rm-meter test report rev 1
DESCRIPTION
METERTRANSCRIPT
![Page 1: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/1.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
SUMMARYREVISION
PAGE 0 1
1 PURPOSE OF TESTS 2 X
2 REFERENCE DOCUMENT 2 X
3 SCOPE 2 X
4 METER TERMINLOGY 3 X
5 TEST EQUIPMENT 3 X
6 PRE-REQUISTES 3 X
7 TEST PROCEDURES 4 X
8 RECORD TEST SHEET 5 X
8.1 METER INFORMATION X
8.2 PROGRAMMED METER SETTINGS
8.3 DISPLAY CHECK X
8.4 FINAL CHECK
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 1 of 7
![Page 2: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/2.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
1 PURPOSE OF TESTS
The purpose of the tests is to check the full functionality of the energy meter. This procedure must be used with the complete Diameter Test Procedure, which provides the list of all panel wiring tests.This procedure does not intend to check that all alarms and trips are correctly sent to the DCS or SCADA level. This part is already developed into dedicated DCS or SCADA Commissioning procedures.
2 REFERENCE DOCUMENTS
DOCUMENTDOCUMENT REFERENCE
VERSION/ DATE
REMARKS
Protection Line Diagram
Schematic Drawing
Service Manual
Operation Manual
3 SCOPE
Substation Name :-
Diameter:
Bay :
Panel Number :
Meter Denomination in Scheme (RM)
Scheme to be Checked Meter Functionality Test.
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 2 of 7
![Page 3: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/3.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
4 TERMINOLOGYCode ( ANSI) Terminology
MAIN, CHECK ENERGY METER
5 TEST EQUIPMENT USED
Sl No Description MakeEquipment
Sl No.Calibration
dateCalibration due
date
1. Secondary Injection Kit
2. Multimeter
3. Laptop NA
6. PRE - REQUISITES
PRE-REQUISITES REMARKS
All Safety Condition Are Ok
All Competent Personnel Available For The Test
Ac & Dc Supply Availability And Security
PPE Safety Available.
All Other Relevant Safety Instructions Been Followed
Coordination With Other Parties ( GIS, Transformer, Etc..)
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 3 of 7
![Page 4: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/4.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
7. TEST PROCEDURES
The following procedures are written for demonstrating the main functions of the energy meters using an Omicron test set or similar. This document is to be referred to when performing commissioning tests in association with the commissioning section of the service manual.
7.1. Operational tests:
7.1.1 Meter Display (Instant Readings) Program the meter with correct ratio of Current Transformer and Voltage transformer.
Apply rated voltage and check the meter readings and record the different readings such as Phase to phase voltage and Phase to neutral voltage.
Now apply rated current and check the readings and record.
Apply rated voltage and current with phase angle 0° and check the Power Factor and note the readings.
Similarly, apply rated voltage and current with different phase angle and note down the readings.
7.1.2 Meter Display (Accumulated Readings)
Apply rated voltage and rated current with Unity power factor for 30 Minutes and check the initial readings and final readings.
Similarly, apply rated voltage and current with different power factor and noted the readings.
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 4 of 7
![Page 5: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/5.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
8. RECORD TEST SHEET
8.1 METER INFORMATION
Designation:
Type No.:
Model No :
Serial Number :
Rated Voltage (V)
Rated Current (A)
Frequency (HZ)
Auxiliary Power (V)
8.2 PROGRAMMED METER SETTINGS
CT Ratio:
VT Ratio:
Multiply by Constant:
Primary Watt Hour Constant:
8.3 DISPLAY CHECK (a) VOLTAGE
PhaseVoltage Applied
(V)Expected Reading
(kV)Meter Display Reading
(kV)Remarks
R-N
Y-N
B-N
R-Y
Y-B
B-R
(b) CURRENT
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 5 of 7
![Page 6: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/6.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
PhaseInjected Current
(A)Expected Reading
(kA)Meter Display Reading
(kA)Remarks
R-N
Y-N
B-N
(c) POWER FACTOR
PhaseAngle
(between V&I)Expected Reading Meter Display Reading Remarks
R-N
Y-N
B-N
RYB
(d) ACTIVE POWER
PhaseVoltage
Applied (V)Current
Injected (A)Angle
(between V&I)
Expected Reading
Meter Display Reading
Remarks
R-N
Y-N
B-N
RYB
(e) REACTIVE POWER
PhaseVoltage
Applied (V)Current
Injected (A)Angle
(between V&I)
Expected Reading
Meter Display Reading
Remarks
R-N
Y-N
B-N
RYB
(f) APPRAENT POWER
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 6 of 7
![Page 7: RM-METER Test Report Rev 1](https://reader035.vdocument.in/reader035/viewer/2022081007/55cf924c550346f57b954621/html5/thumbnails/7.jpg)
Gulf Cooperation CouncilInterconnection AuthorityGCCIA
TRANSMISSION & DISTRIBUTION
Engineer
GCC Interconnection Project - Phase I
RM Site Acceptance Test ReportENERGY METER
Bay Ref: RMSubstation: 400kV AL FADHILI
PhaseVoltage
Applied (V)Current
Injected (A)Angle
(between V&I)
Expected Reading
Meter Display Reading
Remarks
R-N
Y-N
B-N
RYB
(g) WATT HOUR
PhaseVoltage
Applied (V)Current
Injected (A)Angle
(between V&I)
Time Applied
Expected Reading
Meter Display Reading
RYB
(g) VAR HOUR
PhaseVoltage
Applied (V)Current
Injected (A)Angle
(between V&I)
Time Applied
Expected Reading
Meter Display Reading
RYB
8.4 FINAL CHECKSItem Description Result
1 All test equipment, leads, shorts and test block removed safely?
2 Disturbed customer wiring re-checked?
3 Alarms reset?
4 Secondary front cover replaced? (If applicable)
REMARKS………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
END OF REPORT
AREVA T&D GCCIA / SNCL
Signature Signature
Name Name
Date DateDoc. No. REV- 1 Page 7 of 7