RHIC Machine/Detector Planning Meeting 2 Jun 05 Agenda 205x205 GeV pp setup – status report, outlook (Bai) Experiments Plans/Comments/Discussion/Decide on Physics Run (All) PHOBOS Proposal for ~ 4 hours 100x100 pp The proposal (Steinberg) How we might accommodate the request (Bai) Other business Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM/rhic_planning.htm 1

Upload: lamanh

Post on 23-Mar-2019

218 views

Category:

Documents


0 download

TRANSCRIPT

RHIC Machine/Detector Planning Meeting2 Jun 05

Agenda

205x205 GeV pp setup – status report, outlook (Bai)

Experiments Plans/Comments/Discussion/Decide on Physics Run (All)

PHOBOS Proposal for ~ 4 hours 100x100 ppThe proposal (Steinberg)How we might accommodate the request (Bai)

Other business

Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM/rhic_planning.htm

1

RHIC Machine/Detector Planning Meeting• Details – as run/planned

11 Jan – Physics with Cu-Cu began7 Mar (0800) – end 200 GeV/n Cu-Cu7-9 Mar – Setup 62.4 GeV/n Cu-Cu9-15 Mar - 62.4 GeV/n Cu-Cu Physics10 March – Physics begins15 Mar – 8 hours at injection energy 10 March – Physics begins15-22 (1400) Mar - 62.4 GeV/n Cu-Cu Physics22 (1400)-24 (0800) March Cu-Cu Physics at RHIC Injection24 Mar (0800) – End of 10.3 week Cu-Cu run, 8 hr maintenance24-30 Mar – begin 3 week pp setup30 Mar - 1 Apr 05 Cold Snake/Jet Installation/CNI etc1-16 Apr – complete 3 week pp setup (7 April, overnight stores for experiments started)17 Apr – Begin 10.0 week pp Physics run31 May – Begin 410 GeV pp setup2-3 June – 2 shifts Physics at 410 GeV (?)3 June – Back to 200 GeV pp25 Jun – end pp run, RHIC Run 5 ends30 Jun – Cryo switch to LN2 complete, 32.0 weeks of RHIC cryo operation ends

2

3

Run5 RHIC pp Delivered (Physics) Integrated Luminosity

0.02.04.06.08.0

10.012.014.016.018.020.022.0

4/16

/200

5

4/23

/200

5

4 /30

/200

5

5 /7 /

2005

5/14

/200

5

5 /21

/200

5

5/28

/200

5

6 /4/

2005

6 /11

/200

5

6/18

/200

5

6 /25

/200

5

Inte

grat

ed L

umin

osity

[pb

-1]

BRAHMS STAR PHENIX L(min)L(max)

4

Run5 RHIC pp Delivered (Physics) Integrated Luminosity

0.02.04.06.08.0

10.012.014.016.018.020.022.0

4/16

/200

5

4/23

/200

5

4/30

/200

5

5/7/

2005

5/14

/200

5

5/21

/200

5

5/28

/200

5

6/4/

2005

6/11

/200

5

6/18

/200

5

6/25

/200

5

Inte

grat

ed L

umin

osity

[pb

-1]

BRAHMS STAR PHENIX L(min)L(max)

PhenixGoal (and projections) assume 45 % polarization projected at store

PHENIX Goal

STAR Goal*

End of Run* Sum of transverse and longitudal polarization luminosities > 40% p[olarization

BRAHMS Goal

5

Run5 RHIC pp Delivered (Physics) Integrated Luminosity x PB2xPY

2

0.0

100.0

200.0

300.0

400.0

500.0

600.0

700.0

800.0

900.04/

16/2

005

4/23

/200

5

4/30

/200

5

5/7/

2005

5/14

/200

5

5/21

/200

5

5/28

/200

5

6/4/

2005

6/11

/200

5

6/18

/200

5

6/25

/200

5

P4 L

[nb-1

]STAR PHENIX p4L(min) p4L(max)

PHENIX Goal

STAR Goal*

End of Run* Sum of transverse and longitudal polarization luminosities

6

Run5 RHIC pp Delivered (Physics) Integrated Luminosity x PB2xPY

2

0.0

100.0

200.0

300.0

400.04/

16/2

005

4/23

/200

5

4/30

/200

5

5/7 /

2005

5/14

/200

5

5/21

/200

5

5/28

/200

5

P4 L

[nb-1

]STAR PHENIX p4L(min) p4L(max)

7

BNL Energy Use FY 2004-5(C-AD Bldg power is in site base)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.001-

