Page 1: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

RESPONSE to REQUEST for PROPOSAL

BUILDING ASSESMENTFAIRMOUNT SCHOOL BUILDING

NITTANY AVENUE ADMINISTRATION BUILDING

May 22, 2015

110 West Main Street, PO Box 865

Boalsburg, PA 16827-0865

Page 2: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

TABLE OF CONTENTS

LETTER OF INTERESTpage 1

FIRM / TEAM OVERVIEWpages 2 - 14

SIMILAR PROJECTSpages 15 -16

A/E FEE page 17

TIME SCHEDULEpage 18

CLOSING STATEMENTpage 19

Page 3: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

May 22, 2015

Mr. Ed Poprik PRSBO

Director of Physical Plant

State College Area School District

131 West Ni! any Avenue, State College, Pennsylvania. 16801

Re: Request for Proposal: Professional Services: Building Assessments

Dear Mr. Poprik:

It is with pleasure that Hoff man Leakey Architects LLC and our selected professional consultants submit

to you our experience and qualifi ca$ ons for selec$ on as your professionals in evalua$ ng both the former

Fairmount High School and Ni! any Avenue Administra$ on Building. We have assembled a local team

comprised of various disciplines to develop a comprehensive overview of the exis$ ng condi$ ons of both

buildings.

As project leader, I will be the primary contact for this assessment and also will be primary spokesman when

presenta$ ons are required by the team.

As you will note in our presenta$ on, various members of the team have performed previous reports for the

State College School District as members of the Facili$ es Commi! ee and as design professions appointed

by the District to evaluate Fairmount Avenue. It should be noted that we intend to set aside those studies

for a moment and start with a fresh mind as to present condi$ ons. Both buildings have played a strong role

in the history of State College and are within a strong dynamic area of the Borough.

To provide a clear and impar$ al overview of the present condi$ ons, I have assembled the following

disciplines:

An Architectural Team assembled from Hoff man Leakey Architects.

A structural team comprised of two local structural fi rms.

A Construc$ on Management fi rm with extensive construc$ on and management experience

A Hazardous material abatement fi rm

This team can supply important informa$ on based upon their profession as well as construc$ on and

renova$ on experience.

Finally, we understand that our report must address the condi$ ons in a clean precise manner and shall

provide the District with a document in which important school and community decisions can be made. We

feel our team is qualifi ed to perform this task and welcome your support by choosing us as your professionals.

We thank you for the opportunity of presen$ ng our qualifi ca$ ons and support your eff orts in this study

Sincerely

Robert H. Hoff man AIA LEED AP

HOFFMAN LEAKEY ARCHITECTS LLC.1

Page 4: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

TEAM OVERVIEW

The following team has been assembled to par! cipate in the building and immediate site assessment

based upon the scope of services outlined in the Request for Proposal dated May 4, 2015.

Resumes are included for reference.

Architectural Team Hoff man Leakey Architects LLC.

110 West Main Street, PO Box 865, Boalsburg Pa. 16827

Robert H. Hoff man AIA LEED AP Team Coordinator

Michael Leakey AIA Design / ADA Review

Sean Gray Architectural Technician

Structural Team Jesse F. Smith LLC

POB 113, Lemont, Pa. 16851 Structural Inves! ga! on

Jesse F Smith P.E. Structural Coordinator

Penn Central Engineering

154 Asford Drive

Centre Hall Pa. 16828 Structural Inves! ga! on

Jeff rey J. Vones P.E. Structural and Building Skin

Construc! on Team P.J. Dick Building Material Assessment

225 North Shore Drive Cost Es! ma! ng

Pi# sburgh, Pa 15212 Site Logis! cs

Dana F. Damon, Preconstruc! on Manager

Abatement Team Penoco Inc.

