risk-based testing - designing & managing the test process (2002)
TRANSCRIPT
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 1
Risk-Based Testing
Paul Gerrard & Neil Thompson
Systeme Evolutif Limited3rd Floor, 9 Cavendish PlaceLondon W1M 9DL, UKTel: +44 (0)20 7636 6060Fax: +44 (0)20 7636 6072email: [email protected]://www.evolutif.co.uk/
Thompson informationSystemsConsulting Limited
Thompson information Systems Consulting Limited23 Oast House CrescentFarnham, Surrey GU9 0NP, UKTel: +44 (0)7000 NeilTh (634584)Fax: +44 (0)7000 NeilTF (634583)email: [email protected]://www.TiSCL.com/
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 2
Agenda I Introduction II Risk-Based Test Strategy III Risk Based Test Planning and Organisation IV Managing Test Execution and the End-
Game V Close, Q&A
Here’s the commercial bit:– Most of the material presented today is based on:– Risk-Based E-Business Testing, Gerrard and
Thompson,Artech House, 2002
– Visit www.riskbasedtesting.com for samples.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 3
Paul GerrardSysteme Evolutif are a software testing consultancy specialising in E-Business testing, RAD, test process improvement and the selection and implementation of CAST Tools. Evolutif are founder members of the DSDM (Dynamic Systems Development Method) consortium, which was set up to develop a non-proprietary Rapid Application Development method. DSDM has been taken up across the industry by many forward-looking organisations.
Paul is the Technical Director and a principal consultant for Systeme Evolutif. He has conducted consultancy and training assignments in all aspects of Software Testing and Quality Assurance. Previously, he has worked as a developer, designer, project manager and consultant for small and large developments. Paul has engineering degrees from the Universities of Oxford and London, is Co-Programme Chair for the BCS SIG in Software Testing, a member of the BCS Software Component Test Standard Committee and Former Chair of the IS Examination Board (ISEB) Certification Board for a Tester Qualification whose aim is to establish a certification scheme for testing professionals and training organisations. He is a regular speaker at seminars and conferences in Europe and the US, and won the ‘Best Presentation’ award at EuroSTAR ’95.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 4
Neil ThompsonNeil Thompson is the Director of Thompson information Systems Consulting Ltd, a company he set up in 1998 as a vehicle for agile, impartial consultancy and management to blue-chip clients, sometimes in association with other consultancies such as Systeme Evolutif. Neil’s background is in programming, systems analysis and project management. He has worked for a computer hardware manufacturer, two software houses, an international user organisation and two global management consultancies, and currently feels fulfilled as a specialist in software testing.
He is a Certified Management Consultant (UK), and a member of the British Computer Society (BCS) and the IEEE. Neil is active in the BCS Specialist Interest Groups in Software Testing and Configuration Management. He spoke at the first and second EuroSTAR conferences in 1993-4, and again in 1999.
Neil studied Natural Sciences at Cambridge University (BA & MA degrees). He holds the ISEB Foundation Certificate in software testing and will be taking the Practitioner examination in December.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 5
Part IIntroduction
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 6
Part 1 - Agenda How Much Testing is enough? When is the Product Good Enough? Introduction to Risk The V-Model and W-Model.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 7
How Much Testing is Enough?
(can risks help?)
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 8
“I need six testers for eight weeks…”
The Project manager says– “Four testers for six weeks and that’s it!”
The testers say– It’ll take longer than six weeks– It’ll cost more than the budget allocated– It’s too big/complicated/risky for us to do
properly– “It’s just not enough”
Was it ever possible to do “enough” testing in these circumstances?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 9
Testing is time delimited…always
No upper limit to the amount of testing Even in the highest integrity environments,
time and cost limit what we can do Testing is about doing the best job we can in
the time available Testers should not get upset, if our estimates
are cut down (or ignored) The benefits of early release may be worth
the risk But who knows the status of the risks and
benefits?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 10
Did any tester ever get enough time to test? No, of course not We need to separate the two
responses:– the knee-jerk reaction (a back-covering
exercise prior to the post-disaster “I told you so!”)
– a rational evaluation of the risks and response to doing ‘too little’
Often, just like cub-scouts, testers “promise to do their best” and don’t make waves.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 11
Risk-based test planning If every test aims to address a risk, tests
can be prioritised by risk It’s always going to take too long so…
– Some tests are going to be dropped– Some risks are going to be taken
Proposal:– The tester is responsible for making the
project aware of the risks being taken– Only if these risks are VISIBLE, will
management ever reconsider.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 12
So how much testing is enough? Enough testing has been planned when the
stakeholders (user/customer, project manager, support, developers) approve:
TESTS IN SCOPE– They address risks of concern and/or give
confidence THE TESTS THAT ARE OUT OF SCOPE
– Risk is low OR these tests would not give confidence
The amount and rigour of testing is determined by CONSENSUS.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 13
When is the Product“Good Enough”?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 14
Compulsive behaviour Consultants, ‘gurus’, academics preach
perfection through compulsive behaviour:
» product perfection through process maturity and continuous process improvement
» all bugs are bad, all bugs could be found, so use more and more rigorous/expensive techniques
» documentation is always worthwhile» you can’t manage what you can’t count» etc. etc..
