Group Directors: PKE Dollin (Chairman)B, MC du Plooy (Managing)**, AP le Roux (Financial), ESBF Mtetwa (Non-Executive)*
Divisional Directors: DB Green COO*, MP Bouwmeester*, VL Lutchman*, RN Matchett*, F van Rensburg, A van Tonder* Regional Directors: DR Ackerman, JP Farrell, EM Goosen**, ME Goosen*, S Herman*, GA Higgs, MR Hughes*, ED Kotze**,
RG Leach PLN
, AG Malan*, PJ Pretorius*, PS Riley**, L Saunders*, JJ Simoes*, G Smith*, TM Ueckermann*, MB Weyers Consultant: HC Thompson*
Ver: April 2015 (B British) (COO Chief Operating Officer) (* Pr Eng) (** Pr Tech Eng) (PLN Pr Pln)
20 August 2015
GAUTENG PROVINCIAL GOVERNMENT
Department of Transport and Public Works
Michael Brink Street
Koedoespoort Industrial
Pretoria
For Attention : MR DENIS EMETT
Filling Station Committee
ACCESS IN-PRINCIPLE APPROVAL APPLICATION
LOCATED IN CENTURY COUNTRY VIEW (EXTENSION 16), MIDRAND
PROPOSED ACCESS TO FILLING STATION FROM OLIFANTSFONTEIN ROAD (R562/D795)
1. Background
The proposed site is located in Century Country View (Extension 16) in Midrand. The proposed
site is undeveloped and is located north of Olifantsfontein Road (R562/D795) near the
intersection of Olifantsfontein Road and N1 off ramp. The proposed site is shown on Figure 1.
The objective of this application is to provide the GDRT with the necessary information to grant
an in principle approval for an access to the Olifantsfontein Road (R562/D795). Refer to Figure 2
and Figure 3 for the location of this site within the CoJ and GDRT Road network planning
respectively.
Figure 2 shows that Olifantsfontein is a class 2 road and is named as R562 and Figure 3 shows
Olifantsfontein Road named as D795. Therefore the report will be submitted to both JRA and
GDRT.
2. Traffic volumes
Traffic counts were conducted in June 2015. The link volumes on Olifantsfontein Road (R562/D795) were found to be 14522 vehicles travelling east per day and 10415 vehicles travelling to the west per day.
3. Proposed Access Layout
It is proposed that the site be served by a left-in-left-out access off Olifantsfontein Road
(R562/D795) as shown on Drawing SKC 003.
Our Reference : 20418 – CPD Country View (Olifantsfontein) FS
Your Reference :
Enquiries : Basetsana Kgatle
E-mail Address : [email protected]
WSP Group Africa (Pty) Ltd. WSP SA Civil and Structural Engineers Division
314 Glenwood Road, Lynnwood Park, Pretoria
Republic of South Africa, 0081
Postnet Suite 287, Private Bag X025, Lynnwood Ridge, 0040
Tel: +27 (0)12 762 1200
E-mail: [email protected]
Web: http: //www.wspgroup.co.za
WSP Group Africa (Pty) Ltd.
Registered Number: 1999/008928/07
An ISO 9001:2008 Certified Company
A member of the WSP Group Ltd.
Offices worldwide
-
2
The location of this proposed site access conforms to the Guidelines for Access to Filling Stations
(BB2). As per the guideline, drawing GTP 16/15 a minimum of 210m from the preceding/following
intersection to the access to the filling station on Olifantsfontein Road (R562/D795) is required for
a design speed of 100 km/h. Only vehicles travelling eastbound will be able to access the filling
station.
It is therefore concluded, as shown on Drawing SKC 003 that the access to the site is well
positioned at a distance of 248m from the intersection of Olifantsfontein Road and meets the
minimum requirements as set out in the Guidelines for Access to Filling Stations (BB2).
The long term planning of the D795 is shown conceptually on Drawing SKC 005.
4. Future Road Changes
There are expected changes to the present road infrastructure in the foreseeable future. There is
a planned future PWV5 that will run near Olifantsfontein Road (R562/D795) as shown on Figure
2 and Drawing SKC 003. This future road will run to the north of the development. The
development will not impact the PWV5 road reserve.
