Page 1: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

Risk

Sedco Express DGPS OperationsFive Years of Lessons Learned

Lew Weingarth and Stephane Angue

Transocean, Inc.

October 17-18, 2006

Return to Session Directory

Page 2: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

1

SEDCO EXPRESS DGPS OPERATIONS Five years of lessons learned

Page 3: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

2

SEDCO EXPRESS• DP 5th generation semi submersible / DP

class 3 ABS• 4 azimuth thrusters (7MW each) and 6

generators (4.4MW each)• ALSTOM 903 DP system• 2 DGPS position reference systems• 1 Acoustic position reference system• ALSTOM ICS (VMS/PMS) system on the

bridge (engine control room)

Page 4: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

3

Transocean technical specifications for DGPS suite installation

• 2 separate DGPS suites (hardware/software)• Dual frequency GPS receivers• Redundancy in correction links• Separate UPS for each DGPS suite• User friendly system• Compliance with industry standards for reliability,

fault tolerance and fail safe behavior

Page 5: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

4

DGPS systems replaced in 2005

Decision was made to replace DGPS suites on board due to:

• Identical software running on both DGPS suite• Obsolete GPS receivers and computers• Poor performance during scintillation periods • No more vendor support• New sensors and software with better

performances available on market.

Page 6: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

5

DGPS system basic design layout

L1/L2GPS receiver

Differentialcorrections

GYRO

MRU

Antenna DGPSposition calculation

And QC

Offset calculator(rotary table position)

Message to various usersDP system, radars, GMDSS, others

• A motion compensated offset position of the rotary table is required to be output to the DP system and various users.

Page 7: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

6

DPO background and areas of influence

Position referencesystems

ReportingChecklistspaperwork

Navigationequipment

Ballast control

Deck/drilling operations

Emergency duty

VMS system

DP SYSTEM

DPO

ElectronicMechanicalbackground

Deckbackground

Marinebackground

DPO

Page 8: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

7

DPO expectations in Reference position systems performance

•Reliability and accuracy •Easy man machine interface•Internal redundancy•Low variance•Easy data download and analysis•Vendor support

Page 9: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

8

Positioning data validation tests performed by the DP system

• Prediction test• Variance test• Median check test• Hardware / system problem test• Signal latency / age limit• Freeze test

Page 10: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

9

Position reference and DP system

• Losing one Position reference is not defeating station keeping but the operation status may be affected → Downtime?

• DPO input in DP system is significant regarding position reference performances

a) set up of the median check limitsb) set up of the prediction windows limitsc) set up of position reference weightingd) Set up Kalman gain parameter

Page 11: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

10

Former DGPS system - TRINAV

Main positioning antennaplus three antennas for Roll/Pitch/Yaw determination

Backup position antenna

Reference stationdata antennas

Receiver 1

Receiver 2

Receiver 3

Receiver 4

Receiver 5

Gyro TSS VRU

Main Computer Backup Computer

All inputs to the main computer are duplicated to the backup computer

To DP systemTo DP system

Page 12: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

11

TRINAV system

•No remote control from backup room system

•Software failures and bugs

•Unix O/S

•RTCM link hardware failures•Spare parts available on board

•Multiple GPS receiver failures or loss of performances

•DPO / ET system experience

•Same software on both system•HF link correction available

•No quality control except the DQI parameter

•1 GPS receiver+ 1 differential link installed on bridge mast

•Poor performance during scintillation period

•Good internal redundancy (GPS receiver and differential links)

•Obsolete (poor Dual frequency performances)

•Simple man machine interface

DISADVANTAGESADVANTAGES

Page 13: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

12

DP event 1– Yellow alert – 15/11/2002

Scintillation was affecting the DGPS prior the event.

• 2216 within 2 seconds acoustic PME, DGPS1 and DGPS2 failed to DP system and DP entered in model control.

• 2217 Yellow Alert activated manually by DPO• 2217 Acoustic available and selected. In DP• 2218 DGPS available, 7m drift off due to model

control and unstable positioning prior the event• 2231 position stabilized and Green light on.

Page 14: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

13

• Poor performance of DGPS during scintillation. Both DGPS inputs Rejected from DP.

• No specific reason found to explain the acoustic PME rejection (isolated jump / failure)

DP event 1– Yellow alert – 15/11/2002Analysis

Page 15: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

14

DP event 2 – Drive off – 29/06/2004

• DGPS 1 and 2 with DQI of 3 but variance was acceptable (<1m).01 24 33 Acoustic rejected by DP system on median check. Both

DGPS drifted to NW.01 24 37 DGPS 1 rejected by DP system01 24 38 DGPS 2 rejected by DP system. Entered model control.

Yellow alert activated manually by operator.01 25 14 Acoustic available and selected. Rig in Auto DP01 26 05 DGPS 1 selected in DP01 30 21 DGPS 2 selected in DP. Rig position stabilized 20m NW of

original position.01 35 52 Rig back to original position01 43 00 Green light on

Page 16: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

15

DP event 2 – Drive off – 29/06/2004 Analysis

• DGPS 1 and 2 were setup differently (different GPS receiver and correction link)

• DQI 3 indicates poor position precision• PME weighting was in auto.• Acoustic rejected on median check• DGPS 1 and 2 rejected on prediction test

DGPS position was affected by poor geometry and low number of satellite was in use.

