City of Richmond To: Development Permit Panel From: Wayne Craig Director, Development Report to Development Permit Panel Date: May 5, 2020 File: DP 19-866690 Re: Application by GBL Architects for a Development Permit at 5491 No. 2 Road Staff Recommendation 1. That a Development Permit be issued which would: a) Permit the construction of a six-storey building containing approximately 80 purpose-built residential rental tenure units at 5491 No. 2 Road on a site zoned "High Rise Apartment and Congregate Housing (ZHR3)- Dover Crossing"; and b) Vary the provisions of Richmond Zoning Bylaw 8500 to: 1. Reduce the minimum building setback from No. 2 Road from 6 m to 5 m; 11. Increase the maximum building height from 18 m to 20.3 m for the west portion of the building; and 111. Reduce the number of required parking spaces from 87 to 46. 2. That the Chief Administrative Officer and the General Manager, Engineering & Public Works, be authorized to execute a servicing agreement with the owner of 5900 River Road, to install road works and utility works along No. 2 Road City land and remove and relocate eight City trees from No. 2 Road City land, based on the material terms and conditions set out in Attachment 6 of the staff report titled, "Application by GBL Architects for a Development Permit at 5491 No. 2 Road," dated May 5, 2020 from the Director of Development. Wayne Craig Director, Development (604-247-4625) WC:SB Att. 6 Document Number: 6433306 6433306 Version: 3

Upload: others

Post on 24-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

City of Richmond

To: Development Permit Panel

From: Wayne Craig Director, Development

Report to Development Permit Panel

Date: May 5, 2020

File: DP 19-866690

Re: Application by GBL Architects for a Development Permit at 5491 No. 2 Road

Staff Recommendation

1. That a Development Permit be issued which would:

a) Permit the construction of a six-storey building containing approximately 80 purpose-built residential rental tenure units at 5491 No. 2 Road on a site zoned "High Rise Apartment and Congregate Housing (ZHR3)- Dover Crossing"; and

b) Vary the provisions of Richmond Zoning Bylaw 8500 to:

1. Reduce the minimum building setback from No. 2 Road from 6 m to 5 m;

11. Increase the maximum building height from 18 m to 20.3 m for the west portion of the building; and

111. Reduce the number of required parking spaces from 87 to 46.

2. That the Chief Administrative Officer and the General Manager, Engineering & Public Works, be authorized to execute a servicing agreement with the owner of 5900 River Road, to install road works and utility works along No. 2 Road City land and remove and relocate eight City trees from No. 2 Road City land, based on the material terms and conditions set out in Attachment 6 of the staff report titled, "Application by GBL Architects for a Development Permit at 5491 No. 2 Road," dated May 5, 2020 from the Director of Development.

Wayne Craig Director, Development (604-247-4625)

WC:SB Att. 6

Document Number: 6433306 6433306

Version: 3

Page 2: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 2 -

Staff Report

Origin

DP 19-866690

GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built rental residential development at 5491 No. 2 Road on a site zoned "High Rise Apartment and Congregate Housing (ZHR3)- Dover Crossing". Key components of the proposal include: • A six-storey building containing affordable housing over a single-level underground parking

structure. • A total floor area of approximately 5,273 m2 (56,762 ft2) purpose-built residential rental units

and an additional approximately 100 m2 (1,076 ft2) ofresident indoor amenity space. • 80 purpose-built residential rental units secured in perpetuity with a Housing Affordability

Agreement and covenant registered on title. Proposed rental rate, subsidies and household income restrictions are subject to the BC Housing Community Housing Fund program and all of the units will be secured with a legal agreement between Pathways and BC Housing. Further details on form of rental are provided in the housing section of this report. The residential units include: o 16 deep subsidy affordable housing units with proposed rental rate and household income

restrictions targeted at low income households; o 40 rent geared to income units with proposed rental rate and household income

restrictions targeted at below BC Housing Income Limits; and o 24 low and moderate income units with proposed rental rate and household income

restrictions targeted at low and moderate income households.

This Development Permit application was received as part of a partnership between the City, BC Housing and Pathways Clubhouse Society of Richmond (Pathways). The City has advised it will provide the vacant City-owned site through a long term ground lease. The building will be constructed and operated by Pathways, a Richmond based non-profit housing and service organization that has been offering community-based services to Richmond residents since 1984. Pathways collaborates with people and organizations in the broader community to provide education and promote mental wellness. Pathways Clubhouse currently manages more than 120 apartments in Richmond. BC Housing will provide Pathways with financing and funding.

Road and Engineering improvements required with respect to the subject development will be secured through the City's standard Servicing Agreement process prior to Building Permit issuance. Works include road works, frontage improvements and utility upgrades.

Development Information

Please refer to attached Development Application Data Sheet (Attachment 1) for a comparison of the proposed development data with the relevant Bylaw requirements.

Background

Development surrounding the subject site is as follows:

To the north: A vacant development site under the same zoning as the subject site.

6433306

Page 3: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 3 - DP 19-866690

To the east: Across No. 2 Road is a vacant development site in the high-density high-rise City Centre Oval Village, zoned "High Rise Apartment and Olympic Oval (ZMU4)­Oval Village (City Centre)".

To the south: Across a multi-purpose pathway in an unconstructed City road right-of-way (ROW) is a strata-titled three-storey townhouse development on a property zoned "Town Housing (ZT5)- Dover Crossing".

To the west: Fronting onto Dover Crescent is a strata-titled mixed use eight-storey building with apartments and a City-owned child care facility on a property zoned "Low Rise Apartment (ZLR3)- Dover Crossing".

Public Consultation

An open house was held on Wednesday, September 11, 2019 from 4:00 to 8:00 pm at the Thompson Community Centre to present the subject proposal and listen to feedback from the community. The meeting was facilitated by public engagement consultant Ideaspace Consulting Inc. and Pathways and City staff were in attendance to answer questions. A summary report prepared by Ideaspace is attached to this report, along with sign-in forms and comments forms (Attachment 2) and the one item of public correspondence received regarding the subject application (Attachment 3).

In August 2019, invitations to the open house were mailed by City Affordable Housing staff to owners and residents of properties within 50 m of the subject site and all properties along Dover Crescent. Approximately 85 people attended the open house engagement meeting. At the open house, approximately 70 people signed the sign-in forms and an additional approximate 15 people attended. 27 comment forms were completed, expressing support for the proposal, expressing concerns regarding the proposal and providing suggestions for consideration.

Key themes regarding the design and construction of the proposal identified in the summary report and public correspondence include the following:

a) Support for the project

b) Concerns about the proposed vehicle access location, including traffic speed, congestion, sight lines and the capacity of No. 2 Road to accommodate the subject proposal - The No. 2 Road frontage will be improved through a required Servicing Agreement, including frontage beautification, sidewalk, off-road multi-use path separated from vehicular traffic and improvements to the road geometry (increasing the sight line of traffic from the No. 2 Road bridge). The City's Transportation Department has reviewed the site and is satisfied that the required No. 2 Road improvements will be an improvement over the existing condition and will address traffic safety concerns for the site access and on-ramp to No. 2 Road.

c) Concerns about impacts on traffic congestion on No. 2 Road, River Road and Lynas Lane -A Traffic and Parking Study prepared by Tetra Tech was submitted in support of the proposal and has been reviewed and accepted by Transportation staff. The study concluded that the existing road network has sufficient capacity to accommodate the proposed 80-unit development.

6433306

Page 4: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 4 - DP 19-866690

d) Concerns about overflow parking on Dover Crescent and Dike Road -A Traffic and Parking Study prepared by Tetra Tech was submitted in support of the proposal and has been reviewed and accepted by Transportation staff. The study addresses the anticipated demand for vehicle parking for this unique mix of subsidized rental affordable housing uses and this unique model of building management as well as Transportation Demand Management (TDM) features associated with the proposal. Further information regarding proposed TD Ms is provided in the 'Parking and Access' section below. While resident parking is reduced based on analysis, visitor parking is being provided in accordance with the Zoning Bylaw. The proposal is not anticipated to result in overflow parking.

e) Concerns about neighbourhood impact of building height obstructing views and sunlight -The proposal complies with the overall height permitted in the existing zoning, with increased height in a portion of the roof area to allow the top floor to be a full size floor, the same size as lower floors. The applicant has submitted shadow analysis that demonstrates that the proposal will only have a minor impact on existing neighbouring development. The shadow analysis is included as a reference plan in the DP plans.

f) Considerations regarding exterior and interior building design, including a desire for a building design that ensures safety, accessibility, inclusiveness for tenants and aircraft and traffic sound mitigation The subject development is designed to provide a secure building with a high level of accessibility and shared social spaces. All of the residential units will incorporate basic universal housing features. Four of the residential units will be accessible units, designed to accommodate a resident in a wheelchair and the remainder of the units will be designed to be easily renovated to accommodate a future resident in a wheelchair. Further interior design, and building security system details will be addressed at the Building Permit stage. The building will achieve CMHC interior noise standards as verified through acoustical reports at the Building Permit stage.

g) Concerns about construction traffic impacts, parking, noise, and hours of operation -Prior to Building Permit issuance, the developer is required to submit a construction traffic and parking management plan to the satisfaction of the City's Transportation Department.

Staff Comments

The proposed scheme attached to this report has satisfactorily addressed the significant urban design issues and other staff comments identified as part of the review of the subject Development Permit application. In addition, it complies with the intent of the applicable sections of the Official Community Plan (OCP) and is in compliance with the "High rise Apartment and Congregate Housing (ZHR3)- Dover Crossing" zone, except for the zoning variances noted below.

Zoning ComplianceNariances (staff comments in bold)

The applicant requests to vary the provisions of Richmond Zoning Bylaw 8500 to:

1) Reduce the minimum building setback from No. 2 Road from 6 m to 5 m.

(Staff supports the proposed variance as the variance accommodates a more efficient and functional layout and enables increased separation from the building to the west. Ambient noise will be mitigated through building envelope design and construction which is

6433306

Page 5: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 5 - DP 19-866690

secured through the registration of an aircraft noise sensitive use covenant prior to Development Permit (DP) issuance).

2) Increase the maximum building height from 18 m to 20.3 m for the west portion of the building.

(Staffs up ports the proposed variance as it involves only a portion of the top floor, the variance accommodates a more efficient and functional layout with the same size jloorplates on all of the upper floors, and adequate building separation is proposed with approximately 19 m to 29 m separation between the proposed building and neighbouring apartment and townhouse buildings).

3) Reduce the number ofrequired parking spaces from 87 to 46.

(Staff supports the proposed variance as it reflects the anticipated demandfor this unique use and the proposal includes Transportation Demand Management (TDM} features. A Parking Analysis Study prepared by Tetra Tech was submitted in support of the proposal and has been reviewed and accepted by Transportation staff. The study addresses the anticipated demand for vehicle parking for this unique mix of subsidized rental affordable housing uses and this unique model of building management. Transportation Demand Management (TDM} features associated with the proposal include: (i) subsidized transit passes for the 16 deep subsidy affordable housing units for two years; (ii) Pathways shuttle bus program transportation for all Pathways members to and from their residence and the Pathways Clubhouse in City Centre; (iii) bicycle rental/bicycle share program for the building, including four bicycles and four dedicated bicycle storage rack spaces located close to the building lobby; (iv) a bicycle maintenance room located in the parking structure; (v) electric bicycle charging outlets (120V) provided in each bicycle storage room; and (vi) short term pick-up and drop-off area for two vehicles is accommodated in the service area).

Advisory Design Panel Comments

On February 19, 2020, the Advisory Design Panel (ADP) supported the subject Development Permit application moving forward to the Development Permit Panel, subject to the applicant giving consideration to the ADP's comments. A copy of the relevant excerpt from the Advisory Design Panel Minutes is attached for reference (Attachment 4), together with the applicant's design response in 'bold italics'.

Analysis

Conditions of Adjacency • The No. 2 Road streetscape is enhanced with the orientation of the residential lobby. • The interface with the public multi-use path along the south edge of the site includes the

class 2 bike racks, landscape buffer, stair connections to individual unit patios and a stair connection to the shared outdoor amenity space. The raised patios adjacent to path have limited retaining walls to accommodate planting screening. Landscaping improvements to the public multi-use path are will be provided through the required servicing agreement.

• The residential six-storey building massing is provided along all sides of the site.

6433306

Page 6: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 6 - DP 19-866690

• The proposed residential building is setback along all sides of the property. The underground parking structure extends towards the edges of the property. The setback area along the west property line provides a landscape buffer to the neighbouring residential development.

• The north elevation of the single level parking podium will be visible until the neighbouring site redevelops. This party wall is low and is proposed to be treated with vine planting to provide interim screening until the neighbouring property develops.

Urban Design and Site Planning

The proposed massing includes a six-storey mid-rise wood-frame building over a single-level concrete parking structure. The building massing is articulated in an L-shape with an angled hinge point and textured with projecting and recessed areas. The site is located in an area impacted by aircraft noise and registration of an aircraft noise sensitive use legal agreement is a consideration of the Development Permit. As part of the Building Permit (BP) application process, the applicant is required to design and construct the building in a manner that mitigates potential aircraft noise to the proposed dwelling units, including submission of a mechanical report prepared by a registered professional confirming the development achieves the ASHRAE 55-2004 "Thermal Environmental Conditions for Human Occupancy" standard for interior living spaces and an acoustic report prepared by a registered professional confirming the development achieves the following CMHC interior noise level guidelines:

Portions of Dwelling Units Noise Levels (decibels)

Bedrooms 35 decibels

Living, dining, recreation rooms 40 decibels

Kitchen, bathrooms, hallways, and utility rooms 45 decibels

• In accordance with the City's flood plain designation and protection Bylaw 8204, registration of a flood covenant is a consideration of the Development Permit. The proposed ground floor elevation and lower lobby elevation providing access for persons in wheelchairs comply with the bylaw.

Parking and Access • Vehicle access is proposed to the subject site from a single driveway connection on

No. 2 Road through the adjacent site to the north at 5900 River Road. There is an existing cross-access easement registered on title to both properties which, prior to Building Permit issuance for the subject proposal, is required to be discharged and replaced with a new Public-Rights-of Passage (PROP) Statutory-Right-of-Way (SRW) over 5900 River Road and cost sharing legal agreement regarding construction and maintenance of works within the SR W areas. The SR W area would allow for subdivision in the future and consolidation with the subject site after future development of 5900 River Road is completed. Existing legal agreements prohibiting access to No. 2 Road and existing cross-access easement will be discharged from both properties. The vehicle access in the SR W area will be designed and constructed through the required Servicing Agreement process.

• The total number of parking spaces proposed to be provided on-site is 46, including 29 spaces for the use of residents, 15 shared spaces for the use of visitors and two spaces for a car share provider. Registration of a legal agreement securing the two car share spaces for car share service, including a Public-Rights-of Passage (PROP) Statutory-Right-of-Way (SRW) is a DP consideration.

6433306

Page 7: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 7 - DP 19-866690

• The applicant proposes to provide the following Transportation Demand Management (TDM) measures to support the reduced parking rates as considerations of the Development Permit: o Enhanced bicycle facilities, secured by legal agreement, including shared bicycle

repair/maintenance stations and Pathways administering a bicycle rental and bicycle sharing program for the shared use of all residents, including the provision of four bicycles and four additional outdoor rack spaces over and above the bicycle storage bylaw requirements.

o Electric charging outlets in all class 1 bicycle storage rooms. o Transit pass program providing two years of two-zone compass cards for each of the

16 deep subsidy units at a subsidized rate of $45 per year, secured with Letter of Credit ( or BC Housing letter of assurance) and by legal agreement.

o The Pathways shuttle bus service program will provide transportation for Pathways members between their residence and the Pathways Clubhouse facility.

o Two short term pick-up/drop-off parking spaces for non-loading hours. • Short term class 2 bicycle storage is accommodated with bicycle racks near the building

lobby entry. Longer term class 1 bicycle storage facilities are accommodated in shared bicycle storage rooms in the parking structure, and secured by legal agreement as a consideration of the DP.

• One medium (SU-9) on-site loading space is provided adjacent to the vehicle access.

Architectural Form and Character •

• •

The development style is contemporary with a high level of architectural design, articulation and material quality. The design includes articulation along the building facades and a corner entry lobby to anchor the building. The proposed cladding materials (flat and textured cement panel, strip cement panel soffit, aluminum and vinyl windows, glass guard rails and privacy screens) are consistent with the Official Community Plan (OCP) guidelines and compatible with recent low-rise development in the City. The palette of colours includes light grey to black tones, and wood tone accents . The building roof will be flat and rooftop mechanical equipment will be screened with light grey metal louver screening as shown in the DP plans.

Landscape Design and Open Space Design • 482 m2 (5,188 ft2

) ofresidential outdoor amenity space is provided, based on the OCP standard of 6 m2 (65 ft2

) per dwelling unit, comprising two consolidated, irrigated landscaped, multi-use outdoor spaces on the west and north sides of the development at the ground floor level ( co-located with required indoor amenity space) and accessed from interior corridors and the indoor amenity space. The west area is designed as a communal social space with outdoor dining, BBQ, moveable seating, arbour and urban agriculture planters. The north children's play area features four pieces of play equipment as well as a rubberized surfacing with a stepping stone pattern to encourage active and social play for a number of children at the same time. Bench seating is also incorporated for parent supervision.

• All landscaped areas on the ground level will be serviced by an irrigation system. • Private outdoor patios and balconies are provided for all dwelling units.

6433306

Page 8: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 8 - DP 19-866690

• Prior to forwarding the subject application to Council, the developer is required to provide to the City a Letter of Credit ( or BC Housing Letter of Assurance) for landscaping in the amount of $229,074 as estimated by the project Landscape Architect, to ensure that on-site landscape features are provided in accordance with the Development Permit.

Shared Indoor Amenity Space • The OCP requires that multi-family development comprising 40 units or more provide at

least 100 m2 (1,076 ft2) of indoor amenity space. The subject development meets the OCP

minimum and provides for attractive indoor amenity space located adjacent to the outdoor amenity space. These amenities include a multi-purpose indoor amenity room, building management office and laundry room.

Crime Prevention Through Environmental Design • The building has been designed in accordance with CPTED principles and the building will

be managed by a property manager. • The streetscape and common area design is defined and visually permeable to establish a

sense of territoriality that contributes toward overall safety. • The parking area is secured with an overhead gate and include appropriate lighting level and

light painted ceilings and walls for enhanced visibility.

Accessible Housing

The proposed development includes 100% basic universal housing units that are designed to be easily renovated to accommodate a future resident in a wheelchair. These single-storey units are required to incorporate all of the accessibility provisions listed in the Basic Universal Housing Features section of the City's Zoning Bylaw, and are permitted a density exclusion of 1.86 m2 (20 ft2) per unit. The proposed development includes four barrier free housing units that are designed to be fully accessible at the time of construction for a resident in a wheelchair. In addition to complying with the Basic Universal Housing Features section of the City's Zoning Bylaw as noted above, these single-storey units are required to comply with the BC Building Code requirements for accessible housing. Wheelchair access is accommodated in all common areas and corridors to unit entries .

Sustainability Measures • The development is designed to utilize energy from the City's Oval District Energy Utility

(OVDEU), which will supply space heating and domestic hot water heating. Connection to the City's DEU system will be secured with a legal agreement registered on title as a consideration of the Development Permit.

• The proposed development is required to meet the sustainability requirements set out in the applicable sections of the Richmond BC Energy Step Code, which is step 2 for the proposed mid-rise building where combined with a low carbon building energy system, such as the OVDEU. In fact, the applicant is endeavouring to target a higher step 3 rating.

Tree Management • There are no existing trees on the subject site.

6433306

Page 9: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 9 - DP 19-866690

• There are eight trees located within the area No. 2 Road that requires road works in order to provide access to the subject site fronting both the subject site and the adjacent site to the north at 5900 River Road. These trees are in conflict with the required City road works and in close proximity to major infrastructure. These Oak trees are to be relocated to the satisfaction of the Parks Department. They may tentatively be relocated to Brighouse Neighbourhood School Park and Terra Nova South Park as they both have irrigation to aid in re-establishment and are located relatively nearby.

• Six trees located on the neighbouring property to the west will not be impacted by the proposed development. The proposal has been designed with additional parking structure setbacks along the west edge of the site to protect these adjacent existing trees.

• Installation of appropriate tree protection fencing is required for these trees as part of the development prior to any construction activities, including building demolition, occurring on­site. The applicant is also required to enter into a contract with a Certified Arborist for supervision of any works conducted within the tree protection zone of the trees, to monitor the trees and submit a post-construction assessment report to the City for review.

• There a total of 38 new trees included in the Development Permit plans.

Water Sustainability Act Approvals • The vacant site features grass and a portion of a land depression that is located both on the

subject site and the adjacent privately-owned site to the north. Historic aerial photographs and site visits indicate that the depression appears to feature seasonal wetland. In accordance with the provincial Water Sustainability Act, the developer has engaged a Qualified Environmental Professional to assess the site and work with the Province for the necessary approvals which are required prior to any site preparation and construction activity disturbance in the area under investigation.

Affordable Housing • The site is City-owned and the City will contribute the City-owned site through a long-term

ground lease for the development. The terms of the lease will be approved by Council separate from the Development Permit application process and prior to Building Permit issuance.

• All 80 residential units in the development are affordable housing units. The proposed rental dwelling units are provided at three affordability rates as follows: 20% deep subsidy units; 50% rent geared to income units; and 30% low and moderate income units. All of the units will be secured in perpetuity with a Housing Affordability Agreement registered on title. All of the units are subject to the BC Housing Community Housing Fund program criteria and secured with a legal agreement between the developer and BC Housing.

Dwelling Unit Mix: The OCP and City Centre Area Plan (CCAP) encourage the development of a variety of unit types and sizes supportive of the diverse needs of Richmond's population including, but not limited to, households with children. While the number of units in each affordability tier is secured, the unit types (studio, I-bedroom, etc.) are not specified by affordability tier. This arrangement is designed to enable tenants to move between affordability levels in the event that their income changes. For example, a tenant who receives a salary increase may be able to transition from a Rent Geared to Income unit to a Low and Moderate Income unit without moving away from the building.

6433306

Page 10: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 10 - DP 19-866690

One-person households and couples without children are overrepresented among renters experiencing housing affordability challenges in Richmond. This trend is particularly pronounced for low-income renter households that earn less than $30,000 per year, where 61% of households are individuals living alone and an additional 14% are couples without children. Accordingly, there is a high demand for smaller units among households in this income category. In recognition of this demand, the proposal includes 75% of the units with studio or one bedroom, and 25% of the units with two or three bedrooms.

Staff support the applicant's proposal, which includes the following mix ofrental affordability and unit sizes:

Min. Permitted Rental Affordability Type (2) Unit Type Unit Area Rent Geared to Low and Moderate

Deep Subsidy (1) Income

Studio 37 m2 (400 ft2)

1-bedroom 50 m2 (535 ft2)

2-bedroom 69 m2 (741 ft2) (3) (3)

3-bedroom 91 m2 (980 ft2)

Total n/a 16 40

20% 50% (1) 100% of units meet Richmond Basic Universal Housing (BUH) standards. (2) As per BC Housing Community Housing Fund program

Income

(3)

24

30%

Total

%of #of Units Units

30% 24

45% 36

19% 15

6% 5

100% 80

100% 80

(3) Unit type distribution within each rental affordability type to be determined on an annual basis as per BC Housing household income criteria

Rental Housing:

The units will be operated by Pathways non-profit organization. The development will be subject to a legal agreement between Pathways and BC Housing. Working with BC Housing through the Provincial Community Housing Fund Program, all of the proposed 80 residential rental tenure units are subject to maximum rental rate and household income restrictions by BC Housing, which will also facilitate construction financing and operational funding for the project.

The core goal of BC Housing's Community Housing Fund program is to increase the supply of affordable rental homes for middle and low-income families, independent seniors and individuals in BC through working with non-profit organizations, housing co-operatives, and local government. In compliance with the City's Affordable Housing strategy, the proposal includes:

• Deep Subsidy Units: 20% of the units (16 units) are subject to BC Housing restrictions to secure rental rates and household income targeted at households receiving income assistance, old age security and guaranteed income supplement, or whose rent geared to income rate would be no more than shelter allowance. Rental rates for these units are restricted to shelter rate or equivalent. These units receive operational funding from the BC Housing Community Housing Fund program.

• Rent Geared to Income Units: 50% of the units (40 units) are subject to BC Housing restrictions to secure rental rates and household income targeted at BC Housing Income Limits. Rental rates for these units are restricted to rent geared to income (RGI) of 30% of pre-tax household income and in accordance with the BC rent scale and using BC Housing's Housing Income Limits. These units receive operational funding from the BC Housing Community Housing Fund Program, depending on household income.

6433306

Page 11: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 11 - DP 19-866690

• Low and Moderate Income Units: 30% of the units (24 units) are subject to BC Housing restrictions to secure rental rates and household income targeted at the median income levels for BC households without and with children. Initial rental rates for these units will be based on market rates with a maximum of 30% of pre-tax annual household income using BC Housing's "Low and Moderate Income Limits" (median or 50th percentile income for BC households without and with children). Rental rate increases are restricted to Residential Tenancy Act permitted annual increases.

Prior to Development Permit issuance, a Housing Affordability Agreement in perpetuity and Housing Covenant will be registered on title for the 80-unit affordable housing development comprising 16 deep subsidy units, 40 rent geared to income units, and 24 low and moderate income limits units, requiring that the developer satisfies all City requirements.

Deep Subsidy Units:

Max. Monthly Unit Rent Total Max. Household Proposal Unit Type Income % of Units # of Units

Studio

1-bedroom

2-bedroom (1)(2) (2)(3) 100% (4) 16 (4)

3-bedroom

Total Varies Varies 100% 16

(1) Rent rate to be set at the shelter rate allowance applicable to individual households as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income equivalent to income assistance, old age security and guaranteed income

supplement, or whose rent geared to income rate would not exceed shelter allowance as per BC Housing criteria.

(4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.

Rent Geared to Income Units:

Max. Monthly Unit Rent Total Max. Household Proposal Unit Type (1 )(2) Income (2)(3) % of Units # of Units

Studio $1,287.50 $51,500 or less

1-bedroom

2-bedroom $1,575.00 $63,000 or less 100% (4) 40 (4)

3-bedroom $1,837.50 $73,500 or less

Total Varies Varies 100% 40

(1) Rent rate to be set at 30% of pre-tax income of individual households and as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income as per Housing Income Limits BC Housing criteria. (4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.

Low and Moderate Income Limits Units:

Target Monthly Unit Max. Monthly Unit Rent Total Max. Household Proposal Unit Type Rent Range (1 )(2) (3)(4) Income (5) % of Units # of Units

Studio (1) $1,853 $74,150 or less

1-bedroom (1) 100% (6) 24 (6)

2-bedroom (1) $2,826 $113,040 or less

3-bedroom (1)

Total n/a n/a n/a 100% 24

6433306

Page 12: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 12 - DP 19-866690

(1) Initial rent rate values will be established by BC Housing based on CMHC Average market Rent. Rates may be adjusted periodically with the agreement of BC Housing.

(2) Rates may be adjusted periodically with the agreement of the City and (i) for existing tenants, no more than Provincial Residential Tenancy Act provisions.

(3) Denotes maximum rent at 30% of total maximum household income as per BC Housing criteria. (4) Rates may change as approved by BC Housing. (5) Denotes BC median household incomes 2020 values based on the BC Housing published 2020 Low and

Moderate Income Limits for households without and with children in BC. (6) Unit type distribution within each rental affordability type to be determined on an annual basis as per BC Housing

household income criteria.

Prior to Development Permit issuance, a legal agreement will be registered on title, prohibiting subdivision (including stratification and/or air space parcels) of the residential housing units (Single Owner for Residential Units).

Public Art • This unique affordable housing project with a mix of income levels and subsidized rental

units is not required to provide a contribution towards Public Art.

Servicing Agreement

The developer shall be responsible for the design and construction of required works, including: (i) road works, which will require City tree relocation or removal along No. 2 Road; (ii) water, storm sewer, and sanitary sewer upgrades; (iii) related public and private utility improvements; and (iv) related granting of new statutory rights-of-way. The developer's design and construction of the required works and granting of statutory rights-of-way, as determined to the satisfaction of the City, shall be implemented through the City's standard Servicing Agreement process (secured with legal agreement registered on title and provision of a Letter of Credit) prior to Building Permit issuance, as set out in the attached Development Permit Considerations (Attachment 5). The subject development includes driveway and frontage works affecting the neighbouring property to the north of the site at 5900 River Road as contemplated in the existing cross­access easement registered on both properties. The existing cross-access easement and covenant prohibiting access to No. 2 Road will be replaced with a new SRW as noted above. The owner of 5900 River Road has requested that the access SR W area be provided in the proposed location to minimize impacts to the future development potential of 5900 River Road and has agreed to provide a voluntary contribution in the amount of $69,800 toward the cost increase associated with additional frontage works at 5491 No. 2 Road resulting from the proposed SRW location. In order to maximize efficiency, the owner of 5900 River Road has requested to construct frontage improvements and utility upgrades along No. 2 Road required for their future development in conjunction with the construction of the frontage improvements and utility upgrades required to serve the subject development. To construct such frontage works, the owner of 5900 River Road is required to enter into the City's standard Servicing Agreement process (secured with a legal agreement registered on title and provision of a Letter of Credit) for road works, relocation of the eight City trees along No. 2 Road, frontage improvement and utilities works that overlap with the frontage works related to the driveway access for the subject development (Attachment 6). Utility and frontage requirements for the entire property at 5900 River Road will be reviewed comprehensively through future potential development application review and additional utility upgrades and frontage improvements may be required.

6433306

Page 13: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

May 5, 2020 - 13 - DP 19-866690

Conclusions

The development will provide much needed affordable housing in an innovative facility and secured through partnership between the City, BC Housing and Pathways. An analysis of the proposal shows it to be well considered and consistent with the Official Community Plan (OCP) development, livability, sustainability, and urban design objectives. The applicant has agreed to complete Development Permit considerations (Attachment 5). To facilitate the proposed development, the owner of 5900 River Road, the neighbouring property to the north of the subject site, has agreed to complete considerations (Attachment 6). On this basis, staff recommend that the Development Permit be endorsed, and issuance by Council be recommended and that staff be authorized to execute a servicing agreement with the property owner of 5900 River Road.

Sara Badyal Planner 2 (604-276-4282)

SB:blg

Attachments: Attachment 1 : Development Application Data Sheet Attachment 2: Pathways Open House Engagement Summary, Sign-in Forms and Comment

Sheets (September 11, 2019) Attachment 3: Public Correspondence Attachment 4: Advisory Design Panel Minutes Meeting Minutes Annotated Excerpt

(February 19, 2020) Attachment 5: Development Permit Considerations Attachment 6: Preliminary Servicing Agreement Scope of Work at Adjacent 5900 River Road

6433306

Page 14: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

, City of Richmond

DP 19-866690

5491 No. 2 Road GBL Architects

Site Area Land Uses OCP Desi nation

Zoning

Number of Units

Floor Area Ratio

Lot Coverage

Setback - No. 2 Road

Setback - North Side Yard

Setback - South Side Yard

Setback - Rear Yard

Height: Within 26 m of East property line Beyond 26 m of East property line Parking structures

Lot Size

Parking Spaces: Affordable Housing Units

(Deep subsidy: 2 car-share sp) (Studio & 1-bd: 0.27 spaces/unit) (2-bd & 3-bd: 0.9 spaces/unit)

Visitors (0.18 spaces/unit) Car Share Total

Parking - Accessible

Parking - Small Car Spaces

Parking - Tandem Spaces

Loading

Bicycle Storage

EV (Energized) Charging for Cars

Amenity Space - Indoor:

Amenity Space - Outdoor:

Document Number: 6433306 6433306

Attachment 1 To report dated May 5, 2020

Development Application Data Sheet Development Applications Department

City of Richmond

Existing Proposed 2,024 m2 No chan e

Vacant Multi-Famil Rental Tenure Residential Mixed Use Com lies High Rise Apartment and Congregate Housin ZHR3 - Dover Crossin

Variances requested as noted below

Vacant 80

Bylaw Requirement Proposed I Variance

3.0 & 0.1 amenity space 2.61 None permitted

Max. 70% 43% None

Min.Gm Sm 1 m decrease

Min. 6m 6m None

Min. 3 m 3m None

Min. 3 m 3m None

Max. 24 m 24 m Max.18 m 20.3 m 2.3 m increase Max. 5 m Sm (Includes 0.1 m

tolerance)

Min. 2,000 m2 2,024 m2 None

With TDMs With TDMs 72 29

52% reduction with appropriate TDMs

15 15 2 2

87 46

Min. 2% 2% (1 space) None

Max. 50% 42% (19 spaces) None

Permitted None None

Manoeuvring 1 medium truck (SU-9) space None

100 class 1 secure bike spaces 100 class 1 secure bike spaces None 16 class 2 bike rack spaces 20 class 2 bike rack spaces

100% resident parking spaces 100% resident parking spaces None

Min. 100 m2 100 m2 None

Min. 480 m2 480 m2 None

Version: 3

Page 15: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~

~ chmond

Attachment 2 To report dated May 5, 2020

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT

Sept em ber 24, 2019

Think Big

Prepared by ldeaspace Consulting Inc. for the City of Richmond

Page 16: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

TABLE OF CONTENTS

1. Introduction

2. Key Themes

3

4

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

2

Page 17: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

1. INTRODUCTION

The City of Richmond, Pathways Clubhouse, and BC Housing are partnering to build new, affordable renta l

housing at 5491 No . 2 Road. The proposed project is a six-storey building with 80 new homes for single people, families and seniors offering:

• 5 x 3 bedroom apartments • 15 x 2 bedroom apartments

• 36 x 1 bedroom apartments

• 24 studio apartments

An open house was held on Wednesday, September 11 from 4:00 to 8:00 pm at the Thompson Community Centre to present the project and listen to feedback from the community.

A summary of the feedback received at the open house is provided below.

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

3

Page 18: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

2. KEV THEMES

A total of 27 feedback forms were completed by Open House attendees. The forms included two

questions:

• Is there anything the project team should consider as we finalize the exterior design of the

building?

• Is there anything else we should consider for this project?

Key themes that emerged from written responses to these questions include the following:

a) Support for the project

b) Concerns about proposed vehicle access

c) Concerns about project impacts on traffic

d) Concerns about parking

e) Concerns about neighbourhood impact

f) Considerations regarding access to neighbourhood amenities

g) Considerations regarding exterior and interior building design

h} Desire for additional feedback and notification mechanisms

Detailed feedback from each of these key themes has been summarized on the following pages.

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

4

Page 19: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

a) SUPPORT FOR THE PROJECT

A sign ificant number of Open House attendees expressed appreciation for the project.

Key comments include:

• the project addresses the need for more affordable housing in the City of Richmond; and

• the new development will make a positive contribution to the community and will be a good fit

with the surrounding area.

Several respondents expressed that they would like the project to be completed as soon as possible to

ensure that affordable housing is promptly available to those who need it.

b) CONCERNS ABOUT PROPOSED VEHICLE ACCESS

Some Open House attendees expressed concerns about proposed vehicle access to the development.

Comments include :

• vehic le access could be unsafe and difficult to navigate due to the heavy traffic on the River Road

on ramp to No. 2 Road, which some respondents cla im al ready has a high occurrence of vehicle

accidents; and

• a calmer street such as Dover Crescent could be considered as an alternative vehicle access point

to the property.

c) CONCERNS ABOUT PROJECT IMPACTS ON TRAFFIC

Several Open House attendees expressed concerns about the potential increase in traffic, detours and

delays that could occur during the project construction phase and after the building is tenanted.

Comments include:

• traffic in the area is already heavy and may become more congested with project construction;

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

5

Page 20: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

• traffic impacts resulting from construction activities could be challenging to navigate for residents

who use River Road to access No. 2 Road on their daily commutes; and

• traffic on Lynas Lane may increase after the building is tenanted, as this street may be used as an

access route to River Road.

d) CONCERNS ABOUT LOCAL AREA PARKING

Several Open House attendees expressed concerns about the availability of parking in the surround ing

neighbourhood during the project construction phase and after the building is tenanted.

Comments include:

• there may be overflow from the development's parking lot, with residents and visitors seeking

access to street parking;

• parking on Dover Crescent and at Dover Park is already very limited and cannot accommodate

another 100 to 200 people living in the area; and

• options for construction parking and visitor parking should be considered .

e) CONCERNS ABOUT NEIGHBOURHOOD IMPACT

While a significant number of Open House attendees considered the project to be a good fit for the

surrounding area, a few attendees had concerns about the development's impact on the neighbourhood.

Comments include :

• the proposed bu ilding is too tall and w ill block views; and

• the project may have a negative effect on property values.

f) CONSIDERATIONS REGARDING TENANT ACCESS TO NEIGHBOURHOOD AMENITIES

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

6

Page 21: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

Some attendees questioned whether tenants will have sufficient access to community amenities and

services based on the planned location of the building.

Comments include:

• the Walk Score to grocery sto res, drug stores, banks and other retail locations and services should

be measured and considered in planning; and

• seeing as though the nearby elementary school is at capacity, the project plan should consider

where the children in the building will go to school and how they will get there.

g) CONSIDERATIONS REGARDING EXTERIOR AND INTERIOR BUILDING DESIGN

Several respondents expressed their desire for a building design that ensures safety, accessibility and

inclusiveness fo r tenants.

Ideas for exterior design elements include:

• benches;

• a pet-friendly outdoor area;

• water dispensers for people and pets;

• a key fob entry system;

• a video intercom system; and

• a front entrance oriented toward Dover Crescent to increase neighbourhood inclusiveness.

Ideas for interior design elements include:

• an elevator;

• grab bars in washrooms;

• countertops of an appropriate height for seniors and people with disabilities;

• a panic call button system in case of emergency; and

• sufficient soundproofing from traffic and airport noise.

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

7

Page 22: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~ mond

h) DESIRE FOR ADDITIONAL FEEDBACK AND NOTIFICATION MECHANISMS

A few Open House at tendees expressed a desire for additional feedbac k and notification mechanisms

regarding the project, including:

• project notifications sent to site neighbours; and

• feedback fo rms available online and sent by mail to local residents, with Chinese t ranslation.

PATHWAYS CLUBHOUSE AFFORDABLE HOUSING OPEN HOUSE ENGAGEMENT SUMMARY REPORT 6458737

8

Page 23: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing Sign-In Sheet

~ame r Postal Code I . J\ {))Nllvx1;: \--.-V\~ vrc~c_p CJh1rvh /v(;W ·'-!1(k;J V(/--e- ?5PS' a!:f r1.j} ' m <:'7/y\..6).-,,.0 v-;ic .S-Sb

4<i {){Jc_/' ( ~~7T-) v::7-C,- S1J6 /JJ :) I ·iJ/LYd.A ~

I

Ir 71 s-✓-j-

Ma9\I\ 601 K Cl i 'v<,,_(,; ( VC/l lLJ ' . Vi-, -f <1=> G ~ M ( RJ9 (_;.; o s. SR \:) '

{LG lA\1"'.i 0 \J c-r\ ~Jl \Jl b <-) p l-f ~\ l l\-J I\ l(, y \ (l ft b(l. 71 ~ \) 7f LJ /3Dlf;11-orrn: C..,-Avv(Ar:::i l

cl, .,, : u - Of>3

...!J--/1 M f-t o.lBH { / 7c. 51) .,z; ' , 7

-

Page 24: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing Sign-In Sheet

Name Postal Code

v·1c:

Page 25: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing Sign-In Sheet

Name Postal Code . ' I \ r··--------+----./\------------j

',"." "'- \1.., "·-J -1 C c., \l I )- ) j-. ' .

\ I ,. ·t ~· .. 1J 12 \, u [_,,, {,'----. --

Page 26: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing Sign-In Sheet

Name Postal Code

?

Page 27: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing Sign-In Sheet

Name Postal Code

/ -j r . Jr"-( : ' . ....._, - i \. ,- ,.... ' A) i; 1,-., l /\ / ;.:, -:_..-( I Vi--,

V'

,, f -, )1,,1 I

h~ k~¼£h-l~ V1c_Sy::./ u

Page 28: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

(--~ IV .

