NORMAN C. ALLEN |435-339-3631 | [email protected] |https://www.linkedin.com/pub/norman-allen Summary Over 20 years of Program (Logistics) Management and Engineering experience in the aerospace solid and liquid propulsion industries. Managed annual budgets of over 50 million on the Space Shuttle Solid Rocket Motor Nozzle Program. Created and maintained an Integrated Master Schedule (IMS) schedules using Primavera for the Space Launch System (SLS) program. Demonstrated excellent oral communication through regular high level presentations to Corporate V.P. and Customer Personnel. Provided vendor oversight and control. Recognized for problem solving and being calm under pressure. Previously held DOD security clearance. Expertise Problem Solving Technical Oversight Program/ Project Management Customer Support Earned Value Management 5S/Kaizen Proposals Scheduling Sub-Contract Management Process Planning Change Management MS Office Suite Cost Reduction Presentations Supplier Interface Primavera Procedure Development Process Improvement Experience Orbital ATK/Thiokol, Brigham City, Utah Program Manager, Space Launch System (SLS) Nozzle Program 2013-4/2015

Upload: norman-allen

Post on 07-Jan-2017

79 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Resume 9-9-15

NORMAN C. ALLEN |435-339-3631 | [email protected] |https://www.linkedin.com/pub/norman-allen

SummaryOver 20 years of Program (Logistics) Management and Engineering experience in the aerospace solid and liquid propulsion industries. Managed annual budgets of over 50 million on the Space Shuttle Solid Rocket Motor Nozzle Program. Created and maintained an Integrated Master Schedule (IMS) schedules using Primavera for the Space Launch System (SLS) program. Demonstrated excellent oral communication through regular high level presentations to Corporate V.P. and Customer Personnel. Provided vendor oversight and control. Recognized for problem solving and being calm under pressure. Previously held DOD security clearance.

Expertise

Problem Solving

Technical Oversight

Program/Project Management

Customer Support

Earned Value Management

5S/Kaizen

Proposals

Scheduling

Sub-Contract Management

Process Planning

Change Management

MS Office Suite

Cost Reduction

Presentations

Supplier Interface

Primavera

Procedure Development

Process Improvement

ExperienceOrbital ATK/Thiokol, Brigham City, Utah

Program Manager, Space Launch System (SLS) Nozzle Program 2013-4/2015Managed the SLS Solid Rocket Motor Nozzle program. Led the effort to qualify a new nozzle through NASA’s qualification process. Implemented significant cost and reliability improvements on the nozzle as part of the redesign effort. Performed risk management to understand and mitigate program risks.

Implemented additional cost savings ideas of over $1 Million/nozzle, $6 Million total

Managed $2.5 Million dollar annual material procurement for nozzle program Earned Value Management schedule creation and maintenance using Primavera

Directed resolution of technical questions and discrepancies generated during Critical Design Review (CDR)

Orbital ATK/Thiokol, Brigham City, Utah cont.

Page 2: Resume 9-9-15

Program Manager Chief, Reusable Solid Rocket Motor Nozzle Program 2007-2013Responsible for entire Space Shuttle Solid Rocket Motor Nozzle Program. Managed a team of 5 Program Managers overseeing day to day operations including cost, schedule, quality, technical resolution and change management. Prepared and Presented Flight Readiness Review presentations to Flight Readiness Review boards. Led effort to design, propose and build the first Ares nozzle planned as the replacement for the space shuttle. Managed transition from Ares to SLS program involving significant downsizing.

Led a $10 million program to replace two large linear accelerator X-ray machines

Voting member of Flight Readiness Review Board for Space Shuttle Solid Rocket Motor Managed annual budget in excess of $50 million dollars

Chaired change review board to evaluate and approve process and design changes

Program Manager, RSRM Nozzle Program 1998- 2007Managed the bond and assembly portion of the Space Shuttle Solid Rocket Motor Nozzle program. Led the effort to replace all the nozzle adhesives with one new adhesive due to obsolescence. Implemented significant cost and reliability improvements in the nozzle joints by replacing RTV back fill with a carbon fiber rope thermal barrier.

Program Manager, RSRM Final Assembly Program 1990-1998 Directed the activities of the Final Assembly and procurement portion of a 40 million dollar enhancement program. Oversaw construction and implementation efforts for new space shuttle solid rocket motor manufacturing facilities. Presented cost and schedule status to NASA and Company management. Coordinated vendor support of aggressive schedules. Developed and executed implementation and qualification plans to bring new facilities online. Transitioned from facility implementation to Program oversight.

Manufacturing Engineer, RSRM Insulation 1988-1990Led facility teams in the implementation of new tooling and equipment for the Redesigned Solid Rocket Motor. Developed and improved manufacturing processes. Documented new and improved processes in manufacturing planning

Test Engineer, Solid Rocket Motor Re-Design TPTA Test, Huntsville, Al 1987-1988Wrote procedures for receiving, handling, assembly, dis-assembly, and refurbishment of a full diameter Transient Pressure Test Article for the redesigned space shuttle solid rocket booster. Provided integration between tooling, facilities and test hardware for startup on a new test stand. Presented new procedures to NASA Marshall Space Flight Center representatives for approval. Supervised critical handling operations and crane moves.

Manufacturing Engineer, Solid Rocket Motor, Insulation 1984-1987Led facility teams in the implementation of new tooling and equipment for the Space Shuttle Solid Rocket Motor. Wrote manufacturing planning for case assembly and insulation. Developed cost savings such as automated flap sewing and sling liner maintenance.

Rocketdyne Div. Rockwell Intl., Canoga Park, CA

Norman C. Allen [email protected] (435)339-3631 2

Page 3: Resume 9-9-15

Welding Engineer, Space Shuttle Main Engine (SSME) 1983-1984Provided engineering support for welding problems during the fabrication of Liquid (SSME’s). Wrote procedures, specifications, test plans, and reports. Programmed CNC electron beam, laser, and Gas Tungsten Arc Welding equipment. Supervised operation of electron beam and laser welders. Reviewed NDT results and determined repairs required. Provided support to sub-contractors on welding related problems.

EDUCATIONB. S. Industrial Technology, Business Administration Minor,

3.5/4.0 G.P.A., Utah State University, Logan Utah

AWARDS

SILVER SNOOPY

o Individual award given by NASA Astronauts to less than 1% of the entire Space Shuttle Team

NASA GROUP ACHIEVEMENT AWARD

o Given to small groups for significant contributions to NASA Programs

LAUNCH HONOREE

o Highest award given by ATK to Employees included a trip to Florida to view a Shuttle Launch

SPECIALIZED TRAINING Earned Value Management System

Program Management

Communicating to External and Internal Audiences

Protecting Proprietary and Competition Sensitive Information

Merchant Supplier Confidentiality and Fair Pricing

Hazardous Waste and Environmental Awareness

Radiation Area Access