RHIC pp Status. http://www.agsrhichome.bnl.gov/AP/Spin2005/. Beam experiment. Beam experiment. STAR ire Alarm. Cryo lead flow problem Booster Main Magnet problem. Status. Luminosity achieved: 56x56, 1.0x10 11 bunch intensity Peak luminosity : ZDC 4kHz ~ 1.02x10 31 cm -2 s -1 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RHIC pp Status

RHIC pp Status

http://www.agsrhichome.bnl.gov/AP/Spin2005/

Page 2: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Beam

exp

eri

ment

Beam

exp

eri

ment

STA

R ire

Ala

rm

Cry

o lead fl

ow

pro

ble

mB

oost

er

Main

Mag

net

pro

ble

m

Page 3: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Page 4: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Page 5: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Status Luminosity achieved:

56x56, 1.0x1011 bunch intensity Peak luminosity: ZDC 4kHz ~ 1.02x1031cm-2s-1

Good lifetime Polarization achieved at store: ~45%

CNI ready for 120 bunch mode

Page 6: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Remaining Issues Emittance blowup during the ramp

Instability along the ramp: negative chromaticity: corrected Poor reproducibility of Yellow lifetime at store

Different golden orbit for store Couple of good stores over weekend, but not reproducible

Page 7: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Plan Machine development to improve the performance

Peak Luminosity: bunch intensity maxed out at 1x1011 for now Go beyond 56 bunches Eliminate emittance blowup during ramp:

Correct the negative chromaticity along the ramp

Integrated luminosity Solve the yellow lifetime issue at store

Yellow aperture study Yellow non-linear corrector setting

Page 8: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Best store: LP^4

Lifetime: 17 hours

Page 9: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Page 10: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Fill 6997 and Fill 6998

Page 11: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

Angle bump at Store

Page 12: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton

High peak luminosity

Page 13: RHIC pp Status

May 4, 2005 RHIC Weekly MeetingBNL, Upton