Page 1: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

RESTORATION OF PÄRNU RIVER BASIN

Page 2: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

SOME FACTS ABOUT PÄRNU RIVER

• SECOND LONGEST RIVER IN ESTONIA, 144 KM

• CATCHMENT AREA ~7000 KM²; COVERS 17% ESTONIAS

TERRITORY

• 270 TRIBUTARIES (RIVERS AND STREAMS), LONGEST OF THEM

NAVESTI RIVER (100 KM), ALL TOGEHTHER MORE THAN 3000

KM

• PÄRNU RIVER IS PART OF THE NATURA 2000 NETWORK

• SALMONIDS RIVER BIGGER THAN ALL 10 OHTER SALMONIDS

RIVERS IN ESTONIA ALLTOGETHER

• 22 FISH SPIECES DEPEND ON THE SPAWNING AREAS IN PÄRNU

RIVER BASIN

Page 3: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

RESTORATION ON PÄRNU RIVERBASIN

TIMEFRAME: 27.03.2015 – 31.12.2023

BUDGET: 15 200 000 EUROS, 85% COHESION FUND, 15%

ESTONIAN STATE BUDGET;

MAIN ACTIVITIES: 3 DAM REMOVALS ON PÄRNU RIVER,

INCLUDING SINDI DAM, 5 REMOVALS ON TRIBUTARIES,

THE LARGEST NATURE PROTECTION PROJECT IN ESTONIA

Page 4: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main
Page 5: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

1832

1922

Page 6: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

THE THIRD SINDI RIVER DAM, 1977150 M WIDE, 4,5 M HIGH

Page 7: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

October 2013

Page 8: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

October 2018

Page 9: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

HOW WE GOT THERE?

• Boldminister and a bitof luck

• EU + STATE FUNDING

• Publicservantswith a mission

• WFWD

• NATD

LEGAL OBLIGATIONS

SYSTEM AND TEAM

POLITICS MONEY

Page 10: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

April 2019

Page 11: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

…AND WE PLAN THAT IT LOOKS SOMETHING LIKE THIS IN 2 YEARS

Page 12: RESTORATION OF PÄRNU RIVER BASIN...restoration on pÄrnu riverbasin timeframe: 27.03.2015 –31.12.2023 budget: 15 200 000 euros, 85% cohesion fund, 15% estonian state budget; main

IF TOU HAVE ANY FURTHER QUESTIONS, CONTACT

THE PROJECT MANAGER:

KÜLLI TAMMUR

+372 5669 6476

[email protected]

THANK YOU!