riskman vision and plans k. holmberg, a. jovanovic et al 13.2.2003 vtt industrial systems, finland
DESCRIPTION
RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland. CONTENT. 1. Background argumentation 2. Awareness and available tools 3. RISKMAN vision 4. Structure, roadmap and execution plan 5. Research areas, subprojects and deliverables - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/1.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMANVISION and PLANS
K. Holmberg, A. Jovanovic et al
13.2.2003
VTT Industrial Systems, Finland
![Page 2: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/2.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
CONTENT
1. Background argumentation
2. Awareness and available tools
3. RISKMAN vision
4. Structure, roadmap and execution plan
5. Research areas, subprojects and deliverables
5. Consortium management
6. Role of partners
7. Supporting organisations
8. Global budget
9. Calendar for the preparation
![Page 3: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/3.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Motivation and justificationMain arguments for launching RISKMAN IP:
1.Disasters result in a great number of human losses, large environmental damage, breakdown of societal functions and citizen insecurity
2. Security of urban environment, protection against terrorist attacks and individual sabotage
3. Safety and reliability will in future have a key role in industrial competitiveness, risk management will be a key element in business decision making
RISKMAN improves safety and reliability by systematic risk management
![Page 4: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/4.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Motivation and justificationRISKMAN will strengthen the European industrial competitiveness as a provider of products, processes and services representing world excellence in terms of safety and reliability.
The novelty of this approach is to integrate fields with strong experience and high level safety and reliability related knowledge and skills with new business opportunities, with applications of new evolving technologies, with public security issues and with legislation aspects to form a holistic concept.
![Page 5: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/5.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
UNDERSTANDING RISKS AND CONSEQUENCES
Forerunner:• NUCLEAR INDUSTRY
High awareness:• CHEMICAL INDUSTRY• POWERPLANTS• AVIATION• OFF SHORE• PROCESS INDUSTRY• ENERGY SYSTEMS
Low awareness:• MARINE TRANSPORT• RAIL AND ROAD TRANSPORT• CONSTRUCTION• MANUFACTURING• CONSUMER PRODUCTS• INFORMATION SYSTEMS• PUBLIC SYSTEMS• FOOD PRODUCTION• SOCIETAL FUNCTIONS
![Page 6: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/6.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
TOOLS AVAILABLE OR UNDER DEVELOPMENT FOR IMPROVED SAFETY AND RELIABILITY
• Probabilistic risk analysis methods
• Condition monitoring: sensors, wireless communication, signal processing
• Diagnostic techniques: neural networks, fuzzy logic, expert systems
• Material and component lifetime estimation
• System modelling and control techniques, meta-modelling
• Design for reliability methods
• Inherent safety in design
• Safety management systems
• Intelligent safety and reliability information management
• Data bases, data collection, data validation
• New business concepts: availability contracts, capacity contracts
• Human behaviour in stressed situations
• Human error analysis
• Organisational interactions
• Training, education
• Legislation, standardisation
![Page 7: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/7.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN Research Areas
RA1. Integrated Approach to Risk Management (meta-modelling, networking, dynamic risk-assesment & safety and risk management grade)
RA2. Systems Performance Monitoring and Diagnostics
RA3. Human-Technology Interaction
RA4. Business Models Promoting Risk
Management
RA5. Public Safety and Environment Protection
RA6. IT and Infrastructural Security
![Page 8: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/8.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Motivation and justification
There is a need to work out improved techniques, methods and guidelines for better risk management
This is not enough!
We need implementation of safety culture on all levels - both SME:s and large companies that control assets, production, products and services
Safety and risk management should be a key value in the European companies and communities
How is this done?
