Advantages of risk assessments
• reduced frequency of injuries to students to school staff
• reduced costs for paperwork, litigation and payouts
• compliance with the law (c.f. industry)• helps maintain variety of chemicals and
equipment
![Page 3: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/3.jpg)
Advantages of a formalised system
• ensures proper consideration of risks and control measures
• standardisation within school-board area• storage of records for legal purposes• communication between teachers and
science technicians
![Page 4: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/4.jpg)
Is it practical?
Paper-based system NO (almost)
Electronic system YES
![Page 5: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/5.jpg)
Paper-based system
• time consuming • unwieldy forms
many prompts - mostly empty space few prompts - requires knowledge & skill
• non-searchable• difficult to update• storage problems
![Page 6: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/6.jpg)
Electronic system
• relatively rapid • prompts sensitive to context• reduces paper consumption• easy to review and update• easy monitoring• easy storage• demonstrated to work in schools
(e.g. 650 schools in AU&NZ)
![Page 7: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/7.jpg)
RiskAssess• web-based risk assessment tool • customised to the school situation• provides
electronic templates (CA/ISO) database information on risks (chemical, equipment, biological) equipment ordering lab scheduling
• easy sharing of experiment templates for customisation
![Page 8: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/8.jpg)
Logic• separate sections for teacher and science
technician • initial assessment of inherent risk
if low, go to endif medium or more, record control measuresif high or extreme, third reviewer required
• cross-checking by teacher/scitech/reviewer• scheduling and ordering system to save time• inexpensive ($160 per school per year)
![Page 9: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/9.jpg)
Details• access from school/home • nothing to install on computer (instant update)• unlimited number of simultaneous users and
risk assessments (virtually)• minimal data entry• complements MSDS/SDS• student subscriptions, if desired• continuing input from science staff• multiple backups of data & backup server• support and advice
![Page 10: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/10.jpg)
Summary of benefits
• safer laboratories • better communication• meets legal requirements• reduced costs• happy teachers and sci techs!
![Page 11: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/11.jpg)
Occupational Health and Safety Code 2009
An employer must assess a work site and identify existing and potential hazards before
work begins at the work site . . . must prepare a report of the results of a hazard assessment and the methods
used to control or eliminate the hazards identified . . . must ensure that the date on which the hazard assessment is prepared or
revised is recorded on it . . . must ensure that the hazard assessment is repeated at reasonably
practicable intervals to prevent the development of unsafe and unhealthy working conditions. . .
Part 2 7(1)-7(4)
![Page 12: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/12.jpg)
You should:
• identify
• assess
• control
risks
Before: Establish the context
After: Monitor and review
Always: Consult and communicate
![Page 13: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/13.jpg)
Risk identification
• history of “accidents” and “near-accidents” at schoolat similar schools
• brainstorming, preferably with friends• checklists of possible risks
![Page 14: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/14.jpg)
Risk assessment
To assess the severity of a risk,
you need to consider:
• the consequences of the event, and
• the chance that it will occur (likelihood)
CAS ISO 31000:2009 “Risk management”
HB 436:2004 “Risk management guidelines”
![Page 15: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/15.jpg)
Risk matrix
Consequences
Likelihood
Minor Severe
Likely
Unlikely
x
??
OK = acceptable risk
? = doubtfulCONSIDER THE OPTIONS
x = unacceptable risk
DON’T DO IT!
Code
OK
?
![Page 16: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/16.jpg)
Risk control
Hierarchy of options:
eliminationsubstitution
isolationengineering
administrationpersonal protective equipment
![Page 17: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/17.jpg)
EXPERIMENT
or
ACTIVITY
RISK
ASSESSMENT
Written procedure
Equipment
Materials
Chemicals
Living organisms
People
Potential hazards
Standard operating procedure
Manufacturer User
instructions instructions
Potential hazards
Standard handling procedure
Potential hazards
Standard handling procedure
MSDS
Potential hazards
Standard handling procedure
Potential hazards
Standard handling procedure
Componentrisk assessment
Overallrisk assessment
KEY
![Page 18: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/18.jpg)
Multi-level scale of consequences
• Level 1 : first aid treatment at the school(Minor)
• Level 2: treatment by a doctor(Moderate)
• Level 3: immediate hospitalization(Severe)
![Page 19: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/19.jpg)
Multi-level scale of likelihood
• Level 1: known to commonly occur; not unexpected in the class(Likely)
• Level 2: uncommon, rare, but sufficiently frequent to have been witnessed by self or a known person(Unlikely)
• Level 3: very rare; have heard of it happening; may possibly have been witnessed by self or a known person(Very unlikely)
![Page 20: Risk assessments made easy! Phillip Crisp EcoSolve Australia Pty Ltd](https://reader036.vdocument.in/reader036/viewer/2022083004/56649dbe5503460f94ab22ba/html5/thumbnails/20.jpg)
Risk matrix
Consequences
Likelihood
Minor Moderate Severe
Likely
Unlikely
Veryunlikely
OK x x
? x
??
OK = acceptable risk (low risk)
? = doubtfulCONSIDER OTHER OPTIONS
?? = very doubtfulEither DON’T DO IT orPROCEED WITH GREAT CARE
x = unacceptable risk
DON’T DO IT!
Code
OK
OK