Process hypochondriacs can’t resist.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 15
* James Bach, “Good Enough Quality: Beyond the Buzzword”, Computer, August 1997Web site: www.satisfice.com
“Good Enough” James Bach* is main advocate of the
‘Good Enough’ view (also Yourdon and others)
A reaction to compulsive formalism– if you aim at perfection, you’ll never
succeed– your users/customers/businesses live in
the real world, why don’t you?– compromise is inevitable, don’t kid
yourself– guilt and fear should not be part of the
process.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 16
“Good Enough” means:1. X has sufficient benefits2. X has no critical problems3. Benefits of X sufficiently
outweigh problems
4. In the present situation, and all things considered, improving X would cause more harm than good.
All the above must apply
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 17
Contribution of testing to the release decision
Have sufficient benefits been delivered?– Tests must at least demonstrate that features
providing benefits are delivered completely Are there any critical problems?
– Test records must show that any critical problems have been corrected, re-tested, regression tested
Is our testing Good Enough?– Have we provided sufficient evidence to be
confident in our assessment?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 18
Who makes the release decision?
“Good enough” is in the eye of the stakeholder
Testers can only say:– “at the current time, our tests demonstrate
that:» the following features/benefits have been delivered» the following risks have been addressed» these are the outstanding risks of release...”
Stakeholders and management, not the tester, can then make the decision.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 19
Introduction to Risk
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 20
The definition of risk Italian dictionary: Risicare, “to dare” Simple generic definition:
–“The probability that undesirable events will occur”
In this tutorial, we will use this definition:
“A risk threatens one or more of a project’s cardinal objectives and has an uncertain probability”.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 21
Some general statements about risk
Risks only exist where there is uncertainty
If the probability of a risk is zero or 100%, it is not a risk
Unless there is the potential for loss, there is no risk (“nothing ventured, nothing gained”)
There are risks associated with every project
Software development is inherently risky.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 22
Cardinal Objectives The fundamental objectives of the
system to be built Benefits of undertaking the project Payoff(s) that underpin and justify
the project
Software risks are those that threaten the Cardinal Objectives of a project.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 23
Three types of software risk
Project Riskresource constraints, external interfaces,
supplier relationships, contract restrictions
Process Riskvariances in planning and
estimation, shortfalls in staffing, failure to track progress, lack of quality
assurance and configuration management
Primarily a management responsibility
Planning and the development process are the main issues here.
Product Risklack of requirements stability, complexity,
design quality, coding quality, non-functional
issues, test specifications.
Requirements risks are the most significant risks reported in risk assessments.
Testers are mainly
concerned with Product Risk
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 24
Quantitative or qualitative Risks can be quantified:
– Probability = 50%– Consequence or loss £100,000– Nice to use numbers for
calculations/comparisons– But we deal in perceived risk, not absolute
risk Or qualified:
– Probability is high medium or low– Consequence is critical, moderate, low– More accessible, usable in discussions, risk
workshops.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 25
Uncertainty Consequence
– Do you know the consequences of failure?– Need user input to determine this– Some costs could be calculated but others are
intangible (credibility, embarrassment etc.) Probability
– The toughest one to call– Crystal ball gazing
In conducting a risk assessment, make it clear what level of uncertainty you are working with
Testing (and test results) can reduce uncertainty.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 26
The V-Model and W-Model
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 27
Requirements
FunctionalSpecification
PhysicalDesign
ProgramSpecification
UserAcceptance
Test
SystemTest
IntegrationTest
UnitTest
V-Model
Is there ever a one-to-one relationship between baseline documents and testing?
Where is the static testing (reviews, inspections, static analysis etc.)?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 28
WriteRequirements
SpecifySystem
DesignSystem
Test theRequirements
Test theSpecification
Test theDesign
UnitTest
AcceptanceTest
SystemTest
IntegrationTest
InstallSystem
BuildSystem
BuildSoftware
WriteCode
W-Model
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 29
WriteRequirements
SpecifySystem
DesignSystem
Test theRequirements
Test theSpecification
Test theDesign
UnitTest
AcceptanceTest
SystemTest
IntegrationTest
InstallSystem
BuildSystem
BuildSoftware
WriteCode
Reviews
Inspections
ScenarioWalkthroughs
Early TestCase Preparation
InspectionStatic
Analysis
RequirementsAnimation
W-Model and static testing
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 30
WriteRequirements
SpecifySystem
DesignSystem
Test theRequirements
Test theSpecification
Test theDesign
UnitTest
AcceptanceTest
SystemTest
IntegrationTest
InstallSystem
BuildSystem
BuildSoftware
WriteCode
SecurityTesting
PathTesting
PerformanceTestingUsability
Testing
BusinessIntegration
TestingSystem
IntegrationTesting
EquivalencePartitioning
BoundaryValue Testing
Exploratory Testing
W-Model and dynamic testing
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 31
What do we mean by a (work) product?
Project documents:– schedule, quality plan, test strategy,
standards Deliverables:
– requirements, designs, specifications, user documentation, procedures
– software: custom built or COTS components, sub-systems, systems, interfaces
– infrastructure: hardware, O/S, network, DBMS– transition plans, conversion software,
training...
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 32
What do we mean by testing?
Testing is the process of evaluating the deliverables of a software project– detect faults so they can be removed– demonstrate products meet their
requirements– gain confidence that products are ready for
use– measure and reduce risk
Testing includes:– static tests: reviews, inspections etc.– dynamic tests: unit, system, acceptance
tests etc.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 33
Part IIRisk Based Test Strategy
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 34
Part II - Agenda Risk Management Process The Role of Testing in Product Risk
Management Identifying Benefits and Risks From Risks to Test Objectives Generic Test Objectives and System
Requirements Test Objectives, Coverage and
Techniques
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 35
Risk Management Process
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 36
Process
Risk identification– what are the risks to be addressed?
