rm1 equipment management list final rev-06 21-09-08
TRANSCRIPT
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
1/45
EQUIPMENT MANAGEMENT SYSTEM
September_2008
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
2/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
CLEANING:
INSP:
ADJ:
LUBRICATION:
REPAIR:
SPARE PARTS:
P
M
E
U
MH
Purpose
Area of Responsibility
Definition of Responsibility
Department Symbol
This Standard is created as a guideline for the equipment management and responsibility
of various departments involved in production and facility management.
General Service, Information technology, Quality Control, Safety departments
All Operation and Maintenance departments
Means external cleaning or area cleaning
Means inspection of operation parameter, equipment condition monitoring or any inspection
special monitoring equipment including physical inspection
Material Handlin De artment
Utility and Water Plant Department
Electrical-Automation-Instrumentation Department
Mechanical Maintenance Department
RM Production Department (Operations + Roll shop)
Means planning, procurement related jobs, Inspection of spare parts and inventory managing
Means all type of repair work, overhauling, condition maintenance
Complete lubricant changing for major mechanical equipments are part of repair work
Means Lubrication of rotary equipments, Make up of lubrication.
Means Adjustment of operation parameter or any on line adjustment related to operation of equipment.
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
WH
G
QCIT
S
CHECKED CHECKED
through General Service.
All Major Buildings, civil and structural repair or modification shall be responsibility of end user department
General Note:
Safety and Fire Department
Information Technology Department
General Services Department
Warehouse
Quality Control Department
APPROVED REVISED DATE APPROVED
ESTABLISHED DATE : 21-09-2008
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
3/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
1
2
3
4
5
1
2
1
through subcontractor.
individual department vehicles hired, cleaning is individual department responsibility
Responsibility description
Cleaning
Inspection
Adjustment
Routine inspection performed by end user of machines for regular safe and efficient operation like,
abnormal sound, fume, smoke, temperature, pressure, alarm, tripping, malfunction of logics-switches safety
equipments, leakages or any other defects.
Detailed inspection of any equipments like, condition monitoring, vibration analysis, reliability checks, tolerance limits of
rotary equipments, bearing condition analysis, oil analysis, simulations and logic checks calibration of equipments or
machinery and other sophisticated checks are to be done by either mechanical or electrical-Automation agency
Routine adjustment for smooth operation of equipments like valve operations, damper adjustment, gauges,
leaka e arrestin are classified as minor adustment and end user will be res onsible.
Regular cleaning of equipments or area required to keep the plant tidy and neat, cleaning of process
equipments where scale, sludge, scraps are handled are operations responsibility.
Cleaning of buildings, structure and general area like, roads, pits, sumps are to taken up by
end user with subcontract through general serv ice wherever required is operations responsibility.
Machinery and electrical equipments need internal cleaning or opening of equipments for cleaning
is maintenance responsibility as part of repair jobs
All mobile equipments which under material handling department cleaning is responsibility of MH Dept
2
CHECKED CHECKED
are part of repair jobs and respective maintenance agency who does repair will be responsible.
.
APPROVED
ESTABLISHED DATE : 21-09-2008
APPROVED REVISED DATE
Major adjustment demanding opening of equipment, calibrations, tuning of controllers or control valve,
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
4/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
1
E E E E
E E E E
E E E E
E E E E E
E E G E Repair on electrical request
E E E E
2
E E E E
E E E E
E E E E
E E E E
E E E E
E E E E
E E E E
3
E E E E
E E E E
E E E E
4
E E E E
E E E E
E E E E
Main and auxiliary drive panels
AC drive panel for main stand motors
AC drive panel for auxiliary motors
MCC Panel
Automation control system
PLC main CPU Panels
PLC remote I/O station
HMI work stations for LEVEL - 1 automation s stem
Power and distribution transformer
circuit breaker isolator /disconnector
Low voltage distribution panels
Main transformer
11 kv metal clad circuit breaker
Protection relay MV panel
Building and cable trench
33 kv cable
RM1 Incoming substation
33 kv circuit breaker
External protection relay panel
UPS
Building HVAC
ELECTRICAL INCOMING
33 KV Substation
Switch gear panel
E E E E
IT IT IT IT
E E E EE E E E
E E E E
5
P P G P
P P G P
P P M P Repair on request
P P M P Repair on request
P P M P Repair on request
CHECKED CHECKEDAPPROVED REVISED DATE
ESTABLISHED DATE : 21-09-2008
UPS and Battery charger
Field Instrument and MMD / FMD
Billet Bay General Area
Steel Structure
Steel Structure Cabins/Buildings
Railings
Walk Ways
SERVER & CLIENT work stations for LEVEL - 2 automation system
Networking of Level 2 Automation system
Process data acquisition system
APPROVED
Auxiliary Steel Structure
Ladders
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
5/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
P P G G
P P G P Repair on request
P P M P Repair on request
P P M P Repair on request
P P M P Repair on request
E E E E
E E E E
G G G G Repair on request by user dept.
