    Presented by Robert LockhartThe RETHINK GROUP

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    2/78

    yThe RETHINK GROUP

    Demand for Indoor Recreation Facilities

    What has transpired in the region sincewhat is planned, anticipated & being resere: recreation facilities?

    The Arena/Community Centre propose2014 Feasibility Study & the 2011 Maste

    C h i f i i d i

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    3/78

    Questions & Discussion.

    Try to focus in on the preferred facility c – which will require further contemplationdefinition.

    Associated Information

    2014 Arena/Community Centre NeedsFeasibility Study

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    4/78

    Sources of Information:

    Use patterns of the community ce Registration (user groups & progr

    User Group Survey & workshop ( 2011 Parks & Recreation Master

    Leisure Trends + Best Practices Other recent plans & new facilitie

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    5/78

    Anticipated population growth: 11

    2031 (30% increase over 2011 censpopulation of 8,850) – based on currnumbers in support of the Township

    That represents an annual average

    rate of 1.5% (well above the averag0 27% i 1991)

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    6/78

    Unless the rate of population growthexceeds that of the past few decadeprofile of the population will contiage - for the next 30 years – influenc

    mostly by the big Baby Boom & Echgenerations.

    With most of the new population targfor the Millbrook Settlement Area,

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    7/78

    For the foreseeable future, the need arenas in Cavan Monaghan can be

    accommodated by one ice pad. If demand eventually exceeds loca

    some nearby arenas have excesscapacity.

    22 ice pads in the region (av. ratio

    pad:14,000 pop.). CM: 1 per 9,000

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    8/78

    Facilities such as multi-purposeprogram/activity space & an assem

    hall/gymnasium are often provided communities like Cavan Monaghan.

    An indoor walking/running track calso be justified, since there is a sho

    this type of facility in the region &fit / ll i i hi h & i i

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    9/78

    There is a need for indoor facilities& recreation programming & volubased groups to support the intereslarge & increasing older adult pop

    (similar needs for children & youth)

    Strong interest has been expressed li d l i f ili

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    10/78

    The Township’s population will need to larger to support some of the facilitiessuggested in the 2011 Parks & RecreatMaster Plan, especially with a fitness c

    indoor swimming pool located at Flem

    Re: indoor soccer: Trent Hills & Hamil

    have just opened indoor soccer facilities

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    11/78

    For most types of culture & rec. facilthe Twp., supply & quality are belonorm for a community the size &characteristics of Cavan Monaghan.

    The 2011 Parks & Recreation Maste

    & the 2014 Feasibility Study recommi il l i f ili i

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    12/78

    Indoor soccer facilities in HastingBaltimore

    New twin-pad arena to be built at U.

    Indoor swimming pool & field houbeing contemplated at Trent U.

    Peterborough Sport & wellness Ccould be expanded (gyms, fitness

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    13/78

    Very strong demand for expansionetwork in Peterborough.

    Conditions are improving for accegrowth within the Peterborough re

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    14/78

    Single-pad NHL-size arena with seatin200-300, 6-8 adult-size dressing room

    other components & features of a modarena Elevated walking/running track around

    arena Ample lobby with a concession, café-s

    seating, ice viewing area, etc.

    Assembly hall/gymnasium Multi purpose activity rooms

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    15/78

    If you plan to further pursue this endeavwould be prudent to again consult the

    community to confirm the componenfeatures of the facility (both, to researraise awareness).

    An online household survey and/orCommunity Forum to discuss & cocomponents – to inform the concept

    design process.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    16/78

    Required site size: 8 acres (+/-), depending onnature/size of facility

    2014 estimated capital cost: $15.9 - $19.9 mi5% per year - $17.5 - $22 million in 2016$)

    Single-pad arena only: $12.5 - $15.5 (2016$)

    Estimated net operating cost: $189,600 in Yedecreasing to $146,800 by Year Five.

    Current facility

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    17/78

    Capital Cost: $23-30 million (2016 $) -depending on level of fit & finish, feature

    size – to be confirmed, based on moreinformation.

    Operating Costs: may break even, depeon level of use & rates.

