  • SJVN LIMITED (A JOINT VENTURE OF GOVT. OF INDIA & GOVT. OF H.P.)

    LUHRI HYDRO ELECTRIC PROJECT (588 MW)

    REVISED DETAILED PROJECT REPORT

    VOLUME 3

    COST ESTIMATE AND

    ECONOMIC EVALUATION

    SHIMLA FBRUARY-2013

  • SJVN Limited Himfed Building New Shimla Shimla 171009 India

    Luhri Hydroelectric Project

    Revised Detailed Project Report

    Volume 3Cost Estimate

    and Economic Evaluation

    February 2013

    Luhri Hydroelectric ProjectRevised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________Volume-3 Cost Estimate and Economic Evaluation

  • LUHRI HYDRO-ELECTRIC PROJECT

    REVISEDDETAILED PROJECT REPORT

    VOLUME-3

    COST ESTMATE

    and

    ECONOMIC EVALUATION

    (January 2013 Price Level)

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • List of Contents S.No. Description

    1.0 Summary of Project Cost

    2.0 Cost Estimate for Civil Works

    3.0 Analysis of Basic items and wages

    4.0 Analysis for Hourly Use Rate of Machinery

    5.0 Analysis of Principle items

    6.0 Cost Estimate for Electro-Mechanical Works

    7.0 Economic Evaluation

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 1. Summary of Project Cost

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • S.No Description Amount1 Total Civil Cost 4939.472 Total Electro-Mechanical Cost 1047.84

    Sub-Total 5987.31

    3 Interest During Construction (IDC) 1144.714 Financial Charges (FC) 5.00

    Sub-Total 1149.71

    5 Total Project Cost 7137.02

    Summary of Project CostLuhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 2. Cost Estimatefor Civil Works

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Amount Total Amount

    Rs. in Lacs Rs. in LacsDIRECT CHARGES

    I - Works1.0 A - Prelimanary1.1 A1 - Preliminary 7020.311.2 A2 - Consultancy Fee 300.00

    Total of A - Preliminary 7320.312.0 B - Land2.1 B1 - Land 37685.39

    Total of B - Land 37685.393.0 C - Works3.1 River Diversion and Sediment Flushing Tunnel 30228.543.2 Coffer dams including Diversion channel 525.413.3 Concrete Dam including Spillway 31829.073.4 Intake Structure 8841.793.5 Hydro-Mechanical Equipment 8191.26

    Total of C - Works 79616.074.0 J - Power Plant (Civil Works)4.1 Head Race Tunnel and Construction Adits 220216.634.2 Headrace Surge Shaft including adit 11590.104.3 Penstock Valve Chamber 595.914.4 Penstocks 5185.264.5 Spherical Valve house 595.914.6 Machine Hall 5909.794.7 Transformer Hall 1347.714.8 Tailrace Tunnel,TRT Manifold and outfall 3128.924.9 Tailrace Surge Gallery 2473.784.1 Main access tunnel, Cable tunnel, Adit to Valve house and other access adits 6200.474.1 Hydro-Mechanical Equipment 1523.16

    Total of J - Works 258767.635.0 K - Buildings 20510.286.0 M - Plantation 253.507.0 O - Miscellaneous 7.1 O1- Miscellaneous @ 1.5% of I-Works limited to 40 Crores 4000.007.2 O2- Miscellaneous 7077.008.0 P - Maintainance 5024.669.0 Q - Spl. T & P (vehicles & Tools) 200.00

    10.0 R - Communications 24275.81

    11.0 X - Environment & Ecology 22392.46

    12.0 Y - Losses on stock @ 0.25% of C-Works and J-Power Plant Civil works and K-Buildings only 897.23

    ABSTRACT OF COSTSLHEP-CIVIL WORKS

    S.No. Description

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Total of I - Works 468020.3513.0 II - Establishment @

    13.1 Basic Establishment Cost for Civil (BEC-C)=135 crs+2% of (I - Works less B-Land) exceeding 3000 crs 16106.70

    13.2For scattered work@1% of BEC-C per km of HRT length more than 5 Km+10% of BEC-C per year for the period more than 6 years of gestation period 8536.55

    13.3 Total Establishment Cost 24643.2514.0 III - Tools and Plants 200.0015.0 V - Receipts and Recoveries -86.43

    Total of Direct Charges 492777.17

    INDIRECT CHARGES16.0 Audit and Accounts @ 0.25% of I - Works subject to minimum of Rs. 5 Crs 1170.05

    Total of Direct and Indirect Charges 493947.22Say (in Crores) 4939.47

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • S.No.12i)a)b)c)ii)iii)iv)v)vi)vii)3456

    AmountRs. in Lacs

    1 Consultants fee (including charges for preliminary design work and advice) 300.000

    A - PRELIMINARY(1.5 % of I works)

    DescriptionPreparation of Pre-feasibility Report

    Visits to project sites by helicopter for investigation purposes.

    Pre-construction and construction stage investigations.

    Environmental and ecological studies.Hydraulics and hydrologic model studies and equipments.

    Hydro-Meteorological data including establishing self recording discharge gauges, climatological laboratory Geological and geo-physical explorations, geo-technical and geo-physical testing and seismological studies

    Survey by Survey of India (SOI): Accurate topographic maps of triangulation stations and GTS bench marks Detailed Surveys: Detailed surveys of final locations including survey of colony sites and layout of area.

    Construction material testing and establishing soil and rock testing laboratory.

    Topographical Surveys

    Training of Engineers during investigations and preparation of DPR.

    Department surveys: Preliminary Surveys comprising longitudinal section of river, contour plan of area i.e.

    A2 - Consultancy Fee

    S.No. Description

    Inspection vehicles and special tools and plants required for investigation works.Surveying, drawing, mathematical and camping equipments.

    Construction of access paths, retaining structures and temporary store shed to facilitate investigations.

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • B1-Land

    1a) Forest Land cost 271.15 7.56 2049.894i) Compensation for trees on forest land 124b) Private Land compensation 109 120 13080i Compensation for trees on private land 635ii Compensation for standing crops on private land 100iii Compensation for acquisition of 150 houses 400iv Cost of Establishment for land acquisition and Rehabilitation @ 6.25% 1766v Solatium Charges @ 30% of Cost of Private Land, trees and houses 4235vi Interest charges on amount of award for the period between taking over possession of land and date of award @ 12% per annum

    total compensation for 1 years (land compensation + trees comp. + houses comp. + Solatium)2202

    vii Legal charges @ 1% of total compensation (land compensation + trees comp. + houses comp. + Solatium) 184viii Labour and material required for measurement and demarcation of land/properties @ 1% of cost of land Acquisition (land

    compensation + trees comp. + houses comp. + Solatium)184

    c) Compensatory afforestation as per estimate of Forest Department for diversion of forest land 550d) Providing fencing etc. to the acquired private land 300

    Sub total of 1 258102

    2.a R&R Package i Cost of land for resettlement colony. Each 37 houseless PAFs to be provided house plot of 250 sqm @ 120 Lac per ha. 111ii Financial assistance to 37 houseless PAFs @ Rs. 4000 per sqm for construction of house of plinth area upto 100 sqm 148iii Site development of resettlement colony which includes path, electrification, water supply etc. 95iv Shop construction grant to 15 displaced shopkeeper @ Rs. 4000 per sqm for construction of shop of plinth area upto 50 sqm. 30

    v Rehabilitation grant to 64 landless PAFs @ Rs. 2.0 lakh per PAF. 128vi Rehabilitation grant to other 404 PAFs like marginal farmers, small farmers etc. @ Rs. 1.0 lakh per PAF. 404vii Subsistence allowance to 464 PAFs @ Rs. 30,000 for one year. 139viii Life long Economic rehabilitation grant (ERG) to 134 displaced vulnerable group families @ Rs 10,000 per year. (initially

    calculated for 7 years) 95

    ix Grant for cattle shed to 37 displaced PAFs @ Rs. 20,000/- 8x Shifting/Transportations grant to 150 PAFs 30xi Transition allowance to 37 houseless PAFs @ Rs. 2500 pm 17xii Grant to 200 PAFs for income generation scheme @ Rs. 3000 per family. 60xiii Grant for merit scholarship scheme to 40 students @ average Rs. 14400 per year (initially calculated for 07 years) 40xiv Marriage grant to 200 families @ Rs. 20000 (initially estimated for the period of project construction) 40xv Grant for child girl to 200 PAFs @ Rs. 10000 (initially estimated for the period of project construction) 20b) Infrastructural development works in project affected area villages under LADC 9000c) Community development works 0i) Protection of cultural heritage and old monuments 100ii) Support services for agricultural, horticultural activities etc. 50iii) Free power supply 750iv) Indemnification Budget 500d) Expenditure on monitoring committee 10e) Misc. Social /R&R Studies 100

    Sub total of 2 11875Grand total of 1 & 2 37685.387

    Cost for Implementation of R&R Plan

    DescriptionS. No.

