Data Center Infrastructure RFP Huawei confidential 1 BID DOCUMENT FOR Establishment of IT Data Centre on Turnkey Basis Huawei Technologies Pakistan Pvt (Ltd).

Upload: umairmukhtar2002

Post on 01-Dec-2014

695 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 1

BID DOCUMENT

FOR

Establishment of IT Data Centre on Turnkey Basis

Huawei Technologies Pakistan Pvt (Ltd).

Page 2: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 2

Table of Content

1. Huawei Data Center Requirements ........................................................ 3

1.1 General ................................................................................................................................ 3

1.2 Project Location .................................................................................................................. 3

1.3 Project Schedule .................................................................................................................. 3

1.4 Scope of Work for Vendors ................................................................................................ 3

1.5 Commerce Terms ................................................................................................................ 6

1.6 Request for Contract Signature Entity ................................................................................ 6

1.7 Request for Bank Performance Guarantee Letter................................................................ 6

2. Request for Bidding Documents ............................................................ 7

2.1 The Bidding documents Terms ........................................................................................... 7

2.2 Request for the Bidding documents .................................................................................... 7

2.3 Request for Bidding documents submission ....................................................................... 7

2.4 Clarification ........................................................................................................................ 8

2.5 Other Explanation............................................................................................................... 8

3. Technical Specification ............................................................................. 9

3.1 Decoration System .............................................................................................................. 9

General requirements & Layouts ................................................................................. 9

General Specifications ................................................................................................. 10

3.2 Electrical requirements...................................................................................................... 12

Electrical Room ............................................................................................................. 12

Power supply, power distribution & Power consumption ........................................ 13

Uninterruptible power supply (UPS) .......................................................................... 14

Standby diesel generator............................................................................................. 16

3.3 Cabling System ................................................................................................................. 18

General Specifications ................................................................................................. 18

3.4 Facility Management System ............................................................................................ 19

Closed-Circuit Television (CCTV) system ................................................................. 19

Access Control system ................................................................................................ 22

3.5 Mechanical System ........................................................................................................... 24

Air conditioning ............................................................................................................. 24

Fire Protection System ................................................................................................ 27

Page 3: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 3

1. Huawei Data Center Requirements

1.1 General

Bidders are invited for the supply, delivery, installation, testing, commissioning and

maintenance of the Data Center Infrastructure Services for Huawei Data Center, to meet

the requirements of the specification. Bidders are required to propose a turnkey solution

for the implementation at sites defined by Huawei.

The successful Bidder shall be the Contractor and single point of contact for all services

offered and should be fully responsible for the overall project management and

co-ordination of supply, delivery, installation, testing, commissioning and Maintenance of

Data center Infrastructure Services for Huawei.

1.2 Project Location

Huawei Data Centers will be situated at Islamabad

1.3 Project Schedule

The delivery of the project shall be completed within three (3) months after the contract

signed.

1.4 Scope of Work for Vendors

Huawei Data Center layout of the facility should obey the criteria availability. The

availability level of TIER 3 is recommended based on a tiering system included in the

TIA-942 standard (Telecommunications Infrastructure Standard for Data Centers), the

worldwide most widely recognized standard for Data Centers at present.

Bidder should provide the turnkey project including the Data Center infrastructure

construction. The following figure and table are the data center site and equipment

information. Bidder should provide data center relevant infrastructure service on turkey

basis:

1. Professional decoration for equipment room

Page 4: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 4

2. Precision air cooling for equipment room

3. Access control system for whole building

4. CCTV surveillance system for whole building

5. Power system provisioning

6. Cabling system

7. Fire protection system

Site layout (Layout PDF attached in Paragraph 3)

Page 5: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 5

Rack statistics

Sector Rack Rack Type Power Type Amount Size(W*L*H)

