![Page 1: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/1.jpg)
City of Richmond
To: Development Permit Panel
From: Wayne Craig Director, Development
Report to Development Permit Panel
Date: May 5, 2020
File: DP 19-866690
Re: Application by GBL Architects for a Development Permit at 5491 No. 2 Road
Staff Recommendation
1. That a Development Permit be issued which would:
a) Permit the construction of a six-storey building containing approximately 80 purpose-built residential rental tenure units at 5491 No. 2 Road on a site zoned "High Rise Apartment and Congregate Housing (ZHR3)- Dover Crossing"; and
b) Vary the provisions of Richmond Zoning Bylaw 8500 to:
1. Reduce the minimum building setback from No. 2 Road from 6 m to 5 m;
11. Increase the maximum building height from 18 m to 20.3 m for the west portion of the building; and
111. Reduce the number of required parking spaces from 87 to 46.
2. That the Chief Administrative Officer and the General Manager, Engineering & Public Works, be authorized to execute a servicing agreement with the owner of 5900 River Road, to install road works and utility works along No. 2 Road City land and remove and relocate eight City trees from No. 2 Road City land, based on the material terms and conditions set out in Attachment 6 of the staff report titled, "Application by GBL Architects for a Development Permit at 5491 No. 2 Road," dated May 5, 2020 from the Director of Development.
Wayne Craig Director, Development (604-247-4625)
WC:SB Att. 6
Document Number: 6433306 6433306
Version: 3
![Page 2: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/2.jpg)
May 5, 2020 - 2 -
Staff Report
Origin
DP 19-866690
GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built rental residential development at 5491 No. 2 Road on a site zoned "High Rise Apartment and Congregate Housing (ZHR3)- Dover Crossing". Key components of the proposal include: • A six-storey building containing affordable housing over a single-level underground parking
structure. • A total floor area of approximately 5,273 m2 (56,762 ft2) purpose-built residential rental units
and an additional approximately 100 m2 (1,076 ft2) ofresident indoor amenity space. • 80 purpose-built residential rental units secured in perpetuity with a Housing Affordability
Agreement and covenant registered on title. Proposed rental rate, subsidies and household income restrictions are subject to the BC Housing Community Housing Fund program and all of the units will be secured with a legal agreement between Pathways and BC Housing. Further details on form of rental are provided in the housing section of this report. The residential units include: o 16 deep subsidy affordable housing units with proposed rental rate and household income
restrictions targeted at low income households; o 40 rent geared to income units with proposed rental rate and household income
restrictions targeted at below BC Housing Income Limits; and o 24 low and moderate income units with proposed rental rate and household income
restrictions targeted at low and moderate income households.
This Development Permit application was received as part of a partnership between the City, BC Housing and Pathways Clubhouse Society of Richmond (Pathways). The City has advised it will provide the vacant City-owned site through a long term ground lease. The building will be constructed and operated by Pathways, a Richmond based non-profit housing and service organization that has been offering community-based services to Richmond residents since 1984. Pathways collaborates with people and organizations in the broader community to provide education and promote mental wellness. Pathways Clubhouse currently manages more than 120 apartments in Richmond. BC Housing will provide Pathways with financing and funding.
Road and Engineering improvements required with respect to the subject development will be secured through the City's standard Servicing Agreement process prior to Building Permit issuance. Works include road works, frontage improvements and utility upgrades.
Development Information
Please refer to attached Development Application Data Sheet (Attachment 1) for a comparison of the proposed development data with the relevant Bylaw requirements.
Background
Development surrounding the subject site is as follows:
To the north: A vacant development site under the same zoning as the subject site.
6433306
![Page 3: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/3.jpg)
May 5, 2020 - 3 - DP 19-866690
To the east: Across No. 2 Road is a vacant development site in the high-density high-rise City Centre Oval Village, zoned "High Rise Apartment and Olympic Oval (ZMU4)Oval Village (City Centre)".
To the south: Across a multi-purpose pathway in an unconstructed City road right-of-way (ROW) is a strata-titled three-storey townhouse development on a property zoned "Town Housing (ZT5)- Dover Crossing".
To the west: Fronting onto Dover Crescent is a strata-titled mixed use eight-storey building with apartments and a City-owned child care facility on a property zoned "Low Rise Apartment (ZLR3)- Dover Crossing".
Public Consultation
An open house was held on Wednesday, September 11, 2019 from 4:00 to 8:00 pm at the Thompson Community Centre to present the subject proposal and listen to feedback from the community. The meeting was facilitated by public engagement consultant Ideaspace Consulting Inc. and Pathways and City staff were in attendance to answer questions. A summary report prepared by Ideaspace is attached to this report, along with sign-in forms and comments forms (Attachment 2) and the one item of public correspondence received regarding the subject application (Attachment 3).
In August 2019, invitations to the open house were mailed by City Affordable Housing staff to owners and residents of properties within 50 m of the subject site and all properties along Dover Crescent. Approximately 85 people attended the open house engagement meeting. At the open house, approximately 70 people signed the sign-in forms and an additional approximate 15 people attended. 27 comment forms were completed, expressing support for the proposal, expressing concerns regarding the proposal and providing suggestions for consideration.
Key themes regarding the design and construction of the proposal identified in the summary report and public correspondence include the following:
a) Support for the project
b) Concerns about the proposed vehicle access location, including traffic speed, congestion, sight lines and the capacity of No. 2 Road to accommodate the subject proposal - The No. 2 Road frontage will be improved through a required Servicing Agreement, including frontage beautification, sidewalk, off-road multi-use path separated from vehicular traffic and improvements to the road geometry (increasing the sight line of traffic from the No. 2 Road bridge). The City's Transportation Department has reviewed the site and is satisfied that the required No. 2 Road improvements will be an improvement over the existing condition and will address traffic safety concerns for the site access and on-ramp to No. 2 Road.
c) Concerns about impacts on traffic congestion on No. 2 Road, River Road and Lynas Lane -A Traffic and Parking Study prepared by Tetra Tech was submitted in support of the proposal and has been reviewed and accepted by Transportation staff. The study concluded that the existing road network has sufficient capacity to accommodate the proposed 80-unit development.
6433306
![Page 4: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/4.jpg)
May 5, 2020 - 4 - DP 19-866690
d) Concerns about overflow parking on Dover Crescent and Dike Road -A Traffic and Parking Study prepared by Tetra Tech was submitted in support of the proposal and has been reviewed and accepted by Transportation staff. The study addresses the anticipated demand for vehicle parking for this unique mix of subsidized rental affordable housing uses and this unique model of building management as well as Transportation Demand Management (TDM) features associated with the proposal. Further information regarding proposed TD Ms is provided in the 'Parking and Access' section below. While resident parking is reduced based on analysis, visitor parking is being provided in accordance with the Zoning Bylaw. The proposal is not anticipated to result in overflow parking.
e) Concerns about neighbourhood impact of building height obstructing views and sunlight -The proposal complies with the overall height permitted in the existing zoning, with increased height in a portion of the roof area to allow the top floor to be a full size floor, the same size as lower floors. The applicant has submitted shadow analysis that demonstrates that the proposal will only have a minor impact on existing neighbouring development. The shadow analysis is included as a reference plan in the DP plans.
f) Considerations regarding exterior and interior building design, including a desire for a building design that ensures safety, accessibility, inclusiveness for tenants and aircraft and traffic sound mitigation The subject development is designed to provide a secure building with a high level of accessibility and shared social spaces. All of the residential units will incorporate basic universal housing features. Four of the residential units will be accessible units, designed to accommodate a resident in a wheelchair and the remainder of the units will be designed to be easily renovated to accommodate a future resident in a wheelchair. Further interior design, and building security system details will be addressed at the Building Permit stage. The building will achieve CMHC interior noise standards as verified through acoustical reports at the Building Permit stage.
g) Concerns about construction traffic impacts, parking, noise, and hours of operation -Prior to Building Permit issuance, the developer is required to submit a construction traffic and parking management plan to the satisfaction of the City's Transportation Department.
Staff Comments
The proposed scheme attached to this report has satisfactorily addressed the significant urban design issues and other staff comments identified as part of the review of the subject Development Permit application. In addition, it complies with the intent of the applicable sections of the Official Community Plan (OCP) and is in compliance with the "High rise Apartment and Congregate Housing (ZHR3)- Dover Crossing" zone, except for the zoning variances noted below.
Zoning ComplianceNariances (staff comments in bold)
The applicant requests to vary the provisions of Richmond Zoning Bylaw 8500 to:
1) Reduce the minimum building setback from No. 2 Road from 6 m to 5 m.
(Staff supports the proposed variance as the variance accommodates a more efficient and functional layout and enables increased separation from the building to the west. Ambient noise will be mitigated through building envelope design and construction which is
6433306
![Page 5: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/5.jpg)
May 5, 2020 - 5 - DP 19-866690
secured through the registration of an aircraft noise sensitive use covenant prior to Development Permit (DP) issuance).
2) Increase the maximum building height from 18 m to 20.3 m for the west portion of the building.
(Staffs up ports the proposed variance as it involves only a portion of the top floor, the variance accommodates a more efficient and functional layout with the same size jloorplates on all of the upper floors, and adequate building separation is proposed with approximately 19 m to 29 m separation between the proposed building and neighbouring apartment and townhouse buildings).
3) Reduce the number ofrequired parking spaces from 87 to 46.
(Staff supports the proposed variance as it reflects the anticipated demandfor this unique use and the proposal includes Transportation Demand Management (TDM} features. A Parking Analysis Study prepared by Tetra Tech was submitted in support of the proposal and has been reviewed and accepted by Transportation staff. The study addresses the anticipated demand for vehicle parking for this unique mix of subsidized rental affordable housing uses and this unique model of building management. Transportation Demand Management (TDM} features associated with the proposal include: (i) subsidized transit passes for the 16 deep subsidy affordable housing units for two years; (ii) Pathways shuttle bus program transportation for all Pathways members to and from their residence and the Pathways Clubhouse in City Centre; (iii) bicycle rental/bicycle share program for the building, including four bicycles and four dedicated bicycle storage rack spaces located close to the building lobby; (iv) a bicycle maintenance room located in the parking structure; (v) electric bicycle charging outlets (120V) provided in each bicycle storage room; and (vi) short term pick-up and drop-off area for two vehicles is accommodated in the service area).
Advisory Design Panel Comments
On February 19, 2020, the Advisory Design Panel (ADP) supported the subject Development Permit application moving forward to the Development Permit Panel, subject to the applicant giving consideration to the ADP's comments. A copy of the relevant excerpt from the Advisory Design Panel Minutes is attached for reference (Attachment 4), together with the applicant's design response in 'bold italics'.
Analysis
Conditions of Adjacency • The No. 2 Road streetscape is enhanced with the orientation of the residential lobby. • The interface with the public multi-use path along the south edge of the site includes the
class 2 bike racks, landscape buffer, stair connections to individual unit patios and a stair connection to the shared outdoor amenity space. The raised patios adjacent to path have limited retaining walls to accommodate planting screening. Landscaping improvements to the public multi-use path are will be provided through the required servicing agreement.
• The residential six-storey building massing is provided along all sides of the site.
6433306
![Page 6: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/6.jpg)
May 5, 2020 - 6 - DP 19-866690
• The proposed residential building is setback along all sides of the property. The underground parking structure extends towards the edges of the property. The setback area along the west property line provides a landscape buffer to the neighbouring residential development.
• The north elevation of the single level parking podium will be visible until the neighbouring site redevelops. This party wall is low and is proposed to be treated with vine planting to provide interim screening until the neighbouring property develops.
Urban Design and Site Planning
•
•
The proposed massing includes a six-storey mid-rise wood-frame building over a single-level concrete parking structure. The building massing is articulated in an L-shape with an angled hinge point and textured with projecting and recessed areas. The site is located in an area impacted by aircraft noise and registration of an aircraft noise sensitive use legal agreement is a consideration of the Development Permit. As part of the Building Permit (BP) application process, the applicant is required to design and construct the building in a manner that mitigates potential aircraft noise to the proposed dwelling units, including submission of a mechanical report prepared by a registered professional confirming the development achieves the ASHRAE 55-2004 "Thermal Environmental Conditions for Human Occupancy" standard for interior living spaces and an acoustic report prepared by a registered professional confirming the development achieves the following CMHC interior noise level guidelines:
Portions of Dwelling Units Noise Levels (decibels)
Bedrooms 35 decibels
Living, dining, recreation rooms 40 decibels
Kitchen, bathrooms, hallways, and utility rooms 45 decibels
• In accordance with the City's flood plain designation and protection Bylaw 8204, registration of a flood covenant is a consideration of the Development Permit. The proposed ground floor elevation and lower lobby elevation providing access for persons in wheelchairs comply with the bylaw.
Parking and Access • Vehicle access is proposed to the subject site from a single driveway connection on
No. 2 Road through the adjacent site to the north at 5900 River Road. There is an existing cross-access easement registered on title to both properties which, prior to Building Permit issuance for the subject proposal, is required to be discharged and replaced with a new Public-Rights-of Passage (PROP) Statutory-Right-of-Way (SRW) over 5900 River Road and cost sharing legal agreement regarding construction and maintenance of works within the SR W areas. The SR W area would allow for subdivision in the future and consolidation with the subject site after future development of 5900 River Road is completed. Existing legal agreements prohibiting access to No. 2 Road and existing cross-access easement will be discharged from both properties. The vehicle access in the SR W area will be designed and constructed through the required Servicing Agreement process.
• The total number of parking spaces proposed to be provided on-site is 46, including 29 spaces for the use of residents, 15 shared spaces for the use of visitors and two spaces for a car share provider. Registration of a legal agreement securing the two car share spaces for car share service, including a Public-Rights-of Passage (PROP) Statutory-Right-of-Way (SRW) is a DP consideration.
6433306
![Page 7: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/7.jpg)
May 5, 2020 - 7 - DP 19-866690
• The applicant proposes to provide the following Transportation Demand Management (TDM) measures to support the reduced parking rates as considerations of the Development Permit: o Enhanced bicycle facilities, secured by legal agreement, including shared bicycle
repair/maintenance stations and Pathways administering a bicycle rental and bicycle sharing program for the shared use of all residents, including the provision of four bicycles and four additional outdoor rack spaces over and above the bicycle storage bylaw requirements.
o Electric charging outlets in all class 1 bicycle storage rooms. o Transit pass program providing two years of two-zone compass cards for each of the
16 deep subsidy units at a subsidized rate of $45 per year, secured with Letter of Credit ( or BC Housing letter of assurance) and by legal agreement.
o The Pathways shuttle bus service program will provide transportation for Pathways members between their residence and the Pathways Clubhouse facility.
o Two short term pick-up/drop-off parking spaces for non-loading hours. • Short term class 2 bicycle storage is accommodated with bicycle racks near the building
lobby entry. Longer term class 1 bicycle storage facilities are accommodated in shared bicycle storage rooms in the parking structure, and secured by legal agreement as a consideration of the DP.
• One medium (SU-9) on-site loading space is provided adjacent to the vehicle access.
Architectural Form and Character •
•
• •
The development style is contemporary with a high level of architectural design, articulation and material quality. The design includes articulation along the building facades and a corner entry lobby to anchor the building. The proposed cladding materials (flat and textured cement panel, strip cement panel soffit, aluminum and vinyl windows, glass guard rails and privacy screens) are consistent with the Official Community Plan (OCP) guidelines and compatible with recent low-rise development in the City. The palette of colours includes light grey to black tones, and wood tone accents . The building roof will be flat and rooftop mechanical equipment will be screened with light grey metal louver screening as shown in the DP plans.
Landscape Design and Open Space Design • 482 m2 (5,188 ft2
) ofresidential outdoor amenity space is provided, based on the OCP standard of 6 m2 (65 ft2
) per dwelling unit, comprising two consolidated, irrigated landscaped, multi-use outdoor spaces on the west and north sides of the development at the ground floor level ( co-located with required indoor amenity space) and accessed from interior corridors and the indoor amenity space. The west area is designed as a communal social space with outdoor dining, BBQ, moveable seating, arbour and urban agriculture planters. The north children's play area features four pieces of play equipment as well as a rubberized surfacing with a stepping stone pattern to encourage active and social play for a number of children at the same time. Bench seating is also incorporated for parent supervision.
• All landscaped areas on the ground level will be serviced by an irrigation system. • Private outdoor patios and balconies are provided for all dwelling units.
6433306
![Page 8: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/8.jpg)
May 5, 2020 - 8 - DP 19-866690
• Prior to forwarding the subject application to Council, the developer is required to provide to the City a Letter of Credit ( or BC Housing Letter of Assurance) for landscaping in the amount of $229,074 as estimated by the project Landscape Architect, to ensure that on-site landscape features are provided in accordance with the Development Permit.
Shared Indoor Amenity Space • The OCP requires that multi-family development comprising 40 units or more provide at
least 100 m2 (1,076 ft2) of indoor amenity space. The subject development meets the OCP
minimum and provides for attractive indoor amenity space located adjacent to the outdoor amenity space. These amenities include a multi-purpose indoor amenity room, building management office and laundry room.
Crime Prevention Through Environmental Design • The building has been designed in accordance with CPTED principles and the building will
be managed by a property manager. • The streetscape and common area design is defined and visually permeable to establish a
sense of territoriality that contributes toward overall safety. • The parking area is secured with an overhead gate and include appropriate lighting level and
light painted ceilings and walls for enhanced visibility.
Accessible Housing
•
•
•
The proposed development includes 100% basic universal housing units that are designed to be easily renovated to accommodate a future resident in a wheelchair. These single-storey units are required to incorporate all of the accessibility provisions listed in the Basic Universal Housing Features section of the City's Zoning Bylaw, and are permitted a density exclusion of 1.86 m2 (20 ft2) per unit. The proposed development includes four barrier free housing units that are designed to be fully accessible at the time of construction for a resident in a wheelchair. In addition to complying with the Basic Universal Housing Features section of the City's Zoning Bylaw as noted above, these single-storey units are required to comply with the BC Building Code requirements for accessible housing. Wheelchair access is accommodated in all common areas and corridors to unit entries .
Sustainability Measures • The development is designed to utilize energy from the City's Oval District Energy Utility
(OVDEU), which will supply space heating and domestic hot water heating. Connection to the City's DEU system will be secured with a legal agreement registered on title as a consideration of the Development Permit.
• The proposed development is required to meet the sustainability requirements set out in the applicable sections of the Richmond BC Energy Step Code, which is step 2 for the proposed mid-rise building where combined with a low carbon building energy system, such as the OVDEU. In fact, the applicant is endeavouring to target a higher step 3 rating.
Tree Management • There are no existing trees on the subject site.
6433306
![Page 9: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/9.jpg)
May 5, 2020 - 9 - DP 19-866690
• There are eight trees located within the area No. 2 Road that requires road works in order to provide access to the subject site fronting both the subject site and the adjacent site to the north at 5900 River Road. These trees are in conflict with the required City road works and in close proximity to major infrastructure. These Oak trees are to be relocated to the satisfaction of the Parks Department. They may tentatively be relocated to Brighouse Neighbourhood School Park and Terra Nova South Park as they both have irrigation to aid in re-establishment and are located relatively nearby.
• Six trees located on the neighbouring property to the west will not be impacted by the proposed development. The proposal has been designed with additional parking structure setbacks along the west edge of the site to protect these adjacent existing trees.
• Installation of appropriate tree protection fencing is required for these trees as part of the development prior to any construction activities, including building demolition, occurring onsite. The applicant is also required to enter into a contract with a Certified Arborist for supervision of any works conducted within the tree protection zone of the trees, to monitor the trees and submit a post-construction assessment report to the City for review.
• There a total of 38 new trees included in the Development Permit plans.
Water Sustainability Act Approvals • The vacant site features grass and a portion of a land depression that is located both on the
subject site and the adjacent privately-owned site to the north. Historic aerial photographs and site visits indicate that the depression appears to feature seasonal wetland. In accordance with the provincial Water Sustainability Act, the developer has engaged a Qualified Environmental Professional to assess the site and work with the Province for the necessary approvals which are required prior to any site preparation and construction activity disturbance in the area under investigation.
Affordable Housing • The site is City-owned and the City will contribute the City-owned site through a long-term
ground lease for the development. The terms of the lease will be approved by Council separate from the Development Permit application process and prior to Building Permit issuance.
• All 80 residential units in the development are affordable housing units. The proposed rental dwelling units are provided at three affordability rates as follows: 20% deep subsidy units; 50% rent geared to income units; and 30% low and moderate income units. All of the units will be secured in perpetuity with a Housing Affordability Agreement registered on title. All of the units are subject to the BC Housing Community Housing Fund program criteria and secured with a legal agreement between the developer and BC Housing.
Dwelling Unit Mix: The OCP and City Centre Area Plan (CCAP) encourage the development of a variety of unit types and sizes supportive of the diverse needs of Richmond's population including, but not limited to, households with children. While the number of units in each affordability tier is secured, the unit types (studio, I-bedroom, etc.) are not specified by affordability tier. This arrangement is designed to enable tenants to move between affordability levels in the event that their income changes. For example, a tenant who receives a salary increase may be able to transition from a Rent Geared to Income unit to a Low and Moderate Income unit without moving away from the building.
6433306
![Page 10: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/10.jpg)
May 5, 2020 - 10 - DP 19-866690
One-person households and couples without children are overrepresented among renters experiencing housing affordability challenges in Richmond. This trend is particularly pronounced for low-income renter households that earn less than $30,000 per year, where 61% of households are individuals living alone and an additional 14% are couples without children. Accordingly, there is a high demand for smaller units among households in this income category. In recognition of this demand, the proposal includes 75% of the units with studio or one bedroom, and 25% of the units with two or three bedrooms.
Staff support the applicant's proposal, which includes the following mix ofrental affordability and unit sizes:
Min. Permitted Rental Affordability Type (2) Unit Type Unit Area Rent Geared to Low and Moderate
Deep Subsidy (1) Income
Studio 37 m2 (400 ft2)
1-bedroom 50 m2 (535 ft2)
2-bedroom 69 m2 (741 ft2) (3) (3)
3-bedroom 91 m2 (980 ft2)
Total n/a 16 40
20% 50% (1) 100% of units meet Richmond Basic Universal Housing (BUH) standards. (2) As per BC Housing Community Housing Fund program
Income
(3)
24
30%
Total
%of #of Units Units
30% 24
45% 36
19% 15
6% 5
100% 80
100% 80
(3) Unit type distribution within each rental affordability type to be determined on an annual basis as per BC Housing household income criteria
Rental Housing:
The units will be operated by Pathways non-profit organization. The development will be subject to a legal agreement between Pathways and BC Housing. Working with BC Housing through the Provincial Community Housing Fund Program, all of the proposed 80 residential rental tenure units are subject to maximum rental rate and household income restrictions by BC Housing, which will also facilitate construction financing and operational funding for the project.
The core goal of BC Housing's Community Housing Fund program is to increase the supply of affordable rental homes for middle and low-income families, independent seniors and individuals in BC through working with non-profit organizations, housing co-operatives, and local government. In compliance with the City's Affordable Housing strategy, the proposal includes:
• Deep Subsidy Units: 20% of the units (16 units) are subject to BC Housing restrictions to secure rental rates and household income targeted at households receiving income assistance, old age security and guaranteed income supplement, or whose rent geared to income rate would be no more than shelter allowance. Rental rates for these units are restricted to shelter rate or equivalent. These units receive operational funding from the BC Housing Community Housing Fund program.
• Rent Geared to Income Units: 50% of the units (40 units) are subject to BC Housing restrictions to secure rental rates and household income targeted at BC Housing Income Limits. Rental rates for these units are restricted to rent geared to income (RGI) of 30% of pre-tax household income and in accordance with the BC rent scale and using BC Housing's Housing Income Limits. These units receive operational funding from the BC Housing Community Housing Fund Program, depending on household income.
6433306
![Page 11: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/11.jpg)
May 5, 2020 - 11 - DP 19-866690
• Low and Moderate Income Units: 30% of the units (24 units) are subject to BC Housing restrictions to secure rental rates and household income targeted at the median income levels for BC households without and with children. Initial rental rates for these units will be based on market rates with a maximum of 30% of pre-tax annual household income using BC Housing's "Low and Moderate Income Limits" (median or 50th percentile income for BC households without and with children). Rental rate increases are restricted to Residential Tenancy Act permitted annual increases.
Prior to Development Permit issuance, a Housing Affordability Agreement in perpetuity and Housing Covenant will be registered on title for the 80-unit affordable housing development comprising 16 deep subsidy units, 40 rent geared to income units, and 24 low and moderate income limits units, requiring that the developer satisfies all City requirements.
Deep Subsidy Units:
Max. Monthly Unit Rent Total Max. Household Proposal Unit Type Income % of Units # of Units
Studio
1-bedroom
2-bedroom (1)(2) (2)(3) 100% (4) 16 (4)
3-bedroom
Total Varies Varies 100% 16
(1) Rent rate to be set at the shelter rate allowance applicable to individual households as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income equivalent to income assistance, old age security and guaranteed income
supplement, or whose rent geared to income rate would not exceed shelter allowance as per BC Housing criteria.
(4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.
Rent Geared to Income Units:
Max. Monthly Unit Rent Total Max. Household Proposal Unit Type (1 )(2) Income (2)(3) % of Units # of Units
Studio $1,287.50 $51,500 or less
1-bedroom
2-bedroom $1,575.00 $63,000 or less 100% (4) 40 (4)
3-bedroom $1,837.50 $73,500 or less
Total Varies Varies 100% 40
(1) Rent rate to be set at 30% of pre-tax income of individual households and as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income as per Housing Income Limits BC Housing criteria. (4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.
Low and Moderate Income Limits Units:
Target Monthly Unit Max. Monthly Unit Rent Total Max. Household Proposal Unit Type Rent Range (1 )(2) (3)(4) Income (5) % of Units # of Units
Studio (1) $1,853 $74,150 or less
1-bedroom (1) 100% (6) 24 (6)
2-bedroom (1) $2,826 $113,040 or less
3-bedroom (1)
Total n/a n/a n/a 100% 24
6433306
![Page 12: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/12.jpg)
May 5, 2020 - 12 - DP 19-866690
(1) Initial rent rate values will be established by BC Housing based on CMHC Average market Rent. Rates may be adjusted periodically with the agreement of BC Housing.
(2) Rates may be adjusted periodically with the agreement of the City and (i) for existing tenants, no more than Provincial Residential Tenancy Act provisions.
(3) Denotes maximum rent at 30% of total maximum household income as per BC Housing criteria. (4) Rates may change as approved by BC Housing. (5) Denotes BC median household incomes 2020 values based on the BC Housing published 2020 Low and
Moderate Income Limits for households without and with children in BC. (6) Unit type distribution within each rental affordability type to be determined on an annual basis as per BC Housing
household income criteria.
Prior to Development Permit issuance, a legal agreement will be registered on title, prohibiting subdivision (including stratification and/or air space parcels) of the residential housing units (Single Owner for Residential Units).
Public Art • This unique affordable housing project with a mix of income levels and subsidized rental
units is not required to provide a contribution towards Public Art.
Servicing Agreement
•
•
The developer shall be responsible for the design and construction of required works, including: (i) road works, which will require City tree relocation or removal along No. 2 Road; (ii) water, storm sewer, and sanitary sewer upgrades; (iii) related public and private utility improvements; and (iv) related granting of new statutory rights-of-way. The developer's design and construction of the required works and granting of statutory rights-of-way, as determined to the satisfaction of the City, shall be implemented through the City's standard Servicing Agreement process (secured with legal agreement registered on title and provision of a Letter of Credit) prior to Building Permit issuance, as set out in the attached Development Permit Considerations (Attachment 5). The subject development includes driveway and frontage works affecting the neighbouring property to the north of the site at 5900 River Road as contemplated in the existing crossaccess easement registered on both properties. The existing cross-access easement and covenant prohibiting access to No. 2 Road will be replaced with a new SRW as noted above. The owner of 5900 River Road has requested that the access SR W area be provided in the proposed location to minimize impacts to the future development potential of 5900 River Road and has agreed to provide a voluntary contribution in the amount of $69,800 toward the cost increase associated with additional frontage works at 5491 No. 2 Road resulting from the proposed SRW location. In order to maximize efficiency, the owner of 5900 River Road has requested to construct frontage improvements and utility upgrades along No. 2 Road required for their future development in conjunction with the construction of the frontage improvements and utility upgrades required to serve the subject development. To construct such frontage works, the owner of 5900 River Road is required to enter into the City's standard Servicing Agreement process (secured with a legal agreement registered on title and provision of a Letter of Credit) for road works, relocation of the eight City trees along No. 2 Road, frontage improvement and utilities works that overlap with the frontage works related to the driveway access for the subject development (Attachment 6). Utility and frontage requirements for the entire property at 5900 River Road will be reviewed comprehensively through future potential development application review and additional utility upgrades and frontage improvements may be required.
6433306
![Page 13: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/13.jpg)
May 5, 2020 - 13 - DP 19-866690
Conclusions
The development will provide much needed affordable housing in an innovative facility and secured through partnership between the City, BC Housing and Pathways. An analysis of the proposal shows it to be well considered and consistent with the Official Community Plan (OCP) development, livability, sustainability, and urban design objectives. The applicant has agreed to complete Development Permit considerations (Attachment 5). To facilitate the proposed development, the owner of 5900 River Road, the neighbouring property to the north of the subject site, has agreed to complete considerations (Attachment 6). On this basis, staff recommend that the Development Permit be endorsed, and issuance by Council be recommended and that staff be authorized to execute a servicing agreement with the property owner of 5900 River Road.
Sara Badyal Planner 2 (604-276-4282)
SB:blg
Attachments: Attachment 1 : Development Application Data Sheet Attachment 2: Pathways Open House Engagement Summary, Sign-in Forms and Comment
Sheets (September 11, 2019) Attachment 3: Public Correspondence Attachment 4: Advisory Design Panel Minutes Meeting Minutes Annotated Excerpt
(February 19, 2020) Attachment 5: Development Permit Considerations Attachment 6: Preliminary Servicing Agreement Scope of Work at Adjacent 5900 River Road
6433306
![Page 14: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/14.jpg)
, City of Richmond
DP 19-866690
5491 No. 2 Road GBL Architects
Site Area Land Uses OCP Desi nation
Zoning
Number of Units
Floor Area Ratio
Lot Coverage
Setback - No. 2 Road
Setback - North Side Yard
Setback - South Side Yard
Setback - Rear Yard
Height: Within 26 m of East property line Beyond 26 m of East property line Parking structures
Lot Size
Parking Spaces: Affordable Housing Units
(Deep subsidy: 2 car-share sp) (Studio & 1-bd: 0.27 spaces/unit) (2-bd & 3-bd: 0.9 spaces/unit)
Visitors (0.18 spaces/unit) Car Share Total
Parking - Accessible
Parking - Small Car Spaces
Parking - Tandem Spaces
Loading
Bicycle Storage
EV (Energized) Charging for Cars
Amenity Space - Indoor:
Amenity Space - Outdoor:
Document Number: 6433306 6433306
Attachment 1 To report dated May 5, 2020
Development Application Data Sheet Development Applications Department
City of Richmond
Existing Proposed 2,024 m2 No chan e
Vacant Multi-Famil Rental Tenure Residential Mixed Use Com lies High Rise Apartment and Congregate Housin ZHR3 - Dover Crossin
Variances requested as noted below
Vacant 80
Bylaw Requirement Proposed I Variance
3.0 & 0.1 amenity space 2.61 None permitted
Max. 70% 43% None
Min.Gm Sm 1 m decrease
Min. 6m 6m None
Min. 3 m 3m None
Min. 3 m 3m None
Max. 24 m 24 m Max.18 m 20.3 m 2.3 m increase Max. 5 m Sm (Includes 0.1 m
tolerance)
Min. 2,000 m2 2,024 m2 None
With TDMs With TDMs 72 29
52% reduction with appropriate TDMs
15 15 2 2
87 46
Min. 2% 2% (1 space) None
Max. 50% 42% (19 spaces) None
Permitted None None
Manoeuvring 1 medium truck (SU-9) space None
100 class 1 secure bike spaces 100 class 1 secure bike spaces None 16 class 2 bike rack spaces 20 class 2 bike rack spaces
100% resident parking spaces 100% resident parking spaces None
Min. 100 m2 100 m2 None
Min. 480 m2 480 m2 None
Version: 3
![Page 15: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/15.jpg)
~
~ chmond
Attachment 2 To report dated May 5, 2020
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT
Sept em ber 24, 2019
Think Big
Prepared by ldeaspace Consulting Inc. for the City of Richmond
![Page 16: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/16.jpg)
~ mond
TABLE OF CONTENTS
1. Introduction
2. Key Themes
3
4
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
2
![Page 17: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/17.jpg)
~ mond
1. INTRODUCTION
The City of Richmond, Pathways Clubhouse, and BC Housing are partnering to build new, affordable renta l
housing at 5491 No . 2 Road. The proposed project is a six-storey building with 80 new homes for single people, families and seniors offering:
• 5 x 3 bedroom apartments • 15 x 2 bedroom apartments
• 36 x 1 bedroom apartments
• 24 studio apartments
An open house was held on Wednesday, September 11 from 4:00 to 8:00 pm at the Thompson Community Centre to present the project and listen to feedback from the community.
A summary of the feedback received at the open house is provided below.
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
3
![Page 18: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/18.jpg)
~ mond
2. KEV THEMES
A total of 27 feedback forms were completed by Open House attendees. The forms included two
questions:
• Is there anything the project team should consider as we finalize the exterior design of the
building?
• Is there anything else we should consider for this project?
Key themes that emerged from written responses to these questions include the following:
a) Support for the project
b) Concerns about proposed vehicle access
c) Concerns about project impacts on traffic
d) Concerns about parking
e) Concerns about neighbourhood impact
f) Considerations regarding access to neighbourhood amenities
g) Considerations regarding exterior and interior building design
h} Desire for additional feedback and notification mechanisms
Detailed feedback from each of these key themes has been summarized on the following pages.
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
4
![Page 19: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/19.jpg)
~ mond
a) SUPPORT FOR THE PROJECT
A sign ificant number of Open House attendees expressed appreciation for the project.
Key comments include:
• the project addresses the need for more affordable housing in the City of Richmond; and
• the new development will make a positive contribution to the community and will be a good fit
with the surrounding area.
Several respondents expressed that they would like the project to be completed as soon as possible to
ensure that affordable housing is promptly available to those who need it.
b) CONCERNS ABOUT PROPOSED VEHICLE ACCESS
Some Open House attendees expressed concerns about proposed vehicle access to the development.
Comments include :
• vehic le access could be unsafe and difficult to navigate due to the heavy traffic on the River Road
on ramp to No. 2 Road, which some respondents cla im al ready has a high occurrence of vehicle
accidents; and
• a calmer street such as Dover Crescent could be considered as an alternative vehicle access point
to the property.
c) CONCERNS ABOUT PROJECT IMPACTS ON TRAFFIC
Several Open House attendees expressed concerns about the potential increase in traffic, detours and
delays that could occur during the project construction phase and after the building is tenanted.
Comments include:
• traffic in the area is already heavy and may become more congested with project construction;
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
5
![Page 20: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/20.jpg)
~ mond
• traffic impacts resulting from construction activities could be challenging to navigate for residents
who use River Road to access No. 2 Road on their daily commutes; and
• traffic on Lynas Lane may increase after the building is tenanted, as this street may be used as an
access route to River Road.
d) CONCERNS ABOUT LOCAL AREA PARKING
Several Open House attendees expressed concerns about the availability of parking in the surround ing
neighbourhood during the project construction phase and after the building is tenanted.
Comments include:
• there may be overflow from the development's parking lot, with residents and visitors seeking
access to street parking;
• parking on Dover Crescent and at Dover Park is already very limited and cannot accommodate
another 100 to 200 people living in the area; and
• options for construction parking and visitor parking should be considered .
e) CONCERNS ABOUT NEIGHBOURHOOD IMPACT
While a significant number of Open House attendees considered the project to be a good fit for the
surrounding area, a few attendees had concerns about the development's impact on the neighbourhood.
Comments include :
• the proposed bu ilding is too tall and w ill block views; and
• the project may have a negative effect on property values.
f) CONSIDERATIONS REGARDING TENANT ACCESS TO NEIGHBOURHOOD AMENITIES
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
6
![Page 21: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/21.jpg)
~ mond
Some attendees questioned whether tenants will have sufficient access to community amenities and
services based on the planned location of the building.
Comments include:
• the Walk Score to grocery sto res, drug stores, banks and other retail locations and services should
be measured and considered in planning; and
• seeing as though the nearby elementary school is at capacity, the project plan should consider
where the children in the building will go to school and how they will get there.
g) CONSIDERATIONS REGARDING EXTERIOR AND INTERIOR BUILDING DESIGN
Several respondents expressed their desire for a building design that ensures safety, accessibility and
inclusiveness fo r tenants.
Ideas for exterior design elements include:
• benches;
• a pet-friendly outdoor area;
• water dispensers for people and pets;
• a key fob entry system;
• a video intercom system; and
• a front entrance oriented toward Dover Crescent to increase neighbourhood inclusiveness.
Ideas for interior design elements include:
• an elevator;
• grab bars in washrooms;
• countertops of an appropriate height for seniors and people with disabilities;
• a panic call button system in case of emergency; and
• sufficient soundproofing from traffic and airport noise.
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
7
![Page 22: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/22.jpg)
~ mond
h) DESIRE FOR ADDITIONAL FEEDBACK AND NOTIFICATION MECHANISMS
A few Open House at tendees expressed a desire for additional feedbac k and notification mechanisms
regarding the project, including:
• project notifications sent to site neighbours; and
• feedback fo rms available online and sent by mail to local residents, with Chinese t ranslation.
PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737
8
![Page 23: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/23.jpg)
Pathways Clubhouse Affordable Housing Sign-In Sheet
~ame r Postal Code I . J\ {))Nllvx1;: \--.-V\~ vrc~c_p CJh1rvh /v(;W ·'-!1(k;J V(/--e- ?5PS' a!:f r1.j} ' m <:'7/y\..6).-,,.0 v-;ic .S-Sb
4<i {){Jc_/' ( ~~7T-) v::7-C,- S1J6 /JJ :) I ·iJ/LYd.A ~
I
Ir 71 s-✓-j-
Ma9\I\ 601 K Cl i 'v<,,_(,; ( VC/l lLJ ' . Vi-, -f <1=> G ~ M ( RJ9 (_;.; o s. SR \:) '
{LG lA\1"'.i 0 \J c-r\ ~Jl \Jl b <-) p l-f ~\ l l\-J I\ l(, y \ (l ft b(l. 71 ~ \) 7f LJ /3Dlf;11-orrn: C..,-Avv(Ar:::i l
cl, .,, : u - Of>3
...!J--/1 M f-t o.lBH { / 7c. 51) .,z; ' , 7
-
![Page 24: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/24.jpg)
Pathways Clubhouse Affordable Housing Sign-In Sheet
Name Postal Code
v·1c:
![Page 25: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/25.jpg)
Pathways Clubhouse Affordable Housing Sign-In Sheet
Name Postal Code . ' I \ r··--------+----./\------------j
',"." "'- \1.., "·-J -1 C c., \l I )- ) j-. ' .
\ I ,. ·t ~· .. 1J 12 \, u [_,,, {,'----. --
![Page 26: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/26.jpg)
Pathways Clubhouse Affordable Housing Sign-In Sheet
Name Postal Code
?
![Page 27: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/27.jpg)
Pathways Clubhouse Affordable Housing Sign-In Sheet
Name Postal Code
/ -j r . Jr"-( : ' . ....._, - i \. ,- ,.... ' A) i; 1,-., l /\ / ;.:, -:_..-( I Vi--,
V'
,, f -, )1,,1 I
h~ k~¼£h-l~ V1c_Sy::./ u
-·
![Page 28: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/28.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
(--~ IV .
