AND EXPENSES SHOULD BE DISALLOWED
FROM THE RATES OF SOCAL GAS
Liane M. Randolph Gerald F. Kelly 0 1
132 I1704009 08/09/17
CPUC - OIR TO IMPOSE FINES AND SANCTIONS AGAINST RASIER-CA LLC FOR VIOLATING THE COMMISSION'S D13-09-045,
SAFETY REQUIREMENT D BY FAILING TO COMPLY WITH THE ZERO TOLERANCE RULES/
PUB. UTIL. CODE 5831
Liane M. Randolph
W. Anthony Colbert/
Robert Mason0 1
![Page 152: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/152.jpg)
2017 Report207092767 Page 145
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
133 I1704019 09/14/17
CPUC - OII TO DETERMINE WHETHER PACIFICORP ENGAGES IN LEAST-COST
PLANNING ON A CONTROL AREA BASIS AND WHETHER ITS INTER-JURISDICTIONAL COST
ALLOCATION PROTOCOL RESULTS IN REASONABLE RATES
Liane M. Randolph
Jessica T. Hecht 0 1
134 I1704021 9/20/2017; 11/21/2017
CPUC - OII INTO THE BILLING PRACTICES OF SOCAL GAS CO. AND ORDER TO SHOW CAUSE WHY RULE NO. 14 SHOULD NOT BE REVISED,
IMPOSE PENALTIES, AND/OR OTHER REMEDIES FOR EXTENDING BILLING PERIODS
Clifford Rechtschaffen
Adeniyi A. Ayoade 0 2
135 I1706025 11/21/17
CPUC - OII FOR THE PURPOSE OF EXTABLISHING A LIST FOR THE FISCAL YEARS
2018-2019 AND 2019-2020 OF EXISTING CROSSINGS AT GRADE OF CITY STREETS, COUNTY ROADS OR STATE HIGHWAYS IN
NEED OF SEPARATION
Martha Guzman Aceves Valerie U. Kao 0 1
136 R0310003 03/01/17CPUC - OIR TO IMPLEMENT PORTIONS OF AB
117 CONCERNING COMMUNITY CHOICE AGGREGATION
Michael PickerPeter V. Allen/
Anne E. Simon
0 1
![Page 153: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/153.jpg)
2017 Report207092767 Page 146
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
137 R0901020 09/27/17CPUC - OIR TO CONSIDER ROADWAY WORKER PROTECTIONS BY TRANSIT
AGENCIES IN CALIFORNIA
Clifford Rechtschaffen
Kimberly H. Kim 0 1
138 R1103013 D1706019; D1710022
CPUC - OIR REGARDING REVISIONS TO THE CALIFORNIA UNIVERSAL TELEPHONE SERVICE
(LIFELINE) PROGRAM
Martha Guzman Aceves
Katherine MacDonald 2 0
139 R1111007 D1701033 04/04/17 CPUC - OIR INTO THE REVIEW OF THE CALIFORNIA HIGH COST FUND-A PROGRAM
Martha Guzman Aceves
W. Anthony Colbert/ Legal
Division1 1
140 R1206013 01/23/17
CPUC - OIR TO CONDUCT A COMPREHENSIVE EXAMINATION OF INVESTOR OWNED
ELECTRIC UTILITIES’ RESIDENTIAL RATE STRUCTURES, THE TRANSITION TO TIME
VARYING AND DYNAMIC RATES, AND OTHER STATUTORY OBLIGATIONS
Michael Picker
Jeanne McKinney/
Sophia Park/ S. Pat Tsen
0 1
141 R1211005 06/09/17
CPUC - OIR REGARDING POLICIES, PROCEDURES AND RULES FOR THE
CALIFORNIA SOLAR INITIATIVE, THE SELF-GENERATION INCENTIVE PROGRAM AND
OTHER DISTRIBUTED GENERATION ISSUES
Clifford Rechtschaffen
Regina DeAngelis/ S.