    B-Land

    Quantity (ha)

    Rate (Lacs/ha)

    Amount Lakhs

    Land requirement:

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In soil 5000 m3 189 9.450b) In rock 120000 m3 404 484.800

    2 Underground excavation 630065 m3 1292 8140.440

    3 Untensioned and grouted rock bolts/anchors (25mm dia) including drilling 118548 m 623 738.554

    4 Drilling 38mm dia holes for grouting (contact and consolidation) 9025 m 508 45.847

    5 Grouting (contact and consolidation) 523 t 15700 82.111

    6 Shotcrete including cost of cement 7800 m3 8167 637.026

    7 Mesh reinforced in shotcrete 50000 sqm. 366 183.000

    8 Shotcreting with steel fibers 1000 m3 13207 132.070

    9 Steel rib supports 348 t 98193 341.712

    10 Drainage holes 75mm dia 2400 m 816 19.584

    11 Concrete including cost of cementa) Portals, inlet and outlet structures 44000 m3 5740 2525.600b) Tunnel lining (M30) 136000 m3 7244 9851.840c) Plug 2348 m3 4283 100.565

    12 Steel reinforcement (Fe-415) 6100 t 72787 4440.007Sub-total 27732.605

    13 Instrumentation 1 % 277.326

    14 Dewatering 1 % 277.326

    15 Unforeseen items 2 % 554.652

    16 Contingencies and work charged staff 5 % 1386.630

    TOTAL 30228.540

    RIVER DIVERSION AND SEDIMENT FLUSHING TUNNEL

    C - WORKS

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate Amount

    Rs. Rs. in Lacs

    1 Surface excavationa) In gravel and boulders 56700 m3 189 107.163

    2 Embankmenta) Rockfill 106138 m3 272 288.695b) Soil Bentonite Cement Core 1125 m3 3272 36.810c) Bentonite Slurry Cut off 978 m3 5047 49.360

    482.0283 Instrumentation 1 % 4.820

    4 Dewatering 1 % 4.820

    5 Unforeseen items 2 % 9.641

    6 Contingencies and work charged staff 5 % 24.101

    TOTAL 525.411

    Sub-Total

    C - WORKS

    COFFER DAMS INCLUDING DIVERSION CHANNEL

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In gravel and boulders 325682 m3 189 615.539b) In rock 182243 m3 404 736.262c) In foundation faults and seams 3300 m3 443 14.619

    2 Concretea) M10 40000 m3 4138 1655.200b) M12.5 293900 m3 4314 12678.846c) M20 33000 m3 5740 1894.200d) M25 50000 m3 6645 3322.500e) M60 1000 m3 7539 75.390

    3 Steel reinforcement, Grade Fe-415 7500 t 72787 5459.025

    4 Steel liners in the sluices 2800 t 98193 2749.404

    Total 29200.98

    5 Instrumentation 1 % 292.010

    6 Dewatering 1 % 292.010

    7 Unforeseen items 2 % 584.020

    8 Contingencies and work charged staff 5 % 1460.049

    TOTAL 31829.073

    C - WORKS

    CONCRETE DAM INCLUDING SPILLWAY

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate Amount

    Rs. Rs. in Lacs

    1 Surface excavationa) In soil 81720 m3 189 154.451b) In rock 54480 m3 404 220.099

    2 Underground excavation 4000 m3 1292 51.680

    3 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 10000 m 623 62.300

    4 Shotcrete including cost of cement 2000 m3 8167 163.340

    5 Mesh reinforcement in shotcrete 634 sqm 366 2.320

    6 Concrete reinforcementa) Grade Fe-415 7000 t 72787 5095.090

    7 Concrete in surface worksa) M10 40000 m3 4138b) M20 40000 m3 5740 2296.000c) M25 1000 m3 6645 66.450

    Total 8111.73

    8 Instrumentation 1 % 81.117

    9 Dewatering 1 % 81.117

    10 Unforeseen items 2 % 162.235

    11Contingencies and work charged staff @ 5% except on L.S. items 5 % 405.587

    TOTAL 8841.786

    C - Works

    INTAKE STRUCTURE

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Sr. No. Description Unit SET/NO. WEIGHT IN T per unit/set

    TOTAL Qty/Capac

    ity in T

    Rate/ton Total cost (Rs. In Lacs)

    'C' Works

    1.00 INLET DIVERSION TUNNELa) Gates (Fixed wheel type) etc. MT 2.00 60.00 120.00 225000.00 270.00b) Embedded Parts etc. MT 2.00 30.00 60.00 235000.00 141.00c) Rope Drum hoist etc.(92 T capacity) MT 2.00 92.00 184.00 150000.00 276.00

    2.00 OUTLET DIVERSION TUNNELa) Radial Gates Parts etc. MT 2.00 110.00 220.00 220000.00 484.00b) Embedded Parts etc. MT 2.00 12.00 24.00 235000.00 56.40c) Hydraulic Hoists etc. (280 T Capacity) MT 2.00 280.00 560.00 84000.00 470.40

    3.00 DAM COMPLEXa) Sluice Radial Gates Parts etc, MT 7.00 80.00 560.00 220000.00 1232.00b) Embedded Parts etc. MT 7.00 10.00 70.00 235000.00 164.50c) Hydraulic Hoists etc. (250 T Capacity) MT 7.00 250.00 1750.00 84000.00 1470.00d) Stoplogs etc. MT 2.00 112.00 224.00 225000.00 504.00e) Embedded Parts etc. MT 7.00 34.00 238.00 235000.00 559.30f) Gantry Crane (40 T Capacity) MT 1.00 40.00 40.00 190000.00 76.00g) Lifting Beam etc. MT 1.00 5.00 5.00 260000.00 13.00h) Auxiliary Spillway Tilt gate MT 1.00 9.00 9.00 220000.00 19.80i) Embedded Parts etc. MT 1.00 7.00 7.00 235000.00 16.45j) Hydraulic Hoists etc. (25 T Capacity) MT 1.00 25.00 25.00 84000.00 21.00

    k) Bulkhead gate etc. MT 1.00 7.00 7.00 225000.00 15.75l) Embedded Parts etc. MT 1.00 0.70 0.70 235000.00 1.65

    m) Lifting Beam etc. MT 1.00 5.00 5.00 260000.00 13.00

    3.00 INTAKEa) Trash Racks and Embedded parts. MT 1.00 100.00 100.00 185000.00 185.00c) TRCM 1.00 L.S. 45000000.00 450.00d) Service gates (fixed wheel type) etc. MT 2.00 60.00 120.00 225000.00 270.00e) Embedded Parts etc. MT 2.00 30.00 60.00 235000.00 141.00f) Rope drum hoist etc. (92 T Capacity) MT 2.00 92.00 184.00 150000.00 276.00g) Emergency gate (fixed wheel type) etc. MT 1.00 60.00 60.00 225000.00 135.00h) Embedded Parts etc. MT 2.00 30.00 60.00 235000.00 141.00i) Gantry Crane (75T Capacity) MT 1.00 75.00 75.00 190000.00 142.50

    'C' Works = 7544.75 Add 5% Entery Tax on 'C' Works = 256.46

    Total = 7801.20Add 5% contigency charges on 'C' Works = 390.06

    Grand Total 'C' Works = 8191.26

    HYDRO-MECHANICAL EQUIPMENT

    C-Civil Works

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In soil 1800 m3 189 3.402b) In rock 2700 m3 404 10.908

    2 Underground excavation 4642061 m3 1292 59975.428

    3 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 1180336 m 623 7353.493

    Untensioned and grouted rock bolts/anchors (32 mm. Dia) including drilling 2454257 m 888 21793.802

    4 Shotcrete including cost of cement 131182 m3 8167 10713.634

    5 Mesh reinforcement for shotcrete 460088 sqm 366 1683.922

    6 Shotcrete with steel fiber reinforcement 37092 m3 13207 4898.740

    7 Steel rib supports 19306 t 98193 18957.141

    8 Drilling for contact and consolidation grouting 150000 m 508 762.000

    9 Grouting (contact and consolidation) 8000 t 15700 1256.000

    10 Drilling for drainage holes 24000 m 816 195.840

    11 Concretea) Portals 1000 m3 5740 57.400b) Adits (M15) 4838 m3 4817 233.046c) Tunnel lining (M20) 999486 m3 5898 58949.684d) Plugs 9535 m3 4283 408.384

    12 Steel reinforcement (Grade Fe-415) 14368 t 72787 10458.036

    13 Steel Liners 4292 t 61888 2656.233

    14 Forepolling (25 dia bar with drilling) 891 t 66333 591.027

    15 Lattice Girder with fabrication and installation 1800 t 59749 1075.482

    16 Drainage holes 24 m long 4114 m 1089 45

    17 Steel pipe umbrella 17000 m 4890 831

    Sub-Total 202033.604

    18 Instrumentation 1 % 2020.336

    19 Dewatering 1 % 2020.336

    20 Unforeseen items 2 % 4040.672

    21 Contingencies and work charged staff @ 5% except on L.S. items 5 % 10101.680

    TOTAL 220216.628

    J - POWER PLANT CIVIL WORKS

    HEADRACE TUNNEL (1 TUNNEL OF 10.5m ID) AND CONSTRUCTION ADITS

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In soil 200 m3 189 0.378b) In rock 300 m3 404 1.212