    Site requirements: 8 10 acres dependi

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    18/78

    Questions and Discus

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    19/78

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    20/78

    1. Determine the current & future requirements for arenatime.

    2. Define facility & site requirements for a replacementarena/community centre.

    3. Estimate capital & operating costs.

    4. Identify & evaluate options for a replacement arena/cocentre.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    21/78

    Community profile & anticipated population growth & change

    to the principle arena markets.

    Looked at utilization, operating costs & capital investment re:

    Community Centre (past five years).

    Noted the projected capital cost to maintain the Community Cen

    Examined arenas within the market area, service levels & renta

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    22/78

    Determined current & future need for ice surfaces in Cava

    Identified the ideal replacement arena/community centre &provision options.

    Estimated preliminary capital costs & produced a five-yeacost projection.

    Identified the pros & cons of the three options & options f

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    23/78

    Built in 1952 - partially rebuilt in 1977

    24,400 sq. ft., incl. the second floor hall – half the size of a m

    The facility is deficient in every category:

    Under-sized ice surface (75’ x 175’) (modern standard is 85’ x 200 Only 4 small dressing rooms – designed for children

    Cramped lobby/concession/viewing area

    Building is not accessible (into & throughout)

    Other features of a modern arena are either missing or sub-stand

    f

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    24/78

    Recent repairs: $700,000

    Will require upwards of $1 million in repairs & upgrades oveyears (will not improve usability & appeal, other than accessi

    Prime time use: 93% (similar to last 5 yrs. - down from 98%

    Non-prime time use: 41% (down substantially from average

    Net operating cost in the order of $100,000C tl d f d d f b ildi i & i t

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    25/78

    Current PT and NPT demand can be accommodone ice surface.

    Both PT and NPT use have been trending downthe past five years – especially NPT.

    If a new modern arena is built in the south end of

    Peterborough, some users may leave the dated

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    26/78

    A modern replacement arena/community centre in Cavanwill likely attract some additional local & non-resident deman& floor activities, even without an increase in the Township po

    Over the next 20 years, there is potential for a small amounin demand from the community for PT & NPT ice.

    The potential for increased demand for off-season floor useonly at a new facility.

    The new population should be continually monitored to dete

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    27/78

    One ice surface will meet current & near future d

    Within five years, there may be sufficient PT demice surfaces.

    PT demand for ice would have to increase by 60 justify a second ice pad.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    28/78

    Single-pad Arena:

    NHL size ice surface (85’ x 200’)

    6-8 adult-size dressing rooms Seating for 200-300

    Ample lobby with concession & cafe-style seating area

    Adequate male & female referees rooms Wide hallways & automatic doors

    Energy-efficient building - bright/natural sunlight

    Air conditioned to encourage summer floor use

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    29/78

    Associated Components: (should not built a stand-alone ar

    Assembly hall/gymnasium (5,000 sf of programmable spa

    Smaller multi-purpose activity & meeting rooms (1,500 sf Indoor running/walking track – around top of arena

    Site Requirements: +/- 8 acres

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    30/78

    Size: 61,620 sf (arena portion comprises 43,380 sf)

    Construction cost: $13.25 million - $17.25 million

    Total Project cost: $16.9 million - $19.9 million (incl. site devfees, contingency, equipment & furnishings) – arena portion w

    $9.3 – 12.2 million

    Net Operating Cost: $146,800 by Year 5 of operation

    Conservative utilization targets for NPT ice, summer floor & multipu Even with a 25% increase in rates over first 3 years they will still be

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    31/78

    Option One: Locate the replacement arena/community cecommunity park adjacent to the municipal office.

    Option Two: Locate the components of the replacementarena/community centre at Fleming College as part of a mpartnership.

    Option Three: Split the facility (arena & indoor track to FleCollege – assembly hall/gym & multi-purpose rooms to a ncommunity centre in a new community park adjacent to theoffice)

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    32/78

    Pros

    1. Best access to greatly improved recreation, social & wellness

    programming in a multi-functional facility2. Enhancement of a vital focal point of community activity, iden

    3. Ensures total community control over facility (operation, prog

    pricing)4. Ability to add to this facility as demand warrants & to possibly

    new fire hall & replacement library

    5. Contributes to the economic viability of local commerce, esped t Millb k

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    33/78

    Cons

    1. Cost to construct this facility on a municipal site will be 1

    than Option Two ($1.6 - $3 million)2. May incur cost associated with purchase of land (min. of