, ( ,/ ~~\_l 7 r~ftl' ' I

/ . ,(~

:.r ·-, 11" ' \V I \._;

r, cc: c:1\

C \ bf-\CY

/

i t .. ,Jl)e... / r ,,

!\ '/ . \·-Je,

. ..,___\ --..__j

C'

\ ~ i , 1! \

\ ), /..o >fl 1/ ,. ,.'. '\ r ,' -, c, .. ,-,:/,.:.J / ~J+, . ..J' \·...--, ,· • c" rl ··".· L'' ,-•·\ r_ '1/ . / \ .',-4:J.-',..._,__'-_ .... _ ..... __ .. :o ___ 1 _. _, __ ,_v __ ,,...... __ ._ .• _, _'--_ . .-(;_· ___ T_ .... _-______ 1 __ c.1, _'-_-"_) __ "---______ , __ . -~----" ...... ,,_·· ._,)_1_L_.'-..._-c·r / ,)

2) Is there anything else we should consider for this project? I i , / ............... {. ,........-fl . ; c: .. , ' -~ i . :·-r · .. ,c)b.t \.,A-< l""\Ci \ (/, f)(;)r._. __ ~ \

, C-) cl (//\· i ,~.._, Dy ~ /

i \Jc?(/ I

\ ''\c\ (C I _)

I r _. i / r 1 JC--, \ n ( v-~ct o I/'\ ·1 l--,e C~--Y: "--( 1<c~. /...- ~- Ii l,i /

./''/ /,._.._r .. J:: ic;--c, I . ' , ,...-·: i ~ ,,..- C., ._;,...,'c··, - ~,,.~,,O, c: r-·--. , ' C(__\ i/\ '- / i/ i ! ':::i ·-::, - _ _., ·,,. C. /, I •. -· ( -<'7 ___ -_._\ ___ l_. . .._ ___ ..,....,,___-,c __________________________ , .... __ c .. •i 1 ,,. , .:...=_'/···_ ...

/'/) J_.,, ( !;::! /

\ ! -"\c i

,_........

. Cc, 1--\ ere~'~ ...... I

i ..--1---- i ( • . I c..:: f....-YJ ;___1 ; . .J I c ..

- I f 1 cf\ l ,,.-. , c::i t ' . '--·'\. .A ,

i /'

0 h /-/ ,c,(: --........__'

6294389

Page 29: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

6294389

Page 30: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1} Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

6294389

,f' r°'rl,ttl c v·) li,ct1 I

20Z I,

-1

Page 31: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

:;·· .L., "\( '1-·)2 4 ) . I 1.:I' \ .. ,-··, . \ ,

6294389

7 /·c-. I}

Page 32: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

6294389

Page 33: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

{1 n~~ ;-;~ l11/\-f' k~ ft-~. 1-v lc--c~ ./4--·rt~

v

/4~ ,J/l,,~(f~ f,--t)vu/q __ f , ?,l~ p·lh-&s· /f/J"-tZ ,/cQ..✓6 jt,-,. f.{

/Z i'~/u ~ .,,fj-,JAJ: /~£d /ti /viAA1 ;i/utA.--t?l, 7v /~r I/

6294389

Page 34: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

rf( 0' 14-1) 4-clZ. e 5 5, f ~, ~ cl 4-,,J.e,,t "-N,.~w+z

.,

:;,r y\1ltLr ~

2) Is there anything else we 'should consider for this project?

6294389

Page 35: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

Vo k / ,~::JA f: I C <

2) Is there anything else we should consider for this project?

6294389

Page 36: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

-ni.f '.l)E°§IC.fY' /-()()KS GOOP, 7](1s DE'-'€'- t:J e,v t[Nr "4''-'-

~G A Q:)§t·nvcf f/-0.0 I Tt Q:'Y 7b -ntc C..oHHUtvlT--1, 'Q_\'=: l,/M(7,'\J<)

1;;s / /V Nf._t:D '2.t. Noa.~ A FF012 D &S '= ,.rt' >IOV..S /NC,,. f'.<tTi"'-'AYS

2) Is there anything else we should consider for this project?

6294389

Page 37: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the

building? (

b o n c-f- b v 1 "/ d A e r c - /Vo -J- fl\}!_ r '1 1 )\ -f p ) q ce

I

W ),LU VJ;-/ )

! s

2) Is there anything else we should consider for this project?

( JI 1VCE L ; -r .! ;/ Tau V'vla_ YI')

up

' ~--c':i J J e f - c vvi ~1-e r~ t~e

6294389

a ( I .,,

p ✓-0 J:-:., It! vV/ I

Vvl y kJ i · 1 <j -e s t c u vJ( f: ,- h --~

O\.)('JI

( {)/jrJ G,/ /

-e'

Page 38: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

c; l v L ?L-091 L ~t ( fY'-L ·-b c; i v .e_ -~ ~, L k- L .- l re 4 f _:_~ ." i-e _l

.~ cf J:Y c .r' -a ,J ,~e__ .-e-<_ c.J bee/<- ..> , ,A,- s~ -C LP ..A v( b-<:__ r /v 'V ( c..12-0 - hi \.. cl._x_c c.l { ~r~ ,.-- ~ ( l J LJ l l ~ vl,) () t--..j

[(.)( f"\<)N:_ _AA-eC-,...1.._;::___\ ('.., ( ~./V'I" v' r- \--l- 1

-€. "-~ c \ rr /V\. ~ /t,.? 7 -ed ,.L_ :::::::::~

-~ h,.. l->/ /V' MvY~- ,,,,(_,_ ),_,__ 0 ( (-0 < )_____ /,,__ 0:.,1-'e Le

6294389

Page 39: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1} Is there anything the project team should 7°~sid~\~s we finalize the exterior design of the

building? l:5f7?; Le Cor;r Oo({. ~- It 6J: 1 _'5D(rc)AlJ>v ~~

Gvr-ec---

2) Is there anything else we should consider for this project?

6294389

Page 40: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

f;Q.

t[c,~) (v~\ l' __ :(, YI i~hvd) OY\. tev, Q~f~.e y l

~P ,

\!ILJ;~ (: C \ '

2) Is there anything else we should consider for this project?

6294389

Page 41: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

I! i

") Ji / ii,(}()

/7 i ,,,,. ./\ n r/i

.,i{ ,,/!/ I L.·I

2) Is there anything else we should consider for this project?

6294389

;J ,_,Y(p . ,1 ,.-,') / /1 _. / ..... 2; 0 .. 'J /,r !'.LU .f /J)r J~

(/

Page 42: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

Ji#}~ 1(2 ~ M ±lrff

2) Is there anything else we should consider for this project?

j ad20&Mt£ ~ ff f QALc 117

6294389

Page 43: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

( ( ~ l

',)__~-~- a,~~ 1 -f'-Jf "'--' ctJ & lli:, :U)u:p+-u;i,,( ·T[J

Yl/\ cJLQ_.: jj-- ,k!_ [,'___;:-, L·(J T () C .t~L ---f tw lv.'.l..dt-U~~Li

I\'\ C Gv<'.Ll'., °1 [ 1; cL,U__ O , Li ft"-'-~' ·.,;;;;,.r ~ _Q/VV\ ~r(ffltLJ-,

cd.J ti'VJ ! - ,~ ? et5 p{:_/\ u_JIL,~t

1v\A.haJ f~ 6294389

Page 44: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

lht ✓/1tL 77-{c/( irf'ta. -~h--t" .'., /t,t?,dJ h~ 11.tlt: /ice (;.L-t ?uit~

·71°v 1 <; ft tih ( ' , /

'II O (l;i j fn({, ( [11 £ { - / t11t{ -lkt11; J/af /j/J:/1v I

Jlt1'--J 1t1ut (J,flff · ~ fL,l/vl 1✓t:· re · /1-tr:rJ tbt.1{ 1Zt//'yi[r_,, t:l

Av!Yi y;) {~ 7 s ' l- ~-s i1Jce. )£)(pl ' rli .5 l Av /l;; c~ ti fo ( i) J;v-,f>-1

Mu: /pu! ufr ,~,,_, la,v , 11,,,) rv tv,,/ ,C fill/Gk -/;"' ~. fllvfLf .t

i{ ·Iv 9 1i1 ~ iuv fl ~& 11 Y/i{J n', k c--' tn<tic 1- ~}11/; S h t~f tl~rv: to 71f&i {\-&i~k0rVv(r: r fl) w .flvvJ~ is 1) let~ Vtt'l I} ,L{}-,it ;t ;H nch /(_ llvrv-{//}?lvj ·

2) Is there anyt~ing else we should consider for this project~ /,. U

µh,,il ~tlli VipYr t II; 11 ·n1t,c~_.ec[k Ct 11~ · tteJ,1

11/L !ltf/~it 7 1-1

{r /2 1.R,,6li)/ s 121~ J Fn t( G{ 1&/k /2. c/Ji( le 1~ ' ~fc d t1 s t { ,, l I 2· ''D . 17 1/ '-;

l'U u.,/i J21vl,-tl N t? . U (}yvi. ·~1 Vt,y · ,-,r{ ~u 1.,1l _

6294389

Page 45: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

&tie

6294389

Page 46: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

Cl.

Q

(A/CA'.'.-<2-4<) JJ.-1\:?ICJ cc--it /}-Y~ ~0-(?_ c~ ~ ~!l~j D~P~

~~f :,?O cJ2-<><> ~ ~ Ao ~ ~.CA-/L-\) eo~ _k CL /srf~ ~~

Richmond

6294389

Page 47: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1} Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

( 1 < ,,-,

, ,C./

6294389

Page 48: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

Richmond

6294389

Page 49: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

I

! ') G c; r J? ce,X:-\j

f, I".

r\.eed.12J 1:1 \ l l \ C Y\.11'---l <5,, L·'

u C 0\ r,

2) ls there anything else we should consider for this project?

' /

cuf_ r, 0

6294389

Page 50: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

2) Is there anything else we should consider for this project?

6294389

Page 51: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1} Is there anything the project team should consider as we finalize the exterior design of the building?

I '\ - I \. \..,v(l_,j,

2} Is there anything else we should consider for this project?

\\~ cro,-:,J ~~ ';)..-'-D &'.'":"i ~ '1v---t) \ '"""~/

'2-~'-'\ \"-~o-,,cA c:>,'-/'-.,c).__ c~ ,::t~---t'

6294389

Page 52: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

'

~'~----

2} Is there anything else we should consider for this project?

6294389

Page 53: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

SCc:i\J\d :00A- ~~\~;se_--t- J \-ews Qc u~-±rti'-J'?:R V\0£~ c-es.clw-1~

2) Is there anything else we should consider for this project?

,H-, S \')0, d ~ \ "Si ~o ,-r~ " ·-: J(_ °' \.W ~.Q ~..e , ~ "".> · I~""--\ hM ~ \oL-t (..Q.~·id.Q11t - ~ qfk6\- \\U, ~ ro c vo.\ ~ , °' -~3c_-\JJ'-Q___ !

w~. , :::ttw ,-<::_ ,:::, oc:i l srt>~h Jl(A w, qe<\t J9 oa ·w* C(-e__ ~~\-- • <S G.LLD\01 ~Ct::-~ Ov---'-\'1-e r \ -~

1

\ '\1t \' U {A,

6294389

Page 54: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Pathways Clubhouse Affordable Housing

Comment Form

1) Is there anything the project team should consider as we finalize the exterior design of the building?

(~oc6--

\1c~ \->s,

6294389

Page 55: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built
Page 56: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Excerpt from the Minutes from

Advisory Design Panel Meeting February 19, 2020

Attachment 4 To report dated May 5, 2020

DP 19-866690 - 6-STOREY AFFORDABLE HOUSING DEVELOPMENT

ARCHITECT: LANDSCAPE ARCHITECT: PROPERTY LOCATION:

Applicant's Presentation

GBL Architects Inc. ET A Landscape Architecture Inc. 5491 No. 2 Road

Emily Brett, GBL Architects, Jocelle Smith, ETA Landscape Architecture, Dave MacDonald, Pathways Clubhouse, Casey Clerkson, CPA Development Consultants, presented the project, and together with Alex Chou, AME Group, and Paul Goodwin, GBL Architects, answered queries from the Panel.

Panel Discussion

Comments from Panel members were as follows:

• the four wheelchair accessible apartments are well designed; would enable residents using wheelchairs and walkers to live independently and safely -Noted.

• the project is useful and needed by the City; appreciate the applicant's and the City's efforts to collaborate on the project -Noted.

• overall, the project is well designed; however, (i) review the layout and dimensions of the urban agriculture planters to ensure that they are wheelchair accessible and could accommodate young children-Reviewed. Planters have 2' height and at least 32" clearance on 3 sides, accommodating all ages and wheelchair access. (ii) review the design of the outdoor children's play area and clarify whether it is intended mainly to be an active play space or passive space for relaxation and socialization and identify its main users - Design improved and programmed as active outdoor children's play area.

• the children's play area on the north side will be shaded by the building; consider design development to provide more visual interest and make the space more inviting; should the place be intended primarily as a children's play area, consider enhancing the overall play experience; also consider installing an outdoor exercise equipment for residents with disabilities - Design improved with more visual interest and enhanced play experience in the following ways: additional play equipment was incorporated as well as a rubberized surfacing with a stepping stone pattern, which encourages running,jumping, crawling, exploring and games. Bench seating was also incorporated/or parent supervision, which will extend childrens' play time. We refrained from installing adult exercise equipment due to space constraints, and due to the very specific and limited use of such equipment. A nearby fitness or community centre would be better able to address rehabilitation or mobility needs.

• concerned about the building massing orientation, in particular, (i) the siting of the children's play area on the north side and shaded by the building Reviewed. Children very much enjoy shady forest glens, especially when summer heat hits. The proposed location will enjoy morning sun and ambient lighting. Children have unlimited access to the very large and sunny Dover Park half a block away. Children can access this park via a public pathway, without need/or crossing any arterial roads. We feel it is in children's best interest to have dedicated space to play. If the children's play area were integrated with the dining and urban agriculture in the west, there would not be room/or all the currently proposed active play elements.

Document Number: 6433306 6433306

Version: 3

Page 57: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-2-

(ii) the building fa;:ade fronting No. 2 Road appears like a box and lacks articulation to create a gateway character; the west and south facades are more successful - Reviewed. The site directly to the North will provide the gateway view from the No. 2 Road bridge approach, block the view of our building. The design focuses on the South and West views from the public pathway which will be preserved and provides differentiated elevation designs but not overly decorative (iii) the pad mounted transformer (PMT) and garbage room fronting No. 2 Road lack screening A custom PMT wrap is proposed to celebrate local art or nature. This would keep the space more open than screening.

• consider design development for the rooftop mechanical equipment screening as it appears not coordinated with the design of the building elevations -Design improved. Rooftop mechanical screen area reduced significantly. Screen louvers to match light grey cement panel colour.

• ensure that the dead end parking stalls in the parkade have adequate manoeuvring space - Design improved. Bike storage area wall moved eastward 1 '-6" to allow for additional manoeuvring space

• note that the nearest distance between the proposed building and the adjacent high-rise development to the west is less than 60 feet - Noted, which is acceptable for the proposed mid-rise building, which is not subject to high-rise tower separation guidelines.

• appreciate the comprehensive package provided by the applicant which includes an energy modeling report -Noted.

• the targeted air tightness of the building envelope appears ambitious and would be difficult to achieve -Reviewed. Step 3 can be achieved while having the base infiltration value of 0.20 l/s/m2 for fa<;;ade.

• the modeling report provided by the applicant should include the use of water source heat pumps as clarified during the applicant's presentation of the project -Modelling report was updated.

• the targeted 30 percent reduction in domestic hot water heating would be challenging and difficult to achieve - The modelling report was updated to remove flow ftxture savings and is now based on district energy system heat.

• the provision for a central heat recovery ventilation ( HRV) is a good strategy for a passive house but could present challenges for the project- The modelling report was updated and now based on in-suite HRV equipment.

• the roof plan shows proposed rooms that may not be necessary for the project; e.g. boiler room and mechanical room-Design improved. The mechanical room is required for the heating and cooling loop pumps and related equipment and the boiler room was deleted.

• appreciate the package provided by the applicant which helped the Panel better understand the project -Noted.

• note that the project is more like an infill rather than a gateway project; the future development on the adjacent site to the north would be the gateway project - Noted.

• considering their site context and proposed uses, the building's four elevations are successful as they are differentiated from each other but not overly decorative and overreaching; however, consider further treatment to the north fayade which will be visible from No. 2 Road for some time, e.g. through adding colour to the proposed building exterior materials - Reviewed. Wood tone adds a natural wood colour in the balcony so.ffits, which will be viewed from the lower road and sidewalk elevation. The neutral natural colour scheme fits in with the neighbouring buildings and surrounding context of the public path and nearby Dover Park. Keeping the project on budget is critical, so the mix of materials/colours/complexity is balanced to provide visual interest without overly increasing cost.

• consider slightly altering the roof line to provide architectural interest to the building - Reviewed. The roof edge parapet has lower and 2'6" higher areas to provide visual interest along the roof line.

• the children's play area will be shaded and is located away from the common amenity patio; consider consolidating the two areas - Reviewed. Children's play area improved as noted in previous response. Consolidation is not possible due to building footprint.

6433306

Page 58: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

- 3 -

• consider switching the locations of the common amenity patio along the west side and the wheelchair accessible apartments with associated private patios on the south side of the building; the common amenity patio would provide a better interface with the east-west public pathway and relocating the wheelchair accessible apartments to the west side would enhance their privacy-Reviewed. The depth of the west setback area accommodates a truly interactive space, with dining, BBQ, moveable seating, arbour and urban agriculture would not be possible along the narrow south-facing side.

• the children's play area does not benefit from overlook from family sized units as it is adjacent to studio units -Reviewed. Overlook from family units is not necessary, as parents would either stay outside with toddler-aged children, or send out school-aged children to play on their own, as this is a private resident­only play area, not public. Reconfiguring the units to surround the play area with only family-sized units may mean loss of the space currently available for dedicated play. To accommodate parental surveillance, a bench has been provided within the play area.

• consider screening the PMT and garbage and recycling areas, e.g. through installing landscape screening or fencing - Addressed above.

• consider relocating the outdoor bicycle storage area from the south side adjacent to the lobby to the east side and close to the PMT area to create a usable space adjacent to the lobby - Reviewed. The current bicycle storage area location is maintained to retain shrub planting along No. 2 Road/or screening and a soft landscaped appealing frontage. Relocation would require removing approximately 6'x28' of landscape area.

Panel Decision

It was moved and seconded That DP 19-866690 be supported to move forward to the Development Permit Panel subject to the applicant giving consideration to the comments of the Advisory Design Panel.

6433306

CARRIED Opposed: Michael Cheung

Page 59: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Attachment 5 To report dated May 5, 2020

City of Richmond DP Considerations

Development Applications Department

Address: 5491 No. 2 Road File No.: DP 19-866690

Prior to forwarding this Development Permit application to Council for approval, the developer must complete the following:

I. (Landscape Security) Submission of a Letter of Credit ( or BC Housing letter of assurance) for landscaping in the amount of $229,074.00 as specified on the landscape cost estimate provided and sealed by the project Landscape Architect (including materials, labour and 10% contingency).

2. (E11viro11me11tal) a) (Qualified Environmental Professional) - Submission of a Contract entered into between the applicant and a

Qualified Environmental Professional for services related to provincial Water Sustainability Act requirements. b) (Environmental Security) The developer must agree that should the province require that offsetting habitat

compensation be provided off-site through the Water Sustainability Act review process, the City will require additional security to be provided by the developer, for the sum as specified in a habitat offsetting cost estimate provided and sealed by the project Qualified Environmental Professional. This security is to be provided to the City in the form of a Letter of Credit ( or BC Housing letter of assurance) to the satisfaction of the City prior to the issuance of the Building Permit.

3. (Existillg Tree Ma11ageme11t) The owner shall protect adjacent neighbouring trees, including:

a) ( Tree Protectio11) Installation of appropriate tree protection fencing for the protection of all trees neighbouring the development site prior to any construction activities, including building demolition, occurring on-site.

b) (Arborist Supervision) Submission of a Contract entered into between the developer and a Certified Arborist for supervision of any works conducted within tree protection zones of trees to be protected. The Contract should include the scope of work to be undertaken, including: the proposed number of site monitoring inspections, and a provision for the Arborist to submit a post-construction assessment report to the City for review.

4. (Flood Co11structio11 Level) Registration of a flood indemnity covenant on title (Area A). 5. (Aircraft Noise Se11sitive Developme11t) Registration of an aircraft noise sensitive use restrictive covenant on Title

(Area 2), identifying that the proposed dwelling units must be designed and constructed to achieve the following:

a) CMHC guidelines for interior noise levels as indicated in the chart below:

Portions of Dwelling Units Noise Levels (decibels)

Bedrooms 35 decibels

Living, dining, recreation rooms 40 decibels

Kitchen, bathrooms, hallways, and utility rooms 45 decibels

b) The ASHRAE 55-2004 "Thermal Environmental Conditions for Human Occupancy" standard for interior spaces.

6. (Housi11g Affordability Agreeme11t) Registration of a Housing Affordability Agreement to secure the following deep subsidy, rent geared to income, and low and moderate income limits housing units, the combined total number of units of which shall comprise 100% of the subject development's total residential floor area. Occupants of the housing units subject to the Housing Affordability Agreement shall enjoy full and unlimited access to and use of all on-site indoor and outdoor amenity spaces. The tenns of the Housing Affordability Agreement shall indicate that they apply in perpetuity and provide for the following: a) Unit Mix:

Unit Type (1) Min. Permitted Unit Area % of Units # of Units

Studio 37 m2 (400 ft2) 30% 24

1-bedroom 50 m2 (535 ft2) 45% 36

2-bedroom 69 m2 (741 ft2) 19% 15

3-bedroom 91 m2 (980 ft2) 6% 5

Total n/a 100% 80

(1) 100% of units meet Richmond Basic Universal Housing (BUH) standards.

Document Number: 6433306 6433306

Version: 3

Page 60: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

- 2-b) Deep Subsidy Units:

Unit Type Max. Monthly Unit Rent Total Max. Household Proposal

Income % of Units # of Units

Studio

1-bedroom

2-bedroom (1)(2) (2)(3) 100% (4) 16 (4)

3-bedroom

Total Varies Varies 100% 16 (1) Rent rate to be set at the shelter rate allowance applicable to individual households as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income equivalent to income assistance, old age security and guaranteed income supplement, or

whose rent geared to income rate would not exceed shelter allowance as per BC Housing criteria. (4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.

c) Rent Geared to Income Units:

Unit Type Max. Monthly Unit Rent Total Max. Household Proposal

(1)(2) Income (2)(3) % of Units # of Units

Studio $1,287.50 $51,500 or less

1-bedroom

2-bedroom $1,575.00 $63,000 or less 100% (4) 40 (4)

3-bedroom $1,837.50 $73,500 or less

Total Varies Varies 100% 40

(1) Rent rate to be set at 30% of pre-tax income of individual households and as per BC Housing criteria. (2) Rates may change as approved by BC Housing. (3) Maximum household income as per Housing Income Limits BC Housing criteria. (4) Unit type distribution to be determined on an annual basis as per BC Housing household income criteria.

d) Low and Moderate Income Limits Units

Unit Type Target Monthly Unit Max. Monthly Unit Rent Total Max. Household Proposal

Rent Range (1 )(2) (3)(4) Income (4)(5) % of Units # of Units

Studio (1) $1,853 $74,150 or less

1-bedroom (1)

2-bedroom (1) $2,826 $113,040 or less 100% (6) 24 (6)

3-bedroom (1)

Total n/a n/a n/a 100% 24

(1) Initial rent rate values will be established by BC Housing based on CMHC Average market Rent. Rates may be adjusted periodically with the agreement of BC Housing.

(2) Rates may be adjusted periodically with the agreement of the City and (i) for existing tenants, no more than Provincial Residential Tenancy Act provisions.

(3) Denotes maximum rent at 30% of total maximum household income as per BC Housing criteria. (4) Rates may change as approved by BC Housing. (5) Denotes BC median household incomes 2020 values based on the BC Housing published 2020 Low and Moderate

Income Limits for households without and with children in BC. (6) Unit type distribution within each rental affordability type to be determined on an annual basis as per BC Housing

household income criteria.

7. (Single Owner.for Residential Units) Registration of a legal agreement on title, prohibiting subdivision (including stratification and/or air space parcels) of the residential housing units.

8. (Shared Bicycle Storage) Registration of a legal agreement on title ensuring that bicycle storage facilities are provided and maintained for their intended shared common use.

9. (Transportation Demand Management) Registration of a legal agreement on title ensuring the provision of all TDM measures listed below:

a) (Enhanced Bicycle Facilities) Registration of a legal agreement on title ensuring that:

6433306

1. Pathways provides four bicycles and administers a bicycle rental and bicycle sharing program for the shared use of all residents in additional class 2 bicycle storage outdoor rack spaces; and

Page 61: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

- 3 -

11. bicycle repair/maintenance stations are provided and shared amongst all uses onsite, including bicycle repair stand (with tools); foot pump; and faucet, hose and drain for bicycle washing. A note is required on the Development Permit and Building Permit.

b) (Transit Pass Program) Registration of a legal agreement on title to ensure the execution and completion of a transit pass program, including the following method of administration and terms:

1. Provide 2 years of two-zone compass cards for each deep subsidy housing unit at a subsidized rate of $45 per year. The intention of the transit pass program is to offer transit passes on a per unit basis. If a tenant opts out or does not "subscribe" to the transit pass program, that pass remains in the pool for a future tenant until they have all been utilized. Number of passes capped at number of units for a period of two years;

ii. Letter of Credit (or BC Housing letter of assurance) provided to the City for 100% of transit pass program value;

111. Administration by TransLink or Pathways. Pathways is not responsible for the monitoring of use of transit passes but only noting number of "subscribed" users to the program, until full unit count is exhausted over a period of two years;

1v. If the transit pass program is not fully subscribed within two years, the program is to be extended until the equivalence of the costs of the full one year transit pass program has been exhausted. Should not all transit passes be utilized by the end of the second year, the remaining funds equivalent to the value of the unsubscribed transit passes are to be transferred to the City of Richmond for alternate transportation demand management measures at the City's discretion; and

v. The availability and method of accessing the 2-zone transit passes is to be clearly explained in the tenancy agreements.

c) (Shuttle Bus Program) Pathways shall include the subject site in the Pathways shuttle bus service program, which provides transportation for Pathways members between their residences and the Pathways Clubhouse facility.

d) (Car Share) Pathways shall provide two (2) car share parking spaces along with parking and access SRW to supp01i rental housing, including:

6433306

1. Confinnation from the developer that they have informed a car share provider ( e.g. Modo) that the subject site is viable for car share upon completion of the project.

11. Granting of a Public Right of Passage Statutory Right of Way (SRW), in favour of the City, to secure for the car share vehicles, two (2) parking spaces along with vehicular and pedestrian access to No. 2 Road along the full width of the internal drive aisle, subject to the final dimensions established by the surveyor on the basis of functional plans completed to the satisfaction of the Director of Transportation. Owner responsible for maintenance & liability. The design must be prepared in accordance with good engineering practice with the objective to optimize public safety and after completion of the works, the Owner is required to provide a certificate of inspection for the works, prepared and sealed by the Owner's Engineer in a form and content acceptable to the City, certifying that the works have been constructed and completed in accordance with the accepted design.

m. Registration of a legal agreement on title ensuring that the owner provide a car share facility to a car share operator or the City, at no cost to the car share operator or the City, both as the case may be, the terms of which shall be generally as follows:

a. provision of a minimum of two (2) car share parking spaces within the development, along with pedestrian and vehicular access, designated, constructed, equipped and maintained by the owner, at the owner's cost, to be:

(i) located in the open parking area in a clearly marked and visible location;

(ii) provided with design features, decorative finishing, lighting and signage, as determined through the Development Permit and/or Building Permit processes;

(iii) accessible at all times to all intended users ( e.g. residents, general public, car share operator personnel and car share operator members) at no added cost;

(iv) identified on the Building Permit plans; and

(v) prior to building inspection permitting occupancy, provided with wayfinding and stall identification signage, to the satisfaction of the Director of Transportation;

Page 62: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-4-b. in the event that the car-share facilities are not operated for car-share purposes as intended via the subject

Development Permit application (e.g., operator's contract is terminated or expires), transfer control of the car-share facilities, to the City, at no cost to the City, with the understanding that the City at its sole discretion, without penalty or cost, shall determine how the facilities shall be used going forward; and

c. supporting submissions provided to the City (Transportation Department) as follows: prior to Development Permit issuance, a copy of the letter of intent addressed to the owner from the car share operator outlining the terms of the provision of car sharing services.

10. (Electric Vehicle (EV) Charging Infrastructure for Vehicles and Class 1 Bicycle Storage) Registration of a legal agreement on title, securing the developer's commitment to voluntarily provide, install, and maintain at least the following EV charging infrastructure within the buildings on the subject site:

Energized Outlet - Minimum Permitted Rates User/Use

Vehicle Parking (a) Class 1 (Secured) Bike Storage (b)

Affordable Housing 1 per each bicycle storage room or locker (which Energized

100% Outlet shall be located to facilitate shared use with bicycles in (i.e. resident parking & bike storage) the room/locker\ Visitor N/A N/A (i.e. visitor/car share/class 2 bike rack storage)

a) "Vehicle Parking" "Energized Outlet" shall mean all the wiring, electrical equipment, and related infrastructure necessary to provide Level 2 charging (as per SAE International's Jl 772 standard) or higher to an electric vehicle.

NOTE: Richmond's Electric Vehicle Charging Infrastructure Bylaw provides that, where an electric vehicle energy management system is implemented, the Director of Engineering may specify a minimum performance standard to ensure a sufficient rate of electric vehicle charging. For the purposes of the Bylaw, electric vehicle energy management system means a system to control electric vehicle supply equipment electrical loads comprised of monitor(s), communications equipment, controller(s), timer(s), and other applicable devices.

b) "Class 1 (Secured) Bike Storage" "Energized Outlet" shall mean an operational 120V duplex outlet for the charging of an electric bicycle and all the wiring, electrical equipment, and related infrastructure necessary to provide the required electricity for the operation of such an outlet.

11. (District Energy Utility) Registration of a restrictive covenant and/or alternative legal agreement(s), to the satisfaction of the City, securing the owner's commitment to connect to District Energy Utility (DEU), and granting the statutory right of way(s) necessary for supplying the DEU services to the building(s), which covenant and statutory right of way and/or legal agreement(s) will include, at minimum, the following terms and conditions:

a) No Building Permit will be issued for a building on the subject site unless the building is designed with the capability to connect to and be serviced by a DEU and the owner has provided an energy modelling report satisfactory to the Director of Engineering.

b) If a low carbon energy plant district energy utility (LCD EU) service area bylaw which applies to the site has been adopted by Council prior to the issuance the development permit for the subject site, no building permit will be issued for a building on the subject site unless:

i) the owner designs, to the satisfaction of the City and the City's DEU service provider, Lulu Island Energy Company Ltd. (LIEC), a low carbon energy plant to be constructed and installed on the site, with the capability to connect to and be serviced by a DEU; and

ii) the owner enters into an asset transfer agreement with the City and/or the City's DEU service provider on terms and conditions satisfactory to the City to transfer ownership of the low carbon energy plant to the City or as directed by the City, including to the City's DEU service provider, at no cost to the City or City's DEU service provider, LIEC, on a date prior to final building inspection permitting occupancy of the first building on the site.

c) The owner agrees that the building(s) will connect to a DEU when a DEU is in operation, unless otherwise directed the City and the City's DEU service provider, LIEC.

d) If a DEU is available for connection and the City has directed the owner to connect, no final building inspection pennitting occupancy of a building will be granted unless and until:

i) the building is connected to the DEU;

6433306

Page 63: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

- 5-ii) the owner enters into a Service Provider Agreement for that building with the City and/or the City's DEU

service provider, LIEC, executed prior to depositing any Strata Plan with L TO and on terms and conditions satisfactory to the City; and

iii) prior to subdivision (including Air Space parcel subdivision and Strata Plan filing), the owner grants or acquires, and registers, all Statutory Right-of-Way(s) and/or easements necessary for supplying the DEU services to the building.

e) If a DEU is not available for connection, but a LCDEU service area bylaw which applies to the site has been adopted by Council prior to the issuance of the development permit for the subject site, no final building inspection permitting occupancy of a building will be granted unless and until:

i) the City receives a professional engineer's certificate stating that the building has the capability to connect to and be serviced by a DEU;

ii) the building is connected to a low carbon energy plant supplied and installed by the owner, at the owner's sole cost, to provide heating, cooling and domestic hot water heating to the building(s), which energy plant will be designed, constructed and installed on the subject site to the satisfaction of the City and the City's service provider, LIEC;

iii) the owner transfers ownership of the low carbon energy plant on the subject site, to the City or as directed by the City, including to the City's DEU service provider, LIEC, at no cost to the City or City's DEU service provider, on terms and conditions satisfactory to the City;

iv) prior to depositing a Strata Plan, the owner enters into a Service Provider Agreement for the building with the City and/or the City's DEU service provider, LIEC, on terms and conditions satisfactory to the City; and

v) prior to subdivision (including Air Space parcel subdivision and Strata Plan filing), the owner grants or acquires, and registers, all additional Covenants, Statutory Right-of-Way(s) and/or easements necessary for supplying the services to the building and the operation of the low carbon energy plant by the City and/or the City's DEU service provider, LIEC.

t) If a DEU is not available for connection, and a LCD EU service area bylaw which applies to the site has not been adopted by Council prior to the issuance of the development permit for the subject site, no final building inspection pennitting occupancy of a building will be granted until:

i) the City receives a professional engineer's certificate stating that the building has the capability to connect to and be serviced by a DEU; and

ii) the owner grants or acquires any additional Statutory Right-of-Way(s) and/or easements necessary for supplying DEU services to the building, registered prior to subdivision (including Air Space parcel subdivision and strata plan filing).

Prior to Building Permit* Issuance, the developer must complete the following requirements:

I. (Water Sustainability Act) Confirmation of compliance with the provincial Water Sustainability Act, including obtaining all necessary approvals prior to any construction or development activity on-site (including ground preparatory works such as vegetation removal, site preloading, etc.) .. The Environmental Security as outlined in the Development Permit Considerations is to be submitted to the City prior to Building Permit Issuance. Additional environmental requirements such as submission of a Construction Environmental Management Plan (CEMP) and potential offset habitat compensation plans will be assessed by the City through the Building Permit application review. A Servicing Agreement or other legal agreements required as part of potential offsetting habitat compensation must be completed prior to Building Permit issuance.

2. (Legal Agreements) Confinnation of compliance with legal agreements associated with the development.

3. (Accessibility, Sustainability and Amenities) Incorporation of accessibility, sustainability and amenity features in Building Permit (BP) plans as determined via the Development Permit process.

4. (Energy Step Code) Confinnation of compliance with step 2 of the Richmond BC Energy Step Code.

5. (Ground Lease) Confirmation of having entered into legal agreement(s) to lease the subject City-owned site. The terms of the lease will be approved by Council separate from the Development Permit application process.

6. (Aircraft Noise Sensitive Development) Confirmation that the proposed development is designed in a manner that mitigates potential aircraft noise to the proposed dwelling units, including submission of:

6433306

Page 64: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-6-a) Acoustic report prepared by a registered professional confirming design achieves the following CMHC interior

noise level guidelines: Portions of Dwelling Units Noise Levels (decibels)

Bedrooms 35 decibels

Living, dining, recreation rooms 40 decibels

Kitchen, bathrooms, hallways, and utility rooms 45 decibels

b) Mechanical repo1i prepared by a registered professional confirming design achieves the ASHRAE 55-2004 "Thermal Environmental Conditions for Human Occupancy" standard for interior living spaces.

7. (Access SRW and No. 2 Road Access) Securing a permanent access to the subject site from No. 2 Road through the adjacent property to the No1ih at 5900 River Road, including:

a) Granting of an approximately 64 m2 (689 ft2) statutory right-of-way over 5900 River Road for the purposes of public-right-of-passage and utilities, delineating the permanent access area across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road. The SRW is to include terms allowing the owner of the property at 5900 River Road to utilize the SRW area for the purposes of completing ancillary works within the SRW area and to undertake certain works on the property at 5900 River Road during the future development of the property at 5900 River Road, provided that continuous and adequate access, to the satisfaction of the City, is provided across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road at all times. The SRW area is to be subdivided from 5900 River Road and consolidated with 5491 No. 2 Road after future development of 5900 River Road construction is completed and prior to occupancy of any buildings on 5900 River Road. The future transfer of the SRW area to the City for consolidation with 5491 No. 2 Road is to be secured by an option to purchase or other legal instrument, granted by the owner of 5900 River Road in favour of the City. The agreement will include tenns regarding the acquisition and timing of the SRW area by the City which will likely be associated with the timing of occupancy of the future building to be constructed at 5900 River Road. The owner of the future building at 5491 No. 2 Road will be responsible for the construction of the works within the SRW area under the applicable servicing agreement, which works will be undertaken in advance of, or in coordination with, the construction of the future development on 5900 River Road and any relevant servicing agreements. Upon completion of construction of the works within the SRW area, the owner of the future building at 5491 No. 2 Road will be responsible for the repair and maintenance, and liability of, the SRW works within the SR W area following completion of construction of such works, which obligations will be set out in the cost sharing agreement referenced in section 2b) below. Any works essential for public access within the required statutory right-of-way (SRW) are to be included in the relevant Servicing Agreement (SA). The design must be prepared in accordance with good engineering practice with the objective to optimize public safety and after completion of the works, the developer of the works is required to provide a certificate of inspection for the works, prepared and sealed by the developer's Engineer in a form and content acceptable to the City, certifying that the works have been constructed and completed in accordance with the accepted design.

b) Entering into a cost sharing legal agreement regarding maintenance of works within the SRW area. The owner of the future building at 5491 No. 2 Road is to maintain works located within 5900 River Road providing vehicle access to 5491 No. 2 Road.

c) Discharge existing legal agreement(s) prohibiting access to No. 2 Road registered on title to 5491 No. 2 Road and 5900 River Road.

d) Discharge existing cross-access agreement, including easements and covenants, registered on title to 5491 No. 2 Road and 5900 River Road.

8. ( Construction Traffic and Parking Management Plan*) Submission of a construction traffic and parking management plan to the satisfaction of the City's Transpo1iation Department (http://www.richmond.ca/ services/ttp/ special .htm ).

9. (Latecomer works) If applicable, payment of Latecomer Agreement charges, plus applicable interest associated with eligible latecomer works.

10. (Construction Hoarding) Obtain a Building Permit* for any construction hoarding. If construction hoarding is required to temporarily occupy a public street, the air space above a public street, or any part thereof, additional City approvals and associated fees may be required as part of the Building Permit. For additional information, contact the Building Approvals Depaiiment at 604-276-4285.

6433306

Page 65: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-7-11. (Servicing Agreement) Enter into a Servicing Agreement* for the design and construction of Engineering and

Transportation works in accordance with Transportation Association of Canada (TAC) Specifications, City Engineering Design Specifications and applicable Bylaws to the satisfaction of the City. A Letter of Credit or cash security for the value of the Service Agreement works, as determined by the City, will be required as part of entering into the Servicing Agreement. Works may include, but may not be limited to, the following:

11.1. Road Works:

a) Road works across the site frontage and tying into No. 2 Road to accommodate: 3.3 m wide concrete multi-use path along the property line, 1.5 m wide grass boulevard, concrete curb and gutter, 3 .3 m wide vehicle travel lane, and interim tie in works until such a time as the adjacent property to the north develops.

b) Multi-use path along No. 2 Road to be 3.3 m wide, cast in place concrete, medium sandblast finish with expansion and saw-cut control joints.

c) Multi-use pathway east-west is to be repaired/replaced as required to match existing treatment (asphalt in path, pavers on concrete at Dover Crescent) and irrigation to be provided at new off site trees along the north side of the path. Irrigation to be tied to the onsite water service. Offsite tree planting to be 7cm caliper in size. Any works in City path right-of-way to be reviewed through SA process.

