Overview of the Existing Under Frequency Load Shedding
Scheme
Stage Criteria Load Shed
I 48.75 Hz + 100 ms 5.0 %
II 48.50 Hz + 500 ms 5.0 %
III 48.25 Hz + 1s 48.25 Hz + 500 ms OR 49 Hz AND df/dt > -0.85 Hz/s + 100 ms
7.0 %3.0 %
IV 48.00 Hz + 1.5 s48.00 Hz + 500 ms OR 49 Hz AND df/dt > -0.85 Hz/s+ 100 ms
7.0 %3.0 %
V 47.5 Hz instantaneous 47.5 Hz instantaneous OR 49 Hz AND df/dt > -0.85 Hz/s + 100 ms
6.0 %4.0 %
VI 49 Hz AND df/dt > -0.85 s/Hz + 100 ms 10.0 % + (3%+3%+4%) embedded with stage III,
IV and V
Present status of the UFLS scheme
• Under frequency relays on following feeders yet to be installed 11 kV feeders of Sub E – stage IV 11 kV feeders of Sub A – stage IV 11 kV feeders of Sub I – stage V 11 kV feeders of Sub F – stage IV Habarana Valachchane line from Habarana end –
stage VI
Present status of the UFLS scheme ctdStage Expected amount Actual amount
I 5.0 % 5.3 %
II 5.0 % 5.2 %
III 7.0 %3.0 %
5.16 %2.65 %
IV 7.0 %3.0 %
6.6 %2.4 %
V 6.0 %4.0 %
4.5 %3.6 %
VI 10.0 % + (3%+3%+4%) embedded with stage
III, IV and V
9.7 % + (2.65%+2.4%+3.6%) embedded with
stage III, IV and V
System Frequency Response• PCPP tripped rejecting 300 MW on 29.01.13
ppt
0 7.79999999999998 15.6000000000001 23.400000000000247.75
48
48.25
48.5
48.75
49
49.25
49.5
49.75
50
50.25
50.5
df/dt = 0.678 Hz/sMin fre = 47.945 Hz
df/dt = 0.60 Hz/sMin fre = 47.967 Hz
Free Governor Operation
• Only Victoria and Kothmale machines operated
Frequency Response without Kothmale m/c and Victoria one m/c
With Free Governor
Without Free Governor
Critical Generator Under Frequency Trip Settings
Power Station Under Frequency Trip Setting
O/Lax 48 Hz with 8 sec delay
KCCP ST 48 Hz with 3 sec delay
Barge 48 Hz with 10 sec delay
Initial Frequency Response• It depends on the characteristics of the
synchronous loads and synchronous generators.
• df/dt t=0+= ∆P/2Hsystem
• Hsystem includes the inertia contribution from generators and synchronous loads.
(MW-s/MVA)
System Inertia from committed generators
n
nnn
ii
n
iii
systemMVAMVAMVA
xMVAHxMVAHxMVAH
MVA
MVAHH
............
21
2211
1
1
Operation of Under frequency • df/dt setting was not operated – initial df/dt = 0.6 Hz/s
• Stage I – 62 MW (4.35 %) – 7 MW of load not tripped• Stage II – 40 MW (2.8 %) – 25 MW of load not tripped• Stage III – 92 MW (6.4 %) – 20 MW of load not tripped• Stage IV – 20 MW (1.4 %) – lack of load shedding in
stage IV since frequency remains appro: 1.6 seconds below 48 Hz
• Total load shedding – 214 MW
Frequency response if all feeders operate at stage I,II and III
Frequency response with reduced time setting in stage IV
• Reduce time delay to 1 sec from 1.5 sec
More load shedding In stage IV – 72 MW