richard rogers - facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/lloyds.pdf · design team:...

16
Lloyds Building 1978-86, London Richard Rogers Arch 631

Upload: nguyennga

Post on 13-Apr-2018

226 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Lloyds Building 1978-86, LondonRichard Rogers

Arch 631

Page 2: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Client: Corporation of Lloyd's of London

Bussiness nature: Insurance

Design Team: Richard Rogers Partnership

Structural Engineer: Ove Arup & Partners

Services Engineer: Ove Arup & Partners

Built Up Area: 52,200 square metres gross area

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 3: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

DECEMBER 1980 NOVEMBER 1981 MAY 1982 NOVEMBER 1982

APRIL 1983 JULY 1983 NOVEMBER 1983 APRIL 1984

AUGUST 1984 OCTOBER 1984 MAY 1985 JUNE 1986

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 4: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 5: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

The Lloyds Building, consisting of twelve stories to the north, stepping down to six stories to the south

Served zone

Servant towers with incorporation of

raised flooring system and ceiling viod

Spatial Configuration

Atrium

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 6: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Structural Elements

Material : exposed concrete

Floor : waffle beam grid – enables longer span.

-The floors are composed of a network beams of 550mm x 300mm beams at 1.8m centres supported by inserted in situ U-beams which are post-tensioned to allow the 18m span length. -The corners of the building are also prestressed and post-tensioned in two directions to limit the deflections of the floors. -To create a service void, stub columns are placed on top of these beams which a permanent, specially-designed steel shutter incorporating an acoustic sandwich is positioned, and a non-structural concrete topping is then added to complete the floor.

Lloyds Building 1978-86, London Richard Rogers Arch 631

Main concrete columns

concrete bracket

‘Yokes’

U-Beams

Page 7: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Lloyds Building 1978-86, London Richard Rogers Arch 631

Load Tracing

Page 8: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

By using beams with parallel sides and sharp arises Rogers emphasizes that the floor is a grid not a solid, coffered slab

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 9: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Soil and Foundation

• Constructed by Constain Group PLC• Pile foundation with pile caps supporting main columns• Over 300 piles, each 750 mm dia/ 26 meters deep• Diaphragm Walling and Cast-in-place Retaining walls along edges of site• Soil is mostly clay with a large deposit of sand on the north end of the site

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 10: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Service Towers :

The service towers consist of pre-cast concrete members, each designed as a “kit.” Each tower is tied to the main structure by a concrete connection at each floor.

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 11: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Lloyds Building 1978-86, London Richard Rogers Arch 631

Load Tracing

Page 12: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Lloyds Building 1978-86, London Richard Rogers Arch 631

Lateral Load

Page 13: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Deflections Bending Moments

Multiframe Analysis

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 14: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Lloyds Building 1978-86, London Richard Rogers Arch 631

Shear Diagram Loads

Multiframe Analysis

Page 15: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Bibliography:

Books:Fairweather, Virginia, Tomasetti, Thronton. Expressing Structure: The Technology of Large-Scale Buildings. Basel: Birkhauser Publishers, 2004.

Lloyd’s List. Serving the World: The New Lloyd’s Building. London: Lloyd’s List, 1986.

Powell, Kenneth. Lloyd’s Building: Richard Rogers Partnership. London: Phaidon Press Limited, 1994.

Websites:http://architecture.about.com/od/greatbuildings/ig/Richard-Rogers-Partnership-/Lloyd-s-of-London.htm

http://www.lloyds.com/About_Us/The_Lloyds_building/Visiting_the_Lloyds_building.htm

Lloyds Building 1978-86, London Richard Rogers Arch 631

Page 16: Richard Rogers - Facultyfaculty.arch.tamu.edu/media/cms_page_media/4433/LLOYDS.pdf · Design Team: Richard Rogers Partnership Structural Engineer: Ove Arup & Partners Services Engineer:

Thank You!

Keun- Young Park

Arch 631

Anjali Venkataiah

Deepen Dighe

Devang ladani

Daniel Haskovec

STRUCTURAL CASE STUDY