11.II Water Works:

a) Using the OCP model with the water main upgrades proposed, there will be 252 Lis of water available at a 20 psi residual along the south property line, and 207 Lis of water available at a 20 psi residual at the No 2 Road frontage. Based on your proposed development, your site requires a minimum fire flow of 220 Lis.

b) At Developer's cost, the Developer is required to:

i) Submit Fire Underwriter Survey (FUS) or International Organization for Standardization (ISO) fire flow calculations to confinn development has adequate fire flow for onsite fire protection. Calculations must be signed and sealed by a Professional Engineer and be based on Building Pennit Stage building designs.

ii) Install approximately 150 m of new 200 mm water main along the walkway south of the development site from Dover Crescent to No 2 Road, and along No 2 Road from the walkway to the north property line of the development site, complete with fire hydrants. The water main alignment should avoid any proposed or future trees to be planted along the walkway.

iii) Submit Fire Underwriter Survey (FUS) fire flow calculations within the first servicing agreement submission to confirm that the available flow of 207 Lis is adequate for onsite fire protection. If the 207 Lis is not adequate, the developer shall be required to provide a 300 mm diameter water main instead.

iv) Install a new water connection to serve the proposed development, complete with water meter. The meter is to be located onsite (i.e. in a mechanical room).

c) At Developer's cost, the City will:

i) Complete all tie-ins for the proposed works to existing City infrastructure.

11.III Storm Sewer Works:

a) At Developer's cost, the Developer is required to:

i) Provide an erosion and sediment control plan for all on-site and off-site works, to be reviewed as part of the servicing agreement design.

ii) Confirm the condition and capacity of the existing storm connection serving the development site. If the connection is adequate to be reused for the proposed development, the existing lawn basin shall be removed and a new inspection chamber installed at the property line by the City at the developer's cost. If the connection is not adequate to be reused, then at the developer's cost the City shall remove the existing connection and install a new connection complete with inspection chamber. If feasible, the existing opening in the box culvert shall be re-used for the new connection.

11.IV Sanitary Sewer Works:

a) At Developer's cost, the Developer is required to:

6433306

i) Install approximately 70 m of new 200 mm sanitary sewer from Dover Crescent to the proposed sanitary connection. The actual length of required sanitary sewer will vary depending on the proposed sanitary connection location. In order to avoid disruption to the existing covered walkway at Dover Crescent, a new sanitary manhole will be required approximately 5 meters to the west of existing manhole SMH6993, and the

Page 66: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-8-new sanitary sewer alignment will be south of the existing sanitary sewer. The sanitary alignment should avoid any proposed or future trees to be planted along the walkway, and take into consideration future service for 5900 River Road.

ii) Install a new sanitary connection for the proposed development, complete with inspection chamber.

b) At Developer's cost, the City will:

i) Complete all tie-ins for the proposed works to existing City infrastructure.

11.V Frontage Improvement Works:

a) At Developer's cost, the Developer is required to:

i) Coordinate with BC Hydro, Telus and other private communication service providers to pre-duct for future hydro, telephone and cable utilities along all road frontages.

ii) Locate all above ground utility cabinets and kiosks required to service the proposed development within the development site (see list below for examples). A functional plan showing conceptual locations for such infrastructure shall be included in the development design review process. Please coordinate with the respective private utility companies and the project's lighting and traffic signal consultants to confirm the requirements ( e.g., statutory right-of-way dimensions) and the locations for the aboveground structures. If a private utility company does not require an aboveground structure, that company shall confirm this via a letter to be submitted to the City. The following are examples of statutory right-of-ways that shall be shown on the architectural plans/functional plan, the servicing agreement drawings, and registered prior to SA design approval:

BC Hydro PMT BC Hydro LPT Street light kiosk Traffic signal kiosk Traffic signal UPS Shaw cable kiosk

4.0x5.0m 3.5 X 3.5 m 1.5 X 1.5 m 2.0 X 1.5 m 1.0 X 1.0 m 1.0 X 1.0 m

Telus FDH cabinet 1.1 x 1.0 m

iii) Review street lighting levels along the road and walkway frontages, and upgrade as required. Street lighting along No 2 Road multi-use path is to be pedestrian scale (Double luminaire street lights with taller vehicle scale lighting for road way to the satisfaction of Engineering). Street lighting along the east-west multi-use pathway is to be new pedestrian scale ( 4.4 meter luminaire height as per "Type 8 Decorative Pedestrian Luminaire Pole" in the City of Richmond Supplemental Specifications and Detail Drawings).

iv) Complete other frontage improvements as per Transportation requirements.

11.VI General Items:

a) At Developer's cost, the Developer is required to:

6433306

i) Provide, prior to start of site preparation works or within the first servicing agreement submission, whichever comes first, a preload plan and geotechnical assessment of preload, dewatering, and soil preparation impacts on the existing utilities fronting the development site and provide mitigation recommendations.

ii) Provide a video inspection report of the existing utilities along the development frontages prior to start of site preparation works or within the first servicing agreement submission, whichever comes first. A follow-up video inspection, complete with a civil engineer's signed and sealed recommendation letter, is required after site preparation works are complete (i.e. pre-load removal, completion of dewatering, etc.) to assess the condition of the existing utilities and provide recommendations to retain, replace, or repair. Any utilities damaged by the pre-load, de-watering, or other ground preparation shall be replaced or repaired at the Developer's cost.

iii) Conduct pre- and post-preload elevation surveys of all surrounding roads, utilities, and structures. Any damage, nuisance, or other impact to be repaired at the developer's cost. The post-preload elevation survey shall be incorporated within the servicing agreement design.

iv) Monitor the settlement at the adjacent utilities and structures during pre-loading, dewatering, and soil preparation works per a geotechnical engineer's recommendations, and report the settlement amounts to the City for approval.

Page 67: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-9-v) Submit a proposed strategy at the building permit stage for managing excavation de-watering. Note that the

City's preference is to manage construction water onsite or by removing and disposing at an appropriate facility. If this is not feasible due to volume of de-watering, the Developer will be required to apply to Metro Vancouver for a permit to discharge into the sanitary sewer system. If the sanitary sewer does not have adequate capacity to receive the volume of construction water, the Developer will be required to enter into a de-watering agreement with the City to discharge treated construction water to the storm sewer system.

vi) Not encroach into the No 2 Road dedication with any proposed trees, retaining walls, or other non-removable structures due to the proposed and existing utilities along the No 2 Road frontage.

vii) Coordinate the servicing agreement design for this development with the servicing agreement(s) for the adjacent development(s), both existing and in-stream. The developer's civil engineer shall submit a signed and sealed letter with each servicing agreement submission confirming that they have coordinated with civil engineer(s) of the adjacent project(s) and that the servicing agreement designs are consistent. The City will not accept the 1st submission if it is not coordinated with the adjacent developments. The coordination letter should cover, but not be limited to, the following: (a) Corridors for City utilities (existing and proposed water, storm sewer, sanitary and DEU) and private

utilities. (b) Pipe sizes, material and slopes. (c) Location of manholes and fire hydrants. (d) Road grades, high points and low points. ( e) Alignment of ultimate and interim curbs. (f) Proposed street lights design.

iv) Enter into, if required, additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering, including, but not limited to, site investigation, testing, monitoring, site preparation, de­watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.

Note: * This requires a separate application.

Where the Director of Development deems appropriate, the preceding agreements are to be drawn not only as personal covenants of the property owner but also as covenants pursuant to Section 219 of the Land Title Act.

All agreements to be registered in the Land Title Office shall have priority over all such liens, charges and encumbrances as is considered advisable by the Director of Development. All agreements to be registered in the Land Title Office shall, unless the Director of Development determines otherwise, be fully registered in the Land Title Office prior to enactment of the appropriate bylaw.

The preceding agreements shall provide security to the City including indemnities, warranties, equitable/rent charges, letters of credit and withholding permits, as deemed necessary or advisable by the Director of Development. All agreements shall be in a fonn and content satisfactory to the Director of Development.

Additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Pennit(s), and/or Building Pennit(s) to the satisfaction of the Director of Engineering may be required including, but not limited to, site investigation, testing, monitoring, site preparation, de-watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.

Applicants for all City Penn its are required to comply at all times with the conditions of the Provincial Wildlife Act and Federal Migratory Birds Convention Act, which contain prohibitions on the removal or disturbance of both birds and their nests. Issuance of Municipal permits does not give an individual authority to contravene these legislations. The City of Richmond recommends that where significant trees or vegetation exists on site, the services of a Qualified Environmental Professional (QEP) be secured to perform a survey and ensure that development activities are in compliance with all relevant legislation.

[Signed copy on file]

Signed 6433306

Date

Page 68: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

City of Richmond

Address: 5900 River Road

Attachment 6 To report dated May 5, 2020

Access Considerations Development Applications Department

Scope: Legal agreements and voluntary cash contribution are required to secure access from No. 2 Road to 5491 No. 2 Road across 5900 River Road. In order to maximize efficiency, the owner of 5900 River Road has agreed to construct the frontage improvements and utility upgrades along No. 2 Road required for their development in conjunction with the construction of the frontage improvements and utility upgrades required to serve the development at 5491 No. 2 Road (Pathways). The following requirements are not an exhaustive list of all requirements for a potential future development at 5900 River Road, only the works that overlap with the frontage works related to the driveway access for Pathways. Although we have done our best to ensure that all overlapping works are included below, the City reserves the right to require additional utility upgrades and frontage improvements at the time that the owner of 5900 River Road comes in with a development application.

A. (Access Agreements and Voluntary contribution) The owner of 5900 River Road is required to provide a permanent access from No. 2 Road through that property to the neighbouring property to the south at 5491 No. 2 Road, including:

1) Voluntary Contribution:

a) City acceptance of the voluntary contribution from the owner of 5900 River Road in the amount of $69,800 toward the cost increase associated with additional frontage works at 5491 No. 2 Road resulting from locating the SRW providing permanent access for 5491 No. 2 Road in a location that minimizes impacts to the future development potential of 5900 River Road.

2) Legal Agreements required for both properties at 5491 No. 2 Road and 5900 River Road:

a) Granting of an approximately 64 m2 (689 ft2) statutory right-of-way over 5900 River Road for the purposes of public-right-of-passage and utilities, delineating the permanent access area across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road. The SRW is to include terms allowing the owner of the property at 5900 River Road to utilize the SRW area for the purposes of completing ancillary works within the SRW area and to undertake certain works on the property at 5900 River Road during the future development of the property at 5900 River Road, provided that continuous and adequate access, to the satisfaction of the City, is provided across 5900 River Road to the property at 5491 No. 2 Road from No. 2 Road at all times. The SRW area is to be subdivided from 5900 River Road and consolidated with 5491 No. 2 Road after future development of 5900 River Road construction is completed and prior to occupancy of any buildings on 5900 River Road. The future transfer of the SRW area to the City for consolidation with 5491 No. 2 Road is to be secured by an option to purchase or other legal instrument, granted by the owner of 5900 River Road in favour of the City. The agreement will include tenns regarding the acquisition and timing of the SR W area by the City which will likely be associated with the timing of occupancy of the future building to be constructed at 5900 River Road. The owner of the future building at 5491 No. 2 Road will be responsible for the construction of the works within the SRW area under the applicable servicing agreement, which works will be undertaken in advance of, or in coordination with, the construction of the future development on 5900 River Road and any relevant servicing agreements. Upon completion of construction of the works within the SRW area, the owner of the future building at 5491 No. 2 Road will be responsible for the repair and maintenance, and liability of, the SRW works within the SRW area following completion of construction of such works, which obligations will be set out in the cost sharing agreement referenced in section 2b) below. Any works essential for public access within the required statutory right-of-way (SRW) are to be included in the relevant Servicing Agreement (SA). The design must be prepared in accordance with good engineering practice with the objective to optimize public safety and after completion of the works, the developer of the works is required to provide a certificate of inspection for the works, prepared and sealed by the developer's Engineer in a form and content acceptable to the City, certifying that the works have been constructed and completed in accordance with the accepted design.

Document Number: 6433306 6433306

Version: 3

Page 69: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-2-b) Entering into a cost sharing legal agreement regarding maintenance of access works within the SR W area. The

owner of the future building at 5491 No. 2 Road is to maintain works located within 5900 River Road providing vehicle access to 5491 No. 2 Road.

c) Discharge existing legal agreement(s) prohibiting access to No. 2 Road registered on title to 5491 No. 2 Road and 5900 River Road.

d) Discharge existing cross-access agreement, including easements and covenants, registered on title to 5491 No. 2 Road and 5900 River Road.

B. (Servicing Agreement) The owner of 5900 River Road is required to enter into a Servicing Agreement* for the design and construction of Engineering and Transportation works in accordance with Transportation Association of Canada (TAC) Specifications, City Engineering Design Specifications and applicable Bylaws to the satisfaction of the City. A Letter of Credit or cash security for the value of the Service Agreement works, as determined by the City, will be required as part of entering into the Servicing Agreement. Works may include, but may not be limited to, the following:

l) Road Works: a) Design and construction of road works in front of 5900 River Road frontage and any area (beyond that frontage)

overlapping with the frontage works related to the driveway access for 5491 No. 2 Road to accommodate: 3.3 m wide concrete shared path along the property line, 1.5 m wide grass boulevard, concrete curb and gutter, 3 .3 m wide vehicle travel lane, median alteration works, and interim tie in works until such a time as the adjacent property to the north develops.

b) Multi-use pathway along No. 2 Road is to be 3 .3 m wide, cast in place concrete paving, medium sandblast finish with expansion and saw-cut control joints. Carry the No. 2 Road multi-use path treatment through the driveway crossing.

c) Median grass boulevard between No. 2 Road and the No. 2 Road bridge, additional lawn is preferred. Additional trees to be planted in this area, subject to Engineering and Transportation approval regarding proximity to utilities/structures/sight lines. Irrigation not required. Offsite tree planting to be 7 cm caliper in size.

2) Parks Works: a) Existing eight Oak Trees along No. 2 Road to be removed and relocated with input from Parks Operations.

Existing Oak Trees to tentatively be relocated to Brighouse Neighbourhood School Park and Terra Nova South Park as they both have irrigation to aid in re-establishment and are located relatively nearby.

b) In the event that the tree relocation works are necessitated by 5491 No. 2 Road frontage works before 5900 River Road frontage works commence, the owner of 5900 River Road shall pay for the tree relocation works to be carried out on their behalf at an approximate value of $200,000, or an amount detennined by a registered Arborist, to the satisfaction of the City.

3) Water Works: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:

i) Install approximately 280 m of new 200 mm water main from the existing 300 mm water main on River Road down No. 2 Road, and along the pathway south of 5491 No. 2 Road to tie into the existing water main on Dover Crescent.

ii) Through the future development application for 5900 River Road, install a new water connection, complete with meter and meter box located onsite within a right-of-way.

b) At the owner of 5900 River Road's cost, the City will: i) Complete all tie-ins for the proposed works to existing City infrastructure.

4) Stonn Sewer Works: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:

i) Provide an erosion and sediment control plan for all on-site and off-site works, to be reviewed as part of the servicing agreement design.

b) At the owner of 5900 River Road's cost, the City will:

6433306

i) Cut, cap, and remove all existing storm connections and inspection chambers along the development's No. 2 Road frontage - unless required for drainage until the ultimate frontage improvements are constructed.

ii) Note, for infonnation: the development's future storm connection shall reuse an existing opening within the box culvert on River Road, if feasible. The storm connection is not permitted to cross beneath the large­diameter water main on No. 2 Road.

Page 70: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

- 3 -

5) Sanitary Sewer Works: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:

i) Install approximately 155 m of new 200 mm sanitary sewer from the existing sanitary sewer on Dover Crescent, along the pathway south of 5491 No 2 Road, and up No. 2 Road to extent of the No. 2 Road frontage improvements. The exact extent of new sanitary sewer required to serve 5900 River Road will depend on the location of the future sanitary connection as detennined through the future development application at 5900 River Road.

b) At the owner of 5900 River Road's cost, the City will: i) Complete all tie-ins for the proposed works to existing City infrastructure.

6) Frontage Improvements: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:

i) Coordinate with BC Hydro, Telus and other private communication service providers: (a) To pre-duct for future hydro, telephone and cable utilities required to serve the subject site along the

extent of the frontage improvements (if applicable). (b) Before relocating/modifying any of the existing power poles and/or guy wires within the property

frontages. ii) Through the future development application for 5900 River Road, locate/relocate all above ground utility

cabinets and kiosks required to service the proposed development, and all above ground utility cabinets and kiosks located along the development's frontages, within the developments site (see list below for examples). A functional plan showing conceptual locations for such infrastructure shall be included in the development design review process. Please coordinate with the respective private utility companies and the project's lighting and traffic signal consultants to confirm the requirements (e.g., statutory right-of-way dimensions) and the locations for the aboveground structures. If a private utility company does not require an aboveground structure, that company shall confirm this via a letter to be submitted to the City. The following are examples of statutory right-of-ways that shall be shown on the architectural plans/functional plan, the servicing agreement drawings, and registered prior to SA design approval: - BC Hydro PMT 4.0 x 5.0 m - BC Hydro LPT 3.5 x 3.5 m - Street light kiosk 1.5 x 1.5 m - Traffic signal kiosk 2.0 x 1.5 m - Traffic signal UPS 1.0 x 1.0 m - Shaw cable kiosk 1.0 x 1.0 m - Telus FDH cabinet 1.1 x 1.0 m

iii) Review street lighting levels along No. 2 Road, and upgrade as required along the extent of the frontage improvements being constructed through this servicing agreement. The ultimate street lighting works will be constructed through the future development application for 5900 River Road. Street lighting along No. 2 Road multi-use path is to be pedestrian scale (Double luminaire street lights with taller vehicle scale lighting for road way to the satisfaction of Engineering).

iv) Complete other frontage improvements as per Transportation requirements.

7) General Items: a) At the owner of 5900 River Road's cost, the owner of 5900 River Road is required to:

6433306

i) Provide, if required based on the City review of the detailed design through the servicing agreement, additional rights-of-ways to accommodate existing/proposed utilities.

ii) Design the proposed frontage works to accommodate potential future raising of River Road to dike elevation (4.7 m geodetic). Through the future development application for 5900 River Road, the building and remaining frontage works will also need to accommodate the potential future raising of River Road to dike elevation (4.7 m geodetic).

iii) Impact due to site preparation: (a) Provide, prior to start of site preparation works (preload, soil densification, etc.) or within the first

servicing agreement submission, whichever comes first, a preload plan and geotechnical assessment of preload, dewatering, and soil preparation impacts on the existing utilities, dike, bridge, and other structures fronting the development site and provide mitigation recommendations. The rep01i must show that there will be no impact to the large-diameter water main on No 2 Road, or any other adjacent utilities or structures, to the City's satisfaction prior to any site preparation works commencing onsite.

Page 71: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-4-(b) Conduct pre- and post-pre load elevation surveys of all surrounding roads, utilities, and structures. Any

damage, nuisance, or other impact to be repaired at the owner of 5900 River Road's cost. The post­preload elevation survey shall be incorporated within the servicing agreement design.

( c) Monitor the settlement at the adjacent utilities and structures during pre-loading, dewatering, and soil preparation works per a geotechnical engineer's recommendations, and report the settlement amounts to the City for approval.

iv) Not encroach into City rights-of-ways with any proposed trees, retaining walls, or other non-removable structures.

v) Coordinate the servicing agreement design for 5900 River Road with the servicing agreement(s) for the adjacent development(s), both existing and in-stream. The owner of 5900 River Road's civil engineer shall submit a signed and sealed letter with each servicing agreement submission confirming that they have coordinated with civil engineer(s) of the adjacent project(s) and that the servicing agreement designs are consistent. The City will not accept the 1st submission if it is not coordinated with the adjacent developments. The coordination letter should cover, but not be limited to, the following: (a) Corridors for City utilities (existing and proposed water, storm sewer, sanitary and DEU) and private

utilities. (b) Pipe sizes, material and slopes. ( c) Location of manholes and fire hydrants. (d) Road grades, high points and low points. (e) Alignment of ultimate and interim curbs. (f) Proposed street lights design.

vi) Enter into, if required, additional legal agreements, as determined via this Servicing Agreement and/or future Servicing Agreement(s), Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering, including, but not limited to, site investigation, testing, monitoring, site preparation, de­watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.

Note:

* This requires a separate application.

Where the Director of Development deems appropriate, the preceding agreements are to be drawn not only as personal covenants of the property owner but also as covenants pursuant to Section 219 of the Land Title Act.

All agreements to be registered in the Land Title Office shall have priority over all such liens, charges and encumbrances as is considered advisable by the Director of Development. All agreements to be registered in the Land Title Office shall, unless the Director of Development determines otherwise, be fully registered in the Land Title Office prior to enactment of the appropriate bylaw.

The preceding agreements shall provide security to the City including indemnities, warranties, equitable/rent charges, letters of credit and withholding permits, as deemed necessary or advisable by the Director of Development. All agreements shall be in a form and content satisfactory to the Director of Development.

Additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering may be required including, but not limited to, site investigation, testing, monitoring, site preparation, de-watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.

Applicants for all City Permits are required to comply at all times with the conditions of the Provincial Wildlife Act and Federal Migratory Birds Convention Act, which contain prohibitions on the removal or disturbance of both birds and their nests. Issuance of Municipal permits does not give an individual authority to contravene these legislations. The City of Richmond recommends that where significant trees or vegetation exists on site, the services of a Qualified Environmental Professional (QEP) be secured to perfonn a survey and ensure that development activities are in compliance with all relevant legislation.

[Signed copy on file]

Signed Date

6433306

Page 72: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

City of Richmond

To the Holder:

Property Address:

Address:

GBL ARCHITECTS

5491 NO. 2 ROAD

C/O PAUL GOODWIN 139 EAST 8TH AVENUE, VANCOUVER, BC V5T 1R8

Development Permit

No. DP 19-866690

1. This Development Permit is issued subject to compliance with all of the Bylaws of the City applicable thereto, except as specifically varied or supplemented by this Permit.

2. This Development Permit applies to and only to those lands shown cross-hatched on the attached Schedule "A" and any and all buildings, structures and other development thereon.

3. The "Richmond Zoning Bylaw 8500" is hereby varied to:

a) Reduce the minimum building setback from No. 2 Road from 6 m to 5 m; and

b) Increase the maximum building height from 18 m to 20.3 m for the west portion of the building.

c) Reduce the number of required parking spaces from 87 to 46.

4. Subject to Section 692 of the Local Government Act, R.S.B.C.: buildings and structures; off-street parking and loading facilities; roads and parking areas; and landscaping and screening shall be constructed generally in accordance with Plans #1 to #35 attached hereto.

5. Sanitary sewers, water, drainage, highways, street lighting, underground wiring, and sidewalks, shall be provided as required.

6. As a condition of the issuance of this Permit, the City is holding the security in the amount of $229,074.00. to ensure that development is carried out in accordance with the terms and conditions of this Permit. Should any interest be earned upon the security, it shall accrue to the Holder if the security is returned. The condition of the posting of the security is that should the Holder fail to carry out the development hereby authorized, according to the terms and conditions of this Permit within the time provided, the City may use the security to carry out the work by its servants, agents or contractors, and any surplus shall be paid over to the Holder. Should the Holder carry out the development permitted by this permit within the time set out herein, the security shall be returned to the Holder. The City may retain the security for up to one year after inspection of the completed landscaping in order to ensure that plant material has survived.

7. If the Holder does not commence the construction permitted by this Permit within 24 months of the date of this Permit, this Permit shall lapse and the security shall be returned in full.

Document Number: 6433306 6433306

Version: 3

Page 73: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

To the Holder:

Property Address:

Address:

GBL ARCHITECTS

5491 NO. 2 ROAD

C/O PAUL GOODWIN 139 EAST 8TH AVENUE, VANCOUVER, BC V5T 1R8

Development Permit No. DP 19-866690

8. The land described herein shall be developed generally in accordance with the terms and conditions and provisions of this Permit and any plans and specifications attached to this Permit which shall form a part hereof.

This Permit is not a Building Permit.

AUTHORIZING RESOLUTION NO. DAY OF

DELIVERED THIS DAY OF

MAYOR

6433306

ISSUED BY THE COUNCIL THE

Page 74: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

SI

ZTn

3 60

City of Richmond

Middle Arm Fraser River ~

I I I

RSI/A

I I 1-------~

0::: SI t) o:::f------1

w > 0 0

r----1 I I I I I I I "I I

ZTS

ZT4

CO2

DOVER CR I~ I I lO t, I 1° L ____ I

68.91

77.76 61.74

1_.J~-.J-'--:;r--l,....!~.,

I '1- I 1..., ~ _J

I ___ --~-,- I

DP 19-866690

C ~ N . 0 z

~ SCHEDULE "A"

Ill!

RSI/E

6011 60.09 24.74

RIVER RD

70.26

Original Date: 07/17/19

Revision Date:

Note: Dimensions are in METRES

Page 75: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

OVE

RVI

EW

DE

VE

LOP

ME

NT

STA

TIS

TIC

S

LEG

AL

AD

DR

ES

S:

PR

OP

OS

ED

US

ES

:

LOT

B S

EC 1

BLK

4N

RG

7W

PL

BC

P29

277

Res

iden

tial

[re

ntal

}

FIN

. SIT

E G

RA

DE

ELE

VA

TIO

N:

3.67

m /

12.

03'

BU

ILD

ING

CO

DE

RE

QU

IRE

ME

NTS

CO

NS

TRU

CTI

ON

: G

RO

UP

C &

GR

OU

P F

3 U

P TO

6 S

TOR

EYS

SP

RIN

KLE

RE

D

GR

OSS

AR

EA

FS

R -

Are

a -T

ype

I AR

EA

AM

ENIT

Y

I 1

,07

5S

F

CIR

CU

LATI

ON

I

9,2

06

SF

ME

CH

/EL

EC

I 1,

581

SF

RE

SID

EN

TIA

L I

L.7,

556S

F

TOTA

L 59

,418

SF

FAR

BY

TYPE

F

SR

-Are

a-T

yp

e I

AR

EA

I

FSR

CIR

CU

LATI

ON

I

9,2

06

SF

I 0.

42

RE

SlO

EN

TIA

L I

l,7,

556S

FI

2.18

FAR

BY

LEV

EL

LEV

EL

AR

EA

I

FSR

Ll

7,44

7SF

0.

34

L2

9,86

3 S

F

0.45

L3

9,86

3 SF

0.

45

L4

9,86

3 SF

0.

45

L5

9,86

3SF

0.

45

L6

9,86

3SF

0.

45

TOTA

L 56

,762

SF

2.

61

CO

MB

US

TIB

LE C

ON

STR

UC

TIO

N

TOTA

L 5

6,7

62

SF

2.

61

City

of

Ric

hmon

d D

P 1

9-86

6690

Add

ress

: 54

91 N

o. 2

Roa

d

App

lican

t:

Zon

ing:

N

um

be

r of

Uni

ts

Flo

or

Are

a R

atio

Lo

t C

over

age

Set

bac

ks:

No

2 R

oad

(F

ron

t Y

ard

) W

est

prop

erty

line

(R

ear

Yar

d)

Nor

th p

rope

rty

line

(Int

erio

r S

ide

Yar

d)

Sou

th p

rope

rty

line

(Ext

erio

r S

ide

Yar

d)

Par

kade

Set

back

s:

Und

ergr

ound

: N

o 2

Roa

d (F

ront

Yar

d)

We

st p

rope

rty

line

(Rea

r Y

ard)

N

orth

pro

pert

y lin

e (I

nter

ior

Sid

e Y

ard)

S

outh

pro

pert

y lin

e (E

xter

ior

Sid

e Y

ard)

A

bove

-gro

und:

N

o 2

Roa

d (F

ront

Yar

d)

Wes

t pr

oper

ty li

ne (

Rea

r Y

ard)

N

orth

pro

pert

y lin

e (I

nter

ior

Sid

e Y

ard)

S

outh

pro

pert

y lin

e (E

xter

ior

Sid

e Y

ard)

H

eig

ht

With

in 2

6m o

f Eas

t pro

pert

y lin

e B

eyo

nd

26m

of

Eas

t p

rop

erty

lin

e P

arki

ng s

truc

ture

s Lo

t S

ize

Bic

ycle

Sto

rage

: C

lass

1 (i

n lo

cker

or

bike

roo

m)

Cla

ss 2

(at

out

door

rac

k)

Hab

itabl

e F

loor

Ele

vatio

n P

arki

ng:

Aff

orda

ble

Hou

sing

Uni

ts

Vis

itors

C

ar S

hare

T

otal

A

cces

sibl

e P

arki

ng S

pace

s

Sm

all

Car

Par

king

Spa

ces

Tan

dem

Par

king

Spa

ces

Load

ing

Ind

oo

r Am

enity

Spa

ce

Ou

tdo

or

Am

enitv

Spa

ce

Dev

elo

pm

ent A

pp

licat

ion

Dat

a S

hee

t D

evel

opm

ent

App

licat

ions

Dep

artm

ent

69

11

No

. 3

Ro

ad

, R

ich

mo

nd

, B

C

V6

Y 2

C1

Pat

hway

s le

ase

from

City

of

Ric

hmon

d

Mul

ti-F

amily

Ren

tal T

enur

e R

esid

entia

l C

om

lies

Hig

h R

ise

Apa

rtm

ent a

nd C

ongr

egat

e H

ousi

ng

(ZH

R3)

-D

over

Cro

ssin

g V

aria

nces

req

uest

ed a

s no

ted

be

low

V

aca

nt

80

Req

uir

emen

t P

rop

ose

d

Var

ian

ce

3.0

& 0

.1 a

men

ity s

pace

2.

61

Non

e oe

rmitt

ed

Max

. 70

%

43%

N

one

Min

.6m

S

m

1 m

dec

reas

e M

in. 6

m

6m

M

in. 3

m

3m

M

in. 3

m

3m

MIN

. 5.

8m

MIN

. 0.

4m

0.1

m

Min

. 0

m

0.4m

Min

. 3

m

N/A

M

in.

3 m

3.

1 m

(st

air)

M

in.

0 m

O

m

Min

.Om

0.

4m (

patio

s)

Max

. 24

m

24 m

M

ax

.18

m

20

.3m

2

.3m

incr

ease

M

ax.

5 m

0.

8m a

bove

fin.

site

gra

de

[inc

lude

s 0.

1 m

tol

eran

ce)

Min

. 2,

000

m2

2,02

4 m

2 N

one

100

@ 1

.25/

unit

100

Non

e 1

6@

0.2

0/un

it 16

M

in.

4 m

GS

C

4.5

m G

SC

N

one

With

TD

Ms

With

TD

Ms

72

29

52%

red

uct

ion

with

15

15

ap

pro

pri

ate

TD

Ms

2 87

46

M

in2

%

4% (

2 sp

aces

) N

one

Max

50%

42

% (

19 s

pace

s)

Non

e

Per

mitt

ed

Non

e N

one

Man

oeuv

ring

for

med

ium

truc

k 1

med

ium

loa

ding

bay

N

one

Min

100

m2

100

m2

480

m2

@ 6

m2 /

unit

482

m2

UN

IT M

IX

Bas

ical

Un

iver

sal

Ho

usi

ng

Fe

atu

res

(B

UH

F)

Tar

get:

85%

P

rovi

ded:

100

%

UN

IT

I A

rea

I

CO

UN

T

A-

STU

DIO

ST

UD

IO -

A1

I

124 24

B -

1 BE

DRO

OM

1B

R-

Bl

I 12

6 1

BR

-B2

+ 15

21 S

F 11

1

BR

-83

16

03 S

F 16

1

BR

-84

" 15

36 S

F 13

36

C -

2 BE

DR

OO

M

2B

R-C

1

1774

SF

15

2BR

-C

2 18

13 S

F IS

2

8R

-C3

I BO

S SF

15

15

D -

3 BE

DR

OO

M

38

R-

01

I !5 5 80

~WH

EE

LCH

AIR

AC

CE

SS

IBLE

UN

IT

Not

es:

UN

IT M

IX B

Y LE

VE

L

LEV

EL

1 LE

VE

LS 2

-6

UN

IT

I A

rea

I CO

UN

T U

NIT

A -

STU

DIO

A

-S

TU

DIO

STU

DIO

-A

l I

1,

STU

DIO

-Al

' B

-1

BE

DR

OO

M

B -

1 BE

DRO

OM

1BR

81

15

37 S

F 11

lB

R-8

1

18R

8

2'

1521

SF

11

1B

R -

83

18R

83

l6

03S

F

11

18R

8

4'

l536

SF

_1

3 6 -7

10

C -

2 BE

DR

OO

M

28

R-

C1

28

R-

C2

28

R-

C3

D -

3 BE

DR

OO

M

38

R-

01

• V

aria

nce

incl

uded

to r

educ

e th

e m

inim

um b

uild

ing

setb

ack

from

No.

2 R

oad

from

6 m

to 5

m.

I A

rea

I

j455

SF

1,

' l5

36S

F

15

j60

3S

F

11 6

j774

SF

11

l813

SF

11

I BOS

SF

11 3

1993

SF

11 1 14

• V

aria

nce

incl

uded

to

incr

ease

max

imum

bui

ldin

g he

ight

fro

m 1

8 m

to 2

0.3

m f

or t

he w

este

rn p

orti

on o

f the

bui

ldin

g.

• V

aria

nce

incl

uded

to r

educ

e th

e nu

mbe

r o

f req

uire

d pa

rkin

g sp

aces

fro

m 8

7 to

46.

80 p

urpo

se-b

uilt

ren

tal

dwel

ling

uni

ts r

equi

red

to c

ompl

y w

ith H

ousi

ng A

ffor

dabi

lity

Agr

eem

ent

lega

l ag

reem

ents

. •

80 B

asic

Uni

vers

al H

ousi

ng F

eatu

res

unit

s re

quir

ed t

o co

mpl

y w

ith

Zon

ing

Byl

aw s

tand

ards

. •

4 ac

cess

ible

uni

ts r

equi

red

to c

ompl

y w

ith B

C B

uild

ing

Cod

e ac

cess

ible

sta

ndar

ds.

• In

door

Am

enit

y sp

ace

for

the

shar

ed u

se o

f all

resi

dent

s on

the

grou

nd f

loor

lev

el f

or t

he s

hare

d us

e o

f all

resi

dent

s.

• 2

car

shar

e sp

aces

pro

vide

d as

per

lega

l ag

reem

ent.

• D

evel

opm

ent

requ

ired

to

conn

ect t

o O

VD

EU

. D

istr

ict E

nerg

y U

tili

ty r

equi

rem

ents

as

per

lega

l ag

reem

ent.

• D

evel

opm

ent r

equi

red

to c

ompl

y w

ith

step

3 o

f BC

Ene

rgy

Step

Cod

e.

• D

evel

opm

ent r

equi

red

to m

eet

indo

or a

cous

tic

and

ther

mal

cri

teri

a as

per

lega

l ag

reem

ent.

• H

ose

bibs

to b

e pr

ovid

ed in

bot

h ou

tdoo

r am

enit

y ar

eas.

Irri

gati

on to

be

prov

ided

in

all

land

scap

ed a

reas

.

COU

NT

• S

ervi

cing

Agr

eem

ent r

equi

red.

Off

-sit

e an

d S

R W

wor

ks t

o be

pro

vide

d vi

a se

para

te r

equi

red

Ser

vici

ng A

gree

men

t fo

r C

ity

road

wor

ks,

fron

tage

im

prov

emen

t wor

ks,

infr

astr

uctu

re w

orks

and

SR

W v

ehic

le a

cces

s w

orks

as

per

lega

l ag

reem

ent.

• T

his

Dev

elop

men

t P

erm

it d

oes

not

incl

ude

sign

age.

A

ll si

gnag

e re

quir

ed to

com

ply

with

Sig

n R

egul

atio

n by

law

970

0,

incl

udin

g su

bmit

ting

sep

arat

e si

gn p

erm

it a

ppli

cati

ons

as n

eede

d.

De

ep

Su

bsi

dy

Un

its

Re

nt

Ge

are

d t

o I

nco

me

Un

its

Aff

ord

ab

le M

ark

et

Re

nt

Un

its

Stu

dio

T

BD

T

BD

T

BD

1

-be

dro

om

T

BD

T

BD

T

BD

2

-be

dro

om

T

BD

T

BD

T

BD

3

-be

dro

om

T

BD

T

BD

T

BD

T

ota

l 1

6

40

2

4

%

20

%

50

%

30

%

BC

Ho

usi

ng

2

0%

5

0%

3

0%

C

om

mu

nit

y H

ousi

nQ F

un

d

Inco

me

Re

stri

ctio

n

Lo

w I

nco

me

-h

ou

seh

old

in

com

e

Ma

xim

um

ho

use

ho

ld i

nco

me

M

axi

mu

m h

ou

seh

old

in

com

e

be

low

BC

Ho

usi

ng

Ho

usi

ng

re

stri

ctio

n t

o b

elo

w B

C H

ou

sin

g

rest

rict

ion

to

th

e L

ow

an

d

Inco

me

Lim

its

an

d

Inco

me

Lim

its

Mo

de

rate

in

com

e l

imit

(p

er

un

it

(i) I

n re

ceip

t o

f in

com

e

size

) a

ssis

tan

ce;

or

(ii)

In

rece

ipt o

f o

nly

OA

S/G

IS

inco

me

; o

r (i

ii) R

GI

is e

qu

al o

r le

ss t

ha

n

she

lte

r a

llow

an

ce

Inco

me

Te

stin

q

~n

nu

al

v:\n

nual

~

t m

ove

-in

on

ly

Re

nt

Re

stri

ctio

n

Ho

use

ho

lds

pa

y S

he

lte

r R

ate

or

Re

nt

Ge

are

d t

o I

nco

me

pe

r B

C

CM

HC

Ave

rag

e M

ark

et

Re

nt

eq

uiv

ale

nt

Re

nt

Sca

le (

30

% o

f p

re-t

ax

ho

use

ho

ld i

nco

me

) R

en

t In

cre

ase

s V

\s p

er

ren

t re

stri

ctio

n

V\s

pe

r re

nt

rest

rict

ion

V

\s p

er

RT

A a

nn

ua

l in

cre

ase

To

tal

24

3

6

15

5 80

1

00

%

10

0%

• G

BL A

RC

HIT

ECTS

IN

C

139

EAST

BTH

AVEN

UE

VA

NCO

UV

ER, B

C CA

NADA

V5T

1 RB

TE

L 60

4 73

6 11

~ FA

X 60

4 73

1 52

7

CO

P\'R

IGfH

RE

SER

VE

O

THIS

/>LA

NA

NO

OES

IGN

AA

!:AN

OA

~AlL

TIM

ESR

EMA

IN'T

HE

EX

CLU

SIV

EP

RO

PE

RTY

OFG

SLA

RC

HIT

EC

TSIN

CA

NO

MA

YN

OT8

EU

SE

OO

R

REP

RO

OU

CED

WIT

flOU

TTH

EIR

WR

liTEN

CO

NSE

NT

NO

TES

DP

19-8

6669

0 P

lan#

l

May

5, 2

020

REV

ISIO

NS

NO.

DATE

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Rev

iew

PRO

JEC

T S

TATI

STI

CS

D

ATE

DR

AWN

BY

CH

EC

KE

D B

Y SC

ALE

JOB

NU

MB

ER

3/1

9/2

02

01

0:2

6:3

1 A

M

Aut

hor

Che

cker

1602

2

A-0

.01

Page 76: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

"'I/

30

·-1

9.4

m

SE

TBA

CK

' ' rin

~

' ' ' '

't,~

CH

ILD

RE

N'S

PLA

Y

AR

EA

!Ll)

-----------

~-------

I _

__

__

__

__

__

_ L

__

_ _

__

__

__

__

_

I

r ' ' ' ' ' ' ' ' ' '

f\(1

BO

ILE

R

RM R

OO

F

----

--

----

----

----

-

~., 'I

RO

OF

ACC

EO

1 't

,~~

ESS

TO M

'EC

HA

NIC

AL

UIP

ME

~T

:NL

Y

10

7'-

33

/8"

-...!o

't,·

32.7

m

14

4'-

7"

44.I

m

EXIS

TIN

G P

EDE

STR

IAN

/ CY

CLI

NG

PA

TH

'\.~

'),,·

-~

ELEV

ATO

R

OVE

RR

UN

R

OO

F

~

I

I

I I I I

I,.

