rfp 3044-23-09-2016 annexure 6
TRANSCRIPT
TECHNICAL REQUIREMENTS DOCUMENTATION
Technical Requirements
SANReN National Backbone Upgrade RFP No. 3044/23/09/2016
Project 6: Cape Town to Port Elizabeth Link
CSIR RFP No. 3044/23/09/2016 Page 2 of 12 Technical Requirements: Project 6
Table of Contents 1 Requirement Level Keywords ................................................................................................................. 6
2 Link Requirements .................................................................................................................................. 6
3 Link specifications ................................................................................................................................... 6
3.1 Context ............................................................................................................................................ 6
3.2 End Points ....................................................................................................................................... 8
3.3 Signal Repeating Requirements ...................................................................................................... 8
4 Fibre requirements ................................................................................................................................. 9
4.1 Fibre pairs ....................................................................................................................................... 9
4.2 Fibre specifications ......................................................................................................................... 9
4.3 Termination Details ....................................................................................................................... 10
5 Build Specifications ............................................................................................................................... 10
5.1 Civil ................................................................................................................................................ 10
5.2 Route ............................................................................................................................................. 10
5.3 Repeater Sites ............................................................................................................................... 10
5.4 Acceptance Documentation.......................................................................................................... 11
5.5 Test results .................................................................................................................................... 11
5.6 As-built documentation ................................................................................................................ 11
5.7 Customer acceptance certificates ................................................................................................. 11
6 Reliability ............................................................................................................................................... 12
6.1 Service Level Agreement ............................................................................................................... 12
6.2 Maintenance ................................................................................................................................. 12
CSIR RFP No. 3044/23/09/2016 Page 3 of 12 Technical Requirements: Project 6
Glossary
Abbreviation Term Description
CAC Customer Acceptance Certificate Certificate of Acceptance that the
SANReN customer needs to sign off on
when civil work is done on the SANReN
customer’s premises.
CSIR Council for Scientific and Industrial
Research
A statutory body established in terms of
Scientific Research Council Act 46 of
1988, as amended.
GIS Geographic Information System A system designed to capture, store,
manipulate and visualise spatial or
geographic data.
IETF Internet Engineering Task Force A body that defines standard Internet
operating protocols such as TCP/IP.
ITU International Telecommunication Union A United Nations agency whose purpose
is to coordinate telecommunication
operations and services throughout the
world.
LC/APC Lucent/Little/Local Connector - Angled
Physical Contact
Fibre optic connector of the LC type with
angle-polishing on fibre end-face.
LC/PC Lucent/Little/Local Connector - Physical
Contact
Fibre optic connector of the LC type with
a polished flat fibre end-face.
ODF Optical Distribution Frame A passive device that terminates fibre
cables.
PoP Point of Presence Location where networking equipment
may be accessed.
CSIR RFP No. 3044/23/09/2016 Page 4 of 12 Technical Requirements: Project 6
Abbreviation Term Description
RU Rack Unit Unit of measure describes the height of
electronic equipment designed to mount
in a 19-inch rack. One rack unit is 1.75
inches (44.45 mm) high.1
RFP Request for Proposal A request for organisations and
companies to submit a proposal to
supply goods and services to CSIR
SANReN South African National Research Network The South African National Research
Network (SANReN) is a high-speed
network dedicated to science, research,
education and innovation traffic.
1 From: https://en.wikipedia.org/wiki/Rack_unit
CSIR RFP No. 3044/23/09/2016 Page 5 of 12 Technical Requirements: Project 6
Definition of Terms
Term Definition
Attenuation Gradual loss in intensity of light through the fibre-optic medium.
Specified in decibel (dB) for light at a specific wave-length.
Chromatic Dispersion The phenomenon where the phase and group velocity of light in an
optical fibre is dependent on the frequency of the light.
Fibre link The concatenation of fibre spans to allow end-to-end connection
between the two sites specified.
Fibre pair Consisting of two fibre cores/strands.
Fibre span The contiguous fibre between two repeater stations or a repeater
station and a link endpoint.
Polarization mode dispersion When different polarizations of light travel at different speeds due to
imperfections and asymmetries in the optical fibre, results in spreading
of optical pulses.
Repeater sites Facility for the co-location of amplification and/or regeneration
equipment between fibre spans.