6
P M M M M
P M M M M
P M M M M
P M M M M
E E E E E
P M M M M
E E E E E
E E/M E E/M ERepair/adjustment of structure/cylinder by
Mechanical
P M M M M
P M M M M
E E E E E Striker repair by Mech on request
P M M M M
E E E E E
P P M M Repair on request
P P M P Repair on request
Electrical Area Devices
Instrumentation Devices
Furniture & Other Assets
Billet Charging System
Billet Charging Table
Billet Lifter Mechanism
Disappearing Stopper Mechanism
Service Water Line
Potable Water Line
Fire water system
Service Water Line
Charging Roller Table Inside Furnace
Charging Roller Table Inside Furnace Motors
Cooling Water System
Fixed Stopper Mechanism
Entry Roller Table 01
Entry roller table motor
Entry Roller Table 02
Entry roller table motor
Weighing Mechanism
Kick In Device
Field sensor / devices
Concrete Structure Buildings
Billet Bay Office Ground Floor
7
M M M M M Refractory under Operation
M M M M M Refractory under Operation
M M M M M
M M M M M
M M M M M
P P M M P
P P M P Repair on request
P P M P Repair on request
P P M M Repair on request
E E E E E
P P P P
CHECKED CHECKED
Billet Reheating System
ESTABLISHED DATE : 21-09-2008
Translation Wheel
Lifting Cylinder
Fixed Hearth Assembly
Movable Hearth Assembly
APPROVED REVISED DATE APPROVED
Translation Cylinder
Charging Door
Inspection Doors
Maintenance Doors
Cooling Water System
Motor, Flume Flushing Pump Motor
Burners
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
6/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
M P M/E M Actuator under Electrical
E E M MPower up to sol .vlv connected/ terminal
under Electrical
E E E E E
E E E E E
P P M M
8
P P P P
P P P P
P P P P
P P P P DELETED.
9
P P/E M/E E Actuator under Electrical
E E M MPower up to sol .vlv connected/ terminal
under Electrical
E E E E E
U U M U Repair on request
E E E E E
10
P P M M M
E E E E E
E E E E E
P P/E M/E E Actuator under Electrical
E E M M Power up to sol.vlv connected/ terminal
E E E E E
Combustion Air System
Combustion air blower
Electrical Area Devices
Service Air S stem
Motor, Combustion Air Fan Motor 1
Motor, Combustion Air Fan Motor 2
Furnace Roof Refractory
Purging System
Combustion Gas System
Control Valves and actuators
Solenoid Valves
Electrical Area Devices
NG Valve Stand up to PRV station
Instrumentation Devices
Scale through cleaning
Refractory System
Control Valves and actuators
Solenoid Valves
Furnace Hearth Refractory
Furnace Wall Refractory
Control Valves and actuators
Solenoid Valves
Electrical Area Devices
Instrumentation Devices
E E E E E
E E E E E
E E E E EE E E E E
12
P M M M M
E E E E E
P M M M M All Scale cleaning by Production
P M M M M All Scale cleaning by Production
P M M M M
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
REVISED DATE APPROVED
Billet Discharging System
Discharging Roller Inside Furnace
Kick Off Mechanism
Kick Off Positioning
Kick Off Finger
Kick Off Encoder
APPROVED
Discharge Roller Motors
Kick Off Device
Motor, Service Air Fan Motor 1
Motor, Service Air Fan Motor 2
Electrical Area DevicesInstrumentation Devices
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
7/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
P M M M M
M M M M M
P P M M M Operating Mechanism by M/T
P M M M M All Scale cleaning by Production
E E E E E All Scale cleaning by Production
P M M M M All Scale cleaning by Production
P M M M M All Scale cleaning by Production
P E E E E All Scale cleaning by Production
P M M M M All Scale cleaning by Production
E E E E E All Scale cleaning by Production
E E E E E All Scale cleaning by Production
13
M M M M M
P P M M M Refractory Repair by Production
P P M M M Refractory Repair by Production
E E E E E
E E E E E
E E E E E
14
P P G P Repair on request
P P G P Repair on request
P P M P Repair on request
P P M P Re air on re uest