Pat Tsen/ Legal Division
0 1
![Page 154: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/154.jpg)
2017 Report207092767 Page 147
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
142 R1212011 4/7/2017; 6/12/2017
CPUC - OIR ON REGULATIONS RELATING TO PASSENGER CARRIERS, RIDESHARING, AND NEW ONLINE-ENABLED TRANSPORTATION
SERVICES
Liane M. Randolph
Robert Mason/ Legal Division 0 2
143 R1301010 06/02/17CPUC - OIR TO CONDUCT A COMPREHENSIVE
EXAMINATION OF THE CALIFORNIA TELECONNECT FUND
Carla J. Peterman Sophia J. Park 0 1
144 R1309011 D1703012 05/11/17
CPUC - OIR TO ENHANCE THE ROLE OF DEMAND RESPONSE IN MEETING THE STATE
RESOURCE PLANNING NEEDS AND OPERATIONAL REQUIREMENTS
Martha Guzman Aceves
Nilgun Atamturk/ Kelly A.
Hymes/ Legal Division
1 1
145 R1311006 03/17/17
CPUC - OIR TO DEVELOP A RISK-BASED DECISION-MAKING FRAMEWORK TO
EVALUATE SAFETY IMPROVEMENTS AND REVISE THE GENERAL RATE CASE PLAN FOR
ENERGY UTILITIES
Clifford Rechtschaffen
Stephen C. Roscow 0 1
146 R1311007 D1709039CPUC - OIR TO CONSIDER ALTERNATIVE-
FUELED VEHICLE PROGRAMS, TARIFFS, AND POLICIES
Carla J. Peterman
Michelle Cooke/ Sasha
Goldberg1 0
![Page 155: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/155.jpg)
2017 Report207092767 Page 148
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
147 R1312011
D1704021; D1706016; D1708013; D1710019
CPUC - OIR TO PROMOTE A PARTNERSHIP FRAMEWORK BETWEEN ENERGY INVESTOR OWNED UTILITIES AND THE WATER SECTOR
TO PROMOTE WATER-ENERGY NEXUS PROGRAMS
Martha Guzman Aceves
Michelle Cooke 4 0
148 R1403002 02/28/17
CPUC - OIR TO IMPLEMENT REGISTRATION OF THIRD PARTY NATURAL GAS PROCUREMENT
SERVICE PROVIDERS TO REGULATE NON-RATE MATTERS AND MINIMUM STANDARDS
OF CONSUMER PROTECTION
Carla J. Peterman
Kelly A. Hymes 0 1
149 R1403003 01/27/17
CPUC - OIR TO ADDRESS NATURAL GAS DISTRIBUTION UTILITY COST AND REVENUE ISSUES ASSOCIATED WITH GREENHOUSE
GAS EMISSIONS
Carla J. Peterman
Melissa K. Semcer 0 1
150 R1407002 08/31/17
CPUC - OIR TO DEVELOP A SUCCESSOR TO EXISTING NET ENERGY METERING TARIFFS AND TO ADDRESS OTHER ISSUES RELATED
TO NET ENERGY METERING
Martha Guzman Aceves
Jessica T. Hecht/ Valerie U. Kao/ Legal
Division
0 1
151 R1411001 04/28/17CPUC - OIR TO IMPROVE PUBLIC ACCESS TO
PUBLIC RECORDS PURSUANT TO THE CALIFORNIA RECORDS ACT
Michael Picker Rafael L. Lirag 0 1
![Page 156: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/156.jpg)
2017 Report207092767 Page 149
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
152 R1501008 D1706030 09/20/17
CPUC - OIR TO ADOPT RULES AND PROCEDURES GOVERNING COMMISSION-
REGULATED NATURAL GAS PIPELINES AND FACILITIES TO REDUCE NATURAL GAS
LEAKAGE CONSISTENT WITH SENATE BILL 1371
Clifford Rechtschaffen
Colette E. Kersten 1 1
153 R1502012 09/25/17
CPUC - OIR TO CONSIDER THE ANNUAL REVENUE REQUIREMENT DETERMINATION OF
THE CALIFORNIA DEPARTMENT OF WATER RESOURCES AND RELATED ISSUES
Clifford Rechtschaffen
Stephen C. Roscow 0 1
154 R1503010 12/06/17
CPUC - OIR TO IDENTIFY DISADVANTAGED COMMUNITIES IN THE SAN JOAQUIN VALLEY
AND ANALYZE ECONOMICALLY FEASIBLE OPTIONS TO INCREASE ACCESS TO
AFFORDABLE ENERGY IN THOSE DISADVANTAGED COMMUNITIES
Martha Guzman Aceves
Darcie L. Houck 0 1
155 R1503011D1705015; D1708012; D1709037
CPUC - OIR TO CONSIDER POLICY AND IMPLEMENTATION REFINEMENTS TO THE
