    Risk ManagementRisk Management

    QuantitativeRisk Analysis

    QualitativeRisk Analysis

    11.611.611.511.5

    RiskIdentification

    RiskManagement

    Planning

    Project RiskManagement

    11.0

    11.311.311.211.211.111.1 11.411.4

    RiskResponsePlanning

    RiskMonitoring& Control

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    3/27

    3

    Risk ManagementRisk Management

    Definition: The processes concernedDefinition: The processes concernedwith conducting risk managementwith conducting risk management

    planning, identification, analysis, responsesplanning, identification, analysis, responsesand control on a project.and control on a project.Increasing the probability and consequences of Increasing the probability and consequences of

    positive eventspositive eventsDecreasing the probability and consequences of Decreasing the probability and consequences of adverse events to project objectives.adverse events to project objectives.

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    4/27

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    5/27

    5

    Risk ManagementRisk Management

    O bjectivesO bjectivesYou will be able to initiate perform Risk You will be able to initiate perform Risk Management P lanning as described in para 11.1Management P lanning as described in para 11.1P MBOK P MBOK You will be able to perform Risk Identification asYou will be able to perform Risk Identification asdescribed in para 11.2 P MBOK described in para 11.2 P MBOK

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    6/27

    6

    Risk ManagementRisk Management

    I dont know what I dont know

    I know what I dont know

    I know what I know

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    7/27

    7

    Risk ManagementRisk Management

    Risk IdentificationRisk IdentificationThe DefinitionThe Definition

    Determining which risks might affect theDetermining which risks might affect theproject, and documenting theirproject, and documenting theircharacteristics.characteristics.

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    8/27

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    9/27

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    10/27

    10

    Risk ManagementRisk Management

    O utputsO utputsRisk RegisterRisk Register

    List of Identified RisksList of Identified RisksP otential ReponsesP otential Reponses

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    11/27

    11

    Risk ManagementRisk Management

    Wh at are t h e projectsWh at are t h e projectsobjectives?objectives?

    Project Charter Project Charter Wh at is t h e completeWh at is t h e completedefinition of t h edefinition of t h eproject?project?Project Scope Statement Project Scope Statement H ow will t h e project beH ow will t h e project beexecuted, monitoredexecuted, monitoredand controlled?and controlled?Project Management Plan Project Management Plan

    Risk Identification: What do I need to know?Risk Identification: What do I need to know?

    Wh at are t h e pre-definedapproac h es to Risk Management?O rganizational Process Assets O rganizational Process Assets

    Wh at are t h e attitudes

    toward Risk and Risk Tolerance?E nvironmental and O rganizational E nvironmental and O rganizational Factors Factors

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    12/27

    12

    Risk ManagementRisk Management

    Tec h nical Risk Tec h nical Risk Quality Quality P erformanceP erformanceTechnical failureTechnical failureP oor assumptionsP oor assumptions

    P roject ManagementP roject Management

    Risk Risk ScheduleScheduleCostCostIncomplete planning Incomplete planning

    Lack of DisciplineLack of Discipline

    Types of P roject Risks and O pportunities

    O rganizational Risk

    Lack of P rioritization

    Inadequate funding, time,resources

    Resource Conflict

    E xternal Risk

    Shifting regulatory requirements

    Labor issuesP olitical issues

    Acts of God

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    13/27

    13

    Risk ManagementRisk Management

    Review documentsReview documentsGather informationGather informationUse checklistsUse checklistsAnalyze assumptionsAnalyze assumptions

    Influence AnalysisInfluence AnalysisDiagram process impacts on one anotherDiagram process impacts on one another

    Risk Identification: what do I do?

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    14/27

    14

    Risk ManagementRisk Management

    Information Gathering TechniquesInformation Gathering TechniquesBrainstorming Brainstorming DelphiDelphiInterviewing Interviewing Root Cause IdentificationRoot Cause IdentificationSW O T analysisSW O T analysis

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    15/27

    15

    Risk ManagementRisk Management

    Influence Analysis

    Keep SatisfiedKeep Satisfied Manage CloselyManage Closely

    MonitorMonitor

    (Minimum E ffort)(Minimum E ffort) Keep InformedKeep Informed

    P

    O

    W

    E

    R

    LO W

    HIGH

    INTERESTLO W HIGH

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    16/27

    16

    Risk ManagementRisk Management

    Problem

    Material

    Cause

    Effect

    Risk

    Identification11.2

    Personnel Method

    Is h ikawa (Fis h bone) Diagram

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    17/27

    1 7

    Risk ManagementRisk Management

    P rocess Flow C h art

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    18/27

    1 8

    Risk ManagementRisk Management

    Risk Breakdown Structure (RBS)

