rest and be thankful - a83 rabt 2012 - geobrugg...rest and be thankful - a83 rabt debris flow &...

8
Debris Flow & Shallow Landslide Protection REST AND BE THANKFUL - A83 RABT, GB

Upload: others

Post on 22-Apr-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

Debris Flow & Shallow Landslide Protection

REST AND BE THANKFUL - A83RABT, GB

Page 2: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

REST AND BE THANKFUL - A83 RABTDebris Flow & Shallow Landslide Protection

Project Rest and Be Thankful - A83 RabTStreet A83Place ArrocharCountry/Region United Kingdom

Year of installation 2012

Customer Transport ScotlandEngineering Geobrugg / BAM RitchiesContractor BAM Ritchies / BAM Nuttall Ltd.

Initial situation The A83 at Rest and Be Thankful (RabT) in Argyll and Bute, Scotland, has beensubject to a number of landslide or mudslide events that have caused majordisruption to the traffic that regularly uses this key trunk road. The road wasclosed for several weeks in October 2007 when around 400 tonnes of materialwere deposited on the road when one such event occurred. Then in September2009 the road was again closed for 48 hours after 1070 tonnes of material wasdeposited after a more significant event.

Description BAM Ritchies, working closely with Geobrugg and Scotland Transerv, developed asolution of an eighty meters long, 4 m high shallow landslide barrier and 15.0 mwide VX ‘in-channel’ barrier nearby. These were installed in 2010. In 2012 asecond phase of works saw the installation of a further 83.0 m of shallowlandslide barrier at 3.5 m high. Another channel saw the instalation of both 25.0m by 5.0 m UX debris flow barrier above 9.0 m by 2.0 m VX debris flow barrier.

Incident of Saturday 5th December, 2015During storm Desmond that affected most parts of the UK a substantial landslideoccurred at the A83 Rest and be Thankful. This is an area that has sufferednumerous large landslide over the years and as such has numerous landslideand debris flow barriers have been installed. During the daytime on the 5th anevent estimated at 150m3 struck a Geobrugg SL-150 barrier, the barriersuccessfully held the landslide and there was no need to close the road. Afurther 100m3 event struck the barrier overnight and over the next few daysresidual small movement led to a total of ~300 m³ being held by the barrier. Thebarrier held all of this material without failure or damage, brake rings wereactivated as designed and the posts and bases suffered no damage. Thanks tothe Geobrugg SL-150 barrier the A83, a major transport route in this arearemained open.

Protected object RoadSystems VX, UX, SL-150

Corrosion protection Galvanized, GEOBRUGG SUPERCOATING ®

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /

Page 3: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

System height 2.0 m, 3.5 m, 4.0 m, 5.0 mSystem length 9 m - 83 m

Number of barriers 5Retention capacity - m³

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /

Page 4: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

SL-150 type shallow landslide barrierinstalled in 2010

Another view of SL-150 type shallowlandslide barrier installed in 2010

View from the road at the SL-150 typeshallow landslide barrier installed in2010

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /

Page 5: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

UX barrier installed above VX barrier in2012 - protection against landslips

SL-150 shallow landslide barrier installedin 2012

Another view of the UX type debris flowbarrier installed in 2010

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /

Page 6: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

UX type debris flow barrier installedabove VX type debris flow barrier in 2012

Storm Desmond: On Saturday 5thDecember 2015 during storm Desmond asubstantial landslip occurred at the A83Rest and be Thankful

Storm Desmond: Thanks to the GeobruggSL-150 barrier the A83, a major transportroute in this area remained open

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /

Page 7: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

Storm Desmond: 150m³ struck a SL-150barrier

Storm Desmond: A further 100m³ eventstruck the barrier overnight and over thenext few days residual small movementsled to a total of ~300m³ being held by thebarrier

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /

Page 8: Rest and Be Thankful - A83 RabT 2012 - Geobrugg...REST AND BE THANKFUL - A83 RABT Debris Flow & Shallow Landslide Protection Project Rest and Be Thankful - A83 RabT Customer Transport

For questions please contact our Geobrugg specialist at your side

Kamal Khodja, MSc.Project Specialist Eastern CanadaPhone +1 514 862 4636

[email protected]

[email protected] | www.geobrugg.comA BRUGG GROUP COMPANY

Debris Flow & Shallow Landslide Protection | Rest and Be Thankful - A83 RabT, GB /