    2 Underground excavation 212254 m3 1770 3756.896

    3 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 132409 m 623 824.908

    4 Shotcrete including cost of cement 2142 m3 8167 174.937

    5 Mesh reinforcement for shotcrete 52822 sqm 366 193.329

    6 Shotcrete with steel fiber reinforcement 100 m3 13207 13.207

    7 Steel rib supports 3426 t 98193 3364.092

    8 Drilling for contact and consolidation grouting 5000 m 508 25.400

    9 Grouting (contact and consolidation) 595 t 15700 93.415

    10 Drilling for drainage holes 600 m 816 4.896

    11 Concretea) Portal 150 m3 5740 8.610b) Surge Shaft lining 17448 m3 5898 1029.083

    12 Steel reinforcement (Grade Fe-415) 1570 t 72787 1142.756

    Total 10633.119

    13 Instrumentation 1 % 106.331

    14 Dewatering 1 % 106.331

    15 Unforeseen items 2 % 212.662

    16 Contingencies and work charged staff @ 5% except on L.S. items 5 % 531.656

    TOTAL 11590.099

    J - POWER PLANT CIVIL WORKS

    HEADRACE SURGE SHAFT(31M DIA) INCLUDING ADIT

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Underground excavation 18000 m3 1292 232.560

    2 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 4200 m 623 26.166

    3 Shotcrete with steel fiber reinforcement 300 m3 13207 39.621

    4 Drilling for consolidation grouting 200 m 508 1.016

    5 Grouting (Consolidation) 10 t 15700 1.570

    6 Concretea) M20 2000 m3 5010 100.200

    7 Steel reinforcement (Grade Fe-415) 200 t 72787 145.574

    Total 546.707

    8 Instrumentation 1 % 5.467

    9 Dewatering 1 % 5.467

    10 Unforeseen items 2 % 10.934

    11 Contingencies and work charged staff @ 5% except on L.S. items 5 % 27.335

    TOTAL 595.911

    J - POWER PLANT CIVIL WORKS

    PENSTOCK VALVE CHAMBER

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Underground excavation 22000 m3 5575 1226.500

    2 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 15000 m 623 93.450

    3 Shotcrete with steel fiber reinforcement 500 m3 13207 66.035

    4 Concretea) Shaft lining (M20) 5000 m3 5898 294.900

    5 Steel Liners 3000 t 102541 3076.230

    Total 4757.115

    6 Instrumentation 1 % 47.571

    7 Dewatering 1 % 47.571

    8 Unforeseen items 2 % 95.142

    9 Contingencies and work charged staff @ 5% except on L.S. items 5 % 237.856

    TOTAL 5185.255

    J - POWER PLANT CIVIL WORKS

    PENSTOCKS

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Underground excavation 18000 m3 1292 232.560

    2 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 4200 m 623 26.166

    3 Shotcrete with steel fiber reinforcement 300 m3 13207 39.621

    4 Drilling for consolidation grouting 200 m 508 1.016

    5 Grouting (Consolidation) 10 t 15700 1.570

    6 Concretea) M20 2000 m3 5010 100.200

    7 Steel reinforcement (Grade Fe-415) 200 t 72787 145.574

    Total 546.707

    8 Instrumentation 1 % 5.467

    9 Dewatering 1 % 5.467

    10 Unforeseen items 2 % 10.934

    11 Contingencies and work charged staff @ 5% except on L.S. items 5 % 27.335

    TOTAL 595.911

    J - POWER PLANT CIVIL WORKS

    SPHERICAL VALVE HOUSE

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Underground excavation 147000 m3 1292 1899.240

    2 Untensioned and grouted rock bolts/anchors (32 mm. Dia) including drilling 45000 m 804 361.960

    3 Shotcrete with steel fiber reinforcement 2500 m3 13207 330.175

    4 Drilling for consolidation grouting 2000 m 508 10.160

    5 Grouting (consolidation) 150 t 15700 23.550

    6 Concretea) M25 20000 m3 6705 1341.000

    7 Steel reinforcement (Grade Fe-415) 2000 t 72787 1455.740

    Total 5421.825

    8 Instrumentation 1 % 54.218

    9 Dewatering 1 % 54.218

    10 Unforeseen items 2 % 108.437

    11 Contingencies and work charged staff @ 5% except on L.S. items 5 % 271.091

    TOTAL 5909.789

    J - POWER PLANT CIVIL WORKS

    MACHINE HALL

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate Amount

    Rs. Rs. in Lacs

    1 Underground excavation 38000 m3 1292 490.960

    2 Untensioned and grouted rock bolts/anchors (32 mm. Dia) including drilling 30000 m 888 266.400

    3 Shotcrete with steel fiber reinforcement 1400 m3 13207 184.898

    4 Drilling for consolidation grouting 1000 m 508 5.080

    5 Grouting (consolidation) 60 t 15700 9.420

    6 Concretea) M25 2000 m3 6705 134.100

    7 Steel reinforcement (Grade Fe-415) 200 t 72787 145.574

    Total 1236.432

    8 Instrumentation 1 % 12.364

    9 Dewatering 1 % 12.364

    10 Unforeseen items 2 % 24.729

    11 Contingencies and work charged staff @ 5% except on L.S. items 5 % 61.822

    TOTAL 1347.711

    J - POWER PLANT CIVIL WORKS

    TRANSFORMER HALL

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In soil 5000 m3 189 9.450b) In rock 15000 m3 404 60.600

    2 Underground excavation 51077 m3 1292 659.915

    3 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 30000 m 623 186.900

    4 Shotcrete including cost of cement 1412 m3 8167 115.318

    5 Mesh reinforcement for shotcrete 7330 sqm 366 26.828

    6 Shotcrete with steel fiber reinforcement 100 m3 13207 13.207

    7 Steel rib supports 600 t 98193 589.158

    8 Drilling for contact and consolidation grouting 3000 m 508 15.240

    9 Grouting (contact and consolidation) 100 t 15700 15.700

    10 Drilling for drainage holes 600 m 816 4.896

    11 Concretea) Tunnel lining 10804 m3 5898 637.220b) Outfall 3000 m3 5740 172.200

    12 Steel reinforcement (Grade Fe-415) 500 t 72787 363.935

    Total 2870.567

    13 Instrumentation 1 % 28.706

    14 Dewatering 1 % 28.706

    15 Unforeseen items 2 % 57.411

    16 Contingencies and work charged staff @ 5% except on L.S. items 5 % 143.528

    TOTAL 3128.918

    J - POWER PLANT CIVIL WORKS

    TAILRACE TUNNEL ( TUNNEL OF 10.5m ID),TRT MANIFOLD AND OUTFALL

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In soil 3000 m3 189 5.670b) In rock 1000 m3 404 4.040

    2 Underground excavation 49077 m3 1292 634.075

    3 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 28350 m 623 176.621

    4 Shotcrete including cost of cement 1412 m3 8167 115.318

    5 Mesh reinforcement for shotcrete 7330 sqm 366 26.828

    6 Shotcrete with steel fiber reinforcement 100 m3 13207 13.207

    7 Steel rib supports 366 t 98193 359.386

    8 Drilling for contact and consolidation grouting 2000 m 508 10.160

    9 Grouting (contact and consolidation) 100 t 15700 15.700

    10 Drilling for drainage holes 600 m 816 4.896

    11 Concretea) Tunnel lining 10804 m3 5898 637.220

    12 Steel reinforcement (Grade Fe-415) 366 t 72787 266.400

    Total 2269.521

    13 Instrumentation 1 % 22.695

    14 Dewatering 1 % 22.695

    15 Unforeseen items 2 % 45.390

    16 Contingencies and work charged staff @ 5% except on L.S. items 5 % 113.476

    TOTAL 2473.778

    J - POWER PLANT CIVIL WORKS

    TAILRACE SURGE GALLERY (1 TUNNEL OF 10.5m ID)

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Surface excavationa) In soil 200 m3 189 0.378b) In rock 300 m3 404 1.212

    2 Underground excavation 190756 m3 1292 2464.568

    3 Untensioned and grouted rock bolts/anchors (25 mm. Dia) including drilling 56548 m 623 352.294

    4 Shotcrete including cost of cement 2543 m3 8167 207.687

    5 Mesh reinforcement for shotcrete 84780 sqm 366 310.295

    6 Shotcrete with steel fiber reinforcement 458 m3 13207 60.488

    7 Steel rib supports 849 t 98193 833.659

    8 Drilling for contact and consolidation grouting 5000 m 508 25.400

    9 Grouting (contact and consolidation) 400 t 15700 62.800

    10 Drilling for drainage holes 1000 m 816 8.160

    11 Concretea) Tunnel lining (M15) 20000 m3 5898 1179.600

    12 Steel reinforcement (Grade Fe-415) 250 t 72787 181.968

    Total 5688.507

    13 Instrumentation 1 % 56.885

    14 Dewatering 1 % 56.885

    15 Unforeseen items 2 % 113.770

    16 Contingencies and work charged staff @ 5% except on L.S. items 5 % 284.425

    TOTAL 6200.473

    J - POWER PLANT CIVIL WORKS

    S.No. Quantity Unit

    MAIN ACCESS TUNNEL, CABLE TUNNEL, ADIT TO VALVE HOUSE AND OTHER ACESS ADITS

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Sr. No. Description Unit SET/NO. WEIGHT IN T per unit/set

