rlb rider's digest (phils.) 2013

Upload: dennis-landicho

Post on 07-Jul-2018

291 views

Category:

Documents


4 download

TRANSCRIPT

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    1/137

    RLB|Rider Levett Bucknall

    PHILIPPINES 2013

    RIDERS

    DIGEST

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    2/137

    Instantcost dataon the spot

    Rider Levett Bucknallsmartphone app

    The fastest way to get the

    latest construction cost

    information right at your fngertips

    www.rlb.com/app

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    3/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    4/137

    Rider Levett Bucknall Philippines 2013 i

    Riders Digest Philippines 2013

     A compilation of cost data and related information onthe Construction Industry in the Philippines.

    Compiled byRider Levett Bucknall Philippines

    Main Ofce:Building 3, Corazon Clemeña Compound#54 Danny Floro Street, Bagong Ilog,Pasig City,

    1600, PhilippinesT: +63 2 687 1075 / 470 0642F: +63 2 5704025E:[email protected], [email protected]

    Cebu Ofce:

    Suite 602, PDI Condominium, Arch. Bishop Reyes Avenue cor. J.Panis Street,Banilad, Cebu City,6014, PhilippinesT: +63 32 268 0072E:[email protected]

    Davao Ofce:Suite 1, Ram-Line Resources Bldg,R. Castillio Street, Agdao District, Davao City,8000, PhilippinesT: +63 082 235 0997

    E: [email protected]

    Rider Levett Bucknall Philippines has endeavoured to ensure the accuracyof the information contained herein, and does not warrant its adequacyor completeness and expressly disclaims any liability for any errors in, oromissions from this Digest. Rider Levett Bucknall Philippines shall not beheld liable for any damages; loss; expenses or costs whatsoever or howso-ever arising out of, or in connection with the use of the Digest. The Digest is

    provided for general information only and should not be construed as cost,legal, tax, or any other professional advice. Professional advice should besought when utilizing any information in this publication to verify its applica-bility to specic construction requirements and circumstances. This Digestmay not, in any medium, be reproduced, published, altered or otherwiseused in whole or in part in any manner without the prior written consent ofRider Levett Bucknall Philippines.

    Cost information in this publication is indicative and for general guidance

    only. All prices and rates are as at 4th Quarter 2012 and expressed in Phil-ippine Peso unless otherwise stated. References to legislative provisionsand regulations are as at 31 December 2012. Changes after these datescannot be reected.

    Fourth Edition 2013Rider Levett Bucknall Philippines

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    5/137

    ii

      Contents

    Disclaimer and Contact Information i

    Table of Contents ii

    Message from

    the Chairman and Managing Director vi

    Quality Policy Statement  1

    Certicate for ISO – 9001:2008  2

    Philippine Construction Trends  4 Number of New ConstructionProjects by Type 5

    Distribution of New ConstructionProjects by Region 5

    Value of Construction

    By Type of Building 6

    Number and Value of ResidentialConstruction 6

    Number and Value of Non-ResidentialConstruction By Type 7

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    6/137

    Rider Levett Bucknall Philippines 2013 iii

    Philippine Construction Cost Data  10

    Denition of Terminology 11

    Building Construction Prices 13

    External Works 15

    Construction Elements 16

    Construction MaterialsWholesale Price Index 21

    Summary of Current RegionalDaily Minimum Wages Rates 23

    Building Services (as of 4th Quarter 2012) 27

    Denition (Building Services) 29

    Ofce Fit-Out, Workstations 31

    Ofce Refurbishment 32

    Hotel Fit-Out 32

    Estimating Data 34

    Reinforcements Ratios 35

     Average ConstructionPayment Drawdown 38

    Vertical Transport Services 39

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    7/137

    iv

      Contents

    International Construction 42

    Building Costs 43

    Specic DenitionsFor International Construction Cost 51

    Construction Market Activity Cycle 52

    Sector Data 53

    Philippine Construction Information 58

    Building for Ecologically ResponsiveDesign Excellence (B.E.R.D.E.) 59

    LEED® Green Building Rating System 67

    Development DataMeasurement of Building Areas 75

    Government System Implemented forPrivate And Public Construction 79

    Primer On Application For Exploration Permit (EP) 82

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    8/137

    Rider Levett Bucknall Philippines 2013 v

     

    Professional Services  90

    Cost Consultancy 91

    Project Management 91

    Special Services 92

    International Ofces 94

     Asia 95

    China 97

    Middle East 102

    Oceania 103

    North America 107

    Europe 111

     Africa 112

    Miscellaneous  114

    Conversion Factors 115

    Calculation Formulae 117

    IDD country codes andtime differences 119

    Philippine Regular Holidays and Special(Non-Working) Holidays 120

     Abridged Business terms 121

    Calendar 126

    Contact Information  127

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    9/137

    vi

    Message from the Chairman and Managing Director 

    Rider Levett Bucknall Philippines proudly presents to

    you the fourth Philippine edition of “Riders Digest” acompilation of cost data and related information on thePhilippine Construction Industry.

    Rider Levett Bucknall Philippines is a member of theRider Hunt, Levett & Bailey, and Bucknall Austin Groupnow RIDER LEVETT BUCKNALL (RLB), with afliates in

    more than 100 ofces in 80 different countries coveringfour Continents namely OCEANIA which covers all of

     Australia and New Zealand, ASIA which covers ThePhilippines, China, Hong Kong, Indonesia, Japan,Korea, Malaysia, Singapore, Taiwan, Thailand andVietnam, EMEA which covers Europe and Middle East,and NORTH AMERICA which covers Phoenix, Boston,Chicago, Denver, Honolulu, New Jersey, Las Vegas,Los Angeles, Florida, Portland Oregon, San Francisco,Seattle, Washington DC, Canada, and now in South

     Africa.

    Our group employs over 3,000 people in its ofces

    across the world integrating local knowledge andexpertise with access to the global network to providethe best and most up to date service our clients deserve.Our open communication and interaction betweenofces transform to greater experience across everysector of the Construction Industry. The Philippine ofceis now operating in its 24th year having commenced ouroperation in 1989.

    We have provided our Quantity Surveying Services andProject/Construction Management on over 710 projectsin The Philippines in Luzon, Visayas and Mindanaofrom Ofce Towers, Residential Condominiums, Hotels,

    Residential Estates, Industrial Development Plants, andInstitutional Schools, Ports and Harbours, Roads andBridges, Airports and Airports Buildings, CommercialCentres, Hospitals, BPO, Land Development Works,Energy, Petrochemical and Mining to include overseasprojects within the Pacic Rim including Guam, Saipan,Palau, Hawaii, Australia, Malaysia, Vietnam, and as faras the Middle East, Pakistan and Syria.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    10/137

    Rider Levett Bucknall Philippines 2013 vii

    Our corporate vision is to be the leading global practicein our respective market and deliver sustainable andcompetitive advantage to our clients through the passion

    of our people and focused on integrity, professionalism,innovation, team work and client satisfaction. We haveadopted our core values, together with our globalnetwork and in-depth knowledge that made Rider LevettBucknall Philippines unique in providing quality servicesto our client.

    Our combined experience and expertise enables usto provide excellent and efcient service in business,protect our integrity and capacity and optimize useof resources and create maximum performance andvalue throughout the life cycle of a project. Rider LevettBucknall Philippines is committed to develop tools andtechniques to help our clients save costs and yet sustainexpected results not only at present but also in the future.

    The entire RIDER LEVETT BUCKNALL Group ensuresthat a signicant fund shall be allocated for research anddevelopment programs for our own IT tools and developtraining to maintain quality staff performance within our

    group.

    Publication of our Riders Digest, International Report onConstruction Market Intelligence from our global networkof ofces will continue to be benecial to our clients byproviding professional input, advisory experts, and valueadded services to our clients. As key resources in theInternational Construction Industry, these will prioritizebenchmarking of construction and services throughoutthe International market.

    Rider Levett Bucknall Philippines hopes that you ndthis publication informative and useful, and will aid in the

    successful completion of your construction needs.

    Corazon Clemeña Ballard

    Chairman & Managing Director Rider Levett Bucknall Philippines

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    11/137

    1

    QUALITY POLICY STATEMENT

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    12/137

    Rider Levett Bucknall Philippines 2013 2

    ISO CERTIFICATE

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    13/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    14/137

    Philippine Construction

    TrendsNumber of New Construction Projects by Region

    Distribution of New Construction Projects by Region

    Value of Construction by Type of BuildingNumber and Value of Residential Construction

    Number and Value of Non-ResidentialConstruction by Type

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    15/137

    PHILIPPINE CONSTRUCTION TRENDS

    5

    Number of New Construction Projects by TypeFourth Quarter, 2012 and 2011

    Distribution of New Construction Projects by RegionFourth Quarter 2012

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    16/137

    Rider Levett Bucknall Philippines 2013 6

    Value of Construction by Type of BuildingFourth Quarter, 2012 and 2011

    Number and Value of Residential Construction

    Fourth Quarter 2012

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    17/137

    PHILIPPINE CONSTRUCTION TRENDS

    7

    Number and Value of Non-Residential Construction

    by Type: Fourth Quarter 2012

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    18/137

    Rider Levett Bucknall Philippines 2013 8

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    19/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    20/137

    Philippine Construction Cost

    DataDenition of Terminology

    Building Construction Prices

    External WorksConstruction Elements

    Construction Materials Wholesale Price

    Summary of Current Regional Daily

    Minimum Wages Rates

    Building Services (as of 4th Quarter 2012)

    Denition (Building Services)

    Ofce Fit-Out, Workstations

    Ofce Refurbishment

    Hotel Fit-Out

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    21/137

    PHILIPPINE CONSTRUCTION COST DATA

    11

    Denitions of Terminology

    Central Business District (CBD)

    The Central Business District is within the MetroManila Cities of The Philippines, which consists ofseven planning areas Makati City, Global City-Taguig,Quezon City, Pasig City, Mandaluyong City, San Juanand Manila. It is the prime area of all the commercialand nancial activities in the region and also includes

    the developments from the nearby provinces around theperimeter of Metro Manila.

    Construction Floor Area (CFA)

    CFA is the area of all building enclosed covered spacesmeasured to the outside face of the external wallsincluding covered basement and above ground car parkareas.

    Gross Floor Area (GFA)

    GFA is the sum of fully enclosed covered areas and theunenclosed covered areas of the building for purposes ofplanning submissions (refer to Page 75: Measurement of

    Building Areas – Gross Floor Area for more information).

    Net Lettable Area (NLA)

    NLA is the total tenancy area designated for rentablepurposes.

    Building Works

    Building Works include substructure (piling, foundation,and basement), super-structure, architectural works,nishes and ttings, external works, site works,preliminaries, attendance and other builder’s work inconnection with services.