Risk analysis– nature, probability, consequences, exposure
Risk response planning– pre-emptive or reactive risk reduction
measures Risk resolution and monitoring Stakeholders should be involved at all
stages.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 37
Assessing consequences (loss)
Severity Description Score
Critical business objectives cannot be accomplished 5
High business objectives undermined 4
Moderate business objectives affected 3
Low slight effect on business 2
Negligible no noticeable effect 1
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 38
Assessing probability (likelihood)
Probability Description Score
>80% almost certainly, highly likely 5
61-80% probable, likely, we believe 4
41-60% better than even, 50/50, we doubt, improbable 3
21-40% unlikely, probably not 2
1-20% chances are slight, highly unlikely 1
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 39
Risk exposure Risks with the highest exposure are
those of most concern Worst case scenarios drive concerns Risk EXPOSURE is calculated as the
product of the PROBABILITY and CONSEQUENCE of the risk
A simple notation is L2
– where L2 = LIKELIHOOD x LOSS.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 40
What do the numbers mean? Sometimes you can use numeric
assessments– We may have experience that tells us
» Likelihood is high (it always seems to happen)» Loss is £50,000 (that’s what it cost us last time)
But often, we are guessing– Use of categories help us to compare risks– Subjective perceptions (never the same)– E.g. Developers may not agree with users on
probability! Maybe you can only assign risk RAG
numbers– RED, AMBER, GREEN
The ability to compare is what is most important.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 41
The danger slope
Hig
hly
U
nlik
ely
Un
likel
y
Imp
rob
ab
le
Lik
ely
Ve
ry L
ike
ly
Critical
High
Moderate
Low
Negligible
Whe
re w
e wan
t to
move
all ri
sks
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 42
Risk response planning Do nothing! Pre-emptive risk reduction measures
– information buying– process model– risk influencing– contractual transfer
Reactive risk reduction measures– contingency plans– insurance
The risk that’s left is the residual risk.
Where testing fits in
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 43
Role of Testing inProduct Risk Management
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 44
Faults, failure and risk System failures are what we fear The faults that cause failures are
our prey Uncertainty is what makes us
concerned:– what type of faults are present in the
system?– how many faults are in the system?– did testing remove all the serious
faults? Testing helps us to address these
uncertainties.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 45
Testing helps to reduce risk If risk assessment steers test
activity– we design tests to detect faults– we reduce the risks caused by faulty
products Faults found early reduce rework,
cost and time lost in later stages Faults found are corrected and re-
tested and so the quality of all products is improved.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 46
Testing can measure risk Testing is a measurement activity Tests that aim to find faults provide
information on the quality of the product– which parts of the software are faulty– which parts of the software are not faulty
Tests help us understand the risk of release
Understanding the risks helps us to make a risk-based decision on release
After testing, our risk assessment can be refined.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 47
The test passes… The risk could be unchanged because:
Risk probability higher because:
Risk probability lower because:
Risk consequence higher because:
Risk consequence lower because:
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 48
The test fails… The risk could be unchanged because:
Risk probability higher because:
Risk probability lower because:
Risk consequence higher because:
Risk consequence lower because:
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 49
Identifying Benefits and Risks
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 50
Business benefits (cardinal objectives)
At the highest level, normally set out in a project initiation document or business case etc.
A benefit is any 'good thing' required to be achieved by a project
Normally expressed in financial/business terms e.g.
Save money - one or a combination of– cut staff, stock, work in progress, time to
deliver… Increase revenues - one or a combination of
– increase market share, launch new product, improve existing product, increase margins, exploit a new market…
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 51
Risk identification Expert interviews Independent consultant or domain
expert assessment Past experience (lessons learned) Checklists of common risks (risk
templates) Risk workshops Brainstorming.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 52
Risk workshops Brainstorming sessions can be very
productive Make risks visible Generates risk ideas Generates ideas for resolution Starts buy-in.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 53
Exercise Main features of an ATM:
– Validation of a customers card and PIN– Cash withdrawal– On-line balance request– Request a statement
…amongst others.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 54
What kind of failures could occur for each of the four requirements?
Failure BankPOV
Cust.POV
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 55
Risks and viewpoints Viewpoint has an influence over
which risks are deemed important Developer/supplier viewpoint
– what stops us getting paid for the system?
Customer/service provider viewpoint– what could lose us business, money?
Customer viewpoint– what could lose ME money?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 56
The testers viewpoint Typically, testers represent either
suppliers or their customers Main stakeholders in the project:
– system supplier– customer/buyer– service provider and support– end-users
Testers may work for one stakeholder, but should consider concerns of all.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 57
From Risks to Test Objectives
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 58
Why use risks to define test objectives?
If we focus on risks, we know that bugs relating to the selected mode of failure are bound to be important.
If we focus on particular bug types, we will probably be more effective at finding those bugs
If testers provide evidence that certain failure modes do not occur in a range of test scenarios, we will become more confident that the system will work in production.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 59
Risks as failure modes or bug types
Risks describe ‘what we don’t want to happen’
Typical modes of failure:– calculations don’t work– pages don’t integrate– performance is poor– user experience is uncomfortable
Think of them as ‘generic bug types’.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 60
Defining a test objective from risk
We ‘turn around’ the failure mode or risk Risk:
– a BAD thing happens and that’s a problem for us
Test objective:– demonstrate using a test that the system
works without the BAD thing happening The test:
– execute important user tasks and verify the BAD things don’t happen in a range of scenarios.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 61
Risks and test objectives - examples
Risk Test Objective
The web site fails to function correctly on the user’s client operating system and browser configuration.
