resume october 2015

3

Click here to load reader

Upload: mauricio-barros

Post on 14-Apr-2017

44 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESUME OCTOBER 2015

Page 1 of 2

Maurício S. S. de Barros

Rua Aridio Martins 50, ap. 603, bloco 10 Bairro de Fatima

Niterói, 24070-110 R.J. Brasil +55-21-99624 2355

+1-626-375 3610 Email: [email protected] and [email protected]

S U M M A R Y O F Q U A L I F I C A T I O N S - 36 YEARS OF SOLID PROFESSIONAL EXPERIENCE WHICH INCLUDES

DESIGN, INSTALLATION, MAINTENANCE AND OPERATION OF A VARIETY OF OFFSHORE PETROLEUM TERMINALS, PIPELINES, EQUIPMENTS AND FLOATING PRODUCTION SYSTEMS.

- SOUND ACADEMIC BACKGROUND COMPLEMENTED BY EXTENSIVE FIELD EXPERIENCE AND SEVERAL OVERSEAS ASSIGNMENTS.

- MANAGEMENT EXPERIENCE INCLUDING DIRECT SUPERVISION OF DERRICK LAY BARGE AND SIZABLE FLEET OF OFFSHORE DRILLING RIGS AS WELL AS LOADING TERMINALS.

E D U C A T I O N Federal University of Rio de Janeiro, Brazil 1974 - 1978 B. Sc. in Marine Engineering and Naval Architecture Naval Academy of Rio de Janeiro, Brazil 1974 – 1977 2nd Lieutenant Petrobras, Rio de Janeiro, Brazil 1979 Graduate Course in Offshore Engineering Federal University of Rio de Janeiro - COPPE, Brazil 1981 – 1983 Post-graduated Course in Hydrodynamics Federal University Fluminense, Rio de Janeiro, Brazil 1990 – 1993 BA in Business Administration Orange Coast College, California, USA 1997 English Second Language Federal University Fluminense, Rio de Janeiro, Brazil 1999 – 2000 Post-gratuated Course in Industrial Engineering Salgado de Oliveira University, Rio de Janeiro, Brazil 2002 – 2003 BA In Mathematics

Page 2: RESUME OCTOBER 2015

Page 2 of 2

Candido Mendes University, Rio de Janeiro, Brazil 2003 – 2004 Teaching in higher education P R O F E S S I O N A L E X P E R I E N C E Petrobras – Engineering Department 2013 – 2015. Rio de Janeiro, Brazil

WORKING FOR THE GUARÁ AND LULA NE EPCI PROJECTS CONSIST OF TWO FIELDS IN THE PRE-SALT AREA IN 2200M WATER DEPTH. EACH FIELD COMPRISES OF ONE FLOATING PRODUCTION STORAGE AND OFFLOADING VESSEL AND TWO BUOYANCY SUPPORTED RISERS SYSTEMS. THE STEEL CATENARY RISERS (SCRS), FLEXIBLE SERVICE LINES AND UMBILICAL RISERS ARE SUPPORTED IN A SINGLE CATENARY CONFIGURATION FROM THE SEABED TO THE BSR UNIT. FLEXIBLE JUMPERS CONNECT THE BSR UNITS TO THE FPSO AND FLEXIBLE FLOWLINES CONNECT THE SCRS TO THE WELL HEADS.

Petrobras – Engineering Department 1993 – 2013. Rio de Janeiro, Brazil

MEMBER OF THE MARINE ENGINEERING GROUP, PROVIDES MARINE ENGINEERING SUPPORT TO LARGE SCALE PROJECTS WITHIN THE PETROBRAS GROUP, IN BRAZIL AND ABROAD. MAJOR ACHIEVEMENTS INCLUDE SIZING AND SPECIFICATION OF THE SHUTTLE TANKER FLEET FOR THE GIANT MARLIM AND ALBACORA FIELDS, TECHNICAL & ECONOMIC STUDY OF A SPM TERMINAL FOR THE O PORTO REFINERY (PORTUGAL), LEAD ENGINEER FOR THE DICAS (DIFFERENTIATED COMPLIANCE ANCHORING SYSTEM) RESEARCH PROGRAM. OPERATIONAL SUPERVISION OF DERRICK LAY BARGE (BGL-1). FROM 2000 SECTION MANAGER OF DESIGNING, CONSTRUCTION AND INSTALLATION OF SUBMERSE PIPELINES AND EQUIPMENTS.

Petrobras – Production & Exploration Department 1987 – 1993 Rio de Janeiro, Brazil

ASSIGNED TO THE MACAÉ REGIONAL OFFICE, TOOK PART IN DESIGN, INSTALLATION, MAINTENANCE AND OPERATION OF SEVERAL OFFSHORE LOADING TERMINALS AND FLOATING PRODUCTION SYSTEMS FOR THE CAMPOS BASIN. ALSO PERFORMED AS SITE ENGINEER RESPONSIBLE FOR SEVERAL FLEXIBLE PIPE INSTALLATIONS IN INTERMEDIATE AND DEEP WATERS. MEMBER OF THE PROJECT TEAM FOR THE WORLD’S DEEPEST CALM TERMINALS, FOR THE MARLIM FIELD, WITH IMODCO INC.

Petrobras – Drilling Department 1986 – 1987 Rio de Janeiro, Brazil

WORKING FOR THE EXECUTIVE GROUP FOR OFFSHORE DRILLING, WAS RESPONSIBLE FOR THE STABILITY OF ALL PETROBRAS’S DRILLING RIGS, INCLUDING SEVERAL SEMI-SUBMERSIBLES, JACK-UPS AND ONE DRILL SHIP. RESPONSIBILITIES ALSO INCLUDED SUPERVISION AND TRAINING OF ALL BARGE ENGINEERS AND “WATCH STANDERS”.

Petrobras – Production & Exploration Department 1983 – 1986 Rio de Janeiro, Brazil

WORKING FOR THE MACAÉ REGIONAL OFFICE, WAS DIRECTLY RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE AND OPERATION OF ALL LOADING TERMINALS IN THE NORTHERN CAMPOS BASIN AREA.

Petrobras – Production & Exploration Department 1979 – 1983 Rio de Janeiro, Brazil

Page 3: RESUME OCTOBER 2015

Page 3 of 2

AS A MEMBER OF THE OFFSHORE PIPELINE GROUP, ENGINEERING DIVISION, TOOK PART IN THE DESIGN, SPECIFICATION AND INSTALLATION OF SEVERAL OFFSHORE PIPELINES. AS A MARINE ENGINEER, ALSO PARTICIPATED IN THE SPECIFICATION, DESIGN AND INSTALLATION OF SEVERAL FLOATING PRODUCTION SYSTEMS SUCH AS THE CONVERSION OF THE P. P. MORAES INTO FPSO FOR THE GAROUPA FIELD, IN CAMPOS BASIN.

Brazilian Navy 1974 – 1977 Based on Rio de Janeiro, Brazil

GRADUATED FROM THE NAVAL ACADEMY OF RIO DE JANEIRO, SERVED ON BOARD THE DESTROYER “MARIZ E BARROS” AND THE CARGO & DEPLOYMENT SHIP “GARCIA D’AVILA”.