    Building servicesBuilding Services include Mechanical services –Heating, air conditioning and mechanical ventilation,re protection system, sanitary and plumbing; Electricalservices – electrical installation, vertical transportation,building management systems. Exclusions; Specialequipment – Chutes, incinerators, compactors,

    pneumatic refuse disposal system, façade maintenanceequipment, engineered smoke control systems etc., ITservices – high speed cables etc.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    22/137

    Rider Levett Bucknall Philippines 2013 12

    Ofce Buildings

    The ofce within the CBD refers to good quality ofcebuildings located at the Central Business District, for theupper range of the rental market and leading owneroccupiers such as headquarter ofces for nancialinstitutions and major companies.

    Ofces outside CBD refer to medium quality ofcebuildings which are built for the middle range of the

    rental market.

    Hotels

    Types of hotels listed are based on ‘ve-star’, ‘four-star’and ‘three-star’ international hotel ratings.

    Retail – Shopping Mall

    Shopping malls with typical amenities and nishes incommon spaces. Exclusions: Tenant equipment, shopttings and nishes in tenancy spaces.

    Industrial Buildings

    Quality reects a simplied type of construction suitable

    for light or heavy industries, Exclusions: Special andoperating equipment, processing plant and proprietarysystems.

    Residential

    Ratio of kitchen, laundry and bathroom areas to livingareas and the quality of nishes required will affect the

    cost range. Range given is signicantly affected by theheight and conguration of the building. Exclusions:Show apartments. Loose furniture, special light ttings,household electrical appliances, kitchen equipmentand building owners’ special requirements.

    Institutions of Higher LearningTertiary educational schools such as universities,polytechnics and other colleges that require full rangeof educational facilities and amenities.

    Car Park

     Above Grade – minimal external walling excluding

    mechanical ventilation.

    Basement – diaphragm wall or contiguous bored pileswall with standard mechanical ventilation provisions.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    23/137

    PHILIPPINE CONSTRUCTION COST DATA

    13

    Development Type

    Range of Cost per Construction Floor Area

    OFFICE BUILDINGS - Prestige

    10 - 25 Storeys

    25 - 40 Storeys

    40 - 55 Storeys

    HOTELS (Including FF&E)

     Five (5) Star 

    Four (4) Star 

    Three (3) Star 

    HOTELS; Multi-Storey

     Five (5) Star 

    Four (4) Star 

    Three (3) Star 

    INDUSTRIAL

    6.00m to U/S Truss; Metal Cladding

    6.00m to U/S Truss; PCC Cladding

    RESIDENTIAL

    1 to 3 Storey Units; 85 - 120 SQM per Unit

    Single and Double Storey

    Condominiums (Up to 10 Storeys with Lift)Condominiums: 10 to 20 Storeys

    Condominiums: 20 to 40 Storeys

    Condominiums: 40 to 80 Storeys

    CAR PARKING

    Basement CBD: 35 SQM per Car 

    Basement Outside CBD: 35 SQM per Car 

    Building Construction Prices

     All construction prices for The Philippines are indicativeonly and are as at 4th Quarter 2012. Items generallyexcluded from the order of costs are land costs, legaland professional fees, development charges, localauthority fees, nance costs, loose furniture, ttings andworks of art (unless otherwise stated).

    Exclusions

    * Land Cost * Legal and Professional Fee * Development Charges * Local Authority Fee * Finance Cost * Loose

    Furniture, Fittings and Works of Art * Tenancy Work * Site Infrastructure Work * Diversion of Existing Services

    * Resident

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    24/137

    Rider Levett Bucknall Philippines 2013 14

    Low High

    Philippine Peso per Square Metre

    32,100 36,200

    35,300 39,800

    38,900 43,800

    Philippine Pesos per Bedroom

    1,980,000 2,280,000

    1,490,000 1,720,000

    990,000 1,140,000

    Philippine Pesos per Bedroom3,310,000 3,830,000

    2,950,000 3,410,000

    2,670,000 3,030,000

    Philippine Peso per Square Metre

    17,200 19,800

    17,600 20,300

    Philippine Peso per Square Metre

    31,700 36,500

    27,800 32,000

    26,900 31,00032,100 35,400

    33,300 37,600

    34,500 39,700

    Philippine Peso per Square Metre

    555,800 639,200

    463,200 534,400

    Partitions in ofce building and shop t-out in retailspaces, private telephone systems, site infrastructurework, diversion of existing services, resident site staffcost, models and prototypes, future cost escalation andGoods & Services Tax. All prices stated below include ageneral allowance for foundation and external works.

    Site Staff Cost * Models and Prototypes * Future Cost Escalation * Goods and Services

    Note: As Foreign Currency exchange rates uctuate in a daily basis we have not converted the Philippine Peso

    rate to foreign currencies.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    25/137

    PHILIPPINE CONSTRUCTION COST DATA

    15

    External Works

    Description Low High

    LANDSCAPING

    Philippine Peso per Square Metre

    Dense, Shrubs, Topsoil and Grassing 5,610 6,460

    Grassing, Large Areas, Topsoil, Sowing, Treating 3,740 4,310

    Price per Hectare (in Millions of Pesos)

    Light, Large Areas, Minimal Planting 11.674 13.426

    CAR PARKS - ON GROUND

    Philippine Peso per Car 

    Light Duty Paving 81,500 86,600

    Heavy Duty Paving 86,600 91,700

    ROADS

    (Premix nish including kerbs, channels and drainage)

    Philippine Peso per Metre

    Residential estate, 6.80 meters wide excluding

    foot-paths and nature Strips 35,100 40,400

    Industrial estate 10.40 meters wide includingminimal to extensive formation

    49,200 56,600

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    26/137

    Rider Levett Bucknall Philippines 2013 16

    Construction Elements

    The following rates are indicative only and includean allowance for prot and overheads but excludepreliminaries. The rates are not valid for tendering orpricing of variations.

    Item Low High

    SUB-STRUCTURE

    Philippine Peso per Cubic Metre

    Reinforced concrete pad footing (6000 PSI) 6,000 8,250

    Reinforced concrete slab on ground(3000 PSI) 4,450 5,950

    COLUMNS

    Philippine Peso per Metre

    Reinforced Concrete(600mm x 600mm) (7000 PSI)

    8,600 12,000

    Reinforced Concrete(900mm x 900mm) (3000 PSI)

    18,500 24,000

    Steel with reinforced concrete casing(3000 PSI)

    28,000 30,360

    UPPER FLOORS 

    Philippine Peso per Square Metre

    150mm reinforced concrete suspended oor slab(3000 PSI)

    3,000 6,900

    Concrete slab on Metal deck with structural steelsupports and 2-hour re spray

    10,560 12,000

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    27/137

    PHILIPPINE CONSTRUCTION COST DATA

    17

    Construction Elements

    Item Low High

    STAIRCASES

    Number per Flight

    1050mm wide reinforced concretestair with painted steel tube balustrade(average rise 3.70m)

    220,000 250,800

    1050mm wide reinforced concrete scissor

    stair with painted tube handrail(average rise 3.70m)

    215,000 220,000

    2000mm wide grand public stair with glassand brass balustrade(4.00m rise)

    2,700,000 3,500,000

    ROOF

    Philippine Peso per Square Metre

    RC Slab (3000 PSI) graded to fall and built-up roong membrane

    5,000 8,000

    Structural steel, purlins and insulated metaldeck roof 

    10,000 15,500

    EXTERNAL WALLS

    Philippine Peso per Square Metre

    150mm concrete hollow block walls jointedin cement mortar including reinforcement

    1,050 1,100

    Single glazed window unit(casement type)

    12,500 15,000

    Double glazed window unit

    (casement type) 15,000 17,000

     Aluminum with 10mmtempered glass curtainwall system

    24,500 31,500

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    28/137

    Rider Levett Bucknall Philippines 2013 18

    Item Low High

    EXTERNAL DOORS (EXCLUDING IRONMONGERY)

    Number 

    Single leaf solid core steel door  22,750 28,000

    Double leaf glazed door  56,700 80,500

    Double leaf auto operating door  297,500 420,000

    INTERIOR WALLS

    Philippine Peso per Square Metre

    250mm reinforced concrete wall(3000 PSI)

    5,500 6,700

    100mm brick or block wall 950 1,200

    Stud plasterboard wall 2,000 2,500

    Fire rated steel stud wall 4,200  5,500

    2 hour shaft wall 6,300 7,500

    INTERNAL DOORS (EXCLUDING IRONMONGERY)

    Number 

    Single leaf solid core wood ush door 7,000 8,500

    Single leaf half hour re rated steeldoor 

    18,000 28,000

    Single leaf one hour re door 28,000 35,000

    Double leaf auto operating door  230,000 315,000.

    INTERIOR SCREENS

    Number

    Laminated toilet partition with onecubicle

    21,000 33,250

    Stone nish toilet partition 46,000 50,750

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    29/137

    PHILIPPINE CONSTRUCTION COST DATA

    19

    Construction Elements

    Item Low High

    WALL FINISHES

    Philippine Peso per Square Metre

    Cement and sand plaster and emulsion paint 700 850

    Cement render and vinyl fabric 1,350 2,000

    Cement render and ceramic tile 2000 2,800Marble wall nish on renderedbacking

    8,000 10,000

    Marble wall cladding 10,000 13,000

    CEILING FINISHES

    Philippine Peso per Square Metre

    Fiber cement plaster board ceiling Painted 1,400 1,600

    One way exposed grid with mineral berboard acoustic ceiling

    1,600 1,750

    Molded plasterboard ceiling system 4,200 5,600

     Aluminum louver ceiling system 6,300 8,000

    FLOOR FINISHES

    Philippine Peso per Square Metre

    Carpet tile 1,750 2,000

    Ceramic / Homogeneous tile 2,600 4,000

    Granite tile 8,000 20,000

     Access oors 3,500 6,500

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    30/137

    Rider Levett Bucknall Philippines 2013 20

    Item Low High

    SPECIALIST SERVICES

    SANITARY AND PLUMBING

    Philippine Peso per Square Metre

     Average cost per plumbing point includ-ing xture, soil waste and vent

    35,000 43,750

     Average cost for storm Water drains,industrial

    490 875

    VERTICAL TRANSPORTATION

    Number 

    Glass sided escalator(4m rise)