ENERGY STORAGE PROCUREMENT FRAMEWORK AND DESIGN PROGRAM AND
RELATED ACTION PLAN OF THE CALIFORNIA ENERGY STORAGE ROADMAP
Carla J. Peterman
Michelle Cooke 3 0
![Page 157: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/157.jpg)
2017 Report207092767 Page 150
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
156 R1506009 03/10/17
CPUC - OIR FOR REGULATION OF PHYSICAL SECURITY FOR THE ELECTRIC SUPPLY
FACILITIES OF ELECTRICAL CORPORATIONS AND TO ESTABLISH STANDARDS FOR
DISASTER AND EMERGENCY PREPAREDNESS PLAN
Clifford Rechtschaffen Gerald F. Kelly 0 1
157 R1612001 04/26/17CPUC - OIR TO CONSIDER SPECIFIED
AMENDMENTS TO RULE 18 OF GENERAL ORDER 95
Michael Picker Timothy Kenney 0 1
158 R1703009 06/26/17
CPUC - ORDER GRANTING PETITION 16-08-016 AND OIR TO CONSIDER AMENDMENTS TO THE REVISED RIGHT-OF-WAY RULES ADOPTED BY
DECISION 16-01-046
Michael PickerTimothy Kenney/
Robert Mason0 1
159 R1706015 09/21/17
CPUC - OIR TO IMPLEMENT DAIRY BIOMETHANE PILOT PROJECTS TO
DEMONSTRATE INTERCONNECTION TO THE COMMON CARRIER PIPELINE SYSTEM IN COMPLIANCE WITH SENATE BILL 1383.
Clifford Rechtschaffen
Michelle Cooke/ Legal
Division0 1
160 R1706023 10/11/17CPUC - OIR TO CONSIDER WHETHER TEXT MESSAGING SERVICES ARE SUBJECT TO
PUBLIC PURPOSE PROGRAM SURCHARGES
Carla J. Peterman
Regina DeAngelis/ Zita Kline
0 1
![Page 158: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/158.jpg)
2017 Report207092767 Page 151
APPENDIX IORDERS EXTENDING THE STATUTORY DEADLINE
AND SCOPING MEMOS ISSUED IN PROCEEDINGS IN YEAR 2017
(NUMBER OF EXTENSIONS= 46 IN 31 PROCEEDINGS) (NUMBER OF SCOPING MEMOS= 149 IN 140 PROCEEDINGS)
NUMBER DECISION#SCOPING
MEMO FILE DATE
SHORT TITLE CMMR ALJ
NUMBER OF EXTENSIONS
PER PROCEEDING
NUMBER OF SCOPING
MEMOS PER PROCEEDING
161 R1706026 09/25/17CPUC - OIR TO REVIEW, REVISE, AND
CONSIDER ALTERNATIVES TO THE POWER CHARGE INDIFFERENCE ADJUSTMENT
Carla J. Peterman
Stephen C. Roscow/ Anne
E. Simon0 1
162 R1707007 10/02/17
CPUC - OIR TO CONSIDER STREAMLINING INTERCONNECTION OF DISTRIBUTED ENERGY
RESOURCES AND IMPROVEMENTS TO RULE 21
Michael Picker Kelly A. Hymes 0 1
TOTAL OF EXTENSION ORDERS AND SCOPING MEMOS 46 149
(END OF APPENDIX I)
![Page 159: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/159.jpg)
APPENDIX J
2017 Report207092767
COMMISSIONERS PRESENCE DURING 2017 AT HEARINGS SUBJECT TO SB 960*
No. of Days No. of Days Total DaysAttending Presiding Present
PICKER 3 3 6
PETERMAN 1 9 10
RANDOLPH 6 7 13
GUZMAN ACEVES 8 8 16
RECHTSCHAFFEN 4 4 8
TOTAL 22 31 53
* The database consists of all proceedings which went to hearing during 2017 under the SB 960 rules:
1. Number of proceedings = 160 2. Number of proceeding days with at least 1 Commissioner present = 53 3. Number of hearing days = 302
( Prehearing Conferences, Final Oral Arguments, and Evidentiary Hearings)
(END OF APPENDIX J)
![Page 160: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/160.jpg)
2017 Report207092767 Page 153
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
1
Pacificorp and Liberty Utilities LLC
(Calpeco Electric)
D.17-06-026R.15-02-020
11-30-17 Completed Order Modifying Decision 17-06-026 and Denying Rehearing of Decision, as Modified
D.17-11-037 (12-1-17)
2
Telephone Companies:Calaveras, Cal-Ore, Ducor, Foresthill, Kerman,
Pinnacles, Ponderosa, Sierra, Siskiyou, and Volcano.