485 East College Avenue Abatement Overview

Plesant Gap, Pa. 16823 Cost Es! ma! ng

Tim Sommer, President and Sales Es! ma! ng

2

Page 5: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

O F F I C E P R O F I L E

In 1972, Robert H. Hoffman founded Hoffman Architecture to practice architectural, landscape, planning and interior design. Located in the village of Boalsburg, Pennsylvania our office strives to provide creative design alternatives and strong support throughout the design and construction phases. In January 2014, J. Michael Leakey joined Hoffman Architecture to form Hoffman Leakey Architects LLC. While the company name has changed, Hoffman Leakey Architects LLC remains firmly committed to the foundation of core values that Robert H. Hoffman has established in over 40 years of professional practice. Our office promotes a philosophy dedicated to client needs and achieving excellence in design; developing innovative yet functional buildings and sites that are sensitive to both the aesthetic and practical needs of our clients, the end user, and the context of which each facility is a part. As a commitment to our design philosophy, we emphasize the importance of a well-structured, collaborative approach to design. Our approach recognizes the value of client input, specific user needs, and a step by step process to obtain endorsement through interim decisions during the design process. As an extension of our commitment to architectural excellence, great care is given from the conceptual phase through the construction and post construction phases of a project to ensure that our client’s goals and financial objectives are met. Hoffman Leakey Architects LLC has diversified experience in a variety of projects including: University Facilities Life Care Communities Historical Renovation Maintenance Facilities Airport Support Facilities Master Planning Athletic Facilities Office Facilities Commercial Interiors Retirement Homes Copy Centers Restaurants Food Service Facilities Student Housing Governmental Buildings Technology Centers Hoffman Leakey Architects LLC offers full service design, contract documents, project management and construction administration. Our professional services include: Architectural Design Feasibility and design of new buildings as well as renovations including: adaptive re-use and restoration projects. Project scale ranges from small renovations to multi-million dollar projects.

Tombros Varsity Golf Clubhouse

Pennsylvania State University

Walker Building- Weather Station

Pennsylvania State University

Centre County Fire Training

Pleasant Gap, PA

Hoffman Architecture 1972

jowen
Text Box
3
Page 6: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

Site/Building Analysis Initial exploration and analysis of site and building conditions including: architectural, structural, mechanical, electrical and site/civil for potential re-use considerations. Studies of this nature do not always continue into built form but allow for owner review to determine project feasibility. Planning Master planning, urban design, with emphasis upon regional planning. Land development planning assists owners in recognizing and interfacing their design with the local and regional planning agencies. Interior Design/Space Planning Programming, space planning, budget and cost estimating, selection and specification of furniture and furnishings. Specific Function Studies Small scale studies relating to subjects such as ADA (American Disabilities Act), life safety, and zoning requirements. In order to keep pace with our clients’ needs we offer the following services: Contract drawings are developed utilizing AutoCAD, Revit and 3D modeling software. Specifications are developed from an office master based on the CSI Master Format. In conclusion, we listen to our client's needs, we create unique design options, and we provide strong support during the construction process.

Robert H. Hoffman, AIA, LEED AP

J. Michael Leakey, AIA

Hoffman Leakey Architects LLC Boalsburg, Pennsylvania

Personnel by Discipline Registered Architects 2 Interior Designer - Space Planner 1 Technical Support 3 Administration 1 7

The COG Building

The Deike Building Renovation-

Pennsylvania State University

jowen
Text Box
4
Page 7: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

  

Robert  H.  Hoffman,  AIA,  LEED®  AP                  

Senior Principal

As Principal of Hoffman Architecture, Robert Hoffman’s work has developed from the beginning of a small design studio  in Boalsburg, PA  in 1972 to the present studio at 110 West Main Street, Boalsburg, PA. His Experience and leadership skills has resulted in many successful projects within  the Centre Region  and  in particular, projects  relating  to Penn  State University. Most recently he has associated with  J. Michael Leakey to  form the  firm of Hoffman Leakey Architects, LLC. 

p r o j e c t   e x p e r i e n c e  

Master Plan • Penn State Rec Hall • Penn State University  McElwain Residence Hall Renovations • Penn State University  Simmons Hall Housing Renovations • Penn State University  Feasibility Study and Bridging Documents • South Halls Sorority Complex Penn State University  Centre County Fire Training Facility • Phase 1, 2 & 3 • Pleasant Gap, PA  West Stands Structural Study • Memorial Field State College Area School District  Alpha Fire Company Sub‐Station at College Township  College Township Office Renovations • Adapting Water Reuse  Centre Region Council of Governments Office Building  Renovations to North Halls Student Living Complex • 4 Buildings Penn State University  Tombros Varsity Golf Clubhouse • Penn State University  Visiting Team and Home Team Locker Rooms • Beaver Stadium Expansion  Feasibility Study • Borough of State College • New Maintenance Complex 