    3. Net cost to operate this facility will be higher compared to

    a larger, shared arena/community centre complex at the 4. Reduced likelihood of receiving capital grants from senio

    government

    5. If Cavan Monaghan-based groups require more ice or flob d t d i i l d l t d i t

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    34/78

    Pros

    1. 10-15% lower capital cost than Option One ($1.6 - $3 mibe even lower, depending on cost-sharing of ‘other’ com

    2. No land cost to the Municipality

    3. Township’s share of net operating costs will be lower 

    4. Likelihood of senior government grants will be higher 

    5. Convenient for Township residents to rent additional timecomponents & to access the Peterborough Sport & Welln

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    35/78

    Cons

    1. Will remove a vital focal point of community activity, iden

    2. Due to location, this option will greatly reduce access to recreation, social & wellness programming for many Tow

    residents

    3. Some groups & programs may not associate with this fac

    4. Loss of economic stimulus for local businesses

    5. Almost no potential to partner with local service clubs & o

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    36/78

    Pros

    1. Best access to greatly improved facilities & programming in a multi-

    2. Enhancement of a vital focal point of community activity, identity & p

    3. Will cost about the same to build as Option One (if the Township is

    for the cost of the indoor track)

    4. No cost to the Municipality associated with purchase of land for the

    5. Ensures total community control over the facility (operation, program

    6. Ability to add to this facility as demand warrants & to possibly incorp

    hall & replacement library

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    37/78

    Cons

    1. The capital cost of splitting the facilities will be higher than for Op

    similar to Option One (if the cost of the indoor track is shared by

    2. Loss of the arena & indoor track will reduce usability, appeal & s

    3. The combined cost to operate the separated facilities will be high

    the components were combined in one facility4. Reduced likelihood of receiving capital grants for the community

    5. May incur cost associated with purchase of land for the commun

    portionL t ti l f f d i i d t O ti O b t

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    38/78

    Raise the building & create a signature downtowpublic square. (The Municipality does not have a

    square or other outdoor focal point for communitycelebration & identity.)

    Retain the building for alternative civic/non-publlease to a third party for inside storage.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    39/78

    Further research should be completed to fully define the m

    multi-purpose space

    a field house for soccer & other activities an equipment-based fitness facility

    outdoor facilities that may be suitable for a community pa

    the potential for partnerships with community groups

    To increase community-based programming & facility use –need to assess volunteer engagement practices & potenTownship, & prepare a Volunteer Engagement Strategy.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    40/78

    Questions

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    41/78

    Education Session

    for aNew Community Centre

    April 4, 2016

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    42/78

    Purpose

    1. To review the assessment and needs of the Cavan

    Monaghan Community Centre.

    2. Key messages from recent studies – leading torecommended components for a replacement facility.

    3. Site requirements for recommended replacementfacility.

    4. Be prepared for potential infrastructure funding.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    43/78

    Reports and Studies With Direct CommunityInput:

    1989 - Recreational Needs Study – Village of Millbrook

    1992 - Community Centre Feasibility Study

    2000 - Culture and Recreational Needs Assessment

    2001 - Municipal Services Complex Feasibility Study

    2011 - Parks and Recreation Master Plan2014 - Arena/Community Centre Needs and Feasibility

     Assessment Study

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    44/78

    Facilities Engineering Assessments

    2002 - Condition Assessment – Millbrook CavanNorth Monaghan Community Centre

    2011 - Structural Condition Assessment – Cavan Monaghan Community Centre

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    45/78

    1992 Community Centre Feasibility Study

    Determining the need for Arena Facilities – Section 3.2 – Rationale:

    “The Facility is unsafe for use.” 

    “The Facility does not meet the minimum standardrequired to encourage its use.” 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    46/78

    2001 Municipal Services Complex Feasibility Study

    “The recreation facility used most by Cavan-Millbrook-North Monaghan is the Community Centre by 60% ofthe population”. 