, ( ,/ ~~\_l 7 r~ftl' ' I
/ . ,(~
:.r ·-, 11" ' \V I \._;
r, cc: c:1\
C \ bf-\CY
/
i t .. ,Jl)e... / r ,,
!\ '/ . \·-Je,
. ..,___\ --..__j
C'
\ ~ i , 1! \
\ ), /..o >fl 1/ ,. ,.'. '\ r ,' -, c, .. ,-,:/,.:.J / ~J+, . ..J' \·...--, ,· • c" rl ··".· L'' ,-•·\ r_ '1/ . / \ .',-4:J.-',..._,__'-_ .... _ ..... __ .. :o ___ 1 _. _, __ ,_v __ ,,...... __ ._ .• _, _'--_ . .-(;_· ___ T_ .... _-______ 1 __ c.1, _'-_-"_) __ "---______ , __ . -~----" ...... ,,_·· ._,)_1_L_.'-..._-c·r / ,)
2) Is there anything else we should consider for this project? I i , / ............... {. ,........-fl . ; c: .. , ' -~ i . :·-r · .. ,c)b.t \.,A-< l""\Ci \ (/, f)(;)r._. __ ~ \
, C-) cl (//\· i ,~.._, Dy ~ /
i \Jc?(/ I
\ ''\c\ (C I _)
I r _. i / r 1 JC--, \ n ( v-~ct o I/'\ ·1 l--,e C~--Y: "--( 1<c~. /...- ~- Ii l,i /
./''/ /,._.._r .. J:: ic;--c, I . ' , ,...-·: i ~ ,,..- C., ._;,...,'c··, - ~,,.~,,O, c: r-·--. , ' C(__\ i/\ '- / i/ i ! ':::i ·-::, - _ _., ·,,. C. /, I •. -· ( -<'7 ___ -_._\ ___ l_. . .._ ___ ..,....,,___-,c __________________________ , .... __ c .. •i 1 ,,. , .:...=_'/···_ ...
/'/) J_.,, ( !;::! /
\ ! -"\c i
,_........
. Cc, 1--\ ere~'~ ...... I
i ..--1---- i ( • . I c..:: f....-YJ ;___1 ; . .J I c ..
- I f 1 cf\ l ,,.-. , c::i t ' . '--·'\. .A ,
i /'
0 h /-/ ,c,(: --........__'
6294389
•
![Page 29: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/29.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
6294389
![Page 30: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/30.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1} Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
6294389
,f' r°'rl,ttl c v·) li,ct1 I
20Z I,
-1
![Page 31: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/31.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
:;·· .L., "\( '1-·)2 4 ) . I 1.:I' \ .. ,-··, . \ ,
6294389
7 /·c-. I}
![Page 32: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/32.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
6294389
![Page 33: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/33.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
{1 n~~ ;-;~ l11/\-f' k~ ft-~. 1-v lc--c~ ./4--·rt~
v
/4~ ,J/l,,~(f~ f,--t)vu/q __ f , ?,l~ p·lh-&s· /f/J"-tZ ,/cQ..✓6 jt,-,. f.{
/Z i'~/u ~ .,,fj-,JAJ: /~£d /ti /viAA1 ;i/utA.--t?l, 7v /~r I/
6294389
![Page 34: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/34.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
rf( 0' 14-1) 4-clZ. e 5 5, f ~, ~ cl 4-,,J.e,,t "-N,.~w+z
.,
:;,r y\1ltLr ~
2) Is there anything else we 'should consider for this project?
6294389
![Page 35: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/35.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
Vo k / ,~::JA f: I C <
2) Is there anything else we should consider for this project?
6294389
![Page 36: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/36.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
-ni.f '.l)E°§IC.fY' /-()()KS GOOP, 7](1s DE'-'€'- t:J e,v t[Nr "4''-'-
~G A Q:)§t·nvcf f/-0.0 I Tt Q:'Y 7b -ntc C..oHHUtvlT--1, 'Q_\'=: l,/M(7,'\J<)
1;;s / /V Nf._t:D '2.t. Noa.~ A FF012 D &S '= ,.rt' >IOV..S /NC,,. f'.<tTi"'-'AYS
2) Is there anything else we should consider for this project?
6294389
![Page 37: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/37.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the
building? (
b o n c-f- b v 1 "/ d A e r c - /Vo -J- fl\}!_ r '1 1 )\ -f p ) q ce
I
W ),LU VJ;-/ )
! s
2) Is there anything else we should consider for this project?
( JI 1VCE L ; -r .! ;/ Tau V'vla_ YI')
up
' ~--c':i J J e f - c vvi ~1-e r~ t~e
6294389
a ( I .,,
p ✓-0 J:-:., It! vV/ I
Vvl y kJ i · 1 <j -e s t c u vJ( f: ,- h --~
O\.)('JI
( {)/jrJ G,/ /
-e'
![Page 38: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/38.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
c; l v L ?L-091 L ~t ( fY'-L ·-b c; i v .e_ -~ ~, L k- L .- l re 4 f _:_~ ." i-e _l
.~ cf J:Y c .r' -a ,J ,~e__ .-e-<_ c.J bee/<- ..> , ,A,- s~ -C LP ..A v( b-<:__ r /v 'V ( c..12-0 - hi \.. cl._x_c c.l { ~r~ ,.-- ~ ( l J LJ l l ~ vl,) () t--..j
[(.)( f"\<)N:_ _AA-eC-,...1.._;::___\ ('.., ( ~./V'I" v' r- \--l- 1
-€. "-~ c \ rr /V\. ~ /t,.? 7 -ed ,.L_ :::::::::~
-~ h,.. l->/ /V' MvY~- ,,,,(_,_ ),_,__ 0 ( (-0 < )_____ /,,__ 0:.,1-'e Le
6294389
![Page 39: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/39.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1} Is there anything the project team should 7°~sid~\~s we finalize the exterior design of the
building? l:5f7?; Le Cor;r Oo({. ~- It 6J: 1 _'5D(rc)AlJ>v ~~
Gvr-ec---
2) Is there anything else we should consider for this project?
6294389
![Page 40: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/40.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
f;Q.
t[c,~) (v~\ l' __ :(, YI i~hvd) OY\. tev, Q~f~.e y l
~P ,
\!ILJ;~ (: C \ '
2) Is there anything else we should consider for this project?
6294389
![Page 41: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/41.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
I! i
") Ji / ii,(}()
/7 i ,,,,. ./\ n r/i
.,i{ ,,/!/ I L.·I
2) Is there anything else we should consider for this project?
6294389
;J ,_,Y(p . ,1 ,.-,') / /1 _. / ..... 2; 0 .. 'J /,r !'.LU .f /J)r J~
(/
![Page 42: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/42.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
Ji#}~ 1(2 ~ M ±lrff
2) Is there anything else we should consider for this project?
j ad20&Mt£ ~ ff f QALc 117
6294389
![Page 43: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/43.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
( ( ~ l
',)__~-~- a,~~ 1 -f'-Jf "'--' ctJ & lli:, :U)u:p+-u;i,,( ·T[J
Yl/\ cJLQ_.: jj-- ,k!_ [,'___;:-, L·(J T () C .t~L ---f tw lv.'.l..dt-U~~Li
I\'\ C Gv<'.Ll'., °1 [ 1; cL,U__ O , Li ft"-'-~' ·.,;;;;,.r ~ _Q/VV\ ~r(ffltLJ-,
cd.J ti'VJ ! - ,~ ? et5 p{:_/\ u_JIL,~t
1v\A.haJ f~ 6294389
![Page 44: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/44.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
lht ✓/1tL 77-{c/( irf'ta. -~h--t" .'., /t,t?,dJ h~ 11.tlt: /ice (;.L-t ?uit~
·71°v 1 <; ft tih ( ' , /
'II O (l;i j fn({, ( [11 £ { - / t11t{ -lkt11; J/af /j/J:/1v I
Jlt1'--J 1t1ut (J,flff · ~ fL,l/vl 1✓t:· re · /1-tr:rJ tbt.1{ 1Zt//'yi[r_,, t:l
Av!Yi y;) {~ 7 s ' l- ~-s i1Jce. )£)(pl ' rli .5 l Av /l;; c~ ti fo ( i) J;v-,f>-1
Mu: /pu! ufr ,~,,_, la,v , 11,,,) rv tv,,/ ,C fill/Gk -/;"' ~. fllvfLf .t
i{ ·Iv 9 1i1 ~ iuv fl ~& 11 Y/i{J n', k c--' tn<tic 1- ~}11/; S h t~f tl~rv: to 71f&i {\-&i~k0rVv(r: r fl) w .flvvJ~ is 1) let~ Vtt'l I} ,L{}-,it ;t ;H nch /(_ llvrv-{//}?lvj ·
2) Is there anyt~ing else we should consider for this project~ /,. U
µh,,il ~tlli VipYr t II; 11 ·n1t,c~_.ec[k Ct 11~ · tteJ,1
11/L !ltf/~it 7 1-1
{r /2 1.R,,6li)/ s 121~ J Fn t( G{ 1&/k /2. c/Ji( le 1~ ' ~fc d t1 s t { ,, l I 2· ''D . 17 1/ '-;
l'U u.,/i J21vl,-tl N t? . U (}yvi. ·~1 Vt,y · ,-,r{ ~u 1.,1l _
6294389
![Page 45: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/45.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
&tie
6294389
![Page 46: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/46.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
Cl.
Q
(A/CA'.'.-<2-4<) JJ.-1\:?ICJ cc--it /}-Y~ ~0-(?_ c~ ~ ~!l~j D~P~
~~f :,?O cJ2-<><> ~ ~ Ao ~ ~.CA-/L-\) eo~ _k CL /srf~ ~~
Richmond
6294389
![Page 47: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/47.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1} Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
( 1 < ,,-,
, ,C./
6294389
![Page 48: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/48.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
~·
Richmond
6294389
![Page 49: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/49.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
I
! ') G c; r J? ce,X:-\j
f, I".
r\.eed.12J 1:1 \ l l \ C Y\.11'---l <5,, L·'
u C 0\ r,
2) ls there anything else we should consider for this project?
' /
cuf_ r, 0
6294389
![Page 50: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/50.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
2) Is there anything else we should consider for this project?
6294389
![Page 51: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/51.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1} Is there anything the project team should consider as we finalize the exterior design of the building?
I '\ - I \. \..,v(l_,j,
2} Is there anything else we should consider for this project?
\\~ cro,-:,J ~~ ';)..-'-D &'.'":"i ~ '1v---t) \ '"""~/
'2-~'-'\ \"-~o-,,cA c:>,'-/'-.,c).__ c~ ,::t~---t'
6294389
![Page 52: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/52.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
'
~'~----
2} Is there anything else we should consider for this project?
6294389
![Page 53: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/53.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
SCc:i\J\d :00A- ~~\~;se_--t- J \-ews Qc u~-±rti'-J'?:R V\0£~ c-es.clw-1~
2) Is there anything else we should consider for this project?
,H-, S \')0, d ~ \ "Si ~o ,-r~ " ·-: J(_ °' \.W ~.Q ~..e , ~ "".> · I~""--\ hM ~ \oL-t (..Q.~·id.Q11t - ~ qfk6\- \\U, ~ ro c vo.\ ~ , °' -~3c_-\JJ'-Q___ !
w~. , :::ttw ,-<::_ ,:::, oc:i l srt>~h Jl(A w, qe<\t J9 oa ·w* C(-e__ ~~\-- • <S G.LLD\01 ~Ct::-~ Ov---'-\'1-e r \ -~
1
\ '\1t \' U {A,
6294389
![Page 54: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/54.jpg)
Pathways Clubhouse Affordable Housing
Comment Form
1) Is there anything the project team should consider as we finalize the exterior design of the building?
(~oc6--
\1c~ \->s,
6294389
![Page 55: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/55.jpg)
![Page 56: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/56.jpg)
Excerpt from the Minutes from
Advisory Design Panel Meeting February 19, 2020
Attachment 4 To report dated May 5, 2020
DP 19-866690 - 6-STOREY AFFORDABLE HOUSING DEVELOPMENT
ARCHITECT: LANDSCAPE ARCHITECT: PROPERTY LOCATION:
Applicant's Presentation
GBL Architects Inc. ET A Landscape Architecture Inc. 5491 No. 2 Road
Emily Brett, GBL Architects, Jocelle Smith, ETA Landscape Architecture, Dave MacDonald, Pathways Clubhouse, Casey Clerkson, CPA Development Consultants, presented the project, and together with Alex Chou, AME Group, and Paul Goodwin, GBL Architects, answered queries from the Panel.
Panel Discussion
Comments from Panel members were as follows:
• the four wheelchair accessible apartments are well designed; would enable residents using wheelchairs and walkers to live independently and safely -Noted.
• the project is useful and needed by the City; appreciate the applicant's and the City's efforts to collaborate on the project -Noted.
• overall, the project is well designed; however, (i) review the layout and dimensions of the urban agriculture planters to ensure that they are wheelchair accessible and could accommodate young children-Reviewed. Planters have 2' height and at least 32" clearance on 3 sides, accommodating all ages and wheelchair access. (ii) review the design of the outdoor children's play area and clarify whether it is intended mainly to be an active play space or passive space for relaxation and socialization and identify its main users - Design improved and programmed as active outdoor children's play area.
• the children's play area on the north side will be shaded by the building; consider design development to provide more visual interest and make the space more inviting; should the place be intended primarily as a children's play area, consider enhancing the overall play experience; also consider installing an outdoor exercise equipment for residents with disabilities - Design improved with more visual interest and enhanced play experience in the following ways: additional play equipment was incorporated as well as a rubberized surfacing with a stepping stone pattern, which encourages running,jumping, crawling, exploring and games. Bench seating was also incorporated/or parent supervision, which will extend childrens' play time. We refrained from installing adult exercise equipment due to space constraints, and due to the very specific and limited use of such equipment. A nearby fitness or community centre would be better able to address rehabilitation or mobility needs.
• concerned about the building massing orientation, in particular, (i) the siting of the children's play area on the north side and shaded by the building Reviewed. Children very much enjoy shady forest glens, especially when summer heat hits. The proposed location will enjoy morning sun and ambient lighting. Children have unlimited access to the very large and sunny Dover Park half a block away. Children can access this park via a public pathway, without need/or crossing any arterial roads. We feel it is in children's best interest to have dedicated space to play. If the children's play area were integrated with the dining and urban agriculture in the west, there would not be room/or all the currently proposed active play elements.
Document Number: 6433306 6433306
Version: 3
![Page 57: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/57.jpg)
-2-
(ii) the building fa;:ade fronting No. 2 Road appears like a box and lacks articulation to create a gateway character; the west and south facades are more successful - Reviewed. The site directly to the North will provide the gateway view from the No. 2 Road bridge approach, block the view of our building. The design focuses on the South and West views from the public pathway which will be preserved and provides differentiated elevation designs but not overly decorative (iii) the pad mounted transformer (PMT) and garbage room fronting No. 2 Road lack screening A custom PMT wrap is proposed to celebrate local art or nature. This would keep the space more open than screening.
• consider design development for the rooftop mechanical equipment screening as it appears not coordinated with the design of the building elevations -Design improved. Rooftop mechanical screen area reduced significantly. Screen louvers to match light grey cement panel colour.
• ensure that the dead end parking stalls in the parkade have adequate manoeuvring space - Design improved. Bike storage area wall moved eastward 1 '-6" to allow for additional manoeuvring space
• note that the nearest distance between the proposed building and the adjacent high-rise development to the west is less than 60 feet - Noted, which is acceptable for the proposed mid-rise building, which is not subject to high-rise tower separation guidelines.
• appreciate the comprehensive package provided by the applicant which includes an energy modeling report -Noted.
• the targeted air tightness of the building envelope appears ambitious and would be difficult to achieve -Reviewed. Step 3 can be achieved while having the base infiltration value of 0.20 l/s/m2 for fa<;;ade.
• the modeling report provided by the applicant should include the use of water source heat pumps as clarified during the applicant's presentation of the project -Modelling report was updated.
• the targeted 30 percent reduction in domestic hot water heating would be challenging and difficult to achieve - The modelling report was updated to remove flow ftxture savings and is now based on district energy system heat.
• the provision for a central heat recovery ventilation ( HRV) is a good strategy for a passive house but could present challenges for the project- The modelling report was updated and now based on in-suite HRV equipment.
• the roof plan shows proposed rooms that may not be necessary for the project; e.g. boiler room and mechanical room-Design improved. The mechanical room is required for the heating and cooling loop pumps and related equipment and the boiler room was deleted.
• appreciate the package provided by the applicant which helped the Panel better understand the project -Noted.
• note that the project is more like an infill rather than a gateway project; the future development on the adjacent site to the north would be the gateway project - Noted.
• considering their site context and proposed uses, the building's four elevations are successful as they are differentiated from each other but not overly decorative and overreaching; however, consider further treatment to the north fayade which will be visible from No. 2 Road for some time, e.g. through adding colour to the proposed building exterior materials - Reviewed. Wood tone adds a natural wood colour in the balcony so.ffits, which will be viewed from the lower road and sidewalk elevation. The neutral natural colour scheme fits in with the neighbouring buildings and surrounding context of the public path and nearby Dover Park. Keeping the project on budget is critical, so the mix of materials/colours/complexity is balanced to provide visual interest without overly increasing cost.
• consider slightly altering the roof line to provide architectural interest to the building - Reviewed. The roof edge parapet has lower and 2'6" higher areas to provide visual interest along the roof line.
• the children's play area will be shaded and is located away from the common amenity patio; consider consolidating the two areas - Reviewed. Children's play area improved as noted in previous response. Consolidation is not possible due to building footprint.
6433306
![Page 58: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/58.jpg)
- 3 -
• consider switching the locations of the common amenity patio along the west side and the wheelchair accessible apartments with associated private patios on the south side of the building; the common amenity patio would provide a better interface with the east-west public pathway and relocating the wheelchair accessible apartments to the west side would enhance their privacy-Reviewed. The depth of the west setback area accommodates a truly interactive space, with dining, BBQ, moveable seating, arbour and urban agriculture would not be possible along the narrow south-facing side.
• the children's play area does not benefit from overlook from family sized units as it is adjacent to studio units -Reviewed. Overlook from family units is not necessary, as parents would either stay outside with toddler-aged children, or send out school-aged children to play on their own, as this is a private residentonly play area, not public. Reconfiguring the units to surround the play area with only family-sized units may mean loss of the space currently available for dedicated play. To accommodate parental surveillance, a bench has been provided within the play area.
• consider screening the PMT and garbage and recycling areas, e.g. through installing landscape screening or fencing - Addressed above.
• consider relocating the outdoor bicycle storage area from the south side adjacent to the lobby to the east side and close to the PMT area to create a usable space adjacent to the lobby - Reviewed. The current bicycle storage area location is maintained to retain shrub planting along No. 2 Road/or screening and a soft landscaped appealing frontage. Relocation would require removing approximately 6'x28' of landscape area.
Panel Decision
It was moved and seconded That DP 19-866690 be supported to move forward to the Development Permit Panel subject to the applicant giving consideration to the comments of the Advisory Design Panel.
6433306
CARRIED Opposed: Michael Cheung
![Page 59: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/59.jpg)
Attachment 5 To report dated May 5, 2020
City of Richmond DP Considerations
Development Applications Department
Address: 5491 No. 2 Road File No.: DP 19-866690
Prior to forwarding this Development Permit application to Council for approval, the developer must complete the following:
I. (Landscape Security) Submission of a Letter of Credit ( or BC Housing letter of assurance) for landscaping in the amount of $229,074.00 as specified on the landscape cost estimate provided and sealed by the project Landscape Architect (including materials, labour and 10% contingency).
2. (E11viro11me11tal) a) (Qualified Environmental Professional) - Submission of a Contract entered into between the applicant and a
Qualified Environmental Professional for services related to provincial Water Sustainability Act requirements. b) (Environmental Security) The developer must agree that should the province require that offsetting habitat
compensation be provided off-site through the Water Sustainability Act review process, the City will require additional security to be provided by the developer, for the sum as specified in a habitat offsetting cost estimate provided and sealed by the project Qualified Environmental Professional. This security is to be provided to the City in the form of a Letter of Credit ( or BC Housing letter of assurance) to the satisfaction of the City prior to the issuance of the Building Permit.
3. (Existillg Tree Ma11ageme11t) The owner shall protect adjacent neighbouring trees, including:
a) ( Tree Protectio11) Installation of appropriate tree protection fencing for the protection of all trees neighbouring the development site prior to any construction activities, including building demolition, occurring on-site.
b) (Arborist Supervision) Submission of a Contract entered into between the developer and a Certified Arborist for supervision of any works conducted within tree protection zones of trees to be protected. The Contract should include the scope of work to be undertaken, including: the proposed number of site monitoring inspections, and a provision for the Arborist to submit a post-construction assessment report to the City for review.
4. (Flood Co11structio11 Level) Registration of a flood indemnity covenant on title (Area A). 5. (Aircraft Noise Se11sitive Developme11t) Registration of an aircraft noise sensitive use restrictive covenant on Title
(Area 2), identifying that the proposed dwelling units must be designed and constructed to achieve the following:
a) CMHC guidelines for interior noise levels as indicated in the chart below:
Portions of Dwelling Units Noise Levels (decibels)
Bedrooms 35 decibels
Living, dining, recreation rooms 40 decibels
Kitchen, bathrooms, hallways, and utility rooms 45 decibels
b) The ASHRAE 55-2004 "Thermal Environmental Conditions for Human Occupancy" standard for interior spaces.
6. (Housi11g Affordability Agreeme11t) Registration of a Housing Affordability Agreement to secure the following deep subsidy, rent geared to income, and low and moderate income limits housing units, the combined total number of units of which shall comprise 100% of the subject development's total residential floor area. Occupants of the housing units subject to the Housing Affordability Agreement shall enjoy full and unlimited access to and use of all on-site indoor and outdoor amenity spaces. The tenns of the Housing Affordability Agreement shall indicate that they apply in perpetuity and provide for the following: a) Unit Mix:
Unit Type (1) Min. Permitted Unit Area % of Units # of Units
Studio 37 m2 (400 ft2) 30% 24
1-bedroom 50 m2 (535 ft2) 45% 36
2-bedroom 69 m2 (741 ft2) 19% 15
3-bedroom 91 m2 (980 ft2) 6% 5
Total n/a 100% 80
(1) 100% of units meet Richmond Basic Universal Housing (BUH) standards.
Document Number: 6433306 6433306
Version: 3
![Page 60: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/60.jpg)
- 2-b) Deep Subsidy Units:
Unit Type Max. Monthly Unit Rent Total Max. Household Proposal
Income % of Units # of Units
Studio
1-bedroom
2-bedroom (1)(2) (2)(3) 100% (4) 16 (4)
3-bedroom
Total Varies Varies 100% 16 (1) Rent rate to be set at the shelter rate allowance applicable to individual households as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income equivalent to income assistance, old age security and guaranteed income supplement, or
whose rent geared to income rate would not exceed shelter allowance as per BC Housing criteria. (4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.
c) Rent Geared to Income Units:
Unit Type Max. Monthly Unit Rent Total Max. Household Proposal
(1)(2) Income (2)(3) % of Units # of Units
Studio $1,287.50 $51,500 or less
1-bedroom
2-bedroom $1,575.00 $63,000 or less 100% (4) 40 (4)
3-bedroom $1,837.50 $73,500 or less
Total Varies Varies 100% 40
(1) Rent rate to be set at 30% of pre-tax income of individual households and as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income as per Housing Income Limits BC Housing criteria. (4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.
d) Low and Moderate Income Limits Units
Unit Type Target Monthly Unit Max. Monthly Unit Rent Total Max. Household Proposal
Rent Range (1 )(2) (3)(4) Income (4)(5) % of Units # of Units
Studio (1) $1,853 $74,150 or less
1-bedroom (1)
2-bedroom (1) $2,826 $113,040 or less 100% (6) 24 (6)
3-bedroom (1)
Total n/a n/a n/a 100% 24
(1) Initial rent rate values will be established by BC Housing based on CMHC Average market Rent. Rates may be adjusted periodically with the agreement of BC Housing.
(2) Rates may be adjusted periodically with the agreement of the City and (i) for existing tenants, no more than Provincial Residential Tenancy Act provisions.
(3) Denotes maximum rent at 30% of total maximum household income as per BC Housing criteria. (4) Rates may change as approved by BC Housing. (5) Denotes BC median household incomes 2020 values based on the BC Housing published 2020 Low and Moderate
Income Limits for households without and with children in BC. (6) Unit type distribution within each rental affordability type to be determined on an annual basis as per BC Housing
household income criteria.
7. (Single Owner.for Residential Units) Registration of a legal agreement on title, prohibiting subdivision (including stratification and/or air space parcels) of the residential housing units.
8. (Shared Bicycle Storage) Registration of a legal agreement on title ensuring that bicycle storage facilities are provided and maintained for their intended shared common use.
9. (Transportation Demand Management) Registration of a legal agreement on title ensuring the provision of all TDM measures listed below:
a) (Enhanced Bicycle Facilities) Registration of a legal agreement on title ensuring that:
6433306
1. Pathways provides four bicycles and administers a bicycle rental and bicycle sharing program for the shared use of all residents in additional class 2 bicycle storage outdoor rack spaces; and
![Page 61: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/61.jpg)
- 3 -
11. bicycle repair/maintenance stations are provided and shared amongst all uses onsite, including bicycle repair stand (with tools); foot pump; and faucet, hose and drain for bicycle washing. A note is required on the Development Permit and Building Permit.
b) (Transit Pass Program) Registration of a legal agreement on title to ensure the execution and completion of a transit pass program, including the following method of administration and terms:
1. Provide 2 years of two-zone compass cards for each deep subsidy housing unit at a subsidized rate of $45 per year. The intention of the transit pass program is to offer transit passes on a per unit basis. If a tenant opts out or does not "subscribe" to the transit pass program, that pass remains in the pool for a future tenant until they have all been utilized. Number of passes capped at number of units for a period of two years;
ii. Letter of Credit (or BC Housing letter of assurance) provided to the City for 100% of transit pass program value;
111. Administration by TransLink or Pathways. Pathways is not responsible for the monitoring of use of transit passes but only noting number of "subscribed" users to the program, until full unit count is exhausted over a period of two years;
1v. If the transit pass program is not fully subscribed within two years, the program is to be extended until the equivalence of the costs of the full one year transit pass program has been exhausted. Should not all transit passes be utilized by the end of the second year, the remaining funds equivalent to the value of the unsubscribed transit passes are to be transferred to the City of Richmond for alternate transportation demand management measures at the City's discretion; and
v. The availability and method of accessing the 2-zone transit passes is to be clearly explained in the tenancy agreements.
c) (Shuttle Bus Program) Pathways shall include the subject site in the Pathways shuttle bus service program, which provides transportation for Pathways members between their residences and the Pathways Clubhouse facility.
d) (Car Share) Pathways shall provide two (2) car share parking spaces along with parking and access SRW to supp01i rental housing, including:
6433306
1. Confinnation from the developer that they have informed a car share provider ( e.g. Modo) that the subject site is viable for car share upon completion of the project.
11. Granting of a Public Right of Passage Statutory Right of Way (SRW), in favour of the City, to secure for the car share vehicles, two (2) parking spaces along with vehicular and pedestrian access to No. 2 Road along the full width of the internal drive aisle, subject to the final dimensions established by the surveyor on the basis of functional plans completed to the satisfaction of the Director of Transportation. Owner responsible for maintenance & liability. The design must be prepared in accordance with good engineering practice with the objective to optimize public safety and after completion of the works, the Owner is required to provide a certificate of inspection for the works, prepared and sealed by the Owner's Engineer in a form and content acceptable to the City, certifying that the works have been constructed and completed in accordance with the accepted design.
m. Registration of a legal agreement on title ensuring that the owner provide a car share facility to a car share operator or the City, at no cost to the car share operator or the City, both as the case may be, the terms of which shall be generally as follows:
a. provision of a minimum of two (2) car share parking spaces within the development, along with pedestrian and vehicular access, designated, constructed, equipped and maintained by the owner, at the owner's cost, to be:
(i) located in the open parking area in a clearly marked and visible location;
(ii) provided with design features, decorative finishing, lighting and signage, as determined through the Development Permit and/or Building Permit processes;
(iii) accessible at all times to all intended users ( e.g. residents, general public, car share operator personnel and car share operator members) at no added cost;
(iv) identified on the Building Permit plans; and
(v) prior to building inspection permitting occupancy, provided with wayfinding and stall identification signage, to the satisfaction of the Director of Transportation;
![Page 62: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/62.jpg)
-4-b. in the event that the car-share facilities are not operated for car-share purposes as intended via the subject
Development Permit application (e.g., operator's contract is terminated or expires), transfer control of the car-share facilities, to the City, at no cost to the City, with the understanding that the City at its sole discretion, without penalty or cost, shall determine how the facilities shall be used going forward; and
c. supporting submissions provided to the City (Transportation Department) as follows: prior to Development Permit issuance, a copy of the letter of intent addressed to the owner from the car share operator outlining the terms of the provision of car sharing services.
10. (Electric Vehicle (EV) Charging Infrastructure for Vehicles and Class 1 Bicycle Storage) Registration of a legal agreement on title, securing the developer's commitment to voluntarily provide, install, and maintain at least the following EV charging infrastructure within the buildings on the subject site:
Energized Outlet - Minimum Permitted Rates User/Use
Vehicle Parking (a) Class 1 (Secured) Bike Storage (b)
Affordable Housing 1 per each bicycle storage room or locker (which Energized
100% Outlet shall be located to facilitate shared use with bicycles in (i.e. resident parking & bike storage) the room/locker\ Visitor N/A N/A (i.e. visitor/car share/class 2 bike rack storage)
a) "Vehicle Parking" "Energized Outlet" shall mean all the wiring, electrical equipment, and related infrastructure necessary to provide Level 2 charging (as per SAE International's Jl 772 standard) or higher to an electric vehicle.
NOTE: Richmond's Electric Vehicle Charging Infrastructure Bylaw provides that, where an electric vehicle energy management system is implemented, the Director of Engineering may specify a minimum performance standard to ensure a sufficient rate of electric vehicle charging. For the purposes of the Bylaw, electric vehicle energy management system means a system to control electric vehicle supply equipment electrical loads comprised of monitor(s), communications equipment, controller(s), timer(s), and other applicable devices.
b) "Class 1 (Secured) Bike Storage" "Energized Outlet" shall mean an operational 120V duplex outlet for the charging of an electric bicycle and all the wiring, electrical equipment, and related infrastructure necessary to provide the required electricity for the operation of such an outlet.
11. (District Energy Utility) Registration of a restrictive covenant and/or alternative legal agreement(s), to the satisfaction of the City, securing the owner's commitment to connect to District Energy Utility (DEU), and granting the statutory right of way(s) necessary for supplying the DEU services to the building(s), which covenant and statutory right of way and/or legal agreement(s) will include, at minimum, the following terms and conditions:
a) No Building Permit will be issued for a building on the subject site unless the building is designed with the capability to connect to and be serviced by a DEU and the owner has provided an energy modelling report satisfactory to the Director of Engineering.
b) If a low carbon energy plant district energy utility (LCD EU) service area bylaw which applies to the site has been adopted by Council prior to the issuance the development permit for the subject site, no building permit will be issued for a building on the subject site unless:
i) the owner designs, to the satisfaction of the City and the City's DEU service provider, Lulu Island Energy Company Ltd. (LIEC), a low carbon energy plant to be constructed and installed on the site, with the capability to connect to and be serviced by a DEU; and
ii) the owner enters into an asset transfer agreement with the City and/or the City's DEU service provider on terms and conditions satisfactory to the City to transfer ownership of the low carbon energy plant to the City or as directed by the City, including to the City's DEU service provider, at no cost to the City or City's DEU service provider, LIEC, on a date prior to final building inspection permitting occupancy of the first building on the site.
c) The owner agrees that the building(s) will connect to a DEU when a DEU is in operation, unless otherwise directed the City and the City's DEU service provider, LIEC.
d) If a DEU is available for connection and the City has directed the owner to connect, no final building inspection pennitting occupancy of a building will be granted unless and until:
i) the building is connected to the DEU;
6433306
![Page 63: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/63.jpg)
- 5-ii) the owner enters into a Service Provider Agreement for that building with the City and/or the City's DEU
service provider, LIEC, executed prior to depositing any Strata Plan with L TO and on terms and conditions satisfactory to the City; and
iii) prior to subdivision (including Air Space parcel subdivision and Strata Plan filing), the owner grants or acquires, and registers, all Statutory Right-of-Way(s) and/or easements necessary for supplying the DEU services to the building.
e) If a DEU is not available for connection, but a LCDEU service area bylaw which applies to the site has been adopted by Council prior to the issuance of the development permit for the subject site, no final building inspection permitting occupancy of a building will be granted unless and until:
i) the City receives a professional engineer's certificate stating that the building has the capability to connect to and be serviced by a DEU;
ii) the building is connected to a low carbon energy plant supplied and installed by the owner, at the owner's sole cost, to provide heating, cooling and domestic hot water heating to the building(s), which energy plant will be designed, constructed and installed on the subject site to the satisfaction of the City and the City's service provider, LIEC;
iii) the owner transfers ownership of the low carbon energy plant on the subject site, to the City or as directed by the City, including to the City's DEU service provider, LIEC, at no cost to the City or City's DEU service provider, on terms and conditions satisfactory to the City;
iv) prior to depositing a Strata Plan, the owner enters into a Service Provider Agreement for the building with the City and/or the City's DEU service provider, LIEC, on terms and conditions satisfactory to the City; and
v) prior to subdivision (including Air Space parcel subdivision and Strata Plan filing), the owner grants or acquires, and registers, all additional Covenants, Statutory Right-of-Way(s) and/or easements necessary for supplying the services to the building and the operation of the low carbon energy plant by the City and/or the City's DEU service provider, LIEC.
t) If a DEU is not available for connection, and a LCD EU service area bylaw which applies to the site has not been adopted by Council prior to the issuance of the development permit for the subject site, no final building inspection pennitting occupancy of a building will be granted until:
i) the City receives a professional engineer's certificate stating that the building has the capability to connect to and be serviced by a DEU; and
ii) the owner grants or acquires any additional Statutory Right-of-Way(s) and/or easements necessary for supplying DEU services to the building, registered prior to subdivision (including Air Space parcel subdivision and strata plan filing).
Prior to Building Permit* Issuance, the developer must complete the following requirements:
I. (Water Sustainability Act) Confirmation of compliance with the provincial Water Sustainability Act, including obtaining all necessary approvals prior to any construction or development activity on-site (including ground preparatory works such as vegetation removal, site preloading, etc.) .. The Environmental Security as outlined in the Development Permit Considerations is to be submitted to the City prior to Building Permit Issuance. Additional environmental requirements such as submission of a Construction Environmental Management Plan (CEMP) and potential offset habitat compensation plans will be assessed by the City through the Building Permit application review. A Servicing Agreement or other legal agreements required as part of potential offsetting habitat compensation must be completed prior to Building Permit issuance.
2. (Legal Agreements) Confinnation of compliance with legal agreements associated with the development.
3. (Accessibility, Sustainability and Amenities) Incorporation of accessibility, sustainability and amenity features in Building Permit (BP) plans as determined via the Development Permit process.
4. (Energy Step Code) Confinnation of compliance with step 2 of the Richmond BC Energy Step Code.
5. (Ground Lease) Confirmation of having entered into legal agreement(s) to lease the subject City-owned site. The terms of the lease will be approved by Council separate from the Development Permit application process.
6. (Aircraft Noise Sensitive Development) Confirmation that the proposed development is designed in a manner that mitigates potential aircraft noise to the proposed dwelling units, including submission of:
6433306
![Page 64: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/64.jpg)
-6-a) Acoustic report prepared by a registered professional confirming design achieves the following CMHC interior
noise level guidelines: Portions of Dwelling Units Noise Levels (decibels)
Bedrooms 35 decibels
Living, dining, recreation rooms 40 decibels
Kitchen, bathrooms, hallways, and utility rooms 45 decibels
b) Mechanical repo1i prepared by a registered professional confirming design achieves the ASHRAE 55-2004 "Thermal Environmental Conditions for Human Occupancy" standard for interior living spaces.
7. (Access SRW and No. 2 Road Access) Securing a permanent access to the subject site from No. 2 Road through the adjacent property to the No1ih at 5900 River Road, including:
a) Granting of an approximately 64 m2 (689 ft2) statutory right-of-way over 5900 River Road for the purposes of public-right-of-passage and utilities, delineating the permanent access area across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road. The SRW is to include terms allowing the owner of the property at 5900 River Road to utilize the SRW area for the purposes of completing ancillary works within the SRW area and to undertake certain works on the property at 5900 River Road during the future development of the property at 5900 River Road, provided that continuous and adequate access, to the satisfaction of the City, is provided across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road at all times. The SRW area is to be subdivided from 5900 River Road and consolidated with 5491 No. 2 Road after future development of 5900 River Road construction is completed and prior to occupancy of any buildings on 5900 River Road. The future transfer of the SRW area to the City for consolidation with 5491 No. 2 Road is to be secured by an option to purchase or other legal instrument, granted by the owner of 5900 River Road in favour of the City. The agreement will include tenns regarding the acquisition and timing of the SRW area by the City which will likely be associated with the timing of occupancy of the future building to be constructed at 5900 River Road. The owner of the future building at 5491 No. 2 Road will be responsible for the construction of the works within the SRW area under the applicable servicing agreement, which works will be undertaken in advance of, or in coordination with, the construction of the future development on 5900 River Road and any relevant servicing agreements. Upon completion of construction of the works within the SRW area, the owner of the future building at 5491 No. 2 Road will be responsible for the repair and maintenance, and liability of, the SRW works within the SR W area following completion of construction of such works, which obligations will be set out in the cost sharing agreement referenced in section 2b) below. Any works essential for public access within the required statutory right-of-way (SRW) are to be included in the relevant Servicing Agreement (SA). The design must be prepared in accordance with good engineering practice with the objective to optimize public safety and after completion of the works, the developer of the works is required to provide a certificate of inspection for the works, prepared and sealed by the developer's Engineer in a form and content acceptable to the City, certifying that the works have been constructed and completed in accordance with the accepted design.
b) Entering into a cost sharing legal agreement regarding maintenance of works within the SRW area. The owner of the future building at 5491 No. 2 Road is to maintain works located within 5900 River Road providing vehicle access to 5491 No. 2 Road.
c) Discharge existing legal agreement(s) prohibiting access to No. 2 Road registered on title to 5491 No. 2 Road and 5900 River Road.
d) Discharge existing cross-access agreement, including easements and covenants, registered on title to 5491 No. 2 Road and 5900 River Road.
8. ( Construction Traffic and Parking Management Plan*) Submission of a construction traffic and parking management plan to the satisfaction of the City's Transpo1iation Department (http://www.richmond.ca/ services/ttp/ special .htm ).
9. (Latecomer works) If applicable, payment of Latecomer Agreement charges, plus applicable interest associated with eligible latecomer works.
10. (Construction Hoarding) Obtain a Building Permit* for any construction hoarding. If construction hoarding is required to temporarily occupy a public street, the air space above a public street, or any part thereof, additional City approvals and associated fees may be required as part of the Building Permit. For additional information, contact the Building Approvals Depaiiment at 604-276-4285.
6433306
![Page 65: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/65.jpg)
-7-11. (Servicing Agreement) Enter into a Servicing Agreement* for the design and construction of Engineering and
Transportation works in accordance with Transportation Association of Canada (TAC) Specifications, City Engineering Design Specifications and applicable Bylaws to the satisfaction of the City. A Letter of Credit or cash security for the value of the Service Agreement works, as determined by the City, will be required as part of entering into the Servicing Agreement. Works may include, but may not be limited to, the following:
11.1. Road Works:
a) Road works across the site frontage and tying into No. 2 Road to accommodate: 3.3 m wide concrete multi-use path along the property line, 1.5 m wide grass boulevard, concrete curb and gutter, 3 .3 m wide vehicle travel lane, and interim tie in works until such a time as the adjacent property to the north develops.
b) Multi-use path along No. 2 Road to be 3.3 m wide, cast in place concrete, medium sandblast finish with expansion and saw-cut control joints.
c) Multi-use pathway east-west is to be repaired/replaced as required to match existing treatment (asphalt in path, pavers on concrete at Dover Crescent) and irrigation to be provided at new off site trees along the north side of the path. Irrigation to be tied to the onsite water service. Offsite tree planting to be 7cm caliper in size. Any works in City path right-of-way to be reviewed through SA process.
