RFQ Status
Mathew Smith: UBC/TRIUMFTITAN Collaboration meeting June 10th 2005
![Page 2: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/2.jpg)
RFQ Status & Testing of the RFQ
Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005
![Page 3: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/3.jpg)
OverviewTITANBackgroundStatus of SimulationsStatus of RF GeneratorStatus of Experimental Setup and TestsSummary
![Page 4: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/4.jpg)
RFQ Subject of today’s presentation
EBIT under testing at MPI-HD.to TRIUMF Oct. 2005.
Cooler trap for HCI(to be built in Manitoba, CFI grant received)
TITAN platform finished at ISAC
Penning trap magnet ordered (del. Oct. 2005)
Wien filter (R=500)
The TITAN system is under construction and will be operational for mass measurements at ISAC/TRIUMF in 2006. Isotopes with T1/2 ≈ 10 ms δm/m < 1⋅10-8
TRIUMF
ISAC
![Page 5: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/5.jpg)
Be--beam
axially: electron beam space charge
50
µm
longitudinally: electrodes
Why do we need a cooler and buncher?
![Page 6: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/6.jpg)
VIon Beam
EBIT cannot accept a continuous beamLow emittance needed in order to traverse magnetic field efficientlyTherefore, we need to cool and bunch the ISAC beam
Why do we need a cooler and buncher?
![Page 7: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/7.jpg)
Thermalization in three dimensions stops the ions in the gasIons will disperse radially due to scattering of forward momentumUse RFQ ion trap to provide a force to counteract the dispersionSegmenting the RFQ allows for the application of a longitudinal field
Why do we need an RFQ?
![Page 8: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/8.jpg)
Standard quadrupolar geometry focuses in one direction and defocuses in the other
2 2
20
( )x yVr
φ −=
20
2 ,xVE xr
= − 20
2y
VE yr
=
How does the RFQ work?
![Page 9: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/9.jpg)
However, it has long been known that by placing a series of quadrupoles together a net focusing force can be obtained e.g. in a quad triplet
How does the RFQ work?
![Page 10: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/10.jpg)
Can use RF- potential to alternate the orientation of the focusing and defocusing directionsNet focusing force is then independent of ions longitudinal velocityForm of periodic potential somewhat arbitrary, see: J. A. Richards et al., Int. J. Mass Spectrom. and Ion Phys. 12, 339 (1973).
How does the RFQ work?
![Page 11: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/11.jpg)
By segmenting the structure we can also apply a longitudinal field and hence create bunches
How are beam bunches formed?
![Page 12: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/12.jpg)
ConceptSimple rod structureSquare-wave-drivenExtraction from both endsSeparate DC offsets for each electrode
![Page 13: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/13.jpg)
The RFQ DesignL = 700 mm
r0 = 10mm
24 segments
![Page 14: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/14.jpg)
Properties of the RFQ from First Order Model
Meissner equations determine ions motion in square-wave-driven trap:
Analytic solution shows a simple harmonic macro-motion perturbed by a coherent micro-motionAs q increases so does the amplitude of the micro-motion until at q = 0.712 the motion becomes unbound
2
2 2 0,x qxς∂
− =∂
2
2 2 0,y qyς∂
+ =∂
.2tως =
![Page 15: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/15.jpg)
Properties of the RFQ from First Order Model
![Page 16: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/16.jpg)
In Phase Spaceq = 0.3
Micro-motion distorts ideal harmonic ellipseAcceptance defined as area of harmonic ellipse whose maximum distorted amplitude = r0
Acceptance varies as a function of q with a maximum at q ≈ 0.3
![Page 17: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/17.jpg)
TemperatureMicro-motion is coherent and therefore doesn’t contribute to the temperature of the ions in the trapTemperature of an ion cloud in a harmonic potential can be defined in terms of the standard deviation in position and momentum space:
Can use information from ellipses to convert from σx and σv as a function of phase/time to σx-SHM and σv-SHM and hence define temperature
1 ,us
kTm
σω
= .v mkTσ =
![Page 18: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/18.jpg)
Space-Charge LimitCan use amplitude of harmonic motion combined with secular frequency to define the depth of the psuedopotentialUse simple model for the beam to get an idea of the space charge limitIn continuous mode consider beam to be an infinitely long cylinderIn bunched mode consider bunch to be a perfect sphere
2maxps s
mE rzeω= −
For Cylinder:
204sc
QERπε
=
For Sphere:
d
IV
λ =0
,2scE
rλπε
=
![Page 19: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/19.jpg)
Space Charge LimitContinuous, Vd = 1000 m/s Bunched, t = 1 ms
In continuous mode Imax ≈ 2.3 µA, @ q = 0.49In bunched mode Qmax ≈ 3.2 pC, @ q = 0.39
![Page 20: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/20.jpg)
Status of Simulations
Used SIMION to define geometry and simulate electric fieldsInitially used viscous drag model to simulate ion ranges & cooling timesUser program developed that contains a Monte Carlo algorithm to simulate the ion interaction with the buffer gasUses realistic ion-atom interaction potentialsRuns in SIMION or separately in CTested by using to recreate experimental results for the mobility of ions in the gas
