risk sedco express dgps operations five years of lessons...
TRANSCRIPT
![Page 1: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/1.jpg)
Risk
Sedco Express DGPS OperationsFive Years of Lessons Learned
Lew Weingarth and Stephane Angue
Transocean, Inc.
October 17-18, 2006
Return to Session Directory
![Page 2: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/2.jpg)
1
SEDCO EXPRESS DGPS OPERATIONS Five years of lessons learned
![Page 3: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/3.jpg)
2
SEDCO EXPRESS• DP 5th generation semi submersible / DP
class 3 ABS• 4 azimuth thrusters (7MW each) and 6
generators (4.4MW each)• ALSTOM 903 DP system• 2 DGPS position reference systems• 1 Acoustic position reference system• ALSTOM ICS (VMS/PMS) system on the
bridge (engine control room)
![Page 4: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/4.jpg)
3
Transocean technical specifications for DGPS suite installation
• 2 separate DGPS suites (hardware/software)• Dual frequency GPS receivers• Redundancy in correction links• Separate UPS for each DGPS suite• User friendly system• Compliance with industry standards for reliability,
fault tolerance and fail safe behavior
![Page 5: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/5.jpg)
4
DGPS systems replaced in 2005
Decision was made to replace DGPS suites on board due to:
• Identical software running on both DGPS suite• Obsolete GPS receivers and computers• Poor performance during scintillation periods • No more vendor support• New sensors and software with better
performances available on market.
![Page 6: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/6.jpg)
5
DGPS system basic design layout
L1/L2GPS receiver
Differentialcorrections
GYRO
MRU
Antenna DGPSposition calculation
And QC
Offset calculator(rotary table position)
Message to various usersDP system, radars, GMDSS, others
• A motion compensated offset position of the rotary table is required to be output to the DP system and various users.
![Page 7: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/7.jpg)
6
DPO background and areas of influence
Position referencesystems
ReportingChecklistspaperwork
Navigationequipment
Ballast control
Deck/drilling operations
Emergency duty
VMS system
DP SYSTEM
DPO
ElectronicMechanicalbackground
Deckbackground
Marinebackground
DPO
![Page 8: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/8.jpg)
7
DPO expectations in Reference position systems performance
•Reliability and accuracy •Easy man machine interface•Internal redundancy•Low variance•Easy data download and analysis•Vendor support
![Page 9: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/9.jpg)
8
Positioning data validation tests performed by the DP system
• Prediction test• Variance test• Median check test• Hardware / system problem test• Signal latency / age limit• Freeze test
![Page 10: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/10.jpg)
9
Position reference and DP system
• Losing one Position reference is not defeating station keeping but the operation status may be affected → Downtime?
• DPO input in DP system is significant regarding position reference performances
a) set up of the median check limitsb) set up of the prediction windows limitsc) set up of position reference weightingd) Set up Kalman gain parameter
![Page 11: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/11.jpg)
10
Former DGPS system - TRINAV
Main positioning antennaplus three antennas for Roll/Pitch/Yaw determination
Backup position antenna
Reference stationdata antennas
Receiver 1
Receiver 2
Receiver 3
Receiver 4
Receiver 5
Gyro TSS VRU
Main Computer Backup Computer
All inputs to the main computer are duplicated to the backup computer
To DP systemTo DP system
![Page 12: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/12.jpg)
11
TRINAV system
•No remote control from backup room system
•Software failures and bugs
•Unix O/S
•RTCM link hardware failures•Spare parts available on board
•Multiple GPS receiver failures or loss of performances
•DPO / ET system experience
•Same software on both system•HF link correction available
•No quality control except the DQI parameter
•1 GPS receiver+ 1 differential link installed on bridge mast
•Poor performance during scintillation period
•Good internal redundancy (GPS receiver and differential links)
•Obsolete (poor Dual frequency performances)
•Simple man machine interface
DISADVANTAGESADVANTAGES
![Page 13: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/13.jpg)
12
DP event 1– Yellow alert – 15/11/2002
Scintillation was affecting the DGPS prior the event.
• 2216 within 2 seconds acoustic PME, DGPS1 and DGPS2 failed to DP system and DP entered in model control.
• 2217 Yellow Alert activated manually by DPO• 2217 Acoustic available and selected. In DP• 2218 DGPS available, 7m drift off due to model
control and unstable positioning prior the event• 2231 position stabilized and Green light on.
![Page 14: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/14.jpg)
13
• Poor performance of DGPS during scintillation. Both DGPS inputs Rejected from DP.
• No specific reason found to explain the acoustic PME rejection (isolated jump / failure)
DP event 1– Yellow alert – 15/11/2002Analysis
![Page 15: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/15.jpg)
14
DP event 2 – Drive off – 29/06/2004
• DGPS 1 and 2 with DQI of 3 but variance was acceptable (<1m).01 24 33 Acoustic rejected by DP system on median check. Both
DGPS drifted to NW.01 24 37 DGPS 1 rejected by DP system01 24 38 DGPS 2 rejected by DP system. Entered model control.
Yellow alert activated manually by operator.01 25 14 Acoustic available and selected. Rig in Auto DP01 26 05 DGPS 1 selected in DP01 30 21 DGPS 2 selected in DP. Rig position stabilized 20m NW of
original position.01 35 52 Rig back to original position01 43 00 Green light on
![Page 16: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/16.jpg)
15
DP event 2 – Drive off – 29/06/2004 Analysis
• DGPS 1 and 2 were setup differently (different GPS receiver and correction link)
• DQI 3 indicates poor position precision• PME weighting was in auto.• Acoustic rejected on median check• DGPS 1 and 2 rejected on prediction test
DGPS position was affected by poor geometry and low number of satellite was in use.