CSIR RFP No. 3044/23/09/2016 Page 6 of 12 Technical Requirements: Project 6
Project 6: Cape Town to Port Elizabeth Link
1 Requirement Level Keywords To eliminate ambiguity, bidders are to interpret the meaning of functional (technical) requirements
using the keywords; "must", "must not", "required", "shall", "shall not", "should", "should not",
"recommended", "may", and "optional", as defined by the IETF RFC (Request For Comments)
document designated as RFC2119. A copy of RFC 2119 is attached as Annexure J - RFC 2119.
2 Link Requirements Bidders are invited to offer a dark fibre-optic solution that will allow SANReN to transmit multiple
wavelengths of a bitrate of at least 100 Gbps between the end points specified below. The bidders
must ensure that their solution adheres to all the requirements specified in the sections that follow.
Bidders must be cognisant of the following:
● The routing of the fibre will be dependent on the bidder's available infrastructure, and the
bidder must ensure that it is optimised for minimum total distance;
● Maps indicating the proposed routes in electronic GIS format must be provided, as well as
diagrams annotated with sufficient detail to allow the CSIR to identify any and all shared
infrastructure components, including the physical location of cable routes and ODFs (fibre
optic patch panels), so that SANReN may independently determine where such locations are
shared with other providers (e.g. a cable in the same road reserve, or ODF in the same
building) that SANReN could be obtaining services from;
● Bidders must include documentation for the physical installation and optical engineering
standards used, as well the specifications of the fibre optic cable itself and the ODF to be
installed at each site;
● SANReN expects the bidder to conduct a desktop study to plan for the required solution
regardless whether the bidder intends to build a new route or propose an existing route; and
● Bidders must provide an end-to-end solution, i.e. from one ODF to the next ODF.
3 Link specifications
3.1 Context The following diagram summarises the requirements for this Tender. SANReN will require the bidder
to provide dark fibre between the endpoints detailed below. The existing SANReN PoP is indicated
CSIR RFP No. 3044/23/09/2016 Page 7 of 12 Technical Requirements: Project 6
for connection to the required infrastructure. This network diagram illustrates a generic solution.
Bidders must adapt the sample diagram for an optimal implementation topology (optimising for a
balance of cost and reliability) given available infrastructure.
CSIR RFP No. 3044/23/09/2016 Page 8 of 12 Technical Requirements: Project 6
3.2 End Points The bidder must provide dark fibre between the two end points specified below in Table 1. The
address, coordinates and site contacts for each endpoint is provided.
Table 1: Site Information
End Point Address GPS Coordinates Contact details
Teraco
Rondebosch,
Cape Town
Teraco CT1 Datacentre,
240 Main Road,
Rondebosch,
Cape Town
Latitude: -33.970355
Longitude: 18.464655
Name: Lynette Pretorius (TENET)
Work: (021)763 7100
Mobile:
Email: [email protected]
Nelson Mandela
Metropolitan
University Main
Campus,
Port Elizabeth
Building 07,
South Campus,
University Way,
Summerstrand,
Port Elizabeth
Latitude: -34.009574
Longitude: 25.667986
Name: Connie Van Zyl
Work: (041) 504 3489
Mobile: 082 612 7853
Email: [email protected]
3.3 Signal Repeating Requirements The supplier must include in its solution the access and use of all repeater sites on the fibre route so
that SANReN can deploy equipment as needed. These sites, which must house SANReN’s equipment,
must adhere to at least the following:
Table 2: Signal Repeating Requirements
Provision Requirement
Distance between repeater sites 80km – 120km
(if there are consecutive repeater sites at
distances less than 80km apart, the option must
be available to splice through a certain repeater
site if necessary).
Power >0.5kW
Rack space At least 6 RUs
Access SANReN or an appointed representative must
have suitably convenient access to the facility
whenever determined as necessary by
SANReN/SANReN representative.
Cooling The site must provide for sufficient cooling (in the
form of an A/C) to ensure that equipment does
not overheat. Ambient temperature should be
between 19 and 23°C
CSIR RFP No. 3044/23/09/2016 Page 9 of 12 Technical Requirements: Project 6
SANReN anticipates that it will use between five (5) and seven (7) amplifiers/repeaters on this route.
4 Fibre requirements
4.1 Fibre pairs
SANReN estimates that it will require one (1) fibre pair. However, the bidder may offer extra bids for
two (2) to six (6) fibre pairs (inclusive). SANReN reserves the right to choose which option best suits
its budget and requirements.