![Page 21: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/21.jpg)
Status of SimulationsLithium in helium perfect agreementCesium in helium some small discrepanciesLi+-He interaction potential well known with ab-initio calculations possibleCs+-He simple (8,6,4) potential used. Much disagreement about the proper form in the literature
![Page 22: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/22.jpg)
Modeling Buffer-gas Cooling:Monte Carlo
Simulation of cooling of Cs+ in 2x10-2 mbar of HeSegmented into 24 pieces with longitudinal potential previously shown Transfer of beam with 98% efficiency Cooling time approx. 2 x
longer than that from simple drag model
![Page 23: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/23.jpg)
Modeling Buffer-gas Cooling:Monte Carlo
Ions initialized in trap with T = 800 KCooled for 500 µs and then data recorded in 0.02 µs intervals for 10 µsPlot of temperature as a function of q shows the effects of RF-heatingSpace-charge not yet included so represents a minimum possible temperature
![Page 24: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/24.jpg)
Extraction Methods
In absence of buffer-gas expect all bunches to have the same longitudinal and transverse emittancesFirst extraction method releases ions with a small energy spread and large time of flight spreadSecond method reduces time of flight spread but increases energy spread
![Page 25: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/25.jpg)
Simulated Beam Properties
Cooling times on the order of 1-2 msBuffer-gas heats beam so emittancesnot constantKicking the ions hard out of the trap reduces time of flight spread and increases energy spreadεrms = 3 π mm mrad @ 2.5 kV Doesn’t include space charge which becomes important for >106 ions in the trap
2224 xxxxrms −=ε . .
![Page 26: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/26.jpg)
The Square-Wave RF Generator
7 ≤ m ≤ 235 u, 0.4 ≤ f ≤ 3 MHz @ 400 Vpp, r0 = 10 mmFirst system in use:Vpp = 400 V, f = 1 MHz (m ≥ 65)Second version designed and tested:Vpp = 600 V, f = 3 MHz
2 20
4 ,zeVqm rω
=Sine-Wave q<0.908 Stable, q≈0.4 best.
Square-Wave q<0.712 Stable, q≈0.3 best.
![Page 27: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/27.jpg)
The Square-Wave Driver
![Page 28: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/28.jpg)
Test Setup
The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC beamAllows us to optimize the RFQ performance before installation at ISAC
![Page 29: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/29.jpg)
Injection Optics
![Page 30: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/30.jpg)
Extraction Optics
![Page 31: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/31.jpg)
Experimental Setup
![Page 32: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/32.jpg)
Experimental Setup
![Page 33: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/33.jpg)
Experimental Setup: Injection
![Page 34: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/34.jpg)
Experimental Setup: Injection
Beam through four-way switch with approx. 100% efficiencyBeam into RFQ with approx. 95% efficiency
![Page 35: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/35.jpg)
Experimental Setup: RFQ
Installed and Square-Wave successfully applied to the rodsBeam passed through RFQ and detected at the RFQ exit without gas with 30% efficiency
![Page 36: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/36.jpg)
Experimental Setup: Extraction
![Page 37: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/37.jpg)
Experimental Setup: Extraction
Extraction optics installedMOSFET switch developed at McGill used to switch RFQ dc biasBelhke 60 kV switch used to pulse drift tubeDrift tube pulser underway tested and ready for instalation
![Page 38: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/38.jpg)
Commissioning the RFQTransverse emittance rig has been built and is being tested.Time-of-flight information from MCP couple either directly to scope or through MCALongitudinal energy spread?
![Page 39: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/39.jpg)
Summary and OutlookDetailed simulations of cooling process in a square-wave driven RFQ carried outBased on simulations system designed and builtSquare-wave driver capable of driving large capacitive loads at high voltage and high frequency developed and testedTesting of the system underway. Beam has been extracted from the RFQ and detected in DC mode.TITAN platform now installed in proton hallRFQ will be installed ready for the delivery of the EBIT at the end of the summer
![Page 40: RFQ Status - TRIUMFtitan.triumf.ca/misc/TITAN05talks/TITAN05_MSmith.pdf · Test Setup The purpose of the test setup is to provide a test ion beam with properties similar to the ISAC](https://reader034.vdocument.in/reader034/viewer/2022051902/5ff1822bb3455332017d4ec5/html5/thumbnails/40.jpg)
ThanksJens Dilling, Joe Vaz, Laura Blomeley and the rest of the
TITAN group.
Co-op Students: Robert Cussons, Ori Hadary, Amar Kamdar, George Yuan.
Triumf Support: M. Good, H. Sprenger, M. McDonald, R. Dube, R. Baartman, Controls Group, Design Office,
KICKER Group, Machine Shop, Vacuum Group.
For more information see my thesis at:www.triumf.ca/titan/group