11.II Water Works:
a) Using the OCP model with the water main upgrades proposed, there will be 252 Lis of water available at a 20 psi residual along the south property line, and 207 Lis of water available at a 20 psi residual at the No 2 Road frontage. Based on your proposed development, your site requires a minimum fire flow of 220 Lis.
b) At Developer's cost, the Developer is required to:
i) Submit Fire Underwriter Survey (FUS) or International Organization for Standardization (ISO) fire flow calculations to confinn development has adequate fire flow for onsite fire protection. Calculations must be signed and sealed by a Professional Engineer and be based on Building Pennit Stage building designs.
ii) Install approximately 150 m of new 200 mm water main along the walkway south of the development site from Dover Crescent to No 2 Road, and along No 2 Road from the walkway to the north property line of the development site, complete with fire hydrants. The water main alignment should avoid any proposed or future trees to be planted along the walkway.
iii) Submit Fire Underwriter Survey (FUS) fire flow calculations within the first servicing agreement submission to confirm that the available flow of 207 Lis is adequate for onsite fire protection. If the 207 Lis is not adequate, the developer shall be required to provide a 300 mm diameter water main instead.
iv) Install a new water connection to serve the proposed development, complete with water meter. The meter is to be located onsite (i.e. in a mechanical room).
c) At Developer's cost, the City will:
i) Complete all tie-ins for the proposed works to existing City infrastructure.
11.III Storm Sewer Works:
a) At Developer's cost, the Developer is required to:
i) Provide an erosion and sediment control plan for all on-site and off-site works, to be reviewed as part of the servicing agreement design.
ii) Confirm the condition and capacity of the existing storm connection serving the development site. If the connection is adequate to be reused for the proposed development, the existing lawn basin shall be removed and a new inspection chamber installed at the property line by the City at the developer's cost. If the connection is not adequate to be reused, then at the developer's cost the City shall remove the existing connection and install a new connection complete with inspection chamber. If feasible, the existing opening in the box culvert shall be re-used for the new connection.
11.IV Sanitary Sewer Works:
a) At Developer's cost, the Developer is required to:
6433306
i) Install approximately 70 m of new 200 mm sanitary sewer from Dover Crescent to the proposed sanitary connection. The actual length of required sanitary sewer will vary depending on the proposed sanitary connection location. In order to avoid disruption to the existing covered walkway at Dover Crescent, a new sanitary manhole will be required approximately 5 meters to the west of existing manhole SMH6993, and the
![Page 66: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/66.jpg)
-8-new sanitary sewer alignment will be south of the existing sanitary sewer. The sanitary alignment should avoid any proposed or future trees to be planted along the walkway, and take into consideration future service for 5900 River Road.
ii) Install a new sanitary connection for the proposed development, complete with inspection chamber.
b) At Developer's cost, the City will:
i) Complete all tie-ins for the proposed works to existing City infrastructure.
11.V Frontage Improvement Works:
a) At Developer's cost, the Developer is required to:
i) Coordinate with BC Hydro, Telus and other private communication service providers to pre-duct for future hydro, telephone and cable utilities along all road frontages.
ii) Locate all above ground utility cabinets and kiosks required to service the proposed development within the development site (see list below for examples). A functional plan showing conceptual locations for such infrastructure shall be included in the development design review process. Please coordinate with the respective private utility companies and the project's lighting and traffic signal consultants to confirm the requirements ( e.g., statutory right-of-way dimensions) and the locations for the aboveground structures. If a private utility company does not require an aboveground structure, that company shall confirm this via a letter to be submitted to the City. The following are examples of statutory right-of-ways that shall be shown on the architectural plans/functional plan, the servicing agreement drawings, and registered prior to SA design approval:
BC Hydro PMT BC Hydro LPT Street light kiosk Traffic signal kiosk Traffic signal UPS Shaw cable kiosk
4.0x5.0m 3.5 X 3.5 m 1.5 X 1.5 m 2.0 X 1.5 m 1.0 X 1.0 m 1.0 X 1.0 m
Telus FDH cabinet 1.1 x 1.0 m
iii) Review street lighting levels along the road and walkway frontages, and upgrade as required. Street lighting along No 2 Road multi-use path is to be pedestrian scale (Double luminaire street lights with taller vehicle scale lighting for road way to the satisfaction of Engineering). Street lighting along the east-west multi-use pathway is to be new pedestrian scale ( 4.4 meter luminaire height as per "Type 8 Decorative Pedestrian Luminaire Pole" in the City of Richmond Supplemental Specifications and Detail Drawings).
iv) Complete other frontage improvements as per Transportation requirements.
11.VI General Items:
a) At Developer's cost, the Developer is required to:
6433306
i) Provide, prior to start of site preparation works or within the first servicing agreement submission, whichever comes first, a preload plan and geotechnical assessment of preload, dewatering, and soil preparation impacts on the existing utilities fronting the development site and provide mitigation recommendations.
ii) Provide a video inspection report of the existing utilities along the development frontages prior to start of site preparation works or within the first servicing agreement submission, whichever comes first. A follow-up video inspection, complete with a civil engineer's signed and sealed recommendation letter, is required after site preparation works are complete (i.e. pre-load removal, completion of dewatering, etc.) to assess the condition of the existing utilities and provide recommendations to retain, replace, or repair. Any utilities damaged by the pre-load, de-watering, or other ground preparation shall be replaced or repaired at the Developer's cost.
iii) Conduct pre- and post-preload elevation surveys of all surrounding roads, utilities, and structures. Any damage, nuisance, or other impact to be repaired at the developer's cost. The post-preload elevation survey shall be incorporated within the servicing agreement design.
iv) Monitor the settlement at the adjacent utilities and structures during pre-loading, dewatering, and soil preparation works per a geotechnical engineer's recommendations, and report the settlement amounts to the City for approval.
![Page 67: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/67.jpg)
-9-v) Submit a proposed strategy at the building permit stage for managing excavation de-watering. Note that the
City's preference is to manage construction water onsite or by removing and disposing at an appropriate facility. If this is not feasible due to volume of de-watering, the Developer will be required to apply to Metro Vancouver for a permit to discharge into the sanitary sewer system. If the sanitary sewer does not have adequate capacity to receive the volume of construction water, the Developer will be required to enter into a de-watering agreement with the City to discharge treated construction water to the storm sewer system.
vi) Not encroach into the No 2 Road dedication with any proposed trees, retaining walls, or other non-removable structures due to the proposed and existing utilities along the No 2 Road frontage.
vii) Coordinate the servicing agreement design for this development with the servicing agreement(s) for the adjacent development(s), both existing and in-stream. The developer's civil engineer shall submit a signed and sealed letter with each servicing agreement submission confirming that they have coordinated with civil engineer(s) of the adjacent project(s) and that the servicing agreement designs are consistent. The City will not accept the 1st submission if it is not coordinated with the adjacent developments. The coordination letter should cover, but not be limited to, the following: (a) Corridors for City utilities (existing and proposed water, storm sewer, sanitary and DEU) and private
utilities. (b) Pipe sizes, material and slopes. (c) Location of manholes and fire hydrants. (d) Road grades, high points and low points. ( e) Alignment of ultimate and interim curbs. (f) Proposed street lights design.
iv) Enter into, if required, additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering, including, but not limited to, site investigation, testing, monitoring, site preparation, dewatering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
Note: * This requires a separate application.
Where the Director of Development deems appropriate, the preceding agreements are to be drawn not only as personal covenants of the property owner but also as covenants pursuant to Section 219 of the Land Title Act.
All agreements to be registered in the Land Title Office shall have priority over all such liens, charges and encumbrances as is considered advisable by the Director of Development. All agreements to be registered in the Land Title Office shall, unless the Director of Development determines otherwise, be fully registered in the Land Title Office prior to enactment of the appropriate bylaw.
The preceding agreements shall provide security to the City including indemnities, warranties, equitable/rent charges, letters of credit and withholding permits, as deemed necessary or advisable by the Director of Development. All agreements shall be in a fonn and content satisfactory to the Director of Development.
Additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Pennit(s), and/or Building Pennit(s) to the satisfaction of the Director of Engineering may be required including, but not limited to, site investigation, testing, monitoring, site preparation, de-watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
Applicants for all City Penn its are required to comply at all times with the conditions of the Provincial Wildlife Act and Federal Migratory Birds Convention Act, which contain prohibitions on the removal or disturbance of both birds and their nests. Issuance of Municipal permits does not give an individual authority to contravene these legislations. The City of Richmond recommends that where significant trees or vegetation exists on site, the services of a Qualified Environmental Professional (QEP) be secured to perform a survey and ensure that development activities are in compliance with all relevant legislation.
[Signed copy on file]
Signed 6433306
Date
![Page 68: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/68.jpg)
City of Richmond
Address: 5900 River Road
Attachment 6 To report dated May 5, 2020
Access Considerations Development Applications Department
Scope: Legal agreements and voluntary cash contribution are required to secure access from No. 2 Road to 5491 No. 2 Road across 5900 River Road. In order to maximize efficiency, the owner of 5900 River Road has agreed to construct the frontage improvements and utility upgrades along No. 2 Road required for their development in conjunction with the construction of the frontage improvements and utility upgrades required to serve the development at 5491 No. 2 Road (Pathways). The following requirements are not an exhaustive list of all requirements for a potential future development at 5900 River Road, only the works that overlap with the frontage works related to the driveway access for Pathways. Although we have done our best to ensure that all overlapping works are included below, the City reserves the right to require additional utility upgrades and frontage improvements at the time that the owner of 5900 River Road comes in with a development application.
A. (Access Agreements and Voluntary contribution) The owner of 5900 River Road is required to provide a permanent access from No. 2 Road through that property to the neighbouring property to the south at 5491 No. 2 Road, including:
1) Voluntary Contribution:
a) City acceptance of the voluntary contribution from the owner of 5900 River Road in the amount of $69,800 toward the cost increase associated with additional frontage works at 5491 No. 2 Road resulting from locating the SRW providing permanent access for 5491 No. 2 Road in a location that minimizes impacts to the future development potential of 5900 River Road.
2) Legal Agreements required for both properties at 5491 No. 2 Road and 5900 River Road:
a) Granting of an approximately 64 m2 (689 ft2) statutory right-of-way over 5900 River Road for the purposes of public-right-of-passage and utilities, delineating the permanent access area across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road. The SRW is to include terms allowing the owner of the property at 5900 River Road to utilize the SRW area for the purposes of completing ancillary works within the SRW area and to undertake certain works on the property at 5900 River Road during the future development of the property at 5900 River Road, provided that continuous and adequate access, to the satisfaction of the City, is provided across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road at all times. The SRW area is to be subdivided from 5900 River Road and consolidated with 5491 No. 2 Road after future development of 5900 River Road construction is completed and prior to occupancy of any buildings on 5900 River Road. The future transfer of the SRW area to the City for consolidation with 5491 No. 2 Road is to be secured by an option to purchase or other legal instrument, granted by the owner of 5900 River Road in favour of the City. The agreement will include tenns regarding the acquisition and timing of the SR W area by the City which will likely be associated with the timing of occupancy of the future building to be constructed at 5900 River Road. The owner of the future building at 5491 No. 2 Road will be responsible for the construction of the works within the SRW area under the applicable servicing agreement, which works will be undertaken in advance of, or in coordination with, the construction of the future development on 5900 River Road and any relevant servicing agreements. Upon completion of construction of the works within the SRW area, the owner of the future building at 5491 No. 2 Road will be responsible for the repair and maintenance, and liability of, the SRW works within the SRW area following completion of construction of such works, which obligations will be set out in the cost sharing agreement referenced in section 2b) below. Any works essential for public access within the required statutory right-of-way (SRW) are to be included in the relevant Servicing Agreement (SA). The design must be prepared in accordance with good engineering practice with the objective to optimize public safety and after completion of the works, the developer of the works is required to provide a certificate of inspection for the works, prepared and sealed by the developer's Engineer in a form and content acceptable to the City, certifying that the works have been constructed and completed in accordance with the accepted design.
Document Number: 6433306 6433306
Version: 3
![Page 69: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/69.jpg)
-2-b) Entering into a cost sharing legal agreement regarding maintenance of access works within the SR W area. The
owner of the future building at 5491 No. 2 Road is to maintain works located within 5900 River Road providing vehicle access to 5491 No. 2 Road.
c) Discharge existing legal agreement(s) prohibiting access to No. 2 Road registered on title to 5491 No. 2 Road and 5900 River Road.
d) Discharge existing cross-access agreement, including easements and covenants, registered on title to 5491 No. 2 Road and 5900 River Road.
B. (Servicing Agreement) The owner of 5900 River Road is required to enter into a Servicing Agreement* for the design and construction of Engineering and Transportation works in accordance with Transportation Association of Canada (TAC) Specifications, City Engineering Design Specifications and applicable Bylaws to the satisfaction of the City. A Letter of Credit or cash security for the value of the Service Agreement works, as determined by the City, will be required as part of entering into the Servicing Agreement. Works may include, but may not be limited to, the following:
l) Road Works: a) Design and construction of road works in front of 5900 River Road frontage and any area (beyond that frontage)
overlapping with the frontage works related to the driveway access for 5491 No. 2 Road to accommodate: 3.3 m wide concrete shared path along the property line, 1.5 m wide grass boulevard, concrete curb and gutter, 3 .3 m wide vehicle travel lane, median alteration works, and interim tie in works until such a time as the adjacent property to the north develops.
b) Multi-use pathway along No. 2 Road is to be 3 .3 m wide, cast in place concrete paving, medium sandblast finish with expansion and saw-cut control joints. Carry the No. 2 Road multi-use path treatment through the driveway crossing.
c) Median grass boulevard between No. 2 Road and the No. 2 Road bridge, additional lawn is preferred. Additional trees to be planted in this area, subject to Engineering and Transportation approval regarding proximity to utilities/structures/sight lines. Irrigation not required. Offsite tree planting to be 7 cm caliper in size.
2) Parks Works: a) Existing eight Oak Trees along No. 2 Road to be removed and relocated with input from Parks Operations.
Existing Oak Trees to tentatively be relocated to Brighouse Neighbourhood School Park and Terra Nova South Park as they both have irrigation to aid in re-establishment and are located relatively nearby.
b) In the event that the tree relocation works are necessitated by 5491 No. 2 Road frontage works before 5900 River Road frontage works commence, the owner of 5900 River Road shall pay for the tree relocation works to be carried out on their behalf at an approximate value of $200,000, or an amount detennined by a registered Arborist, to the satisfaction of the City.
3) Water Works: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:
i) Install approximately 280 m of new 200 mm water main from the existing 300 mm water main on River Road down No. 2 Road, and along the pathway south of 5491 No. 2 Road to tie into the existing water main on Dover Crescent.
ii) Through the future development application for 5900 River Road, install a new water connection, complete with meter and meter box located onsite within a right-of-way.
b) At the owner of 5900 River Road's cost, the City will: i) Complete all tie-ins for the proposed works to existing City infrastructure.
4) Stonn Sewer Works: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:
i) Provide an erosion and sediment control plan for all on-site and off-site works, to be reviewed as part of the servicing agreement design.
b) At the owner of 5900 River Road's cost, the City will:
6433306
i) Cut, cap, and remove all existing storm connections and inspection chambers along the development's No. 2 Road frontage - unless required for drainage until the ultimate frontage improvements are constructed.
ii) Note, for infonnation: the development's future storm connection shall reuse an existing opening within the box culvert on River Road, if feasible. The storm connection is not permitted to cross beneath the largediameter water main on No. 2 Road.
![Page 70: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/70.jpg)
- 3 -
5) Sanitary Sewer Works: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:
i) Install approximately 155 m of new 200 mm sanitary sewer from the existing sanitary sewer on Dover Crescent, along the pathway south of 5491 No 2 Road, and up No. 2 Road to extent of the No. 2 Road frontage improvements. The exact extent of new sanitary sewer required to serve 5900 River Road will depend on the location of the future sanitary connection as detennined through the future development application at 5900 River Road.
b) At the owner of 5900 River Road's cost, the City will: i) Complete all tie-ins for the proposed works to existing City infrastructure.
6) Frontage Improvements: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:
i) Coordinate with BC Hydro, Telus and other private communication service providers: (a) To pre-duct for future hydro, telephone and cable utilities required to serve the subject site along the
extent of the frontage improvements (if applicable). (b) Before relocating/modifying any of the existing power poles and/or guy wires within the property
frontages. ii) Through the future development application for 5900 River Road, locate/relocate all above ground utility
cabinets and kiosks required to service the proposed development, and all above ground utility cabinets and kiosks located along the development's frontages, within the developments site (see list below for examples). A functional plan showing conceptual locations for such infrastructure shall be included in the development design review process. Please coordinate with the respective private utility companies and the project's lighting and traffic signal consultants to confirm the requirements (e.g., statutory right-of-way dimensions) and the locations for the aboveground structures. If a private utility company does not require an aboveground structure, that company shall confirm this via a letter to be submitted to the City. The following are examples of statutory right-of-ways that shall be shown on the architectural plans/functional plan, the servicing agreement drawings, and registered prior to SA design approval: - BC Hydro PMT 4.0 x 5.0 m - BC Hydro LPT 3.5 x 3.5 m - Street light kiosk 1.5 x 1.5 m - Traffic signal kiosk 2.0 x 1.5 m - Traffic signal UPS 1.0 x 1.0 m - Shaw cable kiosk 1.0 x 1.0 m - Telus FDH cabinet 1.1 x 1.0 m
iii) Review street lighting levels along No. 2 Road, and upgrade as required along the extent of the frontage improvements being constructed through this servicing agreement. The ultimate street lighting works will be constructed through the future development application for 5900 River Road. Street lighting along No. 2 Road multi-use path is to be pedestrian scale (Double luminaire street lights with taller vehicle scale lighting for road way to the satisfaction of Engineering).
iv) Complete other frontage improvements as per Transportation requirements.
7) General Items: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:
6433306
i) Provide, if required based on the City review of the detailed design through the servicing agreement, additional rights-of-ways to accommodate existing/proposed utilities.
ii) Design the proposed frontage works to accommodate potential future raising of River Road to dike elevation (4.7 m geodetic). Through the future development application for 5900 River Road, the building and remaining frontage works will also need to accommodate the potential future raising of River Road to dike elevation (4.7 m geodetic).
iii) Impact due to site preparation: (a) Provide, prior to start of site preparation works (preload, soil densification, etc.) or within the first
servicing agreement submission, whichever comes first, a preload plan and geotechnical assessment of preload, dewatering, and soil preparation impacts on the existing utilities, dike, bridge, and other structures fronting the development site and provide mitigation recommendations. The rep01i must show that there will be no impact to the large-diameter water main on No 2 Road, or any other adjacent utilities or structures, to the City's satisfaction prior to any site preparation works commencing onsite.
![Page 71: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/71.jpg)
-4-(b) Conduct pre- and post-pre load elevation surveys of all surrounding roads, utilities, and structures. Any
damage, nuisance, or other impact to be repaired at the owner of 5900 River Road's cost. The postpreload elevation survey shall be incorporated within the servicing agreement design.
( c) Monitor the settlement at the adjacent utilities and structures during pre-loading, dewatering, and soil preparation works per a geotechnical engineer's recommendations, and report the settlement amounts to the City for approval.
iv) Not encroach into City rights-of-ways with any proposed trees, retaining walls, or other non-removable structures.
v) Coordinate the servicing agreement design for 5900 River Road with the servicing agreement(s) for the adjacent development(s), both existing and in-stream. The owner of 5900 River Road's civil engineer shall submit a signed and sealed letter with each servicing agreement submission confirming that they have coordinated with civil engineer(s) of the adjacent project(s) and that the servicing agreement designs are consistent. The City will not accept the 1st submission if it is not coordinated with the adjacent developments. The coordination letter should cover, but not be limited to, the following: (a) Corridors for City utilities (existing and proposed water, storm sewer, sanitary and DEU) and private
utilities. (b) Pipe sizes, material and slopes. ( c) Location of manholes and fire hydrants. (d) Road grades, high points and low points. (e) Alignment of ultimate and interim curbs. (f) Proposed street lights design.
vi) Enter into, if required, additional legal agreements, as determined via this Servicing Agreement and/or future Servicing Agreement(s), Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering, including, but not limited to, site investigation, testing, monitoring, site preparation, dewatering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
Note:
* This requires a separate application.
Where the Director of Development deems appropriate, the preceding agreements are to be drawn not only as personal covenants of the property owner but also as covenants pursuant to Section 219 of the Land Title Act.
All agreements to be registered in the Land Title Office shall have priority over all such liens, charges and encumbrances as is considered advisable by the Director of Development. All agreements to be registered in the Land Title Office shall, unless the Director of Development determines otherwise, be fully registered in the Land Title Office prior to enactment of the appropriate bylaw.
The preceding agreements shall provide security to the City including indemnities, warranties, equitable/rent charges, letters of credit and withholding permits, as deemed necessary or advisable by the Director of Development. All agreements shall be in a form and content satisfactory to the Director of Development.
Additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering may be required including, but not limited to, site investigation, testing, monitoring, site preparation, de-watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
Applicants for all City Permits are required to comply at all times with the conditions of the Provincial Wildlife Act and Federal Migratory Birds Convention Act, which contain prohibitions on the removal or disturbance of both birds and their nests. Issuance of Municipal permits does not give an individual authority to contravene these legislations. The City of Richmond recommends that where significant trees or vegetation exists on site, the services of a Qualified Environmental Professional (QEP) be secured to perfonn a survey and ensure that development activities are in compliance with all relevant legislation.
[Signed copy on file]
Signed Date
6433306
![Page 72: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/72.jpg)
City of Richmond
To the Holder:
Property Address:
Address:
GBL ARCHITECTS
5491 NO. 2 ROAD
C/O PAUL GOODWIN 139 EAST 8TH AVENUE, VANCOUVER, BC V5T 1R8
Development Permit
No. DP 19-866690
1. This Development Permit is issued subject to compliance with all of the Bylaws of the City applicable thereto, except as specifically varied or supplemented by this Permit.
2. This Development Permit applies to and only to those lands shown cross-hatched on the attached Schedule "A" and any and all buildings, structures and other development thereon.
3. The "Richmond Zoning Bylaw 8500" is hereby varied to:
a) Reduce the minimum building setback from No. 2 Road from 6 m to 5 m; and
b) Increase the maximum building height from 18 m to 20.3 m for the west portion of the building.
c) Reduce the number of required parking spaces from 87 to 46.
4. Subject to Section 692 of the Local Government Act, R.S.B.C.: buildings and structures; off-street parking and loading facilities; roads and parking areas; and landscaping and screening shall be constructed generally in accordance with Plans #1 to #35 attached hereto.
5. Sanitary sewers, water, drainage, highways, street lighting, underground wiring, and sidewalks, shall be provided as required.
6. As a condition of the issuance of this Permit, the City is holding the security in the amount of $229,074.00. to ensure that development is carried out in accordance with the terms and conditions of this Permit. Should any interest be earned upon the security, it shall accrue to the Holder if the security is returned. The condition of the posting of the security is that should the Holder fail to carry out the development hereby authorized, according to the terms and conditions of this Permit within the time provided, the City may use the security to carry out the work by its servants, agents or contractors, and any surplus shall be paid over to the Holder. Should the Holder carry out the development permitted by this permit within the time set out herein, the security shall be returned to the Holder. The City may retain the security for up to one year after inspection of the completed landscaping in order to ensure that plant material has survived.
7. If the Holder does not commence the construction permitted by this Permit within 24 months of the date of this Permit, this Permit shall lapse and the security shall be returned in full.
Document Number: 6433306 6433306
Version: 3
![Page 73: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/73.jpg)
To the Holder:
Property Address:
Address:
GBL ARCHITECTS
5491 NO. 2 ROAD
C/O PAUL GOODWIN 139 EAST 8TH AVENUE, VANCOUVER, BC V5T 1R8
Development Permit No. DP 19-866690
8. The land described herein shall be developed generally in accordance with the terms and conditions and provisions of this Permit and any plans and specifications attached to this Permit which shall form a part hereof.
This Permit is not a Building Permit.
AUTHORIZING RESOLUTION NO. DAY OF
DELIVERED THIS DAY OF
MAYOR
6433306
ISSUED BY THE COUNCIL THE
![Page 74: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/74.jpg)
SI
ZTn
3 60
City of Richmond
Middle Arm Fraser River ~
I I I
RSI/A
I I 1-------~
0::: SI t) o:::f------1
w > 0 0
r----1 I I I I I I I "I I
ZTS
ZT4
CO2
DOVER CR I~ I I lO t, I 1° L ____ I
68.91
77.76 61.74
1_.J~-.J-'--:;r--l,....!~.,
I '1- I 1..., ~ _J
I ___ --~-,- I
DP 19-866690
C ~ N . 0 z
~ SCHEDULE "A"
Ill!
RSI/E
6011 60.09 24.74
RIVER RD
70.26
Original Date: 07/17/19
Revision Date:
Note: Dimensions are in METRES
![Page 75: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/75.jpg)
OVE
RVI
EW
DE
VE
LOP
ME
NT
STA
TIS
TIC
S
LEG
AL
AD
DR
ES
S:
PR
OP
OS
ED
US
ES
:
LOT
B S
EC 1
BLK
4N
RG
7W
PL
BC
P29
277
Res
iden
tial
[re
ntal
}
FIN
. SIT
E G
RA
DE
ELE
VA
TIO
N:
3.67
m /
12.
03'
BU
ILD
ING
CO
DE
RE
QU
IRE
ME
NTS
CO
NS
TRU
CTI
ON
: G
RO
UP
C &
GR
OU
P F
3 U
P TO
6 S
TOR
EYS
SP
RIN
KLE
RE
D
GR
OSS
AR
EA
FS
R -
Are
a -T
ype
I AR
EA
AM
ENIT
Y
I 1
,07
5S
F
CIR
CU
LATI
ON
I
9,2
06
SF
ME
CH
/EL
EC
I 1,
581
SF
RE
SID
EN
TIA
L I
L.7,
556S
F
TOTA
L 59
,418
SF
FAR
BY
TYPE
F
SR
-Are
a-T
yp
e I
AR
EA
I
FSR
CIR
CU
LATI
ON
I
9,2
06
SF
I 0.
42
RE
SlO
EN
TIA
L I
l,7,
556S
FI
2.18
FAR
BY
LEV
EL
LEV
EL
AR
EA
I
FSR
Ll
7,44
7SF
0.
34
L2
9,86
3 S
F
0.45
L3
9,86
3 SF
0.
45
L4
9,86
3 SF
0.
45
L5
9,86
3SF
0.
45
L6
9,86
3SF
0.
45
TOTA
L 56
,762
SF
2.
61
CO
MB
US
TIB
LE C
ON
STR
UC
TIO
N
TOTA
L 5
6,7
62
SF
2.
61
City
of
Ric
hmon
d D
P 1
9-86
6690
Add
ress
: 54
91 N
o. 2
Roa
d
App
lican
t:
Zon
ing:
N
um
be
r of
Uni
ts
Flo
or
Are
a R
atio
Lo
t C
over
age
Set
bac
ks:
No
2 R
oad
(F
ron
t Y
ard
) W
est
prop
erty
line
(R
ear
Yar
d)
Nor
th p
rope
rty
line
(Int
erio
r S
ide
Yar
d)
Sou
th p
rope
rty
line
(Ext
erio
r S
ide
Yar
d)
Par
kade
Set
back
s:
Und
ergr
ound
: N
o 2
Roa
d (F
ront
Yar
d)
We
st p
rope
rty
line
(Rea
r Y
ard)
N
orth
pro
pert
y lin
e (I
nter
ior
Sid
e Y
ard)
S
outh
pro
pert
y lin
e (E
xter
ior
Sid
e Y
ard)
A
bove
-gro
und:
N
o 2
Roa
d (F
ront
Yar
d)
Wes
t pr
oper
ty li
ne (
Rea
r Y
ard)
N
orth
pro
pert
y lin
e (I
nter
ior
Sid
e Y
ard)
S
outh
pro
pert
y lin
e (E
xter
ior
Sid
e Y
ard)
H
eig
ht
With
in 2
6m o
f Eas
t pro
pert
y lin
e B
eyo
nd
26m
of
Eas
t p
rop
erty
lin
e P
arki
ng s
truc
ture
s Lo
t S
ize
Bic
ycle
Sto
rage
: C
lass
1 (i
n lo
cker
or
bike
roo
m)
Cla
ss 2
(at
out
door
rac
k)
Hab
itabl
e F
loor
Ele
vatio
n P
arki
ng:
Aff
orda
ble
Hou
sing
Uni
ts
Vis
itors
C
ar S
hare
T
otal
A
cces
sibl
e P
arki
ng S
pace
s
Sm
all
Car
Par
king
Spa
ces
Tan
dem
Par
king
Spa
ces
Load
ing
Ind
oo
r Am
enity
Spa
ce
Ou
tdo
or
Am
enitv
Spa
ce
Dev
elo
pm
ent A
pp
licat
ion
Dat
a S
hee
t D
evel
opm
ent
App
licat
ions
Dep
artm
ent
69
11
No
. 3
Ro
ad
, R
ich
mo
nd
, B
C
V6
Y 2
C1
Pat
hway
s le
ase
from
City
of
Ric
hmon
d
Mul
ti-F
amily
Ren
tal T
enur
e R
esid
entia
l C
om
lies
Hig
h R
ise
Apa
rtm
ent a
nd C
ongr
egat
e H
ousi
ng
(ZH
R3)
-D
over
Cro
ssin
g V
aria
nces
req
uest
ed a
s no
ted
be
low
V
aca
nt
80
Req
uir
emen
t P
rop
ose
d
Var
ian
ce
3.0
& 0
.1 a
men
ity s
pace
2.
61
Non
e oe
rmitt
ed
Max
. 70
%
43%
N
one
Min
.6m
S
m
1 m
dec
reas
e M
in. 6
m
6m
M
in. 3
m
3m
M
in. 3
m
3m
MIN
. 5.
8m
MIN
. 0.
4m
0.1
m
Min
. 0
m
0.4m
Min
. 3
m
N/A
M
in.
3 m
3.
1 m
(st
air)
M
in.
0 m
O
m
Min
.Om
0.
4m (
patio
s)
Max
. 24
m
24 m
M
ax
.18
m
20
.3m
2
.3m
incr
ease
M
ax.
5 m
0.
8m a
bove
fin.
site
gra
de
[inc
lude
s 0.
1 m
tol
eran
ce)
Min
. 2,
000
m2
2,02
4 m
2 N
one
100
@ 1
.25/
unit
100
Non
e 1
6@
0.2
0/un
it 16
M
in.
4 m
GS
C
4.5
m G
SC
N
one
With
TD
Ms
With
TD
Ms
72
29
52%
red
uct
ion
with
15
15
ap
pro
pri
ate
TD
Ms
2 87
46
M
in2
%
4% (
2 sp
aces
) N
one
Max
50%
42
% (
19 s
pace
s)
Non
e
Per
mitt
ed
Non
e N
one
Man
oeuv
ring
for
med
ium
truc
k 1
med
ium
loa
ding
bay
N
one
Min
100
m2
100
m2
480
m2
@ 6
m2 /
unit
482
m2
UN
IT M
IX
Bas
ical
Un
iver
sal
Ho
usi
ng
Fe
atu
res
(B
UH
F)
Tar
get:
85%
P
rovi
ded:
100
%
UN
IT
I A
rea
I
CO
UN
T
A-
STU
DIO
ST
UD
IO -
A1
I
124 24
B -
1 BE
DRO
OM
1B
R-
Bl
I 12
6 1
BR
-B2
+ 15
21 S
F 11
1
BR
-83
16
03 S
F 16
1
BR
-84
" 15
36 S
F 13
36
C -
2 BE
DR
OO
M
2B
R-C
1
1774
SF
15
2BR
-C
2 18
13 S
F IS
2
8R
-C3
I BO
S SF
15
15
D -
3 BE
DR
OO
M
38
R-
01
I !5 5 80
~WH
EE
LCH
AIR
AC
CE
SS
IBLE
UN
IT
Not
es:
UN
IT M
IX B
Y LE
VE
L
LEV
EL
1 LE
VE
LS 2
-6
UN
IT
I A
rea
I CO
UN
T U
NIT
A -
STU
DIO
A
-S
TU
DIO
STU
DIO
-A
l I
1,
STU
DIO
-Al
' B
-1
BE
DR
OO
M
B -
1 BE
DRO
OM
1BR
81
15
37 S
F 11
lB
R-8
1
18R
8
2'
1521
SF
11
1B
R -
83
18R
83
l6
03S
F
11
18R
8
4'
l536
SF
_1
3 6 -7
10
C -
2 BE
DR
OO
M
28
R-
C1
28
R-
C2
28
R-
C3
D -
3 BE
DR
OO
M
38
R-
01
• V
aria
nce
incl
uded
to r
educ
e th
e m
inim
um b
uild
ing
setb
ack
from
No.
2 R
oad
from
6 m
to 5
m.
I A
rea
I
j455
SF
1,
' l5
36S
F
15
j60
3S
F
11 6
j774
SF
11
l813
SF
11
I BOS
SF
11 3
1993
SF
11 1 14
• V
aria
nce
incl
uded
to
incr
ease
max
imum
bui
ldin
g he
ight
fro
m 1
8 m
to 2
0.3
m f
or t
he w
este
rn p
orti
on o
f the
bui
ldin
g.
• V
aria
nce
incl
uded
to r
educ
e th
e nu
mbe
r o
f req
uire
d pa
rkin
g sp
aces
fro
m 8
7 to
46.
•
80 p
urpo
se-b
uilt
ren
tal
dwel
ling
uni
ts r
equi
red
to c
ompl
y w
ith H
ousi
ng A
ffor
dabi
lity
Agr
eem
ent
lega
l ag
reem
ents
. •
80 B
asic
Uni
vers
al H
ousi
ng F
eatu
res
unit
s re
quir
ed t
o co
mpl
y w
ith
Zon
ing
Byl
aw s
tand
ards
. •
4 ac
cess
ible
uni
ts r
equi
red
to c
ompl
y w
ith B
C B
uild
ing
Cod
e ac
cess
ible
sta
ndar
ds.
• In
door
Am
enit
y sp
ace
for
the
shar
ed u
se o
f all
resi
dent
s on
the
grou
nd f
loor
lev
el f
or t
he s
hare
d us
e o
f all
resi
dent
s.
• 2
car
shar
e sp
aces
pro
vide
d as
per
lega
l ag
reem
ent.
• D
evel
opm
ent
requ
ired
to
conn
ect t
o O
VD
EU
. D
istr
ict E
nerg
y U
tili
ty r
equi
rem
ents
as
per
lega
l ag
reem
ent.
• D
evel
opm
ent r
equi
red
to c
ompl
y w
ith
step
3 o
f BC
Ene
rgy
Step
Cod
e.
• D
evel
opm
ent r
equi
red
to m
eet
indo
or a
cous
tic
and
ther
mal
cri
teri
a as
per
lega
l ag
reem
ent.
• H
ose
bibs
to b
e pr
ovid
ed in
bot
h ou
tdoo
r am
enit
y ar
eas.
•
Irri
gati
on to
be
prov
ided
in
all
land
scap
ed a
reas
.
COU
NT
• S
ervi
cing
Agr
eem
ent r
equi
red.
Off
-sit
e an
d S
R W
wor
ks t
o be
pro
vide
d vi
a se
para
te r
equi
red
Ser
vici
ng A
gree
men
t fo
r C
ity
road
wor
ks,
fron
tage
im
prov
emen
t wor
ks,
infr
astr
uctu
re w
orks
and
SR
W v
ehic
le a
cces
s w
orks
as
per
lega
l ag
reem
ent.
• T
his
Dev
elop
men
t P
erm
it d
oes
not
incl
ude
sign
age.
A
ll si
gnag
e re
quir
ed to
com
ply
with
Sig
n R
egul
atio
n by
law
970
0,
incl
udin
g su
bmit
ting
sep
arat
e si
gn p
erm
it a
ppli
cati
ons
as n
eede
d.
De
ep
Su
bsi
dy
Un
its
Re
nt
Ge
are
d t
o I
nco
me
Un
its
Aff
ord
ab
le M
ark
et
Re
nt
Un
its
Stu
dio
T
BD
T
BD
T
BD
1
-be
dro
om
T
BD
T
BD
T
BD
2
-be
dro
om
T
BD
T
BD
T
BD
3
-be
dro
om
T
BD
T
BD
T
BD
T
ota
l 1
6
40
2
4
%
20
%
50
%
30
%
BC
Ho
usi
ng
2
0%
5
0%
3
0%
C
om
mu
nit
y H
ousi
nQ F
un
d
Inco
me
Re
stri
ctio
n
Lo
w I
nco
me
-h
ou
seh
old
in
com
e
Ma
xim
um
ho
use
ho
ld i
nco
me
M
axi
mu
m h
ou
seh
old
in
com
e
be
low
BC
Ho
usi
ng
Ho
usi
ng
re
stri
ctio
n t
o b
elo
w B
C H
ou
sin
g
rest
rict
ion
to
th
e L
ow
an
d
Inco
me
Lim
its
an
d
Inco
me
Lim
its
Mo
de
rate
in
com
e l
imit
(p
er
un
it
(i) I
n re
ceip
t o
f in
com
e
size
) a
ssis
tan
ce;
or
(ii)
In
rece
ipt o
f o
nly
OA
S/G
IS
inco
me
; o
r (i
ii) R
GI
is e
qu
al o
r le
ss t
ha
n
she
lte
r a
llow
an
ce
Inco
me
Te
stin
q
~n
nu
al
v:\n
nual
~
t m
ove
-in
on
ly
Re
nt
Re
stri
ctio
n
Ho
use
ho
lds
pa
y S
he
lte
r R
ate
or
Re
nt
Ge
are
d t
o I
nco
me
pe
r B
C
CM
HC
Ave
rag
e M
ark
et
Re
nt
eq
uiv
ale
nt
Re
nt
Sca
le (
30
% o
f p
re-t
ax
ho
use
ho
ld i
nco
me
) R
en
t In
cre
ase
s V
\s p
er
ren
t re
stri
ctio
n
V\s
pe
r re
nt
rest
rict
ion
V
\s p
er
RT
A a
nn
ua
l in
cre
ase
To
tal
24
3
6
15
5 80
1
00
%
10
0%
• G
BL A
RC
HIT
ECTS
IN
C
139
EAST
BTH
AVEN
UE
VA
NCO
UV
ER, B
C CA
NADA
V5T
1 RB
TE
L 60
4 73
6 11
~ FA
X 60
4 73
1 52
7
CO
P\'R
IGfH
RE
SER
VE
O
THIS
/>LA
NA
NO
OES
IGN
AA
!:AN
OA
~AlL
TIM
ESR
EMA
IN'T
HE
EX
CLU
SIV
EP
RO
PE
RTY
OFG
SLA
RC
HIT
EC
TSIN
CA
NO
MA
YN
OT8
EU
SE
OO
R
REP
RO
OU
CED
WIT
flOU
TTH
EIR
WR
liTEN
CO
NSE
NT
NO
TES
DP
19-8
6669
0 P
lan#
l
May
5, 2
020
REV
ISIO
NS
NO.
DATE
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Rev
iew
PRO
JEC
T S
TATI
STI
CS
D
ATE
DR
AWN
BY
CH
EC
KE
D B
Y SC
ALE
JOB
NU
MB
ER
3/1
9/2
02
01
0:2
6:3
1 A
M
Aut
hor
Che
cker
1602
2
A-0
.01
![Page 76: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/76.jpg)
"'I/
30
·-1
1·
9.4
m
SE
TBA
CK
' ' rin
~
' ' ' '
't,~
CH
ILD
RE
N'S
PLA
Y
AR
EA
!Ll)
-----------
~-------
I _
__
__
__
__
__
_ L
__
_ _
__
__
__
__
_
I
r ' ' ' ' ' ' ' ' ' '
f\(1
BO
ILE
R
RM R
OO
F
----
--
----
----
----
-
~., 'I
,·
RO
OF
ACC
EO
1 't
,~~
ESS
TO M
'EC
HA
NIC
AL
UIP
ME
~T
:NL
Y
10
7'-
33
/8"
-...!o
't,·
32.7
m
14
4'-
7"
44.I
m
EXIS
TIN
G P
EDE
STR
IAN
/ CY
CLI
NG
PA
TH
'\.~
'),,·
-~
ELEV
ATO
R
OVE
RR
UN
R
OO
F
~
I
I
I I I I
I,.
2.37
' ' ' ' ' -----------
~ ' ~~
~·1
' ' ' ' -w
-----
~ "'!
