Tender Clarification PROJECT : GRAND DATE SENT : 05-04-2016 ATTENTION : BUREGA F SENT TO : Fax FROM : Sinolank DATE RECEIVED : QUERY SHEET NO. : HW_TC/01 Ref. No. Level Area Ref, / Query Reply 1 Grading & Drainage 2 Details are not enough to pricing following i 3 Perforated stone drain cover 4 Surface drain Scupper drain Drain below timber decking 1 Pool main drain point 2 Black PVC grating with ‘L’ angle 3 Drain below timber decking 4 Drain point 5 Copper gutter and copper chains 6 Build in furniture 7 Page number L11-HW/10 item number A & B Our understanding is our cost should be inc 8 ST-04 size and thickness 9 WD-01 Wood thickness, fixing details & pain 10 Provide details of ST-04P (Foot). 11 What is the timber species of drawers and d 12 What is the meaning of symbol GN 1/1 (poo Page no L11-HW/10 item no C 13 Our understanding is our cost should be inc L11& L15-SP/3 item no A, B, C 14 Our understanding is our cost should be inc 15 Issued details drawings are not enough for p 16 Page number : L11& L15-SP/3 item no. C po 17 Page number: L12=-HW/6 item no. A seat s Vertical Garden 18 BOQ mentioned all the vertical garden unit Doors 19 Please issue sectional elevation for Flush do Timber wall panelling 20 Please issue typical details for timber wall p Exhaust hood

Upload: vgunawardana

Post on 13-Jul-2016

216 views

Category:

Documents


0 download

DESCRIPTION

EXam.

TRANSCRIPT

Page 1: Revised ID TENDER

Tender ClarificationPROJECT : GRAND DATE SENT : 05-04-2016 ATTENTION : BUREGA F SENT TO : Fax Email FROM : Sinolank DATE RECEIVED : QUERY SHEET NO. : HW_TC/01

Ref. No. Level Area Ref, / Query Reply1 Grading & Drainage 2 Details are not enough to pricing following items. There for please provide typical drain details and drain point details3 Perforated stone drain cover 4 Surface drain

Scupper drainDrain below timber decking

1 Pool main drain point2 Black PVC grating with ‘L’ angle 3 Drain below timber decking4 Drain point5 Copper gutter and copper chains

6 Build in furniture7 Page number L11-HW/10 item number A & B

Our understanding is our cost should be included only for furniture works? Please clarify and details are not enough to pricing and provide following details accordingly.8 ST-04 size and thickness9 WD-01 Wood thickness, fixing details & painting method

10 Provide details of ST-04P (Foot). 11 What is the timber species of drawers and doors12 What is the meaning of symbol GN 1/1 (pool grill elevation C)

Page no L11-HW/10 item no C 13 Our understanding is our cost should be included only finishing works? Is it correct or not. If not please provide structural drawings.

L11& L15-SP/3 item no A, B, C 14 Our understanding is our cost should be included only finishing works? Is it correct or not.

15 Issued details drawings are not enough for pricing item number A page number : L11& L15-SP/3 (Drawing no 9.01 & 4 @9.11)

16 Page number : L11& L15-SP/3 item no. C pool seat size ?

17 Page number: L12=-HW/6 item no. A seat size?

Vertical Garden18 BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.

Doors19 Please issue sectional elevation for Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.

Timber wall panelling20 Please issue typical details for timber wall panel

Exhaust hood

Page 2: Revised ID TENDER

Page number: L11-HW/6 item number. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details and please issued detailed drawings21 PC-01

Our understanding is cut concrete flooring. Is it correct?22 Movable furniture

OF- 24 Image not available in the issued set of the drawings23 Signage base

Please issue detailed drawing for Signage base24 PVC Grating

Please issue typical detail for PVC grating.25 Pebbles

PB-04 is not available Sri Lankan market. Please provide Any there suppliers for this.26 Floor finishes

BOQ said There are different code of granite type price under one item. ( Ex. Page no : L1-HW/1 Special finish floor) 27 If you can please provide BOQ quantity separately. Because that prices are different code to code.

Page 3: Revised ID TENDER

DATE SENT : 05-04-2016 SENT TO : Fax Email

Details are not enough to pricing following items. There for please provide typical drain details and drain point details

Page number L11-HW/10 item number A & B Our understanding is our cost should be included only for furniture works? Please clarify and details are not enough to pricing and provide following details accordingly.

WD-01 Wood thickness, fixing details & painting method

What is the timber species of drawers and doorsWhat is the meaning of symbol GN 1/1 (pool grill elevation C)

Our understanding is our cost should be included only finishing works? Is it correct or not. If not please provide structural drawings.

Our understanding is our cost should be included only finishing works? Is it correct or not.

Issued details drawings are not enough for pricing item number A page number : L11& L15-SP/3 (Drawing no 9.01 & 4 @9.11)

Page number : L11& L15-SP/3 item no. C pool seat size ?

Page number: L12=-HW/6 item no. A seat size?

BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.

Please issue sectional elevation for Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.

Please issue typical details for timber wall panel

Page 4: Revised ID TENDER

Page number: L11-HW/6 item number. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details and please issued detailed drawings

Our understanding is cut concrete flooring. Is it correct?

OF- 24 Image not available in the issued set of the drawings

Please issue detailed drawing for Signage base

PB-04 is not available Sri Lankan market. Please provide Any there suppliers for this.

BOQ said There are different code of granite type price under one item. ( Ex. Page no : L1-HW/1 Special finish floor) If you can please provide BOQ quantity separately. Because that prices are different code to code.

Page 5: Revised ID TENDER

Our understanding is our cost should be included only for furniture works? Please clarify and details are not enough to pricing and provide following details accordingly.

Our understanding is our cost should be included only finishing works? Is it correct or not. If not please provide structural drawings.

BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.

Please issue sectional elevation for Flush door at umbrella storage. (Page no: L11-HW/1). Also please provide type of Ironmongers.

Page 6: Revised ID TENDER

Page number: L11-HW/6 item number. B and page number: L11-HW/9 item number J, is repeated and difficult to price, because lack of details and please issued detailed drawings

Page 7: Revised ID TENDER

BOQ mentioned all the vertical garden unit is “Item”. There are so many sub-contractors works involve to complete for this work, Because Very difficult to price this item without quantities. There for please provide provisional sum valves for this item.

Page 8: Revised ID TENDER