RESS Final Assembly Steps

Page 2: Rhit Ess Build Book_yr3

Remember to follow all high-voltage safety procedures during ESS assembly

Torque and mark all bolts

Never “force fit” any component.

ESS BUILD BOOK

Page 3: Rhit Ess Build Book_yr3

ESS BUILD BOOK- STEP 1

• Install Battery Module #1 using 4, M-10 Class 12.9 bolts

M-10 Bolts

Z-Frame

Module 1

Page 4: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 2

• Install Battery Module #2 using 4, M-10 Class 12.9 bolts

M-10 Bolts

Module 2

Page 5: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 3

Module 3

M-10 Bolts

• Install Battery Module #3 using 4, M-10 Class 12.9 bolts

Page 6: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 4

• Wire the Low-Voltage (LV) connections on the fronts of Modules 1through 3

Low-Voltage Harness (LV)

Page 7: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 5

• Install the Component Shelf using qty 4, M-5 Bolts

Component Shelf

M-5 Bolts

M-5 Bolts

Page 8: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 6

• Wire the LV connection on the rear of Modules 1 through 3

Low-Voltage Harness

Page 9: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 7

• Install the HV flex connection between the positive terminal of Module 1 (M1P) and the negative terminal of Module 2 (M2N) using 4, M-6 bolts

M-6 Bolts

Page 10: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 8

• Install Lexan cover over the HV connection between the positive terminal of Module 1 (M1P) and the negative terminal of Module 2 (M2N)

LEXAN Cover

Page 11: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 9

• Wire the High-Voltage connection from the positive terminal of Module 3 (M3P) and the MSD using qty 2, M-6 bolts. Tie off the MSD connection.

MSD Lug

M3P

Page 12: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 10

• Install connection with Lexan protective cover

LEXAN Cover (M3P)

Page 13: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 11

Module 4

M10 Bolts

• Install Battery Module #4 using 4, M-10 Class 12.9 bolts

Page 14: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 12

Module 5

M10 Bolts

• Install Battery Module #5 using 4, M-10 Class 12.9 bolts

Page 15: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 13

Module 6

M10 Bolts

• Install Battery Module #6 using 4, M-10 Class 12.9 bolts

Page 16: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 14

Module 7

M10 Bolts

• Install Battery Module #7 using 4, M-10 Class 12.9 bolts

Page 17: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 15

• Wire the Low-Voltage connections on the fronts of Modules 4through 7

Page 18: Rhit Ess Build Book_yr3

EDM/CSM SUBASSEMBLY-STEP 16-18

17) Attach HV EDM Negative M7P connection lug +cable to EDM. Tie off M7P lug.

Note: The EDM/CSM Subassembly will be built outside of the pack, then installed as a unit

18) Attach HV EDM CSM connection lug +cable to EDM. Tie off CSM lug.

EDM EDM-CSM

EDM-External

Module 7-EDM

16) With the top of the EDM removed, attach the EDM-External lug + cable to appropriate lug on EDM

Page 19: Rhit Ess Build Book_yr3

EDM/CSM SUBASSEMBLY – STEP 19

• Mount CSM to EDM using quantity 4 M-6 bolts

Module 7-EDM

EDM-CSM

EDM-External

EDM

CSM

Page 20: Rhit Ess Build Book_yr3

EDM/CSM SUBASSEMBLY – STEP 20 & 21 20) Attach CSM M1N to CSM and tie off M1N lug

21) Attach EDM-CSM RADSTOCK HV connection to CSM

EDM-CSM

Module 7-EDM

EDM-External

M1N to CSM

Page 21: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 22

• Install HV M4N MSD and tie off

M4NMSD tie off

Page 22: Rhit Ess Build Book_yr3

ESS BUILD BOOK- STEP 23

• Install Lexan protective cover at HV M4N MSD tie off

Lexan cover

Page 23: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 24

• Attach EDM/CSM subassembly to component shelf using qty 4 M6 bolts

Page 24: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 25

• Install HV flex connection connecting M5P M6N

Page 25: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 26

• Install Lexan cover over HV flex connection (M5P M6N)

Page 26: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 27

• Attach HV M4P M5N

Page 27: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 28

• Install Lexan cover over HV flex connection (M4P M5N)

Lexan cover

Page 28: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 29

• Attach HV EDM M7P

HV EDM M7P

Page 29: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 30

• Install Lexan cover over HV connection (HV EDM M7P)

Page 30: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 31

• Attach HV CSMM1N

HV CSMM1N

Page 31: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 32

• Install Lexan cover over HV connection (HV CSMM1N )

Lexan cover

Page 32: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 33 & 34

33) Attach HV flex connection M2P M3N

34) Install Lexan cover over HV connection (M2P M3N)

HV M2P M3N

Lexan cover

Page 33: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 35 & 36

35) Attach HV flex connection M6P M7N

36) Install Lexan cover over HV connection (M6PM7N)

Page 34: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 37 & 38

• Attach M4N MSD lug

• Attach M3P MSD lug

M4N MSD lug

M3P MSD lug

Page 35: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 39

• Install battery case

MSD

ESS Case

Pack-to-vehicle HV connector

Page 36: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 40 • Attach the battery control module (BCM) to battery casing using supplied

isolation mounts

BCM ESS Case

Page 37: Rhit Ess Build Book_yr3

ESS BUILD BOOK-STEP 41 & 42

ESS Build Book-

• Install battery control module cover; secure to battery case using 4, M-5 bolts (locations shown below)e

HVIL-BCM and LV- BCM connection points

• Connect HVIL and LV routing wires to BCM

Page 38: Rhit Ess Build Book_yr3

ESS VEHICLE INTEGRATION – STEP 43

• Mount Energy Storage System (ESS) to ESS subframe via qty 6, M14 bolt holes in ESS Z-Frame (see red arrows in the top section view below)

ESS Subframe

Energy Storage System (ESS)

ESS Z-Frame

Front