To demonstrate that the application functions correctly on selected combinations of operating systems and browser version combinations.
Bank statement details presented in the client browser do not match records in the back-end legacy banking systems.
To demonstrate that statement details presented in the client browser reconcile with back-end legacy systems.
Vulnerabilities that hackers could exploit exist in the web site networking infrastructure.
To demonstrate through audit, scanning and ethical hacking that there are no security vulnerabilities in the web site networking infrastructure.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 62
Generic Test Objectives and System Requirements
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 63
Risk-based test objectives are usually not enough
Other test objectives relate to broader issues– contractual obligations– acceptability of a system to its users– demonstrating that all or specified functional
or non-functional requirements are met– non-negotiable test objectives might relate to
mandatory rules imposed by an industry regulatory authority and so on
Generic test objectives complete the definition of your test stages.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 64
Generic test objectivesTest Objective Typical Test Stage Demonstrate component meets requirements Component Testing Demonstrate component is ready for reuse in larger sub-system
Component Testing
Demonstrate integrated components correctly assembled/combined and collaborate
Integration testing
Demonstrate system meets functional requirements Functional System Testing
Demonstrate system meets non-functional requirements Non-Functional System Testing
Demonstrate system meets industry regulation requirements
System or Acceptance Testing
Demonstrate supplier meets contractual obligations (Contract) Acceptance Testing
Validate system meets business or user requirements (User) Acceptance Testing
Demonstrate system, processes and people meet business requirements
(User) Acceptance Testing
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 65
Tests as demonstrations “Demonstrate” is most often used in test
objectives Better than “Prove” which implies
mathematical certainty (which is impossible)
But is the word “demonstrate” too weak?– it represents exactly what we will do– we provide evidence for others to make a
decision– we can only run a tiny fraction of tests
compared to what is possible– so we really are only doing a demonstration
of a small, sample number of tests.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 66
But tests should aim to locate faults, shouldn't they?
The tester’s goal: to locate faults We use boundary tests, extreme values,
invalid data, exceptional conditions etc. to expose faults:– if we find faults these are fixed and re-tested– we are left with tests that were designed to
detect faults, some did detect faults, but do so no longer
We are left with evidence that the feature works correctly and our test objective is met
No conflict between:– strategic risk-based test objectives and– tactical goal of locating faults.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 67
Testing and meeting requirements
Risk-based test objectives do not change the methods of test design much
Functional requirements– We use formal or informal test design
techniques as normal Non-functional requirements
– Test objectives are often detailed enough to derive specific tests.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 68
Test Objectives, Coverage and Techniques
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 69
Risks can be used to… Determine the ‘level’ of testing to be
performed– Four risk levels typically used by most safety-
related standards– Specific test case design techniques and test
completion criteria mandated for each level of risk
Determine the ‘type’ of testing to be performed– E.g. performance, usability, security
backup/recovery testing all address different types of risk.
High risk components might be subjected to:– Code inspections, static analysis and formal
component testing to 100% modified decision coverage.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 70
Example risk – test objective -techniques Risk: feature xxx fails to calculate an
insurance premium correctly Potential test techniques:
– Review or inspect requirements for xxx– Review or inspect specification of xxx– Review or inspect design of xxx– Review or inspect component(s)– Code inspection, static analysis– Defined tests at component, system or
acceptance level We choose the most effective, practical
technique that can be performed as early as possible.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 71
Test objectives and coverage
Easy to derive a test objective from a risk But it is less easy to derive an objective
coverage measure to plan for “How much testing (how many tests) are
required to provide enough information to stakeholders that a risk has been addressed”?
Well documented coverage measures for both black box and white box test design techniques but how can we use these?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 72
Black box test coverage Some techniques subsume others
e.g.– boundary value analysis (BVA)
subsumes equivalence partitioning (EP) and is ‘stronger’
Other test techniques (e.g. decision tables, state-transition testing, syntax testing etc.) do not fit into such an ordered hierarchy
These (and other) techniques have specific areas of applicability.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 73
White box test techniques Most are based on the path-testing
model More ‘inclusive’ ordered hierarchy:
– statement testing (weakest)– branch testing– modified condition decision testing– branch condition combination testing
(strongest) Although costs vary, there is little data
available that compares their cost-effectiveness
British Standard BS 7925-2 available at www.testingstandards.co.uk has all definitions.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 74
Selecting the ‘right’ test techniques
The tester should explain how these are used, the potential depth and consequent cost of using them to the stakeholders
Some test techniques are less formal, or not yet mature enough to have defined coverage levels
For example, coverage targets for configuration testing and ethical hacking as means of detecting security flaws are likely to be subjective.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 75
Selecting the right coverage level Stakeholders will PAY so much to address a
risk Testers need to reconcile the concerns of
stakeholders to the coverage measure to be used– The tester may need to assess the quantity of
testing that could be achieved in the time available
– May also need to offer stakeholders degrees of coverage and quote different costs of each
Tester needs to explain both quantitatively and qualitatively techniques and coverage to be used
The stakeholders must then take a view on which of these coverage targets will be adequate.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 76