GPS receiver was unable to use low elevation satellites.

Page 17: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

16

DGPS degraded status – 22/11/2004

• Software failure. Backup solution @ 141km from primary solution. No operator warning.

• Primary solution failing and Trinav switch to backup solution. Rejected by DP (jump of 141km).

• GPS receiver reset to clear the fault.

Page 18: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

17

New DGPS systems installed in 2005

MULTIFIX 4 / WINFROG SEASTAR DP

Page 19: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

18

Multifix-Winfrog / Seastar DP

•Possibility to use The GPS without the ‘D’

•Good repeatability/variance

•Download and replay facilities on the ‘online machine’

•Remote control of the backup room system from DP desk.

•Spare parts (expensive / limited on board)

•Quality control (multifix system)

•Some compatibility problem with DP system (latency)

•Vendor support

•Poor reliability of the HP solution on Seastar DP system

•Redundancy of RTCM correction type and links

•No backup GPS receiver on Multifix/Winfrog system

•XP correction type quality (orbital and clock)

•All equipment installed on derrick (except 2 RTCM link antennae)

•2 separate and independent systems (software and hardware)

DISADVANTAGESADVANTAGES

Page 20: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

19

Multifix-Winfrog / Seastar DP concerns

• Poor reliability of HP solution in Seastar DP (>1200 solution reset in one year)

• Computer failures on reboot process (Seastar DP)• Software failures (Input/output management software –

Seastar DP)• MRU loss of performance not detected by Multifix

software causing position reference rejection in DP• Software glitch on Multifix 4 (Sunday 0000 GMT bug-

negative latency figure)

Page 21: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

20

37 Recorded DP eventsFrom January 2002 to October 2006

DP events recorded

0 2 4 6 8 10 12 14

2002

2003

2004

2005

2006

Total

Page 22: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

21

Recorded DP events by category

DP events recorded by category

Electrical43%

Thruster22%

Operator3%

Weather5%

Computer8% Other

8%

reference11%

Electrical

Thruster

Operator

reference

Weather

Computer

Other

Page 23: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

22

DGPS related DP events / Yellow-Red alerts

• Around 1500 days of rig operation• 6 Yellow alert conditions occurred since rig start

up. No Red (disconnections) occurred.• 2 of DGPS system failures leaded to Yellow alert

conditions (33% of total yellow alerts)• No Recorded event related to DGPS since new

system installed

Page 24: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

23

Position reference system rejections by DP system since Oct 2002

Position reference system rejections by DP system

0

5

10

15

20

25

30

35

40

45

50

Oct-02

Dec-02

Feb-03Apr-0

3Ju

n-03

Aug-03

Oct-03

Dec-03

Feb-04Apr-0

4Ju

n-04

Aug-04

Oct-04

Dec-04

Feb-05Apr-0

5Ju

n-05

Aug-05

Oct-05

Dec-05

Feb-06Apr-0

6Ju

n-06

Aug-06

Month

Num

ber o

f rej

ectio

ns re

cord

ed

Sonardyne rejection

DGPS#2 rejection

DGPS#1 rejection

Installation of new SPRS

i

Page 25: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

24

New DGPS system time of unavailability since installation

Time of PME unavailibility

0

50

100

150

200

250

Jul-05 Aug-05

Sep-05

Oct-05 Nov-05

Dec-05

Jan-06 Feb-06 Mar-06 Apr-06 May-06

Jun-06 Jul-06 Aug-06

Sep-06

Month

Min

utes

sonardyne

DGPS2

DGPS1

Page 26: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

25

Possibility of future improvement on DGPS system design

• A position reference system is only a ‘tool’ for the DPO in order to perform his duty: Keeping the rig on location.

• Position reference system need to be designed to require the minimum operator input and to provide the highest level of reliability (fail safe / internal redundancy).

Areas where improvement might be beneficial:• Management of the system redundancy• Operator interface

Page 27: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

26

Management of system redundancy

Hardware• Backup GPS receiver on every system• Separate installation area for each GPS receiver• Use of all available correction type• Separate data logger for efficient position

reference data analysis and monitoringSoftware• Fail safe software (no data output if gyro/MRU

input failure)• No automatic reselection of primary solution

after failure.

Page 28: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

27

Possible improvements: Operator interface

• Operator “sound” warning/alarm• “watch circle” input in DGPS on initial position

(available on Winfrog)• Scatter plot of all available solutions (offset

position)• Confirmation after configuration change• Easy selection of the primary solution within all

available solutions list• Configuration access through password

Page 29: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

28

Conclusion

• DGPS related DP events have high level of criticality when occurred.

• DP Operator training should be reinforced• DP Operator and engineer have a different

opinion regarding system design and expected performances.

• Technology is moving fast and vendor must consider the DP operator first when designing a new system.

Page 30: Risk Sedco Express DGPS Operations Five Years of Lessons ...dynamic-positioning.com/proceedings/dp2006/risk_angue_pp.pdf · Sedco Express DGPS Operations Five Years of Lessons Learned

29

Thank you