Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact ControlFor water tank base construction
Project:-
Activity: Excavation & Backfilling
Sl NO Hazard Cause of Hazard Consequences/Impact Risk Evaluation(Before)
Risk Level Recommended Control Measures Risk Evaluation
(After)
Risk Level
H
S
P S (H,M,L)
H
S
P S (H,M,L)
1 Damage of Underground utilities
Not following the procedures Not locating the underground utilities Exposed underground utilities not
support properly. In attention known hazards Strike with machinery/ hand tools Not using cable detector as per
drawing Trial pits
Suspension of work Property Damage Penalties from local
authorities Fire and explosion
3 4 H NOC and permits will be obtained from TRANSCO, ADDC, ADCO and GASCO.
All the area of excavation to be marked and underground utilities to be located and marked by means of drawings from the clients/ property owner, detectors to be used.
Exposed underground utilities to be supported properly and marked.
Tool Box Talk will be carried out for the people and operators on the topic hazards involved in excavation and underground utilities and importance of protecting it.
Close supervision will maintain while exposing the underground utilities or working in near exposed utilities.
2 1 L
2 Collapse of trench Improper shoring/ slopping Movement of machineries Improper Access/ egress Keeping materials at the edge of
excavated trenches
Injury Property Damage
3 4 H Shoring/ sloping will be done for the excavated trench considering the soil condition.
Hard barricades will be provided 1.5 mtr away from the edge of excavated trenches.
All the materials using for construction will kept away from the edge of excavation.
Proper access ladders will be provided.
2 1 L
3 Toppling machinery Uneven ground Over speed of machinery Unauthorized operation of machinery Incompetent person
Property Damage Serious Injury 3 4 H
Competent persons with use driving license and experience will be assigned operation of the machineries.
Uneven grounds will be compacted and levelled.
The machinery speed will be controlled by regular monitoring of machinery and disciplinary action for violators.
2 1 L
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact ControlFor water tank base construction
Project:-
E E
4 Fall of materials Unprotected edge Keeping excavated materials at the
edge In attention to known hazards
Near miss Injury Property damage
2 3 M Excavated edge will be protected by providing hard barricades and warning signs.
Excavated materials will be removed immediately.
Tool box Talk will be carried out prior to start work stating the hazards and control measures exist in excavation, fall of material.
2 1 L
5 Fall of persons Lack of hand rails Lack of warning signs Lack of inspection
Injury Fracture Public
2 3 M Hard barrications will be installed and maintained. Hand rails will be maintained if the excavation
depth increases.
Pre work and regular inspections will be carried out by the foreman and safety officer.
After finish of work security personnel will be assigned to avoid trespassing/unauthorized entry at night.
2 1 L
6 Dust / Noise / vibration Machinery Health illness / hearing loss / white finger
H 2 2 M Ear plug / muff / defender to be used Mask to be used Exposure time PPE to be worn
H 2 1 L
Activity: Lifting Operation
Sl NO Hazard Cause of Hazard Consequences/Impact Risk Evaluation(Before)
Risk Level Recommended Control Measures Risk Evaluation
(After)
Risk Level
H
P S (H,M,L)
M
P S (H,M,L)
1 Crane toppling
Dropping of load
Swinging load
Adjacent work
Faulty Equipment
Damaged lifting gears
Failure of lifting tackles.
Uneven or soft ground.
Outriggers rest on soft/loose soil without load distribution plate./ outriggers not extended
Unbalanced load (improper slinging)
Load contacting the live equipment during lifting operation
Use of uncertified or incorrect lifting tools and tackles
Cuts, bruise, abrasions Fatality, damage to
equipment Serious Injury Fatality Property damage
2 3
H PTW Control Competent operator Method statement , TRA Lifting gears to be certified and colour coded
according to ADCO – GASCO / ADDC standards. Planned lifting Firm and even ground Crane should be positioned horizontally (wooden
supports under the outriggers to be provided) Barricade around lifting radius and limited the
access only to essential personnel. Use approved 3rd party certified crane / Hiab, /
Operator, Riggers & lifting tools & tackles. All lifting gears or equipment shall be inspected
2 2 M
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact ControlFor water tank base construction
Project:-
High wind speed
Personnel under suspended load
Incompetent rigger
Improper maintenance
prior to each lift. Crane safe working load clearly marked on the
crane. Ensure Centre of Gravity (balancing) of load while
slinging (Trained rigger). Use tag lines at both ends to control the load
from swinging. Close supervision to monitor someone not
standing underneath or pass through the suspended load.
Wind speed shall be monitored (Suspend operation if wind speed exceeds 17 knots)
Activity: Manual Handling of steel and other material Sl NO Hazard Cause of Hazard Consequences/Impact Risk Evaluation
(Before)Risk Level Recommended Control Measures Risk
Evaluation(After)
Risk Level
H
P S (H,M,L)
L
P S (H,M,L)
1 Slip, Trip or Fall
Stress, strain
Steel bars
Improper manual lifting techniques
Lifting of heavy weight.
Sharp edges
Personal injury
Upper limb pain and discomfort
Cut, bruises and injury
2 2 M Approved Method statement Approved TRA Trained workers Proper lifting techniques to be used. If weigh is heavy, used two instead of one person Proper PPE to be worn during operation Take care persons passing nearby, standby and
working
2 1 L
Activity: Concreting
Sl NO Hazard Cause of Hazard Consequences/Impact Risk Evaluation(Before)
Risk Level Recommended Control Measures Risk Evaluation
(After)
Risk Level
S
P S (H,M,L)
L
P S (H,M,L)
1 Machine operation Dust Vibration
Rotating parts of the machine not guarded.
In competent operator Dusty environment (Inhalation of dust)
Injury to personnel. Health hazards
2 2 M PTW Control Competent operator Method statement , RA All rotating parts of the machine should be in
place. Avoid long time exposure to dust / vibration Employ a minimum handgrip to observe less
vibration.
2 1 L
Machine operation (mixer machine)
Rotating parts of the machines Loose clothing
Personnel injury Skin irritation H 2 2 M
EPTW Control Method statement & TRA
L 2 1 L
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact ControlFor water tank base construction
Project:-
Cement dust Chemical
Inhalation of dust Chemical exposure
Occupational disease (Breathing disorder)
Environmental impact
Loose clothing should not be worn whilst doing the machine operation.
Keep unauthorized personnel away from the operation.
Rotate the workers to minimize long time exposure by an individual to dust.
Dust mask to be used. Use of MSDS To assigned area for cleaning mixer chute Contaminated concrete to be removed according
to the procedure
Traffic control of concrete equipments
Moving equipments Fatality Injury Property damage
S 2 2 M Route of equipment to be assigned Designated parting for mixers Competent banks man to be assigned Warning light to provided Signboard to kept
L 2 1 L