![Page 9: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/9.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN vision
“20 % of companies and communities in Europe have a Safety & Risk Management Grade (SRMG) in their balance 2008”
![Page 10: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/10.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
SRMG - Safety and Risk Management Grade
Comparable to:• “Basel II” for finance / loans• “Seveso II” for environment• ISO 9001 : 2000
Integrates:• Technical considerations• Business / financial considerations• Environmental considerations• Human factor considerations• Risk perception and communication considerations
![Page 11: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/11.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN Roadmap of RA’s and SRMG
2003
Implementation of Safety and Risk Management Grade concept (SRMG)
RA2. Systems performance monitoring and diagnostics
RA1. Integrated approach to risk management
RA3. Human-technology interaction
RA5. Public safety and environment protection
RA4. Business models promoting risk management
RA1. Integrated approach to risk management
RA1. Integrated approach to risk management
Precise definition of goals, specification and requirements for SRMG
New / alternative methods
Technology
Human factors
Business
Environment
Integration Implementation
2006
RA6. Information technology and infrastructural security
Technology
![Page 12: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/12.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN ROADMAP
OUTPUTRESEARCH AND DEVE-LOPMENT PROJECTS
EVALUATIONPROJECTS
OUTPUT IMPLEMEN-TATION
OUTPUT
RISKMAN VISION:
”20 %have
SRMGin com-
pany andcommu-
nitybalance
year2008”
RA1. Integration of risk management, SRMG concept
RA2. System performance monitoring and diagnostics
RA3. Human-technology interaction
RA4. Business models for risk management
RA5. Public safety and environment protection
RA6. IT and infra-structural security
Guide-lines
Recomm-endations for regu-lations
Quantifi-cation /assess-ment ofSRMG
Corrections
RISKMANCONCEPT
ANDGUIDE-LINES
Pilot n
Pilot 1
Pilot 2
Pilot 3
Pilot 4
Pilot 5
Region n
Region 1
Region 2
Region 3
2003-2006 2007 20082006 2005-2006
2006-2008
Evaluation of effects
and benefits
Commu-nication
andtraining
![Page 13: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/13.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN Structure of Research Areas and Subprojects
RA1 Integra-ted approachto risk manage-ment, Crd:MPA (G), VTT (FI), Risö
RISKMANCoord: VTT (FI),
MPA (G), TNO (NL)
RA2 Systems performance monitoring and diagnosticsCrd: BZF (H),ARC (A), MPA(G),Metlogic (B), Univ.Ljub, VTT(FI)
RA3 Human-technology interactionCrd: CETIM (F),ISPRA (I), VTT(FI), RISÖ(DK),SITEF(N), INERIS(F)
RA4 Business models for riskmanagementCrd: OinetiQ (UK), JRC(I)
RA5 Public safety and en-vironment protectionCrd: TNO (NL),JRC (I), INERIS (F)
RA6 IT and infrastructuralsecurityCrd: AIA (E), Frhr (G), MIT (G), ARC (A)
EC 6FP, TPA3: Nano, materials & processes, 3.4.3.2, DL 6.3.03
EC 6FP: Science and Society, 4.3.3, any time until 9.12.2003
EC 6FP, TPA2: Information society tech, 2.3.2.9, DL 15.10.03
![Page 14: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/14.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA1: Integrated Approach to Risk Management
ENVIRONMENTAL“Hazard”
TECHNICAL“Probabilityof Failure”FINANCIAL
“Value at Risk ”
HUMAN“Qualitative”
New Approach:META-MODELLING
SRMG =SAFETY AND RISK
MANAGENEMT GRADE
INTEGRATION
![Page 15: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/15.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA1 Subprojects and DeliverablesIntegrated Approach to Risk Management
Coordinator: MPA, Germany Vicecoordinator: VTT, Finland Industrial leader: DVN, Norway?? Alexadar Jovanivitc Raija Koivisto NN
Subprojects: Deliverables:SP11. Meta-Modelling of Complex Systems, VTT, Raija Koivisto, 2004-06, 7 ry, TNO,…..
A novel meta-modelling based genericmethod for risk management of complexnetworks and structures
Result from RA1:
RISKMAN IntegratedMeta-Modelling Rsik
Management Concept=
Integates traditionaltechnical (Probability
of Failure), environmental(Hazard) and fiancial
(Value at Risk) approaches by meta-modelling
techniques
New knowledge aboutintegration of complexproduction, network,
organisational and businessrisk management systems
SP12.