Pollock Dining Halls • Penn State University 

Findlay/Johnston Dining Hall • Penn State University  Coaches Complex Lacrosse • Soccer and Field Hockey • Penn State University  Overview and study of New Football Facilities • Michigan State University  Otto’s Kern Graduate Center • Penn State University 

a w a r d s   ABC Central PA • North Halls • Resident House    2009 ABC Central PA • Henderson • College of Nursing    2010 AIA Design Merit • Media Room • Beaver Stadium    1996 AIA Design Merit • Natatorium Locker Rooms    1988 

e d u c a t i o n   

THE PENNSYLVANIA STATE UNIVERSITY         Bachelor of Architecture • 1964  

UNIVERSITY OF MINNESOTA            Masters of Architecture • 1968 City Planning Option  

ARCHITECTURAL ASSOCIATION • 1963 London, England 

c o n t i n u i n g   e d u c a t i o n   

HARVARD GRADUATE SCHOOL OF DESIGN  

1978  Solar Design for Building 1992  Restaurant & Food Service Design 1993  University Resident Hall Design 1998  Office/High Rise Design   1999  Marketing Strategies 2004  New Office Architecture   2005  ADA Universal Design  2006  Campus Planning 2007  Senior Citizen Facilities 2009  Built Environment • Sustainability 2009  NCI Charrette System 2010  Reuse: Renovating Existing Buildings 2011  SEEP Design 2012  Library Design 2013  Urban Retail 

c o mm u n i t y   s e r v i c e   

Centre Region Code Administration Building & Housing Board of Appeals Appointed Member, State College, PA Chair person, 1985  

Borough of State College Professional Selection Committee Downtown Master Plan, 1987  

State College Area School District Facilities Advisory Committee State College, PA  Chair person, 1993‐1996  

Boalsburg Fire Company Fire Chief 1986‐1988 Boalsburg, PA  

Boalsburg Village Conservancy Board of Directors

jowen
Text Box
5
Page 8: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

p r o j e c t e x p e r i e n c e

The Penn Building Renovations

Penn State Altoona

Mushroom Research Compost Building

Penn State University

South Halls Renovations

Penn State University

Pollock Commons Dining Hall Renovation

Penn State University

Child Care Center at Hort Woods

Penn State University

McElwain Hall Housing Renovations

Penn State University

Simmons Hall Housing Renovations

Penn State University

Renovations to the North Halls Student Living Complex • 4 Buildings

Penn State University

Milton S. Hershey Medical Center • New Parking Garage

Penn State University

Milton S. Hershey Medical Center • Fitness Center Expansion

Penn State University

Milton S. Hershey Medical Center • Oncology Treatment Building

Penn State University

Nittany Lion Inn • North Wing Renovation

Penn State University

Eastview Terrace Student Housing

Penn State University

Career Services Center

Penn State University

e d u c a t i o n

THE PENNSYLVANIA STATE UNIVERSITY

COLLEGE OF ARTS AND ARCHITECTURE

Bachelor of Architecture • 2001

EASTERN MENNONITE UNIVERSITY

Art Program • 1979

c o n t i n u i n g e d u c a t i o n

Structural Engineering Workshop

University of Wisconsin • 2004

Healthcare Construction Certificate

American Society for Healthcare

Engineering • 2006

Preventing Deficiencies in

Construction Documents

University of Wisconsin • 2007

Design Build Workshop

Design Build Institute of America

2010

p r o f e s s i o n a l e x p e r i e n c e

Hoffman Leakey Architects

Principal

Boalsburg, PA • 2014

Reese Engineering Inc.

Project Manager/Strategic Planning

State College, PA • 2012-2014

The Pennsylvania State University

Office of Physical Plant

Project Manager

University Park, PA • 2003-2012

Weber Murphy Fox Architects

Construction Administrator

Project Manager

State College, PA • 1999-2003

J. Michael Leakey has more than 30 years of professional experience as a

contractor, project manager, and architect. Mike’s project experience ranges

from private residential work to large scale institutional projects. In January

2014, Mike joined Robert H. Hoffman to form Hoffman Leakey Architects, LLC.