Auxiliary Steel Structure
Ladders
Railin s
Kick Off Water And Air Piping
Kick Off Grease Piping
Exhaust Fan Motor, 30Kw
Electrical Area Devices
Instrumentation Devices
Mill Bay General Area
Steel Structure
Discharge Door No. 1 and 2
Steel Structure Cabins/Buildings
Chimney
Roller 13, 21, 29, 37, 45 degree
Electrical Area Devices
Instrumentation Devices
Chimney & Recuperator System
Exhaust Duct Zone Drainage Pump
Damper Valve
Return Roller Table Motors
Discharging Roller table outside Furnace
Discharging Roller table outside Furnace motors
Billet Rejecting Mechanism
Return Roller Table
P P M P Repair on request
P P G P Repair on request
P P M P Repair on request
P P M M Repair on request
P P M M Repair on request
P P M M Repair on request
E E E E E
E E E E E
G G G G
15
P M M M P/M Rings inventory by Production
E E E E E
CHECKED CHECKEDAPPROVED
Pinch Roll Assembly
Drive Assembly
APPROVED REVISED DATE
ESTABLISHED DATE : 21-09-2008
Circulating Water Line
Natural Gas Pipeline
Pinch Roll No. 1
Electrical Area Devices
Instrumentation Devices
Furniture & Other Assets
Walk Ways
Concrete Structure Buildings
Service Water LineCommon Bay Equipments
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
8/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E/M E E E Alignment, coupling etc by MECH on
E E E E E
16
P M M M M
P P M P Repair on request
E E E E E
17
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
P P M M Up to Stand / Repair on request
E E E E E
E E E E E
Cooling Water Line
Electrical Area Devices
Instrumentation Devices
Vertical Stand V2
Protective Cover
Spindle Guard
Drive Spindles And Wobblers Assembly
Main Drive Gear Box H1
Motor Coupling For Main Drive H1
Motor, Stand 01,
Rest Bars
Radial Screw Down System # 1
Pneumatic Air Motor
Roll Chocks
Horizontal Stand Housing # 1
Motor, Pinch roll 01 Motor,
Electrical Area Devices
Snap Shear No. 1
Roll Changing Sledge (Car)
Spindle Support Assembly
Snap Shear Assembly
Shear blades
Electrical Area Devices
Horizontal Stand H1
P P P P P
P P P P P
P P P P PP P P P P
P P P P P
M M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVEDAPPROVED REVISED DATE
Drive Spindles V2 And Wobblers Assembly
Main Drive Bevel Gear Box V2
Motor Coupling For Main Drive V2
Motor, Stand 02,
Roll Chocks
Spindle Support Assembly
Scale Protection Hood
Protective Cover
Vertical Stand Housing # 2
Rest Bars
Radial Screw Down System # 2Pneumatic Air Motor
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
9/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
P P M M Repair on request
E E E E E
E E E E E
19
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
P P M M Repair on request
E E E E E
E E E E E
20
P P P P P
P P P P P
P P P P P
Cooling Water Line
Electrical Area Devices
Instrumentation Devices
Roll Chocks
Roll Changing Sledge
Spindle Support Assembly
Protective Cover
Spindle Guard
Motor Coupling For Main Drive H3
Motor, Stand 03,
Vertical Stand V4
Vertical Stand Housing # 4
Rest Bars
Radial Screw Down S stem # 4
Drive Spindles And Wobblers Assembly H3
Instrumentation Devices
Horizontal Stand H3
Horizontal Stand Housing # 3
Rest Bars
Radial Screw Down System # 3
Main Drive Gear Box H3
Pneumatic Air Motor
Cooling Water Line
Electrical Area Devices
P P P P P
P P P P P
M M M M MM M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
P P M M Repair on request
E E E E E
CHECKED CHECKEDAPPROVED REVISED DATE
ESTABLISHED DATE : 21-09-2008
APPROVED
Spindle Support AssemblyScale Protection Hood
Protective Cover
Drive Spindles And Wobblers Assembly V4
Main Drive Bevel Gear Box V4
Motor Coupling For Main Drive V4
Motor, Stand 04,
Cooling Water Line
Electrical Area Devices
Pneumatic Air Motor
Roll Chocks
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
10/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
