review workshop - teqip-ii government college of engineering, aurangabad date- 24 th august 2012
TRANSCRIPT
Review Workshop - TEQIP-IIGovernment College of Engineering, Aurangabad
Date- 24th August 2012
2
Goal of Programme:Goal of Programme:
TTo improve quality of Technical Education and enhance existing capacities of the Institutions to become dynamic, demand-driven, quality conscious, efficient and forward looking, responsive to rapid economic and technological developments occurring at the local, State, National and International levels. It has a clear focus on the objectives to improve the overall quality of existing Engineering Education.
3
CONCERNS of the project CONCERNS of the project : :
Acute Faculty shortageAcute Faculty shortage
Poor Industry-academia Poor Industry-academia
collaborationcollaboration
Obsolete learning infrastructureObsolete learning infrastructure
Lack of research cultureLack of research culture
Poor employability of graduatesPoor employability of graduates
4
Factors to gauge the success- Factors to gauge the success-
S.No
Particulars End of TEQIP-I
End of TEQIP-II
1 Academically autonomous institutions
11 16
2 UG Placement rate 76% 95%
3 UG start salary (annually) 2.8 lakh 5.0 lakh
4 Internationally published research papers
Appro. 250 1000
5 PG graduates Appro. 1500
5000
6 Ph.D produced 112 500
7 Share of programs accredited
93% 100%
5
No. of Patents obtained and filed;
No. of integrated PhD programmes introduced;
Joint research projects undertaken;
Consultancies in collaboration with industry;
Publications, joint conferences, workshops;
Campus wide networking established in all
institutions.
Other factors to gauge the success-Other factors to gauge the success-
6
PROJECT STRATEGY :PROJECT STRATEGY :
The Project is designed to bridge the gap in the quality of engineering education between premier institutions & other institutions.
To enable institutions to implement academic and non-academic reforms to achieve the institutional goals.
To impart pedagogical training to all the faculty from Project Institution and also to the faculty from desirous non Project Institutions for effective teaching.
Promote world-class research in emerging areas in Project Institutions.
7
Key Activities to be undertaken:
• Starting new PG programmes in Engineering disciplines
• Strengthening of laboratories and establishment of new laboratories and virtual labs
• Modernization of classrooms and virtual classrooms
• Updatation of learning resources • Modernization and strengthening of libraries so
as to convert it in to knowledge centre
8
Contd…
Providing Teaching and Research Assistantships to existing and new PG programmes in Engineering
Enhancement of R&D and institutional consultancy
Faculty and Staff development for improved competence based on TNA
Enhanced interaction with Industry
Pedagogical Training
Implementation of institutional reforms
Academic support for weak students
Expectation from Project InstitutesExpectation from Project Institutes
Obtaining autonomous institution status within 2 years and ensure quality driven utilization of such status
Accreditation of eligible UG+PG programmes Minimum 4 Board meetings per year Improved faculty qualifications Improvements in placement rate and average
salary of placement package Increased transition of weak students from first
to second year Increase in the overall student and faculty
satisfaction9
Initiation of Technology driven activities such as creating virtual labs and CoEs
Increased number of Masters and Doctoral students enrolled
Increased number of externally funded R&D and consultancy projects
Increase in the number of publications in refereed journals Increased collaboration with institutions and industry Implementation of Governing reforms
Contd…
10
Immediate Expectations NBA accreditation for 50% of eligible UG and PG programmes by
September-12 20% increase in faculty with masters degree over the baseline by
September-12 10% increase in faculty with Ph.D over the baseline by September-
12 Establishing Finishing School for academically weak students by
September-12 60% expenditure of total allocation on procurements of goods by
March- 13 Assistance to at least 15 M.Tech students by March-13 Assistance to at least 5 Ph.D students by March-13 Training to minimum of 20 faculties by March-13 Training to minimum of 30 Technical staff by March-13 Minimum 2 R & D projects by March-13
Performance of Institutes
Sr. No.