    12,600,000 13,300,000

    17 passenger lift 8,000,000 10,150,000

    Hydraulic lift serving 2,650,000 3,200,000

    OTHER ITEMS

    Philippine Peso per Cubic Metre

    Structural excavation 300 – 500

    Structural excavation 300 500

    Philippine Peso per Square Metre

    Waterproong Membrane / Fluid Applied 500 – 1,200

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    31/137

    PHILIPPINE CONSTRUCTION COST DATA

    21

    Commodity group AVE DEC NOV OCT SEP

    Sand and Gravel 197.5 200.4 199.9 199.1 199.0

    Concrete Products 199.5 201.2 200.8 200.8 200.6

    Cement 179.7 183.5 183.3 182.8 182.6

    Hardware 210.7 212.6 212.3 212.2 211.6

    Plywood 178.1 179.7 179.7 179.5 178.6

    Lumber  223.8 227.5 227.3 226.4 225.7

    G.I. Sheet 176.8 178.3 177.9 177.3 176.9

    Reinforcing Steel 245.6 249.7 249.5 248.1 248.0

    Structural Steel 276.0 278.4 278.3 278.0 278.0

    Tileworks 172.8 175.8 174.8 174.0 173.3

    Glass and Glass Products 178.5 179.2 179.2 179.2 179.2

    Doors, Jambs and Steel

    Casement 197.2 198.5 198.0 197.6 197.6

    Electrical Works 193.2 195.8 195.0 194.4 194.3

    Plumbing Fixtures & Accessories / Waterworks

    155.6 156.3 156.1 155.7 155.6

    Painting Works 202.0 203.1 203.0 203.0 202.8

    PVC Pipes 172.3 173.1 173.1 173.1 173.1

    Fuels and Lubricants 336.3 328.2 329.8 337.8 341.2

     Asphalt 448.1 464.0 446.7 446.7 446.7

    Machinery andEquipment Rental

    114.6 114.6 114.6 114.6 114.6

    Construction Materials Wholesale Price Index

    in the National Capital Region (NCR) Year 2012(2000=100)

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    32/137

    Rider Levett Bucknall Philippines 2013 22

    Source: National Statistics Ofce (Prices & Indices Division)

    www.census.gov.ph

     AUG JUL JUN MAY APR MAR FEB JAN

    199.0 198.6 198.6 198.6 198.2 195.1 192.6 190.5

    200.4 200.3 200.0 200.0 199.8 197.6 196.4 196.4

    182.2 179.5 179.3 178.1 178.1 177.4 174.8 175.3

    211.6 211.6 211.2 211.2 211.2 208.5 207.3 207.0

    178.3 178.2 178.1 178.1 177.7 176.6 176.1 177.1

    225.6 225.6 225.1 225.1 222.3 218.7 217.9 218.1

    176.9 176.9 176.9 176.9 176.9 176.9 175.7 174.1

    247.4 246.7 245.7 244.6 243.5 242.1 241.4 240.4

    278.0 278.0 278.0 278.0 275.6 272.2 270.2 269.4

    172.6 172.6 171.9 171.9 171.9 171.9 171.5 171.5

    178.9 178.7 178.4 178.2 177.9 177.7 177.7 177.7

    197.6 197.6 197.6 197.8 197.8 196.3 195.0 194.7

    194.4 194.4 194.4 193.9 193.0 191.1 189.4 188.6

    155.8 155.8 155.8 155.6 155.6 155.4 155.2 154.7

    202.8 202.8 202.8 201.6 201.6 201.1 200.2 199.6

    173.1 172.8 172.4 172.4 172.4 171.2 170.4 170.2

    331.1 318.2 319.7 341.7 353.0 353.4 345.9 335.6

    446.7 446.7 446.7 446.7 446.7 446.7 446.7 446.7

    114.6 114.6 114.6 114.6 114.6 114.6 114.6 114.6

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    33/137

    PHILIPPINE CONSTRUCTION COST DATA

    23

    SUMMARY OF CURRENT REGIONAL DAILY MINIMUM WAGE RATES

    Non-Agriculture, Agriculture

    As of January 2013 (In pesos)