1

ATAE Base IM1B53N68E AC 1 600*800*2200

ATAE Extenal IM1B53N68E AC 1 600*800*2200

UAP8100 AI11B1MGW DC 1 600*800*2200

UAP8100 AI11B1MGCI DC 1 600*800*2200

ATAE Base IM1B49N68E DC 1 600*800*2200

ATAE Extenal IM1B49N68E DC 1 600*800*2200

ATAE Network IM1B52N68E DC 3 600*800*2200

DC Power Dis PDF-N 1 600*800*2200

AC Power Dis APD100-2-30 4

AC Power Dis APD125-2-68 4

DDF MPX286-R2 1 300*300*2600

2

PC Rack N610E-22 AC 3 600*1000*2200

Storage Rack IM1B56N68E AC 7 600*800*2200

PC and Storage

Rack IM1B45N610E AC 1 600*1000*2200

Network Rack IM1B57N68E AC 1 600*800*2200

TV Wall Rack N610E-22 AC 1 600*1000*2200

3 PC Rack IM1B46N610E AC 2 600*1000*2200

Page 6: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 6

PC Rack IM1B46N610E AC 2 600*1000*2200

ATAE Base IM1B53N68E AC 1 600*800*2200

ATAE External IM1B55N68E AC 1 600*800*2200

4 ATAE Base IM1B53N68E AC 1 600*800*2200

Network Rack IM1B57N68E AC 3 600*800*2200

total: Amount

N610E-22 5

N68E-22 27

DCDB 1

ACDB 8

DDF 1

.

1.5 Commerce Terms

1) The quotation submitted by bidder should provide the unit price accordingly.

2) The quotation shall be inclusive of duties, taxes, value added taxes (VAT), social

security, levies and charges arising out of or in connection with the performance of

this service.

3) The quotation expired date: - (according to the actual project)

1.6 Request for Contract Signature Entity

The suppliers have been in the business for the Supply, Customization and Integration of

Data Center equipment for the last three (3) years in Pakistan.

After winning the RFI, the entity of bidder must have local registered entity signing the

contract with the corresponding entity of Huawei. If the bidder cannot comply with the

condition above, Huawei with the right can cutoff the cooperate contract.

1.7 Request for Bank Performance Guarantee Letter

All bidders shall, along with its bid submit to Huawei a Bank Performance Guarantee

Letter which includes a performance bond of the contract winning amount. Such

performance bond shall remain valid until twelve (12) month after the expiry of the

Page 7: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 7

contract. If the successful bidder fails neglects and/or omits to perform any obligation,

breach any terms and conditions of the subcontract agreement and/or complete the

execution of the Project, Huawei shall be entitled to claim upon the performance bond

as penalty. The consultant shall scan the letter together with the performance bond to be

submitted together with the Bidding documents.

2. Request for Bidding Documents

2.1 The Bidding documents Terms

Include: General introduction for huawei data center Project implementation scheme;

Statement of compliance; Quotation.

2.2 Request for the Bidding documents

The original Bidding documents must be with legal signature and stamp; all the pages

must be with signature & stamp.

In Technical part, following necessary documents are required:

Annex Statement of Compliance (SOC)

Annex Solution

In Commercial part, following necessary documents are required:

Annex Quotation

Annex Bank Performance Guarantee Letter

2.3 Request for Bidding documents submission

Please submit the Bidding documents according to the terms blow. The Bidding

documents would be automatic cancellation, if it is submitted late or uncomplying with the

requests below.

The Electronic Copy of Bidding Documents

1) Please send the electronic Bidding documents the following liaisons of Contractor

before 30th ,June, 2011, 24 hrs in Pakistan time

Page 8: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 8

Recipient of Proposal:

Proposal should be submitted to:

amin. [email protected]

Tel: 0092-302-8277052(Pakistan)

The email title must include the bidder and project’s information, and the document

title must include company’s name

The Original Bidding Documents

2) The original Bidding documents should be posted before 5th ,July, 2011, 24hrs in

Pakistan time

Addressee:Ali Afaq

Address Procurement CEG Department

Huawei Technologies Pakistan (PVT) Ltd

4th Floor, Saudi Pak Tower, Blue Area, Islamabad

Mobile: +92-300-5039854

2.4 Clarification

If it’s necessary, the tenderee would inform the tenderer and clarify the tender via meeting

on-site.