Mike’s experience and leadership skills have resulted in many successful

projects for his clients and in particular, projects for Penn State University.

J. Michael Leakey, AIA

Principal

6

.

Page 9: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

Jesse F. Smith, Jr., LLC Structural EngineerP.O. Box 113, Lemont, PA 16851 Phone: (814) 234 -0422

RESUME

Background As a professional engineer, Mr. Smith provides structural consulting services toarchitectural design professionals and residential builders in the State College area. Atpast firms, Mr. Smith has also served as an architectural project manager coordinating thework of other professional team members on numerous projects in Pennsylvania, Florida,and New Hampshire. In this role, he has gained vast experience in code complyingresearch relative to the International Building Code, the International Residential Code,BOCA National Building Code, and NFPA 101 Life Safety Code.

Registration Professional Engineer - Commonwealth of Pennsylvania, PE-035337-E

Education The Pennsylvania State University, College of Liberal Arts BA in Letters, Arts and Science and Minor in Anthropology, 1998 Department of Architectural Engineering, 1971 - 1973 Department of Architecture, 1969 - 1971

Experience Jesse F. Smith, Jr., P.E., Structural Engineer 2004 - presentState College, PA Providing structural engineering.

Comprehensive Design, Architects and Engineers 1990 - 2004State College, PA Principal - primarily responsible for structural engineering, codes, contract administration, and financial.

Lew, Popovich, and Smith 1987 - 1990State College, PA Partner - primarily responsible for structural engineering and financial.

Parfitt/Ling Engineers 1984 - 1987State College, PA Project Engineer - structural design, contract documents, construction inspection.

Franklin D. Baxter & Associates 1981 - 1984State College, PA Project Manager - structural design, supervision of architectural contract documents, construction administration and inspection.

Leisure Life, Inc. 1977 - 1981State College, PA Project Engineer - structural design, contract documents, construction inspection.

Dewberry, Nealon, and Davis 1974 - 1977Fairfax, VA Project Engineer - structural design, contract documents, construction inspection.

jowen
Text Box
7
Page 10: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

Education:Bachelor of Science – Civil Engineering, Structural Emphasis May 2001The Pennsylvania State University University Park, Pennsylvania

Professional Experience:Principal August 2013 to Present

Penn Central Engineering, LLC Centre Hall, Pennsylvania

Project Manager September 2010 to August 2013Stahl Sheaffer Engineering, LLC State College, Pennsylvania

Assistant Resident Engineer December 2007 to September 2010Highway Division 5, North Carolina Department of Transportation Durham, North Carolina

Bridge Design Engineer November 2002 to December 2007Structure Design Unit, North Carolina Department of Transportation Raleigh, North Carolina

Structural Designer May 2000 to November 2002The Sear-Brown Group State College, Pennsylvania

Infantry Officer October 1998 to December 2012United States Army – Active Duty and Reserve Status North Carolina and Pennsylvania

Licenses and Certifications:Licensed Professional Engineer

Commonwealth of Pennsylvania, PE078511

OSHA 30-Hour Construction Safety and Health

U.S. Government Top Secret Security Clearance (TS/SCI)

Bryce Jordan Center Structural Engineering Services, The Pennsylvania State University, University Park, PA. PCE has perfromed structural analysis of the existing roof structure at BJC for the Garth Brooks World Tour event in May 2015. The Garth Brooks event rigging was supported by the existing roof truss structure and weighed over 105,000 pounds. PCE is currently working with BJC for structural analysis related to audio upgrades to the facility.

Jeffrey J. Vones, P.E.Principal

PSU Abington Physical Education Building Concrete Rehabilitation, The Pennsylvania State University, Abington, PA Performed a full evaluation of the concrete building façade to quantify defects and develop construction documents for repairs and coating systems. Construction completed September 2014.

PSU Abington Parking Structure Rehabilitation, The Pennsylvania State University, Abington, PA Performed a full evaluation of the concrete building façade to quantify defects and develop construction documents for repairs and coating systems.