    TOTAL Qty/Capac

    ity in T

    Rate/ton Total cost (Rs. In Lacs)

    'J' Works

    1.00 DRAFT TUBEa) Gates Parts (fixed wheel type) etc. MT 3.00 50.00 150.00 225000.00 337.50b) Embedded Parts etc. MT 3.00 25.00 75.00 235000.00 176.25c) Rope drum hoist etc. (65 T Capacity) MT 3.00 65.00 195.00 150000.00 292.50

    2.00 TRT OUTFALL GATEa) Gates Parts (fixed wheel type) etc. MT 2.00 45.00 90.00 225000.00 202.50b) Embedded Parts etc. MT 2.00 23.00 46.00 235000.00 108.10c) Rope drum hoist etc. (60 T Capacity) MT 2.00 60.00 120.00 150000.00 180.00

    3.00 HRT ADIT GATEa) Gates Parts (hinged gate) etc. MT 3.00 10.00 30.00 220000.00 66.00b) Embedded Parts etc. MT 3.00 6.00 18.00 215000.00 38.70

    'J' Works = 1401.55 Add 5% Entery Tax on 'J' Works = 49.08

    Total = 1450.63Add 5% contigency charges on 'J' Works = 72.53

    Grand Total 'J' Works = 1523.16

    HYDRO-MECHANICAL EQUIPMENT

    J-Power Plant Civil Works

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Residential Buildingsa) Permanent residential buildings 43400 m2 19846.00 8613.164

    Service Charge @ 0.31 2670.081

    Total Residential Buildings 11283.2452 Non-Residential Buildingsa) Permanent non-residential buildings 36132 m2 19846 7170.757

    Service Charges @ 0.225 1613.420b) Temporary non- residential buildings 2000 m2 18376 367.520

    Service charges @ 0.205 75.342Total Non-residential Buildings 9227.039Grand Total (Residential + Non-Residential) 20510.283

    K-BUILDINGS

    S.No. Description UnitTotal Plinth Area

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Annexure-K1

    Sr.No. Unit (Area) Nos. Total Area

    Duttnagar Type -A 57.85 51 2950.35Type -B 89.87 61 5482.07Type - C 119.7 10 1197Type - D1 224.86 8 1798.88Type - D2 257.26 1 257.26

    17591371

    Khegsu Type -A 57.85 6 347.1Type -B 89.87 6 539.22

    1055823

    Power House Area Type -A 57.85 40 2314Type -B 89.87 42 3774.54Type - C 119.7 6 718.2

    823Basantpur Type -A 57.85 42 2429.7

    Type -B 89.87 54 4852.98Type - C 119.7 20 2394Type - D1 224.86 10 2248.6Type - D2 257.26 1 257.26

    175913711000

    Parlog 1055823

    43400

    Executive Field HostelNon-Executive Field Hostel

    VIP Rest House

    Permanent Residential Buildings

    Name of Component

    K-Building

    Residential Building

    1

    Executive Field HostelNon-Executive Field Hostel

    5Executive Field Hostel

    Non-Executive Field HostelTotal

    2Executive Field Hostel

    Non-Executive Field Hostel

    3

    Non-Executive Field Hostel

    4

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Annexure-K2

    Sr. No Name of Component Unit Quantity Remarks

    1 Office Complex at different location m2 65002 Office club m2 3003 Staff Club m2 3004 School m2 50005 Bank m2 5006 Post Office m2 3007 Telephone/Wireless station m2 2008 Hospital m2 30009 Market Complex m2 500010 Auditorium m2 50011 Fire Station m2 50012 Police Station m2 50013 Model Room m2 30014 Maternity/Child welfare center m2 30015 Bus Stand m2 120016 Co-Operative Sociaty m2 10017 Park m2 100018 Helipad m2 120019 Petrol Pump m2 100020 Nursary m2 130021 Material Testing Laboratory m2 50022 Store, Workshop m2 100023 Recreation Room m2 20024 Explosive Magzines m2 50025 Canteen m2 33226 Parking m2 150027 Pooja Place m2 60028 Miscellaneous m2 2500

    36132

    Sr. No. Name of Component Unit Quantity Remarks

    1 Site Offices 10 Nos. m2 1000

    2 Other Miscellaneous structures such as Site Labs, Temporary stores etc. m2 1000

    2000

    Permanent Non-Residential Buildings

    Total

    Permanent Temporary Non - Residential Buildings

    Total

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Cost of 200000 plants to be planted 200000 no. 20 40.0002 Making pit 3ftx3ftx1ft =200000 Nos. 50977 m3 120 61.172

    3 Four nos. gardeners for three years @ Rs. 150 per day 4380 days 150 6.570

    4 Cost of protection by barbed wire at Rs. 60 per plant 200000 no. 60 120.000

    5Beldar (16 Nos.) for protection and plantation for four months every year at Rs. 150/- per day for two years

    3840 days 150 5.760

    6 Development of gardens, parks and lawns etc. LS 20.000

    Total 253.502

    M-PLANTATION

    S.No. UnitQuantityDescription

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • O1-MISCELLANEOUS

    S.No. Description1.0 Capital Cost1.1 Electrification

    1.2 Water supply, purification and distribution arrangements including purchase of water tankers, cost of tanks and chlorination.

    1.3 Providing sewage disposal and storm water drains at various colonies sites.

    1.4 Furnishing and equipping rest houses, field hostels , hospitals, schools etc.1.5 Fire fighting equipment1.6 Telephone, telegraph, post office and wireless

    1.7 Fountains, recreation facilities, special lighting arrangements for beautification of areas in the project, dish antenna, petrol pump etc.

    2.0 Maintenance and service charges during execution period 40002.1 Maintenance of power arrangements2.2 R&M of water supply facilities2.3 R&M of sanitation and drainage facilities2.4 R&M of Telecommunication system and post office2.5 R&M of Hospital and Dispensary2.6 R&M of rest house and field hostel2.7 R&M of Research and Quality control laboratories2.8 Labour welfare compensation and retrenchment benefits2.9 Providing security police including R&M of posts.

    2.10 R&M of inspection vehicles and staff cars2.11 R&M of school buses and staff buses2.12 R&M of Ambulance2.13 R&M of field workshops2.14 Maintenance and running of schools3.0 Miscellaneous3.1 Foundation stone laying ceremony, inauguration and visit of dignitaries3.2 Model exhibition3.3 Group insurance3.4 Compensation for accidents3.5 Training personnel abroad including study courses and visits3.6 Publicity, information centers3.7 Technical record, photographic record and library facilities3.8 Boundary pillars and stones, distance marks and bench marks3.9 Canteen Facilities

    3.10 Co-operative Stores

    O2-MISCELLANEOUS

    S.No. Description Amount (Lacs)1 Construction Power 7077

    O-MISCELLANEOUS

    ( 1.5% of I works )

    Amount (Lacs)

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Annexure-O1Abstract of cost for construction power arrangement

    S.No Amount1 39002 18003 12004 1475 30

    7077Total

    DescriptionEstimate for proposed 220/66KV substationEstimate for proposed 66/33KV substationEstimate for proposed 33 KV HT LineEstimate for shifting of 66 KV Power lineEstimate for shifting of 22 KV Power line

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate Amount% Rs. in Lacs

    1 Maintenance of civil works during construction (1% of C-Works and J- Power Plant Civil Works 338384 1.0 3383.837

    2 Maintenance of building during construction period( 1% per year for 8 years of K-building) 20510 year 1.0% per year 1640.823

    5024.66

    P- MAINTENANCE

    Rs. in Lacs

    Total

    S.No. Description Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Rate AmountRs. Rs. in Lacs

    1 Cars2 Jeeps3 Shift Buses4 School Buses5 Cash Vans6 Ambulances7 Jack hammer with accessories,120cfm8 Wagon drilling machine9 Air compressor diesel, 250cfm

    10 Tipper 10 T

    11Excavator backhoe loader, 0.3 cum of excavator bucket and 1 cum of loader bucket

    12 Truck, 10 T13 Pick - up Van14 Water sprinkler,7500 ltr15 Dewatering pump electrical, 20 HP16 Diesel generating set, 100 KVA17 Road roller, 8 T

    Total 200.00

    LS 200.000

    Q - SPECIAL T & P ( Vehicles)

    S.No. Description Quantity Unit

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Amount

    Rs. In Lacs

    1 7/9m wide approach road for sush Adit (RD 0.00 to 410m). 410 m 46.71

    2 7/9m wide approach road for Balh Adit (RD 0.00 to 575m). 575 m 48.11

    3 7/9m wide approach road for Luhri D/S Bridge (RD 0.00 to 435m). 435 m 32.90

    47/9m wide approach road from NH-22 to left abutment of D/S bridge at Nirath dam from (RD 0.00 to 130m). 130 m 32.58

    57/9m wide approach road from NH-22 to left abutment of U/S bridge at Nirath dam site from (RD 0.00 to 405m).

    405 m 83.04

    67/9m wide approach road from right abutment of U/S bridge at Nirath to construction Adit, (RD 0.00 to 480m).