    Conclusions about current leisure needs in theTownship:

    “Replacement Arena (single pad, 85’ x 200’ ice surface,

    seating for 500, 6 dressing rooms, other typicalcomponents, including storage).” 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    47/78

    2002 Condition AssessmentMillbrook Cavan North Monaghan

    Community Centre 

    “Considering the number of critical issues andanticipated costs to bring the facility to good repair, acost benefit analysis would be suggested to assist inlong term planning”. 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    48/78

    2011 Structural Condition Assessment

    “Roof Deck: High humidity levels causing mildew were

    noted above the roof insulation at the upper hall areawhere roof leaks were reported”. 

    “Site: Grading is adequate; however, proximity to the

    creek subjects the arena to fluctuating ground waterconditions.” 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    49/78

    2011 Township of Cavan Monaghan Parks andRecreation Master Plan

    Section 8.2: Multi-Use Community Centre

    “A new multi-use community centre should be developed toreplace the existing Millbrook Community Centre.Components to include:• Single NHL-size rink with seating for 400, six adult-size

    change rooms and other support spaces• 4,000-5,000 square foot banquet hall/multi-use space

    • 1,200 square foot activity studio with sprung floor toaccommodate fitness activities

    • 800 sq. ft. meeting/club room for meetings, courses, etc.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    50/78

    2011 Township of Cavan Monaghan Parks andRecreation Master Plan

    • Explore possibilities of an indoor soccer facility.•  An indoor walking track should be included.

    • The Township should examine the demand for, andfinancial implications of a modestly-size equipment

    based fitness centre.• Programs and drop-in opportunities for youth and

    seniors” 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    51/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

    This study comprised the following:

    • Examined use, functionality and operation of theCavan Monaghan Community Centre;

    • Reviewed past studies and reports about condition

    and use of the Centre, as well as demand for arenasand associated facilities;• consulted with current user groups;• examined leisure trends;

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    52/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

    • Reviewed anticipated population growth and change forthe Township – with implications for current and futuredemand for recreation;

    • Updated current and future demand for arenas andassociated indoor recreation facilities;

    • Identified the characteristics of a modern arena thatwould be appropriate for the Township;

    • Provided and reviewed three facility options, that at thattime, included the possibility of a partnership with Fleming

    College and the City of Peterborough;

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    53/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

    • Estimated the capital cost of each option (in 2014dollars);

    • Provided a five-year estimate of operating cost for theoption that included an arena, running track,gymnasium/assembly hall and program rooms;

    • Examined the pros and cons of each option; and• Determined site requirements for each option.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    54/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

    “The 1952 Cavan Monaghan Community Centre is well

    past its replacement date. The building is deficient inevery category and will require an additional investmentof between $400,000 and $1,000,000 (or more) over thenext ten years to be maintained in good workingcondition and to meet increasing provincial accessibilitystandards. The site is small and in a floodplain, whichprecludes expansion and does not support sufficientparking, even for existing uses. Continued investment inthis facility is not recommended.” 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    55/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

    This study concluded the following about appropriatefacilities to be considered in a future arena/community

    centre for Cavan Monaghan:• The Township’s population will need to be much larger

    to support some of the facilities recommended in the2011 Parks and Recreation Master Plan, especially

    with a fitness centre and indoor swimming poollocated nearby at Fleming College.• Trent Hills has just opened an indoor soccer facility

    and Peterborough is currently examining the need forone.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    56/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

    There is a need for indoor facilities, social and recreation

    programming and volunteer-based groups to support theinterests of a large and increasing older adultpopulation.

    For the foreseeable future, the need for arenas in Cavan

    Monaghan can be accommodated by one ice pad.Some nearby arenas have excess capacity.

    For some time, strong interest has been expressed for acentralized, multi-facility community centre.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    57/78

    2014 Arena/Community Centre Needsand Feasibility Assessment Study

     Although this study presented three facility options, onlyone remains viable, due to the decision by the City ofPeterborough to locate their new twin-pad arena andancillary facilities at Trent University.

    The Arena/Community Centre Option (main components):• Single-pad NHL-size arena with seating for 200-300, 6-8 adult-size

    dressing rooms and other components and features of a modern arena• Elevated walking/running track around the arena•  Ample lobby with a concession, café-style seating, ice viewing area, etc.•  Assembly hall/gymnasium• Multi-purpose activity rooms

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    58/78

    2014 Arena/Community Centre Needs and FeasibilityAssessment Study

    • Required site size: 8 acres (+/-), depending on site

    • 2014 estimated capital cost: $15.9 - $19.9 million(add 5% per year)

    • Estimated net operating cost: $189,600 in YearOne, decreasing to $146,800 by Year Five.

