rk t biodata

Upload: naresh-keshari

Post on 14-Apr-2018

252 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Rk t Biodata

    1/16

    BIO-DATA

    Name Dr. Rajesh Kumar Tripathi, Head Civil Engineering

    Fathers Name Shri Tulsi Ram TripathiDate of Birth Eight September Ninety Sixty Four (08-09-1964)Nationality IndianPresent address Q. No. E-38, National Institute of Technology Campus, G. E.

    Road Raipur (C.G.)492010 [Phone N0.0771-2255600]

    Educational QualificationName of Examination Year of

    Passing

    Institution Board/ University Specialisation % of

    Marks

    Division

    H.S.S.C.

    Examination 1981

    S.B.B.P. N.V.B.

    Barman, Distt.

    Narsinghpur, M.P.

    M.P. Board of Sec.

    Education Bhopal

    Mathematics

    Physics

    Chemistry

    72.75 % First Division

    B. E. Civil

    Engineering 1986

    Govt. Engineering

    College Jabalpur

    (M.P.)

    Rani Durgavati

    Vishwavidhyalaya

    Jabalpur (M.P.)

    Civil

    Engineering 83.13%

    First Division

    With Distinction

    (VI-Position)

    M. Tech.

    Structural Engg. 1993

    I. I. T. New Delhi I. I. T. New Delhi Structural

    Engineering

    8.38

    C.G.P.A

    First Division

    Certificate Course in

    German Language

    1992 I. I. T. New Delhi I. I. T. New Delhi German

    Language

    Ph. D. Civil

    Engineering 2002

    S. G. S. I. T. S.

    Indore

    Devi Ahilya Vishwa-

    Vidhyalaya Indore

    Structural

    Engineering

    Received one best paper

    award

    One-Sem. Program on

    Earthquake

    Engineering

    2004

    Indian Institute of

    Science Banglore

    N.P.E.E.E

    Sponsored by

    M.H.R.D.

    Earthquake

    Resistant

    Design

    GPA 6.63

    On 8 point

    Grade

    First

    Work ExperienceName of Organisation Office Address Post Salary Period

    M/S Bhogilal & Company Near Railway Station Parasia, Distt-

    Chindwara

    Site Engineer Rs. 1600=00

    Per month

    18-08-1986 to 18-

    10-1987

    Depart of Telecom.

    Govt. of India

    O/S S.E. Telecom Civil Circle,

    G.T.B.Complex Bhopal (M.P.)

    Junior Engineer

    Civil

    In Scale of Rs 1400-

    2300

    26-10-1987 to

    17-07-1989Depart. of Tech. Edu.

    Govt. of Chhattisgarh

    Govt. Engineering College Raipur Reader in Civil

    Engineering*

    In Scale of Rs

    12000-18300

    18-07-1989 to

    30-12-2005

    National Institute of

    Technology Raipur**G.E. Road Raipur

    Raipur-492010 (C.G.)

    India

    Associate

    Professor in Civil

    Engineering

    In Scale of Rs

    37400-57000

    01-01-2006 to

    Continue

    * Initially appointed as lecturer in Civil Engg. w.e.f. 18-07-89 in Govt of Madhya Pradesh and Promoted to the post of Reader in

    Civil Engineering w.e.f. 18-07-2000 by Govt. of Chhattisgarh.

    ** Govt. Engineering College Raipur had been upgraded to National Institute of Technology Raipur w.e.f. 31-12-2005.

    From9-05-05 to 31-01-07 worked as a Deputy Secretary for Technical Education, Science & Technology and ManPower Planning Department, Government of Chhattisgarh

    1.0 Awards and Scholarship1). INDIAN TECHNICAL ADVISOR, for CANADA INDIA INDUSTRY INSTITUE LINKAGE PROGRAMME.

    2). Best paper by Young Engineer award (International Award) in Structural Engineering Convention-2001 (An

    International Meet), held at Indian Institute of Technology Roorkee 2001.

    3). Srimati Saroma Sanyal Memorial Prize for 1994-95 (National Award for Best Paper of the year) by Institution

    of Engineers (India) at 11th Indian Engineering Congress at Jaipur on 23-12-1995.

    4). MHRD New Delhi Q.I.P. Scholarship for pursing Ph. D. degree from S.G.S.I.T.S. Indore (for three year).

    5). MHRD New Delhi Q.I.P. Scholarship for pursing M.Tech. Degree from I.I.T. New Delhi (for one and half year)

    6). National Merit Scholarship for pursing B.E. Degree from G.E.C. Jabalpur (for five year)

    2.0 Books Published

    1). Strength of Materials: Published by M/S G. K. Publishers.

  • 7/29/2019 Rk t Biodata

    2/16

    2). Mechanical Science (Co-author Prof. U.S.Vijaywargiya), Published by M/S G. K. Publishers.

  • 7/29/2019 Rk t Biodata

    3/16

    3.0 Proceeding Edited

    1. Issues pertaining to the Development of New State and The Capital of Chhattisgarh for National Conference.2. Emerging Trends in Civil Engineering for Infrastructure Development for National Conference.

    4.0 M. Tech Dissert ation

    Grillage Analogy applied to Box-Girder Bridges.

    5.0 Ph. D. Thesis

    Non-linear finite element analysis of plate bending using higher order shear deformation theory.

    6.0 Technical Paper

    1. Nema A. K., Jain A. K. and Tripathi R. K. Application of Dynamic Programming to the Optimum Design ofMunicipal waste water in Journal of Instit ution o f Engineers (India), Vol.-75, August 1995, pp 41-48.

    2. Tripathi R. K., Vidyarthi A. K. and Jain A. K. Development of Generalised cost function and EconomicSelection Criteria for Domestic Waste Water Treatment System in Journal of Institution of Engineers

    (India), Vol.-77, August 1996, pp 41-48.

    3. Tripathi R. K., P. Babu and Jain A. K. Environmental Management in a Basic Drug Industry in Journal ofInstitution of Public Health Engineers (India), Vol.-1994, No.4, pp 33-42.

    4. Tripathi R. K., Kumar S. and Jain A. K. Optimum Cost Comparison between different low cost treatmentsystems for Domestic Wastewater treatment, in National Seminar on Pollution Control for Sustainable

    Developm ent and Human Health held at Jabalpur from 12-10-1997 to 13-10-1997, pp 125-131.

    5. Sen G. and Tripathi R. K. Analytical Investigation on Waste Water Disposal using Model Cribs in NationalSeminar on Pollution Control for Sustainable Development and Human Health held at Jabalpur from 12-

    10-1997 to 13-10-1997, pp 82-85.6. Tripathi R. K. and Nayer K. K. Development of New Grillage Model using substructure technique for transverse

    section of Box-Girder Bridge Decks at 58ht annual session ofIndian Road Congress held at Bhopal from 5-

    10-1998 to 8-10-1998, pp 34-42.

    7. Tripathi R. K. and Rode V. (1999). A systematic Computer aided approach for Elasto-Plastic Analysis of fibrereinforced composite structural members. CMSID-99, 3-4 April 1999, Gwalior by Indian Concrete Institute, pp

    127-135.

    8. Tripathi R and Rode V. (1999). Fibre reinforced composite as an emerging building materials: A review ofElasto-Plastic behaviour. CMSID-99, 3-4 April 1999, Gwalior by Indian Concrete Institute, pp 146-151.

    9. Tripathi R and Rode V. (1999). A Review of Anisotropic yield criteria and their applicability in the fibrereinforced composite materials. 2nd Asia Pacific Speciality Conference on Fibre Reinforced Concrete. 27-28

    August 1999, Singapore.

    10. Tripathi R. and Rode V. (2000). Higher Order Shear Deformation Theory as an Emerging Analysis Tool forNon-Linear Plate bending analysis. All India Seminar on Infrastructure Scenario in the Twenty first Century.

    4-5 October 2000, Lucknow, pp 45-57.

    11. Tripathi R. and Rode V. (2000). Analytical modelling of Plate bending behaviour using Higher Order ShearDeformation Theory. National Conference on New Horizons in Civil Engineering Practices for the Millennium-

    2000. 07-08, December 2000, A. M. A. College of Engineering, Kanchipuram, pp 15-21.

    12. Tripathi R. and Rode V. (2001). Finite Element Analysis of Non-linear Plate Bending with Higher Order ShearDeformation Theory. International Conference on Civil Engineering-2001, held on 23-24 July 2001 at Indian

    Institute of Science, Banglore. pp

    13. Tripathi R. and Rode V. (2001). Finite Element Elasto-Plastic Analysis of Plate Bending using LayeredHigher Order Shear Deformation Theory. Structural Engineering Convention-2001 (An International Meet),

    held on 5-7 October 2001 at I. I. T. Roorkee, Roorkee, pp 538-553.

    14. Tripathi R. and Rode V. (2000-2001). Elasto-Plastic Analysis of Plate Bending using Higher Order ShearDeformation Theory inJournal of Institution of Engineers (India), Vol.-83, November 2002, pp 191-200.