2.5 Other Explanation

1) The Tenderer should strictly submit the electronic softcopy and the original hardcopy

on time.

2) It is forbidden for the tenderer to send the electronic softcopy with password and the

original hardcopy to anyone else, except for the person appointed by tenderee. If it is

discovered and verified, the corresponding tender document would be cancelled

automatically.

Page 9: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 9

3) Except for the person appointed by tenderee to get the prescribed contents, it is

forbidden for other persons of tenderee to ask for the electronic softcopy and the

original hardcopy of Bidding documents. If it is discovered and verified, this tender will

be abandoned, and a new tender will be bid.

3. Technical Specification

The levels define the quality of a Data Centre in terms of the statistic downtime during a

year in direct relationship to infrastructural features. The TIA-942 also encompasses the

relevant White Papers of the Uptime Institute regarding the Tier classification and

performance standards, but with an expanded definition. And the Huawei data center

should comply with Tier 3 standard.

The sub-system for this project is as follows:

1. Decoration System

2. Electrical System

3. Cabling System

4. Facility Management System

5. Mechanical System

3.1 Decoration System

General requirements & Layouts

1. Bidder decorates the appointed space in data center. The responsibility

does not include the whole building and the exterior wall. The interior

space includes computer room, NOC, and electrical room and so on.

2. Data center needs decoration to make a comfortable environment for

equipment and staff. The space from the ground floor to first floor is

provided for data center. The height of room from floor to ceiling is 3 m; the

decoration materials should be fire-resistant and no-polluted.

Page 10: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 10

3. The decoration materials should be good heat preservation to save

energy sources. The decoration should be considering the factors of

function, ergonomics, and environment protection to design the room and

making the work more comfortable and efficient.

4. Layout details

l ayout . pdf

General Specifications

Material

1. The material should be free of asbestos, lead-containing paint, PCB’s, and

other environmental hazards. Fire-resistant material should be used in

data center. Consider of building fire-resistance, the building structural

system should be concrete.

2. Fire resistive requirement is over 1 Hour. Floors, walls, and ceiling shall be

painted heat preservation latex paint, in order to save cooling power

Ceiling

Bidder will install a suitable false ceiling in the data center other support

functions room. The false ceiling will have the following basic specifications:

1. Fire retardant

2. Dust free type

3. Removable panels

Raised Floor

1. The raised floor system provides the flexibility in wiring, hardware location

and air conditioning.

Page 11: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 11

2. The raised floor system should be constructed of 600mm*600mm panels

interchangeable with perforated tiles for air distribution, and clear height of

raised floor system should be minimum of 450mm.

3. The tile core may be constructed of compressed wood or concrete

4. Raised floor system should be antistatic, adequacy loading capability,

good wearability. Antistatic floor’s uniformly distributed load is 12500(N/m2),

and its system resistance is less than 0.00001(ohm).

Floor tiles standard grid 600 x 600 mm

Clear height of raised floor ≥ 450 mm

Floor loads 12500 N / m²

Conductivity in IT-rooms ≥ 0.00001(ohm)

Door

1. Fire resistive requirement of door is minimum code requirements (not less

than 1 hour at Computer Room).

2. Doors shall be a minimum of 1 m (3 ft) wide and 2.13 m (7 ft) high, without

doorsill, hinged to open outward (code permitting) or slide side-to-side, or

be removable.

3. Doors shall be fitted with a lock and have either no center post or a

removable center post to facilitate access for large equipment. 2.5 m

width is needed.