    • Current facility:• 2015 net operating cost: $183,142• estimated 2016 net operating cost: $151,682

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    59/78

    Future Growth for the Township

    Official Plan projection: 11,560 by 2031 (30% increase

    over 2011 census population of 8,850 – adjusted forpopulation undercount).

    That represents an annual average growth rate of 1.5% (well above the average of 0.27% since 1991).

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    60/78

    Future Growth for the Township

    Official Plan : 70% (approx. 1,000 units) of the growth has been allocated tothe Millbrook Settlement Area.• 350 units to be located within the existing built boundary

    • 650 units to be allocated to the future expansion area of Millbrook• 240 units are allocated to the countryside area

    Note: * The future growth allocations in Millbrook were based on expected servingconstraints (i.e. treatment capacity at wastewater treatment plant)

    * The preliminary flow rates at the new plant indicate that there may becapacity for additional development* Environmental constraints within existing build boundary of Millbrook mayaffect the number of units that can be built* There may be the potential for more than 650 units in the Millbrookexpansion area

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    61/78

    Future Growth for the Township

    What is unknown is what age group will move into theTownship over the next twenty years.

    If a large proportion of the in-migrating population isyounger than anticipated for the County as a whole, thatwill make the future age profile of the Township youngerthan forecast and influence the demand for leisure -

    especially for facilities of interest to families.

    With most of the new population expected to locate inMillbrook, that is the best location for a communitycentre.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    62/78

    Other Information and Considerations

    Over the past five seasons, total ice time rented at theCommunity Centre has fluctuated between 1,713 and

    1,989 hours.Millbrook Minor Hockey is the principle user, followed bypublic skating, figure skating, Men’s Adult Standard

    Hockey, adult hockey leagues and other uses.

     Although prime time is well booked, later hours are notregularly scheduled on some evenings – due in part tothe poor quality/low appeal of the facility.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    63/78

    Other Information and Considerations

    With a modern, attractive arena, ice programs/uses willincrease (prime and non-prime time) – as well as off-

    season uses. An improved facility will attract increased use fromTownship residents and non-resident groups.

    Increased use will lead to increased revenue. A modern facility will cost less per square foot to operateand will produce a lower carbon footprint.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    64/78

    Other Information and Considerations

    If other quality facilities are provided in the communitycentre, a wide variety of culture, recreation and

    fitness/wellness programs for all ages will be able to besupported – contributing to improved quality of life andresident satisfaction, as well as increased attractivenessof the community to new residents and businesses.

    Therefore, there will be significant personal, social,environmental and economic benefits derived frominvestment in a replacement community centre.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    65/78

    Other Information and Considerations

    If a decision is made to move ahead with a replacementfacility, the most current list of proposed components

    and features should be reviewed and fine-tuned asrequired to ensure that nothing has been missed and allcurrent information and plans are considered.

    Two years have passed since the last study, decisions

    have been made about other recreation facilities withinthe market area, and the Peterborough culture andrecreation plan is taking shape – with possibleimplications for Cavan Monaghan.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    66/78

    Other Information and Considerations

    Conceptual Design and Site Plan:

     A typical next step would be to develop a conceptualdesign for the facility and a conceptual site plan.(Township has allocated funds within the 2016 capital budget  – Council direction required prior)

    That would also provide the opportunity to complete the

    final check-in about required components, features anduses. (Further consultation with stakeholders and residents).

    The estimate of capital cost can be refined and updated,based on the proposed design and current prices.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    67/78

    Other Information and Considerations

    Potential federal-provincial infrastructure funding  – will require well developed projects (possibly shovel-

    ready) and typically favour partnership-oriented projects.Neighbourhood ParklandWhen considering how and where to acquire a suitablesite for the community centre, account for the fact that

    one or more appropriately-sized and locatedneighbourhood parks and linkages will also be requiredwithin the residential community in which the communitycentre will be located.