Academic Activities & Coal Utilization Laboratory Facade Assessment and Rehabilitation, The Pennsylvania State University, University Park, PA Performed a site evaluation of the exterior insulation finishing system to quantify defects and develop repair/replacement alternatives as well as construction cost estimates for completing the repairs. Construction for this facade rehabilitation project is scheduled for summer 2015.

Schwab Auditorium Stage Rigging Support, The Pennsylvania State University, University Park, PA. PCE performed a structural evaluation of historic structure constructed in 1903 and designed structural retrofits for the installation of modern automated stage rigging systems.

PennCentralEngineering, llc

Page 1 of 1

jowen
Text Box
8
Page 11: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

Leadership. Commitment. Safety. Quality. Respect.

These are the values that PJ Dick leans on to build a successful

project. We are a family owned company, with dedicated

employees, working together with trusted partners, to create

a region of which we can all be proud.

For over 35 years, the PJ Dick family of companies has

provided comprehensive general contracting, construction

management, and design-build services for buildings,

heavy highway, and civil; energy and industrial; and asphalt

and material production. Our companies – PJ Dick, Inc.,

Trumbull Corp. and Lindy Paving, Inc. – provide full-service

construction management capabilities under one roof,

enabling us to enhance project quality and schedule, as well

as project communication.

Consistently ranked one of the Top 100 builders by

Engineering News Record, PJ Dick has managed over $9

billion in construction activity in the Mid-Atlantic area. As

one of the region’s largest construction firms, we provide the

industry’s finest construction management staff to estimate,

plan, and build the area’s most prominent projects for major

universities, hospitals, businesses, sports teams,

and industries.

Partnership is a key element in all of our projects. The

quality of our services, professional leadership, and ability

to complete projects effectively has helped us to cultivate

relationships with owners, consultants, vendors, and

subcontractors, resulting in our ability to get the best prices

for quality materials and services.

Our dedication to sustainable building, innovative

technology, quality construction and safety can bring your

next project to life. Together let’s safely build a project of

which we can all be proud.

PJ Dick: We take the best and make it better.

PJ DICK CORPORATE OVERVIEW

9

Page 12: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

Estimating and PreconstructionOur 12-person estimating team continuously collaborate

with design teams to verify that the project is constructible

as well as meets the owner’s needs within the budget. Our

preconstruction experts handle 100 percent of conceptual

civil, structural, architectural, mechanical, electrical,

technology and systems controls estimating, and value

engineering in-house, which allows us to prioritize project

needs and to guarantee reliability of estimates.

ConstructionPJ Dick offers the following services to streamline the

construction efforts for clients:

§ General Contracting

§ Negotiated General Contracting and

General Contracting

§ Construction Management at Risk

§ Construction Management – Agency

§ Design-Build

§ Integrated Project Delivery

To provide clients with quality services with the most value, PJ Dick offers the following services:

Building Information Management ServicesPJ Dick’s four in-house BIM specialists leverage BIM to increase

predictability, reduce risk, and thereby reduce costs during

design and construction. Since incorporating BIM into our

construction management methodology, we have refined our

BIM process on over $1.1 billion dollars worth of projects that

exceeds 4.2 million square feet.

Facilities ManagementOur facilities management team has developed and

implemented programs to assist our clients in proactively

maintaining their assets. Through the application of Facility

and Asset Management practices and properly applied

technologies, our professionals can help organizations gain

operational efficiencies, improve sustainability, identify and track

geographically dispersed, complex asset portfolios, effectively

allocate constrained capital and operating budgets, and develop

and implement strategies that support your organization’s

business or mission.

LEED Project ConstructionA sustainable builder, PJ Dick has constructed or in the process

of constructing 50 LEED projects each varying in complexity

and project type. We are currently the construction manager

for the 33-story Tower at PNC, which will be the greenest

skyrise in the world.

SERVICES

10

Page 13: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

DANA F. DAMONPreconstruction Manager

36 Years Experience B.S., Civil Engineering, Lafayette College

Mt. Lebanon High School - PreconstructionPittsburgh, PA, $87.8 millionMr. Damon provided preconstruction services for over two years for the renovation of Mount Lebanon’s high school. These services included several concept estimates to assist the District with their ultimate program selection. PJ Dick performed at least five detailed estimates at various stages of design completion, detailed phasing drawings and narratives, bid packaging development, constructability reviews, VE studies, etc.