    480 m 16.57

    7 7/9m wide approach road from construction Adit of DT to U/S coffer dam at Nirath (RD 0.00 to 525m). 525 m 17.28

    87/9m wide approach road from U/S coffer dam to bottom of DT intake at Nirath from (RD 0.00 to 595m). 595 m 20.33

    9 7/9m wide approach road in right bank of river satluj for Khegsu Adit (RD 0.00 to 60m). 60 m 12.32

    107/9m wide approach road connecting the lower DT raod & top of DT intake road at Nirath from (RD 0.00 to 610m).

    610 m 36.37

    117/9m wide approach road from right abutment of D/S bridge at Nirath dam site connecting Moin village road from (RD 0.00 to 510m).

    510 m 108.34

    127/9m wide approach road from moin village road to right abutment of U/S bridge at Nirath from (RD 0.00 to 1020m).

    1020 m 110.77

    13 7/9m wide approach road in the left bank of river satluj for Khegsu Adit (RD 0.00 to 645m). 645 m 127.96

    14 7/9m wide approach road in the right bank of river satluj for Kenu Adit (RD 0.00 to 290m). 290 m 56.43

    15 7/9m wide approach road in the left bank of river satluj for Kenu Adit, (RD 0.00 to 225m). 225 m 60.03

    16 7/9m wide approach road to Moin adit (AT-1) on right bank of river satluj from (RD 0.00 to 400). 400 m 54.91

    17 7/9m wide approach road from moin village road to top of intake at Nirath (RD 0.00 to 515m). 515 m 109.95

    187/9m wide approach road from existing Kirti village road to explosive magzine site near Kirti from (RD 0.00 to 330).

    330 m 37.11

    19 7/9m wide Approach road from top of Intake to top of diversion Tunnel (RD 0.00 to 2/200) 2200 m 240.46

    207/9m wide approach road from Sunni-Luhri Road to

    bridge site at PH area of LHEP (RD 0.00 to 1/900m). 1900 m 206.59

    21 7/9m wide approach road connecting MAT Bridge-I & Bridge-II on right bank of river satluj at PH area of LHEP (RD 0.00 to 0/950m).

    950 m 90.90

    227/9m wide approach road from right abutment of proposed bridge near shotara adit to shotara Adit portal. (RD 0.00 to 0/135m).

    135 m 13.12

    R-Communication

    Sr. No. Description Qty. Unit

    Roads

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 237/9m wide approach road from Luhri-Sunni road to left abutment of proposed bridge near shotara Adit. (RD 0.00 to 0/090m).

    90 m 21.28

    247/9m wide approach road from right abutment of proposed bridge at manju to manju Adit (RD 0.00 to 0/315m).

    315 m 31.52

    257/9m wide approach road from right abutment of proposed bridge (over river satluj) near ogli Adit to Ogli portal (RD 0.00 to 1/030).

    1030 m 171.48

    267/9m wide approach road (7/9m) from Luhri -Sunni road to proposed quarry site at Khera (RD 0.00 to 0/900m).

    900 m 67.00

    27

    7/9m wide approach road (3840m), 7/9m from right abutment of proposed bridge-I to surge gallary/switchyard/penstock valves chamber, access tunnel/connecting bridge-II. (RD 0.00 to 3/840m).

    3840 m 402.85

    287/9m wide approach road from Luhri-Sunni road to left abutment of proposed bridge at manju Adit. (RD 0.00 to 825m)

    825 m 101.75

    297/9m wide approach road from Luhri-Sunni road to left abutment of proposed Ogli bridge. (RD 0.00 to 1/540m)

    1540 m 170.28

    30 7/9m wide approach road to basantpur colony. (RD 0.00 to 810m) 810 m 74.53

    317/9m wide approach road from Sunni-Basantpur-Shimla road to proposed magzine site (2.50T) near Sunni. (RD 0.00 to 1/450m).

    1450 m 104.44

    327/9m wide approach road from Luhri-Sunni road to left abutment of proposed bridge-II at PH site. (RD 0.00 to 1/240m).

    1240 m 193.72

    33 7/9m wide approach roads to colony, offices, stores & others Project roads.

    4000 m 450.00

    34 Realigement of NH-22 1700 m 1243.4535 Widening of existing Sunni - Sainj road. 8900 m 3200.0036 Misc. and unforseen Roads 5000 m 1500.00

    37 Widening of existing Luhri - Kot road & road from Dam site to Moin village. 7000 m 2500.00

    38 Widening of existing Basantpur-chabba road. 4500 m 1600.00

    39 Provision of Helipad LS 800.00Sub-Total A 56485 14195.07

    1 Sigle lane steel truss bridge (70R) D/S of proposed dam site at Nirath. 84 m 317.48

    2 Sigle lane steel truss bridge (70R) across river satluj in D/S of Luhri. 77 m 291.37

    3 Sigle lane steel truss bridge of span 117m across river satluj at Kenu. 117 m 586.58

    4 Sigle lane steel truss bridge of span 95.20m across river satluj for Khegsu adit. 95 m 354.14

    5 Sigle lane steel truss bridge (70R) of span of 77m across river satluj U/S of proposed dam at Nirath. 77 m 301.00

    6 Double lane steel truss bridge (70R) at PH site of LHEP. 93 m 546.11

    7 Sigle lane steel truss bridge (70R) of span 90m across river satluj at Ogli adit. 90 m 351.57

    8 Sigle lane steel truss bridge (70R) at Manju adit of LHEP. 78 m 259.53

    9 Sigle lane steel truss bridge-II (70R) at PH Site of LHEP. 90 m 374.18

    10 Sigle lane steel truss bridge (70R) with span of 117m across river satluj at Shotara adit of LHEP. 117 m 600.70

    3982.67

    18177.74

    24275.81

    Sub-Total B

    Grand Total (A+B) at 2009 Price Level as all Technical sanctions for above are on 2009

    Total cost on Dec 2012 Price level from 2009 Price level @ (i.e @7.5% per annum)

    Bridges

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Amount

    Rs. in Lacs

    1 Credit on account of resale value of temporary buildings @ 15% of cost of temporary buildings. 66.429

    2 Q-Special T&P

    i)Cost recoverable on account of resale value of Q - Special T&P other than personal carrier @ 10% of residual value of equipments

    20.000

    Total 86.429

    V - RECEIPTS AND RECOVERIES

    S.No. Description

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • S.No. Description Source of Estimate Amount (Rs. In Lacs)

    1Biodiversity Conservation Management Plan 2.5% of the

    Project Cost)Environmental Reports 180.00

    2 Action Plan for Catchment Area Treatment Environmental Reports 15500.00

    3 Fisheries Enhancement Plan Environmental Reports 346.83

    4 Public Health Delivery System Environmental Reports 768.90

    5 Air, Water and Solid Waste Management Environmental Reports 619.19

    6Provision for Fuel wood/ LPG Depots and Energy Conservation

    MeasuresEnvironmental Reports 53.45

    7 Disposal and Rehabilitation of Muck Environmental Reports 2359.04

    8 Landscaping and Restoration of Construction Areas Environmental Reports 385.10

    9 Development of Green Belt Environmental Reports 350.00

    10 Dam Break and Disaster Management Plan Environmental Reports 244.00

    11Comprehensive Environmental Monitoring and Adaptive

    Capacity Building Programme.Environmental Reports 885.95

    12

    Comprehensive environment impact studies, downstream

    river flow Management, flow studies and other miscellaneous

    environment studies as required

    As per MoEF

    Recommendation500.00

    13Miscellaneous environment activities such as plantation,

    environment protection works not covered in above works

    As per MoEF

    Recommendation200.00

    Total 22392.46

    X-Environment and Ecology

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 3. Analysis for Hourly Use Rate of Machinery

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • Sl.No. Description of Equipment/Machinery Capacity Hourly Use Rate in Rs.

    1 Hydraulic Excavator 1cum 2161.002 Hydraulic Excavator 2cum 2661.003 Hydraulic Excavator 3 cum 4100.004 Front End Loader 1.5 / 2.0 cum 2352.005 Front End Loader 1.0 / 0.25 2059.006 Crawler Dozer 100 HP 2696.007 Crawler Dozer 180 HP 4013.008 Wheeled Dozer 130 HP 2993.009 Air Compressor - Electric 1500 cfm 159.0010 Air Compressor - Electric 1000 cfm 191.0011 Air Compressor - Diesel 500 cfm 593.0012 Composite rate of air 212.0013 Jack Hammer 120 cfm 987.0014 Pavement breaker 70 cfm 862.0015 Auto feed 3.8416 Ventilation Blower 10000 cfm 348.0017 Wagon Drill 400 cfm 2130.0018 Wagon Drill 200 cfm 1507.0019 Rear End Dumper 15 Ton 2048.0020 Rear End Dumper 20 Ton 2269.0021 Tipper Truck 7 Ton 1371.0022 Material truck 10 Ton 79.0023 Hydraulic Jumbo Two Boom 7719.0024 Hydraulic Jumbo Three Boom 10239.0025 Rock Bolter 6172.0026 Grouting Machine 20 Kg/ Sqm 1626.0027 Grouting Machine 100 Kg/ Sqm 1833.0028 Shotcrete Machine 6 cum/hr 2734.0029 Concrete Pump 38 cum / hr 2098.0030 Concrete Pump 10 cum / hr 1123.0031 Concrete placer 1 cum 1402.0032 Transit mixer 6 cum 1900.0033 Transit mixer 2.5 cum 1413.0034 Crushing & Processing plant 40 Ton 3963.0035 Batching & Mixing Plant 90 cum 3449.0036 Batching & Mixing Plant 60 cum 3302.0037 Electric Pump 40 Kw 836.0038 Conveyor Mucker 0.38 cum 1162.0039 Water sprinkler 7000 lts 1144.0040 Concrete Mixer 14/10 cft 870.0041 Mobile Crane 30 Ton 3506.0042 Diesel Shovel 1.91 cum 4413.0043 Air Hoist 30 Ton 3101.0044 Bus 29.0045 Car 19.0046 Jeep 20.0047 Pick up Van 22.0048 Ambulance 32.0049 Raise Borer 18591.0050 Aggregate processing plant 300 T/hr 7901