Oct

-03

1-N

ov-0

31-

Dec

-03

1-Ja

n-04

1-Fe

b-04

1-M

ar-0

41-

Apr

-04

1-M

ay-0

41-

Jun-

041-

Jul-0

41-

Aug

-04

1-S

ep-0

41-

Oct

-04

1-N

ov-0

41-

Dec

-04

1-Ja

n-05

1-Fe

b-05

1-M

ar-0

51-

Apr

-05

1-M

ay-0

51-

Jun-

05

Dai

ly A

vera

ge P

ower

(MW

)Peak-AvSite BaseRHIC otherAGSRHIC Cryo

as of 31 May

RHIC Machine/Detector Planning Meeting

Archive

8

RHIC Machine/Detector Planning Meeting

• RHIC Run5 As Run/Plan

18 Nov 04 – Cool down begins23 Nov 04 – Blue Ring Cold28 Nov 04 – Yellow Cold29 Nov 04 – Short in D6-D8 dipoles Yellow Ring, schedule delay3 Dec 04 – quad bus-bus short in sector 12, shutdown to repair27 Dec 04 – short problem resolved, rings at 4 degrees again27 Dec 04 - “2 week” RHIC setup with beam began28-29 Dec 04 – found & fixed aperture problem in Yellow Ring (Al foil)5 Jan 05 – “2 week” ramp-up with colliding beams began

9

400 GeV pp Run Issue 20 Apr 05

Summary of discussion to date (Y. Makdisi)

Machine issues3 days to setup ramps3+ days to establish adequate polarizationCan start mid-May, before PAC meeting (3rd week of May) or after the PAC meetingPrefer 1.5 day PHOBOS physics at end of 200 GeV pp run

Experiments issuesPHOBOS – strong advocate for short physics run, above schedule OKSTAR – decide after pp physics is established, priority is to integrate 4-6 pb-1 of delivered luminosity (P>35%) at expense of 400 GeV development run if necessaryPHENIX – priority is to integrate 1.5 pb-1 of recorded luminosity (P>45%) before development run and push 1 day PHOBOS physics run to end of 200 GeV pp runBRAHMS – does not plan to run

Status:Decision will be made at a later date

10

Experiment Goals RHIC Run 5, 100x100 GeV pp

• BRAHMS– Began physics 17 April– Goal 5 pb-1 transverse polarized (>45%) delivered

• PHENIX– Began min-bias physics 17 April, main physics 19 April– Goal 5.5 pb-1recorded Luminosity with 45% polarization, 20 pb-1 delivered– Translates to: PB

2PY2L goal 226 nb-1 recorded

– Translates to: PB2PY

2L goal 226 nb-1/(0.45*0.6) = 837 nb-1 delivered

• STAR– Began physics 17 April – Goal ~ 20 Mevts min-bias (~70 hrs)– Goal ~ 7 pb-1 longitudal polarized (>40%) collisions, 14 pb-1 delivered (useable)– Goal ~ 4 pb-1 transverse polarized (>40%) collisions, 8 pb-1 delivered (useable)

11

Experiment Goals RHIC Run 5, 100x100 GeV/n CuCu, Summary of Results (3/23/05 update)

• BRAHMS– Soft physics goal 0.8 nb-1 recorded, achieved 0.8 nb-1 100% of goal– High-Pt goal 2.4 nb-1 recorded, achieved 1.75 nb-1 73% of goal

• PHENIX– Integrated recorded luminosity goal (live BBCLL1) 2.9 nb-1, achieved 3.06 nb-1 105%

of goal

• PHOBOS– Goal 1000M events to tape, achieved 500M 50% of minimum goal– Minimum Goal 400M events to tape, achieved 500M 125% of minimum goal

• STAR– Min bias, Goal 80M events, recorded 64.5M events 80% of goal– High Pt Trigger (BEMC HT18), Goal to sample 1-2 nb-1, recorded >1 nb-1 100% of goal

12

Experiment Goals RHIC Run 5, 31.2 x31.2 GeV/n and 11.2x11.2 GeV/n CuCu and Final Results (3/30/05)

• BRAHMS– 62 GeV, Integrated Recorded Luminosity Goal 90 µb-1

Actual recorded luminosity 120 µb-1 (133% of goal)– 22 GeV, Goal 1.5M FFS triggers recorded

Actual recorded 1.9M triggers (126% of goal)

• PHENIX– 62 GeV, Integrated Delivered Luminosity Goal = 250 µb-1

Integrated Recorded Luminosity Goal 92 µb-1

Actual recorded luminosity 190 µb-1 (206% of goal)– 22 GeV, ~20M recorded events

Actual recorded 23.8M events (119% of goal)

• PHOBOS– 62 GeV, Goal 250M events to tape, minimum Goal 100M events

Actual recorded 115M events (115% of minimum goal)– 22 GeV, Goal 8M events to tape

Actual recorded 20M events (250% of goal)

• STAR– 62 GeV, Min bias, Goal >20M events to tape

Actual recorded 27.3M events (136% of goal)– 22 GeV, Min bias, Goal >1M events to tape

Actual recorded 3.85M events (385% of goal)

13

RHIC Machine/Detector Planning Meeting17 November 2004

PAC Recommendations (very short summary):