2.37

' ' ' ' ' -----------

~ ' ~~

~·1

' ' ' ' -w

-----

~ "'!

> ? ·t?o

,D,,

\

\

v 2.

5(?

().,·

.~

/ g,

');

(j:j

~I,

/

16

'-5

"

5.0

m

SE

TBA

CK

\

\ \ \

i

RE

SID

EN

TIA

L E

NTR

Y

Q,'b

0 'l

q,½

'1,·

I ' I

' C)

I /

.. ~ --

----

0

\! ,\--

----G

)

I) >'/ / I !-

. 't-<

y,

-6.0

3

•! \ ---

0 ,-

--- \

. ..\ .,,,C

f, -i.

\>:

'\,·

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CA

NA

DA

VS

T 1R

8 TE

L 60

4 73

611!

:: FA

X 60

4 73

1 52

7

COPY

FIIG

HT

RES

ERV

ED,

THIS

PI..A

NA

NO

DE

SIG

HA

AE

AN

DA

T.IU

TIM

ES

RH

IAIH

iHE

EXCL

USI

VE

PRO

PER

lYO

FGB

LI.J

!CH

ITE

Cl'S

INC

.AN

OM

~V N

OT

BE

USE

D O

R R

EPR

OO

UC

EDW

ITH

OU

TTH

EIR

WR

ITTE

HC

ON

SEH

T

NO

TES

DP

19-

8666

90

Pla

n#

2 M

ay 5

, 20

20

REV

ISIO

NS

NO

. D

ATE

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

OP

App

licat

ion

OP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

SIT

E P

LAN

-E

NLA

RG

ED

D

ATE

D

RAW

N B

Y CH

ECK

ED B

Y SC

ALE

JOB

NU

MBE

R

3/19

/202

010:

28:2

7 AM

Aut

hor

Che

cker

1/8

"=1

·-o

·

1602

2

A-1

.00a

Page 77: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

I -. \ I I rA ~ \ 11

'-8

" 9

'-3

"

2.B

m

N

STA

IR #

3

----1

__

_ _..

1 U

P

-~

~ I

9'-

0"

I

j_ 2

.7m

I

--

1 I I

:..

E

I ~

t$(:

I

!<: ...

I --

--,

/ \''

I

--

___ /

---

-\~µ',--+

--H-~

-~

I \

\ I

---

1--

-' '

,,.,.--

:-.,....._

,'

26

cp D

-6

.0

I 12

5'-

10

"

23

'-6

" 2

3'-

6"

38.4

m

I 7.

2m

7.2

m

I

----

I I I

:,

::: ~

g: E

o

~j

I :;

SiC

SiC

Sic

SiC

;c

t$(:

I -

-)1

.~~

~

I I ~

E

46S

TA

LL

S

~ E

I

R:;;

19

SC

,1

HC

~

:;;

I I I I

VIS

ITO

R

VIS

ITO

R

) C

AR

SH

AR

E

CA

R S

HA

R f

~

,1 E

:;::-

E

~--t-

,--+-h

,._,,-

H-+--

----

-,--

o~tt

==

==

==

==

==

----

----

--=

==

=

~-

•;::J

1I ~

'"

I

I ,,

I '

/ is

,_:

I '

27

VIS

ITO

R

'-,

____

__.

/ \

2.5

m

20

'-5

"

6.2

m

---

-

. :~

~~

"' ,.

VISI

TOR

VISI

TOR

VISI

TOR

VISI

TOR

r-

L.J

-

I I 22

I

I 23

18' -

01/!

" 5

.5m

l I 24

I I I 1 's

I I I I I I I D

-6

.04

23

'-6

" 2

1i'-

9"

12' _

,.,.

7.2

m

7.5m

3.

Bm

--I

I I

I

:g :g

;g g:

Bir

RA

CK

S/4)

c~sj

SiC

SiC

SiC

SiC

.::3•

_, ..

13

.lm

-

-O

VE

RH

EA

D D

OO

R

SL

OP

E D

N 4

.8%

14

.5%

' '

VIS

ITO

R

VIS

ITO

R

VIS

ITO

R

VIS

ITO

R

:)Si

:)Si

:)Si

:)Si :..

E

~

:::: :£

:c'

~j

T-6

"

2.J

m

I I

I I

I I

I I

I I I

BIK

E S

TOR

AGE

(30)

I I I

I I

I I I

I

36.6

m

I I I I I I

I I I I I I

--

----

0

-~

--

~--

~---

--G

- /

I 7 I

-~ --

~ --

----

0

I y /--j-

-,,.-,--+

-12

ov E

LEC

TRIC

PLU

G-I

NS

I I I I

$ E

~

-:

'c'

N

18

'-1

1"

5.B

m

TO B

E P

RO

VID

ED

FO

R

ELE

CTR

IC B

ICY

CLE

S

C)

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AV

EN

UE

VA

NC

OU

VER

, BC

CA

NA

OA

V5T

1R

8 TE

L 60

4 73

6 11

~ FA

X 60

4 73

1 52

7

CO

l'YR

IGH

TRES

ERVE

0:T

HIS

PLA

NA

N00

ES

IGN

AR

£AN

0ATA

l.LTl

f.lE

SR

Et,1

JljN

THE

EX

CLU

SM

:PR

DP

ER

TY0F

GB

LAIIC

HIT

EC

TSIH

CA

N0t

,IAY

H0T

BE

US

E0O

R

NO

TES

DP

19-

8666

90

Pla

n#

3 M

ay 5

, 20

20

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

OP

Com

men

ts

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

P1 -

PA

RK

ING

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MB

ER

5/7/

2020

10:4

0:41

AM

Aut

hor

Che

cker

1/B

"=l'-

0"

1602

2

A-1

.01

Page 78: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

' ' \ __

____

, __ _

\ -,

\ /

',

,,/

\

30'-

11

"

SE

TBA

CK

6

'-8

1/2

"

AR

BO

UR

ABO

VE

•• _ ~

~---

----

---'c

--r"=

-s-

REF

ER T

O L

AN

DS

CA

PE

' ' ' '

' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '

\ \ \ \ //\

'-,

' ,'

--,

----

\ _

--

---

.J. ~ -

----

--

-

' ',"{

-,, __

____

____

___ ),

\ ,,

,, ..

. ---------,.._

,, ~

I

' ' ' ' ' ' ' ' ' '

\/

EXIS

TIN

G T

REE

S\T

O

' /

I\

RE

MA

IN

\ X

,'

',,

\ ,,,

i ',

:

,,,,"

' V

l

__

,,.,

' '

' '

\,,,

,,

,//

' --

2

47

'-8

"

32

·.9

11

r 9

'-8

"

20

'-1

01

/2"

SE

TBA

CK

3

-6.0

4 5

6'-

97

/8"

41

'-1

0"

145'

-t:

.~

-~ --

--------

-----

-----

------------~

J~

------

' \

I -

-·y

-r

HM

:>0

RAR

YP

AAK

tNG

IPIC

:,(-U

P/!l

R0

?-0

FFI

-S

IGN

T0B

EP

0ST

E0

IN0

IC.-_

TIN

GN

0 ?A

R-<

l"IG

OU

RIN

GW

.UT

EC

OLL

EC

TIO

Nf-

lOU

RS

__

_j _

_ ~

I

,../

.J

\ ',

) 1

.7"st1

. q.

oo\t

/C

HIL

DR

EN

'SP

LAY

AR

EA

\

\ . ._ r·

~::;:

::::;:

::::':

±::;:

::::;:

::::;:

::::;:

::::;:

:::::

;,i;;

,:,j;

:,l[f

u::;:

::::;:

::::;:

::::;:

::::;:

::::;:

::::;:

::::;:

::+:::

::;:::

::/i;,

-Zj1

,:14

"'

11 R

EFER

TO

LA

ND

SC

AP

E

' -

-·~

--;?

j" 16

' -8"

25

' -O"

f--

.._ _

_ O

RA

WIN

GS

\!J

5.1

m

7.6

m

l 1.

--

OV

ER

HE

AO

I

DO

OR

BELO

W

I 14

.5%

,__ _

__

_ s_,o_

e_,_o_

N_s._o

•_• _

_ ~

E

R~

-P

AR

KA

DE

EN

TRY

RA

MP

\

\ \ ' ' I f

_J

L

----,

/

I I I

73

'-3

1/2

"

7

i 1DIO-

A11';

454S

F _

_..,,

1i,1,_.

,j

..._

_ .1

45

2SF

17

'-8

3/4

"

2.1%

BIK

E R

AC

KS

(12

1 C

LAS

S 2

,

i D

I

32

'-6

"

C)

18' -

11"

SE

TBA

CK

5

·6.0

1

15'-

11"

4.9

m

~;::

r-----

6

l--1

5·-

(4.6

ml C

LEA

R

I B

ELO

W O

VE

RH

AN

G

I I

t 9

'-0

"w x

<-O"

h 0/H

DO

OR

I I

I I

LOA

DIN

G

,.

I I

I I

I-B

UIL

DIN

G O

UT

LIN

E A

BO

VE

-6

.0

I L

_

__

_ _

I , _

__

__

__

_

~ 7

B

8

,__

DN

9 5.

0%

10

0

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AV

EN

UE

VA

NC

OU

VER

. BC

CA

NA

OA

V5T

lRB

T

EL 6

0.1; 7

36 1

1~

FAX

60t;

731

527

CO

PYR

IGfH

RES

ER\rE

O:T

HIS

PL.A

NA

NO

OES

IGN

AA

EN'IO

,U,1.

1.LTI

MES

REM

,I.IN

HIE

EX

CU

JSfV

EPR

OPE

RTV

OFG

BL,

t..R

CH

ITEC

TSIN

C..i.

NO

MA

YN

OT

8EU

S€00

R

REPR

OO

UCE

OW

ITHO

UTT

HEI

RWRI

TTEN

CO

NSE

NT

NO

TES

DP

19-

8666

90

Pla

n#

4 M

ay 5

, 202

0

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03

-19

DES

CR

IPTI

ON

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

LEV

EL 1

DAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

04:5

7:07

PM

Aut

hor

Che

cker

1/8

":l'-0

"

1602

2

A-1

.02

Page 79: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-6.0

30

'-11

1/1

."

,-----

-----

' I ' I I \ ' \ ' ' \ ' ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \

\ \ \

\ \ \

2 3

4

47

'-B

" 5

6'-

97

/8"

41

'-1

0"

14

7'-

97

/8"

16

'-S

"

----

----

----

----

----

----

----

----

----

----

----

----

----

----

6'-

r

\ ' ' \

' ' \ ' '

t.9

'-2

"

32

'-9

" 9

'-8

"

BALC

ONY.

7 I __

_J

I '

,~--

I

"JA

NIT

OR

'S C

LOSE

T L3

& 5

, 7

UN

IT S

TOR

AGE

L 2,

4. 6

I

L

-.J

, L

56

'-3

"

56

'-3

*

BA

LCO

NY

I I I

L

8'-

10

" 1

2'-

G"

BA

LCO

NY

B

ALC

ON

Y

i _j

'

! ----

r

8'-

10

" 12

'-4

" 8

'-1

0"

-r ---------

42

'-5

"

36

'-5

"

~

774S

F

29

'-9

"

c ~ ,

7 I

I L,

6'-

0"

' B

AL

q•N

Y

6'-

0"

b

I I

'---

----

----

--_

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

J

C)

5

-6.0

1

6

-6.0

7 8

-6.0

3

9 10

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E V

AN

CO

UV

ER,

BC

CA

NA

DA

VST

lRB

TEL

604

7361

1!:

FAX

604

7315

27

COPY

RIGH

T R

ESER

VED

: IH

ISPL

.AN

AH

OO

ESIG

HA

AE.

I.NO

Al

All

TIM

ESR

EM.IJ

N T

HE

EXC

LUSI

VE P

RO

PE

RTY

O~G

9Ll>

RC

HIT

EC

TSIN

C . .

1.N

DM

AYN

OT

BE U

SED

OR

REP

RO

OU

CED

WlT

HO

UT

THEI

RW

R!T

TEN

CO

NSH

IT

NO

TES

DP

19-8

6669

0 P

lan#

5

May

5, 2

020

REV

ISIO

NS

NO.

DAT

E D

ESC

RIP

TIO

N

1 D

ate

1 Re

visi

on 1

1

2019

-06-

28

DP

App

licat

ion

2 20

20-0

2-18

D

P C

omm

ents

3

2020

-03-

19

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rogr

ess

Revi

ew

LEV

EL

2-5

DAT

E D

RA

WN

BY

CH

EC

KE

D B

Y S

CA

LE

JOB

NU

MB

ER

J/19

/202

010:

28:J

SAM

Aut

hor

Che

cker

1/8"

=1'

-0"

1602

2

A-1

.03

Page 80: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-6.0

1

-6.0

L6

30'-

111/

t."

,------

----

' I ' I I \ I \ ' ' \ ' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ;s N \ \

\ \ \

\ \ \

2 3

47

'-8

" 5

6'-

97

/8"

41

'-1

0"

14

7'-

97

/8"

16

'-5

"

----

----

----

----

----

----

----

-1--

----

----

----

----

----

--

\ ' ' '\

' ' ' ' '

49'-

2"

56

'-3

" t.

2'-

5"

32

"-9

"

I ~

~~

~

,-7

L

12

'-4

"

U'1

'-"

D

<---

0-

a:i

~

E:::.

E

E

ro

"' N ~

~

:r:

:r:

(')

(')

w

w

:r:

:r:

56'-

3"!

l I

· I illim

i~:::i

ll l.i5

51F

' I I,

36'-

5"

BALC

ON

Y

~

992S

F

lsru

o10-

~l

I 459

.~/-U-"

8'-

10

" 2

9'-

9"1

5'-

9"

5·.

11

5•.

3•

I

- ~

I I

'----

----

-..:.

---

---------

t---

----

----

----

----

----

----

-__

_;,

__ J

-6.0

4

C)

5

-6.0

1

6

"' i:J

-6.0

7

1,.. ~

8

,_

-6.0

3

9 10

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

. BC

CA

NA

DA

VS

T 1R

8 TE

L 60

4 73

611E

FA

X 60

4 73

1527

COPY

RIGH

T R

ESER

VED

: TH

ISPL

A.N

AN

OO

ESIG

NA

AEA

NO

AT

.Ill

TIM

ES R

EM.I.I

N T

HE

EXCl

US

IVE

PR

OP

ER

TV0F

G8L

llFIC

HIT

ECT

SIN

C .

.,,,0

MA

VN

0T

BE

USE

0Oll

REP

!IOO

UC

EOW

IHtO

UT

TliE

IRW

RIT

TEN

CO

NSE

NT

NO

TES

DP

19-8

6669

0 P

lan#

6

May

5, 2

020

RE

VIS

ION

S

NO.

DAT

E DE

SCRI

PTIO

N

2019

-06-

28

DP

App

licat

ion

2020

-02-

18

DP

Com

men

ts

2020

-03-

19

AD

P C

omm

ents

549

1 N

o 2

Rd

DP

-P

rog

ress

Rev

iew

LEV

EL 6

DAT

E D

RA

WN

BY

CH

EC

KE

D B

Y S

CA

LE

JOB

NU

MB

ER

3/19

/202

010:

28:3

7AM

Auth

or

Che

cker

1/8

"=1

'-0

"

1602

2

A-1

.04

Page 81: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

-6.0

30

'-1

\"

9.t

.m

-,

SE

TBA

CK

----

' --

"' "'

---

Eu

---

;~~I ' I \ ' \ ' ' \ \

RE

QU

IRE

D

MIN

. S

ETB

AC

K

\

\ \ \

\ \ \ \ \ ~' ~ '

o

\ -;

?,

\

\ ' ' \ ' ' '\

--- -

----

----

3

--

I --

----

r----

----

----

I ------

' --

----

-

' ;---

--=-

-' ' ' ' ' ' ' ' '

RO

OF

AC

CE

SS

TO

M

ECH

AN

ICA

L E

QU

IPM

EN

T O

NLY

IMEC

H. R

OOM

I t.8

6SF

FLU

ID C

OO

LER

S

--,0

7'-

31

/2"

-----

32

.7m

14

4'-

7"

r:RO

OF

ACC

ESS

HAT

CH

0-, l

i L.

'.:l~

85' -

3 5/

8"

26

.0m

4

16

'-5

"

S.0

m

SE

TBA

CK

--7

I I I I i,_."

_, :-: i~'''-----

--

I 6

.0m

R

EQ

UIR

ED

SE

TBA

CK

I I I I I I I I I

C)

5 6 7

'>l

i'2

8 9 10

DP

19-

8666

90

Pla

n# 7

M

ay 5

, 20

20

RE

VIS

ION

S

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

OP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

R

. ev

1ew

ROOF

DA

TE

DRA

WN

BY

CH

ECK

ED B

Y SC

ALE

JOB

NU

MB

ER

3/19

/202

010:

t.1:0

4Afv

l

Aut

hor

Che

cker

1/8

"=\'

-0"

1602

2

Page 82: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

PL

31

'-1

3/4

"

9.5

m

--

--

--

--

---

MAX

. 18

m H

EIG

HT

I -------------

-1

--

~..

.b,,

~--

--I--

--J--

----

l---

---l

----

--l-

----

l---

---,b

....b

...,.W

I I

--

----------------r-----------

-r--

--

~~

~-~

-~~

~=

~---------

----------=

i--=

--=

-----------------=

-=

r~

------

-6.0

4

MA

TER

IAL

LEG

EN

D

# D

esc

ript

ion

Col

our

01

Cem

ent

Pane

l -

Oko

Ski

n li

quid

Bla

ck

02a

Cem

ent

Pan

el -

Har

die

Pane

l li

ght

Mis

t

02b

Cem

ent

Pan

el -

Har

die

Pan

el

Nio

ht G

rey

03

Cem

ent

Pane

l So

ffit

-H

ardi

e P

anel

C

edar

Ton

e

04

Gla

zin

g/

Vin

yl F

ram

e C

lear

/ Whi

te F

ram

e

05

Bal

cony

Doo

r w

Gla

zed

Pan

el

Cle

ar/ W

hite

Fra

me

06

Sto

refr

ont

Gla

zing

C

lear

/Wh

ite

Fra

me

07

Gla

zed

Gua

rd R

ail

Cle

ar/

Fro

sted

/ Alu

m.

Fra

me

DB

Gla

zed

Pri

vacy

Scr

een

O

paqu

e W

hite/

Alu

m.

Fra

me

09

Arc

hite

ctu

ra!C

oncr

ete

Nat

ura

l

10

RTU

Scr

een

-M

etal

Lou

vers

Li

ght

Gre

y

C)

RO

OF

~

22

.94

m

L6~

19

.89m

L5~

1

6.8

4m

~ E

L4

~

Not

es

13.7

9m

L3~

10

.74

m

L2~

7.

70m

L1

,, .. _

9"

4.50

m

Ll_

:_Lo

bby

~

3.9

1m

12

.03 n

3.67

m

Hor

izon

tal

[180

0mm

x 1

47m

m)

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAS

T 8

TH A

VE

NU

E

VA

NC

OU

VE

R,

BC C

AN

AO

AV

ST

1R8

TEL

6047

3611

~ FA

X 60

4 73

1 52

7

COPY

RIG

HTR

ESER

VEO

, TH

ISPL

AN

.t..N

OO

ESIG

NA

REA

NO

AT

AllT

IME

SRE

M.IJ

NTH

E EX

ClU

SIV

EPR

Ol'E

RT'

t'OFG

BLA

RC

HIT

ECTS

JNC

. .t..

NO

MA

YN

OTB

EUSE

OO

R

REP

RO

OU

CEO

WIT

HOUT

THE

IRW

RIT

TEN

CO

NSE

NT

NOT

ES D

P 1

9-86

6690

P

lan#

8

May

5, 2

020

REV

ISIO

NS

N

O.

DA

TE

2019

-06-

28

2020

-02-

18

2020

-03-

19

DESC

RIP

TIO

N

DP

App

licat

ion

OP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Rev

iew

NO

RTH

ELE

VA

TIO

N

DA

TE

DRA

WN

BY

CH

ECK

ED B

Y SC

ALE

JOB

NU

MB

ER

3/19

/202

010

:29:

0BA

M

Emil

yB

Chec

ker

As

indi

cate

d

1602

2

A-2

.01

Page 83: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

r cp r

cy cp

-6.0

3

8 S.a

1 .2

6.f6

rnfr

11

-IT

I I

b

-IJ- , I I

---

---

---

--

-6.0

-6

.03

ROOFC

\ 2

2.9

4m

L6~

1

9.8

9m

LS~

1

6.8

4m

L4~

13

.79

m

LJ~

1

0.7

4m

L2~

7

.70

m

L1

14' -

9"

4.5

0m

_ll-L

ob

by ~

3.9

1m

Fin

.Sit

e 12

.03

ft G

rade

Ele

v.

3.67

m

MA

TE

RIA

L L

EG

EN

D

# D

escr

ipti

on

01

Cem

ent

Pan

el -

Oko

Ski

n

Col

our

Liqu

id B

lack

02a

Cem

ent

Pan

el -

Ha

rdie

Pan

el

Lig

ht

Mis

t

02b

Cem

ent

Pa

ne

l -H

ard

ie P

an

el

NiQ

ht G

rey

03

Cem

ent

Pane

l Sof

lit -

Har

die

Pan

el

Ced

ar T

one

04

Gla

zing

/V

inyl

Fra

me

Cle

ar /

Wh

ite

Fra

me

05

Bal

cony

Doo

r w

Gla

zed

Pan

el

Cle

ar /

Wh

ite

Fra

me

06

Sto

rerr

ont

Gla

zing

C

lear

/ Whi

te F

ram

e

07

Gla

zed

Gua

rd R

ail

Cle

ar/

Fro

sted

/ Alu

m.

Fra

me

08

Gla

zed

Pri

vacy

Scr

een

O

paqu

e W

hit

e/ A

lum

. F

ram

e

09

Arc

hit

ectu

ralC

on

cret

e N

atur

al

10

RTU

Scr

een

-M

etal

Lou

vers

Li

ght

Gre

y

No

tes

Hor

izon

tal

[180

0mm

x 1

47m

m)

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CA

NA

DA

VST

lRB

TE

L 60

4 73

6 11

~ FA

X 60

.G 7

31 5

27

COPY

RIG

HT

RESE

RVEO

:TH

ISPU

.NA

NO

OE.

51G

NA

AEA

NO

ATA

l.LTI

ME.

5REM

AIN

HIE

EX

CLU

SIV

EPRO

PERT

YO

FGBL

ARC

MIT

ECTS

IMC.

A.N

OM

AV

NOT

BEU

SEO

OR

RE

PRO

OU

CEO

WIT

MOU

TTH

EIRW

R1n

rnco

NS

EN

T

NO

TES

DP

19-

8666

90

Pla

n# 9

M

ay 5

, 202

0

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP A

pplic

atio

n D

P C

omm

ents

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rog

ress

Rev

iew

WES

T E

LEV

ATI

ON

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

010:

29:2

8AM

Aut

hor

Che

cker

As

indi

cate

d

1602

2

A-2

.02

Page 84: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

IWIT

HIN

~:;,~

:~~E

;GR

~~-

---Plf

-___ [

_ :.______

_____ _____

J_ _____

_ _7-f

_______ o/

____ :°' ___

______

______

~L

-1

I ,,.

_,-·1

[,o

l _8

_ 01

3

5'-

03

1"'

3.

4m

I l-

10.7

m

----

----!~

' 11

I I

----

---

-I+

---

! I ~ E

! I -----

~,j1

t-l 11

I I

__

__

_ _

I_

-6.0

A

-6.0

1

!a !a !a b !a !a :., !a

RO

OF

~

22.9

4m

L6~

19.8

9m

LS~

16

.84

m

L4~

13

.79

m

L3~

10

.74

m

l2~

7.70

m

L1

14' -

9"

45

~

Ll_

:Lob

bt f:.i

. :..lQ::.

.......

3.91

m

Fin

.Sit

e 12

.Qlf

c G

rade

Ele

v.

3.67

m

C)

MA

TER

IAL

LEG

END

# D

escr

ipti

on

Col

our

No

les

01

Cem

ent

Pan

el -

0ko

Skin

li

quid

Bla

ck

Hor

izon

tal [

1800

mm

x 1

,Hm

m)

02a

Cem

ent

Pan

el -

Har

die

Pan

el

lig

ht

Mis

t

02b

Cem

ent

Pan

el -

Har

die

Pan

el

Nig

ht G

rey

03

Cem

ent

Pan

el S

offit

-H

ardi

e Pa

nel

Ced

ar T

one

04

Gla

zing

/ Vin

yl F

ram

e C

lear

/ Whi

te F

ram

e

05

Bal

cony

Doo

r w

Gla

zed

Pan

el

Cle

ar/ W

hite

Fra

me

06

Sto

refr

ont

Gla

zing

C

lear

/ W

hite

Fra

me

07

Gla

zed

Gua

rd R

ail

Cle

ar/

Fro

sted

/ Alu

m.

Fra

me

08

Gla

zed

Priv

acy

Scre

en

Opa

que

Wh

ite/

Alu

m.

Fra

me

09

Arc

hite

ctur

al C

oncr

ete

Nat

ural

10

RTU

Scr

een

-M

etal

Lou

vers

Li

ght

Gre

y

• G

BL A

RC

HIT

EC

TS

INC

.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CA

NA

DA

VS

T 1

R8

TEL

604

736

11~

FAA

604

731

521

COPY

RIG

HT

RESE

RVED

: TH

ISPL

.AN

AN

OO

ESjG

NA

REA

ND

AT

ALL

TIM

ESRE

MA

INTH

E EX

CLU

SIV

EPR

OPE

RT'

l'DFG

BLA

RC

HIT

ECTS

INC

.AN

DM

AV

ND

TBEU

SED

OR

RE

PRO

DU

CED

WIT

HD

UTT

HEI

RW

RIT

TEN

CD

NSE

NT

NO

TES

DP

19-8

6669

0 P

lan#

10

May

5, 2

020

REV

ISIO

NS

NO

. D

ATE

2019

-06-

28

2020

-02-

18

2020

-03-

19

DE

SCR

IPTI

ON

DP

App

(icat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

EAST

ELE

VA

TIO

N

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

0 10

:29:

48A

M

Aut

hor

Che

cker

As

indi

cate

d

1602

2

A-2

.03

Page 85: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

: -______

________

_______

-~ __

________

_______

~ _______

________

___ -C

f)-_____

_____ -~

~~si~~.":~~~o ,

ROI 10

I

i~:\~

1_

16

·-s·

F""

--------------'-+

---

_.,

0-m

----+

------

;..

I 1--

I I f !a

I ,-----

I b

I I !a

I -------,-

;'!

E

!a ~"

' s

i:2 ~

E

---

----I-

00"'

!;; ,l

,--

I r

MA

TER

IAL

LE

GE

ND

# D

escr

ipti

on

Col

our

RO

OF

~

22

.94

m

L6f::

\ 1

9.8

9m

LS~

1

6.8

4m

l4 f::

\ 13

.79m

LJ~

10

.74

m

L2~

7.

70m

l1

14

'-9

" 4.

50m

LI-

lob

by

~

3.9

1m

Fin.

Sit

e 12

.03 ~

Gra

de E

lev.

3.

67 m

Nol

es

C)

01

Cem

ent

Pan

el -

Oko

Ski

n li

quid

Bla

ck

Hor

izon

tal

(180

0mm

x 1

47m

m)

02a

Cem

ent

Pan

el -

Har

die

Pan

el

Lig

ht M

ist

02b

Cem

ent

Pan

el -

Har

die

Pan

el

Nig

ht G

rey

03

Cem

ent

Pan

el S

offi

t -

Har

die

Pan

el

Ced

ar T

one

04

Gla

zing

/ Vin

yl F

ram

e C

lear

I W

hite

Fra

me

05

Bal

cony

Doo

r w

Gla

zed

Pan

el

Cle

ar/W

hit

e F

ram

e

06

Sto

refr

ont

Gla

zing

C

lear

/ Whi

te F

ram

e

07

Gla

zed

Gua

rd R

ail

Cle

ar/

Fro

sted

/ Alu

m.

Fra

me

OB

Gla

zed

Pri

vacy

Scr

een

O

paqu

e W

hit

e/ A

lum

. F

ram

e

09

Arc

hite

ctur

alC

oncr

ete

Nat

ural

10

RTU

Scr

een

-M

etal

lo

uv

ers

lig

ht

Gre

y

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAS

T 8

TH A

VE

NU

E

VAN

CO

UVE

R,

BC C

AN

AD

A V

ST 1

R8

TE

L604

7361

1E

FAX

604

731

527

CO

PYR

IGH

TRES

ERVE

O:

THIS

PU

.NA

NO

OE

SIG

NA

RE

AN

O,U

ALL

TIM

ESR

EM,iJ

NTH

E EX

CLU

SI\IE

PRO

PER

TYO

FGB

LAR

CH

ITEl

;l'S!

NC

.AN

DM

AV

NO

TBEU

SED

OR

R

EPR

OO

UC

EOW

HH

OV

TTH

EIR

WR

ITIE

NC

ON

SEH

T

NO

TES

DP

19-

8666

90

Pla

n#

11

May

5, 2

020

REV

ISIO

NS

NO

DA

TE

DES

CR

IPTI

ON

2019

-06-

28

OP

App

licat

ion

2020

-02-

18

OP

Com

men

ts

2020

-03-

19

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

SOU

TH E

LEVA

TIO

N

DAT

E D

RAW

N B

Y

CH

ECKE

D B

Y SC

ALE

JOB

NU

MB

ER

3/1

9/20

2010

:30:

10A

M

Aut

hor

Che

cker

As

indi

cate

d

1602

2

A-2

.04

Page 86: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

CE

ME

NT

PA

NE

L JA

ME

S H

AR

DIE

PA

NE

L Li

ght

Mis

t

GU

AR

DR

AIL

S/ H

AN

DR

AIL

S

Alu

min

um

CE

ME

NT

PA

NE

L JA

ME

S H

AR

DIE

PA

NE

L N

ight

Gre

y

VIN

YL

WIN

DO

WS

& D

OO

RS

Cle

ar g

lazi

ng

/ whi

te f

ram

e

CE

ME

NT

PA

NE

L O

KO S

KIN

Li

quid

Bla

ck [

vary

ing

text

ures

) H

oriz

onta

l [18

00m

m x

147

mm

)

LOB

BY

WIN

DO

WS

& D

OO

RS

Sto

refr

on

t G

lazi

ng

Cle

ar G

lazi

ng

/ Whi

te F

ram

e

~----

CEM

EN

T P

AN

EL

SO

FFIT

-W

OO

D T

ON

E

=1-------

CEM

EN

T P

AN

EL

-LI

GH

T M

IST

------

CE

ME

NT

PA

NE

L -

OK

O S

KIN

-----~

STO

RE

FRO

NT

GLA

ZIN

G

-AR

CH

ITE

CTU

RA

L C

ON

CR

ET

E

BA

LCO

NY

PR

IVA

CY

SC

RE

EN

A

lum

fra

me

with

Opa

que

Gla

ss

.-+

----

CE

ME

NT

PA

NE

L -

LIG

HT

MIS

T

(AC

CE

NT

RE

VE

AL

PA

TTE

RN

}

Fll

--+

-f-

-+--

+--

--1-

--

1-1

-II

H!t

<L

JJ--

-;f-

--C

EM

EN

T P

AN

EL

SO

FFI

T -

CE

ME

NT

PA

NE

L S

OFF

IT

JAM

ES

HA

RD

IE P

AN

EL

Tru

eGra

in S

erie

s -

Ced

arto

ne

PLA

NTE

RS

& R

ETA

ININ

G W

ALL

S

Arc

hite

ctu

ral C

oncr

ete

WO

OD

TO

NE

WO

OD

EN

TRY

CO

LUM

NS

W

ood

-to

mat

ch s

off

it

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAS

T 8

TH A

VEN

UE

VAN

CO

UVE

R,

BC C

ANAD

A VS

T 1R

8 TE

L 60

4 73

611:

: FA

X 60

/4 73

1 52

7

CO

PYR

IGH

TR

HE

RV

EO

:Tlil

SPL

AN

AN

DD

ES

IGN

AR

EAH

O.I.

TAL.

LTIM

ESRE

M,1

,!NTH

E E

XC

llJS

IVE

PR

OP

ER

TYO

FGB

LAR

CH

ITE

ClS

INC

.AH

OM

AY

NO

TB

EU

SE

DO

R

NO

TES

DP

19-

8666

90

Pla

n#

12

May

5,

2020

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Revi

ew

MA

TER

IALS

DAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

010:

27:0

iiAM

Aut

hor

Che

cker

1602

2

A-0

.03

Page 87: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

MA

X.1

4m

HE

IGH

T~

cp (W

ITH

IN 2

6m O

F N

O.

2 RD

)

r---

----

----

----

----

----

----

----

----

---

----

----

----

----

----

----

-,

PL

I 16

'-

5"

I :

:

I I I

___

_ _

L_

I I _

__

__

_ _

l_

__

I I

----+

--

I I I

__

I

-

I I I -----1

-

I

----+

-

5.0

m

RE

Q'0

6m

S

ETB

AC

K

I I I

I :

fcp

I I

-__

I __

____

____

__ ,

I

PL

I

29

'-1

3/8

"

8.9

m

--

--

--

--,--

MAX

. 18

m H

EIG

HT

I

I I

--

-'-

----

---

---

_J

l I

:----

REO

'D 6

m

I SE

TBA

CK

I I

----:-

------1

I I

n i

,, I

: "

f_-::_-

::_~-::_

-::_~-:

:_-=:,

':_-::_:

:'.-::_-

::_-::_-

::_-::_-

::_~-:=

--::_-:

:_-::_-

::_-::_;

'::.~';:_

-::_~-:

:_-::_-

::_-::_-

::_-::_-

::_-::_-

::_-::_-

=,'-::;H

I> --

'--1

:'1

--, --

---

D

-6.0

t.

I I:

) L

----

--7 ~

I I -6

.0

RO

OF

~

22.9

lim

L6~

19

.89m

LS~

16

.84

m

L4~

13

.79

m

L3~

1

0.7

4m

L2~

7

.70

m

L1

4.5

0m

!:_! -

Lobb

y ~

3.9

1m

Fin.

Sit

e 12

.03

ft

Gra

de E

lev.

3.

67

m

• G

BL

AR

CH

ITE

CTS

IN

C.

139

EAST

8TH

AV

EN

UE

V

AN

COU

VER

, BC

CA

NA

OA

VST

IRS

TE

L 60

4 73

6 11

~ FA

X 60

li 73

1 52

7

COPY

RIGH

TRE

SER~

EO:

iHIS

PUN

AH

OO

ESI

GN

/III

EA

NO

AT

.lllT

IMES

REM

AjN

lliE

E

XC

WS

IVE

PR

OP

ER

TYO

FG9L

A.R

CH

ITE

CTS

IHC

.N-IO

M.l.

~HO

TBE

US

EO

OR

NOT

ES

DP

19-8

6669

0 P

lan#

13

May

5, 2

020

REV

ISIO

NS

N

O.

DA

TE

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

OP

Com

men

ts

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

SE

CTI

ON

A

DA

TE

DRA

WN

BY

CH

EC

KE

D B

Y SC

ALE

JOB

NU

MB

ER

3/19

/202

010

:30:

14A

M

Aut

hor

Che

cker

As

indi

cate

d

1602

2

A-6

.01

Page 88: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

tf I

~R

OO

F

I '

---

-2

2.9

4m

lo !'a

~L6

19

.89

m

0 !'a

(;;\

LS

16.8

4m

!'a

~L4

13

.79

m

' =

!'a

(:;;\ L

3 I

10

.74

m

I lo

=

I I

~L2

I

7.7

0m

~~

G2·-JQ

"\ L1

-Lo

~ -

: 3.

91

m

12.0

3~

F

in.

Site

3.

67 m

G

rade

Ele

v.

0.0

0m

', '- /

• G

BL

AR

CH

ITE

CT

S

INC

.

139

EA

ST

8TH

AV

EN

UE

V

AN

CO

UV

ER

, B

C C

AN

AD

A V

ST

1R

8

TEL

604

736

11~

FAX

60

4 73

1 52

7

NO

TES

DP

19-8

6669

0 P

lan#

14

May

5, 2

020

REV

ISIO

NS

NO

. D

ATE

2019

-06

-28

20

20-0

2-18

20

20

-03-

19

DE

SC

RIP

TIO

N

OP

App

licat

ion

DP

Com

men

ts

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rogr

ess

Revi

ew

SEC

TIO

N B

DAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SC

ALE

JOB

NU

MB

ER

3/1

9/2

02

01

0:3

0:1

9A

M

Au

tho

r

Che

cker

As

indi

cate

d

1602

2

Page 89: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

__

_ I _

_ _

--, I,

,-,--

32'

-10

7/8"

10.0

m

:-------

--------

--------

q:2----

--------

--------

--------

--------

v~~H

:~~."!~:~

o I;~

5.0m

I

ll--

cc--

--P

---+---c-----

;,=

=e.=

~=

~=

=~

~~

~=

!'_

_~

6=

a=

==

=-~

~------l--

1

::~~~~

; I

~~--

----~R-~1~--

--~,·~

~~

~~

t ___

__

l_

I

•~::

:==

==

::::

::::

~

=====m

=::::==

-i ==

====

::::::

:::~~

~~:::

::::::

:::::n~: 1

_ L _

__

_ +-

_ I]

I

m /

Ii

: SE

rt+

f-_-'"_~

_.___~_

-_-_-_

-+-'-'-

~---_-

_-_-_-

-:_-_-

_"'~--

-'_'-_

-_-'-_-_-

--'_~~

'---_-_

-_-_-_'

-_-_--

'~'---_~

_-_-'_

-_-_"

-_-'--_

-_-_-_

-_-_~

_-_---'

~"---~-f

-_-_-_'

-_-_~

~-'---

_-_-_-

_~_---'

_'-_=_-_

.__ __

____

_____

'-_-_

-_-_

~_-_~

_~.._1

-_---'.J...--

-jj --

---

--I -

; ~

11:7

HI

1 : '.

,_l-_"

'"_-'_'

--'_'-_

-_-_

-_+-

h-'--

_-_-

_-_-

_-_'-

-_-_-

'"~---

'_'-_-

_-'-_-

_'--'_

'-'-_-

_-_-

_-_-

_-'-_

-_--'-

_"-_

-_""-_-

_---'

_'-_-

_"-~-

'----_

-_-_

-_---

'_'-_

-_'-"

~---!+

'---_

-'-_-

_--'"_'-

'-_-_

-_-_

-_-"-

_--'_

'-_""-~-

--'--_

-_-_

-_-_

--'_-_-

_-_-'-_

-_--"_

'-"_,;

--,--_.

J...'---.-

--f'lf --

---

--1

--

m

i -

---+

--I

7 I ""

I

I ,-

,---

--,-

---=

-""~

~,,

.=--

~,,

.:::

;-~

~~~

~.;-~

~~~

--+

~-:

:Jf"

-_ _,

_[~I -~l

~I -~

:---I

: -1

----

-I

---

-

E :::i

ea

19.8

9m

16.8

4m

3 35

•.

3·•

10.7

4m

2~

7.70

m

"==-

=-==

'='-=

-==-

-=-c

==-=

-===

-==-

t==+

=c--

==c-

=-==

-=--

====

-=-=

=--=

-c==

-=-=

==-=

=-==

=-==

-=±=

c-=--_

=-=-=-

=-=-=-

=-=-=-

c:-=-=-

=-=---

=---=

--=---

=-=-

===-

±', +-

---

----

-j ---

-S=EA

=LE=

VE~L

~,.=o,

~m~

-6.0

12.0

3ft

3.67

m

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CAN

ADA

V5T

1 RB

TE

L6•4

7361

1!:

FAX

604

731

527

COPY

!IIGH

TRE

SEIIV

EO:

TtllS

PU.N

AN

OO

ESIG

NA

AE

.lNO

AT.l.

l.LTI

MES

REM

AlN

THE

EXC

WSI

VEPR

OPE

RTY

OFG

BLA

RC

HIT

EC

TSI

NC

..lN

OM

AY

ND

lllE

USE

OO

R

NO

TES D

P 1

9-86

6690

P

lan

# 1

5 M

ay 5

, 202

0

REVI

SIO

NS

NO

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP A

pplic

atio

n D

P C

omm

ents

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

SE

CTI

ON

C

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MBE

R

3/19

/202

010

:30:

25A

M

Aut

hor

Che

cker

As

indi

cate

d

1602

2

A-6

.03

Page 90: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

RO

OF

~

22.9

t;m

6 !:,

L6~

19

.89

m

!:,

LS~

16

.Bt;m

!:,

E

Lt;

~

£' 13

.79m

!:,

L3~

10

.7t;

m

!:,

L2~

7.7

0m

FUTU

RE

!.