Part IIIRisk Based Test Planning
and Organisation
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 77
Part III - Agenda Designing the Test Process Stages, Teams and Environments Estimation Planning and Scheduling Test Specification and Traceability.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 78
Designing the Test Process
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 79
RiskIdentification
• Consult business, technical staff
• Prepare a draft register of risks
RiskAnalysis
RiskResponse
TestScoping
Test ProcessDefinition
• Discuss risks
• Assign probability and consequence scores
• Calculate exposure
• Formulate test objectives, select test technique
• Document dependencies, requirements, costs, timescales for testing
• Assign Test Effectiveness score
• Nominate responsibilities
• Agree scope of risks to be addressed by testing
• Agree responsibilities and budgets
• Draft the test process from the Test Process Worksheet
• Complete test stage definitions
Tester Activity
Workshop
Tester Activity
Review and Decision
Tester Activity
Master Test Planning process
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 80
Internet banking exampleCustomer workstation HTTP dispatcher
Web server(s)
firewall
Application Server(s)
printer
Billing productionservers
HTTPS HTTPS
RMI/IIOPRMI/IIOP
MQ, RMI/IIOP MQ/Series
ExistingBackends
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 81
Example A bank aims to offer an internet based
service to give its corporate customers– balance and account information– multi-account management and inter
account transfers– payments
How many ways could this system fail? Which should be considered for testing?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 82
Failure mode and effects analysis FMEA is a method for:
– assessing the risk of different failure modes
– prioritising courses of action (in our case, testing)
We identify the various ways in which a product can fail
For each failure mode we assign scores
Can use these profiles to decide what to do.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 83
Profiling failure modes What is the consequence of the
failure? What is the probability of the failure
occurring if no action is taken? What is the probability of detecting
this with testing?– How would you detect the problem
that causes the failure?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 84
Failure mode profiling Each mode is scored
– P: probability of occurrence (1 low - 5 high)
– C: consequence (1 low -5 high)– T: test effectiveness (1 low - 5 high)
P x C x T = Risk Number.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 85
Failure mode risk numbers If the range of scores is 1-5 Maximum risk number = 125
– implies it’s a very serious risk but could be detected with testing
Minimum risk number = 1– implies it’s a low risk, and would not be
detected with testing
Risk numbers indicate your testing priorities.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 86
Test process worksheet Failure Mode or
Objective
Pro
ba
bility
Co
nse
qu
en
ce
Te
st Effe
ctiven
ess
RIS
K N
um
ber
Pro
toty
pin
g
Infra
structu
re
Su
b-S
ystem
Ap
plic
ation
Sy
stem
No
n-F
un
ctio
nal
Te
sts
User A
ccep
tan
ce
Op
eration
al A
ccep
tan
ce (B
TS
)
Liv
e Co
nfid
en
ce
Cu
sto
mer L
ive Tria
l
Test Technique
Client Platform
1 Which browsers, versions and O/S platforms will be supported, includes non-frames, non-graphic browsers etc.)?
SS
2 New platforms: Web TV, Mobile Phones, Palm Pilots etc.
3 Connection through commercial services e.g. MSN, Compuserve, AOL
SS
4 Browser HTML Syntax Checking SS
5 Browser compatibility HTML Checking SS
6 Client configuration e.g. unusable, local character sets being rejected by database etc.
SS
7 Client configuration: Client turns off graphics, rejects cookies, Cookies time out, Client doesn’t have required plug-ins etc.
SS
8 Minimum supported client platform to be determined/validated
SS
Component Functionality
9 Client component functionality SS
10 Client web-page object loading SS
11 Custom-built infrastructure component functionality
SS
12 COTS component functionality SS
13 HTML page content checking - spelling, HTML validation
SS
System/Application functionality
14 End-to-end system functionality CC
15 Loss of context/persistence between transactions
SS CC
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 87
Using the worksheet - risks Failure Mode or Objective column
– failures/risks– requirements for demonstrations– mandatory/regulatory/imposed
requirements Probability of the problem occurring Consequence of failure Test Effectiveness - if we test, how
likely would the problem be detected?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 88
Using the worksheet - test stages
Proposed test stages and responsibilities can take shape
A failure mode might be addressed by one or more than one test stage
Let’s fill in a few rows and calculate risk numbers (19, 28, 38, 45).
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 89
Creating the worksheet Create a template sheet with initial risks
and objectives based on experience/checklists
Cross-functional brainstorming– stakeholders or technically qualified
nominees– might take all day, but worth completing in
one session to retain momentum If you can’t get a meeting, use the specs,
then get individuals to review.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 90
Additional columns on the worksheet
COST! How can you prioritise the risks and
proposed test activities, without knowing the cost?
For each test activity, assign a cost estimate identifying all assumptions and dependencies
When the risks and testing is prioritised and cost is the limiting factor, you know– What testing can be afforded – IN SCOPE– What testing cannot be afforded – OUT OF
SCOPE.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 91
From worksheet to test process
Identify/analyse the risk Select a test activity to address the risks Collect test activities into stages and
sequence them Define, for each stage:
– objectives, object under test– entry, exit and acceptance criteria– responsibility, deliverables– environment, tools, techniques, methods.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 92
Test stage - key attributesTest Objectives • The objectives of this stage of testing, e.g. faults to
be found; risks to be avoided; demonstrations to beperformed.
Component(s) under Test • The architectural components, documents,business processes to be subjected to the test.
Baseline • Document(s) defining the requirements to be metfor the components under test (to predict expectedresults).
Responsibility • Groups responsible for e.g. preparing tests,executing tests and performing analysis of testresults.
Environment • Environment in which the test(s) will be performed.
Entry Criteria • Criteria that must be met before test execution maystart.
Exit Criteria • Criteria to be met for the test stage to end.
Techniques/tools • Special techniques, methods to be adopted; testharnesses, drivers or automated test tools to beused.