![Page 16: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/16.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA2: Systems Performance,Monitoring and Diagnostics
DIAGNOSTIC MUL-TIPLE SOURCEALGORITHMS
WIRELESS ANDREMOTE COM-MUNICATION
NANO- AND MEMSSENSORS
INTELLIGENTLEARNINGSENSORS
FOCUSED INNOVATIVE
APPLICATIONS
LIFE-TIMEPREDICTION AND
CONTROL
INTEGRATION
LOCAL AND RE-MOTE DIAGNOSTIC
CENTERS
PROBABILITYCALCULATIONS
DISTRIBUTED AUTONOMOUS DIAG-NOSTIC NETWORKS
![Page 17: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/17.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA2: System Performance Monitoring and Diagnostics
1. Materialdegradation
control
2. Mechanicalcomponent lifetime
prediction
3. Instrumentationlifetime
prediction
4. New sensorapplications, MEMSfibre optical, Bragg
GENERIC DYNAMICAUTOMATIC DIA-
GNOSTIC CONCEPT
5. Multisensordiagnostic
methodology
DIAGNOSTICSAND
PROGNOSTICS
6. Self-diagnostics, learning and tutor fucktions7. Multi-modelling, heuristic, inversion techniques, genetic algorithms8. Probabilisticmethods9. Hybrid dynamic diagnostics: NN,FL, ES, BN10. Remote super-vision, diagnostic networks11. Decision support, safety barriers
SMRG =Safety
andRisk
Mana-gementGrade
APPLICATIONEVALUATIONS IN
Steel plant (SI)Power plant (PL)Off shore rig (NO)Paper machine (FI)Mobile vechicle (FI)SME product (??)
CONDITIONAND LIFETIMEPREDICTIONS,
RISK ESTIMATIONS
![Page 18: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/18.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA2 Subprojects and DeliverablesSystems Performance Monitoring and Diagnostics
New methods for life-time prediction resultingin probability estimations of failure risks of devices
and systems
New techniques to usemicro- and nanosensors, wireless communicationand remote diagnostics
in an integrated wayto monitor the condition
and safety of devices
New knowledge aboutintegrating multiple-sensor and -system
information for diagnosticand prognostic purposes
Coordinator: VTT, Finland Vicecoordinator: BZF, Hungary Industrial leader: Metalogic, Belgium??Kenneth Holmberg Lazlo Toth Marnix Surgeon
Actions: Deliverables:
Task 4-5 Multisensor systems andnovel sensor applications, MEMS,fibre optics, Bragg grits, nanosensors
A generic dynamic concept forautomatic diagnostics and prog-nostics
Result from RA2:
Task 6. Self diagnostics, learningand tutor functions, probabilisticmethods
Task 7-9. Hybrid dynamicdiagnostics, multimodelling,
Task 1-3. Material, component andinstrumentation lifetime prediction
Task 10-11. Diagnostic networks,remote supervision, decisionsupport
A method for optimising disag-nostic functions by multisensorapproach and using novel sensortechnology
A probability based methodfor lifetime prediction of mecha-nical and electronic componens
A method for building remotediagnostic centers includinglearning, tutor and decisionsupport functions
![Page 19: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/19.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA3: Human-TechnologyInteraction
PROBABILISTICCALCULATIONS
PSYCHOLOGICALAND SOCIOLOGICAL
ANALYSIS
RELIABILITY AND DEPENDABILITY
ANALYSIS
HUMAN COOPERATION
AND COMMUNICATION MODELS
HUMAN-BASED RISK ASSESMENT AND
MANAGEMENT NEW METHODS
INTEGRATIONDECISION MAKINGMODELS
COGNITIVE WORK ANALYSIS
TOOLS FOR THE IMPROVEMENT OF
HUMAN PERFORMANCE
REGULATIONSAND MANAGEMENT
SYSTEMS STANDARDS
![Page 20: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/20.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA3 Subprojects and DeliverablesHuman-Technology Interaction
Coordinator: CETIM, France Vicecoordinator: JRC/ISPRA, Italy?? Industrial leader: MIT, Germany??Philippe Lubineau NN NN
Subprojects: Deliverables: Result from RA3:
New methods to measure and express risks related to human and technology inter-action with hybrid qualitative/quantitative techniques
A new approach of companies’ organizationdesign, taking into account formal management and informal norms and values (human behaviour based method).