    15. Verma M. K., Sen G. and Tripathi R. K. (2002). Importance of the Optimisation Techniques in Operation ofExisting Water Resource Systems in work shop on Computer Applications in Mineral Developments and

    Water Resources Managements held at G. E. C. Raipur on 23rd-24th March 2002. Published by South Asian

    Association of Economic Geologist. pp

    16. Verma M. K. and Tripathi R. K. (2003). Development of Sustainable Water Resources Infrastructure for TheState of Chhattisgarh. National Conference on Issues Pertaining to the Development of New State and the

    Capital of Chhattisgarh. Raipur 26-27 April 2003, pp 18-23.

    17. Tripathi R. K. and Verma M. K. (2003). Ready Mix Concrete A Need of Time for Development of New StateCapital. National Conference on Issues Pertaining to the Development of New State and the Capital of

    Chhattisgarh. Raipur 26-27 April 2003, pp 12-17.

  • 7/29/2019 Rk t Biodata

    4/16

    18. Tripathi R. K. and Verma M. K. (2003). Guide Lines for Construction of New Cement Concrete Roads NationalConference on Issues Pertaining to the Development of New State and the Capital of Chhattisgarh. Raipur 26-

    27 April 2003, pp 36-40.

    19. Tripathi R. K., Sahu T., Verma M. K. and Ramtekkar G. D. (2008) Application of Seismic Hazard Analysis forDams in National Seminar on Seismic Response: Design and Strengthening of Buildings Structure. Jabalpur

    27th- 28th October 2007, pp 106-119.

    20. Tripathi R. K., Tiwari S. and Verma M. K. (2008) Deterministic Seismic Hazard Analysis for Hasdeo-bangoDam site in Chhattisgarh state inCSVTU Research Journal, Vol 1, No 1 January 2008, pp 21-27.

    21. Verma M. K., Tripathi R. K. and Gupta D. P. (2008) Conceptulization of Sustainable Water ResourcesInfrastructure and its Development for Chhattisgarh State in CSVTU Research Jour nal, Vol 1, No 1 January

    2008, pp 16-20.

    22. Tripathi R. K. and Verma M. K. (2008) DETERMINISTIC SEISMIC HAZARD ANALYSIS FOR RAIPUR CITYNational Conference on Emerging Trends In Civil Engineering For Infrastructure Development ETC-ID 2008

    at National Institute of Technology Raipur on 15-16 February 2008. pp

    23. Sahu C. R., Tripathi R. K., Verma M. K.. and Parasar A. (2008). Assessment of Seismic Hazard at TandulaDam and Balar Dam using DSHA in Journal of Structural Engineering (ISSN 0970-0137),Vol. 35, No 2

    (June-July 2008), pp 128-136.

    24. Verma M. K. and Tripathi R. K. (2008) Rainfall-Net Inflow Modelling for Dudhawa Reservoir in CSVTUResearch Journal, Vol 1, No 2 January 2008, pp 34-39.

    25. Ishtiyaq Ahmad, Dr. M. K. Verma and Dr. R. K. Tripathi.(2008) ''Application of Fuzzy Logic in Rainfall-RunoffModeling for Murumsilli Reservoir'', National Conference on Water resources in India: Concerns, Conservation

    and Management (WRIIN), University of Kashmir, Srinagar, Nov. 1-3, 2008.

    26. Ishtiyaq Ahmad, M. K. Verma and R. K. Tripathi. . (2008) ''Urban Rain Water Harvesting and Ground WaterRecharging'', National Conference on Technological Advances in Civil Engineering: BITCON 2008, BIT Durg,

    Nov. 7-8, 2008, pp 274-278.

    27.Abhijit Soni, Ishtiyaq Ahmad, M. K. Verma and R. K. Tripathi. (2008) ''Study of Flood Routing Methods forReservoirs'', National Conference on Technological Advances in Civil Engineering: BITCON 2008, BIT Durg,

    Nov. 7-8, 2008, pp 224-228.

    28. Ishtiyaq Ahmad, Sunil Nayak Dr. M. K. Verma and Dr. R. K. Tripathi. (2008) ''Development and Application ofFuzzy Logic based Rainfall-Runoff Model'', National Conference on Hydraulics & Water Resources: HYDRO

    2008, MNIT Jaipur, Dec. 15-16, 2008, pp 275-282.

    29. Ishtiyaq Ahmad, M. K. Verma and R. K. Tripathi. .(2008) ''Fuzzy Logic Approach in Rainfall-Runoff Modeling forDudhawa Reservoir of MRP Complex'', National Seminar: Water Vision 2030, IWWA, Nagpur Centre, Dec. 24-

    25, 2008, 9.

    30. Sunil Nayak, R. K. Tripathi and M. K. Verma. . (2008) ''Weighted Goal Programming An Effective Tool forOptimal Operation of Multiple Reservoir Systems'', National Seminar: Water Vision 2030, IWWA, Nagpur

    Centre, Dec. 24-25, 2008.

    31. Tripathi R. K., Rode V. and Verma M. K. (2009) Plastic Zone Propagation In Thick Plates Using Higher-OrderShear Deformation TheoryCSVTU Research Journal (ISSN 0974-8725) Vol-2, No.-2, pp 30-36 .

    32.Ahmad I., Nayak S., Verma M. K. and Tripathi R. K. (2009) Application of Fuzzy Logic Rainfall RunoffModelling for Ravishankar Reservoir CSVTU Research Journal. Vol 2 No. 1, January 2009, pp 12-16.

    33. Ishtiyaq Ahmad, Sunil Nayak, Dr. M. K. Verma and Dr. R. K. Tripathi. ''Fuzzy Logic Approach in DevelopingRainfall-Runoff Model for Dudhawa Reservoir'', Journal of Indian Water Works Association (IWWA) (ISSN

    0970-275X), Mumbai, Vol. XXXXI. No.1, January-March 2009, pp 75-80.

    34. Tripathi R. K., Verma M. K., Tripathi N. (2009) "Seismic Hazard Analysis For Major Dams Of Chhattisgarh";International Journal of Earth Sciences & Engineering (ISSN 0974-5904) Vol. 02, No. 04, August 2009, pp

    287-298.35. Tripathi R. K., Rode V. and Verma M. K. (2009) Finite Element Elasto-Plastic Analysis of Plate Bending using

    Layered Higher Order Shear Deformation. ICFAI University Journal of Structural Engineering (ISSN 0974-

    6528). Vol. II, No. 04, October 2009, pp 7-23.

    36. Tripathi R. K. (2010) Estimation of Collapse Load in Plates using Higher Order Shear Deformation Theory

    International Journal of Emerging Technologies and Applications in Engineering Technology and

    Sciences, (ISSN:0974-3588) issue 2 Jan-July 2010, pp

    37. Tripathi R. K., Verma M. K. (2010) Seismic Hazard Analysis for Capital City of Chhattisgarh State acceptedfor publication in CSVTU Research Jour nal.

    38. Verma M.K., Shrivastava R.K., Tripathi R.K. (2010) Evaluation of Min-Max, Weighted and Preemptive GoalProgramming Models with reference to Mahanadi Reservoir Project. Journal of Water Resources

    Management, Springer Netherland(ISSN 0920-4741), Vol (24) pp 299-319.

  • 7/29/2019 Rk t Biodata

    5/16

    39. Khatri S., Patel A., Choubey J., Verma M.K. and Tripathi R. K. Modelling of Glycogen Phosphorylase-ligand

    Complex based on Multiple Memplates and Loop Refinement. Journal of Engineering Science and

    Technology.Accepted for Publication

    Communicated Papers

    40. Sunil Nayak, Ishtiyaq Ahmad, Dr. M. K. Verma and Dr. R. K. Tripathi. ''Performance Evaluation of Fuzzy InflowForecasting Model for Murumsilli and Ravishankar Sagar Reservoir'', Hydrology Journal, Roorkee

    (Communicated).

    41. Ishtiyaq Ahmad, Sunil Nayak, Dr. M. K. Verma and Dr. R. K. Tripathi. ''Fuzzy Logic Based Inflow PredictionModel for Reservoirs of Mahanadi Basin'', Indian Society for Hydraulics (ISH) Journal of Hydraulic Engineering,

    Pune (Communicated).

    42. Ishtiyaq Ahmad, Sunil Nayak, Dr. M. K. Verma and Dr. R. K. Tripathi. ''Application of Fuzzy Logic Based InflowForecasting Model for Murumsilli Reservoir'', Journal of Applied Hydrology, Vishakhapatnam (Communicated).

    43. Ishtiyaq Ahmad, Sunil Nayak, Dr. M. K. Verma and Dr. R. K. Tripathi. ''Inflow Forecasting Technique ANN: AnApplication to Ravishankar Sagar Reservoir'', International Commission on Irrigation and Drainage (ICID)

    Journal, New Delhi (Communicated).

    44. Sunil Nayak, Ishtiyaq Ahmad, Dr. M. K. Verma and Dr. R. K. Tripathi. ''Inflow Forecasting Techniques- FuzzyLogic, ANN and Regression: An Application to Dudhawa & Ravishankar Sagar Reservoir'', International Journal

    of Computational Intelligence Research (IJCIR), Korea (Communicated).