Lighting

1. Bidder will install fluorescent lighting fixtures to be installed to provide a

lighting illumination level, and a minimum of 500 lux (50 footcandles) in the

horizontal plane and 200 lux (20 footcandles) in the vertical plane,

measured 1 m (3 ft) above the finished floor in middle of all aisles between

cabinets.

2. Lighting system shall be connected to the standby power system.

3. Emergency lighting and signs shall be properly placed per AHJ such that

an absence of primary lighting will not hamper emergency exit.

Page 12: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 12

3.2 Electrical requirements

Bidder will provide a fully redundant power supply and distribution system to

the equipment room. The electrical subsystem is designed to separate

comply with tier 3 availability data center.

Electrical Room

Introduction

An electrical room is dedicated to house all electrical components as marked

on the attached layout. It will specifically house UPSs, Batteries, Switch Gear,

Switch Board, Power Distribution Units, and Main Line Feed termination. The

Room will be equipped accordingly and will be Air-conditioned to

accommodate the equipment installed. Main Line feed (Generator and/or

main Substation) will be terminated as appropriate within the room on an

appropriate Power Distribution Panel, and with the appropriate Power Panel.

General Specifications

1. Uninterrupted Power Supply Cabinets and its associated batteries to be

laid out as appropriate within the Electrical Room.

2. Surge protection should be located as appropriate within the electrical

room.

3. Static switching cabinets should also be located within the electrical room.

4. Room should be equipped with fluorescent lighting with electronic

started/ballast and connected to the standby diesel power in case of power

outage. The lights should provide lighting intensity of 300 Lux at 85 cm

above ground level.

5. Emergency battery powered lights should be provided as part of the

lighting system. And flooring of electrical room should be appropriately

Page 13: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 13

finished with High quality, dust proof wear resistant finish. And should be

equipped with raised flooring system if appropriate. If raised flooring is

installed, it must follow the same technical guidelines for installation as the

computer room.

6. A false ceiling must be installed in the electrical room and must be of the

fire retardant type.

7. The electrical room will compose a separate fire zone, with its own fire

suppression zone.

8. Doors to the electrical room should be of the security type with double

bolts, and with fire rating of 60 minutes.

9. An Air-conditioning system must be installed in the electrical room and be

sized appropriately to accommodate the heat dissipation of the Equipment

within the room with an outside temperature of 46 degrees Celsius. The

Air-Conditioning system must provide with adequate redundancy capacity

of 25%.

Power supply, power distribution & Power consumption

General Specifications

1. Vendors are required to supply power supply and conditioning systems

that will supply continuous clean power to the data center.

2. The power supply and distribution is designed for a 24 hour/365 day

operation and for 100 % uptime.

3. Surge Protection should be located as appropriate within the Electrical

Room.

4. Automatic switchover from utility power to generator power in case of

power outage.

Page 14: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 14

5. Continuous supply of power through the battery based un-interrupted

power supply with complete redundancy at all elements of the system

6. Remote management of all elements (UPS, Diesel Generator, Panels) of

the power supply and conditioning systems through remote panels and

Simple Network Management Protocol (SNMP)

7. Power consumption

Discreption DC

consumption

AC

consumption

DC power supply

route

AC power

supply route

equipment room 60KW 11KW 56 16

central hall 60KW 10

office/meeting room 60KW 6

Uninterruptible power supply (UPS)

General Specifications

1. Vendors are required to supply an Uninterrupted Power Supply System

that will work in redundant mode. The UPS system will supply clean

continuous power to the Data Center. Each UPS installed is required to

have an SNMP agent and minimum 1x Ethernet port. SNMP Agent

software for Windows and for Linux for the use of management of the UPS

system should be supplied. All UPSs must be supplied with the necessary

power cables and installation kits. All batteries should be installed in proper

cabinets as indicated by the manufacturer.