    REGION DATE NON AGRI

     AGRI

    PLANTNON-

    PLANT

    NCR Nov 01, 2012419.00 -456.00

    419.00 419.00

    CAR Jun.18, 2012263.00 -280.00

    246.00 -262.00

    246.00 -262.00

    I Jul 25, 2012233.00 -253.00

    233.00 205.00

    II May 16, 2012247.00 -255.00

    235.00 -243.00

    235.00 -243.00

    III Oct 11, 2012285.00 -336.00

    270.00 -306.00

    258.00 -290.00

    IV-A May 15, 2012

    255.00 -

    349.50

    251.00 -

    324.50

    231.00 -

    304.50

    IV-B Feb 1, 2013205.00 -275.00

    215.00 -225.00

    215.00 -225.00

    V  Apr 7, 2012228.00 -252.00

    228.00 228.00

    VI May 31, 2012235.00 -277.00

    245.00 235.00

    VII Dec 7, 2012 282.00 -327.00 262.00 -309.00 262.00 -309.00

    VIII Oct 16, 2012 260.00235.00-241.00

    220.50

    IX Nov. 25, 2011 267.00 242.00 222.00

    X Jul 24, 2011271.00 -286.00

    259.00 -274.00

    259.00 -274.00

    XI Jan. 1, 2012 301.00 291.00 291.00

    XII  Apr 18, 2012 270.00 252.00 249.00

    XIII Nov 11, 2011 258.00 248.00 228.00

     ARMM Sep 21, 2012 232.00 232.00 232.00

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    34/137

    Rider Levett Bucknall Philippines 2013 24

    National Capital Region

    RA/WO DATE Amount

    Basic  Allowance Total

    RA 6727 July 01, 1989 89.00 89.00

    WO 01 Nov. 01, 1990 106.00 106.00

    WO 02 Jan. 08, 1991 118.00 118.00

    WO 03 Dec. 16, 1993 135.00 135.00

     April 01, 1994 145.00 145.00

    WO 04 Feb. 02, 1996 161.00 161.00

    May 01, 1996 165.00 165.00

    WO 05 Feb. 06, 1997 180.00 180.00

    May 01, 1997 185.00 185.00

    WO 06 Feb. 06, 1998 198.00 198.00

    WO 07 Oct. 31, 1999 198.00-223.50 198.00-223.50

    WO 08 Nov. 01, 2000 213.00-250.00 213.00-250.00

    WO 09 Nov. 05, 2001 213.00-250.00 15.00 228.00-265.00

    Feb. 01, 2002 213.00-250.00 30.00 243.00-280.00

    WO 10 Jul. 01, 2004 213.00-250.00 50.00 263.00-300.00

    WO 11 Jun. 16, 2005 238.00-275.00 50.00 288.00-325.00

    WO 12 Jul. 10, 2006 288.00-300.00 50.00 313.00-350.00

    WO 13  Aug. 28, 2007 325.00-362.00 325.00-362.00

    WO 14 Jun. 14, 2008 340.00-377.00 5.00 345.00-382.00

     Aug. 28, 2008 345.00-382.00 345.00-382.00

    WO 15 Jul. 01, 2010 367.00-404.00 367.00-404.00

    WO 16 May 26, 2011 367.00-404.00 22.00 389.00-426.00

    WO 17 Jun. 03, 2012 389.00-426.00 20.00 409.00-446.00

    Nov. 1, 2012 389.00-426.00 30.00 419.00-456.00

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    35/137

    PHILIPPINE CONSTRUCTION COST DATA

    25

    Region VII – Metro Cebu

    RA/WO DATE Amount

    Basic  Allow Total

    RA 6727 Jul. 01 1989 89 89

    WO 01 Nov. 08,1990 89.00-105.00 89.00-105.00

    WO 02 Feb. 01,1991 89.00-105.00 9.55 98.55-114.55

    WO 02A Oct. 01, 1991 89.00-105.00 5.73 94.73-110.73

    WO 03 Dec. 19, 1993 89.00-120.73 89.00-120.73

    WO 04 Jan. 01, 1996 94.00-131.00 94.00-131.00

    Jul. 01, 1996 99.00-136.00 99.00-136.00

    Oct. 01, 1996 104.00-141.00 104.00-141.00

    WO 05 Mar. 15,1997 115.00-145.00 115.00-145.00

    WO 05-A Jul. 01,1997 111.00-150.00 111.00-150.00

    Oct. 01,1997 111.00-155.00 111.00-155.00

    WO 06  Apr. 01, 1998 116.00-160.00 116.00-160.00

    Oct. 01, 1998 121.00-165.00 121.00-165.00

     April 01,1999 126.00-165.00 126.00-165.00

    Oct. 01,1999 131.00-165.00 131.00-165.00

    WO 07 Jan. 01, 2000 136.00-170.00 136.00-170.00

    WO 08 Apr. 01, 2000 140.00-170.00 140.00-170.00

    WO 07 Jul. 01, 2000 145.00-175.00 145.00-175.00

    WO 08 Nov. 10, 2001 150.00-180.00 150.00-180.00

    WO 08 Jan. 01, 2001 155.00-185.00 155.00-185.00

    WO 06 Jun. 01, 2001 160.00-190.00 160.00-190.00

    WO 08 Dec. 01, 2001 165.00-195.00 165.00-195.00

    WO 09 Jan. 06, 2002 170.00-200.00 170.00-200.00

    WO 10  Aug. 08, 2004 178.00-208.00 178.00-208.00

    WO 11 Jun. 16, 2005 190.00-223.00 190.00-223.00

    WO 12 Aug. 02, 2006 200.00-241.00 200.00-241.00

    WO 13 Nov. 11, 2007 205.00-250.00 205.00-250.00

    WO 14 Jun. 16, 2008 222.00-267.00 222.00-267.00

    WO 15 Sep. 01 , 2010 240.00-285.00 240.00-285.00

    WO 16 Sep. 22 , 2011 260.00-305.00 260.00-305.00

    WO 17 Dec. 07, 2012 282.00-327.00 282.00-327.00

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    36/137

    Rider Levett Bucknall Philippines 2013 26

    Region VII – Davao

    Note: WO-Wage Order   COLA- Cost Of Living Allowance

      ECOLA- Emergency Cost Of Living Allowance

    RA/WO DATE Amount

    Basic  Allow Total

    RA6727 Jul. 01,1989 89.00 89

    WO 01  Nov. 21,1990 99.00 - 104.00 99.00-104.00

    WO 02 Feb. 15,1991 99.00 - 104.00 8.32 106.92-112.32

    May 15,1991

    WO 03 Dec. 01,1993 99.00 - 104.00 25.00 124.00-129.00

    WO 04 Jan. 01,1995 114.00 - 119.00 114.00-119.00

    WO 05 Jan. 01,1997 123.00-129.00 123.00-129.00

    Jun. 01,1997 123.00-135.00 123.00-135.00

    WO 06 Jan. 01,1998 126.00-135.00 10.00 136.00-145.00

    WO 07 Nov. 01,1999 146.00-148.00 10.00 156.00-158.00

    WO 08 Nov. 01,2000 158.00-160.00 10.00 168.00-170.00

    May 01,2001 168.00-170.00 10.00 178.00-180.00

    WO 09 Jan. 01, 2002 168.00-170.00 25.00 193.00-195.00

    WO 10 Jan. 01, 2004 193.00-195.00 193.00-195.00

    WO 11 Feb. 05, 2005 207.00-209.00 207.00-209.00

    WO 12 Jul. 02, 2005 207.00-209.00 15.00 222.00-224.00

    WO 13 Jul. 27, 2006 222.00-224.00 16.00 238.00-240.00

    WO 14 Sep. 16, 2007 222.00-224.00 26.00 248.00-250.00

    WO 15 Jun. 16, 2008 240.00 25.00 265.00

    Sep. 16, 2008 250.00 15.00 265.00

    WO 16 Sep. 01, 2010 271.00 15.00 286.00

    WO 17 Jan. 01, 2012 285.00 5.00 291.00

    May. 01,2012 285.00 15.00 301.00

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    37/137

    PHILIPPINE CONSTRUCTION COST DATA

    27

    Development Type Range of Costper Construction oor area HVACPhp/m²

    Sanitary &

    PlumbingPhp/m²

    OFFICE BUILDINGS

     Prestige 3,200 – 6,000 1,200 – 2,500

     Average 3,000 – 3,400 1,000 – 1,600

    HOTELS

     Five Star 4,000 - 5,500 2,400 – 3,200

     Four Star 3,000 - 4,000 2,200 – 3,000

     Three Star  2,500 - 2,600 2,000 - 2,200

    RETAIL - SHOPPING MALL

     Medium Class 1,000 – 1,500 800 – 1,000

     High End 1,500 – 2,000 1,000 – 1,200

    INDUSTRIAL

     Flat Roofed Factories 800 – 1,000 900 – 1,200

     Warehouses 700 – 1,000 900 – 1,200

    RESIDENTIAL

     Houses (High End) 300 – 500 1,500 – 2,000

     Houses (Mid Class) 100 – 300 1,000 – 1,500

     Condominiums (High End) 1,500 – 2,500 2,500 – 4,000

     Condominiums (Mid Class) 1,500 – 1,500 2,000 – 2,500

    INSTITUTIONAL

     Institutions of Higher Learning 1,500 – 2,000 1,200 – 2,000

     Schools 700 – 1,200 700 – 1,200

    CARPARKING

     Above Grade Car Park 100 – 200 100 - 200

     Basement Car Park 200 – 300 200 - 300

    Building Services (as at 4th Quarter 2012)

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    38/137

    Rider Levett Bucknall Philippines 2013 28

    Fire ProtectionPhp/m² ElectricalPhp /m² Vertical TransportPhp /m² B.M.S.Php/m²

    500 – 1,200 4,000– 6,200 1,500 – 2,500 700 – 1,000

    500 – 1,200 3,500 – 4,000 1,000 – 1,700 700 – 1,000

    600 – 1,100 5,400 – 6,300 2,500 – 3,400 700 – 1,000

    400 – 1,100 4,000 – 5,000 2,000 – 2,700 600 – 900

    400 – 500 3,800 – 3,900 1,800 – 2,000 600 – 700

    600 – 1,000 1,600 – 2,000 700 – 1,000 300 – 500

    1,000 – 1,500 2,000 – 3,000 800 – 1,200 300 – 500

    600 – 900 1,600 – 2,600  – 100 - 500

    600 – 900 1,500 – 2,600  – 100 - 400

    100 – 500 3,500 – 5,000 - -

    100 – 500 3,000 – 3,500 - -

    500 – 1,400 2,500–4,000 700–1,500 500 – 1,000

    500 – 1,400 2,000 – 3,000 500–1,000 500 – 1,000

    600 – 1,000 1,700 – 3,000 500 – 1,000 300 – 500

    600 – 1,000 1,200 – 1,700 300 – 500 -

    100 – 200 900 – 1,100 300 – 400 -

    100 – 200 900 – 1,100 300 – 400 -

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    39/137

    PHILIPPINE CONSTRUCTION COST DATA

    29

    Denitions (Building Services)

    HVAC (Heating Ventilation and Air Conditioning)

    MV include chiller plant, cooling towers, chilled waterand condenser water pumps and pipework, air-handlingunit systems, fan coil systems, AC ductwork, diffusers,split type air-conditioning units and ductwork, mechanicalventilation (‘MV’) fan system, MV ductwork, diffusers and

    accessories, AC electrical and automatic control workswhere appropriate.

    Sanitary & Plumbing

    Sanitary & Plumbing works include water tanks andpumps, hot/cold water distribution piping, installationof water piping to sanitary ware and ttings, installationof waste piping to sanitary ware, aboveground andunderground drainage piping system where appropriate.

    Fire Protection System

    Fire Protection system includes sprinkler, external rehydrants, hosereels, wet and dry risers, automatic realarms and re extinguishers where appropriate. .

    Electrical Installation

    Electrical Installation includes power transformer, sub-station, HV & LV switch gear, distribution/sub-maincables, nal sub-circuits, cable support systems andcontainments, lighting protection system, earthingsystem, luminaries and lighting control system, standbygenerators, Telecommunications System, Public

     Address system, intercom system, MATV/CATV system

    where appropriate. 

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    40/137

    Rider Levett Bucknall Philippines 2013 30

    Vertical Transportation

    Vertical Transport includes Lifts, Escalators, Travelators,Dumbwaiters, etc, where appropriate.

    Building Management Systems (BMS)

    BMS include Control Systems (mainly for HVACservices) where appropriate.

    Exclusions

    Security Systems, IT systems, AV systems, car parkingSystem, compactors, chutes; special equipment suchas proprietary systems, medical gases, incinerators,pneumatic refuse disposal system, façade maintenanceequipment, engineered smoke control systems etc;supply of kitchen equipment.

    Note:

    The order of costs for Building Services provided herein is indicative and

    based on Construction Floor Area Assumptions.

    Detailed requirements and specication for Building Services need to be

    considered and provided in conceptual designs to derive cost estimates for

    specic project budgetary purposes.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    41/137

    PHILIPPINE CONSTRUCTION COST DATA

    31

    Ofce Fit-Out

    The following costs that include workstations are anindication of those currently achievable for good qualityofce accommodation.

    Type of Tenancy Open Planned Php/m²Fully Partitioned

    Php/m²

    Computer Areas 15,400 - 17.800 18,400 - 21,300

    Executive Areas andFront of House 27,900 - 32,100 32,900 - 37,900

    Insurance Ofce;GovernmentDepartments

    15,400 - 17,800 18,400 - 21,300

    Major CompanyHeadquarters

    23,200 - 26,700 28,200 - 32,500

    Solicitors, Financiers 23,200 - 26,700 28,200 - 32,500

    Workstations

    3,500mm average length including screens generally1,220m high (managerial 1,620mm high), desks, storage

    cupboards, shelving etc. Supply of chairs is excludedType of Workstation Php / Workstation

    Call Centre 36,000 - 41,400

    Executive 111,400 - 128,200

    Secretarial 51,400 - 59,200

    Technical Staff  70,600 - 81,200

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    42/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    43/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    44/137

      Estimating Data

    Reinforcements Ratios

     Average Construction Payment Drawdown

    Vertical Transport Services

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    45/137

    ESTIMATING DATA

    35

    Reinforcement Ratios

    The following ratios give an indication of the averageweight of high tensile rod reinforcement per cubic meterof concrete (Grade 35) for the listed elements. Differingstructural systems, ground conditions, height of buildings,load calculations and sizes of individual elements and gridsizes will result in considerable variation to the stated ratios.For project specic ratios, a civil & structural engineer 

    should be consulted.Element Ave kg/m³

    Pile caps 115 - 250

    BoredPiles (compression) 30 - 60

    Bored Piles (tension) 150 - 250

    Raft Foundation 150 - 220

    RC pad footings 70 - 100

    Ground beams 200 - 300

    Basement

    Retaining Wall 150 - 250

    RC Wall 125 - 150

    Slab 100 - 200

    Edge Beams 220 - 300

     Above Ground

    Columns 250 - 500

    Beams 180 - 300

    Slab 110 - 200

    Walls (core) 130 - 320

    Lift Core 125 - 200

    Household Shelter  200 - 300

    Stairs 130 - 160

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    46/137

    Rider Levett Bucknall Philippines 2013 36

    Average Construction Payment Drawdown

    The tabulation on next page is derived from the statisticalaverage of a series of case histories, which will give anindication of the anticipated rate of expenditure when usedfor a specic project for preliminary budgetary purposes.

     All data are related to the date of submission ofcontractors’ claims to the client and not actual payment,

    which is generally one month later

    No adjustment has been made for the retention moneyon the assumption that such money will be paid by theclient into a joint account with the Contractor.

    The payment of the outstanding monies due to thecontractors and sub-contractors after the date ofpractical completion takes place at irregular intervalswith payments spread over an indenite period.

    The average rate of claims expenditure on constructionprojects are from Php100,000,000 to Php 1,300,000,000

    and/or greater than one year but less than two yearsconstruction period to practical completion.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    47/137

    ESTIMATING DATA

    37

    Av er  a g

     e C  on s t  r  u c t  i   onP 

     a ym en t  Dr  aw d  own

     C  on t  r  a c  t  P  er i   o d 

     (   % )  

     C  u

    m ul   a t  i  v  e

    r  o j   e c  t  

     C 

    l   ai  m s 

    E x  p

     en d i   t   ur  e

     (   % )  

     5  %

    1  0  %

    1  5  %

    2  0  %

    2  5  %

     3  0  %

     3  5  %

    4  0  %

    4  5  %

     5  0  %

     5  5  %

     6  0  %

     6  5  %

    7  0  %

    7  5  %

     8  0  %

     8  5  %

     9  0  %

     9  5  %

    1  0  0  %

     0  %1  0  %

    2  0  %

     3  0  %

    4  0  %

     5  0  %

     6  0  %

    7  0  %

     8  0  %

     9  0  %

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    48/137

    Rider Levett Bucknall Philippines 2013 38

     C  on t  r  a c  t  

    P  er i   o d 

     Ov  er  al  l   P r  o j   e c  t  

     %

     %

     5  5 

     5 2 . 8  5 

     6  0 

     6  0 .1  5 

     6  5 

     6 7 .1  5 

    7  0 

    7  3 . 6  8 

    7  5 

    7  9 . 6  0 

     8  0 

     8 4 .7  9 

     8  5 

     8  9 . 0 7 

     9  0 

     9 2 .2  9 

     9  5 

     9 4 . 3 2 

    1  0  0 

     9 7 . 5  0 

    Av er 

     a g e C  on s t  r  u c t  i   onP  a ym en t  Dr  aw d  own

     C  on t  r  a c  t  P  er i   o d 

     Ov  er  al  l   P r  o j   e c  t  

     %

     %

     5 

     0 .7  5 

    1  0 

    2 .7  0 

    1  5 

     5 .7 1 

    2  0 

     9 . 6  5 

    2  5 

    1 4 .4  0 

     3  0 

    1  9 . 8  0 

     3  5 

    2  5 .7  3 

    4  0 

     3 2 . 0  6 

    4  5 

     3  8 . 6  5 

     5  0 

    4  5 .4  0 

    N o t   e: T 

    h  er  em

     ai  ni  n

     g2 . 5 

     % w

     o u

    l   d  b  er  el   e

     a s  e d  af   t   er 

     a p

     er i   o d  of  

     s i  x 

     t   o

     

     t  w el  v 

     em

     on

     t  h  s  af   t   er h 

     an

     d - ov 

     er 

     of  

     t  h  e pr  o

     j   e c  t  

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    49/137

    ESTIMATING DATA

    39

     Application LiftType Speed(M/Sec) BaseCost ($)

