rims forum 2013 tsa research project update - gregg morrow opus

9
RIMS Conference 2013 TSA Research Project (NZTA) Project Update Gregg Morrow (Manukau) RIMS Conference March 2013

Upload: ingeniumrims

Post on 01-Nov-2014

370 views

Category:

Technology


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

RIMS Conference 2013

TSA Research Project (NZTA)Project Update

Gregg Morrow (Manukau)

RIMS Conference March 2013

Page 2: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

What Does TSA Stand For ?

T – is for TERRIFICS – is for SOUTH

A – is for AUCKLANDER!!!!!

RIMS Conference March 2013

Page 3: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

Questions

Show of hands who knows what TSA does? Who uses TSA? What do you use the outputs for? Who wants to know more about it? Have the results been useful?

RIMS Conference March 2013

Page 4: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

The Project

Just underway, reconfirming objectives, literature review work done

Steering Group – Gordon Hart, Jim McQueen, John Hallet, Theuns Henning, Mike Tapper, Matt Hendry, Mathew Rodwell, Gregg Morrow

Purpose/ Objective To improve the algorithm, better forecast timing and treatment

of works, maintain road in good condition, least whole of life cost, short to medium term

RIMS Conference March 2013

Page 5: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

Research To Address

Algorithm dated, still current?, have things changed? Reality check on outputs, what intervention levels are driving

treatments, is this reflected in the algorithm? LTPP site information, lots of data, reflected in algorithm? Are pavement and surface condition measurement techniques still

valid, replace with more modern methods? Change in economic analysis parameters Algorithm should reflect current knowledge and recent experience Progression of maint. needs should be evidence based

RIMS Conference March 2013

Page 6: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

Key Outcomes

Review the usefulness of the current TSA

How being used, where not, why?

Gather practitioners recommendations for improvements, reasons

Consider LTTP findings

RIMS Conference March 2013

Page 7: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

Key Outcomes

Develop improved algorithms that: Optimise whole of life costs

3yr forecasts

Recommend need for reactive and planned works

Reflect risk of delaying works, classification based

Simple and effective reflecting impact of variables on work programmes

RIMS Conference March 2013

Page 8: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

Key Outcomes

Develop improved algorithms that reflect the: Current economic parameters

Context of sites (urban/ rural?)

Current and forecast traffic demand

Road classification and LOS

Benefits of seal widening/ shape correction or similar associated improvements with maint. or renewal works

Findings from LTTP programme for characterising strength or capacity of pavements.

RIMS Conference March 2013

Page 9: Rims forum 2013   TSA Research Project update - Gregg Morrow OPUS

RIMS Conference March 2013

Thank You

Questions ?