Capacity As per the power budget calculations, 30 minutes

autonomy at full load

AC input 415/240 3-Phase, 240V Phase-Neutral, + 10% / - 15%,

50HZ, +/- 5%

AC output 415/240 3-phase, 240V Phase-Neutral, + .5%

Page 15: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 15

AC Output Frequency 50HZ, +/- 0.05% sine wave

Output THD @ nominal <1%

Voltage Transient Recovery

milliseconds

<0.5 (recovery to 95% of the voltage level)

10 (recovery to 99% of the voltage level)

Capability to handle Up to 0.9 leading PF

Capacitive load Overload

handling

110% of Full Load for 60 minutes

125% of full load for 10 minutes

150% of Full Load for 1 minute

Crest factor 3 (compliant with IEC 62040-3)

Efficiency ≥ 85% at full load

Noise level ≤ 50 dB at 1 m distance

Remote alarms

Potential-free for the Site Management System

UPS on bypass

UPS on battery discharge

Storage battery High performance sealed battery with a 5-10 year design

life and 3 year warranty

Input Current THD at Nominal

voltage <3% without Filter

Input power factor >0.99

Battery Type Valve Regulated Lead Acid

DC Ripple Voltage < 1% rms

Ingress Protection IP20 with one door open

Compliant to Standards

IEC 62040-3, IEC 62040-2, IEC 62040-1-1, IEC

60146-1-1,

IEC 61000-4-2, 4, 5, 6, 8,11, EN 50091-1-1, EN 50091-2,

EN50091-3, EN 60950, EN 60529, ANSI C62.41 (IEEE

587)

2. UPS Room should be Air-conditioned with a precision HVAC system that

will maintain the working temperature of the UPS room within working

limits. HVAC system will be sized as per the proposed UPS system.

3. The proposed UPS has a redundancy solution (N + 1), and ups system at

least has 30minutes backup time.

Page 16: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 16

Standby diesel generator

General Specifications

1. A Diesel power generator is required to handle the loads of:

All IT equipment in the Data Center

All equipment in the building

Lighting and Air Conditioning in the building

Should have a minimum of 25% extra capacity for growth.

2. The Diesel Power generator system will adopt a modular and

synchronized generator design concept, thus maintaining the high

efficiency of operation on low loads. The System will automatically start,

synchronize and distribute load on any number of generator modules as

the load requires, while maintaining the operating point of each generator

module at 50%-75% load.

3. The Diesel Generator should be supplied with:

Equipped with a 4 pole Alternator

Auto start and Auto-switchover power panel,

Bypass switching gear.

Sound insulating and secure shelter

All installation requirements including civil works, concrete platform,

fuel tanks, piping, etc.

Proper cabling into the Data Center including cables and ducting

Connection of panels to the Mains power supply

Diesel Tank capable of running the generator for a minimum of 5 days

Support for 3 years including a dummy test run of once per month.

Page 17: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 17

Supplier support must include one day maximum repair time

commitment, including spare parts.

Supplier is required to propose all consumable items required for the

operation of the diesel generators during the 3 year warranty period,

such as batteries, air filters, fuel filters, etc.

Canopy/and or sound insulation room to maintain sound pressure

below 70db @ 7 meters

All control logic, controllers, panels necessary to maintain

synchronization and startup, shutdown and switching of each

generator module.

It is preferred that the system is implemented using 5-6 Generator

modules, delivering the full required capacity when all modules are

operational and synchronized.

The System will automatically rotate roles of the master generator on a

monthly basis.

Each Generator module is equipped with a separate Fuel Tank, and all

fuel tanks are interconnected via a controllable valve.

System must allow manual bypass/disconnection of any Generator

Module if required in cases of periodic maintenance

3. The Generator/Alternator must have the following specifications:

Skid and vibration isolators

Sound insulation / Weather and Tamper protection canopy

Dry type air filter

Main line circuit breaker

Microprocessor control panel

Alternator Compliant with NEMA MG21, UTE NF C51.111, VDE 0530,

BS4999, CSA standards.