Parameter
Sub Componant- 1.1
CoEK CoEJ CoEC SPCEBVUCoE
SCoE
1 Leadership of Institute and its involvement in the Project B B B B B B
2 Leadership of the TEQIP Coordinator B B B C B B
3 Clarity of amongst all Nodal Officers B B B B B B
4 TEQIP Project office availableC C C C C C
5 Faculty attendanceB B B A A A
6 Faculty involvementC B B C B B
7 Quality of queries from facultyB B B C B B
8 Willingness and readiness for faculty/staff training center C C B C A C
12
Performance of Institutes
Sr. No
Parameter
Sub Componant- 1.2
CoEPCoEA
bdCoE
AmrvICT VJTI
SGGSN
WCE BATUGHRCoE
RIT
1 Leadership of Institute and its involvement in the Project
A B B A B A A B B B
2 Leadership of the TEQIP Coordinator
A C C A B A B C B B
3 Clarity of amongst all Nodal Officers
B B B B B B B B B B
4 TEQIP Project office available A A C B A A B C A B5 Faculty attendance B B C C C C C C C A6 Faculty involvement B C C B C C B C B B7 Quality of queries from
facultyB C C B C B B B C B
8 Willingness and readiness for faculty/staff training center
B C C B C B C B C A
13
EQUITY ACTION PLANEQUITY ACTION PLANEquity Action Plan is the approach that consists of using extra Equity Action Plan is the approach that consists of using extra and different measures to bring equality among the students, and different measures to bring equality among the students, staff, faculty etcstaff, faculty etc
Equity under the project is achieved when each Equity under the project is achieved when each student/faculty gains the requisite skills and knowledge student/faculty gains the requisite skills and knowledge needed to access meaningful opportunities.needed to access meaningful opportunities.
Benefit the academically weaker students by taking Benefit the academically weaker students by taking remedial classes, tutorials, demonstration on remedial classes, tutorials, demonstration on communication, skill development and curricular communication, skill development and curricular development etc to bring these students to required level development etc to bring these students to required level of proficiency.of proficiency.
14
To make campuses physically and socially gender friendly; To make campuses physically and socially gender friendly; especially by providing adequate and suitable facilities to especially by providing adequate and suitable facilities to women students and faculty.women students and faculty.
To ensure adherence of Equity Action Plan scrupulously and To ensure adherence of Equity Action Plan scrupulously and transparently.transparently.
Spend a minimum of 4% of the allocation under Sub-Spend a minimum of 4% of the allocation under Sub-component-1.1 to academic support to weak students. component-1.1 to academic support to weak students.
Contd…
15
16
DISCLOSURE MANAGEMENT FRAMEWORK AND DISCLOSURE MANAGEMENT FRAMEWORK AND ITS OBJECTIVEITS OBJECTIVE
Disclosure Management means making known all Disclosure Management means making known all information related to Project through website.information related to Project through website.
Disclosure Management Framework (DMF) policy will Disclosure Management Framework (DMF) policy will ensure transparency and accountability in project ensure transparency and accountability in project implementation and its achievements.implementation and its achievements.
Adherence to DMF is mandatory in TEQIP II.Adherence to DMF is mandatory in TEQIP II.
WHY AN ORGANIZATION REQUIRES A GOOD M&E SYSTEMWHY AN ORGANIZATION REQUIRES A GOOD M&E SYSTEM
To provide information to managers and stakeholders on the To provide information to managers and stakeholders on the extent to which the project is meeting the desired objectives extent to which the project is meeting the desired objectives
To provide regular feedback on the status of the project and To provide regular feedback on the status of the project and a clearer basis for decision-making a clearer basis for decision-making
To guide the evolution of the system in the future based on To guide the evolution of the system in the future based on lessons learnt from the current systemlessons learnt from the current system
MONITORING & EVALUATION (M & E)MONITORING & EVALUATION (M & E)
17
18
POLICY FOR PROCUREMENTPOLICY FOR PROCUREMENT18
TransparencyTransparency
FairnessFairness
Fraud PreventionFraud Prevention
Equal opportunity to all eligible biddersEqual opportunity to all eligible bidders
Economy and EfficiencyEconomy and Efficiency
EffectivenessEffectiveness
All institutes are supposed to follow the fund allocation guidelines as per the PIP. Disagreements observed by NPIU in the procurement plans are summarized as follows-
Software Packages are to be procured under LRs only.Proprietary items and items under DGS & D shall be marked clearly. Similar type/ common items from various departments shall be combined so as to minimize the number of packages Procurement of safety/ surveillance systems are not permittedBrand name of the items are to be strictly avoidedConsultant services shall be hired only for specialized activities and not for basic requirements.
Observations of NPIU regarding Procurement Plans
PROCUREMENT PLANPROCUREMENT PLAN
20
Revision Threshold
Reviewing Authority
Approving Authority
>= 10% Institution Director/ Head of Institution
< 10% & > 30% Director/ Head of Institution
SPFU
>= 30% SPFU NPIU
THANK YOUTHANK YOU