Influenced by Plan Baton Rouge II, the Downtown Greenway is a 2.75 mile pedestrian and bicycling corridor that links inner city neighborhoods and expanded DDD boundaries to downtown parks, businesses, and cultural attractions utilizing the existing BREC parks, interstate infrastructure, and public right-of-ways.
Parks and Greenspaces connected by the Downtown Greenway:
Downtown Greenway at North Blvd. features a separated 10’ urban bicycle path and 5’ pedestrian garden path, median crossings, specialty pavement, curb ramps, seating areas, lighting, sculpture, water fountains, bicycle racks, and lush landscaping. Over 1,000 plants have been installed to create a botanical experience inspired by Manhattan’s famous “High Line.”
An economic stimulant, intending to spur new investments and redevelopment in the city’s core, as well as strengthen workforce opportunities by providing an alternative transportation source.
Connects to the Mississippi River Levee Trail at the recently completed Florida Riverfront Access Point, the beginning and end of the Downtown Greenway, located at the intersection of Florida Street and River Road. The Rotary Club of Baton Rouge has also secured approximately $350,000 for an interactive sculpture to be constructed at the Florida Riverfront Access Point for their centennial celebration in 2018.
Feasibility Study completed in 2010 by ABMB Engineers, Inc. and Schematic Design completed in 2012 by Spackman, Mossop, & Michaels + Tipton Associates through the EPA’s Greening America’s Capitals Program. Final design and construction plans funded though a grant provided by the Capital Area Finance Authority and completed in 2016 by Design Workshop and sub-consultants; Reich Associates, Fenstermaker, Forte & Tablada, Walter Kulash, and Chris Davala. Rotolo Consultants, Inc. was awarded and constructed the greenway at North Blvd.
Owned and operated by the City of Baton Rouge/Parish of East Baton Rouge in conjunction with the Recreation & Parks Commission for the Parish of East Baton Rouge (BREC) where the Downtown Greenway enters into BREC park areas.
Construction completed at Expressway Park in the spring of 2015 with a partnership between the Downtown Development District/City-Parish of East Baton Rouge & BREC. Construction has also been completed in 2015 along Myrtle Street, connecting the Lincoln Theatre to the Downtown Greenway at Expressway Park, in a partnership with the East Baton Rouge Parish Redevelopment Authority.
Construction on East Blvd./TJ Jemison Blvd. and North Blvd. Town Square expected in early 2017.
Approximately $3 million in grant funding acquired through the local, state, and federal sources listed below:
R I B B O N C U T T I N G
- LSU Lakes
- BREC City/Brooks Park
- BREC Expressway Park
- North Boulevard Town Square
- BREC Convention Street Park
- Capitol Lakes
- BREC 7th Street Park
- BREC Memorial Stadium
- 2011 FHWA Louisiana Recreational Trails Program ($220,000 - Expressway Park)
- 2011 FHWA Louisiana Recreational Trails Program ($118,000 - Myrtle Street Connector)
- 2011 DOTD Transportation Enhancement Program ($1 Million - T.J Jemison & East Blvd.)
- 2012 DOTD Transportation Community & System Preservation ($1.5 Million - North Boulevard Promenade)
- 2012 FHWA Louisiana Recreational Trails Program ($125,000 - Phase One)
- 2012 Capital Area Finance Authority ($250,000 - Planning & Construction Documents)
- 2012 EPA’s Greening America’s Capitals Program (Technical, Schematic Design Assistance)
- Arsenal Park
- BREC Memorial Stadium
- Florida Street Riverfront Access
- Mississippi River Levee Trail
- South Blvd. Levee
Trailhead
Legend
WASHINGTON
KAN
SAS G
EORG
IA
ALA
BAM
A
YK
CUT
NEK
EESS
EN
NETyyyy D
ALRYMPLE
MAIN ST
19T STH
5TH ST
FLORIDA ST
MYRTLE
JULIA
6TH ST
TSHT
4
TSD
R3
TERRACE
TSHT
01
KR
AP
CONVENTION ST
LOUISE
GOVERNMENT ST
EAST
BLV
D
SPANISH TOWN
FRANCE
HIGHLAND
LAUREL STM
AXI
MIL
IAN
EUROPE
SPAIN
HPES
OJT
NIAS
ALICE
GRACIE
LOUISIANA
THOM
AS H
DEL
PIT
AMERICA
RSN
OSNI
BO
REI
DDE
SAIN
T LO
UIS
MC CALOP
FUQUA
BRADDOCK
NAPOLEON
DN
ANI
DREF
TNI
AS
MAYFLOWER
FIG
PERKINS
APPLE
SELR
AH
CT
NIAS
IBER
VILL
E
MARY
HT21
PEAR
SMITH
HOWARD
BRICKYARD
PECAN
SAIN
T PH
ILIP
SWART
HCAE
P
NIC
HO
LSO
N
GRANDPRE
EDUCATION
ORANGE
HICKORY
UTAH
LAKELAND
WOL
AG
NU
B
CAPITOL ACCESS
UNIVERSITY
CAPITOL LAKE
SENNETTEMAGNOLIA
TSH
T9
10TH
INTERSTATE 10
TSHT
41
17TH
SWART
TSHT
61
TSHT
11 13TH ST
18TH ST
HOWARD
15TH ST
7TH ST
HT01
17TH ST
NORTH ST
11TH
TSHT
21
NA
POLE
ON
ROYA
L
TSHT
8
COTTON
ALICEALICE
SOUTH
NORTH BLVDNORTH BLVD
City ParkBrooks Park
Expressway Park
Memorial Stadium
Convention St. Park
Central Green
Lincoln Trail Connector
South Blvd. Connector
NBTS Phase II
River Road Connector (South)
Florida St/River RoadLevee Access
Start/Finish
LSU/ Farr Park
Desoto Park
Government Street Connector
Spanish Town Road Connector
Louisiana Ave Connector
River Road Connector (North)
East Blvd/Tj Jemison Blvd: Construction 2017
7th Street to Capitol Lakes: Grant Pending
Complete Downtown Greenway: Proposed
Trailheads
Start/Finish of GreenwayConnector: Completed
Connector: Construction 2017
Connector: Proposed
North Blvd: Dec 2016 Ribbon Cutting
Connector: Grant Pending
Downtown Greenway Phase Map