8-10 week pp run should have highest priority

Cu-Cu run should accumulate an integrated delivered luminosity of at least 7 nb-1 at = 200 GeV

Cu-Cu at = 62.4 GeV and 1 day at injection is advisable if above goals are met

1-2 day pp (unpolarized) run at = 400-500 GeV desirable

s

s

s

14

PHENIX Goal

RHIC Run 5 (22 GeV) Final Delivered Cu-Cu Luminosity

0.0

2.0

4.0

6.0

8.0

3/21/2005 3/22/2005 3/23/2005 3/24/2005

Days into the run

Lum

inos

ity (µ

b)-1

PHENIXSTARBRAHMSPHOBOS

15

RHIC Run 5 (62GeV) Hours per Day at Store

0.0

6.0

12.0

18.0

24.03/

10/2

005

3/11

/200

5

3/12

/200

5

3/13

/200

5

3/14

/200

5

3/15

/200

5

3/16

/200

5

3/17

/200

5

3/18

/200

5

3/19

/200

5

3/20

/200

5

3/21

/200

5

3/22

/200

5

date

hour

s

Total = 205.5 hours0130 10 Mar – 1330 22 Mar = 300 clock hours68.5% or 115 hrs/week average 16

RHIC Run 5 (62 GeV) Final Delivered Cu-Cu Luminosity

0.0

0.1

0.2

0.3

0.4

0.5

0.6

9-M

ar

11-M

ar

13-M

ar

15-M

ar

17-M

ar

19-M

ar

21-M

ar

Lum

inos

ity (n

b)-1

PHENIXSTARBRAHMSPHOBOS

PHENIX Goal

17

18

RHIC Run 5 Final Delivered 100x100 GeV/n Cu-Cu Luminosity

0

2

4

6

8

10

12

14

16

4-Jan

11-Jan

18-Jan

25-Jan

1-Feb

8-Feb

15-Feb

22-Feb

1-Mar

8-Mar

Date

Lum

inos

ity (n

b)-1

PHENIXSTARBRAHMSPHOBOSRun5Goalmin projectionmax projection

PHYSICSBEGINS

END OF RUN

Physics Begins

PHENIXPHOBOS

PHENIX Goal

PHOBOS Min Goal

RHIC Machine/Detector Planning Meeting

Run5 -- FINAL DELIVERED Integrated Luminosity by week

57.352.0

107.9

92.6 96.7 96.2

76.0

105.5

62.22.11

2.55

1.99

2.39

0.71

1.57

0.48

2.40

1.70

2.16

2.40

1.89

2.42

0.78

1.48

0.41

2.31

1.71

0

24

48

72

96

120

1/04 to 1/10

1/11 to 1/17

1/18 to 1/24

1/25 to 1/31

2/01 to 2/07

2/08 to 2/14

2/15 to 2/21

2/22 to 2/28

2/29 to 3/07

period

hour

s pe

r wee

k at

sto

re(lu

mi o

n - l

umi o

ff)

0.0

0.6

1.2

1.8

2.4

3.0

inte

grat

ed lu

min

osity

[nb^

-1]

hours at store Phenix STAR

19

http://www.c-ad.bnl.gov/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldow/switch to LN 2

RHIC Cryo Operation

RHIC Cryo off

RHIC Systems Test (no colliding beams)

RHIC with colliding beams

RHIC Research with Cu-Cu (100x100 GeV/n)

RHIC Research with Cu-Cu (31x31 GeV/n)

RHIC Research with Cu-Cu (11x11 GeV/n)

RHIC Research with p-p (100x100 GeV)

NSRL (NASA Radiobiology)

AGS (NASA)

Shutdown (RHIC)

C-A Operations-FY05

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2005

22 Feb 05

setup/ramp up luminositySchedule - subject to change

32 weeks

p,O(2),Si,Fe(2),Ti

Sep

schedule to be determinedpending approval/funding

p,C,O,Si,Fe(2)

20

21

BNL Energy Use FY 2005(C-AD Bldg power is in site base)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.001-

Oct

-04

15-O

ct-0

4

29-O

ct-0

4

12-N

ov-0

4

26-N

ov-0

4

10-D

ec-0

4

24-D

ec-0

4

7-Ja

n-05

21-J

an-0

5

4-Fe

b-05

18-F

eb-0

5

4-M

ar-0

5

18-M

ar-0

5

1-A

pr-0

5

15-A

pr-0

5

29-A

pr-0

5

13-M

ay-0

5

27-M

ay-0

5

10-J

un-0

5

24-J

un-0

5

Date

Dai

ly A

vera

ge P

ower

(MW

)Peak-AvSite BaseRHIC otherAGSRHIC Cryo

as of 31 May

RHIC Machine/Detector Planning Meeting17 November 2004

Purpose of this meeting:

To address issues and priorities relating to the optimization of physics output from RHIC experiments.

To discuss and promulgate policy (when needed).