4.2 Fibre specifications
Bidders shall provide either G.652D, G.655 or G.656 fibre in compliance to the cable specifications
(including chromatic and polarization mode dispersion) specified by the ITU. Over and above the
requirements detailed in the ITU specifications, the CSIR expects the provided fibre to be on par with
current industry norms regarding long haul dark fibre. In particular, total attenuation for a fibre span
should not exceed 0.25db/km at 1550nm.
Table 3: Attenuation
Wavelength Expected Value (db/km)
1550 nm <0.20
1625 nm <0.22
Table 4: Chromatic Dispersion
Wavelength Expected Value (ps/(nm.km))
1550 nm 4 - 10
1625 nm 7.5 - 13
Table 5: Polarization mode dispersion
Expected Value (ps / ) <0.06
CSIR RFP No. 3044/23/09/2016 Page 10 of 12 Technical Requirements: Project 6
4.3 Termination Details
● The connector specifications and type must be provided. SANReN requires the use of LC/APC
or LC/PC connectors.
● All terminated fibre spans must be clearly and accurately labelled.
● Sufficient fibre slack must be provided for at all points where the fibre connects to a patch
panel.
5 Build Specifications
5.1 Civil Bidders must provide the following information:
● Civil Construction Specifications, such as depth of trenching, backfill specifications, manhole
specifications, marking standards and method of trenching used/proposed; and
● Building entry specifications must be provided.
5.2 Route Bidders shall provide the details of the planned/actual route, listing at least:
● The planned/actual route details;
● A route GIS file in ESRI Shapefile or KML format;
● Information about the way leaves obtained or the application forms;
● Details of any EIA studies underway or required; and
● Any mission critical construction points such as river crossings, road crossings etc.
5.3 Repeater Sites Bidders shall provide the details of typical repeater sites. This should include at least:
● Construction details of the site;
● Power feed to the site;
● Power distribution into individual racks;
● Specifications of backup power for the site and a description of typical procedure that is
followed when primary power is lost; and
● Description of access control to site.
CSIR RFP No. 3044/23/09/2016 Page 11 of 12 Technical Requirements: Project 6
5.4 Acceptance Documentation The bidders must provide samples of similar documents that they have provided to other clients for
the following:
● Test results (ATPs) for each fibre span of the link;
● As-built documentation;
● CACs for the access builds at the end points;
● Photos showing correct labelling; and
● Photos showing there is a slack as specified in 5.3 above.
5.5 Test results The test results are to be provided for each fibre core on each fibre span. A sample of the test result
documentation must be provided. The following information must be included on the sample Test
Result Sheet / Acceptance Test Sheet:
● Fibre span designation;
● Fibre core number;
● Attenuation figures and return loss specifications and results; and
● Chromatic and Polarisation Mode Dispersion measurements.
5.6 As-built documentation As-built documentation will be required for the links. The actual routes that the fibre runs must be
documented and presented to SANReN. For access builds, the fibre route from the boundary of the
institution where the SANReN PoP is hosted to the SANReN router itself must be detailed.
Photographs of the access build will be required. Examples of access build documents for other
customers can be provided as part of the bidder's response.
5.7 Customer acceptance certificates For new access builds, CACs need to be signed off ensuring that all involved parties are satisfied with
the work done by the supplier.
CSIR RFP No. 3044/23/09/2016 Page 12 of 12 Technical Requirements: Project 6
6 Reliability
6.1 Service Level Agreement End-to-end fibre maintenance services must be offered, i.e. the supplier must maintain the fibre on
CSIR’s behalf. As such, all bids must include an SLA (Service Level Agreement) as part of its solution.
Bidders shall provide the details of the service levels offered. Bids received without SLA options will
be eliminated.
6.2 Maintenance The following details are required in order to evaluate the quality of the maintenance that the
bidder will provide with respect to this link:
● Mean Time To Repair information;
● Fault Response Times;
● Maintenance options such as 24x7x365;
● Same day response, Working day response only, etc;
● Fault Logging Procedures offered;
● Maintenance down time procedures and advance warning procedures;
● Fault Monitoring and Alerting capability;
● Scheduled reporting of incidents & performance measurements offered;
● Technical services support personnel locations;
● Maximum restoration times offered;
● Customer responsibilities indicated; and
● Remote hands for first level support on the equipment that SANReN will deploy at repeater
sites.
The bidder must specify whether the link being provided in this tender will be actively monitored or
not. If the link is actively monitored, SANReN or a SANReN designated party should have access to
this system to aid with fault monitoring and logging.