    HOURLY USE RATE OF MACHINERY/EQUIPMENTLUHRI HYDRO-ELECTRIC PROJECT

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 5000000.0017,500.00

    122

    220047.44

    41030.51.0

    125Rate / hr for two shifts

    435.29254.47254.47

    58.9158.91

    375000.00565714.29470357.14

    213.80 213.80

    357.14 357.14

    11.33537.4952134.3738

    671.87 671.87

    108.82254.47

    63.62426.91

    58.9114.7373.64

    882.57 882.57F 35.71 35.71

    2161.00

    HelperCasual Staff

    D

    Labour ChargesRegular StaffForeman

    E

    23,32623,326

    Rate / Month

    C Repair & MaintenanceR & M Charges

    Hourly Depriciation

    ForemanOperator / Driver

    A

    Owner ship costB

    Basic Data

    Crew rates of SJVNL

    Cost of EquipmentLife in HoursLife in yearsNo. of working Shifts

    Yearly Depriciationa. w.r.t Life in Yearsb. w.r.t Life in HoursAverage Yearly Depriciation

    Cost of Diesel / LtCost of Electricity / unit

    Annual scheduled Production Hours

    1. Hydraulic Excavator ( Wheeled - 1 Cum)

    CWC Guideline

    C1C2R&M Charges in %age

    CWC GuidelineCWC Guideline

    CWC Guideline

    CWC GuidelineCWC Guideline

    OperatorMechanic

    POL Charges

    Mechanic / Electrician

    Diesel Consumption in Lt.Cost of hourly fuel consumptionCost of Lubricants

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    0.25

    Chowkidar

    0.22 * bhp * C1 * C2

    25 % of Fuel Charges

    BHP

    Subject: Use Rate of EquipmentProject: Luhri Hydro Electric Project

    125 % of cost / prod hrs

    Ave. Depreciation / Ann. prod. hrs

    5,400.005,400.00

    HelperChowkidar

    Market Rate

    1

    Number / Shift

    consumption x Rate

    CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    39,902.00

    Indirect Charges @ 80 % of skilled workers 341.52

    POL Charges

    500.54

    0.25

    10.25

    Direct Charges

    HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair ChargesTotal Labour Charges

    40.50

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 8200000.0017,500.00

    122

    220047.44

    41300.5

    1125

    Rate / hr for two shifts

    435.29254.47254.4758.9158.91

    615000.00927771.43771385.71

    350.63 350.63

    585.71 585.71

    14.3678.392169.598847.99 847.99

    108.82254.4763.62

    426.91

    58.9114.7331.91

    817.89 817.89F 58.57 58.57

    2661.00

    0.25

    @ 80 % of skilled workers

    C

    B

    DDiesel Consumption in Lt.Cost of hourly fuel consumptionCost of Lubricants

    Average Yearly DepriciationHourly Depriciation

    5,400.005,400.00

    Helper

    E

    consumption x Rate

    Ave. Depreciation / Ann. prod. hrs

    0.22 * bhp * C1 * C2

    25 % of Fuel Charges

    Total Labour Charges

    0.25

    1Operator

    Helper

    A

    Rate / Month

    Owner ship cost

    Crew rates of SJVNLForemanOperator / DriverMechanic / Electrician

    HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    17.55Indirect Charges 341.52

    458.81

    0.25

    1

    Direct Charges

    Chowkidar

    Labour Charges

    POL Charges

    Mechanic

    Casual Staff

    Repair & Maintenance

    Foreman

    R & M Charges 125 % of cost / prod hrs

    Regular Staff

    POL Charges

    Number / Shift

    Chowkidar

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    Yearly Depriciationa. w.r.t Life in Yearsb. w.r.t Life in Hours

    23,32623,326

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    C1C2R&M Charges in %age

    Annual scheduled Production HoursCost of Diesel / LtCost of Electricity / unitBHP

    Cost of EquipmentLife in Hours

    CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    CWC GuidelineCWC Guideline

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    2. Hydraulic Excavator ( 2.0 Cum)

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Basic Data

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 1200000017,500.00

    122

    220047.44

    42800.5

    1125

    Rate / hr for two shifts

    435.29254.47254.4758.9158.91

    900000.001357714.291128857.14

    513.12 513.12

    857.14 857.14

    30.81461.152365.2881826.44 1826.44

    108.82254.4763.62

    426.91

    58.9114.7331.91

    817.89 817.89F 85.71 85.71

    4100.00

    E

    HelperChowkidar

    17.55341.52 @ 80 % of skilled workers

    D

    Labour ChargesRegular Staff

    Number / Shift

    POL Charges

    Diesel Consumption in Lt.Cost of hourly fuel consumptionCost of Lubricants

    B

    C

    Rate / Month

    Repair & Maintenance

    Owner ship cost

    HelperChowkidar

    Crew rates of SJVNLForemanOperator / DriverMechanic / Electrician

    HOURLY USE RATE [B + C + D + E+F]

    ForemanOperator

    0.22 * bhp * C1 * C2

    25 % of Fuel Charges

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    Indirect ChargesTotal Labour Charges

    458.81

    0.25

    1

    Mechanic

    Casual Staff

    0.25

    Direct Charges

    consumption x Rate

    0.251

    Average Yearly DepriciationHourly Depriciation

    R & M Charges

    POL Charges

    125 % of cost / prod hrs

    Ave. Depreciation / Ann. prod. hrs

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    a. w.r.t Life in Yearsb. w.r.t Life in Hours

    23,32623,326

    Yearly Depriciation

    5,400.005,400.00

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    C1C2R&M Charges in %age

    Cost of Diesel / LtCost of Electricity / unitBHP

    CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    CWC Guideline

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Annual scheduled Production Hours

    Basic Data

    Cost of EquipmentLife in Hours

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    3. Hydraulic Excavator ( 3.0 Cum)A

    CWC Guideline

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 300000015,000.00

    102

    220047.44

    4130

    0.581

    200Rate / Month Rate / hr for two shifts

    435.29254.47254.4758.9158.91

    270000.00396000.00333000.00

    151.36 151.36

    400.00 400.00

    16.588786.93472196.73368

    983.67 983.67

    54.41254.4763.62

    372.49

    58.919.84

    68.75

    777.05 777.05F 40.00 40.00

    2352.00

    Crew rates of SJVNL

    200 % of cost / prod hrs

    consumption x Rate

    Ave. Depreciation / Ann. prod. hrs

    0.22 * bhp * C1 * C2

    [0.9 x cost / Life in Years]a. w.r.t Life in Years

    Chowkidar

    Total Labour Charges

    0.167

    Direct Charges

    Casual StaffHelperChowkidar

    1

    Mechanic

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    HOURLY USE RATE [B + C + D + E+F]

    0.125

    Number / Shift

    37.81Indirect Charges @ 80 % of skilled workers 297.99

    Operator

    441.24

    0.25

    25 % of Fuel Charges

    Repair & MaintenanceR & M Charges

    POL Charges

    Yearly Depriciation

    23,32623,326

    [0.9xcostxProd. hrs/Life in Hrs]

    5,400.005,400.00

    Mechanic / ElectricianHelper

    Operator / Driver

    Owner ship cost

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    C1C2R&M Charges in %age

    Annual scheduled Production HoursCost of Diesel / LtCost of Electricity / unitBHP

    CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    Cost of EquipmentLife in Hours

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    4. Front End Loader ( Wheeled 1.5 / 2 Cum)Basic Data

    E

    DDiesel Consumption in Lt.Cost of hourly fuel consumptionCost of LubricantsPOL Charges

    Labour ChargesRegular StaffForeman

    1

    C

    B

    A

    b. w.r.t Life in HoursAverage Yearly DepriciationHourly Depriciation

    Foreman

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 266500015,000.00

    102

    220047.44

    4100

    0.581

    200Rate / Month Rate / hr for two shifts

    435.29254.47254.4758.9158.91

    239850.00351780.00295815.00

    134.46 134.46

    355.33 355.33

    12.76605.3344151.3336

    756.67 756.67

    54.41254.4763.62

    372.49

    58.919.84

    68.75

    777.05 777.05F 35.53 35.53

    2059.00HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair ChargesTotal Labour Charges

