results on recent technology developments at atf
DESCRIPTION
Results on recent technology developments at ATF. - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion , Crete, Greece, 2011/Oct/5. Beam Position Monitors. 2/27. DR BPM Upgrade for 2 pm emittance. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/1.jpg)
Results on recent technology developments at ATF
- Beam extraction study by a Fast Kicker -
N. Terunuma, KEKLER11, Heraklion, Crete, Greece, 2011/Oct/5
![Page 2: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/2.jpg)
Beam Position Monitors
2/27
![Page 3: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/3.jpg)
DR BPM Upgrade for 2 pm emittance
The original read-out system designed for the single path position measurement has a 10 m resolution.
Upgraded BPM readout system: FNAL•Utilize analog down-conversion and digital signal processing techniques•automatic gain-correction
New functions for optics analysis•Broadband turn-by-turn mode (< 10 µm resolution)
• Injection 1,000 turns• Extraction 64 turns
•Narrowband mode with high resolution (~ 100 nm range)
• 160 ms, 500,000 turns after injection
Further investigation for the system completion is continued.
LO & CAN-bus Distribution
New Timing Module& Custom Digitizers
New Downmix &Calibration
3/27
![Page 4: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/4.jpg)
ATF2 Cavity BPM system
IP BPM system(BPM + Ref) Cavity
1 unitTarget : 2 nm
Aperture: 6 mm(V)
S-band BPM systemBPM cavity: 4 units
Ref. cavity: 1 unitTarget : 100 nm
Aperture: 40 mm
C-band BPM systemBPM cavity: 34 units
Reference cavity: 4 unitsTarget resolution: 100 nm
Aperture: 20 mm
KNU / PAL / KEK / RHUL / SLAC
4/27
![Page 5: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/5.jpg)
Present Status of the ATF2 Cavity BPMs
S-band BPMResolution ~ 1 mJitter subtracted calibrationsCavity frequency correctionAmplifiers were not sufficient.
IP-BPMsJust installed to assist the small beam size study.Not yet well calibrated!
Further investigations are continued.
BPM number
C-band BPM
20 dB attenuation, most of C-band BPMs to widen the dynamic range
Resolutions: with 20dB att. ~ 200 nm w/o 20dB att. ~ 50 nm (well centered beam w/o saturation 27 nm) By S. Boogert (RHUL)
5/27
![Page 6: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/6.jpg)
Fast Kicker R&D at ATFThe fast kicker R&D has been one of the missions at ATF for the ILC technology development.
The bunch separation in the ILC damping ring is• 6 ns for a nominal operation (RDR, SB2009),• 3 ns for a possible luminosity upgrade.
ILC fast kicker: should meet these requirements, 0.6 mrad ~20 units1.5 MHz, +-10 kV, Stability <0.1%,
Multi-units of strip-line kicker
+10kV
-10kV
6/27
![Page 7: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/7.jpg)
Fast Kicker R&D at ATF
7
Pulser performance study (2005~2009)It has been done here by measuring the beam oscillation.
Demonstration of a Beam Extraction (2009~)Swap the conventional pulse kicker with the fast kicker but only in this R&D period
![Page 8: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/8.jpg)
Requirement for ATF beam extractionThe fast kicker R&D for a beam extraction had been performed by exchanging the conventional pulse magnet. It was done only when the study was scheduled because its reliability for other R&Ds was not known well.
The beam extraction system of ATF DR has to have a beam kick angle of 5 mrad. It is difficult to realize by a fast kicker itself under the limited space obtained by replacing the conventional pulse magnet.
Therefore, we needed followings.•pulsed orbit bump in DR as much as possible when a beam is extracted, •aux. septum magnet before the present one,•finally, optimize a gap between two electrodes but as large as possible. 8/27
![Page 9: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/9.jpg)
23/04/21 9
Beam Extraction Orbit using Strip-line Kicker, Aux. septum & Pulse bump
To existing septum magnets
Bump orbit
Stored beam
Local Bump
Extracted beam9/27
![Page 10: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/10.jpg)
(FID Co. Ltd)
10/27
![Page 11: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/11.jpg)
Kicker pulse(10kV) Kicker field
Rise time1.5 ns
Rise time5 ns
11/27
![Page 12: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/12.jpg)
12/27
![Page 13: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/13.jpg)
Fine delay control window of the kicker pulse
Trigger system for fast kicker
Beam extraction signal
![Page 14: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/14.jpg)
Single-bunch beam extraction by a fast kicker
14
![Page 15: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/15.jpg)
15
1st Beam Extraction from DR to ATF22009.Oct. 22.