    7.0 Ph. D. Supervisor :

    S.No Name of Candidate Year of Registration Title Co-supervisor

    1. Rakesh Kumar Grover2008-09

    RGPV BhopalSeismic Hazard Analysis of

    Important Dams of Central IndiaDr H.K. Mishra,

    Head Civil Engg; JEC Jabalpur

    2. Laxmi Kant Yadu2009-2010

    N.I.T. RaipurSoil-Structure Interaction of plates

    resting on Improved Ground

    Dr Kausik Deb, Astt. Prof.Indian Institute of Technology

    Kharagpur

    8.0 M. Tech Dissertati on Guided

    1. Computer Aided Analysis and Design of Folded Plate Structures by Ajit Dwivedi of Government EngineeringCollege Jabalpur in 1994.

    2. Computer Aided Analysis and Design of Cylindrical Shell Structures by R. K. Bansal of GovernmentEngineering College Jabalpur in 1994.

    3. Computer Aided Design and Cost Optimisation of Overhead Circular Water Tank by Yashpal Kant ofGovernment Engineering College Jabalpur in 1995.

    4. Deterministic Seismic Hazard Analysis of Tandula Dam and Balar Dam Sites by Chaitram Sahu of N.I.T.Raipur 2006.5. Study of Earthquake Engineering and Seismic Hazard Analysis for Kodar and Sondur Dam Site in

    Chhattisgarh state by Pramod Khare of N.I.T. Raipur in November-2006.

    6. Evaluation of Peak Ground Acceleration at Hasdeeo Bango and Dudhawa Dam Sites in Chhattisgarh State byShashank Tiwari of N.I.T. Raipur in November-2006.

    7. Assessment of Seismic Hazard for Ravishankar and Sikaser Dam in Chhattisgarh State by Tejram Sahu ofN.I.T. Raipur in November-2006.

    8. Development of Fuzzy Logic Based Rainfall-Runoff Model for Reservoirs of Mahanadi Reservoir ProjectComplex by Ishtiyaq Ahmad of N.I.T. Raipur 2008.

    9.0 Evaluation of M.E. / M. Tech Dissertat ion Work

    1. Conducted M.E. Thesis Via-va on Seismic Response of Building for Indian Earthquakesat S.G.S.I.T.S. Indoreon 08-12-2008. ( No. Exam/PGA/1480 Indore dated 24-09-08 )

    2. Conducted M.Tech. Thesis Via-va on Fire Resistant Design of a Shopping Mall at MANIT Bhopal on 27-10-2009. (Candidate Satish Kumar Chitwar Supervisor Dr P Suryanarayan; No COE/475/Conf./Exam/P-2 Dated

    26-08-09).

    3. Conducted M.Tech. Thesis Via-va on Span Optimization for T-Beam Girder Bridge at MANIT Bhopal on 27-10-2009. (Candidate Bharti Yadav Supervisor Dr S.K.Dubey; No COE/475/Conf./Exam/P-2 Dated 26-08-09).

    4. Conducted M.Tech. Thesis Via-va on Comparison of Cost and Constructional Advantages of Alternate ColumnDesigns at MANIT Bhopal on 27-10-2009. (Candidate Anubhav Rai Supervisor Dr P Suryanarayan; No

    COE/475/Conf./Exam/P-2 Dated 26-08-09).

  • 7/29/2019 Rk t Biodata

    6/16

    5. Conducted M.Tech. Thesis Via-va on Design of Buildings of Steel and Concrete Comparative Assessment ofLimited Continuity Approach and Composite Construction at MANIT Bhopal on 27-10-2009. (Candidate

    Prakash Sangamnerkar Supervisor Dr P Suryanarayan).

    6. Conducted M.Tech. Thesis Via-va on Computation of Safe Loads by Load and Resistance Factor method forColumns in Steel Building Frames at MANIT Bhopal on 27-10-2009. (Candidate Rajesh Prasad Supervisor Dr

    P Suryanarayan).

    10.0 Research Projects

    1. Improving Soft Sub-grades for the Construction of Low Volume Roads using Locally Available MarginalMaterial Submitted to Chhattisgarh Council of Science and Technology Raipur.

    11.0 Continuing Programme Organised1). One month programme on Computer Aided Office Automation for state Government Employees at

    Government Engineering College Jabalpur from 6-3-1995 to 5-4-1995.

    12. Workshop/Conference Organised

    1) Workshop on ALTERNATIVE B UILDING MATERIALS AND ADVANCED CONSTRUCTION TECHNIQUESat Government Engineering College Raipur from 17-2-1997 to 21-2-1997.

    2) National Conference on ISSUES PERTAINING TO THE DEVELOPMENT OF NEW STATE AND THECAPITAL OF CHHATTISGARH at Raipur on 26-27 April 2003.

    3) Workshop on Requirements of Technical Groups t o meet t he Fututre Human Resources at Raipur on29-10-2003 and 30-10-2003. Sponsered by Government of Chhattisgarh.

    4) National Conference on EMERGING TRENDS IN CIVIL ENGINEERING FOR INFRASTRUCTUREDEVELOPMENT ETC-ID 2008 at National Institute of Technology Raipur on 15-16 February 2008.

    5) Seminar on DURABILITY OF CONCRETE AND ROLE OF BLENDED CEMEMTS at N.I.T. Raipur on 29-03-2009 in collaboration with ACC Limited.13.0 Conference / Seminar / Worksho p Particip ated

    1) CMSID-99, 3-4 April 1999 at Gwaliororganised byIndian Concrete Institute.2) All India Seminar on Infrastructure Scenario in the Twenty first Century. 4-5 October 2000 at Lucknow

    organised by

    3) National Conference on New Horizons in Civil Engineering Practices for the Millennium-2000. 07-08,December 2000 at Kanchipuramorganised byA. M. A. College of Engineering, Kanchipuram.

    4) International Conference on Civil Engineering-2001, held on 23-24 July 2001 at Banglore organised byIndian Institute of Science Banglore.

    5) Structural Engineering Convention-2001 (An International Meet), held on 5-7 October 2001 at I. I. T. Roorkee,Roorkee organised by.

    6)

    National Conference on Issues Pertaining to the Development of New State and the Capital of Chhattisgarh on26-27 April 2003 Raipurorganised byInstitution of Engineers (India) Chhattisgarh Sate Centre.

    7) Emerging Trends In Civil Engineering For Infrastructure Development ETC-ID 2008 at Raipur on 15-16February 2008. organised by National Institute of Technology Raipur.

    8) Attended Interactive Session on TATA TISCON 500 Technical Meet on 23rd July 2008 at hotel Golden TulipRaipur Sponsored by M/S Tata Steel. [Ref PAPL:LAUNCHMEET; Tuesday, July 15,2008]

    9) Participated in HOLCIM AWARD CEREMONY as Invited Guest for Asia Pacific Region organized at IndiaHabitat Centre New Delhi on 27-11-08. This award is given for the works in the field of sustainable

    development.

    14.0 Summ er / Winter Schools / Training / Cont inuing Programme At tended

    1). I.S.T.E. Summer School on Analysis and Design of Transmission Line Towers at Anna University, College of

    Engineering Madras from 21 May to 3 June 1990.

    2). Q. I. P. Summer School on Product Development at Indian Institute of Technology New Delhi from 2nd to 15th

    June 1992.

    3). I.S.T.E. Summer School on Foundation for Coastal and Off shore Structures at R. E. C. Calicut from17th to 28th

    May 1993.

    4). One month Training Programme on Remote Sensing Application in Town and Country Planning from 19 th

    February to 15th March 1995 at Indian Institute of Remote Sensing Dehradun.

    5). I.S.T.E. Summer School on Traffic Operation Control and Management in Urban Centres at R. E. C. Surat

    from 5thto 17thJune 1995.

    6). A.I.C.T.E. Winter School on High Rise Structures at Indian Institute of Technology Kharagpur from 23rd

    December 1996 to 3rd January 1997.

    7). I.S.T.E. Short Term Course on Information Technology and Networking at Government Engineering College

    Raipur, from 22nd September to 6th October 1997.

  • 7/29/2019 Rk t Biodata

    7/16

    8). Q.I.P. Short Term Course on Experimental Geotechnics at Indian Institute of Technology Bombay from 15th to

    26thJune1998.

    9). Refresher Course on Project Planning and Preparation Sponsored by CPHEEO, Ministry of Urban Affairs and

    Employment New Delhi from 6th to 15th December 1999 at S.G.S.I.T.S. Indore.

    10). Development of staff Competency Profile for Staff Development Managers from 5-11-2001 to 7-11-2001 at

    S.V.Polytechnic Bhopal under CIIILP.

    11). On Line Learning organised by Technical Teachers Training Institute Bhopal from 29-04-2002 to 03-05-2002

    at T.T.T.I. Bhopal.