> ? ·t?o
,D,,
\
\
v 2.
5(?
().,·
.~
/ g,
');
(j:j
~I,
/
16
'-5
"
5.0
m
SE
TBA
CK
\
\ \ \
i
RE
SID
EN
TIA
L E
NTR
Y
Q,'b
0 'l
,·
q,½
'1,·
I ' I
' C)
I /
.. ~ --
----
0
\! ,\--
----G
)
I) >'/ / I !-
. 't-<
y,
-6.0
3
•! \ ---
0 ,-
--- \
. ..\ .,,,C
f, -i.
\>:
'\,·
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CA
NA
DA
VS
T 1R
8 TE
L 60
4 73
611!
:: FA
X 60
4 73
1 52
7
COPY
FIIG
HT
RES
ERV
ED,
THIS
PI..A
NA
NO
DE
SIG
HA
AE
AN
DA
T.IU
TIM
ES
RH
IAIH
iHE
EXCL
USI
VE
PRO
PER
lYO
FGB
LI.J
!CH
ITE
Cl'S
INC
.AN
OM
~V N
OT
BE
USE
D O
R R
EPR
OO
UC
EDW
ITH
OU
TTH
EIR
WR
ITTE
HC
ON
SEH
T
NO
TES
DP
19-
8666
90
Pla
n#
2 M
ay 5
, 20
20
REV
ISIO
NS
NO
. D
ATE
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
OP
App
licat
ion
OP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
SIT
E P
LAN
-E
NLA
RG
ED
D
ATE
D
RAW
N B
Y CH
ECK
ED B
Y SC
ALE
JOB
NU
MBE
R
3/19
/202
010:
28:2
7 AM
Aut
hor
Che
cker
1/8
"=1
·-o
·
1602
2
A-1
.00a
![Page 77: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/77.jpg)
I -. \ I I rA ~ \ 11
'-8
" 9
'-3
"
2.B
m
N
STA
IR #
3
----1
__
_ _..
1 U
P
-~
~ I
9'-
0"
I
j_ 2
.7m
I
--
1 I I
:..
E
I ~
t$(:
I
!<: ...
I --
--,
/ \''
I
--
___ /
---
-\~µ',--+
--H-~
-~
I \
\ I
---
1--
-' '
,,.,.--
:-.,....._
,'
26
cp D
-6
.0
I 12
5'-
10
"
23
'-6
" 2
3'-
6"
38.4
m
I 7.
2m
7.2
m
I
----
I I I
:,
::: ~
g: E
o
~j
I :;
SiC
SiC
Sic
SiC
;c
t$(:
I -
-)1
.~~
~
O·
I I ~
E
46S
TA
LL
S
~ E
I
R:;;
19
SC
,1
HC
~
:;;
I I I I
VIS
ITO
R
VIS
ITO
R
) C
AR
SH
AR
E
CA
R S
HA
R f
~
,1 E
:;::-
E
~--t-
,--+-h
,._,,-
H-+--
----
-,--
o~tt
==
==
==
==
==
----
----
--=
==
=
~-
•;::J
1I ~
'"
I
I ,,
I '
/ is
,_:
I '
27
VIS
ITO
R
'-,
____
__.
/ \
2.5
m
20
'-5
"
6.2
m
---
-
. :~
~~
"' ,.
VISI
TOR
VISI
TOR
VISI
TOR
VISI
TOR
r-
L.J
-
I I 22
I
I 23
18' -
01/!
" 5
.5m
l I 24
I I I 1 's
I I I I I I I D
-6
.04
23
'-6
" 2
1i'-
9"
12' _
,.,.
7.2
m
7.5m
3.
Bm
--I
I I
I
:g :g
;g g:
Bir
RA
CK
S/4)
c~sj
SiC
SiC
SiC
SiC
.::3•
_, ..
13
.lm
-
-O
VE
RH
EA
D D
OO
R
SL
OP
E D
N 4
.8%
14
.5%
' '
VIS
ITO
R
VIS
ITO
R
VIS
ITO
R
VIS
ITO
R
:)Si
:)Si
:)Si
:)Si :..
E
~
:::: :£
:c'
~j
T-6
"
2.J
m
I I
I I
I I
I I
I I I
BIK
E S
TOR
AGE
(30)
I I I
I I
I I I
I
36.6
m
I I I I I I
I I I I I I
--
----
0
-~
--
~--
~---
--G
- /
I 7 I
-~ --
~ --
----
0
I y /--j-
-,,.-,--+
-12
ov E
LEC
TRIC
PLU
G-I
NS
I I I I
$ E
~
-:
'c'
N
18
'-1
1"
5.B
m
TO B
E P
RO
VID
ED
FO
R
ELE
CTR
IC B
ICY
CLE
S
C)
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AV
EN
UE
VA
NC
OU
VER
, BC
CA
NA
OA
V5T
1R
8 TE
L 60
4 73
6 11
~ FA
X 60
4 73
1 52
7
CO
l'YR
IGH
TRES
ERVE
0:T
HIS
PLA
NA
N00
ES
IGN
AR
£AN
0ATA
l.LTl
f.lE
SR
Et,1
JljN
THE
EX
CLU
SM
:PR
DP
ER
TY0F
GB
LAIIC
HIT
EC
TSIH
CA
N0t
,IAY
H0T
BE
US
E0O
R
NO
TES
DP
19-
8666
90
Pla
n#
3 M
ay 5
, 20
20
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
OP
Com
men
ts
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
P1 -
PA
RK
ING
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MB
ER
5/7/
2020
10:4
0:41
AM
Aut
hor
Che
cker
1/B
"=l'-
0"
1602
2
A-1
.01
![Page 78: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/78.jpg)
' ' \ __
____
, __ _
\ -,
\ /
',
,,/
\
30'-
11
"
SE
TBA
CK
6
'-8
1/2
"
AR
BO
UR
ABO
VE
•• _ ~
~---
----
---'c
--r"=
-s-
REF
ER T
O L
AN
DS
CA
PE
' ' ' '
' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
\ \ \ \ //\
'-,
' ,'
--,
----
\ _
--
---
.J. ~ -
----
--
-
' ',"{
-,, __
____
____
___ ),
\ ,,
,, ..
. ---------,.._
,, ~
I
' ' ' ' ' ' ' ' ' '
\/
EXIS
TIN
G T
REE
S\T
O
' /
I\
RE
MA
IN
\ X
,'
',,
\ ,,,
i ',
:
,,,,"
' V
l
__
,,.,
' '
' '
\,,,
,,
,//
' --
2
47
'-8
"
32
·.9
11
r 9
'-8
"
20
'-1
01
/2"
SE
TBA
CK
3
-6.0
4 5
6'-
97
/8"
41
'-1
0"
145'
-t:
.~
-~ --
--------
-----
-----
------------~
J~
------
' \
I -
-·y
-r
HM
:>0
RAR
YP
AAK
tNG
IPIC
:,(-U
P/!l
R0
?-0
FFI
-S
IGN
T0B
EP
0ST
E0
IN0
IC.-_
TIN
GN
0 ?A
R-<
l"IG
OU
RIN
GW
.UT
EC
OLL
EC
TIO
Nf-
lOU
RS
__
_j _
_ ~
I
,../
.J
\ ',
) 1
.7"st1
. q.
oo\t
/C
HIL
DR
EN
'SP
LAY
AR
EA
\
\ . ._ r·
~::;:
::::;:
::::':
±::;:
::::;:
::::;:
::::;:
::::;:
:::::
;,i;;
,:,j;
:,l[f
u::;:
::::;:
::::;:
::::;:
::::;:
::::;:
::::;:
::::;:
::+:::
::;:::
::/i;,
-Zj1
,:14
"'
11 R
EFER
TO
LA
ND
SC
AP
E
' -
-·~
--;?
j" 16
' -8"
25
' -O"
f--
.._ _
_ O
RA
WIN
GS
\!J
5.1
m
7.6
m
l 1.
--
OV
ER
HE
AO
I
DO
OR
BELO
W
I 14
.5%
,__ _
__
_ s_,o_
e_,_o_
N_s._o
•_• _
_ ~
E
R~
-P
AR
KA
DE
EN
TRY
RA
MP
\
\ \ ' ' I f
_J
L
----,
/
I I I
73
'-3
1/2
"
7
i 1DIO-
A11';
454S
F _
_..,,
1i,1,_.
,j
..._
_ .1
45
2SF
17
'-8
3/4
"
2.1%
BIK
E R
AC
KS
(12
1 C
LAS
S 2
,
i D
I
32
'-6
"
C)
18' -
11"
SE
TBA
CK
5
·6.0
1
15'-
11"
4.9
m
~;::
r-----
6
l--1
5·-
o·
(4.6
ml C
LEA
R
I B
ELO
W O
VE
RH
AN
G
I I
t 9
'-0
"w x
<-O"
h 0/H
DO
OR
I I
I I
LOA
DIN
G
,.
I I
I I
I-B
UIL
DIN
G O
UT
LIN
E A
BO
VE
-6
.0
I L
_
__
_ _
I , _
__
__
__
_
~ 7
B
8
,__
DN
9 5.
0%
10
0
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AV
EN
UE
VA
NC
OU
VER
. BC
CA
NA
OA
V5T
lRB
T
EL 6
0.1; 7
36 1
1~
FAX
60t;
731
527
CO
PYR
IGfH
RES
ER\rE
O:T
HIS
PL.A
NA
NO
OES
IGN
AA
EN'IO
,U,1.
1.LTI
MES
REM
,I.IN
HIE
EX
CU
JSfV
EPR
OPE
RTV
OFG
BL,
t..R
CH
ITEC
TSIN
C..i.
NO
MA
YN
OT
8EU
S€00
R
REPR
OO
UCE
OW
ITHO
UTT
HEI
RWRI
TTEN
CO
NSE
NT
NO
TES
DP
19-
8666
90
Pla
n#
4 M
ay 5
, 202
0
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03
-19
DES
CR
IPTI
ON
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
LEV
EL 1
DAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
04:5
7:07
PM
Aut
hor
Che
cker
1/8
":l'-0
"
1602
2
A-1
.02
![Page 79: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/79.jpg)
-6.0
30
'-11
1/1
."
,-----
-----
' I ' I I \ ' \ ' ' \ ' ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \
\ \ \
2 3
4
47
'-B
" 5
6'-
97
/8"
41
'-1
0"
14
7'-
97
/8"
16
'-S
"
----
----
----
----
----
----
----
----
----
----
----
----
----
----
6'-
r
\ ' ' \
' ' \ ' '
t.9
'-2
"
32
'-9
" 9
'-8
"
BALC
ONY.
7 I __
_J
I '
,~--
I
"JA
NIT
OR
'S C
LOSE
T L3
& 5
, 7
UN
IT S
TOR
AGE
L 2,
4. 6
I
L
-.J
, L
56
'-3
"
56
'-3
*
BA
LCO
NY
I I I
L
8'-
10
" 1
2'-
G"
BA
LCO
NY
B
ALC
ON
Y
i _j
'
! ----
r
8'-
10
" 12
'-4
" 8
'-1
0"
-r ---------
42
'-5
"
36
'-5
"
~
774S
F
29
'-9
"
c ~ ,
7 I
I L,
6'-
0"
' B
AL
q•N
Y
6'-
0"
b
I I
'---
----
----
--_
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
J
C)
5
-6.0
1
6
-6.0
7 8
-6.0
3
9 10
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E V
AN
CO
UV
ER,
BC
CA
NA
DA
VST
lRB
TEL
604
7361
1!:
FAX
604
7315
27
COPY
RIGH
T R
ESER
VED
: IH
ISPL
.AN
AH
OO
ESIG
HA
AE.
I.NO
Al
All
TIM
ESR
EM.IJ
N T
HE
EXC
LUSI
VE P
RO
PE
RTY
O~G
9Ll>
RC
HIT
EC
TSIN
C . .
1.N
DM
AYN
OT
BE U
SED
OR
REP
RO
OU
CED
WlT
HO
UT
THEI
RW
R!T
TEN
CO
NSH
IT
NO
TES
DP
19-8
6669
0 P
lan#
5
May
5, 2
020
REV
ISIO
NS
NO.
DAT
E D
ESC
RIP
TIO
N
1 D
ate
1 Re
visi
on 1
1
2019
-06-
28
DP
App
licat
ion
2 20
20-0
2-18
D
P C
omm
ents
3
2020
-03-
19
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rogr
ess
Revi
ew
LEV
EL
2-5
DAT
E D
RA
WN
BY
CH
EC
KE
D B
Y S
CA
LE
JOB
NU
MB
ER
J/19
/202
010:
28:J
SAM
Aut
hor
Che
cker
1/8"
=1'
-0"
1602
2
A-1
.03
![Page 80: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/80.jpg)
-6.0
1
-6.0
L6
30'-
111/
t."
,------
----
' I ' I I \ I \ ' ' \ ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ;s N \ \
\ \ \
\ \ \
2 3
47
'-8
" 5
6'-
97
/8"
41
'-1
0"
14
7'-
97
/8"
16
'-5
"
----
----
----
----
----
----
----
-1--
----
----
----
----
----
--
\ ' ' '\
' ' ' ' '
49'-
2"
56
'-3
" t.
2'-
5"
32
"-9
"
I ~
~~
~
,-7
L
12
'-4
"
U'1
'-"
D
<---
0-
a:i
~
E:::.
E
E
ro
"' N ~
~
:r:
:r:
(')
(')
w
w
:r:
:r:
56'-
3"!
l I
· I illim
i~:::i
ll l.i5
51F
' I I,
36'-
5"
BALC
ON
Y
~
992S
F
lsru
o10-
~l
I 459
.~/-U-"
8'-
10
" 2
9'-
9"1
5'-
9"
5·.
3·
11
5•.
3•
I
- ~
I I
'----
----
-..:.
---
---------
t---
----
----
----
----
----
----
-__
_;,
__ J
-6.0
4
C)
5
-6.0
1
6
"' i:J
-6.0
7
1,.. ~
8
,_
-6.0
3
9 10
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
. BC
CA
NA
DA
VS
T 1R
8 TE
L 60
4 73
611E
FA
X 60
4 73
1527
COPY
RIGH
T R
ESER
VED
: TH
ISPL
A.N
AN
OO
ESIG
NA
AEA
NO
AT
.Ill
TIM
ES R
EM.I.I
N T
HE
EXCl
US
IVE
PR
OP
ER
TV0F
G8L
llFIC
HIT
ECT
SIN
C .
.,,,0
MA
VN
0T
BE
USE
0Oll
REP
!IOO
UC
EOW
IHtO
UT
TliE
IRW
RIT
TEN
CO
NSE
NT
NO
TES
DP
19-8
6669
0 P
lan#
6
May
5, 2
020
RE
VIS
ION
S
NO.
DAT
E DE
SCRI
PTIO
N
2019
-06-
28
DP
App
licat
ion
2020
-02-
18
DP
Com
men
ts
2020
-03-
19
AD
P C
omm
ents
549
1 N
o 2
Rd
DP
-P
rog
ress
Rev
iew
LEV
EL 6
DAT
E D
RA
WN
BY
CH
EC
KE
D B
Y S
CA
LE
JOB
NU
MB
ER
3/19
/202
010:
28:3
7AM
Auth
or
Che
cker
1/8
"=1
'-0
"
1602
2
A-1
.04
![Page 81: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/81.jpg)
-6.0
30
'-1
\"
9.t
.m
-,
SE
TBA
CK
----
' --
"' "'
---
Eu
---
;~~I ' I \ ' \ ' ' \ \
RE
QU
IRE
D
MIN
. S
ETB
AC
K
\
\ \ \
\ \ \ \ \ ~' ~ '
o
\ -;
?,
\
\ ' ' \ ' ' '\
--- -
----
----
3
--
I --
----
r----
----
----
I ------
' --
----
-
' ;---
--=-
-' ' ' ' ' ' ' ' '
RO
OF
AC
CE
SS
TO
M
ECH
AN
ICA
L E
QU
IPM
EN
T O
NLY
IMEC
H. R
OOM
I t.8
6SF
FLU
ID C
OO
LER
S
--,0
7'-
31
/2"
-----
32
.7m
14
4'-
7"
r:RO
OF
ACC
ESS
HAT
CH
0-, l
i L.
'.:l~
85' -
3 5/
8"
26
.0m
4
16
'-5
"
S.0
m
SE
TBA
CK
--7
I I I I i,_."
_, :-: i~'''-----
--
I 6
.0m
R
EQ
UIR
ED
SE
TBA
CK
I I I I I I I I I
C)
5 6 7
'>l
i'2
8 9 10
DP
19-
8666
90
Pla
n# 7
M
ay 5
, 20
20
RE
VIS
ION
S
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
OP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
R
. ev
1ew
ROOF
DA
TE
DRA
WN
BY
CH
ECK
ED B
Y SC
ALE
JOB
NU
MB
ER
3/19
/202
010:
t.1:0
4Afv
l
Aut
hor
Che
cker
1/8
"=\'
-0"
1602
2
![Page 82: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/82.jpg)
PL
31
'-1
3/4
"
9.5
m
--
--
--
--
---
MAX
. 18
m H
EIG
HT
I -------------
-1
--
~..
.b,,
~--
--I--
--J--
----
l---
---l
----
--l-
----
l---
---,b
....b
...,.W
I I
--
----------------r-----------
-r--
--
~~
~-~
-~~
~=
~---------
----------=
i--=
--=
-----------------=
-=
r~
------
-6.0
4
MA
TER
IAL
LEG
EN
D
# D
esc
ript
ion
Col
our
01
Cem
ent
Pane
l -
Oko
Ski
n li
quid
Bla
ck
02a
Cem
ent
Pan
el -
Har
die
Pane
l li
ght
Mis
t
02b
Cem
ent
Pan
el -
Har
die
Pan
el
Nio
ht G
rey
03
Cem
ent
Pane
l So
ffit
-H
ardi
e P
anel
C
edar
Ton
e
04
Gla
zin
g/
Vin
yl F
ram
e C
lear
/ Whi
te F
ram
e
05
Bal
cony
Doo
r w
Gla
zed
Pan
el
Cle
ar/ W
hite
Fra
me
06
Sto
refr
ont
Gla
zing
C
lear
/Wh
ite
Fra
me
07
Gla
zed
Gua
rd R
ail
Cle
ar/
Fro
sted
/ Alu
m.
Fra
me
DB
Gla
zed
Pri
vacy
Scr
een
O
paqu
e W
hite/
Alu
m.
Fra
me
09
Arc
hite
ctu
ra!C
oncr
ete
Nat
ura
l
10
RTU
Scr
een
-M
etal
Lou
vers
Li
ght
Gre
y
C)
RO
OF
~
22
.94
m
L6~
19
.89m
L5~
1
6.8
4m
~ E
L4
~
Not
es
13.7
9m
L3~
10
.74
m
L2~
7.
70m
L1
,, .. _
9"
4.50
m
Ll_
:_Lo
bby
~
3.9
1m
12
.03 n
3.67
m
Hor
izon
tal
[180
0mm
x 1
47m
m)
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAS
T 8
TH A
VE
NU
E
VA
NC
OU
VE
R,
BC C
AN
AO
AV
ST
1R8
TEL
6047
3611
~ FA
X 60
4 73
1 52
7
COPY
RIG
HTR
ESER
VEO
, TH
ISPL
AN
.t..N
OO
ESIG
NA
REA
NO
AT
AllT
IME
SRE
M.IJ
NTH
E EX
ClU
SIV
EPR
Ol'E
RT'
t'OFG
BLA
RC
HIT
ECTS
JNC
. .t..
NO
MA
YN
OTB
EUSE
OO
R
REP
RO
OU
CEO
WIT
HOUT
THE
IRW
RIT
TEN
CO
NSE
NT
NOT
ES D
P 1
9-86
6690
P
lan#
8
May
5, 2
020
REV
ISIO
NS
N
O.
DA
TE
2019
-06-
28
2020
-02-
18
2020
-03-
19
DESC
RIP
TIO
N
DP
App
licat
ion
OP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Rev
iew
NO
RTH
ELE
VA
TIO
N
DA
TE
DRA
WN
BY
CH
ECK
ED B
Y SC
ALE
JOB
NU
MB
ER
3/19
/202
010
:29:
0BA
M
Emil
yB
Chec
ker
As
indi
cate
d
1602
2
A-2
.01
![Page 83: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/83.jpg)
r cp r
cy cp
-6.0
3
8 S.a
1 .2
6.f6
rnfr
11
-IT
I I
b
-IJ- , I I
---
---
---
--
-6.0
-6
.03
ROOFC
\ 2
2.9
4m
L6~
1
9.8
9m
LS~
1
6.8
4m
L4~
13
.79
m
LJ~
1
0.7
4m
L2~
7
.70
m
L1
14' -
9"
4.5
0m
_ll-L
ob
by ~
3.9
1m
Fin
.Sit
e 12
.03
ft G
rade
Ele
v.
3.67
m
MA
TE
RIA
L L
EG
EN
D
# D
escr
ipti
on
01
Cem
ent
Pan
el -
Oko
Ski
n
Col
our
Liqu
id B
lack
02a
Cem
ent
Pan
el -
Ha
rdie
Pan
el
Lig
ht
Mis
t
02b
Cem
ent
Pa
ne
l -H
ard
ie P
an
el
NiQ
ht G
rey
03
Cem
ent
Pane
l Sof
lit -
Har
die
Pan
el
Ced
ar T
one
04
Gla
zing
/V
inyl
Fra
me
Cle
ar /
Wh
ite
Fra
me
05
Bal
cony
Doo
r w
Gla
zed
Pan
el
Cle
ar /
Wh
ite
Fra
me
06
Sto
rerr
ont
Gla
zing
C
lear
/ Whi
te F
ram
e
07
Gla
zed
Gua
rd R
ail
Cle
ar/
Fro
sted
/ Alu
m.
Fra
me
08
Gla
zed
Pri
vacy
Scr
een
O
paqu
e W
hit
e/ A
lum
. F
ram
e
09
Arc
hit
ectu
ralC
on
cret
e N
atur
al
10
RTU
Scr
een
-M
etal
Lou
vers
Li
ght
Gre
y
No
tes
Hor
izon
tal
[180
0mm
x 1
47m
m)
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CA
NA
DA
VST
lRB
TE
L 60
4 73
6 11
~ FA
X 60
.G 7
31 5
27
COPY
RIG
HT
RESE
RVEO
:TH
ISPU
.NA
NO
OE.
51G
NA
AEA
NO
ATA
l.LTI
ME.
5REM
AIN
HIE
EX
CLU
SIV
EPRO
PERT
YO
FGBL
ARC
MIT
ECTS
IMC.
A.N
OM
AV
NOT
BEU
SEO
OR
RE
PRO
OU
CEO
WIT
MOU
TTH
EIRW
R1n
rnco
NS
EN
T
NO
TES
DP
19-
8666
90
Pla
n# 9
M
ay 5
, 202
0
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP A
pplic
atio
n D
P C
omm
ents
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rog
ress
Rev
iew
WES
T E
LEV
ATI
ON
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
010:
29:2
8AM
Aut
hor
Che
cker
As
indi
cate
d
1602
2
A-2
.02
![Page 84: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/84.jpg)
IWIT
HIN
~:;,~
:~~E
;GR
~~-
---Plf
-___ [
_ :.______
_____ _____
J_ _____
_ _7-f
_______ o/
____ :°' ___
______
______
~L
-1
I ,,.
_,-·1
[,o
l _8
_ 01
3
5'-
03
1"'
3.
4m
I l-
10.7
m
----
----!~
' 11
I I
----
---
-I+
---
! I ~ E
! I -----
~,j1
t-l 11
I I
__
__
_ _
I_
-6.0
A
-6.0
1
!a !a !a b !a !a :., !a
RO
OF
~
22.9
4m
L6~
19.8
9m
LS~
16
.84
m
L4~
13
.79
m
L3~
10
.74
m
l2~
7.70
m
L1
14' -
9"
45
~
Ll_
:Lob
bt f:.i
. :..lQ::.
.......
3.91
m
Fin
.Sit
e 12
.Qlf
c G
rade
Ele
v.
3.67
m
C)
MA
TER
IAL
LEG
END
# D
escr
ipti
on
Col
our
No
les
01
Cem
ent
Pan
el -
0ko
Skin
li
quid
Bla
ck
Hor
izon
tal [
1800
mm
x 1
,Hm
m)
02a
Cem
ent
Pan
el -
Har
die
Pan
el
lig
ht
Mis
t
02b
Cem
ent
Pan
el -
Har
die
Pan
el
Nig
ht G
rey
03
Cem
ent
Pan
el S
offit
-H
ardi
e Pa
nel
Ced
ar T
one
04
Gla
zing
/ Vin
yl F
ram
e C
lear
/ Whi
te F
ram
e
05
Bal
cony
Doo
r w
Gla
zed
Pan
el
Cle
ar/ W
hite
Fra
me
06
Sto
refr
ont
Gla
zing
C
lear
/ W
hite
Fra
me
07
Gla
zed
Gua
rd R
ail
Cle
ar/
Fro
sted
/ Alu
m.
Fra
me
08
Gla
zed
Priv
acy
Scre
en
Opa
que
Wh
ite/
Alu
m.
Fra
me
09
Arc
hite
ctur
al C
oncr
ete
Nat
ural
10
RTU
Scr
een
-M
etal
Lou
vers
Li
ght
Gre
y
• G
BL A
RC
HIT
EC
TS
INC
.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CA
NA
DA
VS
T 1
R8
TEL
604
736
11~
FAA
604
731
521
COPY
RIG
HT
RESE
RVED
: TH
ISPL
.AN
AN
OO
ESjG
NA
REA
ND
AT
ALL
TIM
ESRE
MA
INTH
E EX
CLU
SIV
EPR
OPE
RT'
l'DFG
BLA
RC
HIT
ECTS
INC
.AN
DM
AV
ND
TBEU
SED
OR
RE
PRO
DU
CED
WIT
HD
UTT
HEI
RW
RIT
TEN
CD
NSE
NT
NO
TES
DP
19-8
6669
0 P
lan#
10
May
5, 2
020
REV
ISIO
NS
NO
. D
ATE
2019
-06-
28
2020
-02-
18
2020
-03-
19
DE
SCR
IPTI
ON
DP
App
(icat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
EAST
ELE
VA
TIO
N
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
0 10
:29:
48A
M
Aut
hor
Che
cker
As
indi
cate
d
1602
2
A-2
.03
![Page 85: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/85.jpg)
: -______
________
_______
-~ __
________
_______
~ _______
________
___ -C
f)-_____
_____ -~
~~si~~.":~~~o ,
ROI 10
I
i~:\~
1_
16
·-s·
F""
--------------'-+
---
_.,
0-m
----+
------
;..
I 1--
I I f !a
I ,-----
I b
I I !a
I -------,-
;'!
E
!a ~"
' s
i:2 ~
E
---
----I-
00"'
!;; ,l
,--
I r
MA
TER
IAL
LE
GE
ND
# D
escr
ipti
on
Col
our
RO
OF
~
22
.94
m
L6f::
\ 1
9.8
9m
LS~
1
6.8
4m
l4 f::
\ 13
.79m
LJ~
10
.74
m
L2~
7.
70m
l1
14
'-9
" 4.
50m
LI-
lob
by
~
3.9
1m
Fin.
Sit
e 12
.03 ~
Gra
de E
lev.
3.
67 m
Nol
es
C)
01
Cem
ent
Pan
el -
Oko
Ski
n li
quid
Bla
ck
Hor
izon
tal
(180
0mm
x 1
47m
m)
02a
Cem
ent
Pan
el -
Har
die
Pan
el
Lig
ht M
ist
02b
Cem
ent
Pan
el -
Har
die
Pan
el
Nig
ht G
rey
03
Cem
ent
Pan
el S
offi
t -
Har
die
Pan
el
Ced
ar T
one
04
Gla
zing
/ Vin
yl F
ram
e C
lear
I W
hite
Fra
me
05
Bal
cony
Doo
r w
Gla
zed
Pan
el
Cle
ar/W
hit
e F
ram
e
06
Sto
refr
ont
Gla
zing
C
lear
/ Whi
te F
ram
e
07
Gla
zed
Gua
rd R
ail
Cle
ar/
Fro
sted
/ Alu
m.
Fra
me
OB
Gla
zed
Pri
vacy
Scr
een
O
paqu
e W
hit
e/ A
lum
. F
ram
e
09
Arc
hite
ctur
alC
oncr
ete
Nat
ural
10
RTU
Scr
een
-M
etal
lo
uv
ers
lig
ht
Gre
y
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAS
T 8
TH A
VE
NU
E
VAN
CO
UVE
R,
BC C
AN
AD
A V
ST 1
R8
TE
L604
7361
1E
FAX
604
731
527
CO
PYR
IGH
TRES
ERVE
O:
THIS
PU
.NA
NO
OE
SIG
NA
RE
AN
O,U
ALL
TIM
ESR
EM,iJ
NTH
E EX
CLU
SI\IE
PRO
PER
TYO
FGB
LAR
CH
ITEl
;l'S!
NC
.AN
DM
AV
NO
TBEU
SED
OR
R
EPR
OO
UC
EOW
HH
OV
TTH
EIR
WR
ITIE
NC
ON
SEH
T
NO
TES
DP
19-
8666
90
Pla
n#
11
May
5, 2
020
REV
ISIO
NS
NO
DA
TE
DES
CR
IPTI
ON
2019
-06-
28
OP
App
licat
ion
2020
-02-
18
OP
Com
men
ts
2020
-03-
19
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
SOU
TH E
LEVA
TIO
N
DAT
E D
RAW
N B
Y
CH
ECKE
D B
Y SC
ALE
JOB
NU
MB
ER
3/1
9/20
2010
:30:
10A
M
Aut
hor
Che
cker
As
indi
cate
d
1602
2
A-2
.04
![Page 86: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/86.jpg)
CE
ME
NT
PA
NE
L JA
ME
S H
AR
DIE
PA
NE
L Li
ght
Mis
t
GU
AR
DR
AIL
S/ H
AN
DR
AIL
S
Alu
min
um
CE
ME
NT
PA
NE
L JA
ME
S H
AR
DIE
PA
NE
L N
ight
Gre
y
VIN
YL
WIN
DO
WS
& D
OO
RS
Cle
ar g
lazi
ng
/ whi
te f
ram
e
CE
ME
NT
PA
NE
L O
KO S
KIN
Li
quid
Bla
ck [
vary
ing
text
ures
) H
oriz
onta
l [18
00m
m x
147
mm
)
LOB
BY
WIN
DO
WS
& D
OO
RS
Sto
refr
on
t G
lazi
ng
Cle
ar G
lazi
ng
/ Whi
te F
ram
e
~----
CEM
EN
T P
AN
EL
SO
FFIT
-W
OO
D T
ON
E
=1-------
CEM
EN
T P
AN
EL
-LI
GH
T M
IST
------
CE
ME
NT
PA
NE
L -
OK
O S
KIN
-----~
STO
RE
FRO
NT
GLA
ZIN
G
-AR
CH
ITE
CTU
RA
L C
ON
CR
ET
E
BA
LCO
NY
PR
IVA
CY
SC
RE
EN
A
lum
fra
me
with
Opa
que
Gla
ss
.-+
----
CE
ME
NT
PA
NE
L -
LIG
HT
MIS
T
(AC
CE
NT
RE
VE
AL
PA
TTE
RN
}
Fll
--+
-f-
-+--
+--
--1-
--
1-1
-II
H!t
<L
JJ--
-;f-
--C
EM
EN
T P
AN
EL
SO
FFI
T -
CE
ME
NT
PA
NE
L S
OFF
IT
JAM
ES
HA
RD
IE P
AN
EL
Tru
eGra
in S
erie
s -
Ced
arto
ne
PLA
NTE
RS
& R
ETA
ININ
G W
ALL
S
Arc
hite
ctu
ral C
oncr
ete
WO
OD
TO
NE
WO
OD
EN
TRY
CO
LUM
NS
W
ood
-to
mat
ch s
off
it
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAS
T 8
TH A
VEN
UE
VAN
CO
UVE
R,
BC C
ANAD
A VS
T 1R
8 TE
L 60
4 73
611:
: FA
X 60
/4 73
1 52
7
CO
PYR
IGH
TR
HE
RV
EO
:Tlil
SPL
AN
AN
DD
ES
IGN
AR
EAH
O.I.
TAL.
LTIM
ESRE
M,1
,!NTH
E E
XC
llJS
IVE
PR
OP
ER
TYO
FGB
LAR
CH
ITE
ClS
INC
.AH
OM
AY
NO
TB
EU
SE
DO
R
NO
TES
DP
19-
8666
90
Pla
n#
12
May
5,
2020
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Revi
ew
MA
TER
IALS
DAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
010:
27:0
iiAM
Aut
hor
Che
cker
1602
2
A-0
.03
![Page 87: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/87.jpg)
MA
X.1
4m
HE
IGH
T~
cp (W
ITH
IN 2
6m O
F N
O.
2 RD
)
r---
----
----
----
----
----
----
----
----
---
----
----
----
----
----
----
-,
PL
I 16
'-
5"
I :
:
I I I
___
_ _
L_
I I _
__
__
_ _
l_
__
I I
----+
--
I I I
__
I
-
I I I -----1
-
I
----+
-
5.0
m
RE
Q'0
6m
S
ETB
AC
K
I I I
I :
fcp
I I
-__
I __
____
____
__ ,
I
PL
I
29
'-1
3/8
"
8.9
m
--
--
--
--,--
MAX
. 18
m H
EIG
HT
I
I I
--
-'-
----
---
---
_J
l I
:----
REO
'D 6
m
I SE
TBA
CK
I I
----:-
------1
I I
n i
,, I
: "
f_-::_-
::_~-::_
-::_~-:
:_-=:,
':_-::_:
:'.-::_-
::_-::_-
::_-::_-
::_~-:=
--::_-:
:_-::_-
::_-::_;
'::.~';:_
-::_~-:
:_-::_-
::_-::_-
::_-::_-
::_-::_-
::_-::_-
=,'-::;H
I> --
'--1
:'1
--, --
---
D
-6.0
t.
I I:
) L
----
--7 ~
I I -6
.0
RO
OF
~
22.9
lim
L6~
19
.89m
LS~
16
.84
m
L4~
13
.79
m
L3~
1
0.7
4m
L2~
7
.70
m
L1
4.5
0m
!:_! -
Lobb
y ~
3.9
1m
Fin.
Sit
e 12
.03
ft
Gra
de E
lev.
3.
67
m
• G
BL
AR
CH
ITE
CTS
IN
C.
139
EAST
8TH
AV
EN
UE
V
AN
COU
VER
, BC
CA
NA
OA
VST
IRS
TE
L 60
4 73
6 11
~ FA
X 60
li 73
1 52
7
COPY
RIGH
TRE
SER~
EO:
iHIS
PUN
AH
OO
ESI
GN
/III
EA
NO
AT
.lllT
IMES
REM
AjN
lliE
E
XC
WS
IVE
PR
OP
ER
TYO
FG9L
A.R
CH
ITE
CTS
IHC
.N-IO
M.l.
~HO
TBE
US
EO
OR
NOT
ES
DP
19-8
6669
0 P
lan#
13
May
5, 2
020
REV
ISIO
NS
N
O.
DA
TE
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
OP
Com
men
ts
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
SE
CTI
ON
A
DA
TE
DRA
WN
BY
CH
EC
KE
D B
Y SC
ALE
JOB
NU
MB
ER
3/19
/202
010
:30:
14A
M
Aut
hor
Che
cker
As
indi
cate
d
1602
2
A-6
.01
![Page 88: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/88.jpg)
tf I
~R
OO
F
I '
---
-2
2.9
4m
lo !'a
~L6
19
.89
m
0 !'a
(;;\
LS
16.8
4m
!'a
~L4
13
.79
m
' =
!'a
(:;;\ L
3 I
10
.74
m
I lo
=
I I
~L2
I
7.7
0m
~~
G2·-JQ
"\ L1
-Lo
~ -
: 3.
91
m
12.0
3~
F
in.
Site
3.
67 m
G
rade
Ele
v.
0.0
0m
', '- /
• G
BL
AR
CH
ITE
CT
S
INC
.
139
EA
ST
8TH
AV
EN
UE
V
AN
CO
UV
ER
, B
C C
AN
AD
A V
ST
1R
8
TEL
604
736
11~
FAX
60
4 73
1 52
7
NO
TES
DP
19-8
6669
0 P
lan#
14
May
5, 2
020
REV
ISIO
NS
NO
. D
ATE
2019
-06
-28
20
20-0
2-18
20
20
-03-
19
DE
SC
RIP
TIO
N
OP
App
licat
ion
DP
Com
men
ts
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rogr
ess
Revi
ew
SEC
TIO
N B
DAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SC
ALE
JOB
NU
MB
ER
3/1
9/2
02
01
0:3
0:1
9A
M
Au
tho
r
Che
cker
As
indi
cate
d
1602
2
![Page 89: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/89.jpg)
__
_ I _
_ _
--, I,
,-,--
32'
-10
7/8"
10.0
m
:-------
--------
--------
q:2----
--------
--------
--------
--------
v~~H
:~~."!~:~
o I;~
5.0m
I
ll--
cc--
--P
---+---c-----
;,=
=e.=
~=
~=
=~
~~
~=
!'_
_~
6=
a=
==
=-~
~------l--
1
::~~~~
; I
~~--
----~R-~1~--
--~,·~
~~
~~
t ___
__
l_
I
•~::
:==
==
::::
::::
~
=====m
=::::==
-i ==
====
::::::
:::~~
~~:::
::::::
:::::n~: 1
_ L _
__
_ +-
_ I]
I
m /
Ii
: SE
rt+
f-_-'"_~
_.___~_
-_-_-_
-+-'-'-
~---_-
_-_-_-
-:_-_-
_"'~--
-'_'-_
-_-'-_-_-
--'_~~
'---_-_
-_-_-_'
-_-_--
'~'---_~
_-_-'_
-_-_"
-_-'--_
-_-_-_
-_-_~
_-_---'
~"---~-f
-_-_-_'
-_-_~
~-'---
_-_-_-
_~_---'
_'-_=_-_
.__ __
____
_____
'-_-_
-_-_
~_-_~
_~.._1
-_---'.J...--
-jj --
---
--I -
; ~
11:7
HI
1 : '.
,_l-_"
'"_-'_'
--'_'-_
-_-_
-_+-
h-'--
_-_-
_-_-
_-_'-
-_-_-
'"~---
'_'-_-
_-'-_-
_'--'_
'-'-_-
_-_-
_-_-
_-'-_
-_--'-
_"-_
-_""-_-
_---'
_'-_-
_"-~-
'----_
-_-_
-_---
'_'-_
-_'-"
~---!+
'---_
-'-_-
_--'"_'-
'-_-_
-_-_
-_-"-
_--'_
'-_""-~-
--'--_
-_-_
-_-_
--'_-_-
_-_-'-_
-_--"_
'-"_,;
--,--_.
J...'---.-
--f'lf --
---
--1
--
m
i -
---+
--I
7 I ""
I
I ,-
,---
--,-
---=
-""~
~,,
.=--
~,,
.:::
;-~
~~~
~.;-~
~~~
--+
~-:
:Jf"
-_ _,
_[~I -~l
~I -~
:---I
: -1
----
-I
---
-
E :::i
ea
19.8
9m
16.8
4m
3 35
•.
3·•
10.7
4m
2~
7.70
m
"==-
=-==
'='-=
-==-
-=-c
==-=
-===
-==-
t==+
=c--
==c-
=-==
-=--
====
-=-=
=--=
-c==
-=-=
==-=
=-==
=-==
-=±=
c-=--_
=-=-=-
=-=-=-
=-=-=-
c:-=-=-
=-=---
=---=
--=---
=-=-
===-
±', +-
---
----
-j ---
-S=EA
=LE=
VE~L
~,.=o,
~m~
-6.0
12.0
3ft
3.67
m
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CAN
ADA
V5T
1 RB
TE
L6•4
7361
1!:
FAX
604
731
527
COPY
!IIGH
TRE
SEIIV
EO:
TtllS
PU.N
AN
OO
ESIG
NA
AE
.lNO
AT.l.
l.LTI
MES
REM
AlN
THE
EXC
WSI
VEPR
OPE
RTY
OFG
BLA
RC
HIT
EC
TSI
NC
..lN
OM
AY
ND
lllE
USE
OO
R
NO
TES D
P 1
9-86
6690
P
lan
# 1
5 M
ay 5
, 202
0
REVI
SIO
NS
NO
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP A
pplic
atio
n D
P C
omm
ents
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
SE
CTI
ON
C
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MBE
R
3/19
/202
010
:30:
25A
M
Aut
hor
Che
cker
As
indi
cate
d
1602
2
A-6
.03
![Page 90: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/90.jpg)
RO
OF
~
22.9
t;m
6 !:,
L6~
19
.89
m
!:,
LS~
16
.Bt;m
!:,
E
Lt;
~
£' 13
.79m
!:,
L3~
10
.7t;
m
!:,
L2~
7.7
0m
FUTU
RE
!.