SP33: influences of the working conditions evolutions (flexibility, automation, globalization, ICT, …) on the informal norms and rules of the organisations
Methods about how to relate theactions of humans in technical systems to estimating its risk probability and consequences
SP30. Transfer or modification of existing knowledge from forerunner domains to industrial areas
SP31. Integrated reliability and psycho-logical analysis method for risk assessment,
SP32: improvement of human performances by the use of new technologies.
Set of indicators about human performance in relation with the SMRG
New tools of monitoring or measurement to improve human performances related to risk management
SP34: operator’s decision making process when unexpected situations arise.
![Page 21: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/21.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA4: Business ModelsPromoting Risk Management
DELIVERINGCAPACITY
LONG-TERMAVAILABILITYAGREEMENTS
STRATEGICDECISIONMAKING
SME - SAFETYAND RISK MANA-GEMENT GRADE
INTEGRATION
SECURE NETWORK/SYSTEM
OPERATION
INNOVATIVEACTIVITIES
RISK MANAGE-MENT BUSINESS
MODELS
FINANCIALRISKS
PUBLIC OPINIONRISKS - BRAND &
REPUTATIONRISKS
KNOWLEDGEMANAGEMENT
BENCHMARKING
ENERGYRISKS ADDED VALUE
SERVICES
ORGANISATION MODELS
![Page 22: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/22.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA4 Subprojects and DeliverablesBusiness Models Promoting Risk Management
Coordinator: QinetiQ, UK Vicecoordinator: ??? Industrial leader: ???Brian Spedding NN NN
Subprojects: Deliverables:•SP41. PRIKNOW - Risk-related knowledge management for dispersed organisations (VTT)
•SP42. MoRIS - Management of risks in projects and processes for SMEs (STZ R-Tech)
•SP43. ADDS - Added value products in service businesses (VTT)
•SP44. AscRisk - Europortal for assessment and management of commerce and business risks in operation of SME’s and daily life of European citizen (MIT GmbH)
•SP45. FAMEMAIN - Framework methodology for maintenance benchmarking
•SP46 BELIRIEN - Benchmarking liabilities for risks from energy systems (JRC-IE)
•SP47 SME Risk Portal - Providing access to risk management expertise
Result from RA4:
New techniques andmethodologies for handling riskand uncertainty, to assist actors
(especially SMEs) with innovativeactivities and strategic
decision making
Innovative, effective and robust business models that will
deliver capacity,long-term availability
agreements and added value products, in an
environment characterised by multiple and interacting risks
New knowledgeabout the relationship
between value, costs risks and safety
•Innovative methodologies that account for and combine business risk-related factors
•Tools to allow benchmarking of an organisation’s safety maintenance, to drive better equipment availability and safer working environment
•A common framework to compare the treatment of risk in different domain areas
•Effective integration of safety/risk management into revisions of general business models
•A survey and analysis of implementation of safety/risk management in multiple domains
•Toolsets to enable business risk management
•An internet portal to assist SMEs and European citizens to gain access to relevant expertise relating to business risks•Toolsets to facilitate the management of risk-related knowledge
![Page 23: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/23.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA5: Public Safety andEnvironmental Protection
DIAGNOSTIC,THERAPEUTICSTRATEGIES
NATURAL ANDMAN-MADE
RISKS
INTEGRAL RISK ASS-ESSMENT OF LARGE
SCALE SYSTEMS
CROWD AND PANICBEHAVIOUR
INFO. & COMM.,DECISION SUPPORTFOR EMENRGENCYRESPONSE TEAMS
SRMG =SAFETY AND RISK
MANAGENEMT GRADE
INTEGRATION
MEDICINE,HOSPITAL & HEALTH
RELATED RISKS
IMPROVEDMETHODS