    12). One Semester Programme on Earthquake Engineering at Indian Institute of Science Banglore, Sponsored

    by NPEEE, MHRD, Govt. of Indid from August-December 2004 ( 5 month long).

    13). Training Program attended on Cash & Accounts Management New Delhi, Organized by- Institute of Socio

    Economic Research & Action New Delhi-64 on 10-12th May 2007.

    15.0 Design of Curricu lum

    1). Dacum, Task Analysis and Training Standards for Commissioning and Maintenance of Transformers.

    Facilitator forMinistry of Human Resource Development New Delhi under Canada India Institute Industry

    Linkage Project, August 2003.

    2). Dacum, Task Analysis and Training Standards for Chemical Process Operator. ForMinistry of Human

    Resource Development New Delhi under Canada India Institute Industry Linkage Project, June-July 2003.

    3). Dacum, Task Analysis and Training Standards for Civil Engineering Building Supervisor. ForMinistry of

    Human Resource Development New Delhi under Canada India Institute Industry Linkage Project, July 2003.

    16.0 Government Industry Partnership Program

    During the tenure as Deputy Secretary to Government of Chhattisgarh; Instrumental in starting Government

    Industry Partnership Program in state. In the first step I.T.I. Bhansi (in Baster Region) has been handed over to

    M/s Esar Steelsto start new regular/ vocational courses as per demand of the regional steel and minining industries.

    17.0 Service Rules and Departmental Setup

    Following service rules had been framed during the tenure as Deputy Secretary to Government of

    Chhattisgarh.

    1. Chhattisgarh Technical Education (Gazetted) Service (Teaching Cadre-Polytechnic) RecruitmentRules 2005.

    2. Chhattisgarh Technical Education (Gazetted) Service (Teaching Cadre - Engineering Colleges)Recruitment Rules 2005.

    3. Chhattisgarh Technical Education Service (Non Gazetted Class-III) (Technical Cadre- EngineeringColleges and Polytechnic) Recruitment Rules 2005.4. Chhattisgarh Technical Education Service (Non Gazetted Class-III) (Non-Technical Cadre-Engineering Colleges and Polytechnic) Recruitment Rules 2005.

    Instrumental for preparation and sanction of the following Departmental setups

    1. Departmental Setup for Directorate of Technical Education Raipur2. Setup for Engineering colleges and Polytechnics.

    18.0 Key Note Address and Expert Lecturer Delivered

    1. Delivered Lecture on Design of Flexible Pavements in Training Programme / Workshop for A.E.s and J.E.s of StateImplementing Agencies Organised at ENGINEERING College Raipur from 7-07-2004 to 9-07-2004.

    2. Delivered expert lectures on Basics of Earthquake Engineering GMR Institute of Technology Rajam (AndhraPradesh) on 29thDecember 2007.

    3. Delivered Key Note Address on Finite Element Techniques at National Seminar, organized by Rungta College ofEngineering and Technology Bhilai (Durg) India, on 4-5 January 2008.4. Delivered Key Note Address on Ground Improvement & Earthquake Mitigation Techniques at National Conference

    on Technological Advances in Civil Engineering: BITCON 2008, organized by BIT Durg, on 7-8 November 2008.

    5. Delivered expert lecture on Ground Improvement Techniques in Training Program on Earthquake Resistant.Construction Technology for civil Engineers under Urban Earthquake Vulnerability Reduction Project UNDP at Jabalpur

    Engineering College Jabalpur held on 23-25 October 2008.

    6. Delivered expert lecture on Seismic Hazard Analysis in Training Program on Earthquake Resistant. ConstructionTechnology for civil Engineers under Urban Earthquake Vulnerability Reduction Project UNDP at Jabalpur EngineeringCollege Jabalpur held on 23-25 October 2008.

  • 7/29/2019 Rk t Biodata

    8/16

    7. Delivered Expert Lectures On Pavements & overlays- Design Construction and Maintenance in Training Programfor Graduate Engineer of state P.W.D. at Chhattisgarh State Rural Development Institute (Nimora) Raipur on 08-08-2008.

    8. Invited Talk on Quality Control in R.C.C. Construction in the National Conference (BITCON 2008) on TechnologicalAdvances in Civil Engineering on 8thNovember 2008.

    9. Delivered expert lecture on Ground Improvement Techniques in Training Program on Earthquake Resistant.Construction Technology for civil Engineers under Urban Earthquake Vulnerability Reduction Project UNDP at JabalpurEngineering College Jabalpur held on 27-31 July 2009.

    10. Delivered expert lecture on Seismic Hazard Analysis in Training Program on Earthquake Resistant. ConstructionTechnology for civil Engineers under Urban Earthquake Vulnerability Reduction Project UNDP at Jabalpur Engineering

    College Jabalpur held on 27-31 July 2009.

    11. Delivered expert lecture on Earthquake Hazards and Mitigations at Administrative Academy Raipur on 05-01-2010

    19.0 Editor / Reviewer of the Jou rnals

    1. Editor for C.S.V.T.U. Research Journal.2. Reviewerof C.S.V.T.U. Research Journal.3. Member of Edito rial Team for Journal of Civil Engineering and Construction Technology.

    20.0 Administrative Responsibilities at National Institute of Technology Raipur

    1. Head of the Department, Civil Engineering. [ No NITRR/DIR/CIRCULAR/S-1/2009/341 Raipur Dated 19-08-2009]2. Coordinator, State Technical Agency for Pradhan Mantri Gram Sadak Yojana. [ No 367/Steno-1/PMGSY/2009

    Raipur Dated 03-11-2009).

    3. Training and Placement Officerof N. I. T. Raipur(in 2007). (No. 3120/ NITRR /Estt. Gaz/2007 Raipur, dated09-07-07 and Letter No. 3120 /NITRR /Estt. Gaz/2007 Raipur Dated 9-7-2007 )

    4. Controller of Examinations (From 2008), N. I. T. Raipur. ( No./ NITRR/S-62008/2557 Raipur, dated 25-08-08and No./ NITRR /S-1/ 2008/3933 Raipur, dated 19-12-2008 )

    5. Drawing and Disbursing Officer (with Dr S. S. Gokhale)6. Deputy Controller Examinations (Finance 2007-2008)7. Member, Campus Development Committee of N. I. T. Raipur (No. /NITRR/S-6/2007/4292 Raipur Dated 17-09-

    2007).

    8. Member, N.I.T. Campus Construction and Maintenance Committee. ( No. NITRR /H.C. / 2007 / 3114 Raipur,dated 09-07-07 )

    9. Member Tender Committee. ( No. 3137 / Estt. Gaz/ NITRR /2007 Raipur dated 09-07-07 )10. Central Superintendent at N.I.T. Raipur for Pt. Ravishankar Shukla Universitys Examinations. ( No.

    NITRR/Exam Cell/RSSU/2008/6286 Raipur, dated 05-01-08)

    11. Examination Superintendent at N. I. T. Raipur for Pt. Ravishankar Shukla University Examinations, Raipur. (No./NITRR/S-62008/2557 Raipur, dated 25-08-08 )

    12. Member unfair means committee for examinations of N. I. T. Raipur. ( No. 2782/Exam cell/07 Raipur, dated 12-06-07 )

    13. Professor In charge Computer Lab of Civil Engineering.14. Member in R & D Committee from Civil Engineering Department.15. Member, Training and Placement cell of N. I. T. Raipur (No. /NITRR/S-6/2007/4292 Raipur Dated 17-09-2007).16. Member Anti Ragging Committee of N. I. T. Raipur. ( No. 3065/NITRR/Anti Ragging / 2007, Raipur dated 04-07-

    07 )17. Member Disciplinary Committee at N. I. T. Raipur. ( No. NITRR /S-1/2007/3674 Raipur dated 13-08-07)18. Member, Examination Committee, C.S.V.T.U. Bhilai. ( No. CSVTU/Exam/2007-08/1153 Bhilai dated 22-08-07)19. Member Committee for rule formation for sliding of branches at N. I. T. Raipur. ( No. slid/mdv/ 4180 dated 10-09-

    07 )

    20. Officer In Charge in Writ Petition No 5242 / 07 at Honorable High Court of Chhattisgarh Bilaspur. (No.NITRR/Estt-Gaz /2007 / 4789 Raipur, dated 8-10-2207)

    21. Member, Review Committee for compassionate appointments of N. I. T. Raipur. ( NITRR/Estt-Gaz /2007 Raipurdated 10-11-07).