,
DE
VELO
PM
EN
T !:,
' <>
PA
RK
ING
I
' ' I
' ' '
' '
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CA
NA
DA
VS
T 1R
B T
EL 6
0t;
736
11~
FA
X 60
t; 73
1 52
7
COPY
RIG
tH R
ES
ER
'IW:
THIS
PLA
N A
NO
OES
WN
,1,R
EANO
/>.T
/>.LL
Tl~
ES
REl
4.IJ
N T
HE
EX
CLI
JSI\/
EP
RO
PE
RTY
OFG
IIL.4
RC
HIT
EC
"ISIN
C..1
.N0t
,.1A
YN
OTl
!EU
SE
OO
R
RE
PR
OD
UC
EO
WIT
HD
UT™
EIR
WR
ITTE
NC
ON
SE
NT
NO
TES
DP
19-
8666
90
Pla
n# 1
6 M
ay 5
, 20
20
RE
VIS
ION
S
NO.
DAT
E
201
9-06
-28
2020
-02-
18
2020
-03-
19
OES
CR
JPTI
ON
OP
App
licat
ion
DP
Com
me
nts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
SEC
TIO
N D
DAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SC
ALE
JOB
NU
MB
ER
3/19
/202
010:
30:2
9AM
Aut
hor
Che
cker
As
indi
cate
d
1602
2
A-6
.04
![Page 91: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/91.jpg)
ALL
PLA
NT
S T
O B
E N
UR
SE
RY
GR
OW
N
ALL
PLA
NT
MA
TE
RIA
LS
AN
D L
AB
OU
R T
O C
ON
FO
RM
T
O T
HE
CU
RR
EN
T E
Ol'T
10N
OF
THE
CS
LA/C
LNA
ST
AN
DA
RD
S.
AL
L P
LAN
T M
AT
ER
IAL
TO
BE
IN
SP
EC
TED
PR
IOR
TO
DE
LIV
ER
Y O
N S
ITE.
C
ON
TR
AC
TOR
TO
AR
RA
NG
E F
OR
IN
SP
EC
TIO
N A
ND
MA
TE
RIA
L TO
AS
SE
MB
LED
IN
ON
E L
OC
ATI
ON
FO
R R
EV
IEW
.
IMP
OR
TE
D G
RO
WIN
G M
ED
IA S
HA
U. B
E A
SA
ND
Y L
OA
M O
R L
OA
MY
S
AN
O T
EX
TUR
E (
NO
LE
SS
TH
AN
50
% S
AN
D B
Y W
EIG
HTI
C
ON
TAIN
ING
4 A
NO
15%
OR
GA
NIC
MA
mR
(OR
Y W
EIG
HT
BA
SIS
).
GR
OW
ING
ME
DIA
SH
AU
. BE
FR
EE
FR
OM
SU
BS
OIL
.
WO
OD
IN
CLU
DIN
G W
OO
DY
PLA
NT
PA
RTS
. IN
VAS
IVE
AN
O N
OX
IOU
S P
LAN
T A
ND
TH
QR
R
EP
RO
DU
OB
LE P
AR
TS,
PLA
NT
PA
lHO
GE
NIC
OR
GA
NIS
MS
. O
RG
AN
IC O
R I
NO
RG
AN
IC
MA
TER
IALS
, TO
XJN
S.
STO
NE
S O
VE
R 3
0mm
(1.2
"). A
NY
DE
BR
IS A
NO
FO
RE
IGN
OB
JEC
TS.
IMP
OR
TE
D G
RO
WIN
G M
ED
IA S
HA
U. C
ON
FOR
M T
O A
NO
BE
TR
EA
TED
AS
PER
SE
CllO
N
6.2.
3 TO
6.2
. 7 IN
CLU
SIV
E O
F TH
E C
UR
RE
NT
ED
ITlO
N B
CLN
A S
TAN
DA
RD
S.
GR
OW
ING
ME
DIU
M S
HA
LL C
ON
FOR
M T
O L
EV
EL
1 "W
ELL
-GR
OO
ME
D"
AR
EA
S: L
OW
TR
AFF
IC L
AW
N A
RE
AS
, TR
EE
S A
ND
LA
RG
E S
HR
UB
S j
1 LIN
TA
BLE
T
-6,3
,5.1
OF
THE
C
UR
RE
NT
ED
ITIO
N O
F TH
E C
SL
NB
LN
A S
TAN
DA
RD
S}.
11 S
HA
LL P
OS
SE
SS
lH
E F
OLL
OW
ING
OU
Al.l
llE
S·
TE
XT
UR
E-
"CO
AR
SE
GR
AV
EL
(LA
RG
ER
TH
AN
19m
m A
ND
SM
AL
LER
TH
AN
40m
m):
0-1
%
'ALL
GR
AV
EL
(LA
RG
ER
TH
AN
2m
m A
ND
St,,l
AL
lER
TH
AN
40
mm
): 0
.5%
·S
AN
O (
LAR
GE
R T
HA
N 0
.05
mm
AN
O $
MA
UE
R
TH
AN
2m
m):
50
-70
%
'SIL
T (l
.AR
GE
R T
HA
N 0
.00
2m
m A
ND
SM
AU
ER
TH
AN
0.0
5mm
): 1
0-25
%
'CLA
Y (S
MA
LLER
TI-I
AN
0.0
02m
m):
0-2
0%
'C
LAY
AN
O S
ILT
CO
MB
INE
D: M
AX
IMU
M 2
5%
OR
GA
NIC
CO
NT
EN
T: 3
-10
%
Acl
dit
yjp
H):
6.0
.7,0
DR
AIN
AG
E:
PE
RC
OLA
TIO
N S
HA
LL B
E S
UC
H T
HA
T N
O S
TAN
DIN
G W
ATER
IS
VIS
IBLE
60
M
INU
TES
AFT
ER
AT
LEA
ST
10
MIN
UTE
S O
F M
OD
ER
ATE
TO
HE
AV
Y R
AIN
OR
IRR
IGA
TIO
N.
MIN
IMU
M S
OIL
OEP
lH T
O B
E A
S P
ER
!A
BLE
T 6
.3.5
.5 O
F T
HE
CU
RR
EN
I E
Olll
ON
BC
LNA
S
TAN
DA
RD
S:
Ove
r pr
epar
ed
su
bg
rad
ew
he
reth
e
subs
oil d
rairi
s ra
p1c
ly
TRE
ES
(1
0m
2 P
ER
TR
EE
} 6
10
MM
(24
")
LAR
GE
SH
RU
BS
6
10
MM
(24
'1
GA
OU
NO
CO
VE
RS
30
0 M
M (
12")
LA
WN
-IRR
IGA
TED
15
0 M
M (
6')
LAW
N-N
OT
IRR
IGA
TED
lS
OM
M
(6')
Ove
r st
ruct
ure
s o
r w
he
re t
he
su
bso
il d
rain
s ?
OM
Y
75
0M
M\3
0')
61
0M
M(2
4')
22
5M
M(9
') 1
50
MM
(6')
225M
M(9
')
SO
IL D
EP
THS
'ML
L B
E C
HE
CK
ED
AT
TIM
E O
F S
UB
STA
NTI
AL
CO
MP
L£T
l0N
REv
'IEW
SO
IL F
OR
UR
BA
N A
GA
ICU
L TU
RE
PLO
TS IS
TO
BE
UR
BA
N G
AO
PR
OI/I
DE
D B
Y V
EA
ATI
::C.
OR
AP
PR
OV
ED
ALT
ER
NA
TIVE
. S
OIL
FO
R U
RB
AN
AG
RIC
ULT
UR
E A
RE
AS
IS T
O M
EE
T O
R
EX
CE
ED
TH
E G
UID
ELI
NE
S F
OR
CO
MP
OS
T Q
UA
UT
Y U
ND
ER
CA
NA
DIA
N C
OU
NC
IL O
F M
INIS
TCA
S o
r TI-t
E C
NVI
RO
NM
CN
T (C
CM
E).
CO
MP
OS
T IS
TO
BE
TES
TED
AN
O R
ES
ULT
S S
UB
MIT
TE
D T
O C
ON
SU
LTA
NT
PRIO
R T
O
DE
LIV
ER
Y T
O S
ITE.
BE
DS
TO
HA
VE
50M
U (
2' )
MU
LCH
LA
YE
R (
afte
r set
Uin
g) C
ON
SIS
TIN
G O
F O
RG
AN
IC
CO
MP
OS
TE
D B
AR
K A
PP
LIE
D.
PLA
NTI
::D A
RE
AS
TO
HA
VE
PE
RM
AN
EN
T H
IGH
EFF
ICIE
NC
Y IR
RIG
ATI
ON
SY
ST
I::M
. SH
OP
D
RA
WIN
GS
AR
E T
O B
E P
RE
PA
RE
D B
Y A
N I
AB
C C
ER
TIFI
ED
DE
SIG
NE
R A
NO
AP
PR
OV
ED
BY
LA
ND
SC
AP
E A
AC
Hll
EC
l.
CO
NTR
AC
TOR
TO
PR
OI/I
OE
MA
INTE
NA
NC
E F
OR
1 Y
EA
R F
OU
.OW
ING
SU
BS
TAN
TIA
L C
OM
PLE
TlO
N.
CO
NTR
AC
TOR
TO
PR
OV
IDE
WR
ITTE
N 1
YE
AR
WA
RR
AN
TY
ON
PLA
NT
MA
lcR
lAL
CO
NTR
AC
TOR
TO
PR
OV
IDE
CO
PY
OF
SO
IL T
ES
T TO
LA
ND
SC
AP
E C
ON
SU
LTA
NT
3 W
EE
KS
P
RIO
R T
O D
ELI
VE
RY
ON
-SIT
E.
TES
T TO
BE
PE
RFO
RM
ED
BY
AN
IND
EP
EN
DE
NT
LA
B A
ND
IS
TO
IN
CLU
DE
RE
CO
MM
EN
OA
llON
S F
OR
BO
TH L
AW
N A
ND
PLA
NTI
NG
BE
DS
.
CO
NS
UL T
AN
T T
O A
PP
RO
VE
SO
IL B
EFO
RE
IN
STA
LLA
TIO
N.
THIS
DO
ES
NO
T PR
EC
LUD
E
THE
CO
NS
ULT
AN
T FR
OM
PE
RFO
RM
ING
AN
IN
DE
PE
ND
EN
T S
OIL
AN
ALY
SIS
AT
TIM
E O
F S
UB
STA
NTI
AL
CO
MP
LETI
ON
. C
ON
TRA
CTO
R W
ILL
BE
RE
SP
ON
SIB
LE F
OR
RE
MO
VA
L A
ND
R
EP
LAC
EM
EN
T O
F S
OIL
li-l
AT D
OE
S N
OT
ME
ET
SP
EC
IFIC
ATI
ON
S A
l N
O E
XTR
A C
OS
T TO
C
LIE
NT.
CO
NTR
AC
TOR
TO
PR
OV
IDE
WR
ITT
a.11
YE
AR
WA
RR
AN
TY
ON
SO
IL S
PE
CIF
ICA
TIO
NS
.
AN
IND
EP
EN
DE
NT
SO
IL lc
ST
TO B
E PR
OV
IDE
D 1
WEE
K P
RIO
R T
O E
NO
OF
1 Y
EA
R
WA
RR
AN
TY P
ERIO
D C
ON
TRA
CTO
R T
O P
AO
I/ID
E S
OIL
AM
EN
DM
EN
TS T
O B
RIN
G S
OIL
UP
TO
Q
UA
LITY
RE
CO
MM
EN
DE
D I
N
SO
ILS
RE
PO
RT,
SIT
E I
NS
PE
CT
ION
E
XA
MIN
E E
XIS
TIN
G S
UB
GR
AO
E C
ON
DIT
ION
S A
NO
SIG
NIF
Y A
CC
EP
TAN
CE
IN
WR
iTIN
G T
O
THE
CO
NS
UL T
AN
T.
AS
CE
RTA
IN T
HE
SIZ
E A
NO
LO
CA
TIO
N O
F A
U. E
XIS
llNG
SE
RV
ICE
S A
NO
SU
BG
RA
DE
S
PR
IOR
TO
TH
E W
OR
K.
IMM
ED
IATE
LY
RE
PA
IR D
AM
AG
E R
ES
ULn
NG
FR
OM
FA
JLU
RE
TO
EX
ER
CIS
E S
UC
H
PR
EC
AU
TIO
NS
AT
NO
CO
ST
TO T
HE
OW
NE
R.
AU
. PR
UN
ING
TO
BE
IN A
CC
OR
DA
NC
E 'M
TH
TH
E B
CLN
A/B
CS
LA S
TAN
DA
RD
S C
UR
RE
NT
ED
lllO
N.
PLA
NT
CO
UN
TS
IN
lH
E C
AS
E O
F A
NY
DIS
CR
EP
AN
CY
BE
TWEE
N P
L.AN
T C
OU
NTS
ON
PLA
Nl
US
T A
ND
P
LAN
T S
YM
BO
LS O
N D
RA
WIN
G.
THE
OR
A\-V
ING
S T
AK
ES
PR
EC
ED
EN
T. T
HE
CO
NTR
AC
TOR
IS
TO
VE
RIF
Y A
LL P
LAN
T C
OU
NTS
AN
D N
OTI
FY C
ON
SU
L TA
NT
OF
AN
Y D
ISC
RE
PA
NC
Y.
S,R
O F
RIE
ND
LY P
L.A
NT
lNG
P
LAN
TS
TH
AT
EN
AB
LE 8
1RD
-FR
IEN
DL
Y H
AB
ITA
T C
ON
SE
RVA
TIO
N A
ND
PR
OM
OTl
ON
HAV
E B
EE
N S
ELE
CTE
D A
ND
CA
N B
E F
OU
ND
li-l
AD
UG
HO
UT
THE
LA
ND
SC
AP
E.
PLA
NT
ING
IS
G
RO
UP
ED
IN N
AT
UR
ALI
ZE
D L
AY
ER
S O
F T
RE
ES
. TA
LL S
HR
UB
S
LOW
SH
RU
BS
AN
O
GR
OU
NO
CO
VE
RS
, l,II
MIC
KIN
G T
HE
ID
EAL
ENV
IRO
NM
EN
TA
L C
ON
DlT
ION
S F
OR
BIR
OS.
T
HE
SE
LA
YE
RS
Vvl
LL B
E V
ARIE
D W
TH
A D
IVE
RS
ITY
OF
TE
XT
UR
ES
AM
O D
EN
SIT
IES
TH
AT
A
TT
RA
CT
S A
ND
PR
OT
EC
TS
MA
NY
BIR
O S
PE
CIE
S.
SP
EC
IFIC
LO
CA
L A
NO
NO
N-IN
VA
SIV
E
PLA
NT
SP
EC
IES
HA
VE
BE
EN
SE
LEC
TE
D B
AS
ED
ON
TH
EIR
AB
IUTY
TO
PR
OV
IDE
YE
AR
R
OU
ND
FO
OD
FO
R B
IRO
S A
NO
/OR
YE
AR
-RO
UN
D N
ES
TIN
G O
PP
OR
TUN
ITIE
S.
LIG
HT
ING
LE
GE
ND
S/W
•Pl
-#''
GR
AD
ING
LE
GE
ND
~
BS
0.0
0m
FG
0.0
0m
IG 0
.00
m
BG
O.O
Om
TS
LO
.OO
m
ST
EP
/WA
LL
LIG
HT
PA
TH
LIG
HT
TR
EE
AC
CE
NT
DO
WN
UG
HT
DO
WN
LIG
HT
TW
-T
OP
OF
WA
LL
B
W -
BO
TT
OM
OF
WA
LL
TS
-T
OP
OF
ST
EP
BS
-B
OT
TO
M O
F S
TE
P
FG -
FIN
AL
GR
AD
E
I G-
INT
ER
PO
LATE
D G
RA
DE
BG
-B
UIL
DIN
G G
RA
DE
TS
L -
TO
P O
F S
LA
B
IRR
IGA
TIO
N L
EG
EN
D
AR
EA
TO
BE
IR
RIG
ATE
D
HB•
HO
SE
BIB
IRR
IGA
TIO
N S
TU
B-O
UT
Not
e:
Ref
er l
o ca
nadi
an l
ands
cape
sta
ndar
d, l
yp.
GR
OW
ING
ME
DIU
M L
EG
EN
D
CJ
~I ~
61
0 M
M (
24")
SO
IL D
EP
TH
90
0 M
M (
3')
SO
IL D
EP
TH
750
MM
(30
") S
OIL
DE
PT
H
MA
TE
RIA
LS A
ND
FU
RN
ISH
ING
S
PA
YE
RS
l tD
R
EF
ER
EN
CE
D
ES
CR
IPT
ION
P
1 1/
L1
0.0
G
LA
CIE
R P
OR
CE
LA
IN P
AV
ER
S
P2
1/L1
00
R
IVE
R P
OR
CE
LA
IN P
AV
ER
S
P3
1/
L1
0.0
M
AN
TL
E P
OR
CE
LA
IN P
AV
ER
S
P4
6/l1
0.0
D
RIP
ST
RIP
SIT
E F
UR
NIS
HIN
GS
ID
R
EF
ER
EN
CE
D
ES
CR
IPT
ION
S
1 1
/l1
30
L
AR
GE
AR
BO
UR
S
2 2
/l1
3 0
S
MA
LL
AR
BO
UR
S
3 3
/l1
2.0
BE
NC
H W
AL
L S
4 3
/l1
1.0
SE
AT
BE
NC
H/S
TO
RA
GE
S
S
1/L
14.
0
JOIN
AB
LE
TA
BLE
S
S6
1
/L1
1.0
M
BE
R P
LA
NT
ER
S
S7
1/L
15
.0
CLJ
MB
ING
NE
T
S8
4/L
11.
0 TI
MB
ER
SE
AT
ING
BL
OC
KS
S9
5
/L1
40
L
ON
G B
EN
CH
S
10
6
/L1
4.0
M
OV
EA
BLE
CH
AIR
S
S11
2/l1
4 0
BIK
E R
AC
KS
S
12
4
/L1
4.0
CH
ILD
RE
N'S
PL
AY
HO
US
E
S1
3
2/L
11
0 B
IRD
HO
US
ES
2
BIR
D T
YP
ES
S1
4 P
MT
SC
RE
EN
\f\l
RA
P
S1
5
3!L
15.
0
PIN
E B
EN
CH
S
16
21
L1
5.0
B
EE
SP
RIN
GE
R
HA
RD
SC
AP
E
I1D
R
EF
ER
EN
CE
D
ES
CR
IPT
ION
H
1 2/
L1
2.0
-
RE
TE
PL
AN
TE
R
H2
2
/L1
2.0
T
EP
S
H3
3
4/U
L1
0.0
V
ING
H
4
5/L1
0.0
S
UR
FA
CIN
G
HS
7/
L1
0.0
A
SP
HA
LT
PA
VIN
G -
PE
D.
PA
TH
FE
NC
ING
I 1
D
RE
FE
RE
NC
E
IDE
SC
RIP
TIO
N
F1
2/L1
1.0
M
ET
AL
FE
NC
E
DP
PL
AN
T U
ST
TR
EE
S
Ao
s 22
A
cer
oa
lma
tum
'S
eirv
u'
Jan
an
ese
ma
ole
as
sh
ow
n
5cm
ca
l B
&B
fu
ll/b
ush
v o
lan
ts
Asa
3
Ace
r sh
ira
saw
an
um
'Au
tum
n M
oo
n'
Au
tum
n M
oo
n J
ao
an
ese
ma
as s
ho
wn
2.
Sm
hV
B&
B
2m
sta
nd
ard
/ fu
ll cr
ow
n
He
6
Hal
esia
ca
rolin
a
Car
o in
a S
ilve
rbel
l a
s sh
ow
n
5cm
B&
B
mu
llist
em
me
d/ b
ush
v •I
Md
3 M
ao
no
lla d
en
ud
ata
Y
ulan
ma
on
olla
as
sh
ow
n
7cm
ca
l/B
&B
2
m s
tan
da
rd/ f
ull
cro
wn
SH
RU
B S
/GR
U
NO
CO
VE
RS
/ P
ER
EN
NIA
LS
A
a 6
Am
elan
chie
r al
nifo
lia
Sa
ska
toon
se
rvic
eb
en
v 7
.00
0 #
5 co
nt
full/
bu
shv
lan1
s/ m
ult'
A
m
21
Aza
ra m
icro
nh
Ila
B
ox
lea
f aza
ra
1.0
70
#3
cont
. fu
I/ b
ush
v la
nts
Cn
70
C
arex
ne
nd
ula
D
roo
nin
n s
ed
ne
2.
000
#1 c
on
t D
e 16
1 D
Bsc
ham
nsia
ca
esn
itosa
T
uft
ed
Hai
r G
rass
.3
80
#2
con
t fu
ll/ b
ush
v la
nts
NB
W
En
w
66
E
nim
ed
ium
x w
arle
vens
e W
arl
e B
ish
on
's h
at
.30
0 #
2 co
nt.
full/
bu
shv
ola
nts
E
p G
em
1
56
G
era
niu
m m
acr
orr
hiz
um
Be
van
's V
arie
tv
Bia
roo
t Cra
ne
sbill
1
00
0 #
1 co
nt
full/
bu
shv
olan
1s
p n
8 La
nic
era
x o
uro
usi
i h
vbri
d h
on
evs
uck
le
1.0
70
#2
cont
. fu
ll/ b
ush
v o
lan
ts
Mst
r 27
M
att
eu
cda
str
uth
ioo
teri
s E
uro
oe
an
Ost
rich
Fe
m
2.0
00
AI
I-P
um
ose
Pla
n1 F
oo
d
Do
75
O
xalis
ore
oa
na
re
dw
oo
d s
orre
l 1
00
0 #
1 co
nt.
full/
bu
shv
lant
s N
E P
R
on
62
R
osa
nu
tka
na
N
oo
tka
ros
e ...
#2
con
t.
full/
bu
shv
lan
ts
Rs
13
Rlb
es s
anau
lneu
m 'K
ina
Ed
wa
rd'
flo
we
rina
cu
rra
nt
3.0
00
#5
con
t fu
ll/ b
ush
v la
nts
S
a 34
S
vmo
hori
caro
os
alba
sn
ow
be
rrv
2 5
00
#5
co
nt
ful /
bu
shv
nla
nts
Sh
15
Sa
rco
co
cca
ho
oke
ria
na
var
. H
um
ilis
swe
et
bo
x 1
.50
0 #
2 co
nt.
Ful
l b
ush
v n
lan
ts
Sh
m
29
Sch
izo
nh
ran
ma
hvd
ran
ne
oid
es
'Mo
on
be
Ja
na
ne
se h
vdra
nn
ea
vin
e 4
.00
0 #
2 co
nt.
sla
ked
S
I 1
58
S
olid
ast
er l
ule
us
'Le
me
re'
'Le
mo
re'
So
ida
ste
r 3
00
#2
con
t.
full/
bu
shv
nla
nts
B
p
Snl
4
1 S
on
ho
ra n
rost
rata
'Litt
le B
ab
v'
dw
arf
ko
wh
al
2.0
00
#2
con
t fu
ll/ b
ush
v la
nts
s,
66
S
arc
oco
cca
ru
scilo
lia
fran
rant
sa
rco
cocc
a
1.5
00
#3
cont
. fu
ll/ b
ush
v la
nts
Tm
h
41
Tax
us m
ed
ia 'H
icks
ii'
An
nlo
·an
vew
1.
50
0 1
.2m
/B&
B
full.
bu
shv
0Ia
nts
EW
V
e 17
V
acci
nlu
m c
orv
mb
osu
m
blu
eb
en
v 2
.50
0 #
5 co
nt
full/
bu
shv
lant
s V
ol
77
Vac
cin
ium
ova
lum
'lh
un
de
rbir
d'
ever
aree
n h
uck
leb
errv
...
#
2co
nt •
0
.00
0
LA
WN
N
on
-Ne
tte
d.
aro
wn
on
san
d
0 0
0 0
as s
ho
wn
0
0
1 A
LL
LA
ND
SC
AP
E T
O C
ON
FO
RM
TO
TH
E C
UR
RE
NT
ED
ITIO
N O
F T
HE
CS
LA
ST
AN
DA
RD
S F
OR
LE
VE
L 2
'GR
OO
ME
D'
LAN
DS
CA
PE
TR
EA
TM
EN
T I
N T
HE
EV
EN
T O
F A
D
ISC
RE
PA
NC
Y B
ET
WE
EN
TH
E P
LAN
T U
ST
AN
D T
HE
PLA
NT
ING
PLA
N
TH
E P
LAN
TIN
G P
LAN
TA
KES
PR
EC
ED
EN
CE
. 2
SE
AR
CH
AR
EA
TO
IN
CLU
DE
BR
ITIS
H C
OL
UM
BIA
WA
SH
ING
TO
N A
ND
OR
EG
ON
3
N-
NA
TIV
E
E -
EV
ER
GR
EE
N
8 -
BIR
D F
RIE
ND
LY
P -
PO
LLIN
AT
OR
E
d-
ED
IBLE
W
-W
INT
ER
IN
TE
RE
ST
SIZ
E
MO
DE
L
MA
NU
FA
CT
UR
ER
C
OM
ME
NT
C
OL
OU
R
OT
Y
2,2
' O
UA
RZ
ITI
2.0
B
ELG
AR
D
GL
AC
IER
fLT
GR
EY
) -
2x2'
Q
UA
RZ
2
0
BE
LGA
RD
R
VE
R
ME
D G
RE
Y
2x2'
Q
UA
RZ
ITI
2.0
B
ELG
AR
D
MA
NT
LE
ID
K G
RE
Y)
-1
'2"W
C
US
TO
M
SIZ
E
MO
DE
L
MA
NU
FA
CT
UR
ER
C
OM
ME
NT
C
OL
OU
R
QT
Y
44.5
'L x
8'W
C
US
TO
M
CU
ST
OM
1
CU
ST
OM
C
US
TO
M
1 12
'L x
3'W
C
US
TO
M
CU
ST
OM
1
8.5
'Wx 1
1.5'
L C
US
TO
M
CU
ST
OM
1
3'X
3'
FR
T1
70
0-S
Q-M
1-F
S-3
6
FR
T1
70
0-S
Q-M
1-F
S-3
6 F
RT
17
00
-SQ
SE
RJ!
MA
GU
N
SIL
VE
R 1
4 P
DR
CO
A
5 V
AR
IES
C
US
TO
M
NA
TU
RA
L W
OO
D
3 8
'2"
X 8
'1 Q
" X
8'6
" C
UM
S N
G N
ET
NR
08
13
-10
02
K
OM
PA
N
ST
EE
L F
OO
TIN
GS
N
AT
UR
AL
1
1.5
' X 1
.5' x
var
ied
ht
CU
ST
OM
N
AT
UR
AL
WO
OD
5
IPE
WO
OD
, SIL
VE
R
14 P
DR
CO
AT
7
0"l
X 1
6 5
"0 X
17
5''H
M
LB 1
05
08
BA
CK
LE
SS
BE
NC
H
CE
DA
R W
G H
OP
E M
BE
10
50
000
21
MA
GU
N
5 33
"H X
19.
5"W
K
ON
TO
UR
M
AG
UN
S
ILV
ER
14
PD
R C
OA
10
M
BR
50
0 S
ER
IES
M
AG
UN
S
LV
ER
14
PO
R C
OA
B
6'u
l6'7
'W
VIL
LAG
E S
HO
P
KO
MP
AN
N
AT
UR
AL
WO
OD
1
.47
'x 4
2'x
83
' C
US
TO
M
NA
TU
RA
L W
OO
D
3 IM
AG
E T
O B
E D
ET
ER
MIN
ED
-T
O B
E S
UB
MIT
TE
D T
O B
C H
YD
RO
IM
AG
ET
BD
. 1
82"H
R
OB
INIA
PIN
E B
EN
CH
KP
L201
K
OM
PA
N
NA
TU
RA
L W
OO
D
1 2'
6" X
2'3
" X
2'5
'' R
OB
INIA
BE
E S
PR
ING
ER
NR
O 1
18
KO
MP
AN
N
AT
UR
AL
WO
OD
SIZ
E
MO
DE
L
MA
NU
FA
CT
UR
ER
H
IGH
LIG
HT
C
OL
OU
R
IOT
Y
PE
AR
L, M
AY
G
RE
EN
BE
IGE
~
SIZ
E
MO
DE
L
MA
NU
FA
CT
UR
ER
H
IGH
LIG
HT
C
OL
OU
R
QT
Y
35"H
X 1
9.2
5"W
C
US
TO
M
0
DP
19-8
66
69
0
Pla
n#
17
May
5, 2
020
eta
"""""
.... ,..",..
'69
0V
/as\
Zn
dA
vam
,a
Van
cou'
ICr.B
C.C
anad
a.
V6J
lH4
ll~
.69
.J,1
456
!
1604
.663
.145
9
,.1w
ww
.eta
1a.c
a
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D.
BC
No
tes
and
Sch
edu
les
_..,,
L9J:
l/\j
d·7.
,;.1n
9,
~e-,
)tlM
d-.:s
.;lh
e2
L~~
-in
e.:;
5, ..
...
,..,,.
OT
Dra
wn
Sy
Rc
viOW
1"o
3y
00/0
0/00
2180
6
L0.1
To~
s~
:s
![Page 92: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/92.jpg)
bir
dh
ou
ses
on
fen
ce
po
sts
for
educ
atio
nal
play
val
ue
/~
I bi
rd f
rien
dly
, sh
rub
s
urb
::J~
~~
~~
~:
, _ ✓
/
addi
tion
al t
rees
to
scre
en b
uild
ing
to w
est
seat
ben
ch a
nd s
tora
ge----
--"
unit
l lo
w m
aint
enan
ce:,.
,' ~
---
4\-
-b
lueb
erry
hed
ge
and
sp
ring
flo
wer
ing
orna
men
ted
tree
s
arbo
ur w
ith s
had
e v
in
e------
-'"t/
!!K
----
,M~
~~
----
---
1
BB
Q w
ith ga
s----
----
-.mW
c-'~
M'i! ... 's
:.,,.-,,i.
~~"'(~-
--co
nnec
tlo1
smal
l cu
sto
m b
uiU--------
Wa
.;.,-"
'--"
' jo
lna
ble
tab
l':,'.
~~ 1
..... ,,, .
... M:--
-,1--,-
----'~
-~(_/_/-
-~~-
-"4
gate
d ac
cess
to
terr
ace/
-------------'',-----
--'-
=:::
.:C.-
--+
--~
:!9
~--
-.
gree
nway
J
10
vine
pla
nted
at~
rad
e
on n
orth
wal
l
scre
en p
lant
ing
to f
utur
e
prov
ides
vis
ual
inte
rest
=
Detail P
lan
L0.3
---••
.. •••M
•• ,----
----,
. - 15
M
5491
j NO
2 R
D
w-7
I
" J I
J
f
1-
_I
scre
en p
lant
ing
betw
een
unit
s
r,
Ul
,~ ""·
A.
20
19.0
C,.
{1
6 2~
0'·
19
i'le
.J!&
l<'!
bl'l
;,
C
2J2
!,0
J.t9
DP
19
-86
66
90
P
lan
# 18
M
ay 5
, 20
20
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D.
BC
Sit
e P
lan
, ... logj
A.:
ld'=
ln,:,
1
~A
.»'l
<'.
.S~
2
leg
,jld
:l-e
sslt
le3
Dra
wn
By
Re'
liow
ec3
y
QO!O
OICJ
O
2160
6
L0.
2
To'"
'S'"1
8€1:S
![Page 93: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/93.jpg)
Tim
be
r se
atin
g b
lock
s A
ll A
ge
s
Kom
pan
Ro
bin
ia
Cha
lkbo
ard
on C
IP c
on
cre
te
pla
nte
r w
all
All
ages
clim
bi~
~e
~e
~f;
__
__
-\,,a
c;::;.
,f-:_
_ _
_.;
:.s5
~111
g
Mar
atho
n ru
bb
eriz
ed
surf
aci
ng
in th
ree
colo
rs:
-Pea
rt (
base
) -M
ay g
reen
(g
rass
y ar
ea)
- Be
ige
(ste
pp
ing
sto
ne
s)
Arb
ou
r w
ith v
ine
at
bu
ildin
g e
ntr
ywa
y
Inc
reas
ed p
lan
ting
p
rovi
de
s sc
reen
fo
r a
dja
cen
t 1
-bd
rm s
uite
s
r Ch
ildre
n's
Pia
A
rea
Sca
le: 1
:40
Kom
pan
Rob
inia
Bee
Sp
rin
ge
r A
ge
s 2
-5
Kom
pan
Rob
inia
Clim
bing
Ne
t A
ges
5-1
2
Rob
inia
Vill
age
Sho
p P
layh
ouse
A
ge
s 2
-5
Kom
pan
'Pin
e B
en
ch'
Ko
mp
an
Rob
inia
Vill
age
Sh
op
ch
ildre
n's
pla
yho
use
fo
r ag
es 2
-6
w/
3' c
ircu
latio
n c
lear
ance
16
'Tea
cher
and
stu
den
t' pl
ay
area
wit
h t
imb
er
seat
ing
;::::::;
::_--J
.-'-
:a ... ---_
l---
blo
cks
Cu
sto
m c
ha
lkb
oa
rd
inte
gra
ted
into
co
ncr
ete
/1
,,~-
;.c..,
_,_ _
_ +--
'-<
---
waJI
Ace
r 'S
eir
yu' a
nd A
cer
'Au
tum
n
Mo
on
' pro
vid
e t
wo
typ
es
of
bri
llia
nt o
ran
ge
co
lou
r in
au
tum
n,
each
wit
h d
iffe
ren
tly
text
ure
d
leav
es,
and
l ig
ht g
reen
fol
iag
e d
uri
ng
sp
rin
g a
nd s
umm
er,
bri
gh
ten
ing
up
the
no
rth
fa
cin
g
"'1
-""l
l~--
,ue
il.
Rai
sed
pla
ntin
g p
rovi
de
s b
uff
er f
rom
par
kade
en
try,
an
d al
low
s fo
r pa
rkad
e -
U<-
-------
~---
ceili
ng
he
igh
t bel
ow
23
30 F
T
Rev
lslo
nN
nto
o•.
II 20
19.1
)(;.,
'I
202
0-0
••29
9'
NS !
~!(
;,I)
"'
20~
~1
9
DP
19
-86
66
90
P
lan
# 1
9 M
ay 5
, 2
02
0
·69Q
V/e
s\2
ndAv
11nu
11
Van
cou
~r.
BC
.Cn
nad:
i.V
6J 1
H4
1 16
0~.6
83, 1
456
116
04.6
63,1
459
... I
W\V
W,C
bl:l
.~(I
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Det
ail
Pla
n:
Ch
ildre
n's
Pla
y
Le-,U
u:9
jll,
:jd·e
,ss1n
e·
U."
,}df
d::l
·i!'SS
ln.!
2
LD;P
td<
l•ess
lne
3
Dra
w11
By
Rav
iow
ed
3y
0010
0/00
2180
6
L0.3
To:;
jS-i
6i!'.
S
![Page 94: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/94.jpg)
/ I
Tim
be
r p
lan
ters
J_
. .
-----
k<,.
Clim
bing
net
---
-"'·
"-P
IP r
ub
be
rize
d su
rfa
cin
g
-1,
I l
Gla
cier
pav
er
Ra
ise
d C
IP C
on
e
Pla
nte
r -I
ii-C
l P C
one
Ste
ps
Ma
ntle
pa
ver
''
"
Bik
e ra
cks
4.5%
10
-0
('O
0 0::
C\I 0 z
a P
Co
ne
Pe
d P
avi
ng
15
M
q,,~
~~.J
O!l
otO
-'
2•2
1,o
:;.,
g ""
'~""
-"'"
110:
:,
DP
19
-86
66
90
P
lan
# 2
0 M
ay 5
, 202
0
eta
'""""" •
•o"'
""
"'"
·,690
Wes
t2nd
Ave
nve
Van
cou
,cr.
BC
.Can
ad
a.V
SJ
1H4
116
04,6
63,M
Sfi
116
04,6
83.1
459
WI
WIV
W.c
bl3
,C3
HIR
igllla
_G
,.,.
.,b
yG
l>l>
nd
ilY
po
~'1
1ln
C.
lnl-
••n_
,.-
.. ..
_._,
,._,,.
K..-
,o'"
'°c""
,_.,.,
.,
, .. ,..
.._,.,
._._
,_..,.
,,..en
,,,..,-
,,..
.,_.
__
.......
..........
..... _
.. " .......
. , .......
..... ....
.. .. , ....
___ .,.,,,., _
_ ,,, __ ~-
-· ... ,-.....
-.. ,_
.,.; ....
..........
.... _,,
,.,.., .. , .
........ "
"'""~"
' __
,..,.
,11 .
....
... ,
_ .. _
, ...
.. , .
.....
......
~..,
•. ~
.. ,-
·-"··
.. , ... -.
.,,..
.,
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Mat
eria
ls P
lan
'""
Lgg
j/l:
kle
%l~
l
U·)
(l'-
"'X
Slr
loe2
L~l.
:IO
'ess
loe
.;
OT
Dfa
wn
By
Rc
view
eo
3y
0010
0/00
2'8
06
L3.
1
To:a
S'll
n:s
![Page 95: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/95.jpg)
[ -~
S/
W
r r 71
K
LL
~
\
LIG
HT
ING
LE
GE
ND
S/W
S
TE
P/W
AL
L L
IGH
T
·r
Pl P
ATH
LIG
HT
~D
T
RE
E A
CC
EN
T O
OW
NL
IGH
T
~L
DO
WN
LIG
HT
"=
I LOADIN
G
I ,.,,. 8
r
SLO
PE
ON
5.0
%
VIS
ITO
R
:'.j)~
0
----
-~
PA
RK
AD
E
EN
TR
Y R
AM
P
'l.0
01, ..
71
111
I -,
--
I L _
_
~ I~
=r:. I} ~
I I n GA
RB
AG
E
PIC
KU
P
I
LJ
B
--i
•I Pl I I 1, .[
Pl
1.s•
,1,
>
4.5%
10.'l
)II.
~
10
"O
cu 0 0:::
N
0 z 15
M
-------
2tl1
9-C
6.2
1 1.
s...
,b·D
P
2020
-01-
29
:i,,-1
~, ...
. Jor
D"
~""
-"'"
"DP
DP
19
-86
66
90
P
lan
# 21
M
ay
5, 2
02
0
eta
""'""' ..
. " ... " ...
·590
Vle
st2n
dA~e
nue
Van
rou
,m.
BC
. C
anad
a. V
6J 1
H4
1 l6
04
,68
3.M
56
116
04.6
83.1
459
"I
Wl't
w.C
1313
.C3
NIR
lgh
ta-.
.-.o
d'"
11
1la
l•-eap
o-"'l
nc.
I"'•..
...,_
..,
-.-
..._
,,. •
....,.
,.,..c
..,, .. ,
...,.,
... -..
....
··•-c-
....... , ....
, .... "-"'
" _..
._,.. ...
...........
.........
.. " .......
... ..,.. ..
.. .....
,., ...... _
,_ .....
. , .... -...
......... ,
,_ ....
..... _
.. _
,,";
.,, .. .
,.,..,
_.,.,
-.,,
.,c,
.... ,.,
.,~0-..,,
0..
,
=~•w
!::.~
":;'"
"•• ..
......
.......
. ,i ..
,l,~
••1-
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No
. 2 R
OA
D
nlC
HM
ON
D,
BC
Lig
hti
ng
Pla
n
Leg.
j/\:
ld·;
r...
;l.-.
