risk assessment

3
Risk Assessment

Upload: davidkelly

Post on 13-Aug-2015

55 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Risk assessment

Risk Assessment

Risk Identified Shooting Location ResponsibilityStrategy to Overcome /

Prevention

Illness All MeIf anyone involved in the shoot is ill I may have to find a quick replacement or wait until the person/people are better.

Weather Outside N/AIf the weather is not to my liking or anyone else’s, I will have to wait until it improves or my shoot.

SD card full All Me

If the SD card is full on my camera I will go through the photos on the camera and back up the photos I need onto my computer and then delete them off the card.

Broken Equipment All Me

If any of my equipment gets broken then I might have to hire a camera from college or ask if anyone would borrow me one for a day.

Low battery All MeTo prevent a low battery on my camera I will charge it the night before the shoot.

Lighting All Me

To overcome bad lighting for my shoot I will wait until the lighting I need is available or I will use a flash if the lighting is too dark.

Location safety / unavailable All Me

I will make sure I have the location planned out, if I need permission I will ask for permission and I will also check to see if it is safe.

Public interference Outside MeMake sure the location is empty at the time of the shoot.

General Health & Safety All MeI will tell people involved in the shoot to be careful and safe so there is no illness or injury before the shoot.

Page 2: Risk assessment