,

DE

VELO

PM

EN

T !:,

' <>

PA

RK

ING

I

' ' I

' ' '

' '

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CA

NA

DA

VS

T 1R

B T

EL 6

0t;

736

11~

FA

X 60

t; 73

1 52

7

COPY

RIG

tH R

ES

ER

'IW:

THIS

PLA

N A

NO

OES

WN

,1,R

EANO

/>.T

/>.LL

Tl~

ES

REl

4.IJ

N T

HE

EX

CLI

JSI\/

EP

RO

PE

RTY

OFG

IIL.4

RC

HIT

EC

"ISIN

C..1

.N0t

,.1A

YN

OTl

!EU

SE

OO

R

RE

PR

OD

UC

EO

WIT

HD

UT™

EIR

WR

ITTE

NC

ON

SE

NT

NO

TES

DP

19-

8666

90

Pla

n# 1

6 M

ay 5

, 20

20

RE

VIS

ION

S

NO.

DAT

E

201

9-06

-28

2020

-02-

18

2020

-03-

19

OES

CR

JPTI

ON

OP

App

licat

ion

DP

Com

me

nts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

SEC

TIO

N D

DAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SC

ALE

JOB

NU

MB

ER

3/19

/202

010:

30:2

9AM

Aut

hor

Che

cker

As

indi

cate

d

1602

2

A-6

.04

Page 91: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

ALL

PLA

NT

S T

O B

E N

UR

SE

RY

GR

OW

N

ALL

PLA

NT

MA

TE

RIA

LS

AN

D L

AB

OU

R T

O C

ON

FO

RM

T

O T

HE

CU

RR

EN

T E

Ol'T

10N

OF

THE

CS

LA/C

LNA

ST

AN

DA

RD

S.

AL

L P

LAN

T M

AT

ER

IAL

TO

BE

IN

SP

EC

TED

PR

IOR

TO

DE

LIV

ER

Y O

N S

ITE.

C

ON

TR

AC

TOR

TO

AR

RA

NG

E F

OR

IN

SP

EC

TIO

N A

ND

MA

TE

RIA

L TO

AS

SE

MB

LED

IN

ON

E L

OC

ATI

ON

FO

R R

EV

IEW

.

IMP

OR

TE

D G

RO

WIN

G M

ED

IA S

HA

U. B

E A

SA

ND

Y L

OA

M O

R L

OA

MY

S

AN

O T

EX

TUR

E (

NO

LE

SS

TH

AN

50

% S

AN

D B

Y W

EIG

HTI

C

ON

TAIN

ING

4 A

NO

15%

OR

GA

NIC

MA

mR

(OR

Y W

EIG

HT

BA

SIS

).

GR

OW

ING

ME

DIA

SH

AU

. BE

FR

EE

FR

OM

SU

BS

OIL

.

WO

OD

IN

CLU

DIN

G W

OO

DY

PLA

NT

PA

RTS

. IN

VAS

IVE

AN

O N

OX

IOU

S P

LAN

T A

ND

TH

QR

R

EP

RO

DU

OB

LE P

AR

TS,

PLA

NT

PA

lHO

GE

NIC

OR

GA

NIS

MS

. O

RG

AN

IC O

R I

NO

RG

AN

IC

MA

TER

IALS

, TO

XJN

S.

STO

NE

S O

VE

R 3

0mm

(1.2

"). A

NY

DE

BR

IS A

NO

FO

RE

IGN

OB

JEC

TS.

IMP

OR

TE

D G

RO

WIN

G M

ED

IA S

HA

U. C

ON

FOR

M T

O A

NO

BE

TR

EA

TED

AS

PER

SE

CllO

N

6.2.

3 TO

6.2

. 7 IN

CLU

SIV

E O

F TH

E C

UR

RE

NT

ED

ITlO

N B

CLN

A S

TAN

DA

RD

S.

GR

OW

ING

ME

DIU

M S

HA

LL C

ON

FOR

M T

O L

EV

EL

1 "W

ELL

-GR

OO

ME

D"

AR

EA

S: L

OW

TR

AFF

IC L

AW

N A

RE

AS

, TR

EE

S A

ND

LA

RG

E S

HR

UB

S j

1 LIN

TA

BLE

T

-6,3

,5.1

OF

THE

C

UR

RE

NT

ED

ITIO

N O

F TH

E C

SL

NB

LN

A S

TAN

DA

RD

S}.

11 S

HA

LL P

OS

SE

SS

lH

E F

OLL

OW

ING

OU

Al.l

llE

TE

XT

UR

E-

"CO

AR

SE

GR

AV

EL

(LA

RG

ER

TH

AN

19m

m A

ND

SM

AL

LER

TH

AN

40m

m):

0-1

%

'ALL

GR

AV

EL

(LA

RG

ER

TH

AN

2m

m A

ND

St,,l

AL

lER

TH

AN

40

mm

): 0

.5%

·S

AN

O (

LAR

GE

R T

HA

N 0

.05

mm

AN

O $

MA

UE

R

TH

AN

2m

m):

50

-70

%

'SIL

T (l

.AR

GE

R T

HA

N 0

.00

2m

m A

ND

SM

AU

ER

TH

AN

0.0

5mm

): 1

0-25

%

'CLA

Y (S

MA

LLER

TI-I

AN

0.0

02m

m):

0-2

0%

'C

LAY

AN

O S

ILT

CO

MB

INE

D: M

AX

IMU

M 2

5%

OR

GA

NIC

CO

NT

EN

T: 3

-10

%

Acl

dit

yjp

H):

6.0

.7,0

DR

AIN

AG

E:

PE

RC

OLA

TIO

N S

HA

LL B

E S

UC

H T

HA

T N

O S

TAN

DIN

G W

ATER

IS

VIS

IBLE

60

M

INU

TES

AFT

ER

AT

LEA

ST

10

MIN

UTE

S O

F M

OD

ER

ATE

TO

HE

AV

Y R

AIN

OR

IRR

IGA

TIO

N.

MIN

IMU

M S

OIL

OEP

lH T

O B

E A

S P

ER

!A

BLE

T 6

.3.5

.5 O

F T

HE

CU

RR

EN

I E

Olll

ON

BC

LNA

S

TAN

DA

RD

S:

Ove

r pr

epar

ed

su

bg

rad

ew

he

reth

e

subs

oil d

rairi

s ra

p1c

ly

TRE

ES

(1

0m

2 P

ER

TR

EE

} 6

10

MM

(24

")

LAR

GE

SH

RU

BS

6

10

MM

(24

'1

GA

OU

NO

CO

VE

RS

30

0 M

M (

12")

LA

WN

-IRR

IGA

TED

15

0 M

M (

6')

LAW

N-N

OT

IRR

IGA

TED

lS

OM

M

(6')

Ove

r st

ruct

ure

s o

r w

he

re t

he

su

bso

il d

rain

s ?

OM

Y

75

0M

M\3

0')

61

0M

M(2

4')

22

5M

M(9

') 1

50

MM

(6')

225M

M(9

')

SO

IL D

EP

THS

'ML

L B

E C

HE

CK

ED

AT

TIM

E O

F S

UB

STA

NTI

AL

CO

MP

L£T

l0N

REv

'IEW

SO

IL F

OR

UR

BA

N A

GA

ICU

L TU

RE

PLO

TS IS

TO

BE

UR

BA

N G

AO

PR

OI/I

DE

D B

Y V

EA

ATI

::C.

OR

AP

PR

OV

ED

ALT

ER

NA

TIVE

. S

OIL

FO

R U

RB

AN

AG

RIC

ULT

UR

E A

RE

AS

IS T

O M

EE

T O

R

EX

CE

ED

TH

E G

UID

ELI

NE

S F

OR

CO

MP

OS

T Q

UA

UT

Y U

ND

ER

CA

NA

DIA

N C

OU

NC

IL O

F M

INIS

TCA

S o

r TI-t

E C

NVI

RO

NM

CN

T (C

CM

E).

CO

MP

OS

T IS

TO

BE

TES

TED

AN

O R

ES

ULT

S S

UB

MIT

TE

D T

O C

ON

SU

LTA

NT

PRIO

R T

O

DE

LIV

ER

Y T

O S

ITE.

BE

DS

TO

HA

VE

50M

U (

2' )

MU

LCH

LA

YE

R (

afte

r set

Uin

g) C

ON

SIS

TIN

G O

F O

RG

AN

IC

CO

MP

OS

TE

D B

AR

K A

PP

LIE

D.

PLA

NTI

::D A

RE

AS

TO

HA

VE

PE

RM

AN

EN

T H

IGH

EFF

ICIE

NC

Y IR

RIG

ATI

ON

SY

ST

I::M

. SH

OP

D

RA

WIN

GS

AR

E T

O B

E P

RE

PA

RE

D B

Y A

N I

AB

C C

ER

TIFI

ED

DE

SIG

NE

R A

NO

AP

PR

OV

ED

BY

LA

ND

SC

AP

E A

AC

Hll

EC

l.

CO

NTR

AC

TOR

TO

PR

OI/I

OE

MA

INTE

NA

NC

E F

OR

1 Y

EA

R F

OU

.OW

ING

SU

BS

TAN

TIA

L C

OM

PLE

TlO

N.

CO

NTR

AC

TOR

TO

PR

OV

IDE

WR

ITTE

N 1

YE

AR

WA

RR

AN

TY

ON

PLA

NT

MA

lcR

lAL

CO

NTR

AC

TOR

TO

PR

OV

IDE

CO

PY

OF

SO

IL T

ES

T TO

LA

ND

SC

AP

E C

ON

SU

LTA

NT

3 W

EE

KS

P

RIO

R T

O D

ELI

VE

RY

ON

-SIT

E.

TES

T TO

BE

PE

RFO

RM

ED

BY

AN

IND

EP

EN

DE

NT

LA

B A

ND

IS

TO

IN

CLU

DE

RE

CO

MM

EN

OA

llON

S F

OR

BO

TH L

AW

N A

ND

PLA

NTI

NG

BE

DS

.

CO

NS

UL T

AN

T T

O A

PP

RO

VE

SO

IL B

EFO

RE

IN

STA

LLA

TIO

N.

THIS

DO

ES

NO

T PR

EC

LUD

E

THE

CO

NS

ULT

AN

T FR

OM

PE

RFO

RM

ING

AN

IN

DE

PE

ND

EN

T S

OIL

AN

ALY

SIS

AT

TIM

E O

F S

UB

STA

NTI

AL

CO

MP

LETI

ON

. C

ON

TRA

CTO

R W

ILL

BE

RE

SP

ON

SIB

LE F

OR

RE

MO

VA

L A

ND

R

EP

LAC

EM

EN

T O

F S

OIL

li-l

AT D

OE

S N

OT

ME

ET

SP

EC

IFIC

ATI

ON

S A

l N

O E

XTR

A C

OS

T TO

C

LIE

NT.

CO

NTR

AC

TOR

TO

PR

OV

IDE

WR

ITT

a.11

YE

AR

WA

RR

AN

TY

ON

SO

IL S

PE

CIF

ICA

TIO

NS

.

AN

IND

EP

EN

DE

NT

SO

IL lc

ST

TO B

E PR

OV

IDE

D 1

WEE

K P

RIO

R T

O E

NO

OF

1 Y

EA

R

WA

RR

AN

TY P

ERIO

D C

ON

TRA

CTO

R T

O P

AO

I/ID

E S

OIL

AM

EN

DM

EN

TS T

O B

RIN

G S

OIL

UP

TO

Q

UA

LITY

RE

CO

MM

EN

DE

D I

N

SO

ILS

RE

PO

RT,

SIT

E I

NS

PE

CT

ION

E

XA

MIN

E E

XIS

TIN

G S

UB

GR

AO

E C

ON

DIT

ION

S A

NO

SIG

NIF

Y A

CC

EP

TAN

CE

IN

WR

iTIN

G T

O

THE

CO

NS

UL T

AN

T.

AS

CE

RTA

IN T

HE

SIZ

E A

NO

LO

CA

TIO

N O

F A

U. E

XIS

llNG

SE

RV

ICE

S A

NO

SU

BG

RA

DE

S

PR

IOR

TO

TH

E W

OR

K.

IMM

ED

IATE

LY

RE

PA

IR D

AM

AG

E R

ES

ULn

NG

FR

OM

FA

JLU

RE

TO

EX

ER

CIS

E S

UC

H

PR

EC

AU

TIO

NS

AT

NO

CO

ST

TO T

HE

OW

NE

R.

AU

. PR

UN

ING

TO

BE

IN A

CC

OR

DA

NC

E 'M

TH

TH

E B

CLN

A/B

CS

LA S

TAN

DA

RD

S C

UR

RE

NT

ED

lllO

N.

PLA

NT

CO

UN

TS

IN

lH

E C

AS

E O

F A

NY

DIS

CR

EP

AN

CY

BE

TWEE

N P

L.AN

T C

OU

NTS

ON

PLA

Nl

US

T A

ND

P

LAN

T S

YM

BO

LS O

N D

RA

WIN

G.

THE

OR

A\-V

ING

S T

AK

ES

PR

EC

ED

EN

T. T

HE

CO

NTR

AC

TOR

IS

TO

VE

RIF

Y A

LL P

LAN

T C

OU

NTS

AN

D N

OTI

FY C

ON

SU

L TA

NT

OF

AN

Y D

ISC

RE

PA

NC

Y.

S,R

O F

RIE

ND

LY P

L.A

NT

lNG

P

LAN

TS

TH

AT

EN

AB

LE 8

1RD

-FR

IEN

DL

Y H

AB

ITA

T C

ON

SE

RVA

TIO

N A

ND

PR

OM

OTl

ON

HAV

E B

EE

N S

ELE

CTE

D A

ND

CA

N B

E F

OU

ND

li-l

AD

UG

HO

UT

THE

LA

ND

SC

AP

E.

PLA

NT

ING

IS

G

RO

UP

ED

IN N

AT

UR

ALI

ZE

D L

AY

ER

S O

F T

RE

ES

. TA

LL S

HR

UB

S

LOW

SH

RU

BS

AN

O

GR

OU

NO

CO

VE

RS

, l,II

MIC

KIN

G T

HE

ID

EAL

ENV

IRO

NM

EN

TA

L C

ON

DlT

ION

S F

OR

BIR

OS.

T

HE

SE

LA

YE

RS

Vvl

LL B

E V

ARIE

D W

TH

A D

IVE

RS

ITY

OF

TE

XT

UR

ES

AM

O D

EN

SIT

IES

TH

AT

A

TT

RA

CT

S A

ND

PR

OT

EC

TS

MA

NY

BIR

O S

PE

CIE

S.

SP

EC

IFIC

LO

CA

L A

NO

NO

N-IN

VA

SIV

E

PLA

NT

SP

EC

IES

HA

VE

BE

EN

SE

LEC

TE

D B

AS

ED

ON

TH

EIR

AB

IUTY

TO

PR

OV

IDE

YE

AR

­R

OU

ND

FO

OD

FO

R B

IRO

S A

NO

/OR

YE

AR

-RO

UN

D N

ES

TIN

G O

PP

OR

TUN

ITIE

S.

LIG

HT

ING

LE

GE

ND

S/W

•Pl

-#''

GR

AD

ING

LE

GE

ND

~

BS

0.0

0m

FG

0.0

0m

IG 0

.00

m

BG

O.O

Om

TS

LO

.OO

m

ST

EP

/WA

LL

LIG

HT

PA

TH

LIG

HT

TR

EE

AC

CE

NT

DO

WN

UG

HT

DO

WN

LIG

HT

TW

-T

OP

OF

WA

LL

B

W -

BO

TT

OM

OF

WA

LL

TS

-T

OP

OF

ST

EP

BS

-B

OT

TO

M O

F S

TE

P

FG -

FIN

AL

GR

AD

E

I G-

INT

ER

PO

LATE

D G

RA

DE

BG

-B

UIL

DIN

G G

RA

DE

TS

L -

TO

P O

F S

LA

B

IRR

IGA

TIO

N L

EG

EN

D

AR

EA

TO

BE

IR

RIG

ATE

D

HB•

HO

SE

BIB

IRR

IGA

TIO

N S

TU

B-O

UT

Not

e:

Ref

er l

o ca

nadi

an l

ands

cape

sta

ndar

d, l

yp.

GR

OW

ING

ME

DIU

M L

EG

EN

D

CJ

~I ~

61

0 M

M (

24")

SO

IL D

EP

TH

90

0 M

M (

3')

SO

IL D

EP

TH

750

MM

(30

") S

OIL

DE

PT

H

MA

TE

RIA

LS A

ND

FU

RN

ISH

ING

S

PA

YE

RS

l tD

R

EF

ER

EN

CE

D

ES

CR

IPT

ION

P

1 1/

L1

0.0

G

LA

CIE

R P

OR

CE

LA

IN P

AV

ER

S

P2

1/L1

00

R

IVE

R P

OR

CE

LA

IN P

AV

ER

S

P3

1/

L1

0.0

M

AN

TL

E P

OR

CE

LA

IN P

AV

ER

S

P4

6/l1

0.0

D

RIP

ST

RIP

SIT

E F

UR

NIS

HIN

GS

ID

R

EF

ER

EN

CE

D

ES

CR

IPT

ION

S

1 1

/l1

30

L

AR

GE

AR

BO

UR

S

2 2

/l1

3 0

S

MA

LL

AR

BO

UR

S

3 3

/l1

2.0

BE

NC

H W

AL

L S

4 3

/l1

1.0

SE

AT

BE

NC

H/S

TO

RA

GE

S

S

1/L

14.

0

JOIN

AB

LE

TA

BLE

S

S6

1

/L1

1.0

M

BE

R P

LA

NT

ER

S

S7

1/L

15

.0

CLJ

MB

ING

NE

T

S8

4/L

11.

0 TI

MB

ER

SE

AT

ING

BL

OC

KS

S9

5

/L1

40

L

ON

G B

EN

CH

S

10

6

/L1

4.0

M

OV

EA

BLE

CH

AIR

S

S11

2/l1

4 0

BIK

E R

AC

KS

S

12

4

/L1

4.0

CH

ILD

RE

N'S

PL

AY

HO

US

E

S1

3

2/L

11

0 B

IRD

HO

US

ES

2

BIR

D T

YP

ES

S1

4 P

MT

SC

RE

EN

\f\l

RA

P

S1

5

3!L

15.

0

PIN

E B

EN

CH

S

16

21

L1

5.0

B

EE

SP

RIN

GE

R

HA

RD

SC

AP

E

I1D

R

EF

ER

EN

CE

D

ES

CR

IPT

ION

H

1 2/

L1

2.0

-

RE

TE

PL

AN

TE

R

H2

2

/L1

2.0

T

EP

S

H3

3

4/U

L1

0.0

V

ING

H

4

5/L1

0.0

S

UR

FA

CIN

G

HS

7/

L1

0.0

A

SP

HA

LT

PA

VIN

G -

PE

D.

PA

TH

FE

NC

ING

I 1

D

RE

FE

RE

NC

E

IDE

SC

RIP

TIO

N

F1

2/L1

1.0

M

ET

AL

FE

NC

E

DP

PL

AN

T U

ST

TR

EE

S

Ao

s 22

A

cer

oa

lma

tum

'S

eirv

u'

Jan

an

ese

ma

ole

as

sh

ow

n

5cm

ca

l B

&B

fu

ll/b

ush

v o

lan

ts

Asa

3

Ace

r sh

ira

saw

an

um

'Au

tum

n M

oo

n'

Au

tum

n M

oo

n J

ao

an

ese

ma

as s

ho

wn

2.

Sm

hV

B&

B

2m

sta

nd

ard

/ fu

ll cr

ow

n

He

6

Hal

esia

ca

rolin

a

Car

o in

a S

ilve

rbel

l a

s sh

ow

n

5cm

B&

B

mu

llist

em

me

d/ b

ush

v •I

Md

3 M

ao

no

lla d

en

ud

ata

Y

ulan

ma

on

olla

as

sh

ow

n

7cm

ca

l/B

&B

2

m s

tan

da

rd/ f

ull

cro

wn

SH

RU

B S

/GR

U

NO

CO

VE

RS

/ P

ER

EN

NIA

LS

A

a 6

Am

elan

chie

r al

nifo

lia

Sa

ska

toon

se

rvic

eb

en

v 7

.00

0 #

5 co

nt

full/

bu

shv

lan1

s/ m

ult'

A

m

21

Aza

ra m

icro

nh

Ila

B

ox

lea

f aza

ra

1.0

70

#3

cont

. fu

I/ b

ush

v la

nts

Cn

70

C

arex

ne

nd

ula

D

roo

nin

n s

ed

ne

2.

000

#1 c

on

t D

e 16

1 D

Bsc

ham

nsia

ca

esn

itosa

T

uft

ed

Hai

r G

rass

.3

80

#2

con

t fu

ll/ b

ush

v la

nts

NB

W

En

w

66

E

nim

ed

ium

x w

arle

vens

e W

arl

e B

ish

on

's h

at

.30

0 #

2 co

nt.

full/

bu

shv

ola

nts

E

p G

em

1

56

G

era

niu

m m

acr

orr

hiz

um

Be

van

's V

arie

tv

Bia

roo

t Cra

ne

sbill

1

00

0 #

1 co

nt

full/

bu

shv

olan

1s

p n

8 La

nic

era

x o

uro

usi

i h

vbri

d h

on

evs

uck

le

1.0

70

#2

cont

. fu

ll/ b

ush

v o

lan

ts

Mst

r 27

M

att

eu

cda

str

uth

ioo

teri

s E

uro

oe

an

Ost

rich

Fe

m

2.0

00

AI

I-P

um

ose

Pla

n1 F

oo

d

Do

75

O

xalis

ore

oa

na

re

dw

oo

d s

orre

l 1

00

0 #

1 co

nt.

full/

bu

shv

lant

s N

E P

R

on

62

R

osa

nu

tka

na

N

oo

tka

ros

e ...

#2

con

t.

full/

bu

shv

lan

ts

Rs

13

Rlb

es s

anau

lneu

m 'K

ina

Ed

wa

rd'

flo

we

rina

cu

rra

nt

3.0

00

#5

con

t fu

ll/ b

ush

v la

nts

S

a 34

S

vmo

hori

caro

os

alba

sn

ow

be

rrv

2 5

00

#5

co

nt

ful /

bu

shv

nla

nts

Sh

15

Sa

rco

co

cca

ho

oke

ria

na

var

. H

um

ilis

swe

et

bo

x 1

.50

0 #

2 co

nt.

Ful

l b

ush

v n

lan

ts

Sh

m

29

Sch

izo

nh

ran

ma

hvd

ran

ne

oid

es

'Mo

on

be

Ja

na

ne

se h

vdra

nn

ea

vin

e 4

.00

0 #

2 co

nt.

sla

ked

S

I 1

58

S

olid

ast

er l

ule

us

'Le

me

re'

'Le

mo

re'

So

ida

ste

r 3

00

#2

con

t.

full/

bu

shv

nla

nts

B

p

Snl

4

1 S

on

ho

ra n

rost

rata

'Litt

le B

ab

v'

dw

arf

ko

wh

al

2.0

00

#2

con

t fu

ll/ b

ush

v la

nts

s,

66

S

arc

oco

cca

ru

scilo

lia

fran

rant

sa

rco

cocc

a

1.5

00

#3

cont

. fu

ll/ b

ush

v la

nts

Tm

h

41

Tax

us m

ed

ia 'H

icks

ii'

An

nlo

·an

vew

1.

50

0 1

.2m

/B&

B

full.

bu

shv

0Ia

nts

EW

V

e 17

V

acci

nlu

m c

orv

mb

osu

m

blu

eb

en

v 2

.50

0 #

5 co

nt

full/

bu

shv

lant

s V

ol

77

Vac

cin

ium

ova

lum

'lh

un

de

rbir

d'

ever

aree

n h

uck

leb

errv

...

#

2co

nt •

0

.00

0

LA

WN

N

on

-Ne

tte

d.

aro

wn

on

san

d

0 0

0 0

as s

ho

wn

0

0

1 A

LL

LA

ND

SC

AP

E T

O C

ON

FO

RM

TO

TH

E C

UR

RE

NT

ED

ITIO

N O

F T

HE

CS

LA

ST

AN

DA

RD

S F

OR

LE

VE

L 2

'GR

OO

ME

D'

LAN

DS

CA

PE

TR

EA

TM

EN

T I

N T

HE

EV

EN

T O

F A

D

ISC

RE

PA

NC

Y B

ET

WE

EN

TH

E P

LAN

T U

ST

AN

D T

HE

PLA

NT

ING

PLA

N

TH

E P

LAN

TIN

G P

LAN

TA

KES

PR

EC

ED

EN

CE

. 2

SE

AR

CH

AR

EA

TO

IN

CLU

DE

BR

ITIS

H C

OL

UM

BIA

WA

SH

ING

TO

N A

ND

OR

EG

ON

3

N-

NA

TIV

E

E -

EV

ER

GR

EE

N

8 -

BIR

D F

RIE

ND

LY

P -

PO

LLIN

AT

OR

E

d-

ED

IBLE

W

-W

INT

ER

IN

TE

RE

ST

SIZ

E

MO

DE

L

MA

NU

FA

CT

UR

ER

C

OM

ME

NT

C

OL

OU

R

OT

Y

2,2

' O

UA

RZ

ITI

2.0

B

ELG

AR

D

GL

AC

IER

fLT

GR

EY

) -

2x2'

Q

UA

RZ

2

0

BE

LGA

RD

R

VE

R

ME

D G

RE

Y

2x2'

Q

UA

RZ

ITI

2.0

B

ELG

AR

D

MA

NT

LE

ID

K G

RE

Y)

-1

'2"W

C

US

TO

M

SIZ

E

MO

DE

L

MA

NU

FA

CT

UR

ER

C

OM

ME

NT

C

OL

OU

R

QT

Y

44.5

'L x

8'W

C

US

TO

M

CU

ST

OM

1

CU

ST

OM

C

US

TO

M

1 12

'L x

3'W

C

US

TO

M

CU

ST

OM

1

8.5

'Wx 1

1.5'

L C

US

TO

M

CU

ST

OM

1

3'X

3'

FR

T1

70

0-S

Q-M

1-F

S-3

6

FR

T1

70

0-S

Q-M

1-F

S-3

6 F

RT

17

00

-SQ

SE

RJ!

MA

GU

N

SIL

VE

R 1

4 P

DR

CO

A

5 V

AR

IES

C

US

TO

M

NA

TU

RA

L W

OO

D

3 8

'2"

X 8

'1 Q

" X

8'6

" C

UM

S N

G N

ET

NR

08

13

-10

02

K

OM

PA

N

ST

EE

L F

OO

TIN

GS

N

AT

UR

AL

1

1.5

' X 1

.5' x

var

ied

ht

CU

ST

OM

N

AT

UR

AL

WO

OD

5

IPE

WO

OD

, SIL

VE

R

14 P

DR

CO

AT

7

0"l

X 1

6 5

"0 X

17

5''H

M

LB 1

05

08

BA

CK

LE

SS

BE

NC

H

CE

DA

R W

G H

OP

E M

BE

10

50

000

21

MA

GU

N

5 33

"H X

19.

5"W

K

ON

TO

UR

M

AG

UN

S

ILV

ER

14

PD

R C

OA

10

M

BR

50

0 S

ER

IES

M

AG

UN

S

LV

ER

14

PO

R C

OA

B

6'u

l6'7

'W

VIL

LAG

E S

HO

P

KO

MP

AN

N

AT

UR

AL

WO

OD

1

.47

'x 4

2'x

83

' C

US

TO

M

NA

TU

RA

L W

OO

D

3 IM

AG

E T

O B

E D

ET

ER

MIN

ED

-T

O B

E S

UB

MIT

TE

D T

O B

C H

YD

RO

IM

AG

ET

BD

. 1

82"H

R

OB

INIA

PIN

E B

EN

CH

KP

L201

K

OM

PA

N

NA

TU

RA

L W

OO

D

1 2'

6" X

2'3

" X

2'5

'' R

OB

INIA

BE

E S

PR

ING

ER

NR

O 1

18

KO

MP

AN

N

AT

UR

AL

WO

OD

SIZ

E

MO

DE

L

MA

NU

FA

CT

UR

ER

H

IGH

LIG

HT

C

OL

OU

R

IOT

Y

PE

AR

L, M

AY

G

RE

EN

BE

IGE

~

SIZ

E

MO

DE

L

MA

NU

FA

CT

UR

ER

H

IGH

LIG

HT

C

OL

OU

R

QT

Y

35"H

X 1

9.2

5"W

C

US

TO

M

0

DP

19-8

66

69

0

Pla

n#

17

May

5, 2

020

eta

"""""

.... ,..",..

'69

0V

/as\

Zn

dA

vam

,a

Van

cou'

ICr.B

C.C

anad

a.

V6J

lH4

ll~

.69

.J,1

456

!

1604

.663

.145

9

,.1w

ww

.eta

1a.c

a

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D.

BC

No

tes

and

Sch

edu

les

_..,,

L9J:

l/\j

d·7.

,;.1n

9,

~e-,

)tlM

d-.:s

.;lh

e2

L~~

-in

e.:;

5, ..

...

,..,,.

OT

Dra

wn

Sy

Rc

viOW

1"o

3y

00/0

0/00

2180

6

L0.1

To~

s~

:s

Page 92: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

bir

dh

ou

ses

on

fen

ce

po

sts

for

educ

atio

nal

play

val

ue

/~

I bi

rd f

rien

dly

, sh

rub

s

urb

::J~

~~

~~

~:

, _ ✓

/

addi

tion

al t

rees

to

scre

en b

uild

ing

to w

est

seat

ben

ch a

nd s

tora

ge----

--"

unit

l lo

w m

aint

enan

ce:,.

,' ~

---

4\-

-­b

lueb

erry

hed

ge

and

sp

ring

flo

wer

ing

orna

men

ted

tree

s

arbo

ur w

ith s

had

e v

in

e------

-'"t/

!!K

----

,M~

~~

----

---

1

BB

Q w

ith ga

s----

----

-.mW

c-'~

M'i! ... 's

:.,,.-,,i.

~~"'(~-

--co

nnec

tlo1

smal

l cu

sto

m b

uiU--------

Wa

.;.,-"

'--"

' jo

lna

ble

tab

l':,'.

~~ 1

..... ,,, .

... M:--

-,1--,-

----'~

-~(_/_/-

-~~-

-"4

gate

d ac

cess

to

terr

ace/

-------------'',-----

--'-

=:::

.:C.-

--+

--~

:!9

~--

-.

gree

nway

J

10

vine

pla

nted

at~

rad

e

on n

orth

wal

l

scre

en p

lant

ing

to f

utur

e

prov

ides

vis

ual

inte

rest

=

Detail P

lan

L0.3

---••

.. •••M

•• ,----

----,

. - 15

M

5491

j NO

2 R

D

w-7

I

" J I

J

f

1-

_I

scre

en p

lant

ing

betw

een

unit

s

r,

Ul

,~­ ""·

A.

20

19.0

C,.

{1

6 2~

0'·

19

i'le

.J!&

l<'!

bl'l

;,

C

2J2

!,0

J.t9

DP

19

-86

66

90

P

lan

# 18

M

ay 5

, 20

20

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D.

BC

Sit

e P

lan

, ... logj

A.:

ld'=

ln,:,

1

~A

.»'l

<'.

.S~

2

leg

,jld

:l-e

sslt

le3

Dra

wn

By

Re'

liow

ec3

y

QO!O

OICJ

O

2160

6

L0.

2

To'"

'S'"1

8€1:S

Page 93: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Tim

be

r se

atin

g b

lock

s A

ll A

ge

s

Kom

pan

Ro

bin

ia

Cha

lkbo

ard

on C

IP c

on

cre

te

pla

nte

r w

all

All

ages

clim

bi~

~e

~e

~f;

__

__

-\,,a

c;::;.

,f-:_

_ _

_.;

:.s5

~111

g

Mar

atho

n ru

bb

eriz

ed

surf

aci

ng

in th

ree

colo

rs:

-Pea

rt (

base

) -M

ay g

reen

(g

rass

y ar

ea)

- Be

ige

(ste

pp

ing

sto

ne

s)

Arb

ou

r w

ith v

ine

at

bu

ildin

g e

ntr

ywa

y

Inc

reas

ed p

lan

ting

p

rovi

de

s sc

reen

fo

r a

dja

cen

t 1

-bd

rm s

uite

s

r Ch

ildre

n's

Pia

A

rea

Sca

le: 1

:40

Kom

pan

Rob

inia

Bee

Sp

rin

ge

r A

ge

s 2

-5

Kom

pan

Rob

inia

Clim

bing

Ne

t A

ges

5-1

2

Rob

inia

Vill

age

Sho

p P

layh

ouse

A

ge

s 2

-5

Kom

pan

'Pin

e B

en

ch'

Ko

mp

an

Rob

inia

Vill

age

Sh

op

ch

ildre

n's

pla

yho

use

fo

r ag

es 2

-6

w/

3' c

ircu

latio

n c

lear

ance

16

'Tea

cher

and

stu

den

t' pl

ay

area

wit

h t

imb

er

seat

ing

;::::::;

::_--J

.-'-

:a ... ---_

l---

blo

cks

Cu

sto

m c

ha

lkb

oa

rd

inte

gra

ted

into

co

ncr

ete

/1

,,~-

;.c..,

_,_ _

_ +--

'-<

---

waJI

Ace

r 'S

eir

yu' a

nd A

cer

'Au

tum

n

Mo

on

' pro

vid

e t

wo

typ

es

of

bri

llia

nt o

ran

ge

co

lou

r in

au

tum

n,

each

wit

h d

iffe

ren

tly

text

ure

d

leav

es,

and

l ig

ht g

reen

fol

iag

e d

uri

ng

sp

rin

g a

nd s

umm

er,

bri

gh

ten

ing

up

the

no

rth

fa

cin

g

"'1

-""l

l~--

,ue

il.

Rai

sed

pla

ntin

g p

rovi

de

s b

uff

er f

rom

par

kade

en

try,

an

d al

low

s fo

r pa

rkad

e -

U<-

-------

~---

ceili

ng

he

igh

t bel

ow

23

30 F

T

Rev

lslo

nN

nto

o•.

II 20

19.1

)(;.,

'I

202

0-0

••29

9'

NS !

~!(

;,I)

"'

20~

~1

9

DP

19

-86

66

90

P

lan

# 1

9 M

ay 5

, 2

02

0

·69Q

V/e

s\2

ndAv

11nu

11

Van

cou

~r.

BC

.Cn

nad:

i.V

6J 1

H4

1 16

0~.6

83, 1

456

116

04.6

63,1

459

... I

W\V

W,C

bl:l

.~(I

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Det

ail

Pla

n:

Ch

ildre

n's

Pla

y

Le-,U

u:9

jll,

:jd·e

,ss1n

U."

,}df

d::l

·i!'SS

ln.!

2

LD;P

td<

l•ess

lne

3

Dra

w11

By

Rav

iow

ed

3y

0010

0/00

2180

6

L0.3

To:;

jS-i

6i!'.

S

Page 94: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

/ I

Tim

be

r p

lan

ters

J_

. .

-----

k<,.

Clim

bing

net

---

-"'·

"-P

IP r

ub

be

rize

d su

rfa

cin

g

-1,

I l

Gla

cier

pav

er

Ra

ise

d C

IP C

on

e

Pla

nte

r -I

ii-C

l P C

one

Ste

ps

Ma

ntle

pa

ver

''

"

Bik

e ra

cks

4.5%

10

-0

('O

0 0::

C\I 0 z

a P

Co

ne

Pe

d P

avi

ng

15

M

q,,~

~~.J

O!l

otO

-'

2•2

1,o

:;.,

g ""

'~""

-"'"

110:

:,

DP

19

-86

66

90

P

lan

# 2

0 M

ay 5

, 202

0

eta

'""""" •

•o"'

""

"'"

·,690

Wes

t2nd

Ave

nve

Van

cou

,cr.

BC

.Can

ad

a.V

SJ

1H4

116

04,6

63,M

Sfi

116

04,6

83.1

459

WI

WIV

W.c

bl3

,C3

HIR

igllla

_G

,.,.

.,b

yG

l>l>

nd

ilY

po

~'1

1ln

C.

lnl-

••n_

,.-

.. ..

_._,

,._,,.

K..-

,o'"

'°c""

,_.,.,

.,

, .. ,..

.._,.,

._._

,_..,.

,,..en

,,,..,-

,,..

.,_.

__

.......

..........

..... _

.. " .......

. , .......

..... ....

.. .. , ....

___ .,.,,,., _

_ ,,, __ ~-

-· ... ,-.....

-.. ,_

.,.; ....

..........

.... _,,

,.,.., .. , .

........ "

"'""~"

' __

,..,.

,11 .

....

... ,

_ .. _

, ...

.. , .

.....

......

~..,

•. ~

.. ,-

·-"··

.. , ... -.

.,,..

.,

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Mat

eria

ls P

lan

'""

Lgg

j/l:

kle

%l~

l

U·)

(l'-

"'X

Slr

loe2

L~l.

:IO

'ess

loe

.;

OT

Dfa

wn

By

Rc

view

eo

3y

0010

0/00

2'8

06

L3.

1

To:a

S'll

n:s

Page 95: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

[ -~

S/

W

r r 71

K

LL

~

\

LIG

HT

ING

LE

GE

ND

S/W

S

TE

P/W

AL

L L

IGH

T

·r

Pl P

ATH

LIG

HT

~D

T

RE

E A

CC

EN

T O

OW

NL

IGH

T

~L

DO

WN

LIG

HT

"=

I LOADIN

G

I ,.,,. 8

r

SLO

PE

ON

5.0

%

VIS

ITO

R

:'.j)~

0

----

-~

PA

RK

AD

E

EN

TR

Y R

AM

P

'l.0

01, ..

71

111

I -,

--

I L _

_

~ I~

=r:. I} ~

I I n GA

RB

AG

E

PIC

KU

P

I

LJ

B

--i

•I Pl I I 1, .[

Pl

1.s•

,1,

>

4.5%

10.'l

)II.

~

10

"O

cu 0 0:::

N

0 z 15

M

-------

2tl1

9-C

6.2

1 1.

s...

,b·D

P

2020

-01-

29

:i,,-1

~, ...

. Jor

D"

~""

-"'"

"DP

DP

19

-86

66

90

P

lan

# 21

M

ay

5, 2

02

0

eta

""'""' ..

. " ... " ...

·590

Vle

st2n

dA~e

nue

Van

rou

,m.

BC

. C

anad

a. V

6J 1

H4

1 l6

04

,68

3.M

56

116

04.6

83.1

459

"I

Wl't

w.C

1313

.C3

NIR

lgh

ta-.

.-.o

d'"

11

1la

l•-eap

o-"'l

nc.

I"'•..

...,_

..,

-.-

..._

,,. •

....,.

,.,..c

..,, .. ,

...,.,

... -..

....

··•-c-

....... , ....

, .... "-"'

" _..

._,.. ...

...........

.........

.. " .......

... ..,.. ..

.. .....

,., ...... _

,_ .....

. , .... -...

......... ,

,_ ....

..... _

.. _

,,";

.,, .. .

,.,..,

_.,.,

-.,,

.,c,

.... ,.,

.,~0-..,,

0..

,

=~•w

!::.~

":;'"

"•• ..

......

.......

. ,i ..

,l,~

••1-

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No

. 2 R

OA

D

nlC

HM

ON

D,

BC

Lig

hti

ng

Pla

n

Leg.

j/\:

ld·;

r...