0l
.~1
,j<
N$$
1h
e2
cl!\)
HA
.1C
tes:
;l<1
1!J
. .,,.,..,, ...
.... D
T
Dra
wn
By
Re
view
oo 3
y ,~ 00
/00/
00
2'8
06
L3.
2
To~
S...
ae:s
![Page 96: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/96.jpg)
Leve
l 1
Sca
le: 1
:100
FG14
.75'---
t:::'.:'G:
:=''·=":
:___
__
~
ON
rgs11:
R ::
:::L
_
GIP
D E
G6
79
' J
.,_~}
~
•P
D
ON
_
J,_
•P
D
ff>
E~
: '.
.:).
;c'i
:;
14.5
%
SL
OP
ED
N5
.0"k
7
I I L
:-._i
:,.,
<•E
"'
I/T
T,'
:;,;.;
f
'.IT
~-=-
•$0<
-~
fL~
' f'
10
EG
~.3
7 ,,
~E
G1
0.J
(r
EG
9.2
8'
15M
"O
Ctl
0 er::
N 0 z
Oat
•
20
1g.o
:;.;
1
W2G
-01
-2!1
202G
-CG
-10
IHu
•No
lH
1,..
..,t
o·O
P
i:i.,
~.,
,~~
fc;[
l?
~,O
f0r0
"
DP
19
-86
66
90
Pl
an#
22
Ma
ys. 2
02
0
eta
,. ... " ..
'""'""·"
""'~
H
u
sin
g P
roje
ct
Aff
ord
able
o
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
'"'""
" "'.
and
Dra
inag
e P
lan
G
rad
ing
![Page 97: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/97.jpg)
Lev
el 1
S
cale
: 1 :
100
I LOADIN
G
I ,, ..
SLO
PED
N5.
0't.
VIS
ITO
R
7
I I
PAR
KAO
E E
NT
RY
RA
MP
L _
_
I
~
GA
RB
AG
E
I PI
CK
UP
I
B
10
"O
cu 0 0:::
C'\I 0 z 1
5M
~
-----~
2.!1
9.0C
..21
l>~
fo,[
)P
2020
-01
.29
~i.s
..., t
c,D
"
rl!!
-l,;s
..<1!
<)f
l):>
DP
19-8
66
69
0
Pla
n#
23
May
5, 2
02
0
eta
""""""'"
"'"""·
·s9
0V
/est
2n
dA
venu
e V
ana
,u;c
r.B
C.C
an
a~
a.
VB
J 1H
4
I 16
04.6
83,M
Sfl
f[6
04.6
83,1
459
N
[M'IW
.t'13
1a.c<
1
Mll
lgh
la-o
r>o
dl,
J-
l>ne
lluo
po
_,,,,_
,n<.
, .......
........
.. .-.
......
--
.. ····
·•-<:
""'~'"
"' ,
-...
....
..,.
....
....
ea
. ...
,-.,
... ,
. ..
. ,..
_,,
,,""
'
.-,, ..
,00 ..
...:_
.,.,_
,,,_~
, .. .,,.
.. ~ • ..
;_,, .
. . .,.
, •.. !,-
~::
-"'•
-.....
........
.......
...... ,
....
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
So
fts
ca
pe
Pla
n
L~
Log
j/\:
ld•e
s.;l
r,i
t
~O:J
l'l/,#
~~
2
L~<
.:ld
'ess
kln
J
Ora
wTI
By
Re~
iow
eo 3
y
00/C
O,O
O
"""'
L5.
1
To
:a'S
'lil
ii'.S
![Page 98: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/98.jpg)
Leve
l 1
Sca
le: 1
:100
..
a£
T
l ~ I J J
e ·
''--
I LOADIN
G
I ,,..
SL
OP
E D
N 5
.0%
\JIS
ITO
R
],--
1 -
l
(----
IF :l =
1
1~;!1'
( ~~
me
><
,_ool\
. 'l
-1~ 1
1'
PAR
K.AD
E E
NT
RY
RA
MP
'1.00
1, ..
7 I
I II
I --
---
-
I L _
_
==
=!I
rl I
~ G
AR
BA
GE
P
ICK
UP
B
~ " -OU
TL
INE
AB
OV
E
'b'l1
1;1.
. ,~
~
'\..;
l.n
m
10
"O
cu 0 0:::
C\J 0 z 15M
S.•
m D
P 1
9-8
66
69
0
Pla
n#
24
May
5,
20
20
eta
,. ... " ..
.... ,,." ...
16
90
V/e
st2n
dA
ee
nue
Van
oou
,er.S
C.C
ana
da.V
6J 1
H4
11
604,
683.
1456
11
604.
683.
145
9
"'I
Wl'IW
.cta
lJ.c
a
l\ll
llg
nta
_..
....
.,..
,..,
.,,n
dlc.
apo~
"'l
n<
.
1.--
. •• _
..
___
__
.. ~ ....
.. , ..
.. ~ ..
. ~, ..
...
__
,. ..
_._
,..,., .
.. c-.
.,j ..
.. , ..
... ,
.,,.,;
, ...
.,_,.,
.,.,...
.,.. • ..
,.,....
,i..u .
.. ,.,•
"IP_
.. ,,,
,....,.
. , ....
.. _ ... ,_
....... , .... ..
-.......
,.,, ... ,,
_ ....
. .,., ...
...... .-
----:.
--==:~
-:.:::~
,., .. ,_
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No
. 2 R
OA
D
RIC
HM
ON
D, B
C
Tre
e P
lan
L..-,
µ L
~M
civ
.,s
tnc,
1
l~A
#-
lhe2
l~'<
»es
.sln
eS
Dra
l'ln8
y
Re
vie
we
d 3
y
00
/00
/00
:218
06
L5.
2
To:a
s~
:s
![Page 99: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/99.jpg)
GR
OW
ING
ME
DIU
M L
EG
EN
D
Leve
l 1
Sca
le:
1:10
0
610
MM
(2
4')
SO
IL D
EP
TH
900
MM
(3'
) S
OIL
DE
PT
H
I LOADIN
G
I 1_1
stt
SL
OP
E O
N 5
.0%
VIS
ITO
R
V1S
l10R
~~
~~
8
,~: ....
7
I I
( ~~
,u
~~
,.oo~
1.
.1~"
'
PA
RK
A.D
E
EN
TR
Y R
AM
P
,_001
1- ,~
GA
RB
AG
E
PIC
KU
P B
) 83
1.5%
4.S•
~
10
"O
co 0 a:::
C\I 0 z 1
5M
,= "'·
A
2019
-00.
21
l>~-
"!!o
"D
P
s 2
0:zo
.o·.2
11
~!.
!o~
bD
"
C
20:
Z0
.~1
9
Fi!H
SS
.iot<
i,()O
DP
19
-86
66
90
P
lan
# 2
5 M
ay 5
, 2
02
0
eta
.... "' ....
.....
« ..
.
'69
0V
/es\
2nd
Ave
nue
VJr
>eou
ror
. BC
.Co
no
~a.
V6J
1H
4
116
04,6
83,1
456
!16
04.6
63.1
459
• l w
w1~
cta1
a.ca
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No
. 2
RO
AD
RIC
HM
ON
D,
BC
So
il D
epth
Pla
n
,.,,
Leg
j/d
Yr.
..:;
lffl
1
~ t~
k\d
'(l5
.Sll
le2
Lll(
ln-'
d<
l•=
lfl!
la
-. .....
.,.....,.
. D
T
21
80
6
Dra
l'lnB
y .,,,
..,.-
,n,
Rev
iow
ec3
y
0010
0/00
L6
.0
To:<
1S·1
.tats
![Page 100: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/100.jpg)
n--
~
L---~
"lW
[, -
)
IRR
IGA
TIO
N L
EG
EN
D
AR
EA T
O B
E IR
RIG
ATE
D
HB
-+
HO
SE
BIB
@-:1
IR
RIG
ATI
ON
ST
UB
-OU
T
Not
e:
Ref
er
to c
ana
dia
n la
ndsc
ape
sta
ndar
d, t
yp.
I LOADIN
G
I ,_,., 8 l -
SLO
PE
DN
5.0
%
VIS
ITO
R
~~
0
PA
RK
A.D
E
EN
TRY
RA
MP
~-~
I• ..
7 I
I II
I I L _
_
----71
.i
I
"==j
).83
• G
AR
BA
GE
;:l PI
CK
UP
~ B
-
OU
TLI
NE
AB
OV
E
\~;~:
1.5%
4.5'
1.
'-.~
10
"O
!'Cl
0 0:::
N 0 z 15M
DP
19
-86
66
90
Plan
# 26
M
ay 5
. 20
20
eta
""""°
· ..
.. ,. •
•. " .
.
169
0V
/es\
2n
dA
ven
ue
Van
cou,
cr.S
C. C
ana~
a. V
fiJ
1H4
1 l6
04,6
83.M
S6
1[6
04.6
83.1
459
.,/'M
'IW.C
I.Jla
.ca
Aff
ord
able
Ho
usi
ng
Pro
ject
549
1 N
o. 2
RO
AD
RIC
HM
ON
D,
BC
Irri
gat
ed A
reas
Pla
n
lag
j/\j
cl·
r..s
lne
i
~~ M
,:t-
-lh
e ~
L"'ij
!'IIM
<te
s.il
rll'.l
.3
"""'"
_,,,,..
O
T
218
06
Dra
wn
By
Rc
viow
eo 3
y
OO
/C0/
00
L7.
0
Tota
S'l€
1€1\S
![Page 101: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/101.jpg)
Uni
t pa
tio
Scr
een
plan
ting
I
SE
CT
ION
· N
orth
ern
Sitt
in
Are
a S
cale
: 1 :5
0
SE
CT
ION
-W
este
rn A
me
nit
Are
a S
cale
: 1:5
0
Pav
ers
Rub
beriz
ed s
urfa
cing
S
eatin
g
w/
Play
ele
men
ts
bloc
ks
Entr
ance
P
lant
ing
Ram
p P
lant
ing
Ste
ps
Sea
ting
Mul
ti-U
se P
athw
ay
SE
CT
ION
-E
aste
rn M
ain
Ent
ranc
e S
cale
: 1:
50
3.3m
,- No
. D
~•·
ls
w•
No
lH
2:r.>
0-01
-211
f\o
-1<0
wr,!
c,(
P
C
2n20
-o:J.
.111
~
Sl!
OO,o
tDP
DP
19
-86
66
90
P
lan
# 2
7 M
ay 5
, 2
02
0
etO
""'"··
··"""'°
'"'•
1 l6
04
.66
J,M
S6
fl6
04
.68
3.14
S9
"IW
'll'W
,C1
31
3.C
3
,.R
lgh
laR
N•"
"""l
>)l
eta
.. n
mc.
apo"
"111
1odu
,..l
n<..
,,....,.
.._ ,..
.,....,.
., -.-
.._,,.
• ...,.
••-c
_,,..,
.. •
,.....,.
,_., ... _
,_. __ ..
,,..,_
...... , ...
.. , ...... _
.. . _
.._ .....
. .._ ....
..........
. -..... , ..
..........
.....
r,,,..,
. .. ...
,_ ..
......
... ..
-..
. -L
....
ol"
'. -
,-..
,o,
.-
.....
....
....
,,,_
... -
...
.... c
• .,,
.,.,.~
p,to
,-no
n _ ....
......... _
..............
. .,-.....
. ~ .. ~ ..
,-
Aff
ord
ab
le H
ou
sin
g P
roje
ct
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
La
nd
sca
pe
Se
ctio
ns
'""
Lcg
;(M
dT
..S
lrv.l
l
~~
Md
'tt5
1~,2
Lflg
dlm
!!SS
lne
3
0ral
'"16
y
Rev
iow
ec3
y
OO
IC0/
00
216
06
"'
asna
:ea
LS,O
To:a
s,a
a:s
![Page 102: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/102.jpg)
+-.
..J'
).'~~'.\,
'e,,1
',' -~oD
~"'
"''.:
6'.'!
ftiYJ
!d:br
v./ltf..Y.t
,f,/,,/'
v,J,
fll:'Y
!_~/\
y:_M~"
"~'-N~
_
_ S
od,
non
-ne
tte
d g
row
n o
n sa
nd
Sod
at
Gra
de
Sca
le:
1 :10
300m
m (
12")
min
. gr
owin
g m
ediu
m
Co
mp
act
ed
sub
-gra
de
=, _
......
...,
~~
--
--
Gro
un
dco
ver
50m
m (
2~)
thic
k m
ulch
, re
fer
to
spec
ifica
tions
-d
o n
ot p
ut
mu
lch
~[ p
,,@,., .• 3
1j~
~'!
/1fi
[lliit
!ij~
~!;
ii,1
Qf~
~~
$M
!Eq
----
agai
nst
the
base
of
the
pla
nts
. -"'b
---
300m
m (
12~)
min
. gr
owin
g m
ediu
m
Gro
undc
over
at
Gra
de
Sca
le:
1:10
--+---
Co
mp
act
ed
su
b-g
rad
e
600m
m (
24 ")
min
. gr
owin
g m
ediu
m,
--+---
plan
ting
pit
to b
e 2x
roo
tbal
l si
ze
6=
=,.
,,,,
;.,.
.,,,
..,.
..-,
,,--
-=-=
==
==
f--=
+----
Non
-wo
ven
filt
er f
abric
~
;~~
~~
~~
~~
~i-----
75m
m (
3")
thic
k la
yer
of d
rain
age
rock
~
~~
~-
--
Rig
id i
nsul
atio
n, r
efer
to
arc
h
Dra
in m
at c
/w fi
lter
fabr
ic,
refe
r to
arc
h
Pro
tect
ion
boar
d on
wa
terp
roo
f m
embr
ane,
ref
er to
arc
h
f-
-----------
---
--"'z----
Str
uctu
ral
slab
, re
fer
to a
rch
and
stru
ctur
al
Shr
ub o
n S
lab
Sca
le:
1:10
a, .,. B
C E
0 M
~----
Gro
undc
over
50m
m (
2")
thic
k m
ulch
, re
fer
to
spec
ifica
tions
-d
o n
ot p
ut
mul
ch
pci
li:4
=e
==
='"
'F'"
'-"'
""'i=
==
=""
"'""
'"'-
'i""'
==
'"'F
'..,.
>=
l---
-ag
ains
t th
e ba
se o
f th
e p
lan
ts
--+---
300m
m (
12")
min
. gr
owin
g m
ediu
m
Non
-wov
en f
ilter
fab
ric
75m
m (
3")
thic
k la
yer
of
drai
nage
. ..
.,4,_
__
rock
Rig
id i
nsul
atio
n, r
efer
to
arc
h
Dra
in m
at c
/w f
ilter
fab
ric,
refe
r to
arc
h
Pro
tect
ion
boar
d on
wa
terp
roo
f m
embr
ane,
ref
er to
arc
h
~--
------
---
=--
-=--~
'::j-
---
Str
uctu
ral s
lab,
ref
er t
o a
rch
and
stru
ctur
al
.i.--------
Pru
ne o
ff br
oken
and
dam
aged
bra
nche
s
Tie
s: "
arbo
ur ti
e"
or a
ppro
ved
alte
rnat
e
Tw
o pr
essu
re t
reat
ed h
em
/ fir
50
mm
dia
. w
oods
take
s, 2
m in
len
gth.
Low
sau
cer:
100
mm
of
soil
arou
nd t
ree.
ci
rcum
fere
nce
of tr
ee
to f
orm
a s
hallo
w b
ench
to
pre
vent
wat
er r
un-o
ff.
soil
over
the
---+
t--
root
ball
shal
l no
t exc
eed
25 m
m in
dep
th.
50m
m (
2")
thic
k m
ulch
, re
fer
to s
peci
ficat
ions
-d
o n
ot p
ut
mul
ch a
gain
st t
he b
ase
of t
he
pla
nts
Rol
l ba
ck t
op
113
rd o
f bu
rlap.
re
mov
e al
l pla
stic
tie
s, t
reat
ed
burl
ap o
r co
ntai
ner
mat
eria
ls.
750m
m (
32")
min
. to
120
0mm
(48
") m
ax.
grow
ing
med
ium
, pl
antin
g pi
t to
be
2x r
ootb
a1l
size
t:=
==
==
;:~
~;;
;:;;
;:;;
;:;;
;:j_
_,4
" dr
aina
ge p
ipe
conn
ecte
d to
sto
rm
Co
mp
act
ed
su
b-g
rad
e
Min
imum
Wid
th O
f Tre
e P
it S
hall
Be
The
Roo
tbal
l D
iam
eter
Plu
s 24
" Tr
ee W
ells
Sha
ll B
e 36
" In
De
pth
Tr
ee W
ells
In
Bo
ulev
ards
Sha
ll B
e C
onne
cted
By
A C
ontin
uous
Soi
l Tre
nch
Of A
t Le
ast
24
"x In
Dep
th
Tre
es a
t G
rade
S
cale
: 1:
20
2x
root
ball
Shr
ub a
t G
rade
S
cale
: 1:
10
50m
m (
2")
thic
k m
ulch
, re
fer
to
spec
ifica
tions
-d
o n
ot p
ut
mu
lch
ag
ains
t th
e ba
se o
f th
e pl
ants
600m
m (
24")
min
. gr
owin
g m
ediu
m,
plan
ting
pit
to
be
2x
--+---
root
bal1
siz
e
--+---
Co
mp
act
ed
su
b-g
rad
e
-------
Pru
ne o
ff b
roke
n an
d da
mag
ed b
ranc
hes
Tw
o pr
essu
re t
reat
ed h
em/
fir 5
0 m
m d
ia.
woo
dsta
kes,
2m
in l
engt
h.
Lo
w s
auce
r: 1
00 m
m o
f so
il ar
ound
tre
e.
circ
umfe
renc
e of
tree
to
form
a
shal
low
ben
ch t
o pr
even
t w
ate
r ru
n-of
f.
soil
over
the
roo
tbal
l sh
all n
ot
---+
t--
exce
ed 2
5 m
m i
n de
pth.
50m
m (
2")
thic
k m
ulch
, re
fer
to s
peci
ficat
ions
-d
o n
ot
put
mul
ch a
gain
st
the
bas
e o
f the
pla
nts
Rol
l ba
ck t
op
113
rd o
f bur
lap.
re
mov
e al
l pla
stic
tie
s, t
reat
ed b
urla
p or
co
ntai
ner
mat
eria
ls.
750m
m (
32")
min
. to
120
0mm
(48
") m
ax.
grow
ing
med
ium
, pl
antin
g pi
t to
b
e 2
x ro
otba
ll si
ze
No
n-w
oven
filt
er f
abric
+--
---
'---
--=
:..:
='-
----
-,4
1\,
-75
mm
(3
") th
ick
laye
r of
drai
nage
roc
k
Rig
id i
nsul
atio
n, r
efer
to
arch
D
rain
mat
c/w
filt
er f
abric
, re
fer
to a
rch
Pro
tect
ion
boar
d on
wat
erpr
oof
mem
bran
e, r
efer
to
arc
h
>---------
~'.
==
==
.=,'
-Str
uctu
ral s
lab,
ref
er t
o a
rch
and
stru
ctur
al
Tre
es o
n S
lab
Sca
le:
1:20
Aev
is:O
n
No.
Issu
e N
o.
Da
te
2019
-06
-21
Issu
e/o
r D
P
2020
-01-
29
Issu
e fo
r R
e-D
P
Pro
fess
iona
l Sea
l
DP
19
-86
66
90
P
lan
# 2
8 M
ay 5
, 2
02
0
eta
'"'""" "
""""'""
16
90
WH
l2n
dA
ve
nu
e
Va
nco
uve
r. B
C.
Ca
na
da
. V
6.J
1H4'
116
04.6
83.1
4'56
I
1604
,683
.1"5
9
w I
ww
w.a
laLa
.ca
AII
Rlg
hb
Re
s..
-ve
db
ye
lala
nd
oc•
pe
an
:hit
ectu
,ain
c.
lnt(
lmla
....
,oo
nu
.'Md
on
thoH
d_
,,..
,,.
lap
Mto
lth
oC
on
a-'l
ant'
• l _
_ o
, .. ...
i • .,
.,,d
tho
Co
....
.,,o
m1
11
,o1
1.-
IM'o
o-l
p
-...
.,,S
ucJ,
W-.
-1,.
,.,°
""'l
no
tl>
O.,
.od
lo,o
ny
pu
-o!M
rlN
n
fort
ho
"°""
"""b
no
r11
1o
,-r.
....
,..r
p,o
;.,;
,..,
.,,.
,o
.,,.
,..,
.•,.
...,
....
,.
""''l
l"all
on
oll
hed
oo
um
enta
wllh
oull
hoC
<>
<m
ali•
nl'•
pri
,o,-
lll.
.,
~=
~::.~
:::i=
...i
•,00
1o~
,~-""'-
""t
l~o
,lep
l
Pro
iecl
Aff
ord
able
Ho
usi
ng
Pro
ject
54
91
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Dra
win
gT
dle
So
ftsc
ape
Det
ails
Lega
l Add
ress
line
1
Le
ga
lAd
dre
sslin
e2
Le
ga
lAd
d,e
sslin
e3
OT
c,
-,,.
.,11
1
Dra
wn
By
FII
--.O
et,
Revie
wed
By
00/0
0/00
Plo
t Dat
e
Prc
joal
O
218
06 - as noted
L9.
0
Tota
l She
ets
![Page 103: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/103.jpg)
2'x2
' Ped
estr
ian
Con
cret
e P
ave
rs o
n S
lab
on
Insu
latio
n S
cale
: 1
:10
~------
Con
cret
e un
it pa
vers
, in
sta
lled
pe
r la
nd
sca
pe
dra
win
gs,
2%
slo
pe t
o d
rain
. re
fer
to m
ate
ria
ls s
che
du
le f
or
size
an
d c
olo
ur.
No
n-w
ove
n f
ilte
r fa
bri
c
Voi
d fo
rm m
ate
ria
l or
ap
pro
ved
eq
uiv
ale
nt
-d
ep
th v
arie
s, r
efe
r to
arc
h
Rig
id i
nsu
latio
n,
refe
r to
arc
h
~~
~~---
Dra
in m
at c
/w fi
lter
fabr
ic, r
efer
to
arc
h
=-
="'!
----
Prot
ectio
n bo
ard
on w
ater
proo
f m
embr
ane,
ref
er to
arc
h
------
Sa
w-c
ut
patt
ern
, ins
talle
d p
er
land
scap
e dr
awin
gs
---+
---
100m
m (4
•) c
ip c
oncr
ete
pad,
rei
nfor
ced
with
9 g
auge
wel
ded
wire
mes
h,
2%
slo
pe t
o d
rain
bc--
,---
--..:
:;,,;
:-:r
,==
--si
:=,,-
--=
,,..-
,---
s=-:
r--,
;;,,:
-:r,
=:c
:r-s
:::;
a::-
,-=
-:r-
---s
,-,,
E'r
~d-
--
50m
m (2
') s
an
d s
ett
ing
be
d
NO
TE
: -
Sa
w-c
uts
to
be
inst
alle
d p
er
layo
ut
pla
n
-S
aw
-cu
t co
ntr
ol j
oin
ts t
o b
e 1/
4 s
lab
de
pth
-
To b
e co
mp
lete
d w
ith
in 2
4h
rs o
f p
ou
rin
g t
he
sla
b
Ped
estri
an C
oncr
ete
Pav
in
on s
lab
Sca
le:
1:10
Non
-wo
ven
filte
r fa
bric
Non
-wov
en f
ilter
fabr
ic
Voi
d fo
rm m
ater
ial o
r ap
prov
ed e
quiv
alen
t -
de
pth
var
ies,
ref
er to
arc
h
Rig
id i
nsul
atio
n, r
efer
to
arc
h
,,i:
;~~
&1
------
Dra
in m
at c
/w fi
lter
fabr
ic,
refe
r to
arc
h
==
=""1
-----
Pro
tect
ion
boar
d on
wa
terp
roo
f mem
bran
e, r
efer
to a
rch
13 m
m w
ear
cour
se -
MD
I po
lyur
etha
ne &
E
PD
M r
ubbe
r gr
anul
es
Impa
ct a
ttenu
atio
n la
yer
-M
DI
poly
uret
hane
&
SB
R r
ubbe
r bu
ffing
s, t
hick
ness
var
ies
as p
er
play
equ
ipm
ent
fall
pro
tect
ion
sta
ndar
ds
Sub
-bas
e A
-gr
anite
scr
eeni
ngs
<4..
+----
Sub
-bas
e B
-gr
anu
lar
pack
ing
aggr
egat
e ty
pe
a
Non
-wov
en f
ilter
fab
ric -
refe
r to
arc
hite
ctur
e
Voi
d fo
rm m
ater
ial
or a
ppro
ved
equi
vale
nt
-d
ep
th v
arie
s, r
efer
to
arc
hite
ctur
e
356m
m m
in.
==
•Hf------+
Ped
estr
ian
Con
cret
e U
nit
Pa
vers
on
rade
S
cale
: 1:1
0
~----,.----
Con
cret
e u
nit
pave
rs,
inst
alle
d pe
r la
ndsc
ape
draw
ings
, 2
% s
lope
to
dra
in.
refe
r to
ma
teri
als
sch
ed
ule
fo
r si
ze a
nd
co
lou
r.
50
mm
(2
•) #
9 a
gg
reg
ate
se
ttin
g b
ed
Co
mp
act
ed
su
bg
rad
e
---~
---
Saw
cuts
to
be
25m
m d
ee
p o
r 1/
4 of
con
cret
e sl
ab d
ep
th
•=
No.
D
ate
20
19-0
6-2
1 Is
sue
for
Of'
2020
-01-
29
Issu
e la
Re-
OP
DP
19-8
66
69
0
Pla
n#
29
May
5,
20
20
10
0mm
(4")
cip
con
cret
e pa
d, r
einf
orce
d w
ith 9
gau
ge w
elde
d w
ire
----+
---
mes
h,
2%
slo
pe t
o dr
ain
1-=
"'7"
-:=
::s:
-:r-
::::
:;:-
:,--
-,,:
=-:
ae-;
:=-:
rs:=
-cr-
<=
-::r
-;=-:
r-=
,--=
-,--
=,.
..,.
...-
=i
150m
m (6
") 3
/4"
min
us c
rush
-co
mp
act
ed
95
% m
pd
agg
rega
te b
a;;
h1 ./-
'ff.
ds;--
"'s~l---c
ours
e ta
""""··
··""·"' ..
Ped
estr
ian
Con
cret
e P
avin
on
ra
de
Sca
le:
1:10
1-1 /
2"
dia.
riv
er r
ock
2x4
" pr
essu
re t
reat
ed t
imbe
r ed
ge s
trin
ger F
ilter
fabr
ic
50m
m (
2")
of
drai
n ro
ck
Com
pact
ed s
ubgr
ade
1690
WH
I 2n
d Av
enua
V.1
10t1U
Ver .
BC
• C
anad
a . V
6J 1
H•
t j6
0U
83
.145
6 1
1604
.683
.145
9
w l
www.
etala
.ee
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
O
RIC
HM
ON
D,
BC
Dra
win
gTill
fl
Har
dsc
ape
Det
ails
. :1
=-·
D
rain
mat
c/w
filt
er f
abric
, re
fer
to a
rchi
tect
ure
Pro
tect
ion
boa
rd o
n w
ate
rpro
of m
embr
ane,
re
fer
to a
rch
Pro
tect
ion
boar
d an
d w
ater
proo
f ~
~lilll>
~l1
iii!
iili2
iliill!~
l!Z
1m
~~
~;m
mi!
l1lll<
l!ll!m
llllim
l1!1
2!E
~-
mem
bran
e -
as p
er a
rch
uo•
I.B
g.i1
Alli
-ess
ine
1
I.B
ga1A
ddfe
ssin
e2
l.eg
alA
<b-
essl
nll3
'-------------------------"'-'
Str
uctu
ral s
lab,
ref
er to
arc
h an
d st
ruct
ural
NO
TE
: In
sta
ll a
s p
er
ma
nu
fact
ure
r's
spe
cifi
catio
ns.
D
epth
of
ma
teri
al
de
pe
nd
an
t o
n fa
ll h
eig
hts
of
pla
y e
qu
ipm
en
t.
PIP
Rub
eriz
ed S
urfa
cin
On
Sla
b S
cale
: 1:
10
Dri
stri
On
Sla
b S
cale
: 1:
10
Str
uctu
ral s
lab
-as
pe
r ar
ch
As
halt
Pav
in
-P
edes
tria
n P
ath
S
cale
: 1:
10
-0
218
06
c,_
,e,
-~
Dra
wn
By
-~~
Rev
iew
ed
By
00/0
0/00
Pb
tOa
le
as n
ote
d L
10
.0
Tota
l Sh
eets
![Page 104: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/104.jpg)
pres
sure
tre
ated
tim
ber
brac
ing
to s
ecur
e w
all
@4
-8
' o.
c.
timb
er c
rib w
all,
4" x
4"
timbe
r, tig
ht
kno
ts
~:~i
: ;imber
crib
as
requ
ired
to
r---------------
--.-_-
_-_-_
-_._
_,-_-_
-_-_
-_-_
-_-_
-_-_-
_-,-
_~_-
_:--_-_-
_-_-
_-_-
_-_-
_-_
-_-_-
_-_-
-,k
eep
top
of p
lant
ers
leve
l. S
him
s/
SE
E A
RC
H.
FOR
WA
TER
PR
OO
FIN
G
3.9
90
~-
-
:om
-
elev
atio
n
~
.33
8
t1
14x
4 st
eel
post
s
~
min
. 30"
abo
ve f
inis
hed
grad
e
[][[
J[w
[ m
ax 6
" ab
ove
finis
hed
grad
e
•--
see
stru
ctur
al f
or f
ootin
gs
--
SH
OP
DR
AW
ING
T
O B
E P
RO
VID
ED
S
EE
AR
CH
. F
OR
W
AT
ER
PR
OO
FIN
G
scup
pers
thro
ugh
pla
nter
4'-0
" o
.c.
min
. o'f
-,--0 ----<
g-0 -------,'@
T
imbe
r P
lant
er o
n S
lab
Scal
e: 1
" =
1'-0
"
f
/
Pla
n
I ~~
~1
x2"c
ed
ar
<::::
, =
==
~
slat
s la
id f
lat
~
~
on 2
x4"
fram
e
pla
n
Met
al F
ence
S
cale
: 1
" =
1 '-0
"
11· ~~~~/~'.=
.==
==
m
arin
e gr
ade
lum
ber
, -----
HD
ga
lvan
ized
hea
vy d
uty
slow
-clo
sing
ste
el h
inge
~
~--~
t-c
='-
---=
----
-...
:0,_
'.._
~
~
_c
~-
• .
_ x
4" t
imbe
r po
st
,Zi
· O.=
~~
~~
~----c
r---=
--"C
ii'iffi
=·==
==
==
==
==
==
=i
~ 1x
211 ce
dar
~
:::. ·:~:
:-t~:
.giux
~,---·>
· . --
JXt:.~
: _:_'':_
~ sl
at w
/ 1/
2"
~
co g>
~
r,
spac
ing
~
:;.'.. '§
~!·
~
2x2
" tim
be
r fr
ame
,/1·"·"1 -_·
_ ---·
·"":"-
"-_" ..
'·""_"
_·" :
_, =.,o
.~]~X~
l--.--.,
.. "~"=_""
-~""-·-.·-
-.-.,--.-
. --"·"-
···"~~
.:.1~_x,.-.,
,_"=-_"r.-_:
:.·-." _
__ -__ ---"
'~"'
[ ~
-....
1x6"
ced
ar f
loor
_
_ .
. .
.. ,
""""""
. ·""
".
""""
·""'
. •·
""
'"""
""""
'"'"
"'""
'"""
"'
""-,
.h
bo
ard
s w
/ 1/
2"
Ele
vatio
n
Sea
t be
nch
/ st
ora
e S
cale
: 1"
= 1 '
-0"
. --
--,_
__
_
·· ·
. .
I. .
. 16
, --
spac
ing
· -
., ~
· '
refe
r to
'tim
ber
-----------
· pl
ante
r on
-----
slab
' det
ail
-ro
ugh
hew
n ap
pea
ranc
e -
smoo
th s
ande
d fin
ish
-so
lid w
ood
-ye
llow
ced
ar
-ap
prox
450
mm
x 4
50m
m -
heig
ht v
arie
s
-----
anch
or
-----
sand
blas
ted
woo
d
Slo
pe 2
%
Slo
pe 2
%
/ st
ump
/ -----
AF
M N
atur
els
Cle
ar
/ /
/ P
enet
ratio
n O
il, S
afec
oat
--~
~-,.
....
., ..
, /
~ho
usek
eepi
ng s
lab
100
mm
/
rein
forc
ed a
s re
qu
ired
pour
ed in
pla
ce r
ubbe
r pl
ay s
urfa
cing
~-
void
ing
-re
fer
to a
rch
itect
ure
/ dr
ainm
at c
/w f
ilter
fab
ric
--
--
... ::.:
--
-::...
. .::
=·:::.
::: ....
.:.--~
-~
-.:..
.. -
--
-....
.:. -
--
:..... ~ -
=--
pro
tect
ion
bo
ard
on
wat
erp
roo
f m
em
bra
ne
-re
fer
to
.., ar
chit
ectu
re
~~
--------------------~
----•
--_
-~-
-st
ruct
ura
l sla
b -
refe
r to
arc
hite
ctur
e
Tim
be
r se
atin
b
lock
s on
sla
b
Sca
le:
1 M =
1 '-0
"
Rev
isO
n
No
. D
ate
Issu
e N
o.
Dat
e Is
sue
Not
es
2019
-06-
21
Issu
e fo
r D
P
2020
-01-
29
lssu
efor
Re•
Df'
DP
19-
8666
90
Pla
n#
30
May
5, 2
020
eta
''"""··
""'""""
1690
We,
t 2n
d A
venu
e
Van
couv
er .
BC .
Can
ada
. V6J
1 H
4
I 16
04.6
83.1
456
I j 6
04.6
83.1
-459
w l
ww
w.a
tala
.ca
Proj
ect
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Dra
vvin
gT~l
e
Sit
e F
urn
ish
ing
s D
etai
ls
Log
a
Leg
alA
dd
ri;s
slin
e 1
Leg
alA
dd
ress
line
2
Leg
alA
dd
ress
ine
3
Ora
vvnB
y
-..
s,,
Rev
iew
ed B
y
00/0
010
0
Ptj
tdlO
2180
6 -as noted
L11
.0
Tota
l She
ets
![Page 105: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/105.jpg)
NO
TE:
RA
ISE
D P
LAN
TER
S O
N S
US
PE
ND
ED
S
LAB
TO
BE
SE
PA
RA
TED
MIN
IMU
M 1
' FR
OM
B
UIL
DIN
G W
ALL
S, T
YP
.
1----
--+----
---------<
oncr
ete
wal
l -4'
max
-------
~ra
in ro
ck b
ehin
d w
all
-------
-Nile
x 20
02 w
oven
filt
er fa
bric
, 15
0mm
ove
rlap
drai
n ro
ck
~----
+--
4" pe
rfora
ted
loo
ting
dra
in
con
ne
ct t
o st
orm
~
----
---+-~
onc
rele
uni
t pa
vers
----
---+
-~
ein
forc
ed a
s re
qui·e
d
CIP
Co
ncr
ete
Pla
ntin
B
ed
Wa
ll o
n S
lab
Sca
le: 1
" =
1'-0
"
Rou
gh c
ut c
edar
t Gx,2
----
timbe
r sl
at b
ench
wiri
ng f
or li
ght f
ixtu
res 1
1----
be c
onne
cted
thr
ough
re
tain
ing
wal
l
finis
h gr
ade
of p
lan
lin
,~
----
com
pact
ed g
ranu
lar
Ben
ch 'N
all
Sca
le: 1
" =
1'-0
"
Wal
l lig
ht fi
xtur
e Q
uant
um
Pot
ycar
bobn
ate
Ref
er L
X,X
X/X
•=
l'-------l-
----2
50
mm
(10"
) th
ick
cont
inuo
us c
ast-
in-p
lace
co
ncre
te w
an
ls!,~
~~
~----
Con
cret
e st
ruct
ure
slab
&
build
up la
yers
ref
er to
ar
ch &
str
uctu
ral d
wgs
, &
sp
ecs
CIP
Co
ncr
ete
Ste
sa
t G
rade
S
cale
: 1"
= 1
"-0"
II II -
IT -
s· o
t cru
sh-c
omoa
cted
sub
-bas
e
S1e
p Li
ght a
t top
and
bot
ton
s:ep
-1
-1
-
2019
.0C.
.21
20~
0•-
29
fw-l
s.!""
fcrf
l?
DP
19-8
6669
0 P
lan
# 3
1 M
ay 5
, 202
0
eta
""°"'"
·""
""""
'·
1690
Vln
l2nd
Ave
nue
Van
cou~
c,, B
C,
Can
ada.
V6J
1H
4
t 1
60
~,6
8],
M56
f 16
04,6
83,1
~59
w 1
w.v
w.c
tala
,ca
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Sit
e F
urn
ish
ing
s D
etai
ls
, ... L~j
A;ld
-.,...
;;I..
..,.
-~
Md•
..s.
.lri
.-2
le;:,
dl.
:ld•
imln
e3
Dra
wn
By
Rev
iow
eo
3y
O(l
'C<l
'OO
L
12.0
To:.I
Sne
.11s
![Page 106: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/106.jpg)
I 8
'0"
En
gin
ee
red
stru
11----------
---.o
------
-·.
2" d
ia s
teel
pos
t wel
ded
to s
q po
st b
elow
----------
-
Pai
red
wo
od
arm
pre
dri
lled
fo
r ca
ble
Ca
ble
ho
les
Vin
e su
ppor
t---------
-~
6x6
HSS
pow
der
coat
ed p
ost---------
-+,
Ste
el
fin a
nd
pla
te b
olt
ed
to
buttress--
------
--~~-1
l. •
Thi
cken
ed b
uttr
ess
to s
uppo
rt a
rbou
r po
st----------+
-[]
--+-
"'-•
Gra
vel
dra
ina
ge
co
urs
e
Ele
vatio
n La
r e
Arb
our
Sca
le:
1:20
1
6'
4"
,,
,,
Eng
inee
red
stru
,1---------
-----I!-----
2" d
ia s
teel
pos
t wel
ded
to s
q po
st b
elo,
w----------
---•
Pai
red
wo
od
arm
pre
dri
lled
for
ca
ble
~
Ca
ble
ho
les
Vin
e su
ppo
rt-----------,
~
6x6
HS
S p
owde
r co
ated
pos
t--------
--+
<
Ste
el f
in a
nd p
late
bol
ted
to b
uttr
ess-------
--
-t-
H>-
il
Thi
cken
ed b
uttr
ess
to s
uppo
rt a
rbou
r po
st----------t-+
-!f,•
Gra
vel d
rain
age
cour
se
Sm
all A
rbou
r S
cale
: 1:
20
Ele
vatio
n
"' "'
1
Co
ncr
ete
pa
vers
1
~?
,
Con
cret
e pa
vers
0 CX) (0
st
(0 <:
... - P
lan
Pla
n
-- ~ - = =
- - -
Pa
rap
et
thic
kene
d bu
ttres
s su
ppor
t fo
r ar
bour
pos
ts
c..:
, _ _
,~
-2
" di
a st
eel p
ost
wel
ded
to s
q po
st b
elow
x6 H
SS
pow
der
coat
ed p
ost
Pai
red
woo
d ar
m p
redr
itled
for
cab
les
- - - ~ =
~
- - -
~
-----
;:::::
::---
-
-----~
Pla
nte
r w
all
:--- -- ..______, th
icke
ne
d b
utt
ress
su
pp
ort
for
arb
ou
r p
ost
s
2"
dia
ste
el p
ost
we
lde
d t
o s
q p
ost
be
low
6x6
HS
S p
ow
de
r co
ate
d p
ost
-------
SS
ca
ble
s
------P
air
ed
wo
od
arm
pre
dri
lled
fo
r ca
ble
s
-00
No.
D
ate
•=
No.
DP
19-
8666
90
Pla
n#
32
May
5, 2
020
eta
""'" ... m
,,,.m
..
1690
WH
I 2n
d A
venu
e
Val
lCO
UY
.,. •
BC
• c
.n.d
• . V
6J 1
H4
t 16
04.6
83.1
456
I j 6
04. 6
83.