    Foreman 0.125

    0.25

    1HelperCasual Staff

    Mechanic

    Labour ChargesRegular Staff

    5,400.005,400.00

    HelperChowkidar

    Repair & Maintenance 200 % of cost / prod hrs

    Ave. Depreciation / Ann. prod. hrs

    C2R&M Charges in %age

    23,326

    CWC GuidelineCWC Guideline

    Mechanic / Electrician

    CWC GuidelineCrew rates of SJVNLForeman

    C1

    [0.9 x cost / Life in Years]

    Annual scheduled Production Hours CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    Cost of Diesel / Lt

    Life in HoursCost of Equipment

    Cost of Electricity / unitBHP

    23,326

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    39,902.00

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    5. Front End Loader ( Wheeled 1.0 / 0.25 Cum)

    Operator / Driver

    A

    Market RateCWC Guideline

    Basic Data

    POL Charges

    Owner ship cost

    Average Yearly DepriciationHourly Depriciation

    [0.9xcostxProd. hrs/Life in Hrs]

    R & M Charges

    0.167

    0.22 * bhp * C1 * C2

    25 % of Fuel Charges

    Diesel Consumption in Lt.Cost of hourly fuel consumptionCost of Lubricants

    consumption x Rate

    1

    Number / Shift

    POL Charges

    441.2437.81

    Indirect Charges @ 80 % of skilled workers 297.99

    Direct Charges

    E

    D

    C

    B

    Chowkidar

    Yearly Depriciationa. w.r.t Life in Yearsb. w.r.t Life in Hours

    Operator

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 420000012,000.00

    102

    220047.44

    4100

    0.571

    240Rate / Month Rate / hr for two shifts

    435.29254.47254.4758.9158.91

    378000.00693000.00535500.00

    243.41 243.41

    840.00 840.00

    12.54594.90148.72743.62 743.62

    54.41254.4763.62

    372.49

    58.9114.7373.64

    784.62 784.62F 84.00 84.00

    2696.00

    240 % of cost / prod hrs

    consumption x Rate

    Ave. Depreciation / Ann. prod. hrs

    Total Labour Charges

    0.25

    Direct Charges

    0.125

    @ 80 % of skilled workers

    Mechanic

    HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    40.50Indirect Charges 297.99

    446.13

    0.25

    1

    POL Charges

    Foreman

    23,326

    A

    5,400.005,400.00

    HelperChowkidar

    C1C2R&M Charges in %age

    23,326

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    Annual scheduled Production Hours CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    Cost of Diesel / LtCost of Electricity / unitBHP

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Basic Data

    Cost of EquipmentLife in Hours

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    6. Crawler Dozer (100 HP)

    B

    Crew rates of SJVNLForemanOperator / DriverMechanic / Electrician

    Yearly Depriciationa. w.r.t Life in Yearsb. w.r.t Life in HoursAverage Yearly DepriciationHourly Depriciation

    Repair & Maintenance

    Owner ship cost

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    R & M Charges

    D

    C

    POL Charges

    Labour Charges

    0.22 * bhp * C1 * C2

    25 % of Fuel Charges

    Diesel Consumption in Lt.Cost of hourly fuel consumptionCost of Lubricants

    Number / Shift

    Chowkidar

    E

    Casual StaffHelper

    Regular Staff

    1Operator

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 680000012,000.00

    102

    220047.44

    4180

    0.571

    240Rate / Month Rate / hr for two shifts

    435.29254.47254.47

    58.9158.91

    612000.001122000.00

    867000.00394.09 394.09

    1360.00 1360.00

    22.571070.82

    267.701338.52 1338.52

    54.41254.47

    63.62372.49

    58.9114.7373.64

    784.62 784.62F 136.00 136.00

    4013.00

    Ave. Depreciation / Ann. prod. hrs

    Total Labour Charges

    0.25

    Direct Charges

    0.125

    @ 80 % of skilled workers

    Mechanic

    Casual StaffHelper

    HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    40.50Indirect Charges 297.99

    446.13

    0.25

    1

    POL Charges

    ForemanOperator

    Labour Charges

    1

    Number / Shift

    consumption x Rate

    Repair & MaintenanceR & M Charges 240 % of cost / prod hrs

    Chowkidar

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    Yearly Depriciationa. w.r.t Life in Yearsb. w.r.t Life in Hours

    Owner ship cost

    5,400.00

    C1C2R&M Charges in %age

    23,326

    CWC GuidelineCWC Guideline

    39,902.00

    CWC GuidelineCrew rates of SJVNLForeman

    CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    Cost of Diesel / LtCost of Electricity / unitBHP

    Project:Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    7. Crawlerl Dozer (180 HP)

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Mechanic / Electrician 23,3265,400.00Helper

    Basic Data

    Cost of EquipmentLife in Hours

    Annual scheduled Production Hours

    Regular Staff

    POL ChargesDiesel Consumption in Lt.Cost of hourly fuel consumptionCost of Lubricants

    0.22 * bhp * C1 * C2

    25 % of Fuel Charges

    E

    D

    A

    B

    C

    Chowkidar

    Average Yearly DepriciationHourly Depriciation

    Operator / Driver

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 580000015,000.00

    102

    220047.44

    4130

    0.571

    200Rate / Month Rate / hr for two shifts

    435.29254.47254.4758.9158.91

    522000.00765600.00643800.00

    292.64 292.64

    773.33 773.33

    16.302773.36688193.34172

    966.71 966.71

    108.82254.4763.62

    426.91

    58.9114.7373.64

    882.57 882.57F 77.33 77.33

    2993.00

    consumption x Rate

    Ave. Depreciation / Ann. prod. hrs

    Total Labour Charges

    0.25

    Direct Charges

    0.251

    Number / Shift

    POL Charges

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    40.50Indirect Charges

    HOURLY USE RATE [B + C + D + E+F]

    @ 80 % of skilled workers 341.52

    Regular StaffForemanOperator

    500.54

    0.25

    Average Yearly DepriciationHourly Depriciation

    POL Charges

    200 % of cost / prod hrs

    E

    5,400.005,400.00

    HelperChowkidar

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    Yearly Depriciationa. w.r.t Life in Years

    23,326

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    23,326

    Cost of Diesel / LtCost of Electricity / unitBHPC1C2R&M Charges in %age

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    8. Wheel Dozer (130 HP)Basic Data

    Market RateCost of Equipment

    Chowkidar

    D

    Crew rates of SJVNLForemanOperator / DriverMechanic / Electrician

    b. w.r.t Life in Hours

    Repair & MaintenanceR & M Charges

    Annual scheduled Production Hours

    Mechanic

    Casual StaffHelper 1

    0.22 * bhp * C1 * C2

    Market Rate

    CWC GuidelineMarket rate

    Diesel Consumption in Lt.

    Cost of Lubricants 25 % of Fuel Charges

    Life in HoursCWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    CWC Guideline

    Cost of hourly fuel consumption

    CWC Guideline

    Labour Charges

    A

    B

    C

    Owner ship cost

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 250000030,000.00

    202

    220047.44

    480

    Rate / Month Rate / hr for two shifts435.29254.47254.4758.9158.91

    112500.00165000.00138750.00

    63.07 63.07

    66.67 66.67

    240960240

    1200.00 1200.00

    54.41254.4784.74

    127.23520.85

    58.9114.7373.64

    1051.66 1051.66F 6.67 6.67

    2388.06

    159.00

    40.50

    HOURLY USE RATE [B + C + D + E+F]

    Rate per 100 cfm

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair ChargesTotal Labour Charges

    Operator

    Indirect Charges @ 80 % of skilled workers 416.68

    594.48Direct Charges

    0.333

    1

    0.5

    0.25

    Labour ChargesRegular StaffForeman 0.125

    Owner ship cost

    POL Charges

    25 % of Fuel Charges

    Electricity Consumption in KW.Cost of hourly fuel consumptionCost of Lubricants

    consumption x Rate

    R&M Charges in %age

    23,32639,902.00

    CWC GuidelineCrew rates of SJVNLForemanOperator / Driver

    Market rate

    Cost of Diesel / LtCost of Electricity / unit

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    9. Air Compressor (Electric - 1500 cfm)A

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    Market Rate

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    Basic Data

    Cost of EquipmentLife in Hours CWC Guideline

    Annual scheduled Production Hours CWC GuidelineMarket Rate

    Mechanic / ElectricianHelper

    23,3265,400.005,400.00Chowkidar

    R & M Charges

    Hourly DepriciationAverage Yearly Depriciation

    80 % of cost / prod hrs

    Ave. Depreciation / Ann. prod. hrs

    a. w.r.t Life in Years

    MechanicElectrician

    Casual Staff

    1

    Repair & Maintenance

    b. w.r.t Life in Hours

    Number / ShiftE

    D

    C

    B

    HelperChowkidar

    Yearly Depriciation

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 180000030,000.00

    202

    220047.44

    480

    Rate / Month Rate / hr for two shifts435.29254.47254.47

    58.9158.91

    81000.00118800.00

    99900.0045.41 45.41

    48.00 48.00

    160640160

    800.00 800.00

    54.41254.47

    63.62127.23499.73

    58.9114.7373.64

    1013.64 1013.64F 4.80 3.33

    1910.39

    191.00

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    10. Air Compressor (Electric - 1000 cfm)

    Market RateCWC Guideline

    Basic Data

    Cost of EquipmentLife in Hours

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    CWC GuidelineMarket RateMarket rate

    R&M Charges in %age

    Annual scheduled Production HoursCost of Diesel / LtCost of Electricity / unit

    39,902.00

    CWC Guideline

    Owner ship costYearly Depriciation

    Crew rates of SJVNLForemanOperator / DriverMechanic / Electrician

    a. w.r.t Life in Years

    5,400.005,400.00

    HelperChowkidar

    POL Charges

    80 % of cost / prod hrs

    b. w.r.t Life in Hours

    573.36

    0.25

    1

    0.5

    Direct Charges

    Rate per 100 cfm

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    40.50Indirect Charges 399.78

    HOURLY USE RATE [B + C + D + E+F]

    25 % of Fuel ChargesCost of hourly fuel consumptionCost of Lubricants

    consumption x Rate

    Total Labour Charges

    0.25

    @ 80 % of skilled workers

    1

    23,326

    Number / Shift

    A

    C

    23,326

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    R & M ChargesRepair & Maintenance

    Regular StaffLabour Charges

    MechanicElectrician

    ForemanOperator

    0.125

    Average Yearly DepriciationHourly Depriciation

    Electricity Consumption in KW.