    No. of

    FloorsServed

    $/Floor

     Addition-al FloorsServed

    $/Floor

    Bypassed

    Ofce &Residential

    Electroca-Hydraulicpassenger 

    0.5$70,000 -$95,000

    2 $8,500 $6,500

    Gearless9 to 13Passenger 

    1.0$75,000 -105,000

    2 $7,000 $5,000

    Gearless9 to 13

    Passenger 1.65 -1.75

    $95,000 -145,000

    8 $7,000 $5,000

    GearlessUp to 17

    Passenger 

    1.65 -1.75

    $120,000-

    $170,0008 $7,000 $6,000

    GearlessUp to 23

    Passenger 

    2.0 -2.5

    $150,000-

    $270,00015 $8,000 $6,000

    Gearless 3.0 -3.5 $435,000 20 $8,000 $6,000

    Gearless 4.0 $575,000 20 $10,000 $8,000

    Gearless 5.0 $660,000 20 $10,000 $8,000

    Gearless 6.0 $920,000 30 $10,000 $8,000

    Gearless 7.0 $990,000 30 $10,000 $8,000

    Gearless 8.0 $1,100,000 40 $10,000 $8,000

    Vertical Transport Services

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    50/137

    Rider Levett Bucknall Philippines 2013 40

     ApplicationLift

    Type

    Speed(M/

    Sec)

    Base

    Cost ($)

    No. ofFloorsServed

    $/Floor Additional

    FloorsServed

    $/FloorBy

    passed

    Hospitals

    Gearless23 paxBed Lift

    1.75 $180,000 8 $7,000 $5,000

    GearlessUp to 40Passen-ger 

    2.50 $680,000 10 $13,500 $8,000

    LargeGoodsLifts

    GearlessUp to2000kg

    1.0 $305,000 2 $14,000 $8,000

    GearlessUp to5000kg

    0.50 $510,000 2 $16,500 $10,500

    ServiceLift(Dumb-Waiter)

    BenchHeightUnit

    0.50 $35,000 2 $4,500 $1,800

    LargeUn 0.20 $55,000 20 $5,500 $2,300

    EscalatorsRise 2.5to 5.0m

    0.50$140,000-$320,000

    20 N.A. N.A.

    Travellator 

    Distance1.3 to5.0m

    0.50$120,000-$340,000

    N.A. N.A. N.A.

    To 4.0m 0.15 $68,500 2 N.A. N.A.

    DisabledPlatformLift

     Above4.0m

    0.15 $88,500 3 N.A. N.A.

    Notes:

    Lift types up to 17-passenger capacity serving not more than 18 oors are

    more commonly equipped with motor room-less systems.

    Costs provided above are indicative and vary depending on the brand name

    and technical specications.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    51/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    52/137

     International Construction

    Building Costs

    Specic Denitions For International Construction Costs

    Construction Market Activity Cycle Model

    Sector Data

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    53/137

    INTERNATIONAL CONSTRUCTION

    43

    Building Costs

     All costs are stated in local currency per m² of grossoor area as shown below, as at December 2012. Thecosts stated in this section reect the standards andspecications normal to that country or region.

