rigorous estimation of the coordinates of two new national ... · fig 2011, marrakech, 19 may 2011...
TRANSCRIPT
FIG 2011, Marrakech, 19 MAY 2011 1
Rui M. S. FERNANDESBarde JATAU
Ugochukwu EDOZIEDomingos ARMANDO
José JANUÁRIO
Rigorous Estimation of the Coordinates of two new National permanent GNSS networks in Africa:
NIGNET (Nigeria) and REPANGOL (Angola)
FIG 2011, Marrakech, 19 MAY 2011 2
Reasons to promote NIGNET and REPANGOL
- Adoption of a modern geodeticinfrastructure full compatible with theactual techniques of geo-referencing.
- Low quality of the existing network basedin observations carried out using oldtechniques.
- Lack of geodetic beacons with knowncoordinates in large areas of the country(destroyed or never implemented).
- Compatibility with the reference frames ofneighboring countries through thecollaboration with international projects,namely AFREF and IGS.
FIG 2011, Marrakech, 19 MAY 2011 3
NIGNET
11 stations installed until 2010 2 stations installed in 2011
FIG 2011, Marrakech, 19 MAY 2011
Installed Systems
5
a) GNSS System –Nigeria: Trimble NetR8 and NetR9.Angola: Topcon NetG3A
b) Router –communications based on mobile networks (GPRSand 3G). Software developed by SEGAL using VPNs(Virtual Private Network).
c) Power Management –Solar panels are used to supply all the necessarypower.In Angola, the streaming of RTK corrections ispossible when there is power from the electrical grid(or using an additional battery).
FIG 2011, Marrakech, 19 MAY 2011 6
NIGNET stations – Examples
• State-of-art Receiver+Antenna
• Mobile Communications
• Powered by Panel Solars
FIG 2011, Marrakech, 19 MAY 2011 10
Methodology GIPSY
Processing...
GIPSY (strategy PPP)Day 1
Solution 1
Day n
Solution n
ITRF2008 Coordinates day 1
GIPSY toolsGlobal Parameters
(Dedicated Mapping)
ITRF2008 Coordinates day n
Combined Solution ITRF2008
GIPSY toolsand SEGAL applications
n=7
FIG 2011, Marrakech, 19 MAY 2011 11
NIGNET - r.m.s. repeatabilitiesWeekly Solutions
0,0
1,0
2,0
3,0
4,0
5,0
6,0
7,0
8,0
ABUZ (46) BKFP (43) CGGT (43) FUTY (53) GEMB (8) OSGF (51) RUST (44) ULAG (49) UNEC (43)
North
East
Vertical
mm (number of weeks used between brackets)
FIG 2011, Marrakech, 19 MAY 2011 14
r.m.s. repeatabilitiesWeekly Solutions
Weeks with more than 10 weeks selected
Weeks with all stations available
Selected week to compute thesolution wrtITRF2008