Page 18: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 18

Direct coupled Alternator

Power Factor: .8

Total harmonics (TGH/THC) < 4%

Voltage regulation 0 to 100% load: +/- 1%

Recovery time (20% Volt dip) : < 0.5 second

Rating variation per 10 Deg. Celsius Rise: < 8%

Efficient @ full load > 93%

Continuous Operation @ 40 Degrees Celsius ambient temperature at

full load

Overload by 10% for 1 hour in 12 hour period

3.3 Cabling System

General Specifications

1. The DC’s cabling pathways are designed to offer best maintainability and

optimized for electromagnetic compatibility. Therefore and according to

ANSI/TIA/EIA-942 all data cabling is to be implemented with overhead

cable trays suspended from the ceiling and dedicated solely to data and

voice network cabling.

2. The DC is to be interconnected with pre-terminated fiber and copper

cabling. For advanced maintainability all cabling is to be properly labeled

according to a sophisticated labeling scheme.

3. Copper cabling is to be deployed based on ISO/IEC Category 6a UTP

10 GBit/s specifications with standard RJ-45 connectors. The high

performance Category 6 UTP cable shall be of the traditional round

design with mylar bisector tape.

Page 19: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 19

4. All copper cabling shall exceed ANSI/TIA/EIA and ISO/IEC Category

6A/Class EA channel specifications (including installation) of

ANSI/TIA/EIA-568-B.1, 568-B.2, 568-B.3 and 569.

3.4 Facility Management System

Closed-Circuit Television (CCTV) system

Introduction

1. Surveillance CCTV system is required to ensure effective surveillance of an

area as well as create a tamperproof record for post event analysis. The

Page 20: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 20

System shall provide an on-line display of video images on TFT Monitors

/Video wall/Large plasma monitors located in Central as well as local

control rooms.

2. System should facilitate viewing of live and recorded images and controlling

of all cameras by the authorized users present in the LAN. System should

provide inter-operability of hardware, software, networking, printing,

database connectivity, reporting, and communication protocols. System

expansion should be possible through off-the-shelf available hardware.

3. Equipment with better specifications shall be accepted.

General Specifications

1. The Contractor shall design, supply, install, testing, commissioning, and

maintenance of the Closed Circuit Television system as indicated in this

Specification.

2. The Closed Circuit Television system shall be a digital color system type

and completed with color cameras, camera enclosures, camera domes

with pan/tilt driver, color monitors, wiring and conduit.

3. The color Closed-Circuit Television (CCTV) system shall be designed,

supplied and installed to cover at least the following areas:

a) Main entrances;

b) Reception counters;

c) Ingress and egress points of the building;

e) Access to major plant room such as PABX room, main switch rooms, main

A/C plant, TBE room, transformer rooms / HV switch rooms, etc.;

f) Server rooms;

g) Corridors.

Page 21: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 21

4. CCTV monitors, central equipment and it associated peripherals for the

CCTV system installation shall be provided in the Security Office. Exact

location for the monitor and the CCTV camera is shown in layout plan.

5. Manual selection of the camera scene shall be provided for viewing on

CCTV monitors. Response to system events shall be provided to allow the

assignment of a specific camera scene to a specific monitor at the

occurrence of a pre-defined alarm condition. When camera sequencing is

enabled, the system shall provide the capability to halt the sequencing and

display the requested camera scene at a specific monitor. Sequencing

shall then be re-initiated at the discretion of the operator.

6. DVR shall be capable of connecting at least 16 camera inputs and 16 alarm

inputs.

7. DVR shall be able to provide at least 3 nos. of alarm output for external

equipment interface and interlocking facilities.

8. Recording speed of DVR shall not be less than 2.0 frames per second at a

resolution of about 640 x 480.

9. DVR, in addition to continuous mode of recording, shall be featured with

real time recording by means of event triggered, motion detection by

software illuminance detection technology and/or motion sensor activated.