Beam profile at MS1X screen monitor, which is located at the downstream of the septum magnets.
15/27
![Page 16: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/16.jpg)
16
Jitter 1.05e-6/3e-3=3.5e-4 Jitter 2.24e-6/3e-3=7.4e-4
Kick angle jitter of a fast kicker for single bunch Fast Kicker
ATF2 Cavity BPMs
Angle (urad) Angle (urad)
2010/Oct2010/Mar
Stability of the fast kicker was evaluated by using R12 and beam positions measured with the 100 nm-resolution BPMs.
16/27
![Page 17: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/17.jpg)
Multi-bunch beam extraction by a fast kicker
17
![Page 18: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/18.jpg)
23/04/21 18
Multi-bunch beam extraction by the Fast kicker
in DR:• 3 Trains, • 9(max 10) bunches/train with
5.6 nsec spacingExtracted:
• 27(max 30) bunches with 308 ns spacing
• bunch-by-bunch profile follows that in the DR.
• bunches were extracted from the last bunch to the first bunch.
3 trains in DR
Intensity of extracted bunches
18/27
![Page 19: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/19.jpg)
MB-Orbit and jitter measurement
Pulses Pulses
Kick Angle variation for pulses Stability of each pulses
The jitter ratio for the kick angle was distributed from 1x10-3 to 4x10-3 for each pulse. This value is larger than the single bunch jitter. 19/27
![Page 20: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/20.jpg)
Profile of the kick field and the jitter
Plot shows the beam position at MQM16FF BPM, when scanned the kicker pulse timing. •There is no flattop of the kick field. •The jitter increased at the both side of the peak.
To make stable beam kick, careful timing adjustment of four pulses is needed.
200ps
Trigger Timing (ns)
Kick field scan
BP
M x
-pos
itio
n (
um)
20/27
![Page 21: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/21.jpg)
1st results of multi-bunch extraction, 2010/06/17
The intensity of each bunch was not flat and unstable.The x-position of extracted beam was clustered as bi-stable.
Extracted beam position (x)
Extracted beam intensity
HV pulse arrival
Pulse number
Rel
ativ
e (n
s)
Very much complicated.Different behavior on each pulser!
21/27
![Page 22: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/22.jpg)
22/27
![Page 23: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/23.jpg)
Timing adjustment circuit was installed
w/o delay
with delayUse for beam extraction
Not perfect but much betterPulse-train delay adjustment circuit; common trigger for each pulser is adjusted pulse-by-pulse. No inter-pulser adjustment.
Pulse number
Pulse number
Rel
ativ
e (n
s)R
elat
ive
(ns)
23/27
![Page 24: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/24.jpg)
2nd results of multi-bunch extraction, 2010/10/26
Stable beam extraction was confirmed at the extraction line. The beam reach to the beam dump without any beam loss.
30 bunches of the beam are stored to the DR, stably.
24/27
![Page 25: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/25.jpg)
Photos were taken just a day before earthquake!
INFN stripline for the study at ATF
• Collaboration of KEK and INFN• Low impedance stripline based on the design for DANE
It was delivered to ATF in March 2011. We will install it in DR for the evaluation of impedance, but not for a beam extraction.
25/27
![Page 26: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/26.jpg)
The stored current decreased gradually when the total current becomes higher. It was recovered after several minutes. We suspect the physical deformation of the strip-line electrode due to the heating by wake or SR. Challenging “small gap to enable the extraction at ATF” may leads this difficulty.This may be an issue “only at ATF”.
Difficulty under the higher current “at ATF”
single bunch1 train
9 bunch1 trainItot=2x1010
9 bunch3 trainItot=6x1010
Blue: Stored current in DR
2hour
26/27
![Page 27: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/27.jpg)
Conclusion
The beam extraction by a fast kicker system has been successfully demonstrated at ATF.Further studies on the improvement of the pulser performance and its reliability for long term operation should be continued, but it will not request a beam.
Honestly, we have a difficulty on the fast kicker operation under higher intensity beam. It is due to the design under the limited space for extraction in ATF.
Further, we will proceed a beam test of the low impedance stripline designed and delivered by INFN, Italy in a near future.
27/27
![Page 28: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/28.jpg)
28
![Page 29: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/29.jpg)
29
![Page 30: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/30.jpg)
30
![Page 31: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/31.jpg)
31
![Page 32: Results on recent technology developments at ATF](https://reader036.vdocument.in/reader036/viewer/2022062518/56814014550346895dab59d7/html5/thumbnails/32.jpg)
32