resume_alok_. bilfinger

5
RESUME Alok Sinha DOB:- 28/01/1985 A5-204,Sai Milan Residency E-mail:- [email protected] Near Canal Road, Palanpur Jakatnaka Mob No:- 09375095949 L.P. Savani. Surat (Gujarat) Career Objective To utilize, my technical and functional expertise efficiently and effectively towards the growth and improvement of my organization and work as a key player in challenging & creative environment. Total Experience ( 8 yrs) Working as a Project planning engineer from June-2014 to till date in, Bilfinger Plant Equipment Pvt. Ltd, Surat (Gujarat) Seven Years of working experience as PPC (Production Planning & Control) Engineer in addition to Project Planning & customer co-ordination as well, from July -2007 to June-2014, in GEI industrial systems Ltd. Bhopal(M.P) , An ISO 9001-2000 company and it’s sister concern company GEI Power Ltd. Organizational Profile BILFINGER PLANT EQUIPMENT PVT. Ltd, a German group company engaged into fabrication of Reformer Packages for Hydrogen Generation Unit inclusive of Air preheater, Waste Heat Boiler, Pipings, Pressure vessel, Chimneys,Ducts & Heavy structure fabrication. Mainly belonging to Oil & Gas sector having majority in Export Jobs. It’s prestigious client are ITT (International thermal technology), Air Products etc. GEI INDUSTRIAL SYSTEMS Ltd. is engaged in Design, Engineering & supply of Air cooled Heat Exchangers, Pressure Vessels and complete ACC Package for Oil & Gas & Power sector respectively.

Upload: alok-sinha

Post on 18-Aug-2015

375 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Resume_Alok_. Bilfinger

RESUME

Alok Sinha DOB:- 28/01/1985A5-204,Sai Milan Residency E-mail:- [email protected] Canal Road, Palanpur Jakatnaka Mob No:- 09375095949L.P. Savani. Surat (Gujarat)

Career Objective To utilize, my technical and functional expertise efficiently and effectively towards the growth and improvement of my organization and work as a key player in challenging & creative environment.

Total Experience ( 8 yrs) Working as a Project planning engineer from June-2014 to till date in, Bilfinger Plant

Equipment Pvt. Ltd, Surat (Gujarat) Seven Years of working experience as PPC (Production Planning & Control) Engineer in

addition to Project Planning & customer co-ordination as well, from July -2007 to June-2014, in GEI industrial systems Ltd. Bhopal(M.P) , An ISO 9001-2000 company and it’s sister concern company GEI Power Ltd.

Organizational Profile BILFINGER PLANT EQUIPMENT PVT. Ltd, a German group company engaged into fabrication of Reformer Packages for Hydrogen Generation Unit inclusive of Air preheater, Waste Heat Boiler, Pipings, Pressure vessel, Chimneys,Ducts & Heavy structure fabrication. Mainly belonging to Oil & Gas sector having majority in Export Jobs. It’s prestigious client are ITT (International thermal technology), Air Products etc.GEI INDUSTRIAL SYSTEMS Ltd. is engaged in Design, Engineering & supply of Air cooled Heat Exchangers, Pressure Vessels and complete ACC Package for Oil & Gas & Power sector respectively. This has been accredited ISO- 9001 by Lloyds and also with ASME “U” stamp certification. It’s customers are JAYPEE, PDO Oman, Technip (Italy), TOYO, Reliance (India), L & T , Thermax, Daelim, ABB, BHEL, BPCL, ONGC, HPCL and EIL, Shree Cement etc.

Responsibilities in Production Planning Control Department /Project Planning Study of “Purchase Order” file and Technical Specification given by the Customer. Arranging & attending the Kick off meeting Coordinating for QAP, Drawings, Painting Scheme. Preparation of Manufacturing schedule in MS Project. Preparation of detailed manufacturing plan. Capacity , Resource and Man power planning. Preparation of material procurement plan. Follow-up with purchase dept. for receiving raw material on time.

Page 2: Resume_Alok_. Bilfinger

Preparation and submission of Weekly Progress report to customer & internal Top management.