Deliverables • Inventory of deliverables from the test stage.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 93
Testing in the real world Time and cost limit what can be done Some risks may be deemed acceptable,
without testing Some risks will be de-scoped to squeeze
the plan into the available timescales or budget– mark de-scoped line items ‘out of scope’– if someone asks later what happened, you
have evidence that the risk was considered, but deemed acceptable.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 94
Stages, Teams and Environments
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 95
So what is this real world, for this project?
Test E
xe
cutio
n
STAGES(LEVELS)
TEAMS ENVIRONMENTS
MASTERTESTPLAN
Risks
Failuremodes
Test objectives
AcceptanceTesting
Large-ScaleIntegrationTesting
SystemTesting
IntegrationTesting
UnitTesting
Developers
Sys TestTeam
LSI TestTeam
AcceptanceTest Team To-be-live
(or copyof live)
Partitioned
Personal / by pair
Integration
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 96
Many focused stages, or bigger broader stages?
It depends: may be convenient to...– group test types together (each as early as
possible)– group by responsibilities (teams / managers)– group into available environments
Need to keep dependencies in right sequence
System development lifecycle has an influence:– agile methods suggest fewer, broader stages– proprietary methods may have own stage
names.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 97
Integration, and Large-Scale Integration
2. Web Sub-System
Web Server
1. Application (objects)Sub-System
Database Server
Banking System (Credit Card Processor)
Legacy System(s)
3. Order Processing Sub-System4. Full E-Business System
INTEGRATION
LARGE-SCALE INTEGRATION
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 98
Organising the teams
Requirements Design & Development
Service Integration
Service Implementation
Programme Management
Testing Strategy & Co-ordination
Unit,Integration &SystemTesting
(Involved inAcceptanceTesting)
Large-ScaleIntegration Testing
Acceptance Testing& Pilot
Project (Release) Management
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 99
Specifying and procuring the environments
Test (to-be-live)environmentat location B
Test environmentat location A
Live environment(at location B)
Development environment
(at location A)
Disaster Recoveryand test environment
(at location C)
Release 1 Unit& Integration Testing
Release 1 System Testing
Release 1 LSI Test & Acc Test
Release 1 Pilot & Live
Time
Release 2 LSI Test &Acc Test
Release 2 System Testing
Release 2 Live
move test interfaces
(etc)
Not yetused
connecttest interfaces
connect liveinterfaces
Release 3 LSI Test &Acc Test
Release 2 Unit& Integration Testing
Release 3 Unit& Integration Testing
Release 3 System Testing
(etc)
Not yet live
Now live
Not yet used
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 100
Where do the non-functional tests fit? Some need a stable functional base,
e.g. performance, security, but can do some early work:– configuration benchmarking, infrastructure
& component performance– security inspections, eg source code,
network Usability testing can & should be done
early.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 101
System development life-cycles
Waterfall is still in use, but iterative more suited to risk-based testing:– iterative lifecycles are themselves risk-
reducers– iterations give good opportunity to re-
evaluate risks– incremental is special case of iterative; if
functionality added to stable core, retest risk low
But: if design is iterated, retest risk high, need much regression testing.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 102
Planning for entry to, exit from, and completion of, test stages
INTEGRATION
UNIT
SYSTEM
LARGE SCALE INTEGRATION
ACCEPTANCE
Release 1
Release 1
Every unit as soon as unit-tested Release 2 startsRetesting & regression testing of fixes
Sub-systems or periodic builds, plus “fix” builds
Retesting & regression testing of fixes
Retesting & regression testing of fixes
Retesting & regression testing of fixes
Deliveries of major functional areas
PILOT
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 103
Estimation
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 104
Estimation in a vacuum Need to estimate early “It’s impossible!”
– no requirements yet– don’t know the risks– don’t know how many faults there will be– don’t know how severe the faults will be– don’t know how long the developers will take
to fix– Etc. etc.
But you need some high level estimates to include in the plan.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 105
Problems with high-level estimates If unsubstantiated by lower level detail
– management add a dose of optimism– your estimates may be pruned – contingency removed if it sticks out too much
Estimates not properly justified will be challenged, or simply thrown out
Management target costs, timescales– based on pride– because of real or imagined pressure from above– they lose much of their reputation if dates are not
me Project may not be approved if estimates are
high.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 106
Estimation formula A
Assumption: testing takes as long as development
1. FUNCTESTBUDGET = cost of all technical design and documentation plus development (excluding any testing at all)
2. DEVTESTBUDGET = developers’ estimate of their unit and
integration testing
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 107
Estimation formula A (cont’d)
3. INDEPTESTBUDGET = FUNCTESTBUDGET - DEVTESTBUDGET
document an important assumption: that your team will have sign-off authority on the developers’ unit and especially integration test plans. This may seem overbearing, but if testing is neglected at any stage, the price will be paid!
4. SYSTESTBUDGET =0.75xINDEPTESTBUDGET
5. USERTESTBUDGET =0.25xINDEPTESTBUDGET
6. NFTESTBUDGET = 0.25xFUNCTESTBUDGET
if stringent performance test required
7. Else NFTESTBUDGET = 0.15xFUNCTESTBUDGET
if no or superficial performance test required
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 108
Estimation formula A (cont’d)
Total test budget for staff resources is therefore FUNCTESTBUDGET + 25% (or whatever uplift you choose for non-functional testing)
Add a figure for the cost of test tool licenses that you believe you will incur– Consult one or more vendors what to budget– If they exaggerate they risk losing the
business!– Tools can cost up to $100,000 or even
$150,000 Then add a cost for test environment(s).