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    68/78

    User Group/Program  2010/11  2011/12  2012/13  2013/14  2014/15  2015/16 

    Millbrook Minor Hockey (children and youth – Prime Time) 

    766 

    642.5 

    640 

    718.5 

    831 

    837.5 

    Public Skating Program – adult-only (Non-prime Time) 

    255 

    256 

    267 

    246 

    262 

    252.5 

    Millbrook Figure Skating Club (children and youth – Prime Time) 

    175 

    188 

    211 

    193 

    197 

    214 

    Men’s Adult Standard Hockey – pick-up (mostly Prime Time) 

    314.5 

    313.5 

    225 

    189 

    194.5 

    195 

     Adult Hockey Leagues (Prime Time) 

    120 

    120 

    121 

    121 

    121.5 

    121 

    Public Skating Program  – all ages (Prime Time and Non-prime

    Time) 

    75 

    76.5 

    122.5 

    118.5 

    130.5 

    104 

    Non-resident Groups (Non-prime Time) 

    77 

    75.5 

    68 

    59.5 

    22.5 

    30.5 

    Family/Party sponsored Skating (Non-prime Time) 

    40 

    114.5 

    44.5 

    22.5 

    24 

    61.54 

    High School Skating Program (Non-prime Time) 

    45.5 

    40 

    32 

    16.5 

    18 

    15 

    Parent and Tot Skating Program (Non-prime Time) 

    104 

    75 

    121 

    16 

    Elementary School Skating Program (Non-prime Time) 

    Family/Party sponsored Skating (Prime Time) 

    10.5 

    18 

    10 

    5.5 

    19 

    Total Hours  1,988.5  1,923.5  1,862  1,713  1,802  1,850 

    Notes: 

    1. Free Public Skating and Parent and Tot program ended in 2012/13.2. The Parent and Tot program was cancelled early into the 2013/14 season.3. Ice rental was delayed one month in the 2013/14 season.4. Healthy Kids Community Challenge booked 36 hours of public skating, sponsored school skating, and

    parents and tots programs in 2015/2016.

    Facility UsageHours of Ice Time Rented by User Group/Program per Year  

    Weekly Bookings

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    69/78

    y g2015-2016 Cavan Monaghan Community Centre Ice Times 

    Day 

    Time 

    Monday  Tuesday  Wednesday  Thursday   Friday  Saturday  Sunday 

    7:00 am  Minor Hockey 7:00 am - 9:00 am 7:30 am 

    8:00 am 

    Minor Hockey 8:00 am - 3:00 pm 8:30 am 

    9:00 am  Men’s Adult Hockey 9:00 am - 10:30 am

     9:30 am 

    10:00 am  Puck & Stick 10:00 am - 11:00 am

     

    Adult Exercise 10:00am - 11:00 am

     

    Puck & Stick 10:00 am - 11:00 am

     

    Adult Exercise10:00 am - 11:00 am

     

    Puck & Stick 10:00 am - 11:00 am

     10:30 am  Men’s Adult Hockey 10:30 am - 12:00 pm 11:00 am  Adult Hockey 

    11:00 am - 12:00 pm 

    Adult Skating 11:00 am - 12:00 pm

     

    Adult Hockey 11:00 am - 12:00 pm

     

    Adult Skating 11:00 am - 12:00 pm

     

    Adult Hockey 11:00 am - 12:00 pm

     11:30 am 

    12:00 pm  Men’s Adult Hockey 12:00 pm - 1:00 pm 

    12:30 pm 

    1:00 pm 

    Public Skate 1:00 p.m. –  2:30 p.m. 

    1:30 pm 

    2:00 pm 

    2:30 pm 

    3:00 pm  Minor Skating 3:00 pm - 4:00 pm 

    Minor Hockey 3:00 pm - 7:00 pm 3:30 pm  Public 

    Skating 3:30 pm - 5:00 pm 

    Public 

    Skating 3:30 pm - 5:00 pm  

    4:00 pm  Minor Hockey 4:00 pm -5:00 pm 

    Minor Hockey 4:00 pm - 9:00 pm 4:30 pm 

    5:00 pm  Figure Skating 5:00 pm - 7:00 pm

     

    Figure Skating 5:00 pm - 8:00 pm

     

    Figure Skating 

    5:00 pm - 6:00 pm Figure Skating 5:00 pm - 8:00 pm

     5:30 pm 

    6:00 pm 

    Minor Hockey 

    6:00 pm - 10:00 pm 

    Minor Hockey 

    6:00 pm -9:00 pm 6:30 pm 

    7:00 pm  Minor Hockey 7:00 pm - 10:00 pm

     