    Country Currency

    Ofce Buildings

    Prestige Investment

    Low High Low High

     Asia Pacic

    Beijing Rmb 7,250 12,000 6,750 10,300

    Chengdu Rmb 6,900 11,200 6,350 9,400

    Guangzhou Rmb 7,000 11,100 6,450 9,700

    Ho Chi Minh City VND (‘000) 22,246 31,997 18,972 23,746

    Hong Kong $HKD 18,400 27,200 16,200 22,000

    Jakarta Rp (‘000) 8,338 11,530 5,765 9,008

    Macau MOP 14,600 20,800 12,800 17,900

    Manila PHP 32,470 44,300 25,900 35,300

    Seoul KRW ('000) 2,210 2,830 1,660 2,040

    Shanghai Rmb 7,350 11,850 6,750 10,250

    Shenzhen Rmb 6,750 11,050 6,350 9,600

    Singapore $Sgd 2,600 3,750 2,050 2,850

    Tokyo Yen ('000) 249 329 219 249

    EMEA

    Birmingham £ GBP 1,770 2,330 1,500 2,330

    Bristol £ GBP 1,900 2,500 1,550 2,450

     Abu Dhabi AED 5,800 7,000 4,700 6,600

    Dubai AED 5,600 6,900 4,600 6,400

    London £ GBP 2,150 2,800 1,800 2,800

    Manchester £ GBP 1,770 2,330 1,500 2,330

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    54/137

    Rider Levett Bucknall Philippines 2013 44

    Retail Hotels

    Mall Strip Shopping 5 Star 3 Star  

    Low High Low High Low High Low High

    8,050 12,300 7,000 11,000 12,400 16,400 9,100 11,800

    7,300 11,050 6,600 10,500 11,550 14,300 8,550 10,900

    7,950 11,400 6,900 10,300 12,400 15,900 9,250 11,400

    NA NA NA NA 28,927 35,425 21,746 28,132

    19,100 24,300 16,300 21,300 29,100 35,500 23,800 27,300

    5,815 7,669 NA NA 11,889 15,185 9,084 10,475

    15,000 18,600 12,700 16,300 22,300 27,100 17,900 21,300

    27,510 31,660 20,840 23,365 53,510 61,600 43,200 48,850

    1,480 2,150 1,250 1,900 2,980 4,410 1,920 2,440

    8,050 12,450 7,050 11,200 12,450 16,350 9,250 11,750

    7,350 11,050 6,450 9,850 11,900 15,500 8,900 11,200

    2,100 3,300 NA NA 4,200 5,500 3,200 3,600

    93 204 93 204 378 501 281 455

    2,530 3,550 810 1,520 1,925 2,635 1,215 1,620

    2,530 3,550 810 1,520 2,100 2,800 1,250 1,750

    4,800 6,500 NA NA 8,900 10,400 7,500 9,000

    4,600 6,300 NA NA 8,800 10,250 7,300 8,900

    2,910 4,090 930 1,750 2,300 3,100 1,500 2,000

    2,530 3,550 810 1,520 1,925 2,635 1,215 1,620

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    55/137

    INTERNATIONAL CONSTRUCTION

    45

    Building Costs

    Country Currency

    Ofce Buildings

    Prestige Investment

    Low High Low High

    Oceania

     Adelaide $AUD 3,224 4,925 2,910 4,166

     Auckland $NZ 2,750 3,500 2,100 3,200

    Brisbane $AUD 2,500 3,850 2,000 3,000

    Canberra $AUD 2,930 3,810 2,380 3,000

    Christchurch $NZ 3,500 4,500 3,000 4,000

    Darwin $AUD 2,900 3,980 2,250 3,600

    Melbourne $AUD 2,980 3,740 2,325 2,880

    Perth $AUD 3,150 4,770 2,575 3,740

    Sydney $AUD 2,900 4,050 2,200 3,050

    Wellington $NZ 2,800 3,200 2,200 2,500

    USA

    Boston $USD 2,153 3,014 1,884 2,637

    Chicago $USD 2,476 3,875 1,292 1,938

    Denver $USD 1,507 2,422 1,076 1,615

    Honolulu $USD 2,260 4,198 1,884 3,122

    Las Vegas $USD 1,507 3,068 1,130 2,045

    Los Angeles $USD 1,938 3,014 1,292 2,099

    New York $USD 2,207 3,767 1,938 2,906

    Pheonix $USD 1,345 2,476 1,076 1,668

    Portland $USD 1,776 2,260 1,238 1,722

    San Francisco $USD 2,099 3,229 1,507 2,368

    Seattle $USD 1,776 2,207 1,238 1,722

    Washington DC $USD 1,884 2,583 1,399 1,991

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    56/137

    Rider Levett Bucknall Philippines 2013 46

    Retail Hotels

    Mall Strip Shopping 5 Star 3 Star  

    Low High Low High Low High Low High

    1,908 3,823 1,242 2,008 4,454 5,713 3,501 4,338

    1,100 1,800 1,200 1,400 3,450 3,800 2,800 3,200

    2,150 2,950 1,000 1,450 3,200 4,300 2,500 3,600

    1,960 2,780 1,000 1,360 3,600 4,220 2,620 3,660

    1,500 2,000 NA NA 3,500 4,000 2,800 3,200

    1,550 2,400 1,300 1,900 3,500 4,300 2,800 3,500

    2,020 1,465 1,060 1,465 3,740 4,245 3,035 3,385

    1,995 2,870 1,010 1,445 3,600 4,430 2,645 3,635

    1,600 3,300 1,400 2,050 3,700 4,700 2,600 3,200

    1,300 1,800 NA NA 3,400 4,100 2,200 2,600

    1,292 2,260 969 1,561 2,691 4,306 1,722 2,691

    1,238 2,260 861 1,399 2,691 4,844 1,292 2,260

    861 1,399 700 1,345 1,991 3,014 1,130 1,776

    1,615 3,875 1,292 3,391 4,090 5,920 2,530 4,306

    1,238 5,167 700 1,561 3,498 5,005 1,292 2,422

    1,184 2,099 861 1,507 2,691 4,198 1,830 2,637

    1,507 2,691 1,238 1,722 3,444 5,113 1,991 2,852

    1,130 1,776 753 1,345 2,260 3,767 1,184 1,722

    1,184 2,099 969 1,399 1,884 2,852 1,399 1,830

    1,292 2,368 1,184 1,776 2,852 4,413 2,045 2,799

    1,238 2,153 1,023 1,453 1,991 2,960 1,507 1,938

    1,023 2,045 807 1,453 2,476 4,036 1,615 2,476

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    57/137

    INTERNATIONAL CONSTRUCTION

    47

    Building Costs

    Country Currency

    Industrial

    Warehouse

    Low High

     Asia Pacic

    Beijing Rmb 2,100 2,900

    Chengdu Rmb 2,050 2,800

    Guangzhou Rmb 2,050 2,850

    Ho Chi Minh City VND (‘000) 8,109 12,118

    Hong Kong $HKD 7,300 8,500

    Jakarta Rp (‘000) 2,854 3,730

    Macau MOP NA NA

    Manila PHP 14,666 16,892

    Seoul KRW ('000) 620 760

    Shanghai Rmb 2,200 3,000

    Shenzhen Rmb 2,000 2,800

    Singapore $Sgd 650 1,250

    Tokyo Yen ('000) 94 125

    EMEA

    Birmingham £ GBP 305 610

    Bristol £ GBP 450 750

     Abu Dhabi AED 1,500 3,500

    Dubai AED 1,500 3,500

    London £ GBP 375 750

    Manchester £ GBP 305 610

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    58/137

    Rider Levett Bucknall Philippines 2013 48

    Car Parking Residential

    Multi Storey Basement Multi-Storey

    Low High Low High Low High

    3,450 6,150 4,100 5,200 3,800 5,850

    3,300 5,400 3,490 4,300 3,500 5,400

    3,550 6,200 4,000 5,000 3,650 5,500

    16,677 22,787 5,450 8,250 13,970 21,180

    12,400 17,700 12,600 15,800 16,200 23,400

    3,730 5,198 3,911 4,735 5,868 9,370

    6,850 9,050 NA NA 9,750 16,500

    16,080 18,510 17,400 20,030 35,400 48,450

    800 1,020 1,110 1,390 1,440 2,080

    4,000 6,550 4,100 5,250 3,700 5,700

    3,450 6,050 3,850 4,850 3,550 5,400

    1,950 2,200 1,050 1,550 1,950 3,100

    249 314 94 180 NA NA

    810 1,315 330 610 1,520 2,130

    850 1,400 330 610 1,520 2,130

    2,750 4,500 1,500 2,700 4,500 6,100

    2,750 4,500 1,300 2,600 4,300 5,900

    975 1,600 400 725 1,800 2,500

    810 1,315 330 610 1,520 2,130

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    59/137

    INTERNATIONAL CONSTRUCTION

    49

    Building Costs

    Country Currency

    Industrial

    Warehouse

    Low High

     Asia Pacic

     Adelaide $AUD 802 1,366

     Auckland $NZ 550 750

    Brisbane $AUD 600 800

    Canberra $AUD 680 940

    Christchurch $NZ 800 1,200

    Darwin $AUD 700 1,200

    Melbourne $AUD 655 1,060

    Perth $AUD 685 1,125

    Sydney $AUD 600 900

    Wellington $NZ 500 900

    USA

    Boston $USD 646 969

    Chicago $USD 700 1,184

    Denver $USD 431 753

    Honolulu $USD 700 1,076

    Las Vegas $USD 538 915

    Los Angeles $USD 646 1,023

    New York $USD 700 1,130

    Pheonix $USD 431 700

    Portland $USD 700 915

    San Francisco $USD 753 1,076

    Seattle $USD 700 915

    Washington DC $USD 592 861

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    60/137

    Rider Levett Bucknall Philippines 2013 50

    Car Parking Residential

    Multi Storey Basement Multi-Storey

    Low High Low High Low High

    1,406 1,908 804 1,289 2,642 4,129

    1,000 1,500 450 700 2,100 2,900

    1,100 1,700 600 850 2,100 3,050

    910 1,270 620 820 2,240 3,250

    1,600 2,000 700 1,000 NA NA

    1,100 1,500 700 1,275 1,940 2,560

    1,110 1,365 555 960 2,175 3,490

    990 1,455 625 1,455 2,230 3,830

    900 1,400 600 700 2,150 3,550

    1,800 2,600 900 1,400 2,500 3,200

    861 1,184 753 1,076 1,453 3,498

    969 1,399 753 1,399 1,399 3,498

    646 1,023 700 1,184 753 3,767

    1,076 2,045 1,130 1,776 1,507 6,028

    646 1,615 538 1,076 753 3,767

    915 1,399 753 1,292 1,453 3,014

    915 1,345 969 1,399 1,507 3,767

    646 1,076 592 1,076 861 3,229

    915 1,345 807 1,184 1,184 2,691

    969 1,507 861 1,399 1,561 3,229

    915 1,345 807 1,184 1,292 2,530

    807 1,076 753 1,076 1,076 2,691

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    61/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    62/137

    Rider Levett Bucknall Philippines 2013 52

    The cycle model illustrates the different growth anddecline zones in a theoretical construction industrybusiness cycle. The tabulation in the following pageprovides an overview of the relative growth / decline

    of each development sector in various cities. Each cityhas its own industry business cycle in the context of itsown economy, and as such the performance of eachdevelopment sector is not strictly comparable betweencities. Information as at December 2012.

    Trough Growth Zone

    Mid Growth Zone

    Peak Growth Zone Peak Decline Zone

    Mid Decline Zone

    Trough Decline Zone

    Construction Market Activity Cycle Model

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    63/137

    INTERNATIONAL CONSTRUCTION

    53

    Houses Apartments Ofces

     Americas

    Boston ▼ ▲ ▼Denver  ▼ ▼ ▲Honolulu ▲ ▲ ▼Las vegas ▲ ▲ ▼Los angeles ▼ ▲ ▲New York ▲ ▼ ▼

    Pheonix ▲ ▲ ▼Portland ▲ ▲ ▲San francisco ▼ ▲ ▲Seattle ▲ ▲ ▲Washington D.C. ▲ ▲ ▲

     Asia

    BANGKOK ▼ ▼ ▼Beijing ▼ ▲ ▲Guangzhou

    ▼ ▼ ▲Ho chi minh city ▲ ▼ ▼Hong kong ▲ ▲ ▲Jakarta ▲ ▲ ▲

    Macau ▲ ▲ ▲Manila ▲ ▲ ▲Seoul ▼ ▼ ▲Shanghai ▼ ▼ ▼

    Shenzhen ▼ ▲ ▲Singapore ▲ ▲ ▼Tokyo ▲ ▲ ▲

    Sector Data

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    64/137

    Rider Levett Bucknall Philippines 2013 54

    Industrial Retail Hotel Civil

    ▼ ▼ ▲ ▲▼ ▲ ▼ ▲

    ▼ ▼ ▲ ▲▼ ▼ ▼ ▲▼ ▲ ▲ ▲▲ ▲ ▲ ▲

    ▲ ▼ ▼ ▲▲ ▲ ▲ ▲▼ ▲ ▲ ▲▼ ▼ ▲ ▲▼ ▲ ▲ ▲

    ▼ ▲ ▼ ▲

    ▲ ▲ ▲ ▲

    ▼ ▲ ▼ ▼▲ ▲ ▲ ▲

    ▲ ▲ ▲ ▲

    ▲ ▲ ▲ ▲

    ▲ ▲ ▼ ▲▼ ▲ ▲ ▲

    ▲ ▲ ▼ ▲

    ▼ ▲ ▼ ▲

    ▼ ▲ ▼ ▼▲ ▲ ▲ ▲

    ▲ ▲ ▲ ▲

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    65/137

    INTERNATIONAL CONSTRUCTION

    55

    Houses Apartments Ofces

    EMEA

     Abu dhabi ▼ ▼ ▼Bristol ▼ ▼ ▼Doha ▲ ▲ ▼Dubai ▲ ▲ ▼London ▲ ▲ ▲Manchester  ▲ ▼ ▼

    Saudi arabia ▲ ▲ ▲Shefeld ▲ ▲ ▲

    Oceania

     Adelaide ▼ ▲ ▲

     Auckland ▲ ▲ ▲Brisbane ▲ ▲ ▲Canberra ▼ ▼ ▼Christchurch ▲ ▲ ▲

    Darwin ▲ ▲ ▲Melbourne ▼ ▲ ▲Perth ▼ ▼ ▲Sydney ▼ ▲ ▲Townsville ▲ ▲ ▲Wellington ▲ ▲ ▼

    Sector Data

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    66/137

    Rider Levett Bucknall Philippines 2013 56

    Industrial Retail Hotel Civil

    ▼ ▼ ▼ ▼▲ ▼ ▼ ▲

    ▲ ▲ ▲ ▼▲ ▼ ▲ ▼▼ ▲ ▲ ▼▼ ▲ ▲ ▼

    ▲ ▼ ▼ ▼▼ ▲ ▲ ▼

    ▼ ▲ ▲ ▲

    ▲ ▲ ▼ ▼▼ ▲ ▼ ▲

    ▲ ▲ ▼ ▲

    ▲ ▲ ▲ ▲

    ▲ ▲ ▲ ▲▼ ▲ ▼ ▲

    ▼ ▲ ▲ ▲

    ▼ ▲ ▲ ▼

    ▼ ▲ ▼ ▲

    ▲ ▼ ▼ ▲

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    67/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    68/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    69/137

    PHILIPPINE CONSTRUCTION INFORMATION

    59

    Developing the BERDE Certication Functional Chart

    The PHILGBC Board of Trustees is the highest policymaking body in the Ecologically Responsive DesignExcellence (BERDE) Rating System and owns theBERDE Certication Mark.

    This agency was structured and owns the BERDECertication Seal. The BERDE Development Teamprovides nalization and approval of the BERDE RatingProgram. They conduct periodic review on the Rating

    and provide technical assistance, where necessary andapplicable in the interpretation of the said Program. TÜVRheinland Philippines are envisioned to undertake theBERDE assessment activities, to include documentationreview, reporting and shall appoint a technical person/panel to independently review the Assessment Reportand be responsible for the award of the BERDECertication.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    70/137

    Rider Levett Bucknall Philippines 2013 60

    BERDE Rating Certication Structure

    Technical Assessors and Experts Pool

    TÜV Rheinland Philippines will support the PHILGBCin the development of the CRITERIA for the Technical

     Assessors and Experts. TÜV Rheinland Philippines shallmaintain a list of its technical assessors and expertspool for the BERDE Rating Program. TÜV RheinlandPhilippines in collaboration with PHILGBC will undertakecapacity building programs, such as trainings or

    workshops in order to qualify the technical assessorsand experts and ensure that they have commonunderstanding on the interpretation of the BERDE Ratingsystem, thus ensure the consistent implementation andassessment of the BERDE Rating program. A regularExperience Exchange program shall be required toall qualied technical assessors and experts in order

    to maintain their appointment status. As part of TÜVRheinland Philippines’ compliance with ISO/IEC 17021,it shall ensure that the designated assessment team,including the technical assessors and experts, were notin any way involved in the consulting for the applicantor project.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    71/137

    PHILIPPINE CONSTRUCTION INFORMATION

    61

    Proposed Timeline for BERDE Rating Program

    Man-day Table and Fee Structure TÜV RheinlandPhilippines charges on a man-day rate basis forits assessment and certication and/or registrationactivities. TÜV Rheinland Philippines in collaborationwith PHILGBC, will develop a man-day table or matrixto determine how much time (man-days) is needed,considering the size and complexity of the project, such

    as location, size of lot, number of oors of the building,for the Assessment Team to spend for its assessmentand certication activities, such as but not limited todocumentation review, assessment and documentation/report preparation.TÜV Rheinland Philippines shallcharge the current man-day rate and registration feesduly approved by PHILGBC and published accordingly.

    Minimum Program Requirements

    Each project must meet minimum requirements inorder to quality for BERDE certication. All projectsmuch comply with applicable environmental laws, be

    a complete permanent building or space, have a siteboundary (distinct property lines), comply with minimumoccupancy rates, commit to sharing whole buildingenergy and water usage data, and comply with aminimum building area to site-area ratio.