Res. T-17559A.17-06-017
9-14-17 Completed Order Granting Limited Rehearing and Modifying Resolution T-17559 and DenyingRehearing as Modified
D.17-09-016 (9-18-17)
3 Michael J. Aguirre
Res. L-522A.17-06-001
8-24-17 Completed Order Denying Rehearing of Resolution L-522
D.17-08-033 (8-25-17)
4 AT&TD.17-04-007I.11-06-009
11-30-17 Completed Order Modifying Decision (D.)17-04-007 and Denying Rehearing of D.17-04-007, as Modified.
D.17-11-038 (12-5-17)
5 City of MontebelloD.17-02-015A.15-03-003
5-25-17 Completed Order Denying Rehearing of Decision (D.) 17-02-015
D.17-05-036 (5-26-17)
![Page 161: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/161.jpg)
2017 Report207092767 Page 154
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
6 Kerman Telephone Co.Res.T-17531A.17-03-010
11-30-17 Completed Order Denying Rehearing of Resolution T-17531
D.17-11-036 (12-5-17)
7 Sierra ClubD.16-12-036R.14-10-003
6-29-17 Completed Order Denying Rehearing of Decision (D.) 16-12-036
D.17-06-031 (6-30-17)
8Forest Residents Opposing
New Transmission Lines (“Frontlines”)D.16-12-064A.12-05-020
9-28-17 Completed Order Modifying Decision (D.) 16-12-064 and Denying Rehearing of Decision, as Modified
D.17-09-040 (10-3-17)
9
City of San Juan Capistrano
(related Motion for Stay filed)
D.16-12-064A.12-05-020
9-28-17 Completed Order Modifying Decision (D.) 16-12-064 and Denying Rehearing of Decision, as Modified
D.17-09-040 (10-3-17
10
Cal-Ore Telephone Co., Foresthill Telephone Co., Kerman Telephone Co.,
Ponderosa Telephone Co., Sierra Telephone Co.,
Volcano Telephone Co.
D.16-12-035A.15-09-005
12-14-17 Completed Decision Denying Rehearing of Decision 16-12-035
D.17-12-029 (12-18-17)
![Page 162: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/162.jpg)
2017 Report207092767 Page 155
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
11 Brian HomD.16-12-051C.16-09-009
4-6-17 Completed Order Denying Rehearing of Decision (D.) 16-12-051
D.17-04-022 (4-11-17)
12 Utility Reform Network (TURN), Greenlining Institute, and Center for Accessible Technology
D.16-12-025I.15-11-007
7-13-17 Completed Order DenyingRehearing of Decision (D.)16-12-025
D.17-07-011 (7-14-17)
13 Charter Communications, Inc.Res. T-17514A.17-01-004
8-10-17 Completed Order Modifying Resolution T-17514, and Denying Rehearing of Resolution, as Modified.
D.17-08-015 (8-11-17)
14
Charter Communications, Inc., Charter Fiberlink CA-CCO, LLC.,
Time Warner Cable Information Services, Bright House Networks Information Services
(related Motion for Stay filed)
D.16-12-070A.15-07-009
3-23-17 Completed Order Modifying Decision (D.) 16-12-070, and Denying Rehearing of Decision, as Modified.
D.17-03-028 (3-27-17)
![Page 163: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/163.jpg)
2017 Report207092767 Page 156
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
15 O1 Communications, Inc.D.16-09-005C.15-12-020
8-10-17 Completed Order GrantingRehearing of Decision (D.)16-09-005, and Vacating the Decision.
D.17-08-016 (8-11-17)
16James L. Duncan
(2nd in series)D.16-09-002A.15-05-014
8-10-17 Completed Order Modifying Decision 16-09-002 and Denying Rehearing of the Decision as Modified.