    Ave. Depreciation / Ann. prod. hrs

    E

    D

    B

    HelperChowkidar

    Casual Staff

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 120000012,000.00

    103

    300047.44

    4148

    11

    100Rate / Month Rate / hr for three shifts

    478.82279.91279.9164.8064.80

    108000.00270000.00189000.00

    63.00 63.00

    100.00 100.00

    32.561544.6464386.16161930.81 1930.81

    59.85279.9169.98

    409.74

    64.8016.2081.00

    863.09 863.09F 10.00 10.00

    2966.90

    593.00

    1

    Rate per 100 cfm

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair Charges

    44.55

    0.25

    1

    Mechanic

    Casual StaffHelper

    HOURLY USE RATE [B + C + D + E+F]

    0.25

    Direct Charges

    @ 80 % of skilled workersIndirect ChargesTotal Labour Charges

    327.79

    490.74

    POL Charges

    ForemanOperator

    Labour ChargesRegular Staff

    Number / Shift

    0.125

    Hourly Depriciation

    R & M Charges

    0.22 * bhp * C1 * C2Diesel Consumption in Lt.

    100 % of cost / prod hrs

    Ave. Depreciation / Ann. prod. hrs

    25 % of Fuel Charges

    5,400.005,400.00

    [0.9 x cost / Life in Years]

    Average Yearly Depriciation

    C1C2R&M Charges in %age

    23,326

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    Operator / Driver

    Annual scheduled Production Hours CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    Cost of Diesel / LtCost of Electricity / unitBHP

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Basic Data

    Cost of EquipmentLife in Hours

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    11. Air Compressor (Diesel 500 - cfm))

    Mechanic / ElectricianHelperChowkidar

    Yearly Depriciation

    [0.9xcostxProd. hrs/Life in Hrs]

    a. w.r.t Life in Yearsb. w.r.t Life in Hours

    23,326

    B

    A

    Chowkidar

    E

    D

    Crew rates of SJVNL

    Owner ship cost

    Foreman

    Cost of hourly fuel consumptionCost of Lubricants

    C Repair & Maintenance

    POL Charges

    consumption x Rate

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 95.40

    57.30

    59.30

    212.00

    Hourly use rate of 1500 cfm Electric compressor

    60% of 1500cfm+30% of 1000cfm+10% of 500cfm.

    191

    593Hourly use rate of 500 cfm Diesel compressor

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    12. Composite rate of Air

    A composite rate for 100 cfm of air has been worked out as per details below.

    159

    Rate for 60 cfm of air

    Rate for 10 cfm of air

    Hourly use rate of 1000 cfm Electric compressor

    Rate for 30 cfm of air

    HOURLY COMPOSITE USE RATE

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 3500010,000.00

    102

    220047.44

    212.0080

    Rate / Month Rate / hr for two shifts435.29254.47254.47

    58.9158.91

    3150.006930.005040.00

    2.29 2.29

    2.80 2.80

    120254.40

    63.60318.00 318.00

    50.89254.47

    31.81337.17

    29.457.36

    36.82

    663.97 663.97F 0.28 0.28

    987.00HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair ChargesTotal Labour Charges

    20.25Indirect Charges @ 80 % of skilled workers 269.73

    Regular StaffSupervisor

    373.98

    0.125

    0.5HelperChowkidar 0.125

    Direct Charges

    Number / Shift

    OperatorMechanic

    Casual Staff

    POL Charges

    Labour Charges

    POL Charges

    25 % of Fuel Charges

    Air Consumption in cfm.Cost of hourly fuel consumptionCost of Lubricants

    consumption x Rate

    Chowkidar

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]

    Yearly Depriciationa. w.r.t Life in Yearsb. w.r.t Life in Hours

    Owner ship cost

    R&M Charges in %age

    23,32639,902.00

    CWC GuidelineCrew rates of SJVNLForeman

    Annual scheduled Production Hours CWC GuidelineMarket RateMarket rate

    Cost of Diesel / LtCost of Air/ 100cfm

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    Market RateCWC Guideline

    Basic Data

    Cost of EquipmentLife in Hours

    Project: Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    13. Jack Hammer (120 cfm)

    Operator / DriverMechanic / ElectricianHelper

    23,3265,400.005,400.00

    Repair & MaintenanceR & M Charges

    Hourly DepriciationAverage Yearly Depriciation

    80 % of cost / prod hrs

    Ave. Depreciation / Ann. prod. hrs

    10.2

    A

    E

    D

    C

    B

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 400008,000.00

    101

    120047.44

    212.00nanana80

    Rate / Month Rate / hr for one shifts399.02233.26233.2654.0054.00

    3600.005400.004500.00

    3.75 3.75

    4.00 4.00

    70148.4037.10

    185.50 185.50

    79.80233.2629.16

    342.22

    27.006.75

    33.75

    668.31 668.31F 0.40 0.40

    862.00

    Project:Luhri Hydro Electric ProjectSubject: Use Rate of Equipment

    14. Pavement Breaker (70 cfm)

    Market RateCWC Guideline

    Basic Data

    Cost of EquipmentLife in Hours

    CWC GuidelineCWC Guideline

    Life in yearsNo. of working Shifts

    C1C2

    Annual scheduled Production Hours CWC GuidelineMarket Rate

    CWC GuidelineMarket rate

    Cost of Diesel / LtCost of Air/ 100cfmBHP

    CWC GuidelineCWC Guideline

    39,902.00

    CWC Guideline

    C

    B

    5,400.005,400.00

    HelperChowkidar

    [0.9 x cost / Life in Years][0.9xcostxProd. hrs/Life in Hrs]b. w.r.t Life in Hours

    Average Yearly Depriciation

    23,32623,326

    R & M Charges

    Owner ship cost

    Repair & Maintenance

    Hourly Depriciation

    POL Charges

    Regular Staff

    80 % of cost / prod hrs

    25 % of Fuel Charges

    Air Consumption in cfm.Cost of hourly fuel consumptionCost of Lubricants

    consumption x Rate

    Number / Shift

    375.97

    0.125

    0.5

    Mechanic

    Casual StaffHelper

    18.56Indirect Charges @ 80 % of skilled workers 273.78

    HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repir Charges

    Crew rates of SJVNL

    POL Charges

    Labour Charges

    Total Labour Charges

    0.125

    Direct Charges

    0.21

    Ave. Depreciation / Ann. prod. hrs

    Yeraly Depriciationa. w.r.t Life in Years

    A

    R&M Charges in %age

    ForemanOperator / DriverMechanic / Electrician

    E

    D

    Chowkidar

    OperatorForeman

    Luhri Hydroelectric Project Revised Detail Project Report SJVN Limited

    ______________________________________________________________________________________________________

    _____________________________________________________________________________________________________ Volume-3 Cost Estimate and Economic Evaluation

  • 200008,000.00

    82

    220047.44

    4nanana80

    Rate / Month Rate / hr for two shifts435.29254.47254.4758.9158.91

    2250.004950.003600.00

    1.64 1.64

    2.00 2.00

    nananana na

    0.000.000.000.00

    0.000.000.00

    0.00 0.00F 0.20 0.20

    3.84HOURLY USE RATE [B + C + D + E+F]

    Indirect Charges @ 55%of semi skilled/Unskilled workers

    Miscellaneous Charges @ 10 % of hourly repair ChargesTotal Labour Charges

    0.00Indirect Charges @ 80 % of skilled workers 0.00

    0

    Direct Charges 0.00

    0

    0HelperChowkidar

    Mechanic

    Casual Staff

    [0.9xcostxProd. hrs/Life in Hrs]

    Repair & Maintenance

    0.22 * bhp * C1 * C2Diesel Consumption in Lt.

    80 % of cost / prod hrsR & M Charges

    POL Charges

    E

    D

    C

    25 % of Fuel Charges

    Cost of hourly fuel consumptionCost of Lubricants

    0

    Number / Shift

    POL Charges

    Operator

    B

    C1C2R&M