21
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P M M M
M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
E E E E E
22
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
Rest Bars
Radial Screw Down System # 6
Pneumatic Air Motor
Roll Chocks
Spindle Guard
Drive Spindles And Wobblers Assembly H5
Vertical Stand V6
Vertical Stand Housing # 6
Motor, Stand 05,
Cooling Water Line
Electrical Area Devices
Instrumentation Devices
Roll Chocks
Roll Changing Sledge
Spindle Support Assembly
Protective Cover
Instrumentation Devices
Horizontal Stand H5
Main Drive Gear Box H5
Motor Coupling For Main Drive H5
Horizontal Stand Housing # 5
Rest Bars
Radial Screw Down System # 5
Pneumatic Air Motor
M M M M M
M M M M
M M M MM M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
E E E E E
23
P P P P P
CHECKED CHECKEDAPPROVEDAPPROVED
Electrical Area Devices
Instrumentation Devices
Horizontal Stand H7
Horizontal Stand Housing # 7 Type 280
Spindle Support Assembly
Scale Protection Hood
REVISED DATE
ESTABLISHED DATE : 21-09-2008
Main Drive Bevel Gear Box V6
Motor Coupling For Main Drive V6
Motor, Stand 06,
Cooling Water Line
Protective Cover Drive Spindles And Wobblers Assembly V6
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
11/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
P P P P P
P P P P P
P P P P P
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
E E E E E
24
P P P P P
P P P P P
P P P P P
P P P P P
Utility Coupling to stand
Changing Rail-Long
Changing Rail-Short
Radial Screw Down System # 8
Roll Chocks
Spindle Retainer, Arrangement H7
Protective Covers
Spindle Guard
Drive Spindles And Wobblers Assembly H7
Spindle Support H7
Horizontal Stand Housing # 8 Type 280
Rest Bars
Motor Coupling For Main Drive H7
Motor, Stand 07,
Cooling Water Line
Electrical Area Devices
Instrumentation Devices
Horizontal Stand H8
Main Drive Gear Box H7
Bed Plate Clamping Device
Stand Shifting Device Assembly
Rest Bars
Radial Screw Down System # 7
Roll Chocks
M M M M M
M M M M M
M M M M MM M M M M
M M M M M
M M M M M
M M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVEDAPPROVED REVISED DATE
Spindle Guard
Drive Spindles And Wobblers Assembly H8
Main Drive Gear Box H8
Motor Coupling For Main Drive H8
Utility CouplingChanging Rail-Long
Changing Rail-Short
Spindle Support H8
Spindle Retainer, Arrangement H8
Protective Covers
Bed Plate Clamping Device
Stand Shifting Device Assembly
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
12/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
E E E E E
25
P P P P
P P M M Repair on request
26
P M M M M
P P M P Repair on request
P M M M
M M M M
M M M M
E E/M E E E Alignment, coupling etc by MECH on request
E E E E E
E E E E E
27
P P P P P
P P P P P
P P P P P
P P P P P
M M M M M
M M M M M
M M M M M
Roll Chocks
Bed Plate Clamping Device
Stand Shifting Device Assembly
Uti li t Cou lin
Motor, Stand 08,
Cooling Water Line
Instrumentation Devices
Horizontal Stand H9
Horizontal Stand Housing # 9 Type 280
Rest Bars
Scrap Deflector On Rotary Shear
Motor, Rotary Crop And Cobble Shear,
Instrumentation Devices
Intermediate Stand Trough
Radial Screw Down System # 9
Electrical Area Devices
Electrical Area Devices
Rotary Shear Assembly
Shear Blades
Scrap Chute With Switch
Compressed Air and Control unit
Dummy Troughs
Cooling Water Line
Rotary Crop And Cobble Shear
M M M M M
M M M M M
M M M M MM M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVED REVISED DATE APPROVED
Protective Covers
Spindle Guard
Drive Spindles And Wobblers Assembly H9
Main Drive Gear Box H9
Cooling Water Line
Electrical Area Devices
Motor Coupling For Main Drive H9
Motor, Stand 09,
Changing Rail-Long
Changing Rail-Short
Spindle Support H9Spindle Retainer, Arrangement
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