;l.-.

0l

.~1

,j<

N$$

1h

e2

cl!\)

HA

.1C

tes:

;l<1

1!J

. .,,.,..,, ...

.... D

T

Dra

wn

By

Re

view

oo 3

y ,~ 00

/00/

00

2'8

06

L3.

2

To~

S...

ae:s

Page 96: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Leve

l 1

Sca

le: 1

:100

FG14

.75'---

t:::'.:'G:

:=''·=":

:___

__

~

ON

rgs11:

R ::

:::L

_

GIP

D E

G6

79

' J

.,_~}

~

•P

D

ON

_

J,_

•P

D

ff>

E~

: '.

.:).

;c'i

:;

14.5

%

SL

OP

ED

N5

.0"k

7

I I L

:-._i

:,.,

<•E

"'

I/T

T,'

:;,;.;

f

'.IT

~-=-

•$0<

-~

fL~

' f'

10

EG

~.3

7 ,,

~E

G1

0.J

(r

EG

9.2

8'

15M

"O

Ctl

0 er::

N 0 z

Oat

20

1g.o

:;.;

1

W2G

-01

-2!1

202G

-CG

-10

IHu

•No

lH

1,..

..,t

o·O

P

i:i.,

~.,

,~~

fc;[

l?

~,O

f0r0

"

DP

19

-86

66

90

Pl

an#

22

Ma

ys. 2

02

0

eta

,. ... " ..

'""'""·"

""'~

H

u

sin

g P

roje

ct

Aff

ord

able

o

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

'"'""

" "'.

and

Dra

inag

e P

lan

G

rad

ing

Page 97: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Lev

el 1

S

cale

: 1 :

100

I LOADIN

G

I ,, ..

SLO

PED

N5.

0't.

VIS

ITO

R

7

I I

PAR

KAO

E E

NT

RY

RA

MP

L _

_

I

~

GA

RB

AG

E

I PI

CK

UP

I

B

10

"O

cu 0 0:::

C'\I 0 z 1

5M

~

-----~

2.!1

9.0C

..21

l>~

fo,[

)P

2020

-01

.29

~i.s

..., t

c,D

"

rl!!

-l,;s

..<1!

<)f

l):>

DP

19-8

66

69

0

Pla

n#

23

May

5, 2

02

0

eta

""""""'"

"'"""·

·s9

0V

/est

2n

dA

venu

e V

ana

,u;c

r.B

C.C

an

a~

a.

VB

J 1H

4

I 16

04.6

83,M

Sfl

f[6

04.6

83,1

459

N

[M'IW

.t'13

1a.c<

1

Mll

lgh

la-o

r>o

dl,

J-

l>ne

lluo

po

_,,,,_

,n<.

, .......

........

.. .-.

......

--

.. ····

·•-<:

""'~'"

"' ,

-...

....

..,.

....

....

ea

. ...

,-.,

... ,

. ..

. ,..

_,,

,,""

'

.-,, ..

,00 ..

...:_

.,.,_

,,,_~

, .. .,,.

.. ~ • ..

;_,, .

. . .,.

, •.. !,-

~::

-"'•

-.....

........

.......

...... ,

....

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

So

fts

ca

pe

Pla

n

L~

Log

j/\:

ld•e

s.;l

r,i

t

~O:J

l'l/,#

~~

2

L~<

.:ld

'ess

kln

J

Ora

wTI

By

Re~

iow

eo 3

y

00/C

O,O

O

"""'

L5.

1

To

:a'S

'lil

ii'.S

Page 98: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Leve

l 1

Sca

le: 1

:100

..

T

l ~ I J J

e ·

''--

I LOADIN

G

I ,,..

SL

OP

E D

N 5

.0%

\JIS

ITO

R

],--

1 -

l

(----

IF :l =

1

1~;!1'

( ~~

me

><

,_ool\

. 'l

-1~ 1

1'

PAR

K.AD

E E

NT

RY

RA

MP

'1.00

1, ..

7 I

I II

I --

---

-

I L _

_

==

=!I

rl I

~ G

AR

BA

GE

P

ICK

UP

B

~ " -OU

TL

INE

AB

OV

E

'b'l1

1;1.

. ,~

~

'\..;

l.n

m

10

"O

cu 0 0:::

C\J 0 z 15M

S.•

m D

P 1

9-8

66

69

0

Pla

n#

24

May

5,

20

20

eta

,. ... " ..

.... ,,." ...

16

90

V/e

st2n

dA

ee

nue

Van

oou

,er.S

C.C

ana

da.V

6J 1

H4

11

604,

683.

1456

11

604.

683.

145

9

"'I

Wl'IW

.cta

lJ.c

a

l\ll

llg

nta

_..

....

.,..

,..,

.,,n

dlc.

apo~

"'l

n<

.

1.--

. •• _

..

___

__

.. ~ ....

.. , ..

.. ~ ..

. ~, ..

...

__

,. ..

_._

,..,., .

.. c-.

.,j ..

.. , ..

... ,

.,,.,;

, ...

.,_,.,

.,.,...

.,.. • ..

,.,....

,i..u .

.. ,.,•

"IP_

.. ,,,

,....,.

. , ....

.. _ ... ,_

....... , .... ..

-.......

,.,, ... ,,

_ ....

. .,., ...

...... .-

----:.

--==:~

-:.:::~

,., .. ,_

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No

. 2 R

OA

D

RIC

HM

ON

D, B

C

Tre

e P

lan

L..-,

µ L

~M

civ

.,s

tnc,

1

l~A

#-

lhe2

l~'<

»es

.sln

eS

Dra

l'ln8

y

Re

vie

we

d 3

y

00

/00

/00

:218

06

L5.

2

To:a

s~

:s

Page 99: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

GR

OW

ING

ME

DIU

M L

EG

EN

D

Leve

l 1

Sca

le:

1:10

0

610

MM

(2

4')

SO

IL D

EP

TH

900

MM

(3'

) S

OIL

DE

PT

H

I LOADIN

G

I 1_1

stt

SL

OP

E O

N 5

.0%

VIS

ITO

R

V1S

l10R

~~

~~

8

,~: ....

7

I I

( ~~

,u

~~

,.oo~

1.

.1~"

'

PA

RK

A.D

E

EN

TR

Y R

AM

P

,_001

1- ,~

GA

RB

AG

E

PIC

KU

P B

) 83

1.5%

4.S•

~

10

"O

co 0 a:::

C\I 0 z 1

5M

,=­ "'·

A

2019

-00.

21

l>~-

"!!o

"D

P

s 2

0:zo

.o·.2

11

~!.

!o~

bD

"

C

20:

Z0

.~1

9

Fi!H

SS

.iot<

i,()O

DP

19

-86

66

90

P

lan

# 2

5 M

ay 5

, 2

02

0

eta

.... "' ....

.....

« ..

.

'69

0V

/es\

2nd

Ave

nue

VJr

>eou

ror

. BC

.Co

no

~a.

V6J

1H

4

116

04,6

83,1

456

!16

04.6

63.1

459

• l w

w1~

cta1

a.ca

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No

. 2

RO

AD

RIC

HM

ON

D,

BC

So

il D

epth

Pla

n

,.,,

Leg

j/d

Yr.

..:;

lffl

1

~ t~

k\d

'(l5

.Sll

le2

Lll(

ln-'

d<

l•=

lfl!

la

-. .....

.,.....,.

. D

T

21

80

6

Dra

l'lnB

y .,,,

..,.-

,n,

Rev

iow

ec3

y

0010

0/00

L6

.0

To:<

1S·1

.tats

Page 100: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

n--

~

L---~

"lW

[, -

)

IRR

IGA

TIO

N L

EG

EN

D

AR

EA T

O B

E IR

RIG

ATE

D

HB

-+

HO

SE

BIB

@-:1

IR

RIG

ATI

ON

ST

UB

-OU

T

Not

e:

Ref

er

to c

ana

dia

n la

ndsc

ape

sta

ndar

d, t

yp.

I LOADIN

G

I ,_,., 8 l -

SLO

PE

DN

5.0

%

VIS

ITO

R

~~

0

PA

RK

A.D

E

EN

TRY

RA

MP

~-~

I• ..

7 I

I II

I I L _

_

----71

.i

I

"==j

).83

• G

AR

BA

GE

;:l PI

CK

UP

~ B

-

OU

TLI

NE

AB

OV

E

\~;~:

1.5%

4.5'

1.

'-.~

10

"O

!'Cl

0 0:::

N 0 z 15M

DP

19

-86

66

90

Plan

# 26

M

ay 5

. 20

20

eta

""""°

· ..

.. ,. •

•. " .

.

169

0V

/es\

2n

dA

ven

ue

Van

cou,

cr.S

C. C

ana~

a. V

fiJ

1H4

1 l6

04,6

83.M

S6

1[6

04.6

83.1

459

.,/'M

'IW.C

I.Jla

.ca

Aff

ord

able

Ho

usi

ng

Pro

ject

549

1 N

o. 2

RO

AD

RIC

HM

ON

D,

BC

Irri

gat

ed A

reas

Pla

n

lag

j/\j

cl·

r..s

lne

i

~~ M

,:t-

-lh

e ~

L"'ij

!'IIM

<te

s.il

rll'.l

.3

"""'"

_,,,,..

O

T

218

06

Dra

wn

By

Rc

viow

eo 3

y

OO

/C0/

00

L7.

0

Tota

S'l€

1€1\S

Page 101: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Uni

t pa

tio

Scr

een

plan

ting

I

SE

CT

ION

· N

orth

ern

Sitt

in

Are

a S

cale

: 1 :5

0

SE

CT

ION

-W

este

rn A

me

nit

Are

a S

cale

: 1:5

0

Pav

ers

Rub

beriz

ed s

urfa

cing

S

eatin

g

w/

Play

ele

men

ts

bloc

ks

Entr

ance

P

lant

ing

Ram

p P

lant

ing

Ste

ps

Sea

ting

Mul

ti-U

se P

athw

ay

SE

CT

ION

-E

aste

rn M

ain

Ent

ranc

e S

cale

: 1:

50

3.3m

,- No

. D

~•·

ls

w•

No

lH

2:r.>

0-01

-211

f\o

-1<0

wr,!

c,(

P

C

2n20

-o:J.

.111

~

Sl!

OO,o

tDP

DP

19

-86

66

90

P

lan

# 2

7 M

ay 5

, 2

02

0

etO

""'"··

··"""'°

'"'•

1 l6

04

.66

J,M

S6

fl6

04

.68

3.14

S9

"IW

'll'W

,C1

31

3.C

3

,.R

lgh

laR

N•"

"""l

>)l

eta

.. n

mc.

apo"

"111

1odu

,..l

n<..

,,....,.

.._ ,..

.,....,.

., -.-

.._,,.

• ...,.

••-c

_,,..,

.. •

,.....,.

,_., ... _

,_. __ ..

,,..,_

...... , ...

.. , ...... _

.. . _

.._ .....

. .._ ....

..........

. -..... , ..

..........

.....

r,,,..,

. .. ...

,_ ..

......

... ..

-..

. -L

....

ol"

'. -

,-..

,o,

.-

.....

....

....

,,,_

... -

...

.... c

• .,,

.,.,.~

p,to

,-no

n _ ....

......... _

..............

. .,-.....

. ~ .. ~ ..

,-

Aff

ord

ab

le H

ou

sin

g P

roje

ct

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

La

nd

sca

pe

Se

ctio

ns

'""

Lcg

;(M

dT

..S

lrv.l

l

~~

Md

'tt5

1~,2

Lflg

dlm

!!SS

lne

3

0ral

'"16

y

Rev

iow

ec3

y

OO

IC0/

00

216

06

"'

asna

:ea

LS,O

To:a

s,a

a:s

Page 102: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

+-.

..J'

).'~~'.\,

'e,,1

',' -~oD

~"'

"''.:

6'.'!

ftiYJ

!d:br

v./ltf..Y.t

,f,/,,/'

v,J,

fll:'Y

!_~/\

y:_M~"

"~'-N~

_

_ S

od,

non

-ne

tte

d g

row

n o

n sa

nd

Sod

at

Gra

de

Sca

le:

1 :10

300m

m (

12")

min

. gr

owin

g m

ediu

m

Co

mp

act

ed

sub

-gra

de

=, _

......

...,

~~

--

--

Gro

un

dco

ver

50m

m (

2~)

thic

k m

ulch

, re

fer

to

spec

ifica

tions

-d

o n

ot p

ut

mu

lch

~[ p

,,@,., .• 3

1j~

~'!

/1fi

[lliit

!ij~

~!;

ii,1

Qf~

~~

$M

!Eq

----

agai

nst

the

base

of

the

pla

nts

. -"'b

---

300m

m (

12~)

min

. gr

owin

g m

ediu

m

Gro

undc

over

at

Gra

de

Sca

le:

1:10

--+---

Co

mp

act

ed

su

b-g

rad

e

600m

m (

24 ")

min

. gr

owin

g m

ediu

m,

--+---

plan

ting

pit

to b

e 2x

roo

tbal

l si

ze

6=

=,.

,,,,

;.,.

.,,,

..,.

..-,

,,--

-=-=

==

==

f--=

+----

Non

-wo

ven

filt

er f

abric

~

;~~

~~

~~

~~

~i-----

75m

m (

3")

thic

k la

yer

of d

rain

age

rock

~

~~

~-

--

Rig

id i

nsul

atio

n, r

efer

to

arc

h

Dra

in m

at c

/w fi

lter

fabr

ic,

refe

r to

arc

h

Pro

tect

ion

boar

d on

wa

terp

roo

f m

embr

ane,

ref

er to

arc

h

f-

-----------

---

--"'z----

Str

uctu

ral

slab

, re

fer

to a

rch

and

stru

ctur

al

Shr

ub o

n S

lab

Sca

le:

1:10

a, .,. B

C E

0 M

~----

Gro

undc

over

50m

m (

2")

thic

k m

ulch

, re

fer

to

spec

ifica

tions

-d

o n

ot p

ut

mul

ch

pci

li:4

=e

==

='"

'F'"

'-"'

""'i=

==

=""

"'""

'"'-

'i""'

==

'"'F

'..,.

>=

l---

-ag

ains

t th

e ba

se o

f th

e p

lan

ts

--+---

300m

m (

12")

min

. gr

owin

g m

ediu

m

Non

-wov

en f

ilter

fab

ric

75m

m (

3")

thic

k la

yer

of

drai

nage

. ..

.,4,_

__

rock

Rig

id i

nsul

atio

n, r

efer

to

arc

h

Dra

in m

at c

/w f

ilter

fab

ric,

refe

r to

arc

h

Pro

tect

ion

boar

d on

wa

terp

roo

f m

embr

ane,

ref

er to

arc

h

~--

------

---

=--

-=--~

'::j-

---

Str

uctu

ral s

lab,

ref

er t

o a

rch

and

stru

ctur

al

.i.--------

Pru

ne o

ff br

oken

and

dam

aged

bra

nche

s

Tie

s: "

arbo

ur ti

e"

or a

ppro

ved

alte

rnat

e

Tw

o pr

essu

re t

reat

ed h

em

/ fir

50

mm

dia

. w

oods

take

s, 2

m in

len

gth.

Low

sau

cer:

100

mm

of

soil

arou

nd t

ree.

ci

rcum

fere

nce

of tr

ee

to f

orm

a s

hallo

w b

ench

to

pre

vent

wat

er r

un-o

ff.

soil

over

the

---+

t--

root

ball

shal

l no

t exc

eed

25 m

m in

dep

th.

50m

m (

2")

thic

k m

ulch

, re

fer

to s

peci

ficat

ions

-d

o n

ot p

ut

mul

ch a

gain

st t

he b

ase

of t

he

pla

nts

Rol

l ba

ck t

op

113

rd o

f bu

rlap.

re

mov

e al

l pla

stic

tie

s, t

reat

ed

burl

ap o

r co

ntai

ner

mat

eria

ls.

750m

m (

32")

min

. to

120

0mm

(48

") m

ax.

grow

ing

med

ium

, pl

antin

g pi

t to

be

2x r

ootb

a1l

size

t:=

==

==

;:~

~;;

;:;;

;:;;

;:;;

;:j_

_,4

" dr

aina

ge p

ipe

conn

ecte

d to

sto

rm

Co

mp

act

ed

su

b-g

rad

e

Min

imum

Wid

th O

f Tre

e P

it S

hall

Be

The

Roo

tbal

l D

iam

eter

Plu

s 24

" Tr

ee W

ells

Sha

ll B

e 36

" In

De

pth

Tr

ee W

ells

In

Bo

ulev

ards

Sha

ll B

e C

onne

cted

By

A C

ontin

uous

Soi

l Tre

nch

Of A

t Le

ast

24

"x In

Dep

th

Tre

es a

t G

rade

S

cale

: 1:

20

2x

root

ball

Shr

ub a

t G

rade

S

cale

: 1:

10

50m

m (

2")

thic

k m

ulch

, re

fer

to

spec

ifica

tions

-d

o n

ot p

ut

mu

lch

ag

ains

t th

e ba

se o

f th

e pl

ants

600m

m (

24")

min

. gr

owin

g m

ediu

m,

plan

ting

pit

to

be

2x

--+---

root

bal1

siz

e

--+---

Co

mp

act

ed

su

b-g

rad

e

-------

Pru

ne o

ff b

roke

n an

d da

mag

ed b

ranc

hes

Tw

o pr

essu

re t

reat

ed h

em/

fir 5

0 m

m d

ia.

woo

dsta

kes,

2m

in l

engt

h.

Lo

w s

auce

r: 1

00 m

m o

f so

il ar

ound

tre

e.

circ

umfe

renc

e of

tree

to

form

a

shal

low

ben

ch t

o pr

even

t w

ate

r ru

n-of

f.

soil

over

the

roo

tbal

l sh

all n

ot

---+

t--

exce

ed 2

5 m

m i

n de

pth.

50m

m (

2")

thic

k m

ulch

, re

fer

to s

peci

ficat

ions

-d

o n

ot

put

mul

ch a

gain

st

the

bas

e o

f the

pla

nts

Rol

l ba

ck t

op

113

rd o

f bur

lap.

re

mov

e al

l pla

stic

tie

s, t

reat

ed b

urla

p or

co

ntai

ner

mat

eria

ls.

750m

m (

32")

min

. to

120

0mm

(48

") m

ax.

grow

ing

med

ium

, pl

antin

g pi

t to

b

e 2

x ro

otba

ll si

ze

No

n-w

oven

filt

er f

abric

+--

---

'---

--=

:..:

='-

----

-,4

1\,

-75

mm

(3

") th

ick

laye

r of

drai

nage

roc

k

Rig

id i

nsul

atio

n, r

efer

to

arch

D

rain

mat

c/w

filt

er f

abric

, re

fer

to a

rch

Pro

tect

ion

boar

d on

wat

erpr

oof

mem

bran

e, r

efer

to

arc

h

>---------

~'.

==

==

.=,'

-Str

uctu

ral s

lab,

ref

er t

o a

rch

and

stru

ctur

al

Tre

es o

n S

lab

Sca

le:

1:20

Aev

is:O

n

No.

Issu

e N

o.

Da

te

2019

-06

-21

Issu

e/o

r D

P

2020

-01-

29

Issu

e fo

r R

e-D

P

Pro

fess

iona

l Sea

l

DP

19

-86

66

90

P

lan

# 2

8 M

ay 5

, 2

02

0

eta

'"'""" "

""""'""

16

90

WH

l2n

dA

ve

nu

e

Va

nco

uve

r. B

C.

Ca

na

da

. V

6.J

1H4'

116

04.6

83.1

4'56

I

1604

,683

.1"5

9

w I

ww

w.a

laLa

.ca

AII

Rlg

hb

Re

s..

-ve

db

ye

lala

nd

oc•

pe

an

:hit

ectu

,ain

c.

lnt(

lmla

....

,oo

nu

.'Md

on

thoH

d_

,,..

,,.

lap

Mto

lth

oC

on

a-'l

ant'

• l _

_ o

, .. ...

i • .,

.,,d

tho

Co

....

.,,o

m1

11

,o1

1.-

IM'o

o-l

p

-...

.,,S

ucJ,

W-.

-1,.

,.,°

""'l

no

tl>

O.,

.od

lo,o

ny

pu

-o!M

rlN

n

fort

ho

"°""

"""b

no

r11

1o

,-r.

....

,..r

p,o

;.,;

,..,

.,,.

,o

.,,.

,..,

.•,.

...,

....

,.

""''l

l"all

on

oll

hed

oo

um

enta

wllh

oull

hoC

<>

<m

ali•

nl'•

pri

,o,-

lll.

.,

~=

~::.~

:::i=

...i

•,00

1o~

,~-""'-

""t

l~o

,lep

l

Pro

iecl

Aff

ord

able

Ho

usi

ng

Pro

ject

54

91

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Dra

win

gT

dle

So

ftsc

ape

Det

ails

Lega

l Add

ress

line

1

Le

ga

lAd

dre

sslin

e2

Le

ga

lAd

d,e

sslin

e3

OT

c,

-,,.

.,11

1

Dra

wn

By

FII

--.O

et,

­

Revie

wed

By

00/0

0/00

Plo

t Dat

e

Prc

joal

O

218

06 - as noted

L9.

0

Tota

l She

ets

Page 103: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

2'x2

' Ped

estr

ian

Con

cret

e P

ave

rs o

n S

lab

on

Insu

latio

n S

cale

: 1

:10

~------

Con

cret

e un

it pa

vers

, in

sta

lled

pe

r la

nd

sca

pe

dra

win

gs,

2%

slo

pe t

o d

rain

. re

fer

to m

ate

ria

ls s

che

du

le f

or

size

an

d c

olo

ur.

No

n-w

ove

n f

ilte

r fa

bri

c

Voi

d fo

rm m

ate

ria

l or

ap

pro

ved

eq

uiv

ale

nt

-d

ep

th v

arie

s, r

efe

r to

arc

h

Rig

id i

nsu

latio

n,

refe

r to

arc

h

~~

~~---

Dra

in m

at c

/w fi

lter

fabr

ic, r

efer

to

arc

h

=-

="'!

----

Prot

ectio

n bo

ard

on w

ater

proo

f m

embr

ane,

ref

er to

arc

h

------

Sa

w-c

ut

patt

ern

, ins

talle

d p

er

land

scap

e dr

awin

gs

---+

---

100m

m (4

•) c

ip c

oncr

ete

pad,

rei

nfor

ced

with

9 g

auge

wel

ded

wire

mes

h,

2%

slo

pe t

o d

rain

bc--

,---

--..:

:;,,;

:-:r

,==

--si

:=,,-

--=

,,..-

,---

s=-:

r--,

;;,,:

-:r,

=:c

:r-s

:::;

a::-

,-=

-:r-

---s

,-,,

E'r

~d-

--

50m

m (2

') s

an

d s

ett

ing

be

d

NO

TE

: -

Sa

w-c

uts

to

be

inst

alle

d p

er

layo

ut

pla

n

-S

aw

-cu

t co

ntr

ol j

oin

ts t

o b

e 1/

4 s

lab

de

pth

-

To b

e co

mp

lete

d w

ith

in 2

4h

rs o

f p

ou

rin

g t

he

sla

b

Ped

estri

an C

oncr

ete

Pav

in

on s

lab

Sca

le:

1:10

Non

-wo

ven

filte

r fa

bric

Non

-wov

en f

ilter

fabr

ic

Voi

d fo

rm m

ater

ial o

r ap

prov

ed e

quiv

alen

t -

de

pth

var

ies,

ref

er to

arc

h

Rig

id i

nsul

atio

n, r

efer

to

arc

h

,,i:

;~~

&1

------

Dra

in m

at c

/w fi

lter

fabr

ic,

refe

r to

arc

h

==

=""1

-----

Pro

tect

ion

boar

d on

wa

terp

roo

f mem

bran

e, r

efer

to a

rch

13 m

m w

ear

cour

se -

MD

I po

lyur

etha

ne &

E

PD

M r

ubbe

r gr

anul

es

Impa

ct a

ttenu

atio

n la

yer

-M

DI

poly

uret

hane

&

SB

R r

ubbe

r bu

ffing

s, t

hick

ness

var

ies

as p

er

play

equ

ipm

ent

fall

pro

tect

ion

sta

ndar

ds

Sub

-bas

e A

-gr

anite

scr

eeni

ngs

<4..

+----

Sub

-bas

e B

-gr

anu

lar

pack

ing

aggr

egat

e ty

pe

a

Non

-wov

en f

ilter

fab

ric -

refe

r to

arc

hite

ctur

e

Voi

d fo

rm m

ater

ial

or a

ppro

ved

equi

vale

nt

-d

ep

th v

arie

s, r

efer

to

arc

hite

ctur

e

356m

m m

in.

==

•Hf------+

Ped

estr

ian

Con

cret

e U

nit

Pa

vers

on

rade

S

cale

: 1:1

0

~----,.----

Con

cret

e u

nit

pave

rs,

inst

alle

d pe

r la

ndsc

ape

draw

ings

, 2

% s

lope

to

dra

in.

refe

r to

ma

teri

als

sch

ed

ule

fo

r si

ze a

nd

co

lou

r.

50

mm

(2

•) #

9 a

gg

reg

ate

se

ttin

g b

ed

Co

mp

act

ed

su

bg

rad

e

---~

---

Saw

cuts

to

be

25m

m d

ee

p o

r 1/

4 of

con

cret

e sl

ab d

ep

th

•=

No.

D

ate

20

19-0

6-2

1 Is

sue

for

Of'

2020

-01-

29

Issu

e la

Re-

OP

DP

19-8

66

69

0

Pla

n#

29

May

5,

20

20

10

0mm

(4")

cip

con

cret

e pa

d, r

einf

orce

d w

ith 9

gau

ge w

elde

d w

ire

----+

---

mes

h,

2%

slo

pe t

o dr

ain

1-=

"'7"

-:=

::s:

-:r-

::::

:;:-

:,--

-,,:

=-:

ae-;

:=-:

rs:=

-cr-

<=

-::r

-;=-:

r-=

,--=

-,--

=,.

..,.

...-

=i

150m

m (6

") 3

/4"

min

us c

rush

-co

mp

act

ed

95

% m

pd

agg

rega

te b

a;;

h1 ./-

'ff.

ds;--

"'s~l---c

ours

e ta

""""··

··""·"' ..

Ped

estr

ian

Con

cret

e P

avin

on

ra

de

Sca

le:

1:10

1-1 /

2"

dia.

riv

er r

ock

2x4

" pr

essu

re t

reat

ed t

imbe

r ed

ge s

trin

ger F

ilter

fabr

ic

50m

m (

2")

of

drai

n ro

ck

Com

pact

ed s

ubgr

ade

1690

WH

I 2n

d Av

enua

V.1

10t1U

Ver .

BC

• C

anad

a . V

6J 1

H•

t j6

0U

83

.145

6 1

1604

.683

.145

9

w l

www.

etala

.ee

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

O

RIC

HM

ON

D,

BC

Dra

win

gTill

fl

Har

dsc

ape

Det

ails

. :1

=-·

D

rain

mat

c/w

filt

er f

abric

, re

fer

to a

rchi

tect

ure

Pro

tect

ion

boa

rd o

n w

ate

rpro

of m

embr

ane,

re

fer

to a

rch

Pro

tect

ion

boar

d an

d w

ater

proo

f ~

~lilll>

~l1

iii!

iili2

iliill!~

l!Z

1m

~~

~;m

mi!

l1lll<

l!ll!m

llllim

l1!1

2!E

~-

mem

bran

e -

as p

er a

rch

uo•

I.B

g.i1

Alli

-ess

ine

1

I.B

ga1A

ddfe

ssin

e2

l.eg

alA

<b-

essl

nll3

'-------------------------"'-'

Str

uctu

ral s

lab,

ref

er to

arc

h an

d st

ruct

ural

NO

TE

: In

sta

ll a

s p

er

ma

nu

fact

ure

r's

spe

cifi

catio

ns.

D

epth

of

ma

teri

al

de

pe

nd

an

t o

n fa

ll h

eig

hts

of

pla

y e

qu

ipm

en

t.

PIP

Rub

eriz

ed S

urfa

cin

On

Sla

b S

cale

: 1:

10

Dri

stri

On

Sla

b S

cale

: 1:

10

Str

uctu

ral s

lab

-as

pe

r ar

ch

As

halt

Pav

in

-P

edes

tria

n P

ath

S

cale

: 1:

10

-0

218

06

c,_

,e,

-~

Dra

wn

By

-~~

Rev

iew

ed

By

00/0

0/00

Pb

tOa

le

as n

ote

d L

10

.0

Tota

l Sh

eets

Page 104: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

pres

sure

tre

ated

tim

ber

brac

ing

to s

ecur

e w

all

@4

-8

' o.

c.

timb

er c

rib w

all,

4" x

4"

timbe

r, tig

ht

kno

ts

~:~i

: ;imber

crib

as

requ

ired

to

r---------------

--.-_-

_-_-_

-_._

_,-_-_

-_-_

-_-_

-_-_

-_-_-

_-,-

_~_-

_:--_-_-

_-_-

_-_-

_-_-

_-_

-_-_-

_-_-

-,k

eep

top

of p

lant

ers

leve

l. S

him

s/

SE

E A

RC

H.

FOR

WA

TER

PR

OO

FIN

G

3.9

90

~-

-

:om

-

elev

atio

n

~

.33

8

t1

14x

4 st

eel

post

s

~

min

. 30"

abo

ve f

inis

hed

grad

e

[][[

J[w

[ m

ax 6

" ab

ove

finis

hed

grad

e

•--

see

stru

ctur

al f

or f

ootin

gs

--

SH

OP

DR

AW

ING

T

O B

E P

RO

VID

ED

S

EE

AR

CH

. F

OR

W

AT

ER

PR

OO

FIN

G

scup

pers

thro

ugh

pla

nter

4'-0

" o

.c.

min

. o'f

-,--0 ----<

g-0 -------,'@

T

imbe

r P

lant

er o

n S

lab

Scal

e: 1

" =

1'-0

"

f

/

Pla

n

I ~~

~1

x2"c

ed

ar

<::::

, =

==

~

slat

s la

id f

lat

~

~

on 2

x4"

fram

e

pla

n

Met

al F

ence

S

cale

: 1

" =

1 '-0

"

11· ~~~~/~'.=

.==

==

m

arin

e gr

ade

lum

ber

, -----

HD

ga

lvan

ized

hea

vy d

uty

slow

-clo

sing

ste

el h

inge

~

~--~

t-c

='-

---=

----

-...

:0,_

'.._

~

~

_c

~-

• .

_ x

4" t

imbe

r po

st

,Zi

· O.=

~~

~~

~----c

r---=

--"C

ii'iffi

=·==

==

==

==

==

==

=i

~ 1x

211 ce

dar

~

:::. ·:~:

:-t~:

.giux

~,---·>

· . --

JXt:.~

: _:_'':_

~ sl

at w

/ 1/

2"

~

co g>

~

r,

spac

ing

~

:;.'.. '§

~!·

~

2x2

" tim

be

r fr

ame

,/1·"·"1 -_·

_ ---·

·"":"-

"-_" ..

'·""_"

_·" :

_, =.,o

.~]~X~

l--.--.,

.. "~"=_""

-~""-·-.·-

-.-.,--.-

. --"·"-

···"~~

.:.1~_x,.-.,

,_"=-_"r.-_:

:.·-." _

__ -__ ---"

'~"'

[ ~

-....

1x6"

ced

ar f

loor

_

_ .

. .

.. ,

""""""

. ·""

".

""""

·""'

. •·

""

'"""

""""

'"'"

"'""

'"""

"'

""-,

.h

bo

ard

s w

/ 1/

2"

Ele

vatio

n

Sea

t be

nch

/ st

ora

e S

cale

: 1"

= 1 '

-0"

. --

--,_

__

_

·· ·

. .

I. .

. 16

, --

spac

ing

· -

., ~

· '

refe

r to

'tim

ber

-----------

· pl

ante

r on

-----

slab

' det

ail

-ro

ugh

hew

n ap

pea

ranc

e -

smoo

th s

ande

d fin

ish

-so

lid w

ood

-ye

llow

ced

ar

-ap

prox

450

mm

x 4

50m

m -

heig

ht v

arie

s

-----

anch

or

-----

sand

blas

ted

woo

d

Slo

pe 2

%

Slo

pe 2

%

/ st

ump

/ -----

AF

M N

atur

els

Cle

ar

/ /

/ P

enet

ratio

n O

il, S

afec

oat

--~

~-,.

....

., ..

, /

~ho

usek

eepi

ng s

lab

100

mm

/

rein

forc

ed a

s re

qu

ired

pour

ed in

pla

ce r

ubbe

r pl

ay s

urfa

cing

~-

void

ing

-re

fer

to a

rch

itect

ure

/ dr

ainm

at c

/w f

ilter

fab

ric

--

--

... ::.:

--

-::...

. .::

=·:::.

::: ....

.:.--~

-~

-.:..

.. -

--

-....

.:. -

--

:..... ~ -

=--

pro

tect

ion

bo

ard

on

wat

erp

roo

f m

em

bra

ne

-re

fer

to

.., ar

chit

ectu

re

~~

--------------------~

----•

--_

-~-

-st

ruct

ura

l sla

b -

refe

r to

arc

hite

ctur

e

Tim

be

r se

atin

b

lock

s on

sla

b

Sca

le:

1 M =

1 '-0

"

Rev

isO

n

No

. D

ate

Issu

e N

o.

Dat

e Is

sue

Not

es

2019

-06-

21

Issu

e fo

r D

P

2020

-01-

29

lssu

efor

Re•

Df'

DP

19-

8666

90

Pla

n#

30

May

5, 2

020

eta

''"""··

""'""""

1690

We,

t 2n

d A

venu

e

Van

couv

er .

BC .

Can

ada

. V6J

1 H

4

I 16

04.6

83.1

456

I j 6

04.6

83.1

-459

w l

ww

w.a

tala

.ca

Proj

ect

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Dra

vvin

gT~l

e

Sit

e F

urn

ish

ing

s D

etai

ls

Log

a

Leg

alA

dd

ri;s

slin

e 1

Leg

alA

dd

ress

line

2

Leg

alA

dd

ress

ine

3

Ora

vvnB

y

-..

s,,

Rev

iew

ed B

y

00/0

010

0

Ptj

tdlO

2180

6 -as noted

L11

.0

Tota

l She

ets

Page 105: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

NO

TE:

RA

ISE

D P

LAN

TER

S O

N S

US

PE

ND

ED

S

LAB

TO

BE

SE

PA

RA

TED

MIN

IMU

M 1

' FR

OM

B

UIL

DIN

G W

ALL

S, T

YP

.

1----

--+----

---------<

oncr

ete

wal

l -4'

max

-------

~ra

in ro

ck b

ehin

d w

all

-------

-Nile

x 20

02 w

oven

filt

er fa

bric

, 15

0mm

ove

rlap

drai

n ro

ck

~----

+--

4" pe

rfora

ted

loo

ting

dra

in­

con

ne

ct t

o st

orm

~

----

---+-~

onc

rele

uni

t pa

vers

----

---+

-~

ein

forc

ed a

s re

qui·e

d

CIP

Co

ncr

ete

Pla

ntin

B

ed

Wa

ll o

n S

lab

Sca

le: 1

" =

1'-0

"

Rou

gh c

ut c

edar

t Gx,2

----­

timbe

r sl

at b

ench

wiri

ng f

or li

ght f

ixtu

res 1

1----­

be c

onne

cted

thr

ough

re

tain

ing

wal

l

finis

h gr

ade

of p

lan

lin

,~

----

com

pact

ed g

ranu

lar

Ben

ch 'N

all

Sca

le: 1

" =

1'-0

"

Wal

l lig

ht fi

xtur

e Q

uant

um

Pot

ycar

bobn

ate

Ref

er L

X,X

X/X

•=

l'-------l-

----2

50

mm

(10"

) th

ick

cont

inuo

us c

ast-

in-p

lace

co

ncre

te w

an

ls!,~

~~

~----

Con

cret

e st

ruct

ure

slab

&

build

up la

yers

ref

er to

ar

ch &

str

uctu

ral d

wgs

, &

sp

ecs

CIP

Co

ncr

ete

Ste

sa

t G

rade

S

cale

: 1"

= 1

"-0"

II II -

IT -

s· o

t cru

sh-c

omoa

cted

sub

-bas

e

S1e

p Li

ght a

t top

and

bot

ton

s:ep

-1

-1

-

2019

.0C.

.21

20~

0•-

29

fw-l

s.!""

fcrf

l?

DP

19-8

6669

0 P

lan

# 3

1 M

ay 5

, 202

0

eta

""°"'"

·""

""""

1690

Vln

l2nd

Ave

nue

Van

cou~

c,, B

C,

Can

ada.

V6J

1H

4

t 1

60

~,6

8],

M56

f 16

04,6

83,1

~59

w 1

w.v

w.c

tala

,ca

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Sit

e F

urn

ish

ing

s D

etai

ls

, ... L~j

A;ld

-.,...

;;I..

..,.

-~

Md•

..s.

.lri

.-2

le;:,

dl.

:ld•

imln

e3

Dra

wn

By

Rev

iow

eo

3y

O(l

'C<l

'OO

L

12.0

To:.I

Sne

.11s

Page 106: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

I 8

'0"

En

gin

ee

red

stru

11----------

---.o

------

-·.

2" d

ia s

teel

pos

t wel

ded

to s

q po

st b

elow

----------

-

Pai

red

wo

od

arm

pre

dri

lled

fo

r ca

ble

Ca

ble

ho

les

Vin

e su

ppor

t---------

-~

6x6

HSS

pow

der

coat

ed p

ost---------

-+,

Ste

el

fin a

nd

pla

te b

olt

ed

to

buttress--

------

--~~-1

l. •

Thi

cken

ed b

uttr

ess

to s

uppo

rt a

rbou

r po

st----------+

-[]

--+-

"'-•

Gra

vel

dra

ina

ge

co

urs

e

Ele

vatio

n La

r e

Arb

our

Sca

le:

1:20

1

6'

4"

,,

,,

Eng

inee

red

stru

,1---------

-----I!-----

2" d

ia s

teel

pos

t wel

ded

to s

q po

st b

elo,

w----------

---•

Pai

red

wo

od

arm

pre

dri

lled

for

ca

ble

~

Ca

ble

ho

les

Vin

e su

ppo

rt-----------,

~

6x6

HS

S p

owde

r co

ated

pos

t--------

--+

<

Ste

el f

in a

nd p

late

bol

ted

to b

uttr

ess-------

--

-t-

H>-

il

Thi

cken

ed b

uttr

ess

to s

uppo

rt a

rbou

r po

st----------t-+

-!f,•

Gra

vel d

rain

age

cour

se

Sm

all A

rbou

r S

cale

: 1:

20

Ele

vatio

n

"' "'

1

Co

ncr

ete

pa

vers

1

~?

,

Con

cret

e pa

vers

0 CX) (0

st

(0 <:

... - P

lan

Pla

n

-- ~ - = =

- - -

Pa

rap

et

thic

kene

d bu

ttres

s su

ppor

t fo

r ar

bour

pos

ts

c..:

, _ _

,~

-2

" di

a st

eel p

ost

wel

ded

to s

q po

st b

elow

x6 H

SS

pow

der

coat

ed p

ost

Pai

red

woo

d ar

m p

redr

itled

for

cab

les

- - - ~ =

~

- - -

~

-----

;:::::

::---

-

-----~

Pla

nte

r w

all

:--- -- ..______, th

icke

ne

d b

utt

ress

su

pp

ort

for

arb

ou

r p

ost

s

2"

dia

ste

el p

ost

we

lde

d t

o s

q p

ost

be

low

6x6

HS

S p

ow

de

r co

ate

d p

ost

-------

SS

ca

ble

s

------P

air

ed

wo

od

arm

pre

dri

lled

fo

r ca

ble

s

-00

No.

D

ate

•=

No.

DP

19-

8666

90

Pla

n#

32

May

5, 2

020

eta

""'" ... m

,,,.m

..

1690

WH

I 2n

d A

venu

e

Val

lCO

UY

.,. •

BC

• c

.n.d

• . V

6J 1

H4

t 16

04.6

83.1

456

I j 6

04. 6

83.