10. DVR shall be equipped with system software and adequate built-in

memory capacity for recording 7 days (168 hours) event at 2.0 frame / sec

with resolution of about 640 x 480, which is equivalent to approximate 50

million pictures storage).

11. DVR shall be able to record, review and play back at the same time

without interruption.

Page 22: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 22

Access Control system

Introduction

1. Access control system is an important protection for data center physical

security.

2. Access control system is mainly made of management computer,

management software, access controller, card reader, card-issuing reader,

lock, out-of-door button and so on.

3. Access controller is the core of access control system, it performs access

control management and such value-added functions as online patrol and

real time attendance check.

General Specifications

1. Access control shall be provided at the entrance to the data center. A

system that allows for multiple levels of controls shall be installed to

provide for increased levels of security as moving into the data center.

2. Access control system shall allow for easy modification of access control,

be completely programmable, and provide a digital and hard copy of all

access to the data center and its various components.

3. The controlled entry, via access control system, of only authorized

personnel to secured areas will be based on cardholder information

entered and stored in the system database.

4. Readers are connected to local access control panels or so called

networked intelligent controllers.

5. The central access control application software supervise those local

controllers. Should the security network become disconnected, the

controllers will operate as standalone unit until the communication network

Page 23: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 23

is restored. Standalone activity is then sent back to the database server,

ensuring all records are maintained.

6. If the disconnection is too long, the internal memory of the controller might

be saturated (full): It will then manage its memory on a “first in, first out”

(FIFO) principle which means that remaining fully operational, it will erase

the oldest information.

7. Each point of access is provided with battery-supported equipment

permitting uninterrupted operation even in the event of a primary power

failure.

8. The reader and the associated controller will decide if a person may have

access to a controlled point. If the access is granted, the electric or magna

lock will be released for a fixed time. The magna lock for door access is

designed such as power failure will release the lock (for safety reasons).

9. The status of the door (is monitored via an additional surface mounted

magnetic door contact. This status will provide information about a door

remaining opened too long.

10. Access controlled doors that serve, as an emergency exit will additionally

be equipped with an emergency-break-glass. Operating this device will

release the electric or magna lock and allow egress under emergency

conditions.

11. All access requests, both authorized and denied, will be sent to the host

for storage and annunciation, with the cardholder identification and access

point or area where access was attempted or gained.

12. The system equipment and installation shall comply with provisions and

requirements of this specification as well as all applicable national, state

and local codes and standards.

13. The contractor shall provide and install all equipment, components, wire

cable, and mounting hardware as required to meet manufacture’s

specifications and documented installation procedures.

Page 24: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 24

14. The networked intelligent controller shall utilizing true distributed

processing technology with the capability of local processing based on the

local storage of a least 10,000 cardholders, all system access groups and

time zones, input and output information in RAM memory.

15. The intelligent controller shall support the monitoring and control a

minimum of two (2) readers or two (2) keypads or two(2) readers with key

pads, monitoring and control of at least four (4) five-state, fully supervised

and fully configurable input points, and control at least two (2) fully

configurable auxiliary output control relays.

16. The controller shall support all industry standard reader technologies as

well as 3x4 matrix keypads

17. Each controller must also be capable of expansion, by external remote

input modules and/or remote relay modules.

3.5 Mechanical System

Air conditioning

Since natural ventilation with the exception of a few mechanical rooms is

not sufficient for a Data Centre, most areas within the facility will have to be

equipped with some kind of mechanical system: Air conditioning,

ventilation or heating. Almost all spaces in the Data Centre require cooling

throughout the year because of outside temperatures during most of the

year and the exhaust heat produced by computer and technical equipment.

Only administrative, mechanical and electrical support areas require minor

heating. The IT-equipment generates a large amount of radiant heat. The

equipment operates most effectively in a relatively narrow temperature and

humidity range.

