RESULTS OF TEN YEAR MONITORING PROGRAM AT PIER 53-55 SEDIMENT CAP
ALONG SEATTLE WATERFRONT
CAP 54 WHERE ARE YOU ?
HOW HAVE YOU BEEN FOR THE PAST 10 YEARS ?
ARE YOU READY FOR COMPANY ?
Metro’s Report in 1984 Showed Toxicant Problems In Elliott Bay
Metro Funding Treatment Plants Limited Funding For Cleanup
• Expensive Construction Projects– West Point plant to secondary treatment– Expansion at Renton plant – Move Renton discharge to Puget Sound
• Inexpensive Sediment Cleanup Projects– In-Place Sediment Cap at Denny Way CSO
using clean sand US Army CORP dredged.
Elliott Bay/Duwamish Restoration Program (EB/DRP)
• 1990 Lawsuit by NOAA against Metro and City of Seattle
• Announced same day Metro started in-place capping at Denny Way CSO (March 1990)
• 1991 Settlement by Metro and City of Seattle for $ 24 Million
EB/DRP Provided Funds For Three Sediment Cleanup Projects
• $ 12 Million – SEDIMENT REMEDIATION – 3 Projects
• $ 2 Million – ADDED SOURCE CONTROL – 2 Basins
• $ 10 Million - HABATAT ENHANCEMENT – 6 Projects
EB/DRP Projects Show In-place Capping Costs Less
• 1992 - Pier 53-55 In-Place Sediment Cap-- 4.5 Acres cost -- $ 300 Thousand
• 1999 - Norfolk CSO - Dredge and Cap-- 1 Acre cost -- $ 2 Million
• 2004 - Duwamish/Diagonal Dredge & Cap-- 7 Acres cost -- $ 10 Million
Location of Pier 53-55 cap
Cap Covers Area Off Pier 53 - 55
Pier 54 Where Are You ?In The Middle At Iver’s !
Man Admires Seattle Views
Man Looks For Pier 53-55 Cap
Six Monitoring Tasks Required
• 13 -- bottom stakes to show cap thickness • 7 -- stations show surface chemistry change• 4 --stations show benthic recolinization• 5 --coring stations show chemical isolation• 3 -- diver video transects show cap surface• 4 -- monitoring reports
Expanded Sampling Frequency
• DENNY WAY CAP• 1990 - Baseline• 1991 - 1-yr postcap• 1992 - 2-yrs postcap• 1994 - 4-yrs postcap
• 1996 - 6-yrs postcap
• 2000 - 10-yrs postcap
• PIER 53-55 CAP• 1992 - Baseline• 1993 - 1-yrs postcap
• 1996 - 4-ys postcap
• 2002 - 10-yrs postcap
Importance Of Cap Monitoring
• Supported decision to cap large area of Eagle Harbor to isolate high PAH’s.
• Supported decision to cap where Bell Street Marina is located along Seattle waterfront.
• Provides support to using capping as method for cleaning up Seattle waterfront.
Thanks For Good Monitoring
• Field sampling -- KC field crew• Sample preparation and analysis -- KC labs
– (conventionals lab, metals lab, organics lab, aquatox lab)
• Monitoring reports-- KC marine monitoring
• Diver work -- Outside contract• Bentic taxonomy -- Outside contract
Liberty RV and Diver Boat
Buoys mark stations
Diver measures stakes on bottom
Bottom stake
and
measuring rod
Surface grab sampler
Coring equipment and diver
Core samples through cap
Removing Old Wing Wall Greatly Impacted Cap Surface
13 Measuring Stake Locations
4 Benthic Taxonomy Stations
5 Coring Station Locations
7 Surface Chemistry Stations
LPAH Source Spreads To Cap
HPAH Source Spreads To Cap
Lead Source Spreads To Cap
LPAH Distribution Gradient
Total LPAH
0100020003000400050006000700080009000
10000
VG5 VG6 VG2 VG1 VG3 VG4 VG7
Con
cent
ratio
n in
ppb
, Dry
Wei
ght
May 92
May 93
Jul 94
Aug 96
Sep 02
HPAH Distribution Gradient
Total HPAH
02000400060008000
100001200014000160001800020000
VG5 VG6 VG2 VG1 VG3 VG4 VG7
Con
cent
ratio
n in
ppb
, Dry
Wei
ght
May 92
May 93
Jul 94
Aug 96
Sep 02
Copper Distribution Gradient
Copper, Total ICP
0102030405060708090
100
VG5 VG6 VG2 VG1 VG3 VG4 VG7
Con
cent
ratio
n in
ppm
, Dry
Wei
ght
May 92
May 93
Jul 94
Aug 96
Sep 02
LPAH Change With Time
Total LPAH
-5000
5000
15000
25000
35000
45000
55000
65000
75000
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in
ppb
, dry
wei
ght
VG5
VG6
VG2
VG1
VG3
VG4
VG7
Expanded LPAH Change
Total LPAH
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in
ppb
, dry
wei
ght
VG5
VG6
VG2
VG1
VG3
VG4
VG7
HPAH Change With Time
Total HPAH
0
10000
20000
30000
40000
50000
60000
70000
80000
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in p
pm, d
ry w
eigh
t
VG5
VG6
VG2
VG1
VG3
VG4
VG7
Expanded HPAH Change
Total HPAH
0
5000
10000
15000
20000
25000
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in
ppm
, dry
wei
ght
VG5
VG6
VG2
VG1
VG3
VG4
VG7
Lead Change With Time
Lead
0
20
40
60
80
100
120
140
160
180
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in m
g/kg
, dry
weigh
t
VG5
VG6
VG2
VG1
VG4
VG3
VG7
Phthalate Change With Time
Bis(2-Ethylhexyl) Phthalate
0
50
100
150
200
250
300
350
400
450
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in
ppb
, dry
wei
ght
VG5
VG6
VG2
VG1
VG3
VG4
VG7
PCB Change With Time
Total PCB
0
20
40
60
80
100
120
140
160
May 92 May 93 Aug 96 Sep 02
Con
cent
ratio
n in
ppb
, dry
wei
ght
VG5
VG6
VG2
VG1
VG3
VG4
VG7
CONCLUSIONS:• Adjacent activities can recontaminate cap.• Impact gradient with distance from source.• PAHs and metals at moderately impacted
stations drop to equilibrium in 3 years.• Takes more than 9 years at most impacted. • PAHs and metal way below standards.• PCBs and Phthalates increasing.• One phthalate exceeds standard at one site.
Why More In-Place Capping Is Appealing For Seattle Waterfront• Provides clean bottom for biota.• Less expensive than dredging and disposal.• Less dispersion of contaminate sediment.• Useful for cleaning up large area of bottom.• Can be used near existing pier structures.• Can be used under existing piers• Reduces resuspension and recontamination.