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    19/27

    1 9

    Risk ManagementRisk Management

    WBSWBSRBSRBS

    Cost estimatesCost estimatesDuration estimatesDuration estimatesStaffing P lanStaffing P lanP rocurement Management P lanP rocurement Management P lan

    Risk Identification: Consider

    Dont ForgetSpecifications

    P erformance CriteriaCustomer expectations.Customer major wantsMajor project disciplines and interfaces

    Assumptions

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    20/27

    20

    Risk ManagementRisk Management

    Risk RegisterRisk RegisterList of identified risksList of identified risksSymptoms or warning signsSymptoms or warning signsList of potential responsesList of potential responses

    Root causes of risk Root causes of risk Updated risk categoriesUpdated risk categories

    P roject Management P lan (Update)P roject Management P lan (Update)

    Risk Identification: H ow does it fit into t h e process?

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    21/27

    21

    Risk ManagementRisk Management

    QuantitativeRisk Analysis

    QualitativeRisk Analysis

    11.611.611.511.5

    RiskIdentification

    RiskManagement

    Planning

    Project RiskManagement

    11.0

    11.311.311.211.211.111.1 11.411.4Risk

    ResponsePlanning

    RiskMonitoring& Control

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    22/27

    22

    Risk ManagementRisk Management

    Q ualitative Risk AnalysisQ ualitative Risk AnalysisP rioritizing risks for subsequent further analysis or actionP rioritizing risks for subsequent further analysis or action

    by assessing and combining their probability andby assessing and combining their probability andimpacts.impacts.

    P rioritizes risksP rioritizes risksDetermines the importance of addressing specific risksDetermines the importance of addressing specific risksGuides risk responsesGuides risk responsesRapid and CostRapid and Cost--effectiveeffective

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    23/27

    23

    Risk ManagementRisk Management

    H ow will risk be managedH ow will risk be managed

    for t h e overall P roject?for t h e overall P roject?Project Management Plan Project Management Plan (particularly the Risk Management (particularly the Risk Management Plan and the Risk Register)Plan and the Risk Register)H

    ow h

    as Risk beenH

    ow h

    as Risk beenmanaged before and w h atmanaged before and w h ath ave we learned?h ave we learned?O rganizational Process Assets O rganizational Process Assets

    Q ualitative Risk AnalysisQ ualitative Risk Analysis - - ConsiderConsider

    Wh at is t h e project progress

    th roug h out t h e life cycle?W ork Performance Information W ork Performance Information Wh at type of project is

    th is?

    Project Scope Statement Project Scope Statement Wh at information do we

    h ave on Identified Risks?Risk Register Risk Register

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    24/27

    24

    Risk ManagementRisk Management

    Evaluate risk probability & impactEvaluate risk probability & impact

    Use a risk probability & impact matrixUse a risk probability & impact matrixAssess data precisionAssess data precisionCategorize RisksCategorize Risks

    RBSRBSWBSWBSAssess Risk Urgency Assess Risk Urgency

    Wh at are t h e steps?

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    25/27

    25

    Risk ManagementRisk Management

    Rating Risk Impact

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    26/27

    26

    Risk ManagementRisk ManagementP robabilityP robability- -Impact MatrixImpact Matrix

    P robabilityP robability Risk Score = P x IRisk Score = P x I

    0.90.9 0.050.05 0.090.09 0.180.18 0.360.36 0.720.720.70.7 0.040.04 0.070.07 0.140.14 0.280.28 0.560.56

    0.50.5 0.030.03 0.050.05 0.100.10 0.200.20 0.240.24

    0.30.3 0.020.02 0.030.03 0.060.06 0.120.12 0.240.240.10.1 0.010.01 0.010.01 0.020.02 0.040.04 0.080.08

    0.050.05 0.100.10 0.200.20 0.400.40 0.800.80

    Impact on an objectiveImpact on an objective

  • 8/7/2019 Risk Management Session 2 Summer I 2010

    27/27

    2 7

    Risk ManagementRisk Management

    Update the Risk RegisterUpdate the Risk RegisterRelative rating or priority list of project risksRelative rating or priority list of project risksRisks grouped by categoriesRisks grouped by categoriesList of risks requiring response in the near termList of risks requiring response in the near termList of risks for additional analysis and responseList of risks for additional analysis and responseWatch lists of low priority risksWatch lists of low priority risksTrends in qualitative risk analysis resultsTrends in qualitative risk analysis results