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 109
Estimation formula A (cont’d)
Ask technical architect to estimate the cost and effort required to build three independent functional test environments– Component testing– integration plus system testing (overlapped
for most of the functional testing period)– production-scale performance test
environment available for two months Add that to your total estimate.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 110
Estimation formula B (1-2-3 rule)
This formula works best for SYSTEM testing
If you have detailed requirements/designs, scan a few typical pages of the requirement– Estimate how many test conditions per page– Multiply the average conditions per page by
the number of requirements pages– C = total test conditions
Assume: tester can specify 50 conditions/day
Specification:– Effort to specify SYSTEM test = NDAYS = C /
50
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 111
Estimation formula B (cont’d)
Preparation:– Effort = 2 x NDAYS
– If preparing test data and exp results is easy– Effort = 3 x NDAYS
– If preparing test data and exp results is harder– Effort = 4 x NDAYS
– If you need to prepare details scripts for audit purposes
Execution:– Effort = NDAYS (if it goes well (does it ever?))– Effort = 3 x NDAYS (if it goes badly (always?))
Regression test (execution):– Effort = NDAYS
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 112
Estimation formula B (cont’d)
Total Effort for SYSTEM TEST is between– 6 NDAYS and 9 NDAYS
Allocate an additional budget of one-third of the system test budget to user acceptance ie– Between 2 NDAYS and 3 NDAYS
For nonfunctional testing and tools use formula B:
1-2-3 rule:– 1 day to specify tests (the test cases)– 2 days to prepare tests– 1-3 days to execute tests (3 if it goes badly)– Easy to remember, but you may have different
ratios.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 113
Exercise – Estimation formula A
Total budget for analysis, design and development = £100k
Developers say component/integration test will cost £20k
Calculate, using formula A– Budget for system and acceptance testing– Non-functional testing– Total cost of development and testing
Document your assumptions.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 114
Exercise – Estimation formula A (cont’d)
1. FUNCTESTBUDGET =2. DEVTESTBUDGET =3. INDEPTESTBUDGET =4. SYSTESTBUDGET =5. USERTESTBUDGET =6. NFTESTBUDGET =7. Total cost of dev + test =8. Assumptions?
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 115
Exercise – Estimation formula B
A 150 page specification has 100 pages of requirements with an average of 25 conditions per page
Calculate using formula B estimates for:– Specification– Preparation (assume it’s easy to do)– Execution (assume the worst)– Execution of a complete regression test– User acceptance test.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 116
Planning and Scheduling
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 117
Master Test Planned: now what’s next?
Master Test Plan has estimated, at a high level, resources & time cost
Next steps are:– more detailed and confident test plans
for each stage– bottom-up estimates to check against
top-down– preparing to manage test specification
& execution to time, cost, quality...
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 118
Test Plans for each testing stage
Risk F1
Requirement F1
Risk F2
Risk F3
Risk F4
Risk U1
Risk U2
Risk U3
Risk S1
Risk S2
Requirement F2Requirement F3Requirement N1Requirement N2
eg for System Testing:
Generic test objective G4
Generic test objective G5
Test objective F1
Test objective F2
Test objective F3
Test objective F4
Test objective U1
Test objective U2
Test objective U3
Test objective S1
Test objective S2
Test 1 2 3 4 5 6 7 8 9 10 11 ...
Test importance H L M H H H M M M L L ...
125
10
60
32
12
25
30
100
40
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 119
Plan to manage risk during test execution
RiskQuality
TimeTimeCost
Scope
Time
CostScope
Quality
ScopeCost
best pair tofine-tune
Quality
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 120
Test Design: target execution schedule
TEAMSENVIRONMENTS TESTERS
1
5
6
32
7
9
10
Test execution days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ...
4 8
Retests &
regressio
n tests
11
Earliest completion date
Comfortable completion date
Partition for functional tests
Partition for disruptive non-functional tests
Balance &transactionreporting
End-to-endcustomerscenarios
Inter-accounttransfers
Payments
Direct debits
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 121
Test Specificationand Risk Traceability
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 122
What test specificationdocuments after Design?
}
Master Test Plan StageTestPlans Designs
Cases “Scripts” Data
Execution & managementprocedures
Contrived
Converted
“live”Schedule
(Test procedurespecifications)
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 123
Context-driven approach affects test documentation
Product
Specif-ication
Expectedoutcome
Test
Testoutcome
Pass / fail
Impression of product
Require-ment
Require-ment
Epistem-ology
Product
Cognitivepsychology
“BEST PRACTICE” CONTEXT-DRIVEN
Observe &evaluate
Heuristics
Abductiveinference
Context
Bugadvocacy
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 124
Variables in test documentation
Format of the documents: automated tool, spreadsheet, word processor, or even hand-written cards!
Test procedures: detailed content of tests if needed, and separate overall process
Expected outcomes: explicit or implicit?
Test data: synthetic and lifelike.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 125
How much test documentation is required?
Stake out two extremes, eg:– “best practice” documentation, reviewed– spreadsheet overviews, no review
Identify the requirements each “extreme pre-requisite” is really trying to address, eg:– anyone can execute; efficiency is paramount
Distil common objective, question assumptions, inject refinements; best fit might be a mixture of documentation styles tailored to your project– Sources: Software documentation
superstitions (Daich); Goldratt’s Theory of Constraints (Dettmer).