    22. Member, liability fixation committee. (NITRR /Registrar-II/Court/2008/6478 Raipur dated 17-01-2008 )

  • 7/29/2019 Rk t Biodata

    9/16

    23. Member Right to information Committee, N.I.T. Raipur. ( No./ NITRR/S- /2008/2557 Raipur, dated 25-08-08 )24. Member, for the committee constituted for checking the various works submitted by M/s NBCC Ltd New Delhi for

    N.I.T. Raipur. (No. 3540/NITRR/CC/Registrar/2009 Raipur, dated 8-11-08)

    25.Arranged the End semester examination successfully in Hostel because of adverse. Condition aroused dueDistrict Administration takes the possession of main building. (No. NITRR/ R-1 /2008/3515 Raipur, dated 06-11-

    08 )

    26. Member, Enquiry Committee for state office. (No. 3869/NITRR/S-/Order /2008 Raipur, dated 13-12-08 )27. Member, Works Committee of N. I. T. Raipur. (No. DP & D/2009 Raipur, Dated 27-11-09 )28. Member, for the committee constituted for deciding the faculty requirement at N. I. T. Raipur (No. NITRR/ S-1/2009/4184 Raipur, dated 09-01-2009 ).29. Committee Head for Electika 2009 for venue and stage committee. (No. NITRR/CC/2009/4891 Raipur, dated

    14-03-09 )

    30. Member, Sate Technical Agency, for Pradhan Mantri Gram Sadak Yojana. Evaluated more than Two hundredDetailed Project Reports for Durg and Kanker District of Chhattisgarh ( from 2006 to 2008).

    21.0 Others Assignments

    4. Observer for M.P. P.E.T/P.M.T.5. Valuation Officer for Chhattisgarh P.E.T. and P.M.T -2002.6. Paper Setter for Various Universities.7. Assistant Valuation Officer for Central Valuation R.S.U.Raipur.8. Member, Counselling Committee for admissions to Engineering Colleges.9. Member, Department Admission Committee Civil Engineering.10. Professor In charge Gardens and Water Supply.11. Examination Invigilation for R S U and Other Examinations.12. Recognised Appl ied DACUM Faci lit ator by Canada India Institute-Industry Linkage Project and MHRD

    New Delhi.

    13. Reseach Project Evaluator for Chhattisgarh Council of Science and Technology. (No 494/CGOST Dated 07-06-2007 and No 1404/CGOST Dated 28-02-2008).

    14. Team Leader for BALCO Chimney ( 275 m high) Collapse Investigation.22.0 Membershi p of Profess ional Bodies

    1. Member Institution of Engineers (India) (M / 126287 / 9)2. Member Indian Society for Technical Education. (LM-16694)

    23.0 Advisor / Subject Expert s / Member in diff erent selection Boards

    1. Expert for recruitment of Assistant Professor (Structures) at I.G.K.V. Raipur.2. Expert for recruitment ofAssistant Directors and Assistant Engineers by Chhattisgarh Public Service

    Commission Raipur. [No. 202 Raipur Dated 18-07-2005]

    3. Expert for recruitment of Professor, Readers and Lecturer forC.S.V.T.U. Bhi lai.4. Advisor for Interview board ofStaff Selection Commission, for Recruitment of Junior Engineer Civil in

    2004.

    5. Advisor for Interview board ofStaff Selection Commission, for Recruitment of Junior Engineer Civil in2008. (F.No. 3/10/2007-Exam(MRP) /07 Dated 4-2-2009)

    6. Subject Expert for recruitment of Professor, Readers and Lecturer for C.S.V.T.U. Bhi lai. ( No 257 Dated 01-02-2008, No 310 Dated 06-02-2008, No 710 Dated 26-03-2008, No 711 and Dated 26-03-2008)

    7. Member interview Board for contract lecturer, Applied Mechanics NIT Raipur. ( NITRR/ Recruitment /2007/4171 Raipur, dated 08-09-07).

    8. Member for Recruitment of Lecturers (Civil) on contract basis at N. I. T. Raipur (No. /NITRR/Recruitment /S-42/2007/ 4201 Raipur Dated 11-09-2007).

    9. Member interview Board for contract lecturer, Applied Mechanics NIT Raipur. ( NITRR/ Recruitment /2007/4171 Raipur, dated 08-09-07)

    10. Member for Recruitment of Lecturers (Chemistry) on contract basis at N. I. T. Raipur (No. /NITRR/Recruitment/S-79/2008/ 265 Raipur Dated 02-07-2008).

    11. Subject Export for Selection Junior Engineers & Assistant Engineers (Civil), Chhattisgarh Electricity BoardRaipur.

    12.Advisor of the interview, Staff Selection Commission for Recruitment of Junior Engineers (Civil ) ( F. No.03/10/2007 Exam dated 04-02-09)

    13. Chairman of selection Board for contract lecturer in Civil Engineering at N.I.T. Raipur( 2009)24.0 Testing and Consul tancy

  • 7/29/2019 Rk t Biodata

    10/16

    Actively engaged in the Testing and Consultancy work for the Institution. Structural Consultant for more than

    HUNDRED projects and generated more 40.00 Lacs Rupees.

  • 7/29/2019 Rk t Biodata

    11/16

    (List of Consultancy Project Enclosed.)

    List of some of the Consultancy Projects successfully completedS.No

    Details of the Consul tancy Projects Client ConsultancyAmou nt Rs. (In

    Thousands)

    Remark

    1. Load Testing of Indian Grain Storage InstituteBuilding at Adhartal Jabalpur (M.P.)

    Executive Engineer, Civil,C.P.W.D. Jabalpur

    40.00 Completed

    2. Load Testing of Beams at C.T.O.Building Jabalpur

    (M.P.).

    Executive Engineer, Civil Wing,

    D.O.T. Jabalpur

    12.00 Completed

    3. Construction of Retaining Wall at Krashhi UpajMandi Nawapara (Rajim).

    Secretary, K.U.M., Nawapara(Rajim)

    5.00 Completed

    4. Construction of Overhead Water Tank at KrashhiUpaj Mandi Nawapara (Rajim).

    Secretary, K.U.M., Nawapara(Rajim)

    5.00 Completed

    5. Checking of foundation Design of Ware HousingCorporation Shed at Dhamtari. (C.G.)

    Manager, M.P.W.H.C.Dhamtari

    10.00 Completed

    6. Upgradation of 100 Bedded to 300 Bedded HospitalBuilding at Raigarh phase-I (C.G.). (C. No. 198292Dt 24-2-01) (P. No. 257)

    Executive Engineer, P.W.D. (B &R) Div. Raigarh, Raigarh (C.G)

    60.00 Completed(October-2002)

    7. Upgradation of Komal Dev Hospital Building atKanker phase-I (C.G.) (C. No. 22771 Dt. 8-4-01)(P. No. 258)

    Executive Engineer, P.W.D. (B &R) Div.- Kanker, Kanker (C.G.)

    72.00 Completed(October-2002)

    8. Upgradation of P.H.C. Building at Berla (C.G.) (C.

    No. C 090408 Dt. 30-10-01 & C. No. C 09587 Dt. 9-7-02) (P. No.)

    Executive Engineer, P.W.D. (B &

    R) Division Bemetra (C.G.)

    34.50

    (13.45+21.05)

    Completed

    (September-2002)

    9. Jila Panchayat Building at Korba (C.G.) (C. No. B040671 Dt. 24-12-01) (P. No. 255)

    Executive Engineer, P.W.D. (B &R) Div. Korba (C.G.)

    31.305 Completed(October -2002)

    10. Construction of Cement Concrete Road in IndustrialArea from Sarora to Bana. (C. No. 906990 Dt. 8-11-01) (P. No. 277)

    Upper Managing Director, C. G.State Industrial CorporationRaipur (C.G.)

    70.25 Completed(April -2002)

    11. Construction of 100 Bedded Hospital at Saraipali(Mahasamund) (C.No. C 033055 Dt. 20-8-2001)

    Executive Engineer, P.W.D. (B &R) Div. Mahasamund (C.G.)

    212.50 Completed(November-

    2002)

    12. Construction of Central Valuation Building at Pt. R.S. Vishwavidhyalaya Raipur (C.G.) (C.No. 904525Dt. 2-3-2002)

    University EngineerPt. R.S.V. Raipur (C.G.)

    76.25 Completed(November-

    2002

    13.Construction of Central Semen Centre Building atAnjora District Durg (C.G.) (C. No. C 062865 Dt. 6-2-2002) (P. No. 299)

    Executive Engineer, P.W.D. (B &R) Div.- Durg, (C. G.)

    53.07 Completed(July 2002)

    14. Upgradation of P.H.C. to 30 Bedded HospitalBuilding at Churia (C.G.) (C.No. 004357 Dt. 6-2-2 &C.No.718981 Dt. 17-05-02) (p. No. 300)

    Executive Engineer, P.W.D. (B &R) Div.- Khairagah

    43.80(16.66+27.14)

    Completed(December -

    2002)

    15. Construction of Hospital Building at Arjunda DistrictDurg (C.G.) (C. No. 070923, Dt. 24-10-2002) (P.No. )

    Sub-Divisional Officer, P.W.D. (B& R) Sub. Div-1 Durg

    50.00 Completed(December -

    2002)

    16. Design of Entrance Porch for D.K.S. MantralayaBuilding Raipur. (C. No. Dt. ) (P. No. )

    Executive Engineer, P.W.D. (B &R) Div.-1 Raipur, (C.G.)

    5.00 Completed

    17. Construction of 40 KL Overhead Water Tank 10.00mts staging at Village Demar Distt Durg (C.G.).(Cash, Dt. 29-7-02).

    M/S K. K. Bhardwaj, Contractor,Arang (C.G.)