![Page 24: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/24.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA5 Subprojects and DeliverablesPublic Safety and Environment Protection
New methods thatintegrate the risk
assesment of publicand environment
threting activities withcrowd and panic
control and informationsystems for emergency
response teams
New solutions to makestructures more resistant
to fires, explosions, toxic and terrorist
attacks
New knowledge abouthuman behaviour and
how to control it inemergency and panic
situations
Coordinator: TNO, Netherlands Vicecoordinator: ??? Industrial leader: Alps, Austria??NN NN NN
Subprojects: Deliverables:SP51. Integral risk assessment of largescale systems and structures
A
Result from RA5:
SP52. Guideline for public/stakeholderinteraktion for decision making in spatial planning
SP53. Fire and attack resistant structures and conceptual designfor emergency measures
SP54. Model for crowd behaviour inemergency situations
SP55. Management of natural andman-made risks in mountain areas,Univ. Insbruck
SP56. Management of risks pointingtowards human health and humanlife, Steinbeis technologiezentrum
![Page 25: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/25.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA6: InformationTechnology and Infrastructural Security
ENVIRONMENTALRISK MANAGEMENT
BY ADVANCED IT
DEPENDABILITYOF IT AND COMUNIC. INFRASTRUCTURES
IT RISKMANAGEMENT
IT SUPPORT FORRISK MANAGEMENT
& DECISION SUPPORTSW TOOLS,
PLATFORMS,ARCHITECTURES
NEW IT RISK MANA-GEMENT SOLUTIONS
AND SRMG FOR IT
INTEGRATION
CIVIL SAFETYAND SECURITYAPPLICATIONS
PUBLIC TRUSTAND CONFIDENCE
IN IT
SAFETY AND SECURITY FRAME-
WOKRS FROM NON-IT SECTORS
![Page 26: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/26.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN RA6 Subprojects and DeliverablesInformation Technology and Infrastructural Security
Coordinator: GROPPO AIA, Spain?? Vicecoord: Frauhofer, Germany?? Industrial leader: ??Marta Pierra Ysern?? Frank Bomarius?? NN
Subprojects: Deliverables:SP61. Photograph transmission servicefor rescue, YIT
A
Result from RA6:
New integrated methodsand platforms for risk
management of information systems and
networks for environmental management and civilsecurity applications
New knowledge aboutthe vulnerability of the
different parts and functions in information
and infrastructural systemsand how they can be
estimated and controlled
SP62.
![Page 27: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/27.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN ROADMAP
OUTPUTRESEARCH AND DEVE-LOPMENT PROJECTS
EVALUATIONPROJECTS
OUTPUT IMPLEMEN-TATION
OUTPUT
RISKMAN VISION:
”20 %have
SRMGin com-
pany andcommu-
nitybalance
year2008”
RA1. Integration of risk management, SRMG concept
RA2. System performance monitoring and diagnostics
RA3. Human-technology interaction
RA4. Business models for risk management
RA5. Public safety and environment protection
RA6. IT and infra-structural security
Guide-lines
Recomm-endations for regu-lations
Quantifi-cation /assess-ment ofSRMG
Corrections
RISKMANCONCEPT
ANDGUIDE-LINES
Pilot n
Pilot 1
Pilot 2
Pilot 3
Pilot 4
Pilot 5
Region n
Region 1
Region 2
Region 3
2003-2006 2007 20082006 2005-2006
2006-2008
Evaluation of effects
and benefits
Commu-nication
andtraining
![Page 28: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/28.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Need for a Safety and Risk Management Grade
If we by a car - how do we know the risks?• The car company assures the reliability - but
can we trust the company?
How do we know the risk managing level of the company?
• The balance gives us its economical value• The stock market gives the market value based
on balance, expectations, trends etc• But where are the risks evaluated?
We need a value for the Safety and Risk Management Grade in the companies balance!