Study of manufacturing drawings. Arranging management review meeting. Planning of MAKE or SUBCONTRACT the equipment. Issuing material indents for structural items. Preparing & issuing layout and cutting list to production. Expediting and controlling the project as per prepared schedule. Prepare contingency plan if project is getting delay. Vendor development as and when required. Verification of bills generated by Contractors/ sub-vendors. Interactions with inspection agencies like EIL, LRIS, and BVIS etc. Get approval and dispatch clearance for our equipment from Quality Control.. Preparation of job analysis report (Job History Sheet)

Achievements in GEI INDUSTRIAL SYSTEMS / GEI POWER LTD & BILFINGER PLANT Along with GEI Industrial Systems Ltd, also Worked as Production Planning & Control

Engineer in GEI Power Ltd (Sister concern unit of GEI) , engaged in Fabrication of heavy structure, supplying power plant equipments of Air Cooled Steam Condensers & all structural parts of Air Cooled Heat Exchangers.

Production & Planning activity for Shree Cement project 2x 150 MW. Planning & scheduling of 10 projects of Air cooled steam condenser & Air cooled Heat

exchangers running at same time including Shree cement, Auromira Power plant, Super smelters ltd power plant, Thermax ltd, Jaypee, Essar ,L&T, BORL etc.

Handled Eight vendors with a Manpower of overall 175-200 people for Planning & execution of 10 projects at a single time.

Worked as a Team leader of 5 people for Production Planning / execution / Logistics & Subcontracting department.

Experience in dealing with National & International Clients.

Projects Completed:- Air Cooled Steam condenser for SHREE CEMENT LTD with 50 MW & 18 MW Power

plant CACW (Closed air water coolers) coolers for NPCIL & BHEL Bhopal. Air Cooled Heat Exchanger for DRESSER RAND Ahmedabad.. Air Cooled Heat Exchanger for PUNJJ LLOYDS for IOCL Haldia. Air Cooled Heat Exchanger for BORL Mumbai CACW for TATA STEEL Jamshedpur. & KPCL Pune. Air Cooled Heat Exchanger for IOTL( Indian Oil Tanking LTD). 4 Projects of Air cooled heat exchanger of IOCL Paradip Jobs received through

TOYO/Foster Wheeler. Air cooled steam Condenser for KVK Project Nagapatnam site for 150 MW power

plant. Air cooled steam condenser for UTCL Gulbarga site( Ultratech Cement ltd.) for 30 Mw. Air cooled steam condenser for JAYPEE Shahbad unit for 80 MW Power plant Air Cooled Heat Exchanger for MOGL Project (Mercator Oil & Gas Ltd.)

Page 3: Resume_Alok_. Bilfinger

8 Waste Heat Boiler modules of Hydrogen Generation unit, COMPERJ Project (Complexo Petroquimico Rio de Janerio) Project of ITT for Petrobras, Brazil.

6 Pressure vessels for COMPERJ Project.

Presently working on:-

Project Planning of 3 Units of Hydrogen reformer Package for KNPC (Kuwait National Petroleum Company) Project, inclusive of Heavy structure fabrication & Pressure Pipings received through FLUOR/ITT

Academic Profile Completed Diploma in MECHANICAL ENGINEERING from S.V. POLYTECHNIC, Bhopal. In

2007 Completed Bachelor of Arts degree from Barkatullah university Bhopal with English

literature Higher Secondary from CBSE Board. High School from CBSE Board.

Industrial Training & certifications One year training at BHEL Bhopal on CNC programming & Opeartions Completed the course of AUTO-CAD from CADD CENTRE, BHOPAL Completed the course of CNC programming & operations from

CENTRE OF RESARCH FOR INDUSTRIAL STAFF & PERFORMANCE (CRISP), BHOPAL

Hobbies Watching movies, listening songs. Playing cricket, carrom. Touring and riding bikes

Personal Profile Father’s Name : Shri A .K . SinhaDate of birth : 28/01/1985Marital Status : Married. Permanent Address : 6y/32 Sahara states, Bhojpur road Bhopal

Declaration I hereby declare that all the above informations provided by me are correct and true as per best of my knowledge.

Date : 30/7/2015 Place : Surat(Gujarat)