    5.00 Completed(August-2002)

    18. Construction of 70 KL Overhead Water Tank 12.00mts staging at Village Mahud Distt Durg(C.G.),(Cash, Dt 6-9-02)(P. No.399)

    M/S K. K. Bhardwaj, Contractor,Arang (C.G.)

    5.00 Completed(September-2002)

    19. Construction of I-Type Quarters for MadhyamikShikshha Mandal Raipur. (C. No. Dt. ) (P. No. )

    Executive Engineer, P.W.D. (B &R) Div. Raipur, (C.G.)

    5.00 Completed

    20. Construction of 100 Bedded Hospital atBhopalpatnam (Chhattisgarh). (Foundation DesignOnly) (D.D. No.270515, Dt. 25-10-02) (P. No. )

    Executive Engineer, P.W.D. (B &R) Div. West Baster Bijapur(C.G)

    62.50 Completed(October -2002)

    21. Construction of 100 Bedded Hospital at KharasiaDistrict Kharasia. (Cheque No. 657163, Dt. 3-6-02)

    Executive Engineer, P.W.D. (B &R) Div. Raigarh, Raigarh (C.G.)

    236.00 Completed

    22. Construction of 50 Bedded Hospital at Dhamtari(C.G.) (C.No. C 750931, Dt. 30-9-2001)

    Executive Engineer, P.W.D. (B &R) Div.-1 Dhamtari

    40.00 Completed(October -2002)

    23. Construction of II-floor above old Cancer wing atD.K.S. Bhawan Mantralaya, Raipur. (C. No. 06388,

    Executive Engineer, P.W.D. (B &R) Div-1 Raipur (C.G.)

    33.60 Completed(November

  • 7/29/2019 Rk t Biodata

    12/16

    Dt. 27-1-03) (P. No. 250) 2003)

    24. Design of Water Supply Scheme and DistributionNetwork with pumping requirements. (C. No. Dt. )(P. No. 406)

    Executive Engineer, P.W.D. (B &R) Div-1 Raipur (C.G.)

    28.00 Completed(July-2002)

    25. Office Building for Director Physical Education (C.No. 900179, Dt. 26-11-02) (P. No. 405)

    University Engineer, Pt. R.S.V.Raipur (C.G.)

    10.00 Completed

    26. Horizontal Expansion of Computer ScienceDepartment Building. (C. No. 900179, Dt. 26-11-02)(P. No. 404)

    University Engineer, Pt. R.S.V.Raipur (C.G.)

    22.86 Completed

    27. Design of Distribution Network for KhamtaraiOverhead Water Distribution Tank. (C. No. 080960,

    Dt. 4-12-02) (P. No. 403)

    Executive Engineer, P.H.E.D.,Project Div. Raipur (C.G.)

    48.00 Completed(July-2003)

    28. Design of Concrete Road (Ringroad-Sundernagar-Amapara-Telghaninaka-Khalbada). (Cheque No.131419, Dt. 25-4-03)

    Executive Engineer, P.W.D. (B &R) Div-1 Raipur (C.G.)

    50.00 Completed(May-2003)

    29. Construction of Corridor and Staircase at High CourtBuilding at Bilaspur (C.G.) (Design Checking) (C.N0.b073429, Dt. 20-2-03) (P. No. 400)

    Executive Engineer, P.W.D. (B &R) Div.1-Bilaspur, Bilaspur(C.G.)

    18.00 Completed(Mach-2003)

    30. Central Panel Building over existing R.M.S. Buildingat Raigarh Railway Station. (C.No. 059955, Dt. 1-8-2003) (P. No. 2/248)

    Dy. C.S.T.E. /C/BSP, South EastCentral Railway Bilaspur (C.G.)

    20.00 Completed(August-2003)

    31. Housing Scheme of Rajiv Nirdhan Awas Yojna,Municipal Council Dhamtari (C.G.). (Cash Dt. 19-9-03)

    M/S Anand and Associates,Near Church, Bastar RoadDhamtari (C.G.)

    6.40 Completed(September-

    2003)

    32. Construction of I.T.I. Building at Sanjari. (C.No.071835, Dt. 4-2-2003) (C. No. Dt. ) (P. No. ) Executive Engineer, P.W.D. (B &R) Div.Balod, (C.G.) 90.00 Completed

    33. Construction of I.T.I. Hostel Building at Sanjari.(C.No. 071835, Dt. 4-2-2003)

    Executive Engineer, P.W.D. (B &R) Div.Balod, (C.G.)

    75.00 Completed

    34. Construction of 70 KL Capacity Water Reservoir(12.00 M staging) at Bhanwarpur, Block Basna,Distt. Mahasamund (C.G.) (Cash Dt. 6-10-03) (P.No. 2/245)

    M/S Ranjeet Singh Saluja,Basna. Distt. Mahasamund(C.G)

    5.80 Completed(October-2003)

    35. Design of Cement Concrete Road (Shahid VirNarayan Singh Marg) in Municipal Council Bhilai.(C.No. 8248482, Dt. 26-9-03) (P. No. 2/247)

    Commissioner, MunicipalCorporation Bhiali, Distt. Durg(C.G)

    30.00 Completed(November-

    2003)

    36. Construction of Auditorium at Vidhan SabhaPremises at Raipur, (C.G.) (C.No. 088340, Dt. 21-02-03) (P. No. 407)

    Executive Engineer, P.W.D. (B &R) Div.Vidhan Sabha, (C.G.)

    50.875 Completed(December-2003)

    37. Bridge load test for KOTA-LORMI-PANDARIA Roadat Agar River near Chilfi. (Two different span have

    been tested)

    Executive Engineer, P.W.D.(Bridge Construction) Div.

    Bilaspur, (C.G.)

    32.00 Completed

    38. Extension of Bombay Market Building of RaipurDevelopment Authority at G.E. Road Raipur.

    Executive Engineer, Raipur

    Development Authority, Raipur,(C.G.)

    18.00 Completed

    39. Design of 6.0 M diameter Intake well cum Sumpwell for Kumahari Water Supply Scheme KumhariDistt Durg (C.G.)

    Executive Engineer, P.H.E.D.,Project Div. Durg (C.G.)

    16.00 Completed[20-06-2005]

    40. Design of flexible-pavement for Nehru Nagar(Bhilai) Roads

    Executive Engineer, BhilaiMunicipal Corporation, Bhilai .Durg (C.G.)

    35.00 Completed

    41. Design of flexible-pavement for Nehru Nagar(Bhilai) Roads

    Executive Engineer, BhilaiMunicipal Corporation, Bhilai .

    Durg (C.G.)

    35.00 Completed

    42. Construction of Gokul Nagar at Bhilai, Distt Durg(C.G.)

    Executive Engineer, BhilaiMunicipal Corporation, Bhilai .Durg (C.G.)

    55.00 Completed

    43. Design of R.C.C. Road and field visits Chief Municipal Officer, NagarPanchayat Ahiwara; Distt.-Durg

    40.00 Completed inJune 2005

    44. Structural Design Approval for Weigh-BridgeFoundation. (OPEN FOUNDATION)

    Regional Manager, LeotronicScales Private Ltd. 47, FirstFloor, Hide Market, Amritsor-143001(India)[26-02-2007]

    10.00 Completed inMarch 2007

    45. Structural Design Approval for Weigh-BridgeFoundation. (Pile Foundation)

    Regional Manager, LeotronicScales Private Ltd. 47, FirstFloor, Hide Market, Amritsor-

    10.00 Completed inMarch 2007

  • 7/29/2019 Rk t Biodata

    13/16

    143001(India) )[28-02-2007]

    46. Structural Design and Drawings for 200 seated GirlsHostel Building at Government Engineering CollegeRaipur

    Executive Engineer, P.W.D.Division No-1, Raipur, (C.G.)

    274.680 Completed inAugust 2006

    47. Design for Cement Concrete Pavements proposedto be built-up at Sakti, in Janjgir Dist. For NagarPalika Parishad, Sakti.

    Commissioner, Nagar PalikaParishad, Sakti; Distt. Janjgir(C.G.)

    50.00 Completed in

    48. Site Visit for Inspection for assessing the sitecondition and suggesting suitable test

    Chief Executive Officer, RaipurDevelopment Agency Raipur.[11-10-2006]

    5.00 Completed inOctober 2006

    49. Inspection of Damaged Roads and Embankment atIndustrial Area Bhilai

    Executive Engineer, C.S.I.D.C.

    Raipur (C.G.)

    5.00 Completed in

    50. Design of Overhead Tank of one lakh litre capacityand Under Ground Sump in the Campus of JawaharNavodaya Vidhyalaya Campus Kurud Distt-Dhamtari.

    Assistant Engineer, RaipurCentral Sub Division, C.P.W.D.Raipur (C.G.)

    15.00 Completed inJan 2007

    51. Structural Design for terminal Bus Stand Building atRaipur

    Executive Engineer, RaipurDevelopment Authority, Raipur,(C.G.)