D.17-08-017 (8-11-17)
17Safety and Enforcement Division
(1st in series)D.16-09-002A.15-05-014
8-10-17 Completed Order Modifying Decision 16-09-002 and Denying Rehearing of The Decision aAs Modified.
D.17-08-017 (8-11-17)
18 Californians for Renewal Energy, Inc. (CARE)D.16-09-009A.09-04-001
10-26-17 Completed Order Modifying Decision 16-09-009 and Denying Rehearing of Decision, as Modified
D.17-10-024 (10-30-17)
![Page 164: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/164.jpg)
2017 Report207092767 Page 157
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
19Calaveras Telephone Co., Cal Ore Telephone Co., ETAL
(2nd in series)D.16-08-024R.14-11-001
5-25-17 Completed Order Modifying Decision 16-08-024 and Denying Rehearing of Modified Decision
D.17-05-035 (5-26-17)
20 Safety and Enforcement DivisionD.16-08-020I.14-11-008
10-26-17 Completed Order Modifying Decision (D.)16-08-020 And Denying Rehearing, As Modified
D.17-10-023 (10-30-17)
21 CTIA(1st in series)
D.16-08-024R.14-11-001
5-25-17 Completed Order Modifying Decision 16-08-024 and Denying Rehearing of Modified Decision
D.17-05-035 (5-26-17)
22
Center for Biological Diversity And Citizen Intervenors
Joint Application
D.16-08-002A.13-10-021
4-27-17 Completed Order DenyingRehearing of Decision (D.)16-08-002
D.17-04-044 (5-4-17)
23 Office of Ratepayer AdvocatesD.16-08-017A.13-10-020
3-23-17 Completed Order DenyingRehearing of Decision (D.)16-08-017
D.17-03-029 (3-27-17)
![Page 165: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/165.jpg)
2017 Report207092767 Page 158
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
24So. CA Edison Co.,
San Diego Gas & Electric Co., Natural Resources Defense Council
R.E.- 4792A.16-07-015
5-25-17 Completed Order GrantingLimited Rehearing of Resolution E-4792
D.17-05-034 (5-26-17)
25 Gulsen MaloneyD.16-06-017C.16-01-005
4-27-17 Completed Order DenyingRehearing of Decision (D.)16-06-017
D.17-04-043 (5-1-17)
26 Charter Communications, Inc.Res.T-17515A.16-07-003
8-10-17 Completed Order Modifying Resolution T-17515, Denying Rehearing of Resolution, as Modified, and Denying Related Motion for Stayof Resolution T-17515
D.17-08-018 (8-14-17)
27 Curtin Maritime Corporation
D.16-02-024A.14-10-015A.15-01-005
4-27-17 Completed Order GrantingLimited Rehearing of Decision 16-02-024
D.17-04-042 (4-28-17)
28 O1 Communications, Inc.D.16-09-005C.15-12-020
8-10-17 Completed Order GrantingRehearing of Decision (D.)16-09-005, and Vacating the Decision
D.17-08-016 (8-11-17)
![Page 166: Resolution of Proceedings, Disposition of Applications for ... · later than February 1 of each year. The Commission submits this report for the reporting period of calendar year](https://reader035.vdocument.in/reader035/viewer/2022071000/5fbc2accea57d964290f0811/html5/thumbnails/166.jpg)
2017 Report207092767 Page 159
APPENDIX KINFORMATION ON DISPOSITION OF APPLICATION FOR REHEARING
NUMBER REHEARING APPLICANTDECISION OR RESOLUTION
No./ PROCEEDING No.MEETING DATE/ TITLE/ SIGNED / ISSUANCE DECISION
No.
29 City of San Carlos & ORAD.15-06-034R.11-02-019
2-9-17 Completed Order ClarifyingIssue Related to Establishment of Maximum Allowable Operating Pressure, and Denying Rehearing Of D.15-06-034.
D.17-02-016 (2-10-17)
30 Southern California Edison
D.14-12-082A.12-12-012A.12-12-013
5-11-17 Completed Order Modifying Decision 14-12-082, and Denying Rehearing of Decision, As Modified.
D.17-05-017 (5-15-17)
31
Newhall Land and Farming Company
(Motion to Stay concurrently filed)
D.14-02-041A.13-01-004
4-25-17 Completed Order Dismissing Application For Rehearing of Decision 14-02-041 and RelatedMotion to Stay
D.17-04-025 (4-27-17)
(END OF APPENDIX K)