r&m electrical group - time saving solutions for m&e contractors. · 2015. 4. 3. ·...

6
Time Saving Solutions for M&E Contractors. Sikla Support Systems that are designed to reduce installation time for MEP contractors. New Product Guide 2013 Time Saving Solutions for M&E Contractors.

Upload: others

Post on 10-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R&M Electrical Group - Time Saving Solutions for M&E Contractors. · 2015. 4. 3. · R&M Fixings & Supports Ltd Unit 6, Central Trading Estate Marine Parade Southampton SO14 5JP Telephone:

Time Saving Solutions for M&E Contractors.

Sikla Support Systems that are designed to reduce installation time for MEP contractors.

New Product Guide 2013

Time Saving Solutions for M&E Contractors.

Page 2: R&M Electrical Group - Time Saving Solutions for M&E Contractors. · 2015. 4. 3. · R&M Fixings & Supports Ltd Unit 6, Central Trading Estate Marine Parade Southampton SO14 5JP Telephone:

2 Did you know?

Did you know?

3D ConnectionSelf Forming Fine Adjustment

That avoiding nuts, washers and to make a frame secure does not require hot-works?

That the geometry of a steel section is more relevant to its performance than its dimension?

That, with the right system, a customised steel fabrication can be recycled ?

In this section you will find out how to instantly build professional volumetric steel carcasses without the need for:

1. Hot-works or hot-work facility2. Specifically qualified staff3. External structural design and engineering4. Special tools or equipment5. Paint shop or galvanizer

Framo 80 is the Answer...• Non-weldedsecondarysteelworkframesystem• Threadformingshakeprooffastening• Hightorsionresistance• Weightsavingbenefits(only6.4Kgperm)• 3Dcarcassconstruction• Easilyadjustableconnectioncomponents

Page 3: R&M Electrical Group - Time Saving Solutions for M&E Contractors. · 2015. 4. 3. · R&M Fixings & Supports Ltd Unit 6, Central Trading Estate Marine Parade Southampton SO14 5JP Telephone:

Be Your Own Steel Fabrication Shop

R&M Fixings & Supports 3

Framo 80 Key Components

St

Part Number Product Dimensions Fixing

192539 TPF80BeamSecion(6m) 80x80x3

192512 FLSF80SelfFormingScrew M10

192674 ADKF80EndCap

192856 STAF80 190x80x8 M10

192863 STAF80-E 165x80x8 M10

192870 STAF80-A(FixingtoConcrete) 190x80x8 M12

192801 WBDF80-80/120Footplate 220x220x12 M12

192818 WBDF80-121/160Footplate 320x260x12 M12

192825 WBDF80-161/200Footplate 320x310x12 M16

192832 WBDF80-201/300Footplate 420x220x12 M16

192849 WBDF80-TFootplate 220x220x12 M12

198926 SHBF80InsulatedFootplate 220x220x12

192764 AKF80-400mmCantileverBracket 190x90x8 M10

192771 AKF80-800mmCantileverBracket 190x80x8 M10

192788 TKOF80-400mmBeamBracket 220x220x12 M12

192795 TKOF80-800mmBeamBracket 220x220x12 M12

192887 SAF80-41ChannelAdaptor 190x80x8 M10

168494 SetP2M12BeamConnection M12

179147 SetP3M16BeamConnection M16

192683 SBF80-16U-Holder M10

194010 SBF80-40U-Holder M12

195765 TPHF80TopHatBracket M10/M12

192900 GPLF80-1/2”Backplate M10

195833 GPLF80-M16Backplate M10

STAEndSupport

WBDEndSupport

CantileverBracket

U-HolderBeamClamp

ChannelAdaptor

Page 4: R&M Electrical Group - Time Saving Solutions for M&E Contractors. · 2015. 4. 3. · R&M Fixings & Supports Ltd Unit 6, Central Trading Estate Marine Parade Southampton SO14 5JP Telephone:

4 Did you know?

Be Your Own Steel Fabrication Shop

“CostanddurabilitywerecriticalindecidingtousetheFramo80.Weightisalsoveryimpor-tant,forjustoneofthe12plantroomsonsiteweestimatedthesecondarysteelalonecouldweighinexcesson22tonnes,theFramo80systemcomesinataround80%lighter”

“Whatnormallywouldtakemanyhourstochangeinanoff-siteweldingbay,myteamcandoonsiteinminutesusingtheFramo80system”

“It’saseasyasMeccano!™”

Project ManagerMercuryEngineering

Page 5: R&M Electrical Group - Time Saving Solutions for M&E Contractors. · 2015. 4. 3. · R&M Fixings & Supports Ltd Unit 6, Central Trading Estate Marine Parade Southampton SO14 5JP Telephone:

R&M Fixings & Supports 5

Be Your Own Steel Fabrication Shop

Framo 80 Applications: Electrical, Plant Room & Energy Centres

Secondary Steel Data/Electrical Mechanical

Framo 80 Applications: High Voltage & Carcass Construction

High Voltage Modular Water Works

Framo 80 Applications: Rooftop & Plant Access

Goalpost Frames Walkways Plant Access

Page 6: R&M Electrical Group - Time Saving Solutions for M&E Contractors. · 2015. 4. 3. · R&M Fixings & Supports Ltd Unit 6, Central Trading Estate Marine Parade Southampton SO14 5JP Telephone:

Did you know?That SIKLA provide products and solutions for a vast array of services and applications?

Pressix 27 Siconnect Simotec

Sikla Systems• Pressix27 Thelightdutyquickstrutsystem• Siconnect Theversatilesupportsystem• Simotec Industrialpipeshoes&secondarysteel

Contact Us:R&MFixings&SupportsLtdUnit6,CentralTradingEstateMarineParadeSouthamptonSO145JP

Telephone:+44(0)2380386800

Fax:+44(0)2380386808

Email:[email protected]

rm-electrical.com

Checkoutourfullrangeonoure-Catalogueatsikla.co.uk