    50.00 Completed inDec 2007

    52. Design and drawing of Buildings for ShayamaPrasad Mukharjee Awas Yojana

    Assistant Engineer, RaipurDevelopment Authority, Raipur,(C.G.)[ 1840: 13-12-2007]

    20.00 Completed in22-12-2007

    53. Design of R.C.C. Pavement for 24.00 m wide Roadat Kabir Nagar Raipur

    Assistant Engineer, Sub DivisionNo. 1, C.G. Housing BoardRaipur

    55.00 Completed inDec 2007

    54. Opinion for suitability of Foundation for SwitchingStation at Bhilai Steel Plant, Bhilai (Durg)

    Siemans Ltd., Plot No.2, Sector-2, Kharghar Node, Navi Mumbai[21-04-2008]

    5.00 Completed inApril 2008

    55. Design of Woman Commercial Complex at IndustrialArea Tifra Bilaspur (C.G.)

    Executive Engineer, C.S.I.D.C.Raipur (C.G.)

    33.00 Completed inMay 2008

    56. Design of Cement Concrete Pavements for differentsoil and different road width to be constructed atdifferent colonies

    Executive Engineer, P.W.D.Division No-1, Raipur, (C.G.)

    287.00 Completed inSep 2008

    57. Structural Drawings for the Construction of 42Buildings under Atal Awas Yojana (Revised)

    Executive Engineer, ProjectDivision, C.G. Housing BoardRajnandgaon. [6152: 23-12-08]

    15.00 Completed on16-03-2009

    58. Suitability Report for Installation of VSAT Disc The Additional Chief ExecutiveOffucer, CHIPS, D.K.S.Bhawan

    Mantralaya Raipur

    13.350 Completed on24-03-2009

    59. R.C.C. Structural Drawing and Design of TransportNagar Rawabhata (Construction of Small Shops)

    Executive Engineer, Raipur

    Development Authority, Raipur,(C.G.)

    55.00 Completed on

    31-12-2009

    60. Proof Checking for Reconstruction of H.L. Bridge inKm14/2 (Chhokra Nalla) including approaches onNH -200 (Agreement No. 14 DL 2008-09)

    Executive Engineer, NationalHighway Division No.II,P.D.W.Raipur. [1774: 29-06-09]

    15.000 Completed on17-08-2009

    61. Checking of DrawingDesign of water TreatmentPlant at Dongargarh under Dongargarh Watersupply scheme.

    Executive Engineer, P.H.E.Division, Rajnandgaon. [3493: 1-07-09]

    60.00 Completed on29-09-2009

    62. Visit of Technical Team at Balco Plant Site Korba toinvestigate the collapse of 275 M High RCCChimney

    The Superintendent of Police,District Korba (Chhattisgarh)

    20.00 Completed on12-10-2009

    63. Proof Checking of Drawings-Design of Load TestArrangements of Bridge across sita nadi Bridge inKm 3/6 on Belargaon Ghurawar Road

    Executive Engineer, P.D.W.

    Bridge Division, Raipur. [4527:06-10-09]

    15.00 Completed on

    14-10-2009

    64. Design of 100 Kl Overhead Water Tank at 10.0 mStaging at Krisi Upaj Mandi Bilaspur

    Executive Engineer, Krasi UpajMandi Bilaspur

    15.00 Completed on30-12-2009

    65. Checking of DrawingDesign of 4.5 MLD waterTreatment Plant at Dongargarh under Water supplyscheme.

    Executive Engineer, P.H.E.Division, Rajnandgaon (C.G.) 60.00

    Completed on29-09-2009

    66. Checking of DrawingDesign of 4.5 MLD waterTreatment Plant at Champa under Water supplyscheme.

    Executive Engineer, P.H.E.Division, 60.00

    Completed on23-10-2010

    67. Checking of DrawingDesign of 1.31 MLD waterTreatment Plant at Kusmi under Water supplyscheme. [ (271:01-07-2009) (R/vr No 198: 07-07-

    Executive Engineer, P.H.E.Division, Ambikapur. [(2447: 30-06-09)(C.No. A 237322:4-7-

    26.25

    Completed on25-10-2010

  • 7/29/2019 Rk t Biodata

    14/16

    09: Rs 162349.00} 2009)]

    68. Checking of DrawingDesign of 1.90 MLD waterTreatment Plant at Balrampur under Water supplyscheme. [ (271:01-07-2009) (R/vr No 198: 07-07-09: Rs 162349.00}

    Executive Engineer, P.H.E.Division, Ambikapur. [(2445: 30-06-09)(C.No. A 237322:4-7-2009)]

    53.438 Completed on25-10-2010

    69. Checking of RCC DesignDrawing of variouscomponents for construction of extension andimprovement of 12.0 MLD to 17.50 MLD waterTreatment Plant under Ambikapur AugmentationWater supply scheme Distt Surguja. [ (271:01-07-2009) (R/vr No 198: 07-07-09: Rs 162349.00}

    Executive Engineer, P.H.E.Division, Ambikapur. [2443: 30-06-09)(C.No. A 237322:4-7-2009)]

    67.50 Completed on23-10-2010

    70. Checking of DrawingDesign of water TreatmentPlant at Rajnandgaon under Water supply scheme

    Executive Engineer, P.H.E.Division, Rajnandgaon. [2443:30-06-09]

    Note:

    All above mentioned project s were handled by t he Consul tan t. No Sub Consult ant was involved in all above mentioned Projects.

    S.NO.

    Name of Client Ref. No./ Date

    DetailsBill No /

    DateReceipt

    No. / Date

    TestNo. Report

    Amount(Rs in

    Thousands)

    1. The Executive Engineer PHEDProject Division Raipur

    Concrete Mix Design M-30 and M-35

    6167

    24-12-01

    62010 /70

    24-01-01

    367-2002

    7139

    14-02-0213.00

    2. M/S Sathipal (India ) Ltd. MonetPower Ltd. Mandir Hasand ,Raipur

    Concrete Mix Design M-25 and M-30

    163402.07.02

    18407- 89.02.07.02

    RT -/07/0

    1

    242301.10.02

    13.00

    3. Prasad and Company (ProjectWorks) Limited, Site Office TulsiBhawan, Kharsiya (CG).

    PSD/TW/CG/02/ 107,Raipur,27-05-2002

    Concrete Mix Design forM10, M15, M20, M25,M30, M35, M40 gradesfor CC/RCC work ofShakti and Kharsiyabranch canal system

    334718-10-02

    18882- 0718-10-02

    RT/MKV/569 3583

    28-10-0230.00

    4. M/S GANNON DUNKERLEY &CO. LTD., Merchants Engineersand Contractors , EROSapartments (7th Floor) 56, Nehru

    Place,NEW DELHI 110019

    NEW, Siltara6-01-03

    Concrete Mix Design ofHRC for M30 grade

    444706-01-02

    1889606-01- 03

    RT/BLAST

    _FURNACE

    /01( 847 -2003)

    586510-02-03

    10.00

    5. Mr. Suresh Khosla, RailwayContractor, Station Pura, P. O.Mahasamund; Mahasamund(CG).

    NIL,21-02-2003

    Concrete Mix Design forM25 grade for Br-74 atKm 39/1-2 on R. V. lineunder Sr. DEN/W SERly-SBP

    609621-02-03

    18897-6221-02-03

    927-2003

    14108-04-03

    8.00

    6. THE EXECUTIVE ENGINEER, P.W. D. DIVISION-1; RAIPUR(C.G.)

    Nil;12-05-03

    M-35 Concrete MixDesign for Constructionof Cement ConcreteRoad in Raipur City

    65313-05-03

    18315-3213-05-03

    1015-2003 1080

    13-06-038.00

    7. The Executive Engineer,Public Health Engineering

    Department; G. W. R. DivisionDurg (CG).

    Q/EE/W.R./D.N./ DURG/03,

    18-09-2003.

    Concrete Mix Design forM25 grade for:

    Construction of WaterTreatment Plant atKumhari

    352619-09-03

    19246 /

    1007-10-03

    2257-2003

    497822-12-04 13.55

    8. THE SUB DIVISIONAL OFFICER;P. W. D. BRIDGECONSTRUCTION SUBDIVISION; RAIPUR (C.G.)

    1369/Tech/Raipur;11-12-03

    M-35 Concrete MixDesign for Constructionof Submersible/ Highlevel Bridge acrossPAIRI River on RajimRoad in km 3/6

    497622-12-03

    19248 /64

    22-12-03

    2333-2003 6268

    26-02-048.00

    9. M/S SIMPLEX CONCRETEPILES (INDIA) LIMITED, INDIRABIHAR, T. P. NAGAR, NEARDURGA DHARAMKANTA;

    SS/SCP/1962/43,Dated: 12-3-2004

    Concrete Mix Design forM15 grade ( with MSA40 mm) and M30 grade(with MSA 20 mm).

    718515-03-04

    19584 /65

    13-03-04

    2529-2004 69

    5-4-200416.00

  • 7/29/2019 Rk t Biodata

    15/16

    KORBA-495677 (CG).