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 126
Traceability of risks Many projects use risk analysis
already, but... Maintaining traceability of risks is a
challenge For risk-based reporting, need clerical
help or automation (more work needed on this)
Beware over-complex risk relationships
Tactical solution is usually spreadsheets.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 127
Part IVManaging Test Execution
and the End-Game
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 128
Part IV - Agenda Progress and Incident Management Risk and Benefits-Based Test
Reporting Consensus and Risk-Based
Acceptance.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 129
Progress and Incident Management
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 130
Risk reduction components Tests passed reduce perceived risk Components of risk reduction are:
– progress through tests– severities of incidents reported– progress through fault-fixing and retesting– first quantitative (have we done enough
testing?), then– qualitative (can we tolerate remaining specific
risks?).
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 131
Incident classification and entry-exit criteria
Classifying incidents:– priority: how much testing it interrupts
(“urgency”)– severity: business impact if not fixed
(“importance”)– three levels of each may be enough (ten too
many) Entry and exit criteria:
– entry = preparations + adequate exit from previous stage(s)
– exit: build, delivery or release can proceed to next stage.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 132
Fail
Pass
Progress through tests We are interested in two main aspects:
– can we manage the test execution to get complete before target date?
– if not, can we do it for those tests of high (and medium?) importance?
High
MediumLow
Target tests run
Actual tests run
# tests
date
# tests
Target tests passed
date
Actual testspassed
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 133
Progress through incident fixing and retesting
Similarly, two main aspects:– can we manage the workflow to get incidents
fixed and retested before target date?– if not, can we do it for those of material
impact?
Closed
Deferred
ResolvedAwaitingfix
# incidents
date
# incidents
date
Cumulative incidentsOutstandingmaterial impact
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 134
Quantitative and qualitative risk reduction from tests and retests
PROGRESSTHROUGHINCIDENTFIXING& RETESTING
PROGRESSTHROUGHTESTS
PROGRESS &RESIDUAL RISKUP RIGHT SIDEOF W-MODEL
Large-Scale Integration Testing
SystemTesting
AcceptanceTesting
HM
LFail
Pass
Materialimpact
Awaiting fixResolved
DeferredClosed
Awaiting fix Materialimpact
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 135
Risk and Benefits-BasedTest Reporting
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 136
Risk-based reporting
Progress through the test plan
todayPlanned
end
residual risks of
releasing TODAY
Resi
dual R
isks
start
all risks ‘open’ at the start
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 137
Benefits of risk-based test reporting
Risk of release is known:– On the day you start and throughout the test
phase– On the day before testing is squeezed
Progress through the test plan brings positive results – risks are checked off, benefits available
Pressure: to eliminate risks and for testers to provide evidence that risks are gone
We assume the system does not work until we have evidence – “guilty until proven innocent”
Reporting is in the language that management and stakeholders understand.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 138
Benefit & objectives based test reporting
Open
Closed
Ris
ks
Open
Open
Closed
Closed
Open
Obje
ctiv
e
Obje
ctiv
e
Obje
ctiv
e
Obje
ctiv
e
Benefit
Benefit
Benefit
Benefit
Benefit
Benefits available for release
Obje
ctiv
e
Benefit
Closed
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 139
Benefits of benefit-based test reporting
Risk(s) that block every benefit are known:– On the day you start and throughout the test
phase– Before testing is squeezed
Progress through the test plan brings positive results – benefits are delivered
Pressure: to eliminate risks and for testers to provide evidence that benefits are delivered
We assume that the system has no benefits to deliver until we have evidence
Reporting is in the language that management and stakeholders understand.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 140
How good is our testing? Our testing is good if it provides:
– Evidence of the benefits delivered– Evidence of the CURRENT risk of
release– At an acceptable cost– In an acceptable timeframe
Good testing is:– Knowing the status of benefits with
confidence– Knowing the risk of release with
confidence.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 141
Consensus and Risk-Based Acceptance
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 142
Stakeholders and acceptance hierarchy
Testers build consensus among differing viewpoints of stakeholders, but
Senior management will typically accept system, eg:
Senior managementcustomer-facing? internal-facing?
Project & Quality managementhopes fears
User Acceptance Operational Acceptance
tester-facilitated consensus
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 143
Test Review Boards and degrees of approval
User Acceptance
Operational Acceptance
To ascend the approval and acceptance hierarchy, testers facilitate Testing Review Boards, eg:
Decisions could be:– unqualified– qualified– delay
Pilot start
Large-scale Integration
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 144
Slippages and trade-offs: an example
If Test Review Boards recommend delay, management may demand a trade-off, “slip in a little of that descoped functionality”
This adds benefits but also new risks:
scope
date
actualgo-live
firstslip
originaltarget
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 145
Tolerable risk-benefit balance: another example
Even if we resist temptation to trade off slippage against scope, may still need to renegotiate the tolerable level of risk balanced against benefits:
(risk -benefits)
date
actualgo-live
originaltarget
date“go for
it”margin
original target net risk
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 146
Closing Comments
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 147
Risk-based test approach: planning
RBT approach helps stakeholders:– They get more involved and buy-in– The have better visibility of the test process
RBT approach helps testers– Clear guidance on the focus of testing– Approval to test against risks in scope– Approval to not test against risks out of
scope– Clearer test objectives upon which to design
tests.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 148
Risk-based test approach: execution and reporting
RBT approach helps stakeholders:– They have better visibility of the
benefits available and the risks that block benefits
RBT approach helps management:– To see progress in terms of risks
addressed and benefits that are available for delivery
– To manage the risks that block acceptance
– To better make the release decision.
Version 1.0a ©2002 Systeme Evolutif Ltd and TiSCL Slide 149
Risk-Based TestingClose
Any Questions?