    Men’s Adult Hockey 7:00 pm - 11:00 pm

     7:30 pm 

    8:00 pm  Mens Adult Hockey 8:00 pm - 9:30 pm 

    Minor Hockey 8:00 pm - 11:00 pm 

    8:30 pm 

    9:00 pm  Mens Adult Hockey 9:00 pm - 10:00 pm

     

    9:30 pm  Mens Adult Hockey 9:30 pm - 10:30 pm

     

    10:00 pm 

    10:30 pm 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    70/78

    Other DetailsAvailable Prime Time Ice•  Available weekly prime time ice not booked for 2015-’16: 7

    hours

    Minor Hockey• Have 14 teams playing – approximately 212 players• Booked additional time at Bewdley Arena (4 hours weekly plus

    90 extra hours for tournaments and hockey schools)

    Figure Skating•  Approximately 70 persons including skaters, coaches and

    executives

    Adult• Non-prime time skating hours – approximately 60 daily users

    •  Adult leagues and old timers – approximately 170 weekly users

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    71/78

    2015 Revenue and Expenses

    Total Revenue: $-166,892.82

     

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    72/78

    Total Expense: 351,034.58

    Net: $184,141.76

    2016 Budget

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    73/78

    Total Revenue: $-166,000.00

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    74/78

     

    Total Expense: 317,682.00

    Net: $151,682.00 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    75/78

    Arena/Community Centre Pro-Forma Operating Revenue, 2016-2020 

    Township of Cavan Monaghan  Figure 11 

    Revenue 

    2013 

    2016 

    2017 

    2018 

    2019 

    2020 

    Current Arena  Proposed Arena/Community Centre 

    Arena

     Admission Fees (Public Skating) 

    $7,067.00 $8,000.00 $9,100.00 $9,800.00 $10,100.00 $10,400.00

    Ice Rentals 

    $128,767.00 $148,700.00 $171,700.00 $180,300.00 $185,700.00 $191,300.00

    Non-Ice Rentals 

    $9,658.00 $11,700.00 $14,200.00 $15,700.00 $16,200.00 $16,700.00

    Hall Rentals 

    $2,992.00 Replaced by Assembly Hall/Gymnasium & Multi-Purpose/Meeting Rooms 

     Advertising Space Rental 

    $3,776.00 $4,600.00 $5,600.00 $5,900.00 $6,100.00 $6,300.00

    Snack Bar/Café/Vending Machines 

    $944.00 $5,000.00 $5,200.00 $5,400.00 $5,600.00 $5,800.00

    Sub Total Arena  $153,204.00 $178,000.00 $205,800.00 $217,100.00 $223,700.00 $230,500.00

    Assembly Hall/Gymnasium 

    Hourly Rentals  n/a $7,700.00 $22,000.00 $33,400.00 $34,400.00 $35,400.00

    Event Rentals 

    n/a $1,500.00 $3,400.00 $4,600.00 $4,700.00 $4,900.00

    Sub Total Assembly Hall/Gymnasium  n/a $9,200.00  $25,400.00 $38,000.00 $39,100.00 $40,300.00

    Multi-Purpose/Meeting Rooms  n/a $6,400.00 $13,200.00 $20,300.00 $21,000.00 $21,600.00

    Running/Walking Track 

    n/a $ - $ - $ - $ - $ -Total Revenue  $153,204.00 $193,600.00 $244,400.00 $275,400.00 $283,800.00 $292,400.00

    Source: the Tourism Company and The Rethink Group, 2014 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    76/78

    Arena/Community Centre Pro Forma Operating Expenses, 2016-2020 

    Township of Cavan Monaghan  Figure 12 

    Expenses 

    2013 

    2016 

    2017 

    2018 

    2019 

    2020 

    Current Arena 

    Proposed Arena/Community Centre 

    Wages & Benefits 

    $114,242 $117,600 $119,300 $121,100 $122,900 $124,800

    Staff Training & Development 

    $ - $1,500 $1,500 $1,600 $1,600 $1,700

    Uniforms & Clothing 

    $1,267 $2,200 $2,300 $2,300 $2,400 $2,500

    Memberships 

    $509 $500 $600 $600 $600 $600

     Allocated Insurance 

    $39,004 $41,300 $42,600 $43,900 $45,200 $46,500

    Building Repairs & Maintenance 

    $4,537 $13,200 $13,600 $14,000 $14,400 $14,800

    Equipment Maintenance 

    $4,810 $10,000 $10,300 $10,600 $10,900 $11,200

    Cleaning Supplies 

    $1,463 $6,600 $6,800 $7,000 $7,200 $7,400Materials & Supplies

     