Environmental parameters are:

Page 25: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 25

Environmental Factor Recommended range

Temperature

68℉ to 77℉

20℃ to 25℃

Relative humidity 40% to 55% RH

The rows of cabinets/racks should be set up parallel to the airflow. The

orientation and arrangement of the rack rows in the computer rooms will

follow up-to-date technical standards (hot aisles, cold aisles layout).

All the data Centers (National, Federal, and regional Data Centers) require

Provision of air conditioning. Package A/C units of split system is

recommended for the data center.

Introduction

1. Air conditioning is to provide a temperature-controlled environment within

the parameters needed to run these devices. Computer and networking

equipment is designed to operate within a fairly narrow temperature range.

To ensure reliable operation and the longest possible life sufficient air

conditioning equipment should be installed to achieve this functional

requirement of a DPC (Data Processing Center).

2. The bidder should provide the air conditioning which is energy efficient.

Page 26: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 26

3. The bidder should provide the air conditioning which is easy to install.

4. The bidder should provide the air conditioning which is flexible to adjust to

changing load requirement.

5. The required cooling system should cover the following requirements:

6. Downward flow system to push air between the sub floor and the raised

floor with redundant (in N+1 configuration)

7. Computer controlled humidification system for managing electrostatic

discharge and humidity

General Specifications

1. The data center equipment should be air conditioned with an air

conditioning system in such a manner that a stable environment will be

maintained during 24 hours a day, all year long without any interruption.

2. The HVAC system must be independent from the building HVAC system.

3. A redundancy air conditioning system should be installed in the data center

equipment room for redundancy and failover. The system should be

capable of handling the heat load of the entire data center. Size and

number of HVAC units should be determined by Vendor. Air conditioning

system should allow for 13% headroom capacity.

4. System should be able to operate in a synchronized fashion so that one unit

cannot switch to heating mode while others operate in cooling mode.

Same synchronization should be possible for humidification and

de-humidification.

5. HVAC units will be installed at a suitable location in the data center room,

and will be located in the right place where is easily serviceable. The

external condensing unit should be installed in such a way that it will not

disturb the surrounding environment but can obtain sufficient heat

exchange.

Page 27: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 27

6. Precision air conditioning should be installed in data center equipment room,

comfort air conditioning for working area.

7. The data center will be maintained at a set temperature between18 and 27

degrees Celsius 24 hours a day, 7 days a week. Temperature must be

maintained to 1 Degree Celsius from the set temperature. The room will

have a constant humidity range of 15%~ 85%.

8. The energy efficiency rate should be considered.

Fire Protection System

The fire alarm system shall be designed and installed in accordance with the

specified guidelines and in full compliance with the rules and regulation of other

relevant local authorities. In all cases the minimum requirements for design and

installation shall meet the requirements of the latest issues of the NFPA 101 and

NFPA 72 standards.

General Specifications

1. Smoke & Fire Detection

The fire detection system performs all smoke, heat and fire detection and (in

combination with possible sprinkler systems) life safety functions for the facility.

Detectors will monitor equipment room and power room.

As a standard, analog photoelectric smoke detectors will be installed.

2. Fire Prevention

This system can be used in any situation where the highest level of fire protection

is essential and an interruption of operations cannot be allowed. The system offers

active fire prevention.

3. Alarms, Civil Defence

Manual alarm call points shall be installed at all exit points and along paths of

egress, according to local fire regulation requirements.

Page 28: RFP for Data Center Huawei Islamabad Final

Data Center Infrastructure RFP

Huawei confidential 28

Alarms of all fire protection systems, i.e. general system alarm and fault signals,

shall be forwarded to the permanently manned control room and incorporated into

the fire alarm control panel via addressable line input modules.

The existing building infrastructure, offices, corridors, meeting room, etc., have to

be provided appropriate means of fire extinguishers in accordance with local civil

defence regulations.