During a meeting with Gautrans on the 27th of July 2015, it was requested by Gautrans to check
the road reserve of the PWV5. The latest Basic Plans were then used to confirm the road reserve.
As it can be seen on Drawing SKC 003, the future PWV5 road reserve has moved up (red line)
further to the north as opposed to the old road reserve (green line). This then gives a greater
distance between the building line of the filling station and road reserve (20m).
5. Vehicle tracking
Vehicle tracking was undertaken using the AutoTurn software. Vehicle manoeuvring was tested at
the access and throughout the site. The SU+T truck was used for vehicle tracking on site. The
assessment indicated that the site will function acceptably from a vehicle manoeuvring and site
circulation perspective as shown on Drawings SKC 003 and SKC 005.
6. Alternative access
In addition, it is now GDRT requirement that filling station getting access off provincial roads a possible future alternative access should be provided. This application conforms to this requirement and the possible future alternative access is proposed to be located as shown on Drawing SKC 003. A partial access was approved by Gautrans on the eastern side of Lever Road and a letter is attached in Annexure A stating the approval. The partial access is now changed to a full access. Therefore a possible future alternative access for Country View Extension 16 filling station can be linked with the full access as shown on Drawing SKC 003.
7. Conclusion
It is therefore concluded that access to the proposed filling station development can be
accommodated on Century Country View (Extension 16) off Olifantsfontein Road (R562/D975)
from a traffic engineering point of view.
We trust that the above information will be sufficient for the evaluation of this application.
Please do not hesitate to contact me should you require additional information or need to discuss
this matter.
-
4
Figures
Figure 1: Locality Plan
Figure 2: 2009 RIFSA City of Johannesburg Road Network Planning
Figure 2: 2010 Gauteng-Major Road Network
-
Project: Figure Description: No.
CENTURTY COUNTRY VIEW EXTENSION 16 LOCALITY PLAN 1
20418_Century Country View Extension 16 _Locality Plan
Checked by : A. Koekemoer Pr. Tech. Eng
LEGEND:
DEVELOPMENT SITE
Development Site
-
Project: Figure Description: No.
2009 RIFSA CITY OF JOHANNESBURG ROAD
NETWORK PLANNING 2
20418_Century Country View Extension 16_2009 RIFSA City of Johannesburg Road Network Planning
CENTURY COUNTRY VIEW EXTENSION 16
Checked by : A. Koekemoer Pr Tech Eng Not to scale - Diagrammatic only
Application Site
-
Project: Figure Description: No.
2010 GAUTENG-MAJOR ROAD NETWORK 3
20418_Century Country View Extension 16_Gauteng-Road Network Planning
CENTURY COUNTRY VIEW EXTENSION 16
Not to scale - Diagrammatic only Checked by : A. Koekemoer Pr Tech Eng
Application Site
-
5
Drawing
Drawing SKC 003: Proposed Site and Access Layout (Short Term)
Drawing SKC 005: Proposed Site and Access Layout (Long Term)
-
Remainder Portion 25
ALTERNATIVE ACCESS
8
6
.
1
2
1
1
0
.
0
1
9
4
.
9
3
R
2
0
.
0
0
R
1
5
.
0
0
2
1
0
.
0
0
3
0
8
.
0
0
3
9
2
.
0
0
2
4
8
.
0
0
R
1
5
.
0
0
R
20.00
2
0
.
0
0
1
1
.
4
7
1
3
.
5
9
1
4
.
4
7
1
6
.
0
0
DRAWING STATUS:
CLIENT:
ARCHITECT:
TITLE:
SCALE @ A1: CHECKED: APPROVED:
DRAWN: DATE:
PROJECT No: DRAWING No: REV:
PROJECT:
DESIGN:
F VAN RENBURG J GROBLER
ND MOKANSI 2015/08/20-
-
20418 SKC003 A
REV DATE BY DESCRIPTION CHK APD
1:1500
A 20-08-2015 ND INITIAL ISSUE AK AK
COPYRIGHT RESERVEDC
The content of this document is privileged and confidential and may not be disclosed or reproduced
without the express authorisation of the author, being "WSP GROUP AFRICA (PTY) LTD"
If drawing status = construction, a signed copy of this drawing (either in hardcopy or
electronic format) is available at the office of origin and at the office of issue.