    SCORING AND RATING

    The BERDE Rating System provides a cross‐cuttingmeasure of building performance. Weighting is a centralconcern when combining performance across credits andcredit categories. This work is an effort for the BERDEweighting system to address the social, economic andenvironmental impact priorities of the Philippines.

    Objectives

    The BERDE 1.0 Credit Weighting Tool was developedto provide a transparent and reproducible systemfor understanding building impacts and using this

    information to assign weights to individual BERDEcredits. The workbook is a decision support tool that isintended to provide a framework for creditweighting – and not denitive answers.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    72/137

    Rider Levett Bucknall Philippines 2013 62

    Weighting Approach

    The BERDE weighting system is based on the conceptthat the value of credits or CRITERIA will be determinedby a basic weighting equation (see below). This equationbrings together information on indicators addressed,impact categories (i.e. social, economic, environmental),and the relative importance of CRITERIA indicators. Thisapproach is implemented in a Microsoft Excel based

    workbook called the BERDE 1.0 Credit Weighting Tool.The tool ultimately provides a set of credit weightingssuch as those illustrated in the screen shot below.

    BASIC WEIGHTING EQUATION

    UN Sustainable Development Indicators Addressed

    XSocial, Economic and Environmental Impacts

    X

    Relative Importance of each Impact

    =

    Credit or CRITERIA Weight

    Denitions:

    • Indicators Addressed: each BERDErequirement or CRITERIA addresses different UNSustainable Development Indicators

    • Impacts: each UN Sustainable DevelopmentIndicator (SDI) belong to different impact categories(Social, Economic and Environmental)

    • Relative Importance: each relevant DatabaseIndicator, that belongs to different UN SDIs,

    compares the Philippines’ standing against the rest of theworld. The data puts the Philippines better or worse thanthe World average. A “worse than the world average”standing gives the indicator a relative importance. 

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    73/137

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    74/137

    Rider Levett Bucknall Philippines 2013 64

    Energy Points

    EN-PT-1 : Energy Metering 1

    EN-PT-2 : Energy Efcient Lighting 1

    EN-PT-3 : Natural Ventilation 1

    EN-PT-4 : On-Site Energy Generation 1

    EN-PT-5 : Energy Efciency Improvement 1

    EN-PT-6 : Energy Efcient BuildingEnvelope

    1

    EN-PT-7 : Energy Efcient Equipment 1

    EN-PT-8 : Building Automation Systems 1 - 2

    Transportation Points

    TR-PT-1 : Alternative Transportation :Bicycles

    1

    TR-PT-2 : Alternative Transportation :Low Emission and Energy

      Efcient Vehicles

    1

    TR-PT-3 : Parking 3

    TR-PT-4 : Proximity To Key Establishments 2

    TR-PT-5 : Public Access 1

    TR-PT-6 : Contribution To Public Transport

     Amenities2 - 4

    TR-PT-7 : Public Transportation Access 1 - 4

    TR-PT-8 : Transportation Impact Assessment

    2

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    75/137

    PHILIPPINE CONSTRUCTION INFORMATION

    65

    Indoor Environment Quality Points

    EQ-PT-1 : External View And Daylighting 1

    EQ-PT-2 : Illumination Control 1

    EQ-PT-3 : Glare Control 1

    EQ-PT-4 : Thermal Control 1

    EQ-PT-5 : Indoor Air Quality 1

    EQ-PT-6 : Microbial ContaminationPrevention

    1

    EQ-PT-7 : Low Voc Environment 1

    Materials Points

    MT-PT-1 : Civil Works 1 - 2

    MT-PT-2 : Electrical Works 1 - 2

    MT-PT-3 : Architectural Works And Finishes 2

    Emissions Points

    EM-PT-1 : Pollutant And Greenhouse Gas

    Inventory 2

    EM-PT-2 : Ozone Protection 1

    EM-PT-3 : Emission Control 1

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    76/137

    Rider Levett Bucknall Philippines 2013 66

    Waste Points

    WS-PT-1 : Construction Waste Diversion 2 - 6

    WS-PT-2 : Materials Recovery Facility 5

    Heritage Conservation Points

    HC-PT-1 : Heritage Feature Protection 3

    HC-PT-2 : Heritage Features Promotion 1

    Innovation Points

    IN-PT-1 : Innovation In Design Or Process 1 - 10

    IN-PT-2 : Innovation In Performance

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    77/137

    PHILIPPINE CONSTRUCTION INFORMATION

    67

    LEED® Green Building Rating System

    Background on LEED® 

    Following the formation of the U.S. Green buildingcouncil (USGBC) in 1993, the organization’s membersquickly realized that the sustainable building industryneeded a system to dene and measure “greenbuildings.” USGBC began to research existing green

    building metrics and rating systems. Less than a yearafter formation, the members acted on the initial ndingsby establishing a committee to focus solely on thistopic. The composition of the Committee was diverse;it included architects, real estate agents, a buildingowner, a lawyer, an environmentalist, and Industryrepresentatives. This cross section of people andprofessions added a richness and depth both to theprocess and to the ultimate product.

    Features of LEED® 

    The LEED Green Building Rating Systems are voluntary,

    consensus-based, and market-driven. Based on existingand proven technology, they evaluate environmentalperformance from a whole building perspective over abuilding’s life cycle, providing a denitive standard forwhat constitutes a green building in design, construction,and operation

    The LEED Credit Weightings

    In LEED 2009, the allocation of points between creditsis based on the potential environmental impacts andhuman benets of each credit with respect to a setof impact categories. The impacts are dened as

    the environmental or human effect of the design,construction, operation, and maintenance of the building,such as greenhouse gas emissions, fossil fuel use,toxins and carcinogens, air and water pollutants, indoorenvironmental conditions. A combination of approaches,including energy modeling, life-cycle assessment, andtransportation analysis, is used to quantify each type of

    impact. The resulting allocation of points among creditsis called credit weighting.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    78/137

    Rider Levett Bucknall Philippines 2013 68

    The LEED 2009 credit weightings process is based onthe following parameters, which maintain consistencyand usability across rating systems:

    •  All LEED credits are worth a minimum of 1 point.•  All LEED credits are positive, whole numbers;

    there are no fractions or negative values.•  All LEED credits receive a single, static weight in

    each rating system; there are no individualized

    scorecards based on project location.•  All LEED rating systems have 100 base points;

    Innovation in Design (or Operations) and RegionalPriority credits provide opportunities for up to 10bonus points.

    Given the above criteria, the LEED 2009 credit weight-ings process involves 3 steps:

    1. A reference building is used to estimate theenvironmental impacts in 13 categories associatedwith a typical building pursuing LEED certication.

    2. The relative importance of building impacts in each

    category are set to reect values based on theNIST weightings.

    3. Data that quantify building impacts on environmen-tal and human health are used to assign points toindividual credits.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    79/137

    PHILIPPINE CONSTRUCTION INFORMATION

    69

    II. Overview and Process

    The LEED 2009 green building rating system fornew construction and major renovations is a set ofperformance Standards for certifying the design andconstruction of commercial or institutional buildings andhigh-rise Residential buildings of all sizes, both publicand private. The intent is to promote healthful, durable,affordable, and Environmentally sound practices in

    building design and construction.

    Prerequisites and credits in the LEED 2009 for newconstruction and major renovations addresses 7 topics:

    • Sustainable Sites (SS)• Water Efciency (WE)• Energy And Atmosphere(EA)• Materials And Resources (MR)• Indoor Environmental Quality (IEQ)• Innovation In Design (ID)• Regional Priority (RP)

    LEED 2009 for new construction and major renovationscertications are awarded according to the followingScale:

    • Certied 40–49 points• Silver 50–59 points• Gold 60–79 points

    • Platinum 80 points and above

    GBCI will recognize buildings that achieve 1 of theserating levels with a formal letter of certication

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    80/137

    Rider Levett Bucknall Philippines 2013 70

    When to Use LEED 2009 for New Construction

    LEED for new construction was designed primarily fornew commercial ofce buildings, but it has been appliedto Many other building types by leed practitioners.

     All commercial buildings, as dened by standardbuilding codes, Are eligible for certication as leed fornew construction buildings. Examples of commercialoccupancies include Ofces, institutional buildings

    (libraries, museums, churches, etc.), Hotels, andresidential buildings of 4 or more Habitable stories.

    Registration

    Project teams interested in earning LEED certication fortheir buildings must rst register the project with GBCI.

    Projects can be registered on the GBCI website(www.gbci.org). The website also has information onregistration costs for USGBC national members as wellas nonmembers. Registration is an important step thatestablishes contact with GBCI and provides access tosoftware tools, errata, critical communications, and other

    essential information.

    Certication

    To earn LEED certication, the applicant project mustsatisfy all the prerequisites and qualify for a minimumnumber of points to attain the established project ratingsas listed below. Having satised the basic prerequisitesof the program, applicant projects are then ratedaccording to their degree of compliance within the rating

    system.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    81/137

    PHILIPPINE CONSTRUCTION INFORMATION

    71

    III. Minimum program requirements

    The LEED 2009 minimum program requirements (MPRS)dene the minimum characteristics that a project Mustpossess in order to be eligible for certication underLEED 2009. These requirements dene the categoriesof buildings that the LEED rating systems were designedto evaluate, and taken together serve three goals: to giveClear guidance to customers, to protect the integrity of

    the LEED program, and to reduce challenges that occurDuring the LEED certication process. It is expectedthat MPRS will evolve over time along with LEED ratingsystem improvements. The requirements will apply onlyto those projects registering under LEED 2009.To view the mprs and the MPR supplemental guidance,visit the LEED resources and tools section ofwww.usgbc.org/projecttools

    IV. Exemplary performance strategies

    Exemplary performance strategies result in performancethat greatly exceeds the performance level or expands

    the scope required by an existing LEED 2009 for newconstruction credit. To earn exemplary performancecredits, teams must meet the performance level denedby the next step in the threshold progression. For creditswith more than 1 compliance path, an innovation indesign point can be earned by satisfying more than 1compliance path if their benets are additive. The credits

    for which exemplary performance points are availablethrough expanded performance or scope are noted Inthe leed reference guide for green design & construction,2009 edition and in LEED-online.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    82/137

    Rider Levett Bucknall Philippines 2013 72

    LEED 2009 FOR NEW CONSTRUCTION AND MAJOR

    RENOVATIONS PROJECT CHECKLIST

    Sustainable Site 26 possible points

    Prerequisite 1Construction Activity PollutionPrevention

    Required

    Credit 1 Site Selection 1

    Credit 2Development Density and CommunityConnectivity

    5

    Credit 3 Browneld Redevelopment 1

    Credit 4.1 Alternative transportation:Public transportation access

    6

    Credit 4.2 Alternative transportation:Bicycle storage and Changing rooms

    1

    Credit 4.3

     Alternative transportation:

    Low-Emitting and fuel-Efcient vehicles 3

    Credit 4.4 Alternative transportation:Parking Capacity

    2

    Credit 5.1Site Development:Protect or Restore Habitat

    1

    Credit 5.2Site Development:Maximize open space

    1

    Credit 6.1 Stormwater Design: Quantity Control 1

    Credit 6.2 Stormwater Design: Quality Control 1

    Credit 7.1 Heat island Effect: Nonroof   1

    Credit 7.2 Heat island Effect: Roof   1

    Credit 8 Light Pollution Reduction 1

    Water Efciency 10 possible points

    Prerequisite 1 Water Use Reduction Required

    Credit 1 Water Efcient Landscaping 2-4

    Credit 2 Innovative Wastewater Technologies 2

    Credit 3 Water Use Reduction 2-4

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    83/137

    PHILIPPINE CONSTRUCTION INFORMATION

    73

    Energy and

    Atmosphere10 possible points

    Prerequisite 1 Water Use Reduction Required

    Prerequisite 2 Water Efcient Landscaping Required

    Prerequisite 3 Innovative Wastewater Technologies Required

    Credit 1 Optimize Energy performance 1-19

    Credit 2 On-site Renewable Energy 1-7

    Credit 3 Enhanced Commissioning 2Credit 4 Enhanced refrigerant Management 2

    Credit 5 Measurement and Verication 3

    Credit 6 Green Power   2

    Materials and

    resources 14 possible points

    Prerequisite 1 storage and Collection of recyclables Required

    Credit 1.1Building reuse: Maintain Existing walls,oors and roof 

    1-3

    Credit 1.2Building reuse: Maintain Existing interiorNonstructural Elements

    1

    Credit 2 Construction Waste Management 1-2

    Credit 3 Materials Reuse 1-2

    Credit 4 Recycled Content 1-2

    Credit 5 Regional Materials 1-2

    Credit 6 Rapidly Renewable Materials 1

    Credit 7 Certied Wood 1

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    84/137

    Rider Levett Bucknall Philippines 2013 74

    Indoor

    Environmental

    Quality

    15 possible points

    Prerequisite 1Minimum Indoor Air QualityPerformance

    Required

    Prerequisite 2Environmental Tobacco Smoke (ETS)Control

    Required

    Credit 1 Outdoor Air Delivery Monitoring 1

    Credit 2 Increased Ventilation 1

    Credit 3.1Construction Indoor Air QualityManagement Plan: DuringConstruction

    1

    Credit 3.2Construction Indoor Air QualityManagement Plan: Before Occupancy

    1

    Credit 4.1Low-Emitting Materials:

     Adhesives and Sealants

    1

    Credit 4.2Low-Emitting Materials:Paints and Coatings

    1

    Credit 4.3Low-Emitting Materials:Flooring systems

    1

    Credit 4.4Low-Emitting Materials:Composite Wood And Agriber

    Products

    1

    Credit 5Indoor Chemical And Pollutant SourceControl

    1

    Credit 6.1 Controllability Of Systems: Lighting 1

    Credit 6.2Controllability Of Systems:Thermal Comfort

    1

    Credit 7.1 Thermal Comfort: Design 1

    Credit 7.2 Thermal Comfort: Verication 1

    Credit 8.1 Daylight And Views: Daylight 1

    Credit 8.2 Daylight And Views: Views 1

    Innovation inDesign

    6 possible points

    Credit 1 Innovation in Design 1-5

    Credit 2 LEED accredited professional 1

    Regional Priority 4 possible points

    Credit 1 Regional Priority 1-4

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    85/137

    PHILIPPINE CONSTRUCTION INFORMATION

    75

    Development Data – Measurement of Building Areas

    Prior to 1989, the development intensity for residentialdevelopment was measured in terms of density i.e.persons per hectare. For non-residential developmentssuch as industrial, warehousing, institutional, commercialbuildings etc., the intensity was measured in terms ofplot ratio.

    Following the introduction of the new development chargesystem from 1 September 1989, the Gross Floor Areaconcept was adopted to determine the developmentintensity of a building, thereby standardizing theprevious methods of calculating development intensityfor different types of developments.

    The denition of (GFA) Gross Floor Area in this ofceas per Rider Levett Bucknall Philippines OperatingProcedure No.2 (OP-02):

     All covered space fullling the functional requirementsof the building measured to the outside face of the

    external walls or the external perimeter. Areas occupiedby partitions, columns, internal structural or party walls,stairwells, lift shafts, plant rooms, water tanks and thelike are included. Sloping surfaces such as staircasesand car park ramps have been measured at on plan.Note that;The rooms passing through two or more storey (e.g.foyer, atrium, lobby etc.) - the area is measured onceonly at oor level.

    The rooms passing through two or more storey with agallery or mezzanine – the area is measured once onlyat ground oor level and the area of the mezzanine or

    gallery added.

    Extreme care must therefore be taken to ensure that anyareas quoted by the Architect or Client are understoodby all parties.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    86/137

    Rider Levett Bucknall Philippines 2013 76

    Gross Floor Area (G.F.A.) – The sum of the “FullyEnclosed Covered Area” and “Unenclosed Covered

     Area” as dened.

    Fully Enclosed Covered Area (F.E.C.A) – The sum of allareas at all building oor levels, including basements(except unexcavated portions), oored roof spaces andattics, garages, penthouses, enclosed porches andattached enclosed covered ways alongside buildings,

    equipment rooms, lift shafts, vertical ducts, staircasesand any other fully enclosed spaces and usable areasof the building, computed by measuring from normaloutside face of the exterior walls but ignoring anyprojections such as plinths, columns, piers and thelike which project from the normal inside face of theexterior walls. It shall not include open courts, light wells,connecting or isolated covered ways and net open areasof upper portions of rooms, lobbies, halls, interstitialspaces and the like which extend through the storeybeing computed.

    Unenclosed Covered Area (U.C.A) – The sum of all areas

    at all building oor levels, including roof balconies, openverandahs, porches and porticos, attached open coveredways alongside buildings, undercrofts and usable spaceunder buildings, unenclosed access galleries (includingground oor) and any other trafcable covered areas ofthe building which are not totally enclosed by full heightwalls, computed by measuring the area between the

    enclosed walls or balustrade (i.e. from the inside face ofthe U.C.A. excluding the wall or balustrade thickness).When the covering element (i.e. roof or upper oor) issupported by columns, is cantilevered or is suspended,or any combination of these, the measurements shall betaken to the edge of the paving or to edge of the cover,

    whichever is lesser. U.C.A. shall not include eavesoverhangs, sun shading, awnings and the like wherethese do not relate to clearly dened trafcable coveredareas, nor shall it include connecting or isolated coveredways.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    87/137

    PHILIPPINE CONSTRUCTION INFORMATION

    77

    Development Data – Measurement of Building Areas

    Net Rentable Area (N.R.A.) – The sum of rentable areaswithin a commercial type building, measured from theinside face of exterior walls and windows at a height of1.5m above oor level and including the area occupiedby structural columns.

    Deductions from N.R.A.

     All stairs, toilets, cleaner’s cupboards, lift shafts,escalators and tea rooms where provided as standardfacilities in the buildings.

    Lobbies between lifts facing other lifts serving the sameoor.

     Areas set aside as public space or thoroughfares andnot used exclusively by occupants of the building. (Note:excludes any additional common areas resulting fromthe sub-division of a whole oor to accommodate morethan one tenant.)

     Areas set aside as plant and lift motor rooms or for theprovision of facilities or services to the building and notfor the exclusive use of the occupants of the building.

     Areas set aside for use by service vehicles and fordelivery of goods and access ways thereto.

     Areas set aside for car parking and access ways thereto.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    88/137

    Rider Levett Bucknall Philippines 2013 78

    Usable Floor Area (U.F.A.) – The sum of the oor areasat oor level from the general inside face of walls of allinterior spaces related to the primary function of thebuilding. This will normally be computed by calculatingthe “Fully Enclosed Covered Area” (F.E.C.A.) anddeducting all of the following areas supplementary to theprimary function of the building.

    Deductions from U.F.A.

    Common Use Areas

     All oored areas in the building for circulation andstandard facilities provided for the common use of theoccupants, tenants and/or the public such as lobbiesand foyers to entrances, stairways and lifts, stairways,landings and re escapes, verandahs and balconies,

    corridors and passages, toilets and rest room areas,cloak and locker rooms, cleaner’s rooms, includingstores and cupboards, tea making and similar amenityareas.

    Service Areas

     All areas set aside for building plant supplying servicesand facilities common to the building for the use ofoccupants, tenants and/or public such as mechanicalplant and equipment rooms, electrical equipment andswitch rooms, tank rooms, lift motor rooms, metercupboards, telecommunications switch rooms, refusecollection areas loading bays and all car parks including

    access ways thereto.

    Non-habitable Areas

     All non-habitable building space such as that occupied byinternal columns and other structural supports, internalwalls and permanent partitions, lift shafts, service ducts

    and the like.

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    89/137

    PHILIPPINE CONSTRUCTION INFORMATION

    79

    Government System Implemented for Private

    And Public Construction

    In The Philippines, there are two distinct systems thatgovern the tendering and implementation of public andprivate construction contracts.

    Private Construction

    Contractors are usually selected on the basis of their

    reputations as competent builders or in considerationof their personal relationships with the project owner.Private contracts are also generally negotiated ortendered through sealed canvass bidding and somethrough electronic bidding (e-bidding). The contractis awarded at the price agreed upon through thenegotiation process. The terms and conditions of thecontract constitute the law or agreement between thecontracting parties.

    Public Construction

    Presidential Decree No. 1594 and its ImplementingRules and Regulations (much like the AB 92 of Sweden)

    primarily governs government infrastructure contracts,particularly those funded from local appropriations, bythe contract terms and conditions. However, for projectsfunded partly or wholly from foreign nancing, theInternational Conditions of Contract or “FIDIC” and thebank guidelines apply.

    The Implementing Rules and Regulations of PresidentialDecree No. 1594 and Its Objectives As an overview,Presidential Decree No.1594 has been formulatedand approved by the Government of The Philippinesto adopt a comprehensive, uniform and updated set ofpolicies and guidelines, rules and regulations covering

    government contracts for government infrastructure andother construction projects in order to achieve a moreefcient and effective implantation of these projects. Itis intended to:

    * Bring about maximum efciency in project implantationand minimize project cost and contract variations through

    sound practices in construction management.

    * Promote healthy partnership between the governmentand the private sector in furthering national development,and

  • 8/19/2019 RLB Rider's Digest (Phils.) 2013

    90/137

    Rider Levett Bucknall Philippines 2013 80

    * Enhance the growth of the local construction industryand optimize the use of indigenous manpower, materialsand other resources.

    Generally, government construction projects areundertaken by contract after competitive public bidding.Projects may be undertaken by administration or “forceaccount” or by negotiated contract only in exceptionalcases where time is of the essence, or where there is

    lack of qualied bidders or contractors, or where there isconclusive evidence that greater economy and efciencywould be achieved through this arrangement.

    Life Cycle Economy