1459

w lw

ww

.•tal

•.c•

~:~~~~== .. :: :::

.~.~,;::,~

~n:.!te .. ~= ~

:; ...... 1•,

_o

f_

_,.

«,.

,dlM

CG

najl

afflo

t, ..

,.t

aln

o-lp

--

.Su

cl'

lln

lon

nall

...,

_n

<>

\l>

e\J

fNfo

,..,

,pu

-•O

-tll

wl

fo,V

Nco

nfl

NC

llo

no

fVN

,ol-

,e.d

pn

,jact.

,.,,

,o_

.,.•

•••"

"""'

,.,.

.ilff

caH

en

or.

,.1

1o

-.,;

1n

ou

1,n

oc..

.-,n

r,p

,1o

,.,r

i11

..,

::=.~

::.=.

:.: ... r-

-~

.r.-

.. ilh

ou

ll"'

"llt

Jo

rl•t

ol

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Dl"

awin

grrt

le

Sit

e F

urn

ish

ing

s D

etai

ls

"""

leg

i!IA

O;l

ress

ine

1

Legi

11A

i:t:lr

essi

ne2

leg

i11

Ad

dre

ssin

e3

-0 218

06

~~~ --

f-;;

;,;--

­D

raw

n B

y i:

.-o

o&

,

Re

vie

we

d B

y -~--

--

00

/00

/00

Plo

lOa!

e

as n

ote

d

L13

.0

To1a

l Sh

eets

Page 107: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

~-------

---

--F

OR

O

FR

T1

70

0-S

Q-M

1-F

S-3

6

Fl,\I

ISH

. A

lli;l,N

la;r

n?

0"4

nf~

Jl'l!

l)n

lffi:

!Ud

w!t

nE-

Co;

r.ru

np

roo!

'lr-n

T

htrM~

~m

1.-

fS,,

.:..

.,.1

""""

'-'•

d•1~

1,!,o

l;,,>

:11,

o,i4

11l,,

.,...~

i,u,t«

.,._

T0S

l'EO

FI'

; fl

llt7

txV

iQ·l,

U.f£

-.36

,u .

...-

1

J "

,,--T

~ E

:~ ~ ~

-

D!M

E,-

.sio

t•.S·

_.,

,.

5'11.

15""

/1~.

)u,\)

~

wt,

,.,,

,1

~~

...

1"'

('1

1.l

cl>i

W

tW,i;

1o

uib

(H

)

VIL

LA

GE

SH

OP

n, •

.i:1

~c

h0!.1

1ro

a,.,

._.,

h•

ptay

i.rg

•in

,l'I

thJ

dtv

1W:l

l\<

l1o:1

1:w

dr

oo

l,o~

f\d

""'<

llll

lel

ttco

bo

rn;h

lll:;

io.,

Tllc

d•;a

ma~

.:c;:

lay

1a

inr1

0s

ol"•h

cu1

11li.n

ow

r.o

~mb

.lh

ue0

11

0o

mlo

f m

1n

yr.

ou

r1o

lcoo

~r,

11c

dn

,!1

pt•

y!l

iat

r;hi!

drw

1 w

~!r

-l:m

I.:>

ag:v

n an

d -:

,,,n

, Th•

cc1

1ntu

,.,~I

Ju

nc:.

.:n

••1

hQ

p,.·

,ntl

aN

.. w

1II

H1

b.,

nd

lin

~,

C1,

k!re

n·1c

111n

-;11<

:~r•

y.n

..b

mch

ln1l

o C

hild

ren

's p

layh

ouse

w:U

dm

ulo1

lab

A1a

U 1

11..:

ll!J

nd

on

n ll

;llle

.lO<I

T

hero

rr,1

1n~c

;',l'l

11y,

w:n

d~

-st1.

,nd

lon

cse,

en,,

0

1<:im

11.a

nm

1nip

lte

p'.l

ly.W

hc

nd"<

i:O..-

.n

•11

11;o

~ln

drd

rn•f

cp

!ay

l11r

11<:

1.m

lyln

l:n._

, im

99in

•h~

•nd

em

pe

lhy,

t',,

y.:s

11

;:la

yQ1.

.! cw

rycl

1y

1c.r

.•ri

"11

hlll!

llcy~

lhil#

ill>

al'd

1u

n•u

<>:lc

nila

mi,"

11,1

!1""

n,

!)ol

.1Ln

!,l'h

sirl

.h1

0!;1

1M1~

cn•

.Wh:i

.ao

ino

.o.1

t1,ry

,;on1

W.l!

y

llllll

l. .a

nd w

<nm

uflk

:4\8

,r, .. )

hlh

e!r

""""'

•b

u•

9111

dy1

fm11

lilfn

glll

ng..

i,;,

•m1r

n:m

.J.,

95l,

:jla

Ol 11

1cn

1<

1M

l»'h

H

A(l

•G

roui

,

Pla

yC

ll!l

itll

i'

Co

lorO

pl!G

n1

~----------so

o SE

RIE

S M

BR

50

0-S

,/~

.

FIN

ISH

":

I ll

f~ ,

;,;,m

;,cne

rr::,

In

! p

~e~

v.·

itli

£-C

ea: r

u.n ~

~lln

e,.

The

Mq

l"' P

c-

rg:1

1 s-

,,t~

m i:

,r::vffl

I d

urt

.hio

: t.n

ah o

n 1c

l ,..,

eQII

3urf

Hn

_

.

0-0

01

c -f

'o-M

l-t!

Wlt

(Qii

,r

Gilv

..r>

im!F

in11

-'1

-5u

rt.m

i·M

;u

rill

'-!2f

l.WO

-s..G

/

22 1

/8"

J -

,562

mm

) --!

e M

AG

LIN

I 5/

8 41

mm

j

'.'4

1/2

,

1 l:

4mm

l·-1

•U-•· ,,

__ . ...,

_,_,

.,.,._

,...,.

.,tr•

•,,.,..,

rd-

'\.lfF""

""" ....

_,_

._..,.

__

_ ...

. j,,,_

Mtl<

-,,

.._.

.,_,

,.__

,,.,

__.,_

..,,

....

..,o

)-C

_,e,1

..,,_,

..,

D!M

ENS!

ONS

. rl

ep'lt

; l,

-JU

.9c.-

=I

lao"

I!"-

IU.!

'j(

I.~

"'

"~

1!.J

te-

(Hl.

ll

~----------1

05

0 S

ER

IES

KO

MPA

N"l

-"'"

...,

ML

B10

50B

-R

f(N

iSH

· N

i,~

c.om

::,:

r~n

ts V

'O!

p.r,m

,ned

..,.,:

h [-

0:1.

: n

s ;:.

.-001

\fie,.

Th<t

"-l1t

!ln

~a1

:ly,u

!m~

ad

u-a

b!<

r""'

51

1o

n:J

!,r.11,

:~I~

~•-

TOS

PE

OFY

:

"·-

·""

""".k

,ma1

C,,.

.,..

-HO

PE(r

~<.

tplm

i.:)

CD

ro,

-w~o

,;1c;

,....,

1ocu

,r.,

(G,~

Ct<

ar,E

r~w

nj

;;,..

,.._

~,1

.,;1

,...

.i ...

.. ts=

N-"

""1

•-~

<i)

.!,flr

•-•_

,,,,.,

...,,._

w,.

., ...

. ~,.

,.< ...

. ""'

w,clo

""--;.;

,-_..,<

.,..

-••t

~,,_

..,.,_

.,. ..

. .,~

. .,,.

..,,

,..,

_.,

:,1

e-,

-u.

~

I 5

I .._

____

___)

O.:M

EN

SIO

NS

· ~

gt.

, J"

f.s°(

ol,l

.\,ct

!'J

~-

;-;,;

rn""

'1

o.,.,

ih-

tu·1

•19,

..,.,J

'1,

/e,(

f~·

l'J.

7~, [

~a T

-«1

Qua

rziti

2.0

G.i

Klr

rCl

JID

1N

AT

"4ou

nt;

tim;

CUII

02

NA

T

~'~

,;;~lt_

Sha

pes

& S

izes

DO.

,_ •

. ''"'·"""••··-~-

.... 1.3

,o

<~

Q!I

U•!

JIG

l·O

fU,

0 P

orce

lain

pav

ers

ST

ON

E F

INIS

H

Ava

ilab

le C

olor

s

Re

sist

an

l

'!

Tc-l

r"tu

o,ltt

--..1w

To

brn

kat•

i ·•

Eas

ier

rr

~ ti

fod

H!I.

To

liy

b Ton

,ma-

,.

"''""'

~'c

tl.J

Jl

l',\'/

f!II

S'1

'11C

..{;,1

Ja0

'4"

U...

,_o<

'!-

u".o

"'..

:C•

io,0,,

•,..

4

1•,,

11

,a ..

,--r. ......

... .,., ........ ry,

....

.. 1

...-

.11

, ...

"""°

""""'"

'.,._, ..

. .,. .

.. ~,i

n,,

rM

lt>

f-0

.----------

---K

ON

TU

R

KN

CH

20

00

-M0

,- ~~

flN

!SH

: A

n 1m

:I w

ml'(

>!'IC

"h J

l'I:

J>l"

ltclc

l w

'rtl E

-Co.

.."\ t

ijst

~f.,

,,:. T

ho. l

.t:~

l.'n

Pow

dct

to.;

t ¥

-'"''

o=

~ ~

:l~r

.,bk

, 5:-,

~h C

11.>

I! m

,:,t,~

l,u

<m

ci.

TOS

P£C

JFY:

Sc

-lac!O

:CH

20'

.D-M

O

Ch:

.c:,

·l';

i'Hdc

r,;a..

>!.C

..!ci

r

~M

AG

LIN

""-

"-~---

--,.~-

•---,r;f

•~~·-

ln< _..,~ .. A ....

---•

.:Oh

ri,,"

"...

,._

,.

•-¥

<1

-""

""'°"

',,_,,..

,.....,.

e;=

••'"l

f"4'<'"

!Urz>

"'<

ar~

OIM

CN

SIO

N5:

-C

"'

llC

D"(I

J-'

=1

..,.,1

;, 1'

150"

(4~.

5crr

.l

Wel

p>{.

lM

o!~

1!lU

411

Riw

lwn

No

tu

"'""

No.

D

ate

DP

19-

8666

90

Pla

n#

33

May

5,

2020

eta

'""""" .

,.,,.

,m ..

1690

W~

t 2nd

Ave

nue

Vun

couv

e:

BC

C

ana!

:la .

V6J

1 H

4

t 1

60

-l6

"31

456

I f6

0-'1

66

31

¼9

w t

ww

w.e

lal.

l.ca

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D,

BC

Cu

tsh

eets

-L.OgeJMJrt:31

l;oo

l

l...

eg

,l)~

1"3

!00

2

L.e

gcl~

rtm

llrl

o3

-­OT ~

1C

2180

6

""'

-.. Dra

wn

By

as n

oted

r:

....

..w

llty

Re

vie

we

d B

y L1

4.0

Tot

al S

he

ets

Page 108: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

CLI

MB

ING

NE

T

The

Clim

bin

g N

et Is

a ~

,sa

lle

dlm

be

rlh

al

chlld

ren

w!l

lwa

nt1

0tr

y11

1a

ln1

nd

ag

aln

.Th

e

lncl

loe

dsp

lde

rne

tan

dro

pe

swllh

cilm

bln

g

de

als

olle

rslu

na

nd

ch•l

len

gin

gw

•)'$

10d

imll

up

wa

rds

•nd

do

wn

ag

aln

. Th

e S

pid

er N

et h

as

par1

lyln

dlne

dhor

lzon

talr

un11

s.w

hld

iad

dsa

n

e>11

r1 cl

lalle

ng

elo

lne

loo

tsu

pp

orl

wh

en

ct

lmbl

nliJ

.Thl

stra

lnsp

rop

rlo

cep

llon.

spat

lal

1/

30

.01-

20

20

KP

L201

Pin

e B

ench

. 1

aw

are

ne

ssa

nd

cro

ss-c

oord

na

!lo

n.l

-lJo

fth

ne

mot

ors~

lllsa

relu

nd

am

en

lalf

Of]

ud

gln

g

dls

lan

cna

nd

ma

n1

11

lrtg

the

surr

ou

nd

fng

s co

nf,d

endy

,a\O

idin

ga

cdd

an

ts,T

ha

Chm

oin

g R

op

es

offe

r a d

,ffe

renl

~In

d o

r d

imb

lng

. din

gin

g

on

toro

pe

swh

Ne

go

lni;

up

wa

rds.

Th

ew

rle

d

cllm

bln

gb

aln

,f'

lea

m,,

leg

an

dco

rem

usc

tes

ln1e

nsel

y.T

he s

pe

clo

usC

llmb

ing

Ne

tca

nh

old

men

ych~

dren

.dlm

bln

gto

ge

lM:r

orl

akl

ng

a

bru

k,d

ew

toi,

lng

!mi,o

ruin

tso

ela

l•e

mc1

1on

al

sklD

s. KO

MP

AN

l-Le

t'sp

1ay

O~s

slc

des

ign

ed p

ari

fu

rnit

ure

wit

h l

ow m

al,

tt'n

ilnrt

c rt1

3ltr

ial>

sue

~ a~

'lo

l d

iµ g

olv

~m

ied

~l;;

~I

and

hi~

h o

ua

lit}

·woo

d. T

hcw

ooo

cn

00Jr

d~ar

cc1f

1-n

prcg

na

tcd

DU

e w

oo~

or t

·~1d

1·,oo

d.

Pro

du

ct

Lin

e O

vtd:

ior

Fum

it~re

IN­

GR

OU

. S

UR

·

""'

Ca

teg

ory

C

lass

i, O

utd

oo

r Fu

rnii

ure

To

tal

he

igh

t (C

M1a

2

-l(Q

MP.

t.N l

NC

.iO!,

W H

OW

"Ull

Lin

e. S

u~

J;l

1(

01U

'Alt

FSC -i

e Ho.

FSC

-C0O

,U~0

A

us:l

nT

l!7

8;S

JP

l'on

e

1(8

~0)4

26-9

788

,.,.,_

fsc.

otci

U

SS

.lit

\ 01 o

mpJ

I\C

Cff

l I w

,,w

ko

-p,r

u.s

Th

e m

,1,..

ol r

es11

ar'5

1~1e

I~

KO

MP

AN

i-le

t<sp

1ay

l1e

mn

o.N

RD

a1

~1

001

Dim

en

sio

nsLl

C'M

cH

Age

Gro

11p

l'la

yC

ai,a

clty

Cc4

or0

plio

ns

8'2

'1 8

'1o

·x 8

>1

2

7ch

lldre

n

BE

E S

PR

ING

ER

Th

eB

ee

Sp

ring

erw

ilnlt

sri

chta

cille

ele

me

nts

11

nd1p

penl

lngs

h1pe

met

i1o1

1!e

seh

lldre

nto

rock

, al

on

eo

rtw

oto

ge

the

r,T

he

rock

lng

mo

-.e

me

nt

anra

cts

child

ren

11g1

lnan

daga

in l

orsh

ort1

1r01

lo

ng

er1

ide

s.l\

:,1

rtfr

om

itsc

h1

rmin

g

11i,p

enra

nee

,th

eB

ee

Si,

rlng

erh

as1

r!e

ht.

1cU

le

1o11

rlatlo

n w

lth

lls r

vbb

erw

inlls

,wo

od

en

bo

dy

11nd

stal

nle

ssst

ee

lh1

nd

an

d1

oo

tha

ds.

Ta

c~le

rlch

ne

ssls

am

aln

mol

i1o1

110r

,esi

:,eei

,ay1

or

10

vng

er c

h~dr

en. I

t su

ppor

ts th

eir

vn

de

rs!a

nd

lng

olm

ete

rla

lch

ara

cte

rlsU

cssu

ch

asw

elg

ht.

smo

oth

n1

1ss

,l11

mpe

r11l

urea

nd

lnib

ility

,Th

isis

imp

ort

an

linl0

1ch

ildre

n's

a

blll

lyl0

1$

se

ssd

llfe

ren

ces1

nd

m1

~e

d

ec!

slo

ns.

Th

eso

olh

lng

,roe

kln

gm

o-.

em

en

tso

l th

eb

ee

tra

lnss

pa

ti11

awar

en

ess

an

ose

nse

o1

bala

nc11

,wh

kh

are

bo

lhcr

ucl

all0

1b

od

y co

nftd

ence

, wh

lch

lslm

po

rta

ntr

orc

nlld

ren

to

aw

ldfa

lts.A

go

od

se

nse

olb

ala

nce

als

o

imp

rose

sth

e11

bilit

ylo

sils

till

•ndc

om::e

ntre

t11.

KO

MP

AN

i-te

1-ip

1oy

11em

no.

NR

O11

8-0~

21

Qon

•ra

JP

tod

uclln

lorm

atl

on

o,m

ensl

onsL

>CW

:lH

Age

Gro

up

l'la

yC

ap

tclt

y

C01

010i

:,~on

s

2'6"

12

'3"1

2'5

,., 1c

hlld

D~

la ,

, Ju

bji:c

ttoc

hang

e1<

,tilo

utp1

io1

no

tice

A.

201

9-06

-~I

202

0-01

-29

R,>

.!<!"

"fe<

[}?

DP

19

-86

66

90

P

lan

# 3

4 M

ay 5

, 2

02

0

eta

"""""

·"·"·" ...

·,6

90

Vlu

t2nd

Ave

nue

Vam

:ou

;er.

BC

. C

anad

a. V

6J 1

H4

1 16

(),1,

6113

,1'\5

6

Ji6

04,6

63.1

459

w

l-ct:

lla.e

a

Aff

ord

ab

le H

ou

sin

g P

roje

ct

5491

No

. 2 R

OA

D

RIC

HM

ON

D, B

C

Cut

shee

ts

. ... Lll;

µA

,jd.)

".,,;

1"'1

1

~M

d-e!

iSll'

ll12

Le,µ

,_,,

.ess

lne

.:;

Dfa

wn

B~

Rov

iow

oo

3y

00

/00

/00

21

806

L15.

0

To:

a S

rie.iu

;

Page 109: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

TR

EE

PR

OT

EC

TIO

N F

EN

CIN

G

Min

imu

m R

adia

l D

ista

nce

fro

m t

run

k

# T

ype

DB

H

Met

res

Fee

t 10

R

ed M

aple

25

cm

1.5m

4.

9ft

11

Red

Map

le

25cm

1

.5m

4.

9ft

12

Red

Map

le

28cm

1.

7m

5.6f

t 13

R

ed M

aple

20

cm

1.2m

3.

9ft

14

Red

Map

le

22cm

1.

3m

4.3f

t 15

S

ibe

ria

nS

pru

ce

25cm

1.

5m

4.9

ft

SC

ALE

D

TO

Fl T

2

.5

0 5

10

ALL

D

IST

AN

CE

S A

RE

IN

M

ET

RE

S

AP

PE

ND

IX

3 T

RE

E

PR

OT

EC

TIO

N

PL

AN

D

PL

AN

B

CP

33

72

8

' I

r,ooc

Acl

~s I

~---=-

_] 1

VE

Cr-

l1'il

.C..b

__

__

__

__

__

__

__

__

j E

OJ

IPlvi

cW

O

NLY

Po.

ge

8

---------

7 I I I I I -:O

AR

·' A

llJl

fN

-'<

Y :

RA

l/-:o

I I I I

SIT

A

C I N

I-

TR

EE

IN

VE

NT

OR

Y

# T

yp

e

Act

ion

D

BH

M

PZ

1

Pin

oak

T

rans

plan

t 6

1cm

3.

7m

12 R

ed M

ap

le

Ret

ain

28

cm

1.7m

2 P

in o

ak

Tra

nspl

ant

44

cm

2.6

m

3 P

in o

ak

Tra

nspl

ant

33

cm

2.0m

4

Pin

oak

T

rans

plan

t 4

2cm

2

.5m

5

Pin

oak

T

rans

plan

t 1

5cm

1.

0m

6 P

in o

ak

Tra

nspl

ant

42

cm

2.5

m

8 R

ed M

ap

le

Re

tain

1

5cm

0

.9m

9

Red

Map

le

Re

tain

1

5cm

0

.9m

10

Red

Map

le

Ret

ain

2

5cm

1

.5m

11

R

ed M

aple

R

eta

in

25

cm

1.5m

13

Red

Ma

ple

R

eta

in

20

cm

1.2m

14

Red

Map

le

Re

tain

2

2cm

1

.3m

15

Sib

eria

n S

pru

ce

Re

tain

2

5cm

1.

Sm

DB

H-d

iam

ete

r, M

PZ

-pr

otec

tion

zone

TREE

P

RO

PO

SE

D

DP

19

-86

669

0 Pl

an#

35

May

5, 2

02

0

FOR

R

ETEN

TIO

N

CR

mC

AL

RO

OT

~ Z

ON

E (C

RZ

blue

) ,_

.._,,,

._,_

......

TRA

NS

PLA

NT

/~

',,

PRO

TEC

TIO

N

ZON

E ,'

6 7

9 \

(t.4P

Z)

----

.,,,"

... ,

: L

FEN

CIN

G

DIM

ENSI

ON

S

\ 3.

N

MET

RES

/ 05

\

I I

I o

I

I /

\ I

\ I

',

.,,,✓

,,_

_

_./

RO

TEC

TIO

N

FEN

CIN

G

..... __

_ ....

-:::

----

_ C

ANO

PY

(g

ree

n)

NO

TES:

1.

SI

TE

LAY

OU

T IN

FOR

MAT

ION

AN

D

lRE

E

SUR

VEY

DA

TA P

ER

SUPP

LIED

D

RAW

ING

2.

REF

ER

TO

ATTA

CH

ED

lRE

E

PRO

TEC

TIO

N

REP

OR

T FO

R

INFO

RM

ATIO

N

CO

NC

ERN

ING

TR

EE

SPEC

IES

, ST

EM

DIA

MET

ER,

HEI

GH

T, C

AN

OP

Y S

PREA

D

AND

C

ON

DlllO

N.

3.

ALL

M

EASU

REM

ENTS

AR

E M

ETR

IC

Fro

gg

ers

C

reek

T

ree

Co

nsu

lta

nts

L

td

776.

J ~

or A

-u~

8u

ma

by

8C

V5.

I 4H

4 T

Mph

ono:

60

4-7

21

-60

02

Fax

: 6

04

-43

7-0

97

0

549

1 N

o2

Roa

d Ri

chm

ond

BC

TREE

PR

OT£

Cno

N O

RAW

ING

TH

E D

RAW

ING

PL

OTS

A

LL

TREE

S,

PRO

POSE

D

FOR

RE

TE

~ON

, TR

ANSP

LAN

TIN

G.

THEI

R

CAN

OPI

ES

PRO

TEC

TIO

N

ZON

ES

AN

D

PRO

TEC

TIO

N

FEN

CIN

G

IN

REL

ATIO

N

TO

PRO

POSE

D

LAYO

UT

Mav

4,

2

02

0

Page 110: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

• G

BL A

RC

HIT

ECTS

IN

C

~39

EAST

8TH

AVE

NU

E .

ANC

OU

VER

, BC

CAN

ADA

VST

IRS

TEL

60li

736

11"

:::::::~

;:~;;t

'""~"

'"°'~

"" FA

X 60

4 73

1 521

R

EP

R00

UC

E0

'MT

IWU

~~

i:l~

~':;

1~C

TS

INC

.;~

:~

:~

~~

TIM

ES R

EM.I.

IN i

l!E

N

OTE

S H

CO

NS

EN

T US

ED O

R

DP

19-8

6669

0 R

efer

ence

Pla

n M

ay 5

, 202

0

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

3 20

20-0

3-19

DES

CR

IPTI

ON

OP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Revi

ew

NO

RTH

PE

RSP

ECTI

VE

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

0 1 l

:li6:

00 A

M

Aut

hor

Che

cker

1602

2

Page 111: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

• G

BL A

RC

HIT

ECTS

IN

C

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CAN

ADAV

ST 1

R8

TEL

60/4

736

11~

FAX

60/4

731

527

CO

PYR

IGfH

RES

ERVE

D:T

HIS

PLA

NA

ND

DE

SIG

NA

l!£A

ND

AT

,l.l.L

TIM

ES

RE

MA

INTH

E

EXC

LUSI

VEPR

0PER

TY0F

GS

LAR

CH

ITE

CTS

INC

..I.II

DM

AY

N0

TS

EU

SE

00R

R

EP

R00

UC

E0W

ITli0

UTi

HE

IRW

RIT

TEN

C0N

SE

NT

NO

TES D

P 1

9-86

6690

R

efer

ence

Pla

n M

ay 5

, 20

20

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP A

pplic

atio

n D

P C

omm

ents

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

SO

UT

H/ W

EST

VIEW

DAT

E D

RA

WN

BY

CH

EC

KE

D B

Y S

CA

LE

JOB

NU

MB

ER

3/19

/202

01U

6:00

AM

Aut

hor

Che

cker

1602

2

A-9

.02

Page 112: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

• G

BL

AR

CH

ITE

CTS

IN

C.

139

EA

ST

8TH

AV

EN

UE

T

EL

604

736

11~

VA

NC

OU

VE

R,

BC C

AN

AD

AV

ST

1R8

FAX

604

731

527

COPY

RIGH

TRE

SERV

ED:T

HIS

PL.A

HA

HD

DES

IGH

AA

£.I.N

OA

TN

..LTI

MES

REJ-

.l.llH

THE

EXCL

USIV

E PR

OFE

RiY

OFG

BLA

AC

HIT

ECTS

INC

.AllO

M~Y

HO

TBEU

SEO

OR

RE

PRO

DU

CED

WIT

HOU

TTH

EIR

WR

ITTH

ICO

NSE

NT

NO

TES

DP

19-

8666

90

Ref

eren

ce P

lan

May

5,

2020

REV

ISIO

NS

NO

. D

ATE

D

ES

CR

IPTI

ON

2019

-06-

28

DP

App

licat

ion

2020

-02-

18

DP

Com

men

ts

3 20

20-0

3-19

A

DP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Rev

iew

SO

UT

H/ E

AST

PE

RS

PE

CTI

VE

D

ATE

3

/19

/20

20

11

:l,6

:00

AM

DRA

WN

BY

Au

tho

r

CH

ECK

ED B

Y C

heck

er

SCAL

E

JOB

NU

MB

ER

16

022

A-9

.03

Page 113: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

• G

BL A

RC

HIT

ECTS

IN

C.

1 39

EAS

T 8

TH A

VEN

UE

VAN

CO

UVE

R,

BC C

ANAD

A V5

T 1R

8 TE

L 60

4 73

6 11

5

~~

~::

r;:~

VE

O,T

HIS

PLA

N,V

,IDD

ES

IGN

AR

E,V

,1

FAA

604

731

527

REP

RO

DU

CED

Wli

:~~

:l~

~C

HIT

EC

TS

INC

,V,1

0 MA

~:~~

~ ~~E~

REN

.I.IN

THE

NO

TES

IRIIT

EN

CD

NSE

NT

O

R

DP

19-

8666

90

Ref

eren

ce P

lan

May

5, 2

020

RE

VIS

ION

S

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

NO

RTH

I W

EST

VIEW

DAT

E D

RAW

N B

Y CH

ECKE

D B

Y SC

ALE

JOB

NU

MB

ER

3/19

/202

011:

46:0

0AM

Aut

hor

Che

cke

r

1602

2

Page 114: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

Cf)

CJ

z I Cf)

- z a:

:::>

LL

DIN

ING

CH

AIR

: M

AG

LIN

'KO

NT

OU

R' C

HA

IR

MA

GL

IN K

ON

TO

UR

JO

INA

BL

E T

AB

LE

S

I I- :::>

0 Cf)

<{ w

a:

<{ >- ___J

y

0 z w

a:

LL

0 a:

(l'.)

y

I- (/) w s

<{ w

a:

<{ >- I- z w

I-~

Cf)

<

{ <

{

I-w

C

f)

w s

y D

EN

OT

ES

BIR

D F

RIE

ND

LY P

LA

NT

ING

I l­ a:

0 z

Rel

lisio

n

No

. ·­No. 20

19-0

6-2

1 Is

sue

la O

P

,, ..... , ....

.. DP

19-

8666

90

Ref

eren

ce P

lan

May

5,

2020

eta

··"""··· "

'""'""'"··

1690

We5

1:2n

dAvf

flue

V

aoeo

uv91

' . B

C .

Can

ada

• V6J

1 H

4

116

04.6

83.1

456

fl6

04.6

83.1

459

w 1

ww

w.1

taJa

.ea

AII

Rlg

hb

Res

..-.

ed

bye

tt.a

lan

do

cap

ea

rch

ote

ctu

reln

c.

lrd

-oo

co

ftta

,..d

""lh

eH

do

c.J

m..

,t:,

iop

Mo

l.,,

.e.i

-Ao

nl'

o

-•n

lll•l•

-c-.o

,,d

tl,o

c.o

-,.,

l,-,

.oh

llll,o

laln

c,-

.Np

1

1,.

....

r.s.

.d!W

__

_ N

>11>

o .. ..

iro

r...

,.,_

.,,,

_0

U-l

han

lo

rV

IO

--'l

i°"alV

IO

,,,l

on

nced

~M

Jo

__

__

o,

fflO

<llf

fca

do

no

flh

od

oO

....

-•lt

no

ullh

oC

...,

."'-

•p,\

Drw

mt.

.,

=~=-

~::.~

=...,

,•,oo1

o,1..,..

,...,,.,,..

.,1•MJ

111tt0<

logol

Aff

ord

able

Ho

usi

ng

Pro

ject

5491

No.

2 R

OA

D

RIC

HM

ON

D, B

C

0..a

win

gTr

tle

Pre

ced

ent

Imag

es

.....

Le

ga

1A

dd

ress

lne

1

Le

ga

1A

dd

ress

ine

2

Leg

alA

dd

ress

lne

J

Pn:to

<•~

OT

~ ... 81

Dra

wn

By

~&

,

Rev

iew

ed B

y

00/0

0/00

f>tl1

0a1e

:

-· 21806 - . as note

d L

0.5

Tota

l Sh

eets

Page 115: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

PL

Low

er

win

dow

-to

-wa

ll ra

tio

Lig

ht,

neut

ral

tone

s

PL

J

Lig

ht,

neu

tral

to

nes

Fram

ing

elem

ents------

-•-.:

:::

Rec

esse

d ba

lcon

ies-

------b

:~

c-\:!

:;111

~~

Low

er w

indo

w-t

o-w

all

ratio----

----l-

~~

"'k

:c±

c!..

.;•

Hig

h w

indo

w-t

o-w

all

rat

io

Ligh

t, n

eutr

al t

on

es

NO

. 2

RD

Th

e p

rop

ose

d d

evel

op

men

t si

ts b

etw

een

exi

stin

g la

te 1

990s

dev

elo

pm

ents

aro

und

Dov

er C

resc

ent,

Riv

er G

reen

[2

010s

). an

d fu

ture

de

velo

pm

en

ts to

the

No

rth

and

Eas

t. Th

e lo

catio

n th

en p

rovi

des

a lin

k be

twee

n th

ese

vary

ing

desi

gn s

tyle

s an

d sc

ales

. M

uch

like

the

old

er d

evel

op

men

ts t

o th

e W

est,

the

bui

ldin

g e

nve

lope

is

a hi

gher

p

erce

ntag

e of

sol

id w

all

rath

er

than

win

dow

wal

l. T

he e

leva

tio

ns h

ave

a cl

ear,

sim

ple

fra

min

g p

atte

rn s

imil

ar to

th

e d

evel

op

me

nt

dire

ctly

Wes

t, w

ith

rece

ssed

bal

con

ies

add

ing

dep

th t

o th

e fr

ames

. T

he p

rop

ose

d l

ight

gre

y

cem

ent

pan

el

is a

sim

ilar

sh

ad

e to

bot

h th

e a

dja

cen

t to

wn

ho

me

s a

nd c

ondo

bui

ldin

g. T

he d

ark

cem

ent

pan

el

add

s co

ntr

ast,

an

d t

he

wo

od

-lo

ok

sof

fits

are

a n

atu

ral

ton

e to

ref

lect

th

e su

rro

un

din

g m

atu

re t

rees

. T

he

flat

roo

f,

rath

er

than

th

e p

itc

hed

fo

rms

of t

he

90s

buil

ding

s, i

s ty

pic

al o

f th

e n

ewer

dev

elo

pm

ents

lik

e R

iver

Gre

en.

FUTU

RE

DE

VELO

PM

EN

T

RIV

ER G

RE

EN--

-

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E

VANC

OU

VER

, BC

CA

NA

DA

VST

lRB

TE

L 60

li 73

611

~ FA

X 60

4 73

1 52

7

COPY

RIG

HT

RESE

RVEO

:TH

ISPL

,1.N

AN

OO

ESIG

NA

AE.

I.NO

.lTJl.

l.LTI

MES

REM

.IJN

TIIE

EX

CLl

JSN

EPff

OPE

RTY

OFG

BL.

lRC

HIT

ECTS

INC

.MiO

MA

YN

OTB

EUSE

OO

R

NO

TES

DP

19-

8666

90

Ref

eren

ce P

lan

May

5,

2020

RE

VIS

ION

S

NO.

DA

TE

201

9-06

-28

2020

-02-

18

2020

-03-

19

DESC

RIP

TIO

N

DP

App

licat

ion

OP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

STRE

ETSC

APE

CO

NTEX

T D

ATE

DR

AW

N B

Y C

HE

CK

ED

BY

SC

ALE

JOB

NU

MB

ER

3/19

/202

010

:27:

SOAM

Aut

hor

C hec

ker

1602

2

A-0

.05a

Page 116: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

L----

-----i

-----------l I

DO

VER

CR

ES

CE

NT

-~ ----~ -

-------

/

~OVE

R P

AR

K

1------

i I I

I I I

65

-4"

APP

RO

X.

19.9

m I

'-

(,

I I I

I I I

I I I

, I I

,;.

,.4'

~· 'l-"

-6.0

,<>

'}"

EXIS

TIN

G P

EDES

TR

IAN

/ CY

CLI

NG

PAT

H

~" '}

·

TOW

NH

OU

SES

.~

,.i>

/ --

------

-1

~\

I •'

1t,

,..

,

D~

:0-~

)

FUTU

RE

RES

IDE

NT

IAL

iVEL

OeM

El>J

J. -

. -. -

. -. -

--

19

5'-

2"

59.5

m 14

7'-

10

"

CH

ILD

RE

N'S

PLA

Y A

RE

A(L

l]

.. ~ i ~

- BO

ILE

R

RM

RO

OF

-EL

EVAT

OR

O

VE

RR

UN

RO

OF

l,.ef

RO

OF

AC

CE

SS

TO _

__

__

_ .J

E:u

~;~

:~iC

t~L-

:;Y-------.....1

~

10

7'-

33

/8"

h '}

..,_

'b32

.7m

'

y ... 1

!;4

'-7

" ?.

!,7

'> 4

4.l

m

-,1-'

,,1'

,,,p,

,,{'

,,i'

-PA

RK

AD

E

EN

TRY

RA

P

.. ~

:us

t

! E

,OU

LE

VA

RO

II EX

ISTl

~G T

REE

' TO

BE

rEM

OVE

D

.,.'P'

-+rr

n--

--+

-1 SI

TE vE

H1duLA

/ AC

CES

S I

,,

I ,/-@

,I

/

J

EXIS

TIN

G T

REE

S TO

BE

REM

OVE

D

~N

EW

LE

TDO

WN

~· '}

"

C)

AP

PR

OX

. LO

CAT

ION

OF

EXIS

TIN

G H

YDR

ANT~

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CAN

ADA

VST

1R8

TE

L604

7361

1!:

FAX

604

731

527

CO

PYlllG

HT

RES

ER~E

O:

THlS

PLA

NA

NO

OE

SIG

NA

RE

AN

D ~

TALL

TIM

ES R

EMAJ

NTH

E £X

CLU

SIV

EP

RO

PE

RTY

OFG

BLA

RC

HIT

EC

iSIN

C . .

-INO

M~Y

NO

TB

EU

SEO

OR

R

EPflO

OU

CEO

WIT

HOU

TTH

EIR

YIR

ITT

EN

CO

NS

EN

T

NO

TES D

P 1

9-86

6690

R

efer

ence

Pla

n M

ay 5

, 202

0

REV

ISIO

NS

NO.

DAT

E

2019

-06

-28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP C

omm

ents

AD

P C

omm

ents

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

SITE

PLA

N

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

3/19

/202

010:

28:1

9AM

Aut

hor

Che

cker

1/1

6"=

1'-

0-

JOB

NU

MB

ER

16

022

A-1

.00

Page 117: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

, , ' ' ' '

AC

CE

SS

IBIL

ITY

STR

ATE

GY

Thi

s d

eve

lop

men

t is

ful

ly a

cces

sib

le f

rom

th

e m

ain

en

tran

ce,

thro

ug

ho

ut

the

buil

ding

co

mm

on s

pac

es,

amen

itie

s, s

har

ed a

men

ity

pati

os,

and

res

iden

tial

un

its.

A r

amp

lea

ds

to t

he

mai

n en

try

from

th

e si

dew

alk

with

an

auto

mat

ic d

oor

op

ener

pro

vide

d at

th

e en

try.

All

com

mo

n c

orr

ido

rs a

re 5

' wid

e, a

nd

th

e re

qu

ired

cle

ar

man

oev

erin

g sp

ace

is

pro

vid

ed a

t d

oorw

ays.

Acc

essi

ble

park

ing

stal

ls a

re p

rovi

ded

clo

se t

o th

e el

evat

ors

in t

he

park

ade

. T

he

com

mon

lau

ndry

ro

om

is

a sh

ort

dis

tan

ce f

rom

th

e el

evat

or,

an

d w

ill h

ave

both

sta

cked

and

a

side

by

side

wash

er/

dry

er.

All

resi

dent

ial

unit

s ar

e o

ne

leve

l an

d fo

llow

Bas

ic U

nive

rsal

Hou

sing

Fea

ture

s [B

UH

F).

4 un

its

on t

he

gro

un

d l

evel

are

ful

ly w

hee

lcha

ir a

cces

sib

le.

Ref

er t

o th

e un

it p

lan

s on

A-1

.06

and

A-1

.07

for

all

clea

ran

ces

pro

vid

ed.

PATI

O

3 4

-----------~

----

----

-7

I i

--

' ',

(

i \

i I

---------------------------'

/--

)--:

--I

,.J~

HIL

DR

EN

'S.:~

y A

RE

A,~

\,_

~

1--

----

,if

' !

I 14

.5%

S

LOP

E D

N 5

.0%

\ .....

_____

___ _

/

/

I I

I

PAR

KA

DE

E

NTR

Y RA

MP

I I I I I I I

L _

__

J II

• ii I

:,; .,;

I I

I

C)

6 7 8

-6.0

3

9 10

0

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NU

E

VANC

OU

VER

, BC

CA

NAD

AV

5T 1

RB

TEL

604

736

11~

FAX

604

731

527

CO

P\'ll

lGH

TRES

ERV

EO:T

l!IS

PLA

NA

Nllt

)ESI

ON

.U.E

AN

DAT

,1,L

LTIN

ESR

EI-I

PJN

THE

EXC

LUSr

vEPR

o.>E

RTY

OFG

BLA

RC

HIT

'EC

TSIN

C.A

ND

NA

YN

OTB

EUSE

OO

R

NO

TES

DP

19-

8666

90

Ref

eren

ce P

lan

May

5,

2020

REV

ISIO

NS

NO.

DAT

E

DESC

RIP

TIO

N

201

9-06

-28

DP

App

licat

ion

2020

-02-

18

DP

Co

mm

ent

s

2020

-03-

19

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

AC

CE

SS

IBIL

ITY

ST

RAT

EGY

OAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SCAL

E

JOB

NU

MB

ER

3/1

9/20

204:

58:2

2 P

M

Aut

hor

Che

cker

3/32

"=1'

-0"

1602

2

A-1

.08

Page 118: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

--~

----

7

·--·

T-4

1/r

_

---,

~,I-

'

T

c:,,

1 ; A1-

ST

UD

IO

:.0:

4: B3

-1 B

=E

-D

R~

O~

OM

~--------

t 7

'-2"

r --

-----

--------

-------

r-20

· ----------,/'

~·-~

Yt'

l