1459
w lw
ww
.•tal
•.c•
~:~~~~== .. :: :::
.~.~,;::,~
~n:.!te .. ~= ~
:; ...... 1•,
_o
f_
_,.
«,.
,dlM
CG
najl
afflo
t, ..
,.t
aln
o-lp
--
.Su
cl'
lln
lon
nall
...,
_n
<>
\l>
e\J
fNfo
,..,
,pu
-•O
-tll
wl
fo,V
Nco
nfl
NC
llo
no
fVN
,ol-
,e.d
pn
,jact.
,.,,
,o_
.,.•
•••"
"""'
,.,.
.ilff
caH
en
or.
,.1
1o
-.,;
1n
ou
1,n
oc..
.-,n
r,p
,1o
,.,r
i11
..,
::=.~
::.=.
:.: ... r-
-~
.r.-
.. ilh
ou
ll"'
"llt
Jo
rl•t
ol
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Dl"
awin
grrt
le
Sit
e F
urn
ish
ing
s D
etai
ls
"""
leg
i!IA
O;l
ress
ine
1
Legi
11A
i:t:lr
essi
ne2
leg
i11
Ad
dre
ssin
e3
-0 218
06
~~~ --
f-;;
;,;--
D
raw
n B
y i:
.-o
o&
,
Re
vie
we
d B
y -~--
--
00
/00
/00
Plo
lOa!
e
as n
ote
d
L13
.0
To1a
l Sh
eets
![Page 107: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/107.jpg)
~-------
---
--F
OR
O
FR
T1
70
0-S
Q-M
1-F
S-3
6
Fl,\I
ISH
. A
lli;l,N
la;r
n?
0"4
nf~
Jl'l!
l)n
lffi:
!Ud
w!t
nE-
Co;
r.ru
np
roo!
'lr-n
T
htrM~
~m
1.-
fS,,
.:..
.,.1
""""
'-'•
d•1~
1,!,o
l;,,>
:11,
o,i4
11l,,
.,...~
i,u,t«
.,._
T0S
l'EO
FI'
; fl
llt7
txV
iQ·l,
U.f£
-.36
,u .
...-
1
•
J "
,,--T
~ E
:~ ~ ~
-
D!M
E,-
.sio
t•.S·
_.,
,.
5'11.
15""
/1~.
)u,\)
~
wt,
,.,,
,1
~~
...
1"'
('1
1.l
cl>i
W
tW,i;
1o
uib
(H
4«
)
VIL
LA
GE
SH
OP
n, •
.i:1
~c
h0!.1
1ro
a,.,
._.,
h•
ptay
i.rg
•in
,l'I
thJ
dtv
1W:l
l\<
l1o:1
1:w
dr
oo
l,o~
f\d
""'<
llll
lel
ttco
bo
rn;h
lll:;
io.,
Tllc
d•;a
ma~
.:c;:
lay
1a
inr1
0s
ol"•h
cu1
11li.n
ow
r.o
~mb
.lh
ue0
11
0o
mlo
f m
1n
yr.
ou
r1o
lcoo
~r,
11c
dn
,!1
pt•
y!l
iat
r;hi!
drw
1 w
~!r
-l:m
I.:>
ag:v
n an
d -:
,,,n
, Th•
cc1
1ntu
,.,~I
Ju
nc:.
.:n
••1
hQ
p,.·
,ntl
aN
.. w
1II
H1
b.,
nd
lin
~,
C1,
k!re
n·1c
111n
-;11<
:~r•
y.n
..b
mch
ln1l
"°
o C
hild
ren
's p
layh
ouse
w:U
dm
ulo1
lab
A1a
U 1
11..:
ll!J
nd
on
n ll
;llle
.lO<I
T
hero
rr,1
1n~c
;',l'l
11y,
w:n
d~
-st1.
,nd
lon
cse,
en,,
0
1<:im
11.a
nm
1nip
lte
p'.l
ly.W
hc
nd"<
i:O..-
.n
•11
11;o
~ln
drd
rn•f
cp
!ay
l11r
11<:
1.m
lyln
l:n._
, im
99in
•h~
•nd
em
pe
lhy,
t',,
y.:s
11
;:la
yQ1.
.! cw
rycl
1y
1c.r
.•ri
"11
hlll!
llcy~
lhil#
ill>
al'd
1u
n•u
<>:lc
nila
mi,"
11,1
!1""
n,
!)ol
.1Ln
!,l'h
sirl
.h1
0!;1
1M1~
cn•
.Wh:i
.ao
ino
.o.1
t1,ry
,;on1
W.l!
y
llllll
l. .a
nd w
<nm
uflk
:4\8
,r, .. )
hlh
e!r
""""'
•b
u•
9111
dy1
fm11
lilfn
glll
ng..
i,;,
•m1r
n:m
.J.,
95l,
:jla
Ol 11
1cn
1<
1M
l»'h
H
A(l
•G
roui
,
Pla
yC
ll!l
itll
i'
Co
lorO
pl!G
n1
~----------so
o SE
RIE
S M
BR
50
0-S
,/~
.
FIN
ISH
":
I ll
f~ ,
;,;,m
;,cne
rr::,
In
! p
~e~
v.·
itli
£-C
ea: r
u.n ~
~lln
e,.
The
Mq
l"' P
c-
rg:1
1 s-
,,t~
m i:
,r::vffl
I d
urt
.hio
: t.n
ah o
n 1c
l ,..,
eQII
3urf
Hn
_
.
0-0
01
c -f
'o-M
l-t!
Wlt
(Qii
,r
Gilv
..r>
im!F
in11
-'1
-5u
rt.m
i·M
;u
rill
'-!2f
l.WO
-s..G
/
22 1
/8"
J -
,562
mm
) --!
e M
AG
LIN
I 5/
8 41
mm
j
'.'4
1/2
,
1 l:
4mm
l·-1
•U-•· ,,
__ . ...,
_,_,
.,.,._
,...,.
.,tr•
•,,.,..,
rd-
'\.lfF""
""" ....
_,_
._..,.
__
_ ...
. j,,,_
Mtl<
-,,
.._.
.,_,
,.__
,,.,
__.,_
..,,
....
..,o
)-C
_,e,1
..,,_,
..,
D!M
ENS!
ONS
. rl
ep'lt
; l,
-JU
.9c.-
=I
lao"
I!"-
IU.!
'j(
I.~
"'
"~
1!.J
te-
(Hl.
ll
~----------1
05
0 S
ER
IES
KO
MPA
N"l
-"'"
...,
ML
B10
50B
-R
f(N
iSH
· N
i,~
c.om
::,:
r~n
ts V
'O!
p.r,m
,ned
..,.,:
h [-
0:1.
: n
s ;:.
.-001
\fie,.
Th<t
"-l1t
!ln
~a1
:ly,u
!m~
ad
u-a
b!<
r""'
51
1o
n:J
!,r.11,
:~I~
~•-
TOS
PE
OFY
:
"·-
·""
""".k
,ma1
C,,.
.,..
-HO
PE(r
~<.
tplm
i.:)
CD
ro,
-w~o
,;1c;
,....,
1ocu
,r.,
(G,~
Ct<
ar,E
r~w
nj
;;,..
,.._
~,1
.,;1
,...
.i ...
.. ts=
N-"
""1
•-~
<i)
.!,flr
•-•_
,,,,.,
...,,._
w,.
., ...
. ~,.
,.< ...
. ""'
w,clo
""--;.;
,-_..,<
.,..
-••t
~,,_
..,.,_
.,. ..
. .,~
. .,,.
..,,
,..,
_.,
:,1
e-,
-u.
~
I 5
I .._
____
___)
O.:M
EN
SIO
NS
· ~
gt.
, J"
f.s°(
ol,l
.\,ct
!'J
~-
;-;,;
rn""
'1
o.,.,
ih-
tu·1
•19,
..,.,J
'1,
/e,(
f~·
l'J.
7~, [
~a T
-«1
Qua
rziti
2.0
G.i
Klr
rCl
JID
1N
AT
"4ou
nt;
tim;
CUII
02
NA
T
~'~
,;;~lt_
Sha
pes
& S
izes
•
DO.
,_ •
. ''"'·"""••··-~-
.... 1.3
,o
<~
Q!I
U•!
JIG
l·O
fU,
0 P
orce
lain
pav
ers
ST
ON
E F
INIS
H
Ava
ilab
le C
olor
s
Re
sist
an
l
'!
Tc-l
r"tu
o,ltt
--..1w
To
brn
kat•
i ·•
Eas
ier
rr
~ ti
fod
H!I.
To
liy
b Ton
,ma-
,.
"''""'
~'c
tl.J
Jl
l',\'/
f!II
S'1
'11C
..{;,1
Ja0
'4"
U...
,_o<
'!-
u".o
"'..
:C•
io,0,,
•,..
4
1•,,
11
,a ..
,--r. ......
... .,., ........ ry,
....
.. 1
...-
.11
, ...
"""°
""""'"
'.,._, ..
. .,. .
.. ~,i
n,,
rM
lt>
f-0
.----------
---K
ON
TU
R
KN
CH
20
00
-M0
,- ~~
flN
!SH
: A
n 1m
:I w
ml'(
>!'IC
"h J
l'I:
J>l"
ltclc
l w
'rtl E
-Co.
.."\ t
ijst
~f.,
,,:. T
ho. l
.t:~
l.'n
Pow
dct
to.;
t ¥
-'"''
o=
~ ~
:l~r
.,bk
, 5:-,
~h C
11.>
I! m
,:,t,~
l,u
<m
ci.
TOS
P£C
JFY:
Sc
-lac!O
:CH
20'
.D-M
O
Ch:
.c:,
e·
·l';
i'Hdc
r,;a..
>!.C
..!ci
r
~M
AG
LIN
""-
"-~---
--,.~-
•---,r;f
•~~·-
ln< _..,~ .. A ....
---•
.:Oh
ri,,"
"...
,._
,.
•-¥
<1
-""
""'°"
',,_,,..
,.....,.
e;=
••'"l
f"4'<'"
!Urz>
"'<
ar~
OIM
CN
SIO
N5:
-C
"'
llC
D"(I
J-'
=1
..,.,1
;, 1'
150"
(4~.
5crr
.l
Wel
p>{.
lM
o!~
1!lU
411
Riw
lwn
No
tu
"'""
No.
D
ate
DP
19-
8666
90
Pla
n#
33
May
5,
2020
eta
'""""" .
,.,,.
,m ..
1690
W~
t 2nd
Ave
nue
Vun
couv
e:
BC
C
ana!
:la .
V6J
1 H
4
t 1
60
-l6
"31
456
I f6
0-'1
66
31
¼9
w t
ww
w.e
lal.
l.ca
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D,
BC
Cu
tsh
eets
-L.OgeJMJrt:31
l;oo
l
l...
eg
,l)~
1"3
!00
2
L.e
gcl~
rtm
llrl
o3
-OT ~
1C
2180
6
""'
-.. Dra
wn
By
as n
oted
r:
....
..w
llty
Re
vie
we
d B
y L1
4.0
Tot
al S
he
ets
![Page 108: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/108.jpg)
CLI
MB
ING
NE
T
The
Clim
bin
g N
et Is
a ~
,sa
lle
dlm
be
rlh
al
chlld
ren
w!l
lwa
nt1
0tr
y11
1a
ln1
nd
ag
aln
.Th
e
lncl
loe
dsp
lde
rne
tan
dro
pe
swllh
cilm
bln
g
de
als
olle
rslu
na
nd
ch•l
len
gin
gw
•)'$
10d
imll
up
wa
rds
•nd
do
wn
ag
aln
. Th
e S
pid
er N
et h
as
par1
lyln
dlne
dhor
lzon
talr
un11
s.w
hld
iad
dsa
n
e>11
r1 cl
lalle
ng
elo
lne
loo
tsu
pp
orl
wh
en
ct
lmbl
nliJ
.Thl
stra
lnsp
rop
rlo
cep
llon.
spat
lal
1/
30
.01-
20
20
KP
L201
Pin
e B
ench
. 1
aw
are
ne
ssa
nd
cro
ss-c
oord
na
!lo
n.l
-lJo
fth
ne
mot
ors~
lllsa
relu
nd
am
en
lalf
Of]
ud
gln
g
dls
lan
cna
nd
ma
n1
11
lrtg
the
surr
ou
nd
fng
s co
nf,d
endy
,a\O
idin
ga
cdd
an
ts,T
ha
Chm
oin
g R
op
es
offe
r a d
,ffe
renl
~In
d o
r d
imb
lng
. din
gin
g
on
toro
pe
swh
Ne
go
lni;
up
wa
rds.
Th
ew
rle
d
cllm
bln
gb
aln
,f'
lea
m,,
leg
an
dco
rem
usc
tes
ln1e
nsel
y.T
he s
pe
clo
usC
llmb
ing
Ne
tca
nh
old
men
ych~
dren
.dlm
bln
gto
ge
lM:r
orl
akl
ng
a
bru
k,d
ew
toi,
lng
!mi,o
ruin
tso
ela
l•e
mc1
1on
al
sklD
s. KO
MP
AN
l-Le
t'sp
1ay
O~s
slc
des
ign
ed p
ari
fu
rnit
ure
wit
h l
ow m
al,
tt'n
ilnrt
c rt1
3ltr
ial>
sue
~ a~
'lo
l d
iµ g
olv
~m
ied
~l;;
~I
and
hi~
h o
ua
lit}
·woo
d. T
hcw
ooo
cn
00Jr
d~ar
cc1f
1-n
prcg
na
tcd
DU
e w
oo~
or t
·~1d
1·,oo
d.
Pro
du
ct
Lin
e O
vtd:
ior
Fum
it~re
IN
GR
OU
. S
UR
·
""'
Ca
teg
ory
C
lass
i, O
utd
oo
r Fu
rnii
ure
To
tal
he
igh
t (C
M1a
2
-l(Q
MP.
t.N l
NC
.iO!,
W H
OW
"Ull
Lin
e. S
u~
J;l
1(
01U
'Alt
FSC -i
e Ho.
FSC
-C0O
,U~0
A
us:l
nT
l!7
8;S
JP
l'on
e
1(8
~0)4
26-9
788
,.,.,_
fsc.
otci
U
SS
.lit
\ 01 o
mpJ
I\C
Cff
l I w
,,w
ko
-p,r
u.s
Th
e m
,1,..
ol r
es11
ar'5
1~1e
I~
KO
MP
AN
i-le
t<sp
1ay
l1e
mn
o.N
RD
a1
~1
001
Dim
en
sio
nsLl
C'M
cH
Age
Gro
11p
l'la
yC
ai,a
clty
Cc4
or0
plio
ns
8'2
'1 8
'1o
·x 8
5·
>1
2
7ch
lldre
n
BE
E S
PR
ING
ER
Th
eB
ee
Sp
ring
erw
ilnlt
sri
chta
cille
ele
me
nts
11
nd1p
penl
lngs
h1pe
met
i1o1
1!e
seh
lldre
nto
rock
, al
on
eo
rtw
oto
ge
the
r,T
he
rock
lng
mo
-.e
me
nt
anra
cts
child
ren
11g1
lnan
daga
in l
orsh
ort1
1r01
lo
ng
er1
ide
s.l\
:,1
rtfr
om
itsc
h1
rmin
g
11i,p
enra
nee
,th
eB
ee
Si,
rlng
erh
as1
r!e
ht.
1cU
le
1o11
rlatlo
n w
lth
lls r
vbb
erw
inlls
,wo
od
en
bo
dy
11nd
stal
nle
ssst
ee
lh1
nd
an
d1
oo
tha
ds.
Ta
c~le
rlch
ne
ssls
am
aln
mol
i1o1
110r
,esi
:,eei
,ay1
or
10
vng
er c
h~dr
en. I
t su
ppor
ts th
eir
vn
de
rs!a
nd
lng
olm
ete
rla
lch
ara
cte
rlsU
cssu
ch
asw
elg
ht.
smo
oth
n1
1ss
,l11
mpe
r11l
urea
nd
lnib
ility
,Th
isis
imp
ort
an
linl0
1ch
ildre
n's
a
blll
lyl0
1$
se
ssd
llfe
ren
ces1
nd
m1
~e
d
ec!
slo
ns.
Th
eso
olh
lng
,roe
kln
gm
o-.
em
en
tso
l th
eb
ee
tra
lnss
pa
ti11
awar
en
ess
an
ose
nse
o1
bala
nc11
,wh
kh
are
bo
lhcr
ucl
all0
1b
od
y co
nftd
ence
, wh
lch
lslm
po
rta
ntr
orc
nlld
ren
to
aw
ldfa
lts.A
go
od
se
nse
olb
ala
nce
als
o
imp
rose
sth
e11
bilit
ylo
sils
till
•ndc
om::e
ntre
t11.
KO
MP
AN
i-te
1-ip
1oy
11em
no.
NR
O11
8-0~
21
Qon
•ra
JP
tod
uclln
lorm
atl
on
o,m
ensl
onsL
>CW
:lH
Age
Gro
up
l'la
yC
ap
tclt
y
C01
010i
:,~on
s
2'6"
12
'3"1
2'5
,., 1c
hlld
D~
la ,
, Ju
bji:c
ttoc
hang
e1<
,tilo
utp1
io1
no
tice
A.
201
9-06
-~I
202
0-01
-29
R,>
.!<!"
"fe<
[}?
DP
19
-86
66
90
P
lan
# 3
4 M
ay 5
, 2
02
0
eta
"""""
·"·"·" ...
·,6
90
Vlu
t2nd
Ave
nue
Vam
:ou
;er.
BC
. C
anad
a. V
6J 1
H4
1 16
(),1,
6113
,1'\5
6
Ji6
04,6
63.1
459
w
l-ct:
lla.e
a
Aff
ord
ab
le H
ou
sin
g P
roje
ct
5491
No
. 2 R
OA
D
RIC
HM
ON
D, B
C
Cut
shee
ts
. ... Lll;
µA
,jd.)
".,,;
1"'1
1
~M
d-e!
iSll'
ll12
Le,µ
,_,,
.ess
lne
.:;
Dfa
wn
B~
Rov
iow
oo
3y
00
/00
/00
21
806
L15.
0
To:
a S
rie.iu
;
![Page 109: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/109.jpg)
TR
EE
PR
OT
EC
TIO
N F
EN
CIN
G
Min
imu
m R
adia
l D
ista
nce
fro
m t
run
k
# T
ype
DB
H
Met
res
Fee
t 10
R
ed M
aple
25
cm
1.5m
4.
9ft
11
Red
Map
le
25cm
1
.5m
4.
9ft
12
Red
Map
le
28cm
1.
7m
5.6f
t 13
R
ed M
aple
20
cm
1.2m
3.
9ft
14
Red
Map
le
22cm
1.
3m
4.3f
t 15
S
ibe
ria
nS
pru
ce
25cm
1.
5m
4.9
ft
SC
ALE
D
TO
Fl T
2
.5
0 5
10
ALL
D
IST
AN
CE
S A
RE
IN
M
ET
RE
S
AP
PE
ND
IX
3 T
RE
E
PR
OT
EC
TIO
N
PL
AN
D
PL
AN
B
CP
33
72
8
' I
r,ooc
Acl
~s I
~---=-
_] 1
VE
Cr-
l1'il
.C..b
__
__
__
__
__
__
__
__
j E
OJ
IPlvi
cW
O
NLY
Po.
ge
8
---------
7 I I I I I -:O
AR
·' A
llJl
fN
-'<
Y :
RA
l/-:o
I I I I
SIT
A
C I N
I-
TR
EE
IN
VE
NT
OR
Y
# T
yp
e
Act
ion
D
BH
M
PZ
1
Pin
oak
T
rans
plan
t 6
1cm
3.
7m
12 R
ed M
ap
le
Ret
ain
28
cm
1.7m
2 P
in o
ak
Tra
nspl
ant
44
cm
2.6
m
3 P
in o
ak
Tra
nspl
ant
33
cm
2.0m
4
Pin
oak
T
rans
plan
t 4
2cm
2
.5m
5
Pin
oak
T
rans
plan
t 1
5cm
1.
0m
6 P
in o
ak
Tra
nspl
ant
42
cm
2.5
m
8 R
ed M
ap
le
Re
tain
1
5cm
0
.9m
9
Red
Map
le
Re
tain
1
5cm
0
.9m
10
Red
Map
le
Ret
ain
2
5cm
1
.5m
11
R
ed M
aple
R
eta
in
25
cm
1.5m
13
Red
Ma
ple
R
eta
in
20
cm
1.2m
14
Red
Map
le
Re
tain
2
2cm
1
.3m
15
Sib
eria
n S
pru
ce
Re
tain
2
5cm
1.
Sm
DB
H-d
iam
ete
r, M
PZ
-pr
otec
tion
zone
TREE
P
RO
PO
SE
D
DP
19
-86
669
0 Pl
an#
35
May
5, 2
02
0
FOR
R
ETEN
TIO
N
CR
mC
AL
RO
OT
~ Z
ON
E (C
RZ
blue
) ,_
.._,,,
._,_
......
TRA
NS
PLA
NT
/~
',,
PRO
TEC
TIO
N
ZON
E ,'
6 7
9 \
(t.4P
Z)
----
.,,,"
... ,
: L
FEN
CIN
G
DIM
ENSI
ON
S
\ 3.
N
MET
RES
/ 05
\
I I
I o
I
I /
\ I
\ I
',
.,,,✓
,,_
_
_./
RO
TEC
TIO
N
FEN
CIN
G
..... __
_ ....
-:::
----
_ C
ANO
PY
(g
ree
n)
NO
TES:
1.
SI
TE
LAY
OU
T IN
FOR
MAT
ION
AN
D
lRE
E
SUR
VEY
DA
TA P
ER
SUPP
LIED
D
RAW
ING
2.
REF
ER
TO
ATTA
CH
ED
lRE
E
PRO
TEC
TIO
N
REP
OR
T FO
R
INFO
RM
ATIO
N
CO
NC
ERN
ING
TR
EE
SPEC
IES
, ST
EM
DIA
MET
ER,
HEI
GH
T, C
AN
OP
Y S
PREA
D
AND
C
ON
DlllO
N.
3.
ALL
M
EASU
REM
ENTS
AR
E M
ETR
IC
Fro
gg
ers
C
reek
T
ree
Co
nsu
lta
nts
L
td
776.
J ~
or A
-u~
8u
ma
by
8C
V5.
I 4H
4 T
Mph
ono:
60
4-7
21
-60
02
Fax
: 6
04
-43
7-0
97
0
549
1 N
o2
Roa
d Ri
chm
ond
BC
TREE
PR
OT£
Cno
N O
RAW
ING
TH
E D
RAW
ING
PL
OTS
A
LL
TREE
S,
PRO
POSE
D
FOR
RE
TE
~ON
, TR
ANSP
LAN
TIN
G.
THEI
R
CAN
OPI
ES
PRO
TEC
TIO
N
ZON
ES
AN
D
PRO
TEC
TIO
N
FEN
CIN
G
IN
REL
ATIO
N
TO
PRO
POSE
D
LAYO
UT
Mav
4,
2
02
0
![Page 110: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/110.jpg)
• G
BL A
RC
HIT
ECTS
IN
C
~39
EAST
8TH
AVE
NU
E .
ANC
OU
VER
, BC
CAN
ADA
VST
IRS
TEL
60li
736
11"
:::::::~
;:~;;t
'""~"
'"°'~
"" FA
X 60
4 73
1 521
R
EP
R00
UC
E0
'MT
IWU
~~
i:l~
~':;
1~C
TS
INC
.;~
:~
:~
~~
TIM
ES R
EM.I.
IN i
l!E
N
OTE
S H
CO
NS
EN
T US
ED O
R
DP
19-8
6669
0 R
efer
ence
Pla
n M
ay 5
, 202
0
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
3 20
20-0
3-19
DES
CR
IPTI
ON
OP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Revi
ew
NO
RTH
PE
RSP
ECTI
VE
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
0 1 l
:li6:
00 A
M
Aut
hor
Che
cker
1602
2
![Page 111: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/111.jpg)
• G
BL A
RC
HIT
ECTS
IN
C
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CAN
ADAV
ST 1
R8
TEL
60/4
736
11~
FAX
60/4
731
527
CO
PYR
IGfH
RES
ERVE
D:T
HIS
PLA
NA
ND
DE
SIG
NA
l!£A
ND
AT
,l.l.L
TIM
ES
RE
MA
INTH
E
EXC
LUSI
VEPR
0PER
TY0F
GS
LAR
CH
ITE
CTS
INC
..I.II
DM
AY
N0
TS
EU
SE
00R
R
EP
R00
UC
E0W
ITli0
UTi
HE
IRW
RIT
TEN
C0N
SE
NT
NO
TES D
P 1
9-86
6690
R
efer
ence
Pla
n M
ay 5
, 20
20
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP A
pplic
atio
n D
P C
omm
ents
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
SO
UT
H/ W
EST
VIEW
DAT
E D
RA
WN
BY
CH
EC
KE
D B
Y S
CA
LE
JOB
NU
MB
ER
3/19
/202
01U
6:00
AM
Aut
hor
Che
cker
1602
2
A-9
.02
![Page 112: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/112.jpg)
• G
BL
AR
CH
ITE
CTS
IN
C.
139
EA
ST
8TH
AV
EN
UE
T
EL
604
736
11~
VA
NC
OU
VE
R,
BC C
AN
AD
AV
ST
1R8
FAX
604
731
527
COPY
RIGH
TRE
SERV
ED:T
HIS
PL.A
HA
HD
DES
IGH
AA
£.I.N
OA
TN
..LTI
MES
REJ-
.l.llH
THE
EXCL
USIV
E PR
OFE
RiY
OFG
BLA
AC
HIT
ECTS
INC
.AllO
M~Y
HO
TBEU
SEO
OR
RE
PRO
DU
CED
WIT
HOU
TTH
EIR
WR
ITTH
ICO
NSE
NT
NO
TES
DP
19-
8666
90
Ref
eren
ce P
lan
May
5,
2020
REV
ISIO
NS
NO
. D
ATE
D
ES
CR
IPTI
ON
2019
-06-
28
DP
App
licat
ion
2020
-02-
18
DP
Com
men
ts
3 20
20-0
3-19
A
DP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Rev
iew
SO
UT
H/ E
AST
PE
RS
PE
CTI
VE
D
ATE
3
/19
/20
20
11
:l,6
:00
AM
DRA
WN
BY
Au
tho
r
CH
ECK
ED B
Y C
heck
er
SCAL
E
JOB
NU
MB
ER
16
022
A-9
.03
![Page 113: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/113.jpg)
• G
BL A
RC
HIT
ECTS
IN
C.
1 39
EAS
T 8
TH A
VEN
UE
VAN
CO
UVE
R,
BC C
ANAD
A V5
T 1R
8 TE
L 60
4 73
6 11
5
~~
~::
r;:~
VE
O,T
HIS
PLA
N,V
,IDD
ES
IGN
AR
E,V
,1
FAA
604
731
527
REP
RO
DU
CED
Wli
:~~
:l~
~C
HIT
EC
TS
INC
,V,1
0 MA
~:~~
~ ~~E~
REN
.I.IN
THE
NO
TES
IRIIT
EN
CD
NSE
NT
O
R
DP
19-
8666
90
Ref
eren
ce P
lan
May
5, 2
020
RE
VIS
ION
S
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
NO
RTH
I W
EST
VIEW
DAT
E D
RAW
N B
Y CH
ECKE
D B
Y SC
ALE
JOB
NU
MB
ER
3/19
/202
011:
46:0
0AM
Aut
hor
Che
cke
r
1602
2
![Page 114: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/114.jpg)
Cf)
CJ
z I Cf)
- z a:
:::>
LL
DIN
ING
CH
AIR
: M
AG
LIN
'KO
NT
OU
R' C
HA
IR
MA
GL
IN K
ON
TO
UR
JO
INA
BL
E T
AB
LE
S
I I- :::>
0 Cf)
<{ w
a:
<{ >- ___J
y
0 z w
a:
LL
0 a:
(l'.)
y
I- (/) w s
<{ w
a:
<{ >- I- z w
I-~
Cf)
<
{ <
{
I-w
C
f)
w s
y D
EN
OT
ES
BIR
D F
RIE
ND
LY P
LA
NT
ING
I l a:
0 z
Rel
lisio
n
No
. ·No. 20
19-0
6-2
1 Is
sue
la O
P
,, ..... , ....
.. DP
19-
8666
90
Ref
eren
ce P
lan
May
5,
2020
eta
··"""··· "
'""'""'"··
1690
We5
1:2n
dAvf
flue
V
aoeo
uv91
' . B
C .
Can
ada
• V6J
1 H
4
116
04.6
83.1
456
fl6
04.6
83.1
459
w 1
ww
w.1
taJa
.ea
AII
Rlg
hb
Res
..-.
ed
bye
tt.a
lan
do
cap
ea
rch
ote
ctu
reln
c.
lrd
-oo
co
ftta
,..d
""lh
eH
do
c.J
m..
,t:,
iop
Mo
l.,,
.e.i
-Ao
nl'
o
-•n
lll•l•
-c-.o
,,d
tl,o
c.o
-,.,
l,-,
.oh
llll,o
laln
c,-
.Np
1
1,.
....
r.s.
.d!W
__
_ N
>11>
o .. ..
iro
r...
,.,_
.,,,
_0
U-l
han
lo
rV
IO
--'l
i°"alV
IO
,,,l
on
nced
~M
Jo
__
__
o,
fflO
<llf
fca
do
no
flh
od
oO
....
-•lt
no
ullh
oC
...,
."'-
•p,\
Drw
mt.
.,
=~=-
~::.~
=...,
,•,oo1
o,1..,..
,...,,.,,..
.,1•MJ
111tt0<
logol
Aff
ord
able
Ho
usi
ng
Pro
ject
5491
No.
2 R
OA
D
RIC
HM
ON
D, B
C
0..a
win
gTr
tle
Pre
ced
ent
Imag
es
.....
Le
ga
1A
dd
ress
lne
1
Le
ga
1A
dd
ress
ine
2
Leg
alA
dd
ress
lne
J
Pn:to
<•~
OT
~ ... 81
Dra
wn
By
~&
,
Rev
iew
ed B
y
00/0
0/00
f>tl1
0a1e
:
-· 21806 - . as note
d L
0.5
Tota
l Sh
eets
![Page 115: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/115.jpg)
PL
Low
er
win
dow
-to
-wa
ll ra
tio
Lig
ht,
neut
ral
tone
s
PL
J
Lig
ht,
neu
tral
to
nes
Fram
ing
elem
ents------
-•-.:
:::
Rec
esse
d ba
lcon
ies-
------b
:~
c-\:!
:;111
~~
Low
er w
indo
w-t
o-w
all
ratio----
----l-
~~
"'k
:c±
c!..
.;•
Hig
h w
indo
w-t
o-w
all
rat
io
Ligh
t, n
eutr
al t
on
es
NO
. 2
RD
Th
e p
rop
ose
d d
evel
op
men
t si
ts b
etw
een
exi
stin
g la
te 1
990s
dev
elo
pm
ents
aro
und
Dov
er C
resc
ent,
Riv
er G
reen
[2
010s
). an
d fu
ture
de
velo
pm
en
ts to
the
No
rth
and
Eas
t. Th
e lo
catio
n th
en p
rovi
des
a lin
k be
twee
n th
ese
vary
ing
desi
gn s
tyle
s an
d sc
ales
. M
uch
like
the
old
er d
evel
op
men
ts t
o th
e W
est,
the
bui
ldin
g e
nve
lope
is
a hi
gher
p
erce
ntag
e of
sol
id w
all
rath
er
than
win
dow
wal
l. T
he e
leva
tio
ns h
ave
a cl
ear,
sim
ple
fra
min
g p
atte
rn s
imil
ar to
th
e d
evel
op
me
nt
dire
ctly
Wes
t, w
ith
rece
ssed
bal
con
ies
add
ing
dep
th t
o th
e fr
ames
. T
he p
rop
ose
d l
ight
gre
y
cem
ent
pan
el
is a
sim
ilar
sh
ad
e to
bot
h th
e a
dja
cen
t to
wn
ho
me
s a
nd c
ondo
bui
ldin
g. T
he d
ark
cem
ent
pan
el
add
s co
ntr
ast,
an
d t
he
wo
od
-lo
ok
sof
fits
are
a n
atu
ral
ton
e to
ref
lect
th
e su
rro
un
din
g m
atu
re t
rees
. T
he
flat
roo
f,
rath
er
than
th
e p
itc
hed
fo
rms
of t
he
90s
buil
ding
s, i
s ty
pic
al o
f th
e n
ewer
dev
elo
pm
ents
lik
e R
iver
Gre
en.
FUTU
RE
DE
VELO
PM
EN
T
RIV
ER G
RE
EN--
-
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E
VANC
OU
VER
, BC
CA
NA
DA
VST
lRB
TE
L 60
li 73
611
~ FA
X 60
4 73
1 52
7
COPY
RIG
HT
RESE
RVEO
:TH
ISPL
,1.N
AN
OO
ESIG
NA
AE.
I.NO
.lTJl.
l.LTI
MES
REM
.IJN
TIIE
EX
CLl
JSN
EPff
OPE
RTY
OFG
BL.
lRC
HIT
ECTS
INC
.MiO
MA
YN
OTB
EUSE
OO
R
NO
TES
DP
19-
8666
90
Ref
eren
ce P
lan
May
5,
2020
RE
VIS
ION
S
NO.
DA
TE
201
9-06
-28
2020
-02-
18
2020
-03-
19
DESC
RIP
TIO
N
DP
App
licat
ion
OP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
STRE
ETSC
APE
CO
NTEX
T D
ATE
DR
AW
N B
Y C
HE
CK
ED
BY
SC
ALE
JOB
NU
MB
ER
3/19
/202
010
:27:
SOAM
Aut
hor
C hec
ker
1602
2
A-0
.05a
![Page 116: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/116.jpg)
L----
-----i
-----------l I
DO
VER
CR
ES
CE
NT
-~ ----~ -
-------
/
~OVE
R P
AR
K
1------
i I I
I I I
65
-4"
APP
RO
X.
19.9
m I
'-
(,
I I I
I I I
I I I
, I I
,;.
,.4'
~· 'l-"
-6.0
,<>
'}"
EXIS
TIN
G P
EDES
TR
IAN
/ CY
CLI
NG
PAT
H
~" '}
·
TOW
NH
OU
SES
.~
,.i>
/ --
------
-1
~\
I •'
1t,
,..
,
D~
:0-~
)
FUTU
RE
RES
IDE
NT
IAL
iVEL
OeM
El>J
J. -
. -. -
. -. -
--
19
5'-
2"
59.5
m 14
7'-
10
"
CH
ILD
RE
N'S
PLA
Y A
RE
A(L
l]
.. ~ i ~
- BO
ILE
R
RM
RO
OF
-EL
EVAT
OR
O
VE
RR
UN
RO
OF
l,.ef
RO
OF
AC
CE
SS
TO _
__
__
_ .J
E:u
~;~
:~iC
t~L-
:;Y-------.....1
~
10
7'-
33
/8"
h '}
..,_
'b32
.7m
'
y ... 1
!;4
'-7
" ?.
!,7
'> 4
4.l
m
-,1-'
,,1'
,,,p,
,,{'
,,i'
-PA
RK
AD
E
EN
TRY
RA
P
.. ~
:us
t
! E
,OU
LE
VA
RO
II EX
ISTl
~G T
REE
' TO
BE
rEM
OVE
D
.,.'P'
-+rr
n--
--+
-1 SI
TE vE
H1duLA
/ AC
CES
S I
,,
I ,/-@
,I
/
J
EXIS
TIN
G T
REE
S TO
BE
REM
OVE
D
~N
EW
LE
TDO
WN
~· '}
"
C)
AP
PR
OX
. LO
CAT
ION
OF
EXIS
TIN
G H
YDR
ANT~
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CAN
ADA
VST
1R8
TE
L604
7361
1!:
FAX
604
731
527
CO
PYlllG
HT
RES
ER~E
O:
THlS
PLA
NA
NO
OE
SIG
NA
RE
AN
D ~
TALL
TIM
ES R
EMAJ
NTH
E £X
CLU
SIV
EP
RO
PE
RTY
OFG
BLA
RC
HIT
EC
iSIN
C . .
-INO
M~Y
NO
TB
EU
SEO
OR
R
EPflO
OU
CEO
WIT
HOU
TTH
EIR
YIR
ITT
EN
CO
NS
EN
T
NO
TES D
P 1
9-86
6690
R
efer
ence
Pla
n M
ay 5
, 202
0
REV
ISIO
NS
NO.
DAT
E
2019
-06
-28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP C
omm
ents
AD
P C
omm
ents
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
SITE
PLA
N
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
3/19
/202
010:
28:1
9AM
Aut
hor
Che
cker
1/1
6"=
1'-
0-
JOB
NU
MB
ER
16
022
A-1
.00
![Page 117: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/117.jpg)
, , ' ' ' '
AC
CE
SS
IBIL
ITY
STR
ATE
GY
Thi
s d
eve
lop
men
t is
ful
ly a
cces
sib
le f
rom
th
e m
ain
en
tran
ce,
thro
ug
ho
ut
the
buil
ding
co
mm
on s
pac
es,
amen
itie
s, s
har
ed a
men
ity
pati
os,
and
res
iden
tial
un
its.
A r
amp
lea
ds
to t
he
mai
n en
try
from
th
e si
dew
alk
with
an
auto
mat
ic d
oor
op
ener
pro
vide
d at
th
e en
try.
All
com
mo
n c
orr
ido
rs a
re 5
' wid
e, a
nd
th
e re
qu
ired
cle
ar
man
oev
erin
g sp
ace
is
pro
vid
ed a
t d
oorw
ays.
Acc
essi
ble
park
ing
stal
ls a
re p
rovi
ded
clo
se t
o th
e el
evat
ors
in t
he
park
ade
. T
he
com
mon
lau
ndry
ro
om
is
a sh
ort
dis
tan
ce f
rom
th
e el
evat
or,
an
d w
ill h
ave
both
sta
cked
and
a
side
by
side
wash
er/
dry
er.
All
resi
dent
ial
unit
s ar
e o
ne
leve
l an
d fo
llow
Bas
ic U
nive
rsal
Hou
sing
Fea
ture
s [B
UH
F).
4 un
its
on t
he
gro
un
d l
evel
are
ful
ly w
hee
lcha
ir a
cces
sib
le.
Ref
er t
o th
e un
it p
lan
s on
A-1
.06
and
A-1
.07
for
all
clea
ran
ces
pro
vid
ed.
PATI
O
3 4
-----------~
----
----
-7
I i
--
' ',
(
i \
i I
---------------------------'
/--
)--:
--I
,.J~
HIL
DR
EN
'S.:~
y A
RE
A,~
\,_
~
1--
----
,if
' !
I 14
.5%
S
LOP
E D
N 5
.0%
\ .....
_____
___ _
/
/
I I
I
PAR
KA
DE
E
NTR
Y RA
MP
I I I I I I I
L _
__
J II
• ii I
:,; .,;
I I
I
C)
6 7 8
-6.0
3
9 10
0
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NU
E
VANC
OU
VER
, BC
CA
NAD
AV
5T 1
RB
TEL
604
736
11~
FAX
604
731
527
CO
P\'ll
lGH
TRES
ERV
EO:T
l!IS
PLA
NA
Nllt
)ESI
ON
.U.E
AN
DAT
,1,L
LTIN
ESR
EI-I
PJN
THE
EXC
LUSr
vEPR
o.>E
RTY
OFG
BLA
RC
HIT
'EC
TSIN
C.A
ND
NA
YN
OTB
EUSE
OO
R
NO
TES
DP
19-
8666
90
Ref
eren
ce P
lan
May
5,
2020
REV
ISIO
NS
NO.
DAT
E
DESC
RIP
TIO
N
201
9-06
-28
DP
App
licat
ion
2020
-02-
18
DP
Co
mm
ent
s
2020
-03-
19
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
AC
CE
SS
IBIL
ITY
ST
RAT
EGY
OAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SCAL
E
JOB
NU
MB
ER
3/1
9/20
204:
58:2
2 P
M
Aut
hor
Che
cker
3/32
"=1'
-0"
1602
2
A-1
.08
![Page 118: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/118.jpg)
--~
----
7
·--·
T-4
1/r
_
---,
~,I-
'
T
c:,,
1 ; A1-
ST
UD
IO
:.0:
4: B3
-1 B
=E
-D
R~
O~
OM
~--------
t 7
'-2"
r --
-----
--------
-------
r-20
· ----------,/'
~·-~
Yt'
l
i .