South Fayette Intermediate SchoolSouth Fayette, PA, $24.5 millionMr. Damon provided preconstruction for a new Intermediate School for South Fayette School District. This 3-story, 124,000 sf building is located on the campus of the existing High School and Elementary School and has: Classrooms; a combination gymnasium and auditorium with stage and rock climbing wall; 3 STEAM (Science, Technology, Engineering, Art and Math) labs that each have a theme - earth and space, robotics and environment; cafeteria; library; art and music rooms; rooftop garden; butterfly garden; outdoor gardening area for students; playground with swings, climbers and hopscotch and four square courts.

Montour High School - PreconstructionMcKees Rocks, Pennsylvania, $37.5 millionMr. Damon provided preconstruction services for a major high school renovation program. His involvement through the project development was instrumental in the District making the most economical program choice to renovate its existing building as opposed to constructing a new building with significant site development. The project involved renovation of 258,000 sf space and the addition of 34,000 sf of new space.

Baldwin Whitehall School District - Baldwin High SchoolBaldwin, PA, $55.9 millionMr. Damon provided preconstruction services for a 335,000 sf addition and

renovations to 88,000 sf of existing high school. The project included more than 100 new and renovated classrooms, labs and resource rooms, a new physical education complex, and a new entrance which will provide secure access to the building during the school day.

Allegheny Valley School DistrictCheswick, PA, $6.5 millionMr. Damon led preconstruction services for 73,000 sf of renovations to the Acmetonia Primary School and additions and upgrades to the Veterans’ Field stadium, including new locker rooms and concession areas.

Center Area School DistrictMonaca, PA, $18.7 millionMr. Damon led preconstruction for a new 59,000 sf K-2 primary center and various renovations to existing facilities, including entrance reconfiguration and security, cafeteria expansion, and other basic improvements.

Bentworth Middle SchoolBentleyville, PA, $16 millionMr. Damon provided preconstruction services for construction of a new 83,000 sf middle school, included various athletic fields, and roadway reconfigurations. PJ Dick provided estimating and scheduling services as well as a full-time on-site supervisor while team member, Oxford Development, provided the project management and executive overview services.

Watson Institute Friendship AcademyPittsburgh, PA, $11.5 millionMr. Damon provided preconstruction services for the new Craig Academy facility on South Negley Avenue in Pittsburgh. Craig Academy is a member of the Watson family of schools and provides services to students who are emotionally challenged. This non-profit school will serve approximately 150 students, grades K through 12. Craig Academy is a 50,000-sf three-story structure that includes academics, music, art, science, athletics, professional development and training, a clinical support component and a cafeteria.

PROJECT EXPERIENCE

Mr. Damon has 36 years industry experience with a background in preconstruction, estimating, and construction services. He is a registered professional engineer skilled at conceptual estimating, value engineering, development of guaranteed maximum price, client presentations, lump sum bidding, engineering, and field supervision. Mr. Damon has focused primarily on preconstruction for schools in Pennsylvania. Prior to joining PJ Dick, Mr. Damon served in a variety of roles with a national contractor, including project executive, chief estimating engineer, assistant engineer, assistant superintendent, and field engineer.

jowen
Text Box
11
Page 14: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services
jowen
Text Box
12
Page 15: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services
jowen
Text Box
13
Page 16: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services
jowen
Text Box
14
Page 17: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

SIMILAR PROJECTS

15

Hoff man Leakey Architects LLC.

PENN BUILDING RENOVATION, ALTOONA, PA

1421 12th Avenue, Altoona, PA 16601

Altoona Blair County Development Corpora! on

Date: Completed December 2015

Dollar Value: 3 Million

Contact: Mr. Doug Wenger, [email protected]

PENN STATE UNIVERSITY: GREENBERG COMPLEX

University Park, PA

Date: 2014

Dollar Value: 7 Million

Contact: Mr. Rob bloom, Project Manager, [email protected]

Jesse F. Smith LLC

FAIRMOUNT AVENUE SCHOOL BUILDING

154 West Nitanny Avenue, State College, PA 16801

SCASD

Date: 1996

Scope: Address and abate life safety defi ciencies based on orders

from Labor and Industry state code administra! on as a result of

their onsite assessment of the exis! ng building.