    10. The Sub Divisional Officer, P. W.D. (Bridge Construction) Raipur(CG).

    867 /T;18-06-2004

    Concrete Mix Design forM-25, M-30 and M-35grade.

    2665

    11. M/S ASHA ENTERPRISES PVT.LTD., B 602 ASHOKA RATNAVIP ROAD; RAIPUR- (CG).

    NIL,07-1-2005

    Concrete Mix Design forM-20 grade

    14607-01-05

    19836 /61

    07-01-05

    92-2004

    8403-03-05

    8.00

    12. The Deputy General Manager,National Building ConstructionCorporation Ltd.; 2x 250 MwThermal Power Project, KORWA

    (East)- C.G.-495677

    NBCC/DGM/KRB/38406-06-2005.

    Concrete Mix Design forM-25 and M-30 GradeConcrete for grade 2x250Mw Thermal Power

    Project, KORWA (East)-.

    632

    07-06-05

    47014 /89

    08-06-05

    378-2005

    819

    18-07-0524.244

    13. The Executive Engineer,P.W.D.Vidhan Sabha Division,Raipur (C.G.) 495677

    150/-2/05-06Raipur, 16-01-2006

    M-30 Concrete MixDesign for Bhumia-Lakhana-Somnath road

    13312.01.06

    -64-

    2006558

    16.3.0610.00

    14. The Sub Divisional Officer P. W.D. (Bridge Construction SubDivision)Raipur (CG).

    Q / Tech /R.O.B.Bhatapara13-2-2006.

    M-25, Concrete MixDesign for Const. of R.O. B. at Bhatapara inKM 763/17-19 on MubailHawarh Rail Line

    110-2006

    15. The XEN / Con / II / RO/O Dy Chief EngineerS. E. CENTRAL RAILWAY Raipur(CG).

    DCE/DRG/ROB-DUG/SPL25-03-2006

    Concrete Mix Design forConstruction of RoadOver Bridge at DURG

    231-2006

    16. M/S JAISWAL BUILDERS &CONTRACTORS

    C-7, Sector 2, Devendra Nagar,Raipur (CG).

    NIL 5-05-2006

    M-20 and M-30,Concrete Mix Design for

    Major Building Works atRaipur

    797

    08.05.06

    47158/70

    8.05.06

    262-2006 940

    02.06.0620.00

    17. The Chief Executive OfficerRaipur Development AuthorityRaipur (Chhattisgarh)

    01286/ C-2005 / 28 /rda/ Raipur,29-12-2006

    Design of M-30 GradeConcrete for CementConcrete Road

    161224.11.20

    06

    47228/17/19836

    24.11.06

    788-2006

    18.00

    18. The Deputy Project Manager,Simplex Infrastructures Limited,LIPL Project Chhattisgarh

    012/LAFARGE S /Test / Vol-I /001 / 129-12-2006

    Mix Design M-20, M-25AND M-30 for CivilConstruction Packagefor New Clinker Line atSonadih LIPL Project

    180029.12.20

    06

    47229/1829.12.06

    855-2006

    4247.3.2007

    31.25

    19. The Deputy Project Manager,Simplex Infrastructures Limited,LIPL Project Chhattisgarh

    Mix Design M-35 for

    Civil ConstructionPackage for New ClinkerLine at Sonadih LIPLProject

    1303.01.20

    07

    47229/254.01.2007

    863-

    2007 4257.3.2007

    33.90

    20. The Project Manager (C),N. B. C. CORPORATIONLIMITED; DENTAL COLLEGEWORKS, Rajbbandha MaidanRaipur (Chhattisgarh)

    NBCC/DC(RPR)/06/09/315(b)24-05-2007

    Design Mix (M-20Grade) for Constructionof Government DentalCollege at Raipur(Chhattisgarh).

    79728.05.07

    47325/1121.05.07

    1188-2007

    9409.7.2007

    10.00

    21. The Sr. Manager (FQA),NTPC LIMITED, Sipat Zone -495006Distt. : Bilaspur (Chhattisgarh)

    NTPC/FQA/C.W. DUCT,Stage-114-5-2007.

    Cement Concrete MixDesign (Grade M-20 ). 755

    11.05.0747325/9415.05..07

    1259-2007 1078

    31.08.0710.00

    22. The Sr. Manager (FQA),NTPC LIMITED, Sipat Zone -495006Distt. : Bilaspur (Chhattisgarh)

    NTPC/FQA/C.

    W. DUCT,Stage-114-5-2007.

    Cement Concrete Mix

    Design (Grade M-25 ). 96717.07.07

    47325/9315.05..07

    1259-

    2007 104813.08.07

    10.00

    23. The Executive EngineerP.W.D. Vidhan Sabha Division

    RaipurDistt. : Raipur (Chhattisgarh)

    No.: 3658 /Raipur 20-

    07-2007

    Cement Concrete MixDesign (Grade M-30)

    for Bhanpuri InternalRoad. (Agreement No.97/D.L. year 2006-07)

    105322.08.07

    44326/3323.08.07

    1292-2007

    11804.10.07

    10.00

    24. M/S SIEMENS,Camp: Bhilai Steel Plant Bhilai,Distt. : Durg (Chhattisgarh)

    SIEMENS /BH / 07 /0312-10-2007

    Installation of 220 KVSwitch Yard in BhilaiSteel Plant. [CementConcrete Mix Design(Grade M-20 and M-25)]

    122613.10.07

    47433/1313.10.07

    13035.11.07

    16.00

  • 7/29/2019 Rk t Biodata

    16/16

    25. The Senior Project Manager,Simplex Infrastructures Limited,Velocity Shopping Mall, NearMahalaxmi Market Pandri, Raipur(Chhattisgarh)

    SIL / 2124 /CON / NIT /Vol. 1 / 00102-01-2007.

    Design Mix (M-35Grade) for Constructionof Velocity ShoppingMall, Near MahalaxmiMarket Pandri Raipur(Chhattisgarh).

    26. M/S I V R C L ; Infrastructures &Projects Limited, C-170,Shailendra Nagar, Katora Talab,Raipur (C.G.)

    NIL,22-01-2008

    Design Mix M15, M-25, M- 30 and M-40 forState Secretariat CapitalComplex. (W.O.No.1503/NCC/CC/ 12.24/

    3.2.96/ NRDA/2007Raipur Dated 28-12-2007)

    1667 /22-01-08

    47037/42. 24/01/08

    37_

    2008

    1783.19.02.08

    39.00

    27. The Senior Project Manager,Simplex Infrastructures Limited,

    Velocity Shopping Mall, NearMahalaxmi Market Pandri, Raipur(Chhattisgarh)

    47436/28. 5/3/08

    104_

    2008 4808/03/08

    22.00

    28. M/S S. K. CONSTRUCTION CO.148 A. P. R. Katanga Colony,Narmada Road; Jabalpur-482001(M.P.)

    NIL,15-04-2008.

    Design Mix for M-25 andM-30. for 3200 KLCapacity ElevatedService Reservoir atKabir Nagar KotaRAIPUR.

    8516.04.08

    47440/3217.04.08

    185_

    2008 3747-7-08

    16.00

    29. M/S A.C.C. LimitedSales Unit, Madina Manzil ( ISTFLOOR), Medical College RoadRaipur-492001 (C.G.)

    NIL,16-04-2008.

    Mix Design for M-35Grade Concrete 92

    16-04-0847440/33

    187_

    200849 CED14/05/08

    11.00

    30. The City Head Sales andMarketing,ULTRATECH CEMENTLIMITED; 1ST Floor, CrystalTowers, G.E. Road, TelbandhaRaipur- (C.G.)

    UTCLON/RPR/BKS/08-09/06,19-04-2008

    Mix Design for M-20, M-25 and M-30 GradeConcrete.

    304_

    2008

    31. HSCC (INDIA) LIMITEDAIIMS Project Site KabirNagarRaipur- (C.G.)

    No.:HSCC/RAIPUR/aims/004,Dated:

    23-09-2008.

    Construction of HousingComplex for AIIMS likeInstitution at Raipurunder PMSSY scheme-

    Mix Design for M-25concrete

    464_

    200810.00

    32. The Executive Engineer,Raipur Central DivisionCentral P. W. D.Raipur (Chhattisgarh)

    No.: A.G./Test./ camp/2008/ 54;RaipurDated:18-11-8

    Design Mix (M-25) forConstruction of OfficeBuilding for A.G.(C.G) atRaipur (Agreement No.46/EE/RCD/06-07).

    2009

    10.00

    33. The Sub Divisional Officer,P. W. D. Bridge Construction Sub

    Division No. 1,Raipur (Chhattisgarh)

    No.: 391/Tech/ Mahanadi

    Rajim; Dated:05-01-2009

    Mahanadi bridge onRaipur-Gariyaband road

    (Agg. No. 15/DL of 2008-9 ) Design Mix (M-25, M-30 and M-35 Grade).

    2009

    34.35.