PRELIMINARY
PR No.:
PL
OT
D
AT
E:
20
15
/0
8/2
0 1
2:3
5:2
6 P
M
TEMPLATE VERSION 1.0
314 Glenwood Road, Lynnwood Park, Pretoria, 0081
PostNet Suite 287, Private Bag X025, Lynnwood Ridge, 0040
Tel: +27(0)12-762-1200 Fax: +27(0)12-762-1301 www.wspgroup.co.za
WSP Group Africa (Pty) Ltd
Civil and Coastal Division
CA
D F
ILE
N
AM
E:
Z:\20000\20418 cpd country view
(olifantsfontein) fs\3 - draw
ings\3.3 draw
ings\P
RO
PO
SE
D A
CC
ES
S LA
YO
UT
(S
HO
RT
T
ER
M) - R
EV
D
.dw
g
970429
LEGEND:
ROAD WIDENING BY COUNTRY VIEW X16
FILLING STATION UPGRADES
ALTERNATIVE ACCESS
CENTURY COUNTRY VIEW
FILLING STATION
PROPOSED SITE AND ACCESS
LAYOUT (SHORT TERM)
-
Remainder Portion 25
ALTERNATIVE ACCESS
8
6
.
1
2
1
1
0
.
0
1
9
4
.
9
3
R
2
0
.
0
0
R
1
5
.
0
0
2
1
0
.
0
0
3
0
8
.
0
0
3
9
2
.
0
0
2
4
8
.
0
0
R
1
5
.
0
0
R
20.00
1
1
.
4
7
1
3
.
5
9
1
4
.
4
7
1
6
.
0
0
2
0
.
0
0
DRAWING STATUS:
CLIENT:
ARCHITECT:
TITLE:
SCALE @ A1: CHECKED: APPROVED:
DRAWN: DATE:
PROJECT No: DRAWING No: REV:
PROJECT:
DESIGN:
F VAN RENBURG J GROBLER
ND MOKANSI 2015/08/20-
-
20418 SKC005 A
REV DATE BY DESCRIPTION CHK APD
1:1500
A 20-08-2015 ND INITIAL ISSUE AK AK
COPYRIGHT RESERVEDC
The content of this document is privileged and confidential and may not be disclosed or reproduced
without the express authorisation of the author, being "WSP GROUP AFRICA (PTY) LTD"
If drawing status = construction, a signed copy of this drawing (either in hardcopy or
electronic format) is available at the office of origin and at the office of issue.
PRELIMINARY
PR No.:
PL
OT
D
AT
E:
20
15
/0
8/2
0 1
2:3
4:1
8 P
M
TEMPLATE VERSION 1.0
314 Glenwood Road, Lynnwood Park, Pretoria, 0081
PostNet Suite 287, Private Bag X025, Lynnwood Ridge, 0040
Tel: +27(0)12-762-1200 Fax: +27(0)12-762-1301 www.wspgroup.co.za
WSP Group Africa (Pty) Ltd
Civil and Coastal Division
CA
D F
ILE
N
AM
E:
Z:\20000\20418 cpd country view
(olifantsfontein) fs\3 - draw
ings\3.3 draw
ings\P
RO
PO
SE
D S
IT
E A
ND
A
CC
ES
S LA
YO
UT
(LO
NG
T
ER
M)_R
EV
D
.dw
g
970429
LEGEND:
ROAD WIDENING BY COUNTRY VIEW X16
FILLING STATION UPGRADES
ALTERNATIVE ACCESS
CENTURY COUNTRY VIEW
FILLING STATION
PROPOSED SITE AND ACCESS
LAYOUT (LONG TERM)
-
6
Annexure
Annexure A: GDRT letter