-j ~
2 I 81
-1
BE
DR
OO
M
HC
lJ!i
i[_k
__
536S
F
i------
1
HC
l-JB
~R-_!
Lt .J
521
SF
··r§sJ
~v
. [L
J'/
11
11
'-5
" -!
_,
:.._.
__ __
_ _
----
~'~
s·--
-'~
'i~
""--
----
----
----
"--J
31-
B?-
1. B
ED
R.O
~O
M~
-------------~
r W
HE
ELC
HA
IR A
CC
ES
SIB
LE U
NIT
3'-
6"
~-----~
-9
'_·~
'"--
-++
-+
PR
IVA
TE P
ATI
O
~----· ~
-------
BASI
C U
NIV
ER
SA
L H
OU
SIN
G R
EQU
IREM
ENTS
:
'BU
H' D
ENO
TES
UN
ITS
TH
AT
ARE
REQ
UIR
ED T
O C
OM
PLY
WIT
H T
HE
RIC
HM
ON
D Z
ON
ING
BY
IAW
AN
D M
US
T IN
CO
RPO
RAT
E nB
ASI
C U
NIV
ERSA
L H
OU
SIN
G F
EATU
RES
n:
1) A
N A
UTO
MA
TIC
DO
OR
OPE
NER
SHAL
L BE
PR
OVI
DED
FO
R TH
E M
AIN
BU
ILD
ING
ENT
RY (
MA
IN L
OBB
Y &
VES
TIBU
LE(S
))
2) T
HE L
IINIM
IJ~~
CLE
4R O
PEN
ING
~O
R H
HRY
DO
OR
S TO
EVE
RY D
WH
UN
G I
JNIT
AN
O D
OO
R<;
IN f
OM
MO
N A
RFA
'\ <;
HAI I
RF
NO
LE
SS T
HAN
850
mm
(w
-llC
H 'M
LL B
E PR
OVI
DED
BY A
SW
ING
DO
OR
)
3) T
HE ~
INIM
UM
CLE
AR O
PEN
ING
FO
R IN
TERI
OR
DOO
RS T
O A
T LE
AST
ON
E BE
DR
OO
M A
ND
ON
E AC
CESS
IBLE
BA
THR
OO
M IN
EVE
RY
BUH
DW
ELU
~/G
U~I
IT S
H.Li.
LL B
E M
O L
ESS
THti.
~! !O
Orn
rn
-4) D
OO
RS
IN E
VERY
DW
ELLI
NG
UN
IT A
ND
CO
MM
ON
ARE
AS S
HAL
L BE
OPE
RABL
E BY
DEV
ICES
TH
AT D
O ~
JOT
REQ
UIRE
TIG
HT
GR
ASPI
NG
OR
ffllS
TIN
G O
F W
RIS
T
5) F
LUSH
TH
RES
HO
LDS
THR
OU
GH
OU
T TH
E BU
ILD
ING
SH
ALL
BE A
MA
XIM
UM
OF
13m
m IN
HEI
GH
T
6) T
HE A
BOVE
-NO
TED
REQ
UIR
EMEN
TS F
OR
DO
OR
S D
O N
OT
APPL
Y TO
ME
CH
AN
ICA
L R
OO
MS,
SER
VICE
ARE
AS,
CLO
SETS
, ET
C.
WH
ERE
THR
OU
GH
AC
CES
S IS
NO
T RE
QUI
RED
AND
ACC
ESS
TO A
PER
SON
'WtT
H A
DIS
ABIL
ITY
IS N
OT
ANTI
CIP
ATED
7) E
NTRY
DO
OR
S TO
EVE
RY D
WEL
LIN
G U
NIT
AN
D D
OO
R A
SSEM
BLIE
S IN
CO
MM
ON
ARE
AS S
HALL
HAV
E A
CLE
AR A
ND
LEV
EL A
REA
W
HIC
H iS
~W
T LE
SS T
H:\~
J TH
E FO
LLO
Wl~
!G
a) W
HER
E TH
E D
OO
R S
WIN
GS
TOW
AR
D T
HE A
REA
(PU
LL D
OO
R),
1500
mm
LO
NG
BY
WID
TH O
F TH
E DO
OR
PLUS
AT
LEAS
T 60
0mm
C
l EAR
5PA
CE
ON
THF
LAT
CH
SID
E b)
WH
ERE
THE
DO
OR
SW
ING
S A
WA
Y F
RO
M T
HE A
REA
(PU
SH D
OO
R),
1220
mm
LO
NG
BY
WID
TH O
F TH
E D
OO
R P
LUS
AT L
EAST
30
0mm
CLE
AR S
PACE
ON
THE
LAT
CH
SID
E.
c)W
HE
RE
THE
RE A
RE D
OO
RS
IN A
SER
IES
IN C
OM
MO
N A
REA
S, T
HERE
MU
ST B
E S
EP
A.A
TIO
N O
F AT
LEA
ST 1
220m
m P
LUS
THE
WID
TH
OF
THE
DO
OR
. d)
ENT
RY D
OO
RS
TO E
VER
\' D
WE
LLIN
G U
NIT
AR
E EX
EMPT
ED F
RO
M T
HE R
EQU
IREM
ENT
TO P
ROVI
DE T
HE 1
110m
m L
ON
G C
LEAR
AR
EA
AN
D 6
00m
m Q
£A.R
SPA
a
IF R
OU
GH
IN i.
1.//R
ING
IS P
ROVI
DED
FOR
FUTU
RE C
ONV
ERSI
ON
FOR
,A.N
AU
TO M
A T
IC D
OO
R O
PENE
R
CORR
IDO
R W
IDTH
S:
8) C
OM
MO
N C
OR
RID
OR
S SH
ALL
BE N
O L
ESS
THAN
122
0mm
WID
E A
ND
PRO
VIDE
A C
LEAR
AR
EA 1
500m
m x
150
0mm
AD
JAC
ENT
TO
THE
ELEV
ATO
R E
NTR
ANC
E
fLO
OPI
suR
,AC
t:S:
9) F
LOO
R SU
RFAC
ES T
HR
OU
GH
OU
T TH
E BU
ILD
ING
SH
ALL
HAV
E N
O A
BRU
PT C
HAN
GES
IN
LEVE
L, 1
•, A
MA
XIM
UM
BR
EAK
OF
THE
FLUS
H TH
RES
HO
LD O
F 13
mm
HEI
GH
T. T
HIS
REQ
UIR
EMEN
T DO
ES N
OT
APPL
Y TO
EXT
ERIO
R BA
LCO
NY,
PAT
IO A
ND
DEC
~ D
OO
R S
ILLS
10)
FLO
OR
SURF
ACES
SH
ALL
BE S
LIP
RESI
STAN
T.
11}W
HE
RE
CAR
PETS
ARE
USE
D, T
HEY
MU
ST B
E FI
RMLY
FIX
ED, H
AVE
A F
IRM
UN
DER
LAY
AND
PILE
UND
ER 1
3mm
IN H
EIG
HT
WIN
DO
WS:
12
) WIN
DO
WS
WH
ICH
ARE
ACC
ESSI
BLE
SHAL
L H
AVE
A W
IND
OW
Sill
HEI
GH
T TH
AT
DOES
NO
T EX
CEED
750
mm
ABO
VE T
HE F
LOO
R TO
AFF
OR
D S
EATE
D VI
EWIN
G,
AT L
EAST
ON
E W
IND
OW
IN T
HE B
EDR
OO
M A
NO
mJE
WIN
DO
W IN
THE
LIV
ING
RO
OM
SH
ALL
AFFO
RD
SUC
H S
EATE
D V
IEW
ING
13)W
IND
OW
S W
HIC
H A
RE A
CCES
SIBL
E SH
ALL
HAV
E O
PEN
ING
ME
CH
AN
IS~S
OPE
RABL
E W
llH O
NE H
AN
D A
ND
OF
A T
YPE
fHA
T DO
ES N
OT
REQ
U)RE
TIG
HT
GR
ASPI
NG
, PI
NC
HIN
G O
R ffl
lST
ING
OF
THE
ui,m
OU
TLET
S A
ND
SW
ITC
HES
; 1-
4) L
IGH
T SW
ITC
HES
, EL
ECTR
ICAL
PAN
ELS
AND
INTE
RC
OM
BU
TTO
NS
SHAL
L BE
BE
fflE
EN
900
m T
O 1
200m
m F
RO
M T
HE F
LOO
R IN
TER
CO
M B
UTT
ON
S SH
ALL
BE M
AX
JUM
137
5mm
FR
OM
THE
FLO
OR
15) E
LEC
TRIC
AL O
UTLE
TS,
CAB
LE O
UTLE
TS A
ND
TEL
EPHO
NE J
ACKS
SH
ALL
BE L
OC
ATED
NO
T LE
SS T
HA
N45
0mm
FR
OM
TH
E FL
OO
R O
R N
OT
MO
RE
THAN
120
0mm
16) T
HER
MO
STAT
S SH
ALL
BE L
OC
ATED
BET
WEE
N 9
00m
m T
O 1
200m
m F
RO
M T
HE F
LOO
R
17) T
HE O
PERA
BLE
PART
OF
CO
NTR
OLS
SH
ALL
BE L
OC
ATED
WIT
HIN
REA
CH
OF
THE
CLE
AR F
LOO
R AR
EA T
HAT
HAS
A 'M
OTH
OF
NO
T LE
SS T
HAN
750
mm
.
18)
LIG
HT
SWIT
CH
ES W
ill
BE R
OCK
ER O
R PA
DD
LE-T
YPE
SWIT
CHES
_
BATH
ROO
MS:
19
) AT
LEA
ST O
NE B
ATH
RO
OM
SH
ALL
,1)
HAV
E A
TO
ILET
PO
SITI
ON
ED W
ITH
THE
CEN
TRE
LINE
OF
THE
TOIL
ET 4
20m
m T
O 4
80m
m F
RO
M A
SID
E W
ALL
ON
WH
\CH
A G
RAB
BA
R C
AN
BE
INST
ALLE
D A
ND
AT
LEAS
T 51
0mm
FRO
M A
~ O
BSTR
UC
TIO
N O
N T
HE N
ON
-GR
AB B
AR S
IDE
AN
D A
T LE
AST
BOO
rnrn
FR
OM
AN
Y O
BSTR
UC
TIO
N I
N F
RO
NT
OF
THE
TOIL
ET; A
ND
b)
HAV
E A
CLE
AR F
LOO
R AR
EA !N
FR
ON
T O
F TH
E Sl
~IK
OF
760m
m B
Y 12
20m
m P
OSI
TIO
NED
FO
R A
PAR
ALLE
L AP
PRO
ACH
AN
D
CENT
ERED
ON
THE
SIN
K c}
HAV
E A
MIN
IMU
M C
LEAR
AR
EA O
F 51
0mm
IN D
EPTH
ALO
NG
THE
FUL
L LE
NG
TH O
F TH
E BA
THTU
B d
) H
AVE
STR
UC
TUR
AL R
EIN
FOR
CEM
ENT
IN W
ALLS
BEH
IND
AN
D B
ESID
E TH
E TO
ILET
AN
D T
HE W
ALLS
AR
OU
ND
THE
TU
S AN
D/O
R
SHO
WER
TO
FAC
ILIT
ATE
THE
INST
ALLA
TIO
N O
F G
RAB
SAR
S; A
ND
e)
INC
LUD
E EA
SY T
O G
RASP
HAN
DLE
S O
N F
AUC
ETS,
E.G
., LE
VER-
TYPE
FAU
CETS
20) W
HER
E BA
THR
OO
MS
ARE
PRO
VID
ED T
O S
ERVE
A C
OM
MO
N A
MEN
ITY
SPAC
E, A
T LE
AST
ONE
SH
ALL
BE W
HEE
LCH
AIR
AC
CES
SIBL
E AS
DES
CRIB
ED IN
THE
BU
ILD
ING
CO
DE
AN
D T
HE T
OP
OF T
HE R
IM O
F TH
E TO
ILET
IN T
HAT
ONE
BAT
HR
OO
M S
HAL
L BE
48
0mm
ABO
VE T
HE F
LOO
R
KIT
CHEN
S:
21) T
HE K
ITC
HEN
MU
ST H
AVE:
,1
) US
ABLE
co
uim
R S
PACE
A~J
O C
UPB
OAR
DS
THi.T
CAN
BE
EASI
L y A
CC
ESSE
D B
Y PE
OPL
E W
ITH
DIS
ABIL
ITIE
S, I
NC
LUD
ING
PEO
PLE
WIT
H W
HEE
LCH
AIR
S, E
.G.,
CO
NTI
NU
OU
S C
OU
NTE
R B
E1W
EEN
THE
STO
VE A
NO
SIN
;-;:;
ADJU
STAB
LE S
HELV
ES IN
ALL
CAB
INET
S; P
ULL"
O
UTW
OR
K B
OAR
OS
AT B
10m
m H
EIG
HT;
AN
D P
ULL
-OU
T CA
Bl~J
ET S
HELV
ES;
b) E
ASY
TO G
RASP
HAN
DLE
S O
N F
AUC
ETS,
E.G
., LE
VER-
TYPE
FAU
CET
S;
c) E
ASY
TO G
RAS
P H
AND
LES
ON
CU
PBO
ARD
S, E
.G.,
0 OR
J T
YPE
CAB
INET
HAN
DLE
S A
ND
GR
AB E
DGES
U~J
DER
CO
UN
TER
S;
d) T
ASK
LIG
HTI
NG
AT
SINK
, ST
OVE
AN
O K
EY W
OR
K AR
EAS;
AN
D
e} P
LUM
BIN
G A
ND
UTI
LITY
PIP
ES L
OC
ATED
TO
PRO
VIDE
FO
R A
PO
TEN
TIAL
B 10
mm
WID
E U
ND
ER C
OU
NTE
R W
OR
KSPA
CE
SO A
S N
OT
TO P
REVE
NT T
HE E
ASY
FUTU
RE C
ON
VER
SIO
N O
F C
OU
NTE
R S
PACE
AN
O S
INKS
TO
BEI
NG U
NIV
ERSA
LLY
ACCE
SSIB
LE F
OR
KNEE
SPA
CE
UN
DER
THE
SIN
K W
HER
E TH
ERE
IS A
CO
UN
TER
TO
P ST
OVE
BU
ILT
IN
IEO
lOO
M A
NO
CLO
SET:
22
) TH
E SP
ACE
ARO
UN
D A
BE
D I
N A
DW
ELLI
NG
UN
IT T
HAT
CO
NSIS
TS O
F A
BAC
HEL
OR
SU!
TE A
ND
AT
LEAS
T O
NE
BED
RO
OM
IN
EV
ERY
OTH
ER D
WEL
L!M
G U
NIT
SH
:\LL
H.W
E su
mC
!EM
T S
P/1 .C
E TO
PRO
IJIDE
II
TUR
Nl~
!G D
IAM
ETER
Of
1500
mm
oiJ
O~J
E SI
DE O
F A
D
OU
BLE
BED
23)
THE
CLO
THES
CLO
SET
IN A
DW
ELLI
NG
UN
IT T
HA
T C
ON
SIST
S O
F A
BAC
HEL
OR
SUI
TE A
ND
AT
LEAS
T O
NE B
EDR
OO
M l~
J EV
ERY
OTH
ER D
WEL
LIN
G U
MT
SHAL
L H
AVE
A C
LEAR
OPE
NIN
G O
F AT
LEA
ST 9
00m
m,
CLEA
R FL
OO
R SP
ACE
OF
AT L
EAST
750
mm
BY
1200
mm
AN
D A
CLO
THES
HAN
GER
RO
D TH
AT C
AN B
E LO
WER
ED T
O 1
200m
m
PATI
OS
AN
D B
ALC
ON
IES;
24
) AC
CES
S DO
ORS
SH
ALL
HAV
E A
MIN
IMU
M C
LEAR
OPE
NIN
G O
F 80
0mm
25)
MIN
IMU
M D
IMEN
SIO
NS
OF
AN
Y B
ALC
ON
Y OR
PAT
IO S
HAL
L BE
150
0mm
BY
1500
mm
TH
IS R
EQU
IREM
ENT
DOES
NO
T AP
PLY
TO "
JULI
ET"
OR
"FR
ENC
H"
BALC
ON
Y O
R PA
TIO
.
ALL
REM
AIN
ING
SUI
TES
WIL
L IN
CO
RPO
RAT
E AG
l~JG
IN
PLAC
E FE
ATUR
ES I
NC
LUD
ING
: ST
AIR
WEL
L H
AND
RAI
LS W
HER
E ST
AIRS
ARE
PR
OVI
DED
; LE
VER
TYPE
HAN
DLE
S FO
R: P
LUM
BIN
G F
IXTU
RES,
DO
OR
HAN
DLE
S;
SOLI
D B
LOC
KIN
G IN
WA
SH
RO
OM
WAL
LS F
OR
FUTU
RE G
RAB
BAR
S BE
SIDE
TO
ILET
, BA
THTU
B AN
D S
HO
WER
• G
BL A
RC
HIT
EC
TS
INC
139
EAST
BTH
AVE
NU
E VA
NC
OU
VER
, BC
CA
NA
DA
V5T
1R
8
TEL
604
7361
1:
FAX
604
731
527
CO
PYR
IG~T
RES
ER~E
O
TH
ISPl
AN
AN
00£5
1GN
AR
EA
NO
AT
AL
Lilf
.tESR
EIJ
.AJN
7Hf
EXCllJSl'✓EPR0PERTY0FG8LARCH17ECTSINCAN0NA¥N078ElJSf;00R
NO
TES
DP
19-8
6669
0 R
efer
ence
Pla
n M
ay 5
, 202
0
RE
VIS
ION
S
NO
DAT
E
2019
-06-
2B
2020
"02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
Ap
p(i
utio
n
OP
Com
m•n
t.1
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
UN
IT P
LAN
S
DAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
010:
28:3
9AM
Aut
hor
Che
cker
1/4
",,,
1'-0
"
1602
2
A-1
.06
![Page 119: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/119.jpg)
, C
1 -
2 B
ED
RO
OM
}.,,:
6'-
6"
I 0
1 -
3 B
ED
RO
OM
---J
AN
ITO
R'S
CLO
SE
T L3
& 5
, U
NIT
STO
RA
GE
L 2
, 4,
6
I_ C2
-2
BED
RO
OM
I
·=
-------------
I-C3
-2
BED
RO
OM
• G
BL
ARC
HIT
ECTS
IN
C
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CAN
ADA
V5T
1R8
TEL
604
7361
1~
FAX
604
7315
27
NO
TES D
P 1
9-86
6690
R
efer
ence
Pla
n M
ay 5
, 202
0
RE
VIS
ION
S
NO
D
ATE
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CRIP
TIO
N
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
UN
IT P
LAN
S
DAT
E D
RA
WN
BY
CH
EC
KE
D B
Y SC
ALE
JOB
NU
MB
ER
3/19
/202
010:
28:4
1 A
M
Aut
hor
Che
cker
1/4
".,1
'-0
"
1602
2
A-1
.07
![Page 120: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/120.jpg)
SIT
E C
ON
TEX
T
DE
SIG
N R
ATI
ON
ALE
O
verv
iew
The
prop
osed
de
velo
pm
en
t is
loc
ate
d in
th
e D
over
Cro
ssin
g a
rea
of
Ric
hm
on
d,
we
st o
f th
e C
ity
Ce
ntr
e.
The
site
is
boun
ded
by N
o 2.
Rd
to t
he e
ast,
tow
n h
om
es
to t
he
sout
h, a
nd a
ch
ild d
ayca
re
cen
tre
to t
he
wes
t. F
urt
her
wes
t is
Dov
er P
ark,
a f
utur
e re
sid
en
tial
dev
elo
pm
ent
dire
ctly
nor
th
and
the
Fra
ser
Riv
er b
eyon
d. A
ped
estr
ian/
cycl
ing
path
als
o r
un
s al
ong
the
eas
t an
d s
ou
th e
dg
es
of t
he s
ite,
co
nne
ctin
g to
Dov
er P
ark
and
a n
etw
ork
alo
ng t
he F
rase
r R
iver
. T
he s
ite
is c
lose
to
Ric
hmon
d B
rig
h ou
se,
a m
ajo
r tr
ans
it s
tati
on,
as
we
ll as
all
the
sh
op
pin
g,
rest
aura
nts
and
se
rvic
es a
t R
ichm
ond
Cen
tre.
Un
der
the
ZH
R3
zoni
ng,
a m
axim
um
FA
R o
f 3.
0 is
per
mit
ted
for
res
ide
ntia
l us
es.
Dov
er C
ross
ing
is i
nten
ded
to b
e a
high
-am
enit
y, m
ulti
-fam
ily
resi
den
tial
nei
gh
bou
rhoo
d pr
ovid
ing
a tr
ans
itio
n to
the
hig
her
de
nsit
y C
ity C
ent
re,
yet
sens
itiv
e to
the
sin
gle
-fam
ily
ho
mes
nea
rby.
Th
e p
rop
ose
d
buil
ding
wil
l be
2.6
3 FA
R,
6 st
ore
ys in
hei
ght,
and
pro
vide
80
affo
rdab
le r
enta
l u
nits
.
An
indo
or a
men
ity
are
a fo
r re
sid
ents
is i
ncl
uded
on
the
gro
und
leve
l, w
ith
a ki
tche
nett
e, d
inin
g,
and
seat
ing
area
, an
d sh
are
d w
ork
spac
e.' T
he i
ndoo
r am
enit
y r
oom
ope
ns o
nto
a la
rge
adjo
inin
g ou
tdoo
r pa
tio
and
urb
an a
gri
cult
ure
plo
ts f
acin
g so
uth
. A
sec
ond
am
enit
y pa
tio
is l
ocat
ed o
n th
e no
rth,
act
ing
as a
co
urt
yard
bet
wee
n t
he b
uild
ing
and
it's
futu
re n
eig
hbou
r. O
ne l
evel
of
un
der
gro
un
d p
arki
ng i
s pr
ovid
ed,
incl
udin
g bi
ke s
tora
ge
roo
ms.
Des
ign
et: w
> - et: et: w
V,
<(
et: u.
TOW
N H
OM
ES
The
su
rrou
ndin
g en
viro
nm
enta
l co
ntex
t an
d th
e D
over
Cro
ssin
g C
omm
unit
y D
esi
gn p
lan
wer
e th
e b
asis
for
the
des
ign
app
roac
h. T
he e
ast
volu
me
fro
ntin
g N
o 2
Rd
is s
ligh
tly t
alle
r to
em
ph
asiz
e th
e vi
sual
gat
eway
at
the
Wes
t R
ichm
ond
ent
ranc
e. T
he s
ou
th/w
est
elev
atio
ns t
hen
mir
ror
the
sca
le o
f th
e to
wn
ho
mes
acr
oss
the
pat
h by
in
tro
du
cin
g 2
-sto
rey
fra
min
g el
emen
ts t
o b
reak
up
the
elev
atio
n. T
he n
ort
h/w
est
corn
er
volu
me
is p
ulle
d cl
ose
r to
th
e p
rop
erty
lin
e to
war
ds t
he
rive
r, a
llow
ing
for
view
s to
the
mo
un
tain
s an
d ri
ver
thro
ugh
the
neig
hbou
ring
bui
ldin
gs.
Thi
s d
evel
op
men
t w
ill
targ
et S
tep
Co
de 3
for
ene
rgy
effi
cien
cy.
The
bui
ldin
g en
velo
pe i
s de
sign
ed
wit
h a
low
win
dow
to
wal
l ra
tio
for
bet
ter
insu
lati
ng v
alu
es,
but a
lso
pro
vid
es l
arg
e e
noug
h w
indo
ws
in m
ain
livin
g sp
aces
for
na
tura
l li
ghti
ng.
Ope
rab
le c
asem
ent
win
dow
s a
re m
axim
ized
th
roug
ho
ut t
he u
nits
to
allo
w f
or n
atu
ral
vent
ilat
ion.
Var
ian
ces
We
are
req
ues
ting
a h
eig
ht v
aria
nce
for
the
wes
t po
rtio
n of
th
e bu
ildi
ng,
to a
llow
for
a b
uild
ing
heig
ht
of 1
9.9
m [
refe
r to
ele
vati
ons)
. T
he
allo
wab
le h
eig
ht w
ithi
n 26
m o
f th
e ea
st p
rop
erty
lin
e is
24
m,
whi
le t
he
wes
t po
rtio
n is
1 B
m.
A h
eigh
t of
19.
9m i
s re
qui
red
for
a 6
-sto
rey
bui
ldin
g. T
he
pro
po
sed
flo
or t
o fl
oor
heig
ht w
ill
allo
w f
or t
he
acco
mo
dat
ion
of
du
cts,
lig
ht f
ixtu
res,
ex
it si
gns,
et
c. W
e al
so r
equi
re a
set
bac
k v
aria
nce
on
the
east
sid
e. W
hile
a 6
m s
etba
ck
is p
erm
itte
d,
we
have
pro
po
sed
5m
. S
hift
ing
the
bu
ildi)
lg (
and
core
) w
est
wo
uld
aff
ect
pa
rkin
g b
elow
. as
the
p
ark
ade
is c
on
stra
ined
by
exis
ting
tre
es o
n th
e w
est
side
. A
6m
set
bac
k w
oul
d al
so c
om
pro
mis
e o
ur
unit
s, a
s th
ey r
equi
re a
ddit
iona
l cle
aran
ces
to c
om
ply
wit
h B
UH
gu
idel
ines
.
Ma
teri
als
;tJ <
m
;tJ
;tJ C
To
high
ligh
t an
d f
urt
her
art
icu
late
the
sim
ple
bui
ldin
g m
assi
ng,
cont
rast
ing
sh
ades
and
te
xtu
res
of f
ibre
-cem
ent
pan
el c
ladd
ing
is u
sed
for
the
ext
erio
r. C
emen
t p
anel
is d
ura
ble
and
ea
sy to
mai
ntai
n, w
hich
is
idea
l fo
r an
aff
ord
able
ren
tal
buil
ding
. T
he g
rou
nd
lev
el a
nd p
orti
ons
of t
he u
pp
er le
vels
are
cla
d in
dar
k h
ori
zont
al O
ka-S
kin,
whi
ch i
s n
arro
w s
lats
of
vary
ing
text
ure
s fo
r a
mat
te,
sto
ne-l
ike
qual
ity.
The
end
s o
f th
e bu
ildi
ng a
nd f
ram
ed v
olu
mes
are
a l
ight
gr
ey H
ardi
e P
anel
for
con
tras
t. T
he b
alco
ny a
nd f
ram
e so
ffit
s a
re a
woo
d to
ne/
tex
ture
cem
ent
pane
l, w
hich
pro
vide
s w
arm
th a
nd c
olo
ur
agai
nst
th
e m
on
och
rom
atic
ele
vati
ons.
Lan
ds
cap
e
The
pri
mar
y in
tent
of
the
lan
dsc
ape
desi
gn i
s to
fo
ster
co
mm
uni
ty b
uild
ing
. Th
e la
nd
scap
e de
sign
ai
ms
to f
acili
tate
so
cial
iza
tion
and
co
mm
uni
cati
on
betw
een
dem
og
rap
hic
s w
ho w
ill b
e in
habi
ting
th
e bu
ildin
g.
Ope
n sp
aces
wit
h va
ried
sea
tin
g,
urb
an a
gric
ultu
re,
and
an
ou
tdo
or
dini
ng a
rea
wit
h a
bar
beq
ue
and
joi
nabl
e ta
ble
s p
rese
nt
man
y op
port
uni
ties
for
bot
h tr
anq
uil
rel
axat
ion
, an
d ne
ighb
ourl
y ac
qu
ain
tanc
e.
Th
e de
sign
is
cog
niza
nt o
f th
e ne
arb
y D
over
par
k an
d D
ove
r cr
oss
ing
. B
ecau
se t
he
park
pro
vide
s a
near
by v
ast
ope
n sp
ace
for
acti
ve a
ctiv
ity,
th
e P
athw
ays
lan
dsc
ape
des
ign
focu
ses
on s
ma
lle
r op
en
are
as f
or m
ore
pas
sive
re
laxa
tio
n a
nd s
oc
iali
zati
on
.
······ ··
······
·······1
·······
···:
1 ZH
RJ
Zoni
ng
The
ex
istin
g zo
ning
all
ows
for
mid
-ris
e a
pa
rtm
en
ts u
p to
6
sto
reys
(18
-24
m i
n h
eig
ht)
. Th
e ne
ighb
ou
ring
ap
art
me
nt
to
the
nort
h/w
est
is 8
sto
reys
.
........
io
:0::
iN
ia
jZ
·····•
•:
2 N
o 2
Rd
Ga
tew
ay
Tal
ler
buil
ding
s ar
e p
erm
itte
d n
ear
the
rive
r an
d N
o 2
Roa
d br
idge
to
crea
te a
vis
ual g
atew
ay a
t th
e e
ntr
ance
to
Wes
t R
ichm
ond.
The
No
2 R
d vo
lum
e is
rai
sed
to e
mp
hasi
ze t
his
gate
way
.
.,,...~···
········
········
········
···1
'+,
····•·
<
<r -'>,
1t. Glo
w D
EN
S\\'
{
3 T
ran
siti
on
to
Lo
w D
ensi
ty
Sca
le t
ran
siti
on
s st
ep
do
wn
fro
m n
ort
h to
so
uth
to
min
imiz
e
impa
cts
on e
xist
ing
sin
gle
-fa
mily
ne
igh
bo
urh
oo
ds.
Th
e
4
sout
h/ea
st e
leva
tio
ns a
re b
roke
n w
ith
2-st
orey
fra
med
vo
lum
es r
em
inis
cent
of
the
tow
nho
use
sca
le to
the
so
uth
.
Lin
kag
es
··-···, ; i : i
A m
ulti
-use
ped
estr
ian
/cy
clin
g p
ath
conn
ects
the
sit
e to
D
over
Par
k, a
nd
Fra
ser
Riv
er p
ath
s to
the
nor
th.
Nor
th f
acin
g un
its
have
vie
ws
to t
he m
ou
nta
ins
and
rive
rfro
nt b
etw
een
the
ex
isti
ng a
nd
fu
ture
ap
artm
ent
bui
ldin
gs.
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAST
8TH
AVE
NUE
VA
NCO
UVE
R, B
C C
ANA
DA
V5T
1 RB
TE
L 60
4 73
6 11
~
F AX
604
731
527
CO
Pl'R
IGH
TRES
ERVE
D:
THIS
PLA
NA
ND
DES
ION
.oJl
E..:
.DA
TALL
TIN
ES
RE
MA
iNTH
E
ExtL
USJ
VEPR
OPE
RTY
OFG
BLA
RC
HIT
EC
'ISIN
C . .
.:.O
MA
VN
OTB
EU
SE
OD
R
NO
TES
DP
19-
8666
90
Ref
eren
ce P
lan
May
5, 2
020
RE
VIS
ION
S
NO.
D
ATE
201
9-06
-28
2020
-02-
18
2020
-03-
19
DESC
RIP
TIO
N
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
PR
OJE
CT
RA
TIO
NA
LE
DAT
E D
RA
WN
BY
CH
EC
KE
D B
Y S
CA
LE
JOB
NU
MB
ER
3/1
9/20
2010
:26
:33A
M
Aut
hor
Che
cker
1602
2
A-0
.02
![Page 121: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/121.jpg)
• G
BL A
RC
HIT
ECTS
IN
C.
139
EAS
T 8
TH A
VEN
UE
VAN
CO
UVE
R.
BC C
AN
AO
AV
ST
lRB
TE
L 60
4 73
6 11
~ FA
X 60
4 73
1 52
7
COPY
RIGH
TR
ESO
NED
: TH
ISPl
.AN
/lND
DES
IGN
AA
EAN
D/lT
.l.l.L
TIM
ESR
DtA
INTH
E
EXtL
llSIV
EPR
Dl'E
RT'
t'DFG
BLA
AC
HIT
ECTS
INC
. l.'I
DM
AY
NO
TBE
USE
O O
R RE
P!IO
OU
CEO
WIT
HOUT
THEI
RW
RIT
TEN
CO
NSE
NT
NO
TES D
P 1
9-86
6690
R
efer
ence
Pla
n M
ay 5
, 202
0
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Re
vie
w
CON
TEXT
MA
PS
DAT
E D
RAW
N B
Y C
HE
CK
ED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
0 I0
:27:
06A
M
Aut
hor
Chec
ker
1602
2
A-0
.04
![Page 122: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/122.jpg)
O 1
Vie
w l
ooki
ng W
est
from
ped
estr
ian/
cycl
ing
path
02
V
iew
fro
m N
o 2
Rd l
ooki
ng S
out
h
03
Vie
w f
rom
No
2 R
d/
Rive
r Ro
ad i
nter
sect
ion
look
ing
Nor
th/W
est
04
Vie
w f
rom
No
2 R
d lo
oki
ng N
orth
/Wes
t
DO
VER
CR
ES
CE
NT
05
Vie
w f
rom
ped
estr
ian/
cycl
ing
path
loo
king
So
uth
I I I
\ \ \
SIT
E
~~
--
Iii!.
-05
02
I(' 1
I
__ _J
C)
NO 2
RO
"-
03
• G
BL
AR
CH
ITE
CT
S
INC
.
139
EAS
T 8
TH A
VE
NU
E
VA
NC
OU
VE
R,
BC C
AN
AD
AV
5T 1
R8
TE
L604
7361
1!::
FAX
604
731
527
COPY
RIG
HT
RESE
R~ED
, TH
IS P
l.lN
ANO
DES
IGN
ARE
,/,N
O A
T M
.l TI
MES
REM
AIN
HIE
El
(CLU
SIV
EPR
Ol'E
RTY
OFG
BL'
-RC
HIT
ECTS
INC
. .m
OM
AY
NO
iB
EUSE
OO
R
NO
TES D
P 1
9-86
6690
R
efer
ence
Pla
n M
ay 5
, 202
0
RE
VIS
ION
S
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP C
omm
ents
A
DP
Com
men
ts
5491
No
2 Rd
DP
-P
rog
ress
Rev
iew
STRE
ETSC
APE
PHOT
OS
DA
TE
DR
AW
N B
Y C
HE
CK
ED
BY
SC
ALE
JOB
NU
MB
ER
3/19
/202
010:
27:l
OA
M
Aut
hor
Che
cker
1602
2
A-0
.05
![Page 123: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/123.jpg)
SUR
VEY
PLA
N
OF
LOT
B S
ECTI
ON
1
BLO
CK
4 N
OR
TH
RA
NG
E 7
WES
T NE
W W
ESTM
INST
ER
DIS
TRIC
T PL
AN
B
CP
2927
7 P
AR
CE
L ID
EN
TIFI
ER
(P
IO):
02
7-0
20
-98
3
CIVI
C AD
DRES
S #5
491
NO
. 2
RO
AD
RIC
HM
ON
D,
B.C
.
STR
ATA
P
LAN
LMS
2166
MA
TSO
N
PEC
K
& T
OPL
ISS
SU
RV
EY
OR
S
& E
NG
INE
ER
S
#3
20
-
11
12
0
HO
RS
ES
HO
E
WA
Y
RIC
HM
ON
D,
8.C
., V
7A
5H7
PH:
60
4-2
70
-93
.31
FA
X:
60
4-2
70
-41
37
CA
DF
lL£:
1
83
59
-00
l-T
PG
-00
0.D
WG
STR
ATA
P
LAN
L
MS
26
43
R-1
7-1
83
59
-TP
G
CLI
EN
T R
EF:
CIT
Y O
F R
ICH
MO
ND
#5
86
2
Rem
P
arce
l ·c·
S
RW
P
LAN
2
48
95
ST
RA
TA
P
LAN
LM
S18
03
#5
84
0
D
PLA
N
BC
P3
37
28
#549
1 V
AC
AN
T LO
T
INO
ICA
T£S
S
PO
T
ELE
VA
TIO
N
O
IP
!MD
ICA
1ES
\R
ON
P
OS
T
w1
CS
IN
DIC
AT
ES
C
AT
CH
B
AS
IM
0 M
H
MA
NH
OLE
-$:
-LS
IN
DIC
AT
ES
LA
MP
S
TA
ND
AR
D
...o...
S
H~O
lCAT
ES
SIG
N
LEGE
ND
SC
ALE
1:
30
0
ALL
D
IST
AN
CE
S
AR
E
IN
ME
TR
ES
CO
NT
OU
R
1N
TE
RV
AL
=0
.30
rn
R-1
7-1
83
59
-TP
G
PLA
N
BC
P3
03
83
I RI
VER
RO
AD
Rem
11
6 P
LAN
4
98
57
CER
TIFI
ED
CO
RR
ECT
THIS
17
TH
D
AY
O
F JA
NU
AR
Y,
20
17
WIL
UA
M
P.
WO
NG
, B
CLS
(#
69
7)
THIS
D
OC
UM
EN
T IS
N
OT
VA
LID
U
NLE
SS
O
RIG
INA
LLY
SI
GN
ED
ANO
S
EA
LED
.
C)
• G
BL
AR
CH
ITE
CTS
!N
C.
139
EA
ST
8TH
AV
EN
UE
V
AN
COU
VER
, BC
CA
NA
DA
VST
1 RB
T
EL
6047
3611
5.
FAX
60
4 73
152?
CO
PYR
IGK
TAES
ERV
EOTH
!SPL
aNA
NO
OES
IGN
AR
EAN
OA
7ALL
TIM
ESR
EMA
IN<f
!E
EXCL
USIV
E PR
OPE
R7Y
OFG
BLA
RC
f!HEC
TSIN
C A
ND M
AY N
O~ B
E US
ED O
R R
EPR
OO
UC
EDW
l"H
0lH
TKEI
RW
Rl7
7EN
CO
NSE
NT
NO
TES D
P 1
9-86
6690
R
efer
ence
Pla
n M
ay 5
, 20
20
REV
ISIO
NS
NO.
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP C
omm
ents
A
DP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
SITE
SU
RVE
Y
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
010:
27:5
1 A
M
Aut
hor
Che
cker
1602
2
A-0
.06
![Page 124: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built](https://reader031.vdocument.in/reader031/viewer/2022012006/60f7b292ae07473bdc03937d/html5/thumbnails/124.jpg)
C)
i __ S
PR
ING
EQ
UIN
OX
-1 O
AM
I
!-S~R
l~G
f:O
UIN
OX
.-12P
f'1 _
__
__
__
_
"---
----
----
-·--
--__
_
SP
RIN
G E
QU
INO
X -
2PM
I SU
MM
ER
SO
LS
TIC
E-1
0A
M
:_g
lMM
ER
SO
LS
TIC
E-1
2PM
I
SUM
MER
SO
LSTI
CE
-2P
M
• G
BL A
RC
HIT
ECTS
\N
C
139
EAST
8TH
AVE
NU
E VA
NC
OU
VER
, BC
CA
NA
DA
VS
T 1R
8 TE
L 60
4 73
6 1 l
t FA
X 60
4 73
1 52
7
COP'
l'RIG
HTR
ESER
VEO
iH
ISPL
/lNA
NO
OES
IGN
AR
EAN
OA
iALL
TIM
ESR
EMA
IIS-
HE
EX
CL
USI
VE
PRO
PER
T'IO
FGB
LA
RC
KIT
EC
Sll;C
AN
Ol~
/lYN
OT
BE
USE
DO
R
RE
PRO
OU
CE
DW
ITH
OU
TT
HE
IRW
RIT
TE
NC
ON
SEN
T
NO
TES
DP
19-
8666
90
Ref
eren
ce P
lan
May
5, 2
020
REV
ISIO
NS
NO
DAT
E
2019
-06-
28
2020
-02-
18
2020
-03-
19
DES
CR
IPTI
ON
DP
App
licat
ion
DP
Com
men
ts
ADP
Com
men
ts
5491
No
2 Rd
DP
-P
rogr
ess
Rev
iew
SHA
DO
W S
TUD
IES
DAT
E D
RAW
N B
Y C
HEC
KED
BY
SCAL
E
JOB
NU
MB
ER
3/19
/202
0 10
:28:
10A
M
Aut
hor
Che
cker
, .. ,
,_40
·-o"
1602
2
A-0
.07