GPS receiver was unable to use low elevation satellites.
![Page 17: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/17.jpg)
16
DGPS degraded status – 22/11/2004
• Software failure. Backup solution @ 141km from primary solution. No operator warning.
• Primary solution failing and Trinav switch to backup solution. Rejected by DP (jump of 141km).
• GPS receiver reset to clear the fault.
![Page 18: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/18.jpg)
17
New DGPS systems installed in 2005
MULTIFIX 4 / WINFROG SEASTAR DP
![Page 19: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/19.jpg)
18
Multifix-Winfrog / Seastar DP
•Possibility to use The GPS without the ‘D’
•Good repeatability/variance
•Download and replay facilities on the ‘online machine’
•Remote control of the backup room system from DP desk.
•Spare parts (expensive / limited on board)
•Quality control (multifix system)
•Some compatibility problem with DP system (latency)
•Vendor support
•Poor reliability of the HP solution on Seastar DP system
•Redundancy of RTCM correction type and links
•No backup GPS receiver on Multifix/Winfrog system
•XP correction type quality (orbital and clock)
•All equipment installed on derrick (except 2 RTCM link antennae)
•2 separate and independent systems (software and hardware)
DISADVANTAGESADVANTAGES
![Page 20: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/20.jpg)
19
Multifix-Winfrog / Seastar DP concerns
• Poor reliability of HP solution in Seastar DP (>1200 solution reset in one year)
• Computer failures on reboot process (Seastar DP)• Software failures (Input/output management software –
Seastar DP)• MRU loss of performance not detected by Multifix
software causing position reference rejection in DP• Software glitch on Multifix 4 (Sunday 0000 GMT bug-
negative latency figure)
![Page 21: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/21.jpg)
20
37 Recorded DP eventsFrom January 2002 to October 2006
DP events recorded
0 2 4 6 8 10 12 14
2002
2003
2004
2005
2006
Total
![Page 22: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/22.jpg)
21
Recorded DP events by category
DP events recorded by category
Electrical43%
Thruster22%
Operator3%
Weather5%
Computer8% Other
8%
reference11%
Electrical
Thruster
Operator
reference
Weather
Computer
Other
![Page 23: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/23.jpg)
22
DGPS related DP events / Yellow-Red alerts
• Around 1500 days of rig operation• 6 Yellow alert conditions occurred since rig start
up. No Red (disconnections) occurred.• 2 of DGPS system failures leaded to Yellow alert
conditions (33% of total yellow alerts)• No Recorded event related to DGPS since new
system installed
![Page 24: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/24.jpg)
23
Position reference system rejections by DP system since Oct 2002
Position reference system rejections by DP system
0
5
10
15
20
25
30
35
40
45
50
Oct-02
Dec-02
Feb-03Apr-0
3Ju
n-03
Aug-03
Oct-03
Dec-03
Feb-04Apr-0
4Ju
n-04
Aug-04
Oct-04
Dec-04
Feb-05Apr-0
5Ju
n-05
Aug-05
Oct-05
Dec-05
Feb-06Apr-0
6Ju
n-06
Aug-06
Month
Num
ber o
f rej
ectio
ns re
cord
ed
Sonardyne rejection
DGPS#2 rejection
DGPS#1 rejection
Installation of new SPRS
i
![Page 25: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/25.jpg)
24
New DGPS system time of unavailability since installation
Time of PME unavailibility
0
50
100
150
200
250
Jul-05 Aug-05
Sep-05
Oct-05 Nov-05
Dec-05
Jan-06 Feb-06 Mar-06 Apr-06 May-06
Jun-06 Jul-06 Aug-06
Sep-06
Month
Min
utes
sonardyne
DGPS2
DGPS1
![Page 26: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/26.jpg)
25
Possibility of future improvement on DGPS system design
• A position reference system is only a ‘tool’ for the DPO in order to perform his duty: Keeping the rig on location.
• Position reference system need to be designed to require the minimum operator input and to provide the highest level of reliability (fail safe / internal redundancy).
Areas where improvement might be beneficial:• Management of the system redundancy• Operator interface
![Page 27: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/27.jpg)
26
Management of system redundancy
Hardware• Backup GPS receiver on every system• Separate installation area for each GPS receiver• Use of all available correction type• Separate data logger for efficient position
reference data analysis and monitoringSoftware• Fail safe software (no data output if gyro/MRU
input failure)• No automatic reselection of primary solution
after failure.
![Page 28: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/28.jpg)
27
Possible improvements: Operator interface
• Operator “sound” warning/alarm• “watch circle” input in DGPS on initial position
(available on Winfrog)• Scatter plot of all available solutions (offset
position)• Confirmation after configuration change• Easy selection of the primary solution within all
available solutions list• Configuration access through password
![Page 29: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/29.jpg)
28
Conclusion
• DGPS related DP events have high level of criticality when occurred.
• DP Operator training should be reinforced• DP Operator and engineer have a different
opinion regarding system design and expected performances.
• Technology is moving fast and vendor must consider the DP operator first when designing a new system.
![Page 30: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned](https://reader033.vdocument.in/reader033/viewer/2022050515/5f9fac00a3d43559073f1059/html5/thumbnails/30.jpg)
29
Thank you