    $3,937 $14,800 $15,200 $15,700 $16,200 $18,300

    Telephone 

    $2,243 $3,600 $3,700 $3,800 $3,900 $4,000

    Security Service 

    $885 $1,400 $1,400 $1,500 $1,500 $1,600

    Hydro 

    $58,968 $118,900 $124,900 $131,100 $137,700 $144,600

    Heating $2,681 $9,000 $9,500 $9,900 $10,400 $11,000

    Contracted Services 

    $41 $13,900 $14,300 $14,700 $15,100 $17,100

    Water & Sewer  

    $7,139 $18,800 $19,400 $20,000 $20,600 $21,200

    Grounds Maintenance 

    $ - $5,000 $5,200 $5,400 $5,600 $5,800

    Total Facility Operating Expenses 

    $241,726 $378,300 $390,600 $403,200 $416,200 $433,100

    Source: the Tourism Company and The Rethink Group, 2014 

    Net Deficit: $184,700 $146,200 $127,800 $132,400 $140,700

    Arena/Community Centre Pro-Forma Fees and Prices 2016-2020

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    77/78

    Arena/Community Centre Pro-Forma Fees and Prices, 2016-2020 

    Township of Cavan Monaghan  Figure 13 

    Revenue 

    2013  2016  2017  2018  2019  2020 

    Current Arena  Proposed Arena/Community Centre 

    Arena

     Admission Fees 

    $1.77 $1.82 $1.88 $1.93 $1.99 $2.05Ice Rentals Prime Time

     

    $131.55 $144.71 $159.18 $167.13 $172.15 $177.31

    Ice Rentals Minor Sports  $98.66 $108.53 $119.38 $125.35 $129.11 $132.98

    Ice Rentals Day Ice 

    $60.47 $66.52 $73.17 $76.83 $79.13 $81.51

    Non-Ice Rentals Hourly  $60.47 $66.52 $73.17 $76.83 $79.13 $81.51

    Non-Ice Rentals Event (Max. 8 hours)  $362.83 $399.11 $439.02 $460.98 $474.80 $489.05

    Hall Rentals Hourly  $27.58 Hall replaced by Assembly Hall/Gymnasium in planned new facility 

    Hall Rentals Event (Max. 8 hours)  $229.15 Hall replaced by Assembly Hall/Gymnasium in planned new facility 

     Advertising Space Rental Boards  $120.94 $133.03 $146.34 $153.65 $158.26 $163.01

     Advertising Space Rentals Ice Surface Logo  $240.82 $264.90 $291.39 $305.96 $315.14 $324.59

     Advertising Space Rentals Ice Re-surfacer   $57.29 $63.02 $69.32 $72.79 $74.97 $77.22

    Snack Bar/Café/Vending Machines  $ - $5,000.00 $5,200.00 $5,400.00 $5,600.00 $5,800.00

    Assembly Hall/Gymnasium

    Hourly Rentals  (gym) $27.58 $41.37 $62.06 $63.92 $65.83 $67.81

    Event Rentals 

    (gym) $165.50 $248.25 $372.38 $383.55 $395.05 $406.90

    Multi-Purpose & Meeting Rooms  $27.58 $28.41 $29.26 $30.14 $31.04 $31.97

    Running/Walking Track  n/a $ - $ - $ - $ - $ -

    Note: All prices exclude HST 

    Source: the Tourism Company and The Rethink Group, 2014 

  • 8/18/2019 Rethink Group's Rob Lockhart's presentation on the proposed new Cavan Monaghan Township community centre

    78/78

    End ofEducation Session

    Recommendation: 

    That Council and Staff seek additional information and offer an

    opportunity for public input by holding a Special Council Meeting onMay 2, 2016 at 6:00 p.m.