![Page 29: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/29.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Safety and Risk Management Grade
We need new methods and techniques to improve safety and reliability
We need guidelines about how to take them into use
We need methods to evaluate how they have been implemented
We need a number to show how safety and risk management has been implemented in companies
This should be a value in the balance
![Page 30: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/30.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Safety and Risk Management Grade
Same Safety and Risk Management Grade for large and small companies
Same thinking in communities, how safety and security is included in the community balance
Needs hierarchical structure of guidelines
Easy and quick method - big uncertainty
Detailed and large method - accurate and credible
SRMG should be a competitiveness argument like ISO9000 - not mandatory by regulations
![Page 31: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/31.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Hierarchical SRMG Guideline Structure
SAFETY AND RISK MANGE-GEMENT GRADE (SRMG)
LEVEL OFCONFIDENCE (LC)
SAFETY AND RISKMANAGEMENT LEVEL (SRL)
HIGH = 10
MEDIUM = 5
LOW = 1 Quick Spider-web Estimation (1 p.)Simple Method: - short (5 p.)
- large (20 p.)Moderate Method: - short
- largeDetailed Method: - medium
- largeDetailed Method + internal auditingDetailed Method + external auditingDetailed Method + certification,
accreditation
SRMG=
LCX
SRL
![Page 32: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/32.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
RISKMAN Management and Organisation
Governing Council- Senior partners repr.- External experts - EC representatives- Funding agency´s repr.
Steering Committee- Repr. from partners- IP & RA co-ordinators
Interest Group- Industrial org´s repr.- Interest org´s repr- Societal org´s repr.
Co-ordinators Group- IP co-ordinator- RA co-ordinators
Dissemination Team- Web,seminars,newsletters- Training, regional diss.
Management Team, VTT- IP co-ordinator: K.Holmberg- Administrative officer- Financial officer- Legal adviser
RA1 Scientific Advisory Board- RA1 co-ordinator- RA1 sucoordinator- RA1 Industrial leader- RA1 partners repr.
Delivery Team- Equalising guidelines, regulations, standards,recommendations
RA2 SAB- cord- subc- i.l.- p.r.
RA3 SAB- cord- subc- i.l.- p.r.
RA5 SAB- cord- subc- i.l.- p.r.
RA4 SAB- cord- subc- i.l.- p.r.
ST
EE
RIN
GO
PE
RA
TIO
N
Research Projects Research Projects
![Page 33: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/33.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Role of participants during IP preparation
Core group:• responsible for the planning phase• participants committed to EoI
+ needed partners from e.g. Poland, Hungary, Czech Republic
Interest Group:• potential partners to participate with projects• are kept informed during the preparation phase
![Page 34: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/34.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Role of participants during IP preparation
Business Organisations:• companies planned to be involved in the development and evaluation pilot projects
Supporting Organisations:• European and national business sector, legislation, standardisation etc organisations
• key organisations from which we need support
![Page 35: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/35.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
IP Consortium Management
Governing Council:• senior partner representatives, external experts, EC repr., funding agency repr.
Scientific Advisory Boards / RA:• scientific representatives from partners
Steering Committee:• representatives from partners
Consortium: partners
Interest Group: legislation, training etc org:s
![Page 36: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/36.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
IP Global Budget
• Total volume: 70 Me• Annual volume: 14 Me first 4 years and7 Me fifth year + 7 Me for co-ordination (max 6 %)
![Page 37: RISKMAN VISION and PLANS K. Holmberg, A. Jovanovic et al 13.2.2003 VTT Industrial Systems, Finland](https://reader035.vdocument.in/reader035/viewer/2022062809/568158f4550346895dc62fdc/html5/thumbnails/37.jpg)
VTT INDUSTRIAL SYSTEMS
RISKMAN VISION AND PLANS, 13.2.2003, K. Holmberg, A.Jovanovic et al
Calendar for RISKMAN preparation• 21.1.2003, RA expected results and deliverables from RA coordinators• 22.1.2003 Subproject call/template sent out• 3.2.2003, Dead line for subproject proposals• 7.2.2003, Draft from RA co-ordinators on RA content• 15.1.-10.2.2003 :
• Collect numbers for basic argumentation, radical breakthroughs• Contacts to industry in each RA• Contacts to interest organisations, other EC projects and networks
• 13.2.2003, Core Group meeting, Stuttgart 9.00-16.00• 18-28.2.2003, intensive preparation of the final version of the proposal• 26.2.2003, network/video meeting• 4.3.2003, RISKMAN proposal delivered to EC• 6.3.2003 Dead line for Stage 1