Tender ClarificationPROJECT : GRAND DATE SENT : 05-04-2016 ATTENTION : BUREGA F SENT TO : Fax Email FROM : Sinolank DATE RECEIVED : QUERY SHEET NO. : HW_TC/01
Ref. No. Level Area Ref, / Query Reply1 Grading & Drainage 2 Details are not enough to pricing following items. There for please provide typical drain details and drain point details3 Perforated stone drain cover 4 Surface drain
Scupper drainDrain below timber decking
1 Pool main drain point2 Black PVC grating with ‘L’ angle 3 Drain below timber decking4 Drain point5 Copper gutter and copper chains
6 Build in furniture7 Page number L11-HW/10 item number A & B
Our understanding is our cost should be included only for furniture works? Please clarify and details are not enough to pricing and provide following details accordingly.8 ST-04 size and thickness9 WD-01 Wood thickness, fixing details & painting method
10 Provide details of ST-04P (Foot). 11 What is the timber species of drawers and doors12 What is the meaning of symbol GN 1/1 (pool grill elevation C)
Page no L11-HW/10 item no C 13 Our understanding is our cost should be included only finishing works? Is it correct or not. If not please provide structural drawings.
L11& L15-SP/3 item no A, B, C 14 Our understanding is our cost should be included only finishing works? Is it correct or not.
15 Issued details drawings are not enough for pricing item number A page number : L11& L15-SP/3 (Drawing no 9.01 & 4 @9.11)
16 Page number : L11& L15-SP/3 item no. C pool seat size ?
17 Page number: L12=-HW/6 item no. A seat size?
Vertical Garden18 BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.
Doors19 Please issue sectional elevation for Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.
Timber wall panelling20 Please issue typical details for timber wall panel
Exhaust hood
![Page 2: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/2.jpg)
Page number: L11-HW/6 item number. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details and please issued detailed drawings21 PC-01
Our understanding is cut concrete flooring. Is it correct?22 Movable furniture
OF- 24 Image not available in the issued set of the drawings23 Signage base
Please issue detailed drawing for Signage base24 PVC Grating
Please issue typical detail for PVC grating.25 Pebbles
PB-04 is not available Sri Lankan market. Please provide Any there suppliers for this.26 Floor finishes
BOQ said There are different code of granite type price under one item. ( Ex. Page no : L1-HW/1 Special finish floor) 27 If you can please provide BOQ quantity separately. Because that prices are different code to code.
![Page 3: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/3.jpg)
DATE SENT : 05-04-2016 SENT TO : Fax Email
Details are not enough to pricing following items. There for please provide typical drain details and drain point details
Page number L11-HW/10 item number A & B Our understanding is our cost should be included only for furniture works? Please clarify and details are not enough to pricing and provide following details accordingly.
WD-01 Wood thickness, fixing details & painting method
What is the timber species of drawers and doorsWhat is the meaning of symbol GN 1/1 (pool grill elevation C)
Our understanding is our cost should be included only finishing works? Is it correct or not. If not please provide structural drawings.
Our understanding is our cost should be included only finishing works? Is it correct or not.
Issued details drawings are not enough for pricing item number A page number : L11& L15-SP/3 (Drawing no 9.01 & 4 @9.11)
Page number : L11& L15-SP/3 item no. C pool seat size ?
Page number: L12=-HW/6 item no. A seat size?
BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.
Please issue sectional elevation for Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.
Please issue typical details for timber wall panel
![Page 4: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/4.jpg)
Page number: L11-HW/6 item number. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details and please issued detailed drawings
Our understanding is cut concrete flooring. Is it correct?
OF- 24 Image not available in the issued set of the drawings
Please issue detailed drawing for Signage base
PB-04 is not available Sri Lankan market. Please provide Any there suppliers for this.
BOQ said There are different code of granite type price under one item. ( Ex. Page no : L1-HW/1 Special finish floor) If you can please provide BOQ quantity separately. Because that prices are different code to code.
![Page 5: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/5.jpg)
Our understanding is our cost should be included only for furniture works? Please clarify and details are not enough to pricing and provide following details accordingly.
Our understanding is our cost should be included only finishing works? Is it correct or not. If not please provide structural drawings.
BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.
Please issue sectional elevation for Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.
![Page 6: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/6.jpg)
Page number: L11-HW/6 item number. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details and please issued detailed drawings
![Page 7: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/7.jpg)
BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.
![Page 8: Revised ID TENDER](https://reader036.vdocument.in/reader036/viewer/2022073020/577c828e1a28abe054b142e6/html5/thumbnails/8.jpg)