i .

-j ~

2 I 81

-1

BE

DR

OO

M

HC

lJ!i

i[_k

__

536S

F

i------

1

HC

l-JB

~R-_!

Lt .J

521

SF

··r§sJ

~v

. [L

J'/

11

11

'-5

" -!

_,

:.._.

__ __

_ _

----

~'~

s·--

-'~

'i~

""--

----

----

----

"--J

31-

B?-

1. B

ED

R.O

~O

M~

-------------~

r W

HE

ELC

HA

IR A

CC

ES

SIB

LE U

NIT

3'-

6"

~-----~

-9

'_·~

'"--

-++

-+

PR

IVA

TE P

ATI

O

~----· ~

-------

BASI

C U

NIV

ER

SA

L H

OU

SIN

G R

EQU

IREM

ENTS

:

'BU

H' D

ENO

TES

UN

ITS

TH

AT

ARE

REQ

UIR

ED T

O C

OM

PLY

WIT

H T

HE

RIC

HM

ON

D Z

ON

ING

BY

IAW

AN

D M

US

T IN

CO

RPO

RAT

E nB

ASI

C U

NIV

ERSA

L H

OU

SIN

G F

EATU

RES

n:

1) A

N A

UTO

MA

TIC

DO

OR

OPE

NER

SHAL

L BE

PR

OVI

DED

FO

R TH

E M

AIN

BU

ILD

ING

ENT

RY (

MA

IN L

OBB

Y &

VES

TIBU

LE(S

))

2) T

HE L

IINIM

IJ~~

CLE

4R O

PEN

ING

~O

R H

HRY

DO

OR

S TO

EVE

RY D

WH

UN

G I

JNIT

AN

O D

OO

R<;

IN f

OM

MO

N A

RFA

'\ <;

HAI I

RF

NO

LE

SS T

HAN

850

mm

(w

-llC

H 'M

LL B

E PR

OVI

DED

BY A

SW

ING

DO

OR

)

3) T

HE ~

INIM

UM

CLE

AR O

PEN

ING

FO

R IN

TERI

OR

DOO

RS T

O A

T LE

AST

ON

E BE

DR

OO

M A

ND

ON

E AC

CESS

IBLE

BA

THR

OO

M IN

EVE

RY

BUH

DW

ELU

~/G

U~I

IT S

H.Li.

LL B

E M

O L

ESS

THti.

~! !O

Orn

rn

-4) D

OO

RS

IN E

VERY

DW

ELLI

NG

UN

IT A

ND

CO

MM

ON

ARE

AS S

HAL

L BE

OPE

RABL

E BY

DEV

ICES

TH

AT D

O ~

JOT

REQ

UIRE

TIG

HT

GR

ASPI

NG

OR

ffllS

TIN

G O

F W

RIS

T

5) F

LUSH

TH

RES

HO

LDS

THR

OU

GH

OU

T TH

E BU

ILD

ING

SH

ALL

BE A

MA

XIM

UM

OF

13m

m IN

HEI

GH

T

6) T

HE A

BOVE

-NO

TED

REQ

UIR

EMEN

TS F

OR

DO

OR

S D

O N

OT

APPL

Y TO

ME

CH

AN

ICA

L R

OO

MS,

SER

VICE

ARE

AS,

CLO

SETS

, ET

C.

WH

ERE

THR

OU

GH

AC

CES

S IS

NO

T RE

QUI

RED

AND

ACC

ESS

TO A

PER

SON

'WtT

H A

DIS

ABIL

ITY

IS N

OT

ANTI

CIP

ATED

7) E

NTRY

DO

OR

S TO

EVE

RY D

WEL

LIN

G U

NIT

AN

D D

OO

R A

SSEM

BLIE

S IN

CO

MM

ON

ARE

AS S

HALL

HAV

E A

CLE

AR A

ND

LEV

EL A

REA

W

HIC

H iS

~W

T LE

SS T

H:\~

J TH

E FO

LLO

Wl~

!G

a) W

HER

E TH

E D

OO

R S

WIN

GS

TOW

AR

D T

HE A

REA

(PU

LL D

OO

R),

1500

mm

LO

NG

BY

WID

TH O

F TH

E DO

OR

PLUS

AT

LEAS

T 60

0mm

C

l EAR

5PA

CE

ON

THF

LAT

CH

SID

E b)

WH

ERE

THE

DO

OR

SW

ING

S A

WA

Y F

RO

M T

HE A

REA

(PU

SH D

OO

R),

1220

mm

LO

NG

BY

WID

TH O

F TH

E D

OO

R P

LUS

AT L

EAST

30

0mm

CLE

AR S

PACE

ON

THE

LAT

CH

SID

E.

c)W

HE

RE

THE

RE A

RE D

OO

RS

IN A

SER

IES

IN C

OM

MO

N A

REA

S, T

HERE

MU

ST B

E S

EP

A.A

TIO

N O

F AT

LEA

ST 1

220m

m P

LUS

THE

WID

TH

OF

THE

DO

OR

. d)

ENT

RY D

OO

RS

TO E

VER

\' D

WE

LLIN

G U

NIT

AR

E EX

EMPT

ED F

RO

M T

HE R

EQU

IREM

ENT

TO P

ROVI

DE T

HE 1

110m

m L

ON

G C

LEAR

AR

EA

AN

D 6

00m

m Q

£A.R

SPA

a

IF R

OU

GH

IN i.

1.//R

ING

IS P

ROVI

DED

FOR

FUTU

RE C

ONV

ERSI

ON

FOR

,A.N

AU

TO M

A T

IC D

OO

R O

PENE

R

CORR

IDO

R W

IDTH

S:

8) C

OM

MO

N C

OR

RID

OR

S SH

ALL

BE N

O L

ESS

THAN

122

0mm

WID

E A

ND

PRO

VIDE

A C

LEAR

AR

EA 1

500m

m x

150

0mm

AD

JAC

ENT

TO

THE

ELEV

ATO

R E

NTR

ANC

E

fLO

OPI

suR

,AC

t:S:

9) F

LOO

R SU

RFAC

ES T

HR

OU

GH

OU

T TH

E BU

ILD

ING

SH

ALL

HAV

E N

O A

BRU

PT C

HAN

GES

IN

LEVE

L, 1

•, A

MA

XIM

UM

BR

EAK

OF

THE

FLUS

H TH

RES

HO

LD O

F 13

mm

HEI

GH

T. T

HIS

REQ

UIR

EMEN

T DO

ES N

OT

APPL

Y TO

EXT

ERIO

R BA

LCO

NY,

PAT

IO A

ND

DEC

~ D

OO

R S

ILLS

10)

FLO

OR

SURF

ACES

SH

ALL

BE S

LIP

RESI

STAN

T.

11}W

HE

RE

CAR

PETS

ARE

USE

D, T

HEY

MU

ST B

E FI

RMLY

FIX

ED, H

AVE

A F

IRM

UN

DER

LAY

AND

PILE

UND

ER 1

3mm

IN H

EIG

HT

WIN

DO

WS:

12

) WIN

DO

WS

WH

ICH

ARE

ACC

ESSI

BLE

SHAL

L H

AVE

A W

IND

OW

Sill

HEI

GH

T TH

AT

DOES

NO

T EX

CEED

750

mm

ABO

VE T

HE F

LOO

R TO

AFF

OR

D S

EATE

D VI

EWIN

G,

AT L

EAST

ON

E W

IND

OW

IN T

HE B

EDR

OO

M A

NO

mJE

WIN

DO

W IN

THE

LIV

ING

RO

OM

SH

ALL

AFFO

RD

SUC

H S

EATE

D V

IEW

ING

13)W

IND

OW

S W

HIC

H A

RE A

CCES

SIBL

E SH

ALL

HAV

E O

PEN

ING

ME

CH

AN

IS~S

OPE

RABL

E W

llH O

NE H

AN

D A

ND

OF

A T

YPE

fHA

T DO

ES N

OT

REQ

U)RE

TIG

HT

GR

ASPI

NG

, PI

NC

HIN

G O

R ffl

lST

ING

OF

THE

ui,m

OU

TLET

S A

ND

SW

ITC

HES

; 1-

4) L

IGH

T SW

ITC

HES

, EL

ECTR

ICAL

PAN

ELS

AND

INTE

RC

OM

BU

TTO

NS

SHAL

L BE

BE

fflE

EN

900

m T

O 1

200m

m F

RO

M T

HE F

LOO

R IN

TER

CO

M B

UTT

ON

S SH

ALL

BE M

AX

JUM

137

5mm

FR

OM

THE

FLO

OR

15) E

LEC

TRIC

AL O

UTLE

TS,

CAB

LE O

UTLE

TS A

ND

TEL

EPHO

NE J

ACKS

SH

ALL

BE L

OC

ATED

NO

T LE

SS T

HA

N45

0mm

FR

OM

TH

E FL

OO

R O

R N

OT

MO

RE

THAN

120

0mm

16) T

HER

MO

STAT

S SH

ALL

BE L

OC

ATED

BET

WEE

N 9

00m

m T

O 1

200m

m F

RO

M T

HE F

LOO

R

17) T

HE O

PERA

BLE

PART

OF

CO

NTR

OLS

SH

ALL

BE L

OC

ATED

WIT

HIN

REA

CH

OF

THE

CLE

AR F

LOO

R AR

EA T

HAT

HAS

A 'M

OTH

OF

NO

T LE

SS T

HAN

750

mm

.

18)

LIG

HT

SWIT

CH

ES W

ill

BE R

OCK

ER O

R PA

DD

LE-T

YPE

SWIT

CHES

_

BATH

ROO

MS:

19

) AT

LEA

ST O

NE B

ATH

RO

OM

SH

ALL

,1)

HAV

E A

TO

ILET

PO

SITI

ON

ED W

ITH

THE

CEN

TRE

LINE

OF

THE

TOIL

ET 4

20m

m T

O 4

80m

m F

RO

M A

SID

E W

ALL

ON

WH

\CH

A G

RAB

BA

R C

AN

BE

INST

ALLE

D A

ND

AT

LEAS

T 51

0mm

FRO

M A

~ O

BSTR

UC

TIO

N O

N T

HE N

ON

-GR

AB B

AR S

IDE

AN

D A

T LE

AST

BOO

rnrn

FR

OM

AN

Y O

BSTR

UC

TIO

N I

N F

RO

NT

OF

THE

TOIL

ET; A

ND

b)

HAV

E A

CLE

AR F

LOO

R AR

EA !N

FR

ON

T O

F TH

E Sl

~IK

OF

760m

m B

Y 12

20m

m P

OSI

TIO

NED

FO

R A

PAR

ALLE

L AP

PRO

ACH

AN

D

CENT

ERED

ON

THE

SIN

K c}

HAV

E A

MIN

IMU

M C

LEAR

AR

EA O

F 51

0mm

IN D

EPTH

ALO

NG

THE

FUL

L LE

NG

TH O

F TH

E BA

THTU

B d

) H

AVE

STR

UC

TUR

AL R

EIN

FOR

CEM

ENT

IN W

ALLS

BEH

IND

AN

D B

ESID

E TH

E TO

ILET

AN

D T

HE W

ALLS

AR

OU

ND

THE

TU

S AN

D/O

R

SHO

WER

TO

FAC

ILIT

ATE

THE

INST

ALLA

TIO

N O

F G

RAB

SAR

S; A

ND

e)

INC

LUD

E EA

SY T

O G

RASP

HAN

DLE

S O

N F

AUC

ETS,

E.G

., LE

VER-

TYPE

FAU

CETS

20) W

HER

E BA

THR

OO

MS

ARE

PRO

VID

ED T

O S

ERVE

A C

OM

MO

N A

MEN

ITY

SPAC

E, A

T LE

AST

ONE

SH

ALL

BE W

HEE

LCH

AIR

AC

CES

SIBL

E AS

DES

CRIB

ED IN

THE

BU

ILD

ING

CO

DE

AN

D T

HE T

OP

OF T

HE R

IM O

F TH

E TO

ILET

IN T

HAT

ONE

BAT

HR

OO

M S

HAL

L BE

48

0mm

ABO

VE T

HE F

LOO

R

KIT

CHEN

S:

21) T

HE K

ITC

HEN

MU

ST H

AVE:

,1

) US

ABLE

co

uim

R S

PACE

A~J

O C

UPB

OAR

DS

THi.T

CAN

BE

EASI

L y A

CC

ESSE

D B

Y PE

OPL

E W

ITH

DIS

ABIL

ITIE

S, I

NC

LUD

ING

PEO

PLE

WIT

H W

HEE

LCH

AIR

S, E

.G.,

CO

NTI

NU

OU

S C

OU

NTE

R B

E1W

EEN

THE

STO

VE A

NO

SIN

;-;:;

ADJU

STAB

LE S

HELV

ES IN

ALL

CAB

INET

S; P

ULL"

O

UTW

OR

K B

OAR

OS

AT B

10m

m H

EIG

HT;

AN

D P

ULL

-OU

T CA

Bl~J

ET S

HELV

ES;

b) E

ASY

TO G

RASP

HAN

DLE

S O

N F

AUC

ETS,

E.G

., LE

VER-

TYPE

FAU

CET

S;

c) E

ASY

TO G

RAS

P H

AND

LES

ON

CU

PBO

ARD

S, E

.G.,

0 OR

J T

YPE

CAB

INET

HAN

DLE

S A

ND

GR

AB E

DGES

U~J

DER

CO

UN

TER

S;

d) T

ASK

LIG

HTI

NG

AT

SINK

, ST

OVE

AN

O K

EY W

OR

K AR

EAS;

AN

D

e} P

LUM

BIN

G A

ND

UTI

LITY

PIP

ES L

OC

ATED

TO

PRO

VIDE

FO

R A

PO

TEN

TIAL

B 10

mm

WID

E U

ND

ER C

OU

NTE

R W

OR

KSPA

CE

SO A

S N

OT

TO P

REVE

NT T

HE E

ASY

FUTU

RE C

ON

VER

SIO

N O

F C

OU

NTE

R S

PACE

AN

O S

INKS

TO

BEI

NG U

NIV

ERSA

LLY

ACCE

SSIB

LE F

OR

KNEE

SPA

CE

UN

DER

THE

SIN

K W

HER

E TH

ERE

IS A

CO

UN

TER

TO

P ST

OVE

BU

ILT

IN

IEO

lOO

M A

NO

CLO

SET:

22

) TH

E SP

ACE

ARO

UN

D A

BE

D I

N A

DW

ELLI

NG

UN

IT T

HAT

CO

NSIS

TS O

F A

BAC

HEL

OR

SU!

TE A

ND

AT

LEAS

T O

NE

BED

RO

OM

IN

EV

ERY

OTH

ER D

WEL

L!M

G U

NIT

SH

:\LL

H.W

E su

mC

!EM

T S

P/1 .C

E TO

PRO

IJIDE

II

TUR

Nl~

!G D

IAM

ETER

Of

1500

mm

oiJ

O~J

E SI

DE O

F A

D

OU

BLE

BED

23)

THE

CLO

THES

CLO

SET

IN A

DW

ELLI

NG

UN

IT T

HA

T C

ON

SIST

S O

F A

BAC

HEL

OR

SUI

TE A

ND

AT

LEAS

T O

NE B

EDR

OO

M l~

J EV

ERY

OTH

ER D

WEL

LIN

G U

MT

SHAL

L H

AVE

A C

LEAR

OPE

NIN

G O

F AT

LEA

ST 9

00m

m,

CLEA

R FL

OO

R SP

ACE

OF

AT L

EAST

750

mm

BY

1200

mm

AN

D A

CLO

THES

HAN

GER

RO

D TH

AT C

AN B

E LO

WER

ED T

O 1

200m

m

PATI

OS

AN

D B

ALC

ON

IES;

24

) AC

CES

S DO

ORS

SH

ALL

HAV

E A

MIN

IMU

M C

LEAR

OPE

NIN

G O

F 80

0mm

25)

MIN

IMU

M D

IMEN

SIO

NS

OF

AN

Y B

ALC

ON

Y OR

PAT

IO S

HAL

L BE

150

0mm

BY

1500

mm

TH

IS R

EQU

IREM

ENT

DOES

NO

T AP

PLY

TO "

JULI

ET"

OR

"FR

ENC

H"

BALC

ON

Y O

R PA

TIO

.

ALL

REM

AIN

ING

SUI

TES

WIL

L IN

CO

RPO

RAT

E AG

l~JG

IN

PLAC

E FE

ATUR

ES I

NC

LUD

ING

: ST

AIR

WEL

L H

AND

RAI

LS W

HER

E ST

AIRS

ARE

PR

OVI

DED

; LE

VER

TYPE

HAN

DLE

S FO

R: P

LUM

BIN

G F

IXTU

RES,

DO

OR

HAN

DLE

S;

SOLI

D B

LOC

KIN

G IN

WA

SH

RO

OM

WAL

LS F

OR

FUTU

RE G

RAB

BAR

S BE

SIDE

TO

ILET

, BA

THTU

B AN

D S

HO

WER

• G

BL A

RC

HIT

EC

TS

INC

139

EAST

BTH

AVE

NU

E VA

NC

OU

VER

, BC

CA

NA

DA

V5T

1R

8

TEL

604

7361

1:

FAX

604

731

527

CO

PYR

IG~T

RES

ER~E

O

TH

ISPl

AN

AN

00£5

1GN

AR

EA

NO

AT

AL

Lilf

.tESR

EIJ

.AJN

7Hf

EXCllJSl'✓EPR0PERTY0FG8LARCH17ECTSINCAN0NA¥N078ElJSf;00R

NO

TES

DP

19-8

6669

0 R

efer

ence

Pla

n M

ay 5

, 202

0

RE

VIS

ION

S

NO

DAT

E

2019

-06-

2B

2020

"02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

Ap

p(i

utio

n

OP

Com

m•n

t.1

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

UN

IT P

LAN

S

DAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

010:

28:3

9AM

Aut

hor

Che

cker

1/4

",,,

1'-0

"

1602

2

A-1

.06

Page 119: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

, C

1 -

2 B

ED

RO

OM

}.,,:

6'-

6"

I 0

1 -

3 B

ED

RO

OM

---J

AN

ITO

R'S

CLO

SE

T L3

& 5

, U

NIT

STO

RA

GE

L 2

, 4,

6

I_ C2

-2

BED

RO

OM

I

·=

-------------

I-C3

-2

BED

RO

OM

• G

BL

ARC

HIT

ECTS

IN

C

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CAN

ADA

V5T

1R8

TEL

604

7361

1~

FAX

604

7315

27

NO

TES D

P 1

9-86

6690

R

efer

ence

Pla

n M

ay 5

, 202

0

RE

VIS

ION

S

NO

D

ATE

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CRIP

TIO

N

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

UN

IT P

LAN

S

DAT

E D

RA

WN

BY

CH

EC

KE

D B

Y SC

ALE

JOB

NU

MB

ER

3/19

/202

010:

28:4

1 A

M

Aut

hor

Che

cker

1/4

".,1

'-0

"

1602

2

A-1

.07

Page 120: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

SIT

E C

ON

TEX

T

DE

SIG

N R

ATI

ON

ALE

O

verv

iew

The

prop

osed

de

velo

pm

en

t is

loc

ate

d in

th

e D

over

Cro

ssin

g a

rea

of

Ric

hm

on

d,

we

st o

f th

e C

ity

Ce

ntr

e.

The

site

is

boun

ded

by N

o 2.

Rd

to t

he e

ast,

tow

n h

om

es

to t

he

sout

h, a

nd a

ch

ild d

ayca

re

cen

tre

to t

he

wes

t. F

urt

her

wes

t is

Dov

er P

ark,

a f

utur

e re

sid

en

tial

dev

elo

pm

ent

dire

ctly

nor

th

and

the

Fra

ser

Riv

er b

eyon

d. A

ped

estr

ian/

cycl

ing

path

als

o r

un

s al

ong

the

eas

t an

d s

ou

th e

dg

es

of t

he s

ite,

co

nne

ctin

g to

Dov

er P

ark

and

a n

etw

ork

alo

ng t

he F

rase

r R

iver

. T

he s

ite

is c

lose

to

Ric

hmon

d B

rig

h ou

se,

a m

ajo

r tr

ans

it s

tati

on,

as

we

ll as

all

the

sh

op

pin

g,

rest

aura

nts

and

se

rvic

es a

t R

ichm

ond

Cen

tre.

Un

der

the

ZH

R3

zoni

ng,

a m

axim

um

FA

R o

f 3.

0 is

per

mit

ted

for

res

ide

ntia

l us

es.

Dov

er C

ross

ing

is i

nten

ded

to b

e a

high

-am

enit

y, m

ulti

-fam

ily

resi

den

tial

nei

gh

bou

rhoo

d pr

ovid

ing

a tr

ans

itio

n to

the

hig

her

de

nsit

y C

ity C

ent

re,

yet

sens

itiv

e to

the

sin

gle

-fam

ily

ho

mes

nea

rby.

Th

e p

rop

ose

d

buil

ding

wil

l be

2.6

3 FA

R,

6 st

ore

ys in

hei

ght,

and

pro

vide

80

affo

rdab

le r

enta

l u

nits

.

An

indo

or a

men

ity

are

a fo

r re

sid

ents

is i

ncl

uded

on

the

gro

und

leve

l, w

ith

a ki

tche

nett

e, d

inin

g,

and

seat

ing

area

, an

d sh

are

d w

ork

spac

e.' T

he i

ndoo

r am

enit

y r

oom

ope

ns o

nto

a la

rge

adjo

inin

g ou

tdoo

r pa

tio

and

urb

an a

gri

cult

ure

plo

ts f

acin

g so

uth

. A

sec

ond

am

enit

y pa

tio

is l

ocat

ed o

n th

e no

rth,

act

ing

as a

co

urt

yard

bet

wee

n t

he b

uild

ing

and

it's

futu

re n

eig

hbou

r. O

ne l

evel

of

un

der

gro

un

d p

arki

ng i

s pr

ovid

ed,

incl

udin

g bi

ke s

tora

ge

roo

ms.

Des

ign

et: w

> - et: et: w

V,

<(

et: u.

TOW

N H

OM

ES

The

su

rrou

ndin

g en

viro

nm

enta

l co

ntex

t an

d th

e D

over

Cro

ssin

g C

omm

unit

y D

esi

gn p

lan

wer

e th

e b

asis

for

the

des

ign

app

roac

h. T

he e

ast

volu

me

fro

ntin

g N

o 2

Rd

is s

ligh

tly t

alle

r to

em

ph

asiz

e th

e vi

sual

gat

eway

at

the

Wes

t R

ichm

ond

ent

ranc

e. T

he s

ou

th/w

est

elev

atio

ns t

hen

mir

ror

the

sca

le o

f th

e to

wn

ho

mes

acr

oss

the

pat

h by

in

tro

du

cin

g 2

-sto

rey

fra

min

g el

emen

ts t

o b

reak

up

the

elev

atio

n. T

he n

ort

h/w

est

corn

er

volu

me

is p

ulle

d cl

ose

r to

th

e p

rop

erty

lin

e to

war

ds t

he

rive

r, a

llow

ing

for

view

s to

the

mo

un

tain

s an

d ri

ver

thro

ugh

the

neig

hbou

ring

bui

ldin

gs.

Thi

s d

evel

op

men

t w

ill

targ

et S

tep

Co

de 3

for

ene

rgy

effi

cien

cy.

The

bui

ldin

g en

velo

pe i

s de

sign

ed

wit

h a

low

win

dow

to

wal

l ra

tio

for

bet

ter

insu

lati

ng v

alu

es,

but a

lso

pro

vid

es l

arg

e e

noug

h w

indo

ws

in m

ain

livin

g sp

aces

for

na

tura

l li

ghti

ng.

Ope

rab

le c

asem

ent

win

dow

s a

re m

axim

ized

th

roug

ho

ut t

he u

nits

to

allo

w f

or n

atu

ral

vent

ilat

ion.

Var

ian

ces

We

are

req

ues

ting

a h

eig

ht v

aria

nce

for

the

wes

t po

rtio

n of

th

e bu

ildi

ng,

to a

llow

for

a b

uild

ing

heig

ht

of 1

9.9

m [

refe

r to

ele

vati

ons)

. T

he

allo

wab

le h

eig

ht w

ithi

n 26

m o

f th

e ea

st p

rop

erty

lin

e is

24

m,

whi

le t

he

wes

t po

rtio

n is

1 B

m.

A h

eigh

t of

19.

9m i

s re

qui

red

for

a 6

-sto

rey

bui

ldin

g. T

he

pro

po

sed

flo

or t

o fl

oor

heig

ht w

ill

allo

w f

or t

he

acco

mo

dat

ion

of

du

cts,

lig

ht f

ixtu

res,

ex

it si

gns,

et

c. W

e al

so r

equi

re a

set

bac

k v

aria

nce

on

the

east

sid

e. W

hile

a 6

m s

etba

ck

is p

erm

itte

d,

we

have

pro

po

sed

5m

. S

hift

ing

the

bu

ildi)

lg (

and

core

) w

est

wo

uld

aff

ect

pa

rkin

g b

elow

. as

the

p

ark

ade

is c

on

stra

ined

by

exis

ting

tre

es o

n th

e w

est

side

. A

6m

set

bac

k w

oul

d al

so c

om

pro

mis

e o

ur

unit

s, a

s th

ey r

equi

re a

ddit

iona

l cle

aran

ces

to c

om

ply

wit

h B

UH

gu

idel

ines

.

Ma

teri

als

;tJ <

m

;tJ

;tJ C

To

high

ligh

t an

d f

urt

her

art

icu

late

the

sim

ple

bui

ldin

g m

assi

ng,

cont

rast

ing

sh

ades

and

te

xtu

res

of f

ibre

-cem

ent

pan

el c

ladd

ing

is u

sed

for

the

ext

erio

r. C

emen

t p

anel

is d

ura

ble

and

ea

sy to

mai

ntai

n, w

hich

is

idea

l fo

r an

aff

ord

able

ren

tal

buil

ding

. T

he g

rou

nd

lev

el a

nd p

orti

ons

of t

he u

pp

er le

vels

are

cla

d in

dar

k h

ori

zont

al O

ka-S

kin,

whi

ch i

s n

arro

w s

lats

of

vary

ing

text

ure

s fo

r a

mat

te,

sto

ne-l

ike

qual

ity.

The

end

s o

f th

e bu

ildi

ng a

nd f

ram

ed v

olu

mes

are

a l

ight

gr

ey H

ardi

e P

anel

for

con

tras

t. T

he b

alco

ny a

nd f

ram

e so

ffit

s a

re a

woo

d to

ne/

tex

ture

cem

ent

pane

l, w

hich

pro

vide

s w

arm

th a

nd c

olo

ur

agai

nst

th

e m

on

och

rom

atic

ele

vati

ons.

Lan

ds

cap

e

The

pri

mar

y in

tent

of

the

lan

dsc

ape

desi

gn i

s to

fo

ster

co

mm

uni

ty b

uild

ing

. Th

e la

nd

scap

e de

sign

ai

ms

to f

acili

tate

so

cial

iza

tion

and

co

mm

uni

cati

on

betw

een

dem

og

rap

hic

s w

ho w

ill b

e in

habi

ting

th

e bu

ildin

g.

Ope

n sp

aces

wit

h va

ried

sea

tin

g,

urb

an a

gric

ultu

re,

and

an

ou

tdo

or

dini

ng a

rea

wit

h a

bar

beq

ue

and

joi

nabl

e ta

ble

s p

rese

nt

man

y op

port

uni

ties

for

bot

h tr

anq

uil

rel

axat

ion

, an

d ne

ighb

ourl

y ac

qu

ain

tanc

e.

Th

e de

sign

is

cog

niza

nt o

f th

e ne

arb

y D

over

par

k an

d D

ove

r cr

oss

ing

. B

ecau

se t

he

park

pro

vide

s a

near

by v

ast

ope

n sp

ace

for

acti

ve a

ctiv

ity,

th

e P

athw

ays

lan

dsc

ape

des

ign

focu

ses

on s

ma

lle

r op

en

are

as f

or m

ore

pas

sive

re

laxa

tio

n a

nd s

oc

iali

zati

on

.

······ ··

······

·······1

·······

···:

1 ZH

RJ

Zoni

ng

The

ex

istin

g zo

ning

all

ows

for

mid

-ris

e a

pa

rtm

en

ts u

p to

6

sto

reys

(18

-24

m i

n h

eig

ht)

. Th

e ne

ighb

ou

ring

ap

art

me

nt

to

the

nort

h/w

est

is 8

sto

reys

.

........

io

:0::

iN

ia

jZ

·····•

•:

2 N

o 2

Rd

Ga

tew

ay

Tal

ler

buil

ding

s ar

e p

erm

itte

d n

ear

the

rive

r an

d N

o 2

Roa

d br

idge

to

crea

te a

vis

ual g

atew

ay a

t th

e e

ntr

ance

to

Wes

t R

ichm

ond.

The

No

2 R

d vo

lum

e is

rai

sed

to e

mp

hasi

ze t

his

gate

way

.

.,,...~···

········

········

········

···1

'+,

····•·

<

<r -'>,

1t. Glo

w D

EN

S\\'

{

3 T

ran

siti

on

to

Lo

w D

ensi

ty

Sca

le t

ran

siti

on

s st

ep

do

wn

fro

m n

ort

h to

so

uth

to

min

imiz

e

impa

cts

on e

xist

ing

sin

gle

-fa

mily

ne

igh

bo

urh

oo

ds.

Th

e

4

sout

h/ea

st e

leva

tio

ns a

re b

roke

n w

ith

2-st

orey

fra

med

vo

lum

es r

em

inis

cent

of

the

tow

nho

use

sca

le to

the

so

uth

.

Lin

kag

es

··-···, ; i : i

A m

ulti

-use

ped

estr

ian

/cy

clin

g p

ath

conn

ects

the

sit

e to

D

over

Par

k, a

nd

Fra

ser

Riv

er p

ath

s to

the

nor

th.

Nor

th f

acin

g un

its

have

vie

ws

to t

he m

ou

nta

ins

and

rive

rfro

nt b

etw

een

the

ex

isti

ng a

nd

fu

ture

ap

artm

ent

bui

ldin

gs.

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAST

8TH

AVE

NUE

VA

NCO

UVE

R, B

C C

ANA

DA

V5T

1 RB

TE

L 60

4 73

6 11

~

F AX

604

731

527

CO

Pl'R

IGH

TRES

ERVE

D:

THIS

PLA

NA

ND

DES

ION

.oJl

E..:

.DA

TALL

TIN

ES

RE

MA

iNTH

E

ExtL

USJ

VEPR

OPE

RTY

OFG

BLA

RC

HIT

EC

'ISIN

C . .

.:.O

MA

VN

OTB

EU

SE

OD

R

NO

TES

DP

19-

8666

90

Ref

eren

ce P

lan

May

5, 2

020

RE

VIS

ION

S

NO.

D

ATE

201

9-06

-28

2020

-02-

18

2020

-03-

19

DESC

RIP

TIO

N

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

PR

OJE

CT

RA

TIO

NA

LE

DAT

E D

RA

WN

BY

CH

EC

KE

D B

Y S

CA

LE

JOB

NU

MB

ER

3/1

9/20

2010

:26

:33A

M

Aut

hor

Che

cker

1602

2

A-0

.02

Page 121: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

• G

BL A

RC

HIT

ECTS

IN

C.

139

EAS

T 8

TH A

VEN

UE

VAN

CO

UVE

R.

BC C

AN

AO

AV

ST

lRB

TE

L 60

4 73

6 11

~ FA

X 60

4 73

1 52

7

COPY

RIGH

TR

ESO

NED

: TH

ISPl

.AN

/lND

DES

IGN

AA

EAN

D/lT

.l.l.L

TIM

ESR

DtA

INTH

E

EXtL

llSIV

EPR

Dl'E

RT'

t'DFG

BLA

AC

HIT

ECTS

INC

. l.'I

DM

AY

NO

TBE

USE

O O

R RE

P!IO

OU

CEO

WIT

HOUT

THEI

RW

RIT

TEN

CO

NSE

NT

NO

TES D

P 1

9-86

6690

R

efer

ence

Pla

n M

ay 5

, 202

0

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Re

vie

w

CON

TEXT

MA

PS

DAT

E D

RAW

N B

Y C

HE

CK

ED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

0 I0

:27:

06A

M

Aut

hor

Chec

ker

1602

2

A-0

.04

Page 122: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

O 1

Vie

w l

ooki

ng W

est

from

ped

estr

ian/

cycl

ing

path

02

V

iew

fro

m N

o 2

Rd l

ooki

ng S

out

h

03

Vie

w f

rom

No

2 R

d/

Rive

r Ro

ad i

nter

sect

ion

look

ing

Nor

th/W

est

04

Vie

w f

rom

No

2 R

d lo

oki

ng N

orth

/Wes

t

DO

VER

CR

ES

CE

NT

05

Vie

w f

rom

ped

estr

ian/

cycl

ing

path

loo

king

So

uth

I I I

\ \ \

SIT

E

~~

--

Iii!.

-05

02

I(' 1

I

__ _J

C)

NO 2

RO

"-

03

• G

BL

AR

CH

ITE

CT

S

INC

.

139

EAS

T 8

TH A

VE

NU

E

VA

NC

OU

VE

R,

BC C

AN

AD

AV

5T 1

R8

TE

L604

7361

1!::

FAX

604

731

527

COPY

RIG

HT

RESE

R~ED

, TH

IS P

l.lN

ANO

DES

IGN

ARE

,/,N

O A

T M

.l TI

MES

REM

AIN

HIE

El

(CLU

SIV

EPR

Ol'E

RTY

OFG

BL'

-RC

HIT

ECTS

INC

. .m

OM

AY

NO

iB

EUSE

OO

R

NO

TES D

P 1

9-86

6690

R

efer

ence

Pla

n M

ay 5

, 202

0

RE

VIS

ION

S

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP C

omm

ents

A

DP

Com

men

ts

5491

No

2 Rd

DP

-P

rog

ress

Rev

iew

STRE

ETSC

APE

PHOT

OS

DA

TE

DR

AW

N B

Y C

HE

CK

ED

BY

SC

ALE

JOB

NU

MB

ER

3/19

/202

010:

27:l

OA

M

Aut

hor

Che

cker

1602

2

A-0

.05

Page 123: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

SUR

VEY

PLA

N

OF

LOT

B S

ECTI

ON

1

BLO

CK

4 N

OR

TH

RA

NG

E 7

WES

T NE

W W

ESTM

INST

ER

DIS

TRIC

T PL

AN

B

CP

2927

7 P

AR

CE

L ID

EN

TIFI

ER

(P

IO):

02

7-0

20

-98

3

CIVI

C AD

DRES

S #5

491

NO

. 2

RO

AD

RIC

HM

ON

D,

B.C

.

STR

ATA

P

LAN

LMS

2166

MA

TSO

N

PEC

K

& T

OPL

ISS

SU

RV

EY

OR

S

& E

NG

INE

ER

S

#3

20

-

11

12

0

HO

RS

ES

HO

E

WA

Y

RIC

HM

ON

D,

8.C

., V

7A

5H7

PH:

60

4-2

70

-93

.31

FA

X:

60

4-2

70

-41

37

CA

DF

lL£:

1

83

59

-00

l-T

PG

-00

0.D

WG

STR

ATA

P

LAN

L

MS

26

43

R-1

7-1

83

59

-TP

G

CLI

EN

T R

EF:

CIT

Y O

F R

ICH

MO

ND

#5

86

2

Rem

P

arce

l ·c·

S

RW

P

LAN

2

48

95

ST

RA

TA

P

LAN

LM

S18

03

#5

84

0

D

PLA

N

BC

P3

37

28

#549

1 V

AC

AN

T LO

T

INO

ICA

T£S

S

PO

T

ELE

VA

TIO

N

O

IP

!MD

ICA

1ES

\R

ON

P

OS

T

w1

CS

IN

DIC

AT

ES

C

AT

CH

B

AS

IM

0 M

H

MA

NH

OLE

-$:

-LS

IN

DIC

AT

ES

LA

MP

S

TA

ND

AR

D

...o...

S

H~O

lCAT

ES

SIG

N

LEGE

ND

SC

ALE

1:

30

0

ALL

D

IST

AN

CE

S

AR

E

IN

ME

TR

ES

CO

NT

OU

R

1N

TE

RV

AL

=0

.30

rn

R-1

7-1

83

59

-TP

G

PLA

N

BC

P3

03

83

I RI

VER

RO

AD

Rem

11

6 P

LAN

4

98

57

CER

TIFI

ED

CO

RR

ECT

THIS

17

TH

D

AY

O

F JA

NU

AR

Y,

20

17

WIL

UA

M

P.

WO

NG

, B

CLS

(#

69

7)

THIS

D

OC

UM

EN

T IS

N

OT

VA

LID

U

NLE

SS

O

RIG

INA

LLY

SI

GN

ED

ANO

S

EA

LED

.

C)

• G

BL

AR

CH

ITE

CTS

!N

C.

139

EA

ST

8TH

AV

EN

UE

V

AN

COU

VER

, BC

CA

NA

DA

VST

1 RB

T

EL

6047

3611

5.

FAX

60

4 73

152?

CO

PYR

IGK

TAES

ERV

EOTH

!SPL

aNA

NO

OES

IGN

AR

EAN

OA

7ALL

TIM

ESR

EMA

IN<f

!E

EXCL

USIV

E PR

OPE

R7Y

OFG

BLA

RC

f!HEC

TSIN

C A

ND M

AY N

O~ B

E US

ED O

R R

EPR

OO

UC

EDW

l"H

0lH

TKEI

RW

Rl7

7EN

CO

NSE

NT

NO

TES D

P 1

9-86

6690

R

efer

ence

Pla

n M

ay 5

, 20

20

REV

ISIO

NS

NO.

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP C

omm

ents

A

DP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

SITE

SU

RVE

Y

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

010:

27:5

1 A

M

Aut

hor

Che

cker

1602

2

A-0

.06

Page 124: Richmond of City · 2020. 5. 15. · May 5, 2020 - 2 - Staff Report Origin DP 19-866690 GBL Architects has applied to the City of Richmond for permission to develop a mid-rise purpose-built

C)

i __ S

PR

ING

EQ

UIN

OX

-1 O

AM

I

!-S~R

l~G

f:O

UIN

OX

.-12P

f'1 _

__

__

__

_

"---

----

----

-·--

--__

_

SP

RIN

G E

QU

INO

X -

2PM

I SU

MM

ER

SO

LS

TIC

E-1

0A

M

:_g

lMM

ER

SO

LS

TIC

E-1

2PM

I

SUM

MER

SO

LSTI

CE

-2P

M

• G

BL A

RC

HIT

ECTS

\N

C

139

EAST

8TH

AVE

NU

E VA

NC

OU

VER

, BC

CA

NA

DA

VS

T 1R

8 TE

L 60

4 73

6 1 l

t FA

X 60

4 73

1 52

7

COP'

l'RIG

HTR

ESER

VEO

iH

ISPL

/lNA

NO

OES

IGN

AR

EAN

OA

iALL

TIM

ESR

EMA

IIS-

HE

EX

CL

USI

VE

PRO

PER

T'IO

FGB

LA

RC

KIT

EC

Sll;C

AN

Ol~

/lYN

OT

BE

USE

DO

R

RE

PRO

OU

CE

DW

ITH

OU

TT

HE

IRW

RIT

TE

NC

ON

SEN

T

NO

TES

DP

19-

8666

90

Ref

eren

ce P

lan

May

5, 2

020

REV

ISIO

NS

NO

DAT

E

2019

-06-

28

2020

-02-

18

2020

-03-

19

DES

CR

IPTI

ON

DP

App

licat

ion

DP

Com

men

ts

ADP

Com

men

ts

5491

No

2 Rd

DP

-P

rogr

ess

Rev

iew

SHA

DO

W S

TUD

IES

DAT

E D

RAW

N B

Y C

HEC

KED

BY

SCAL

E

JOB

NU

MB

ER

3/19

/202

0 10

:28:

10A

M

Aut

hor

Che

cker

, .. ,

,_40

·-o"

1602

2

A-0

.07