rf channel simulation: realistic test and training for ... · • uav/target, ground control...

21
Colorado Springs, CO (719) 598-2801 Denver, CO (303) 703-3834 http://www.rtlogic.com Copyright© 2012 Real Time Logic, Inc. All rights reserved. RF Channel Simulation: Realistic Test and Training for Targets, UAVs and Ranges Steve Williams Manager, Signals Instrumentation [email protected] 719-884-6269 3 Oct 2012

Upload: truongtu

Post on 16-Jul-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

Colorado Springs, CO (719) 598-2801 Denver, CO (303) 703-3834 http://www.rtlogic.com Copyright© 2012 Real Time Logic, Inc. All rights reserved.

RF Channel Simulation: Realistic Test and Training for Targets, UAVs and Ranges

Steve Williams Manager, Signals Instrumentation

[email protected] 719-884-6269

3 Oct 2012

Page 2: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

Communications Environment

2 10/9/2012

Dynamic Doppler Shift

Delay Path Loss

Noise Interference

Dynamic Flight Profiles Body Masking Antenna Pointing Antenna Patterns Multipath Terrain Weather

Targets and Platforms under Test

Range Telemetry Monitoring Assets

Ground Control Systems

RF Links

RF Links

Test Requirements and Training Requirements are Implied

Page 3: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

Two Stunning Examples of Testing and/or Training Failures

10/9/2012 3

Page 4: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 4

RQ-170 Incident / 4 Dec 2011

• What happened here? – Simple COMMS Jamming? – Sophisticated EW techniques as Iran claims? – Something else? – Testing and/or training didn’t cover whatever caused the loss – Disastrous Loss

Page 5: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 5

Cassini-Huygens Mission / 2005

• What happened here? – Doppler shift causes Data Rate changes – In-flight analysis: Data tracking loop won’t handle the data rate

change – Testing didn’t cover this dynamic issue – Flight path altered, mid-mission, to decrease separation velocity – Mission was successful.

Page 6: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 6

• Many other examples, large and small – Blue-on-blue interference – Red-on-blue interference – Radios that don’t work in foliage – Navy SATCOM disrupted by purposeful EMI – Etc.

• The Future of Testing and Training

– We’ve got to do go deeper in the labs – Save money and time at later testing stages – Need Intelligent Instrumentation

• SW/FW definable • Built into fielded systems for automatic test, remote test and

training, self-healing • Usable for both test and training

Page 7: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

Communications Environment

7 10/9/2012

Targets and Platforms under Test

Range Telemetry Monitoring Assets

Ground Control Systems

RF Links

RF Links

Dynamic Doppler Shift

Delay Path Loss

Noise Interference

Dynamic Flight Profiles Body Masking Antenna Pointing Antenna Patterns Multipath Terrain Weather

Page 8: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

• UAV/Target and Ground Control System Designers – Must conduct thorough test in absolute worst case conditions

• Test against the very worst that could happen • Think outside the box!

– Comprehensive regression test when modifying HW, SW or FW

• UAV/Target and Ground Control System Operators

– Training: Prepare operators to detect, characterize & mitigate – Planning: Can the system handle the mission? – Pre-mission Test: Is the range fully ready to go right now? – Regression: Does the system still work after HW, FW, SW

upgrades and updates?

10/9/2012 8

Testing and Training Needs

Page 9: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

UAV Testing

9 10/9/2012

Ground Control Systems

Usual testing scenario: - Testing for the UAV - Testing for the Ground Control System (GCS) - Tests usually coordinated to stimulate the

UAV/GCS, at least to some degree. - Tests are often static though, and

therefore don’t represent the actual RF signal environment.

Page 10: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

UAV Testing

10 10/9/2012

Ground Control Systems

RF/IF Channel Simulator

Dynamic Doppler Shift

Delay Path Loss

Noise Interference

Dynamic Flight Profiles Body Masking Antenna Pointing Antenna Patterns Multipath Terrain Weather

Utilize dynamic tests that do represent RF signal propagation, and other matters that will impact the signals.

Page 11: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

• Supplies the “next step” from simulation to actual hardware test

10/9/2012 11

Channel Simulation

• From an RF perspective, recreates

• Substitutes for dangerous tests, expensive tests, tests on different battle fronts, tests that can’t usually be created (WX).

• Inserted into the RF/IF signal path • Physics compliant • Cost sensitive

• The same equipment for test as

training.

Dynamic Doppler Shift

Delay Path Loss

Noise Interference

Dynamic Flight Profiles Body Masking Antenna Pointing Antenna Patterns Multipath Terrain Weather

Page 12: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 12

Dynamic RF Channel Simulation

• Range vs. Time between a UAV and a control station

Range not determined

due to terrain-related

signal dropout

Page 13: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 13

Dynamic RF Channel Simulation

Ground Control Systems

Doppler Shift

Delay

Amplitude

Signal dropouts due to terrain

Page 14: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

14

Dynamic RF Channel Simulation

Ground Control Systems

Page 15: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

15

Dynamic RF Channel Simulation

Ground Control Systems

Page 16: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

• Test under any conditions imaginable

• Harden the UAV and Ground Station HW, SW and FW – Natural RF Physics – Signal Threats

• Blue-on-blue interference • Red-on-blue interference • Operator error • Equipment faults • Single threats / multiple threats

• These tests become the basis for Ground

Station Operator training scenarios, with the same equipment.

10/9/2012 16

Dynamic RF Channel Simulation

Ground Control Systems

Page 17: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

• UAV/Target, Ground Control System, Range Operators

– Assure mission safety – Assure mission success

• Range operators • Customers

– Validate equipment functioning, pre-mission – Validate equipment after upgrades and updates – Calibrate equipment – Training

10/9/2012 17

Testing the Test Range

Page 18: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 18

TM Site

Telemetry

Boeing Photo

TM Site

TM Site

Testing the Test Range

Page 19: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 19

USAF Photo

TM Site

TM Site

TM Site

TM Site (Mobile)

TM Site

Mission Control Center delivers: 1. Mission Safety 2. Best Source

Telemetry

Testing the Test Range

MCC

Telemetry sites receive TM from flying platforms, passing the TM in real-time back to the MCC.

Flight Path

Page 20: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

10/9/2012 20

Channel Simulator (Chan 1)

Channel Simulator (Chan 2)

Channel Simulator (Chan 3)

Channel Simulator (Chan 4)

Channel Simulator (Chan 5)

Channel Simulator (Chan N)

.

.

.

T400TSS Convert data file to IF -PCM/FM -SOQPSK -Multi-h CPM

IF Splitter

Flight path, terrain, antenna and vehicle characteristics

Antennas pointed at telemetry stations. Alternatively, connect networked Ch Sims at each TM site.

Files Best Source Telemetry

RF UPC

RF UPC

RF UPC

RF UPC

RF UPC

RF UPC

Testing the Test Range

Time-synchronized and

driven by AGI STK software.

Page 21: RF Channel Simulation: Realistic Test and Training for ... · • UAV/Target, Ground Control System, Range Operators – Assure mission safety ... Channel Simulator (Chan 1) Channel

• RF Channel Simulation – Essential step from pure simulation, when the systems must be

tested with actual signals – Stimulates systems with physics compliant RF signals

• Doppler shift, Delay, Attenuation, Noise • Interference • Antenna pointing, antenna patterns • Terrain, weather, overhead obscuration

– Decreases test costs, while simultaneously increasing depth

• Critical test instrument and a vital training instrument in one

• Contact Information – Steve Williams – [email protected] – 719-884-6269

10/9/2012 21

Summary