Jeff rey J. Vones - Penn Central Engineering

PENN STATE UNIVERSITY: PHYSICAL EDUCATION BUILDING

Abington, PA

Date: Completed September 2014

Dollar Value: $475,000

PENN STATE UNIVERSITY: PEGULA ICE ARENA

University Park, PA

Date: Completed October 2013

Dollar Value: $88 Million

PENN STATE UNIVERSITY: PARKING DECKS

University Park, PA

Date: Completed 2010 - 2014

Dollar Value: $215,000 - $775,000

Page 18: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

16

SIMILAR PROJECTS

P. J. Dick

P.J. DICK has performed over $500 Million in K-12 Projects since

1993, including:

FOX CHAPEL AREA SCHOOL DISTRICT

CONNELLSVILLE AREA SCHOOL DISTRICT

UPPER ST. CLAIR SCHOOL DISTRICT

CANON McMILLAN SCHOOL DISTRICT

MONTOUR SCHOOL DISTRICT

WEST MIFFLIN AREA SCHOOL DISTRICT

Penoco Inc.

LONZA INC.: PLANT WIDE INSPECTION

3500 Trenton Avenue, Williamsport, PA 17701

LONZA INC

Date: February 2013 - March 2014

Dollar Value: $2541.00

Contact: John Robertson,(570) 321-3949

LYCOMING COLLEGE: WESLEY HALL: BUILDING INSPECTION

700 College Place, Williamsport, PA 17701

Date: March 2015

Dollar Value: $1971.00

Contact: Doug Kuntz, (570) 321-4042

Page 19: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

A/E FEE

Hoff man Leakey Architects LLC $ 23,000.00

Structural $ 18,000.00

P. J. Dick Inc. $ 18,000.00

Penoco Inc. $ 3,300.00

Reimbursable Expenses N/A

TOTAL $ 62,300.00

17

Page 20: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

TIME SCHEDULE

18

�� �����

��

������� � ������� �����

� ��������������� ��� ��� ����

�������

� ������������������������

��������������������������������

��� ������������ ����������

������������

� ��� !� �

���"���

� ����#��� ��������������� $� ��� ���"�"���

� �������������� "� ��� ���"�"���

� %��������������&��'��'������������ � ��� (���"��$���

� �)�������*$+�������&��'�

�'������������

$� ��� (���,�"���

� �)��������$+ $� ��� (���,��-���

� �)�������.$+���/������� ����

�'������������������0��&

$� ��� (���,� ����

� �)���������1����/#�/2 $� ��� (���,� ,���

�� (�����3���)��� �� ��� (���.�-���

�� ������������ $� ��� ����

.��-���

��

��

��

��

��

��

���������������

� �� � �������������������������������������������������������������������������������� ����������������

� �����!�������������������

� � � �"��������������#

� �$ � �%&��������������'��(��(������������

� ��)�������%$*�������'��(��(������������

� �+�)��������$*

� #��)�������,$*���-�������������(������������������.��'

� #��)������� �/����-!�-0

, + , ��1�����2���)���

, �+������������

� � � � � � � � � � � � � � � � � � � �

�� ��!�"�� �� ���!�"�� #�����!�"�� #�$��!�"�� #�$���!�"�� %�&���!�"�� ��'��!�"�� ��'���!�"��

Page 21: RESPONSE to REQUEST for PROPOSAL BUILDING ......The following team has been assembled to par! cipate in the building and immediate site assessment based upon the scope of services

CLOSING STATEMENT

19

Our goal is to provide the district with a

fresh comprehensive overview of the Nit-

tany Avenue and Fairmont Building condi-

! ons by u! lizing a mul! -discipline team.

Our goal is to provide the district with a

fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-

tany Avenue and Fairmont Building condi-

fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-fresh comprehensive overview of the Nit-

tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-tany Avenue and Fairmont Building condi-

Robert H. Hoff man, AIA LEED AP

SENIOR PRINCIPAL

rhoff [email protected]