13/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
28
P P P P P
P P P P P
P P P P P
P P P P P
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
E E E E E
29
M M M M M
Main Drive Gear Box H10
Motor Coupling For Main Drive H10
Motor, Stand 10,
Cooling Water Line
Spindle Retainer, Arrangement
Protective Covers
Electrical Area Devices
Instrumentation Devices
Snap Shear No. 02
Sna Shear Assembl
Radial Screw Down System # 10
Roll Chocks
Utility Coupling
Changing Rail-Long
Changing Rail-Short
Spindle Support H10
Spindle Guard
Drive Spindles And Wobblers Assembly H10
Bed Plate Clamping Device
Stand Shifting Device Assembly
Instrumentation Devices
Horizontal Stand H10
Horizontal Stand Housing # 10 Type 280
Rest Bars
P P M P Repair on request
E E E E E
30P P P P P
P P P P P
P P P P P
P P P P P
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVEDAPPROVED REVISED DATE
Stand Shifting Device Assembly
Utility Coupling
Changing Rail-Long
Changing Rail-Short
Horizontal Stand H11Horizontal Stand Housing # 11 Type 280
Rest Bars
Radial Screw Down System # 11
Roll Chocks
Bed Plate Clamping Device
Shear blades
Electrical Area Devices
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
14/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
M M M M M
M M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
P P M M Repair on request
P P G/U G/U Repair on request
E E E E E
E E E E E
31
M M M M M
E E E E E
32
P P P P P
P P P P P
P P P P P
P P P P P
M M M M M
M M M M M
M M M M M
Rest Bars
Radial Screw Down System # 12
Cooling Water System
Service Water Line
Potable Water Line
Electrical Area Devices
Looper Assembly
Electrical Area Devices
Horizontal Stand H12
Horizontal Stand Housing # 12 Type 280
Protective Covers
Spindle Guard
Drive Spindles And Wobblers Assembly H11
Main Drive Gear Box H11
Motor Coupling For Main Drive H11
Motor, Stand 11,
Instrumentation Devices
Roll Chocks
Bed Plate Clamping Device
Stand Shifting Device Assembly
Uti li t Cou lin
Looper Assembly 01
Spindle Support H11
Spindle Retainer, Arrangement
M M M M M
M M M M M
M M M M MM M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
CHECKED CHECKED
Motor Coupling For Main Drive H12
Motor, Stand 12,
APPROVED
ESTABLISHED DATE : 21-09-2008
Protective Covers
Spindle Guard
Circulating Water Line
APPROVED REVISED DATE
Drive Spindles And Wobblers Assembly H12
Main Drive Gear Box H12
Spindle Support H12Spindle Retainer, Arrangement
Changing Rail-Long
Changing Rail-Short
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
15/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
E E E E E
33 M M M M M
M M M M M
E E E E E
34
P P P P Repair on request
35
P P P P P
P P P P P
P P P P P
P P P P P
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M
M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
Spindle Guard
Main Drive Gear Box H13
Motor Coupling For Main Drive H13
Motor, Stand 13,
Utility Coupling
Changing Rail-Long
Changing Rail-Short
Spindle Support H13
Spindle Retainer, Arrangement
Protective Covers
Dummy Troughs
Horizontal Stand H13
Horizontal Stand Housing # 13 Type 280
Rest Bars
Radial Screw Down System # 13
Roll Chocks
Bed Plate Clamping Device
Stand Shifting Device Assembly
Looper Assembly 02
Looper Assembly
Electrical Area Devices
Intermediate Stand Trough 2
Electrical Area Devices
Instrumentation Devices
,
M M M M M
P P M M Repair on request
E E E E EE E E E E
36
M M M M M
E E E E E
37
P P P P P
P P P P P
P P P P P
P P P P P
CHECKED CHECKEDAPPROVED
Electrical Area Devices
Horizontal Stand H14
Radial Screw Down System # 14
Roll Chocks
ESTABLISHED DATE : 21-09-2008
APPROVED REVISED DATE
Horizontal Stand Housing # 14 Type 280
Rest Bars
, ,
Electrical Area DevicesInstrumentation Devices
Looper Assembly 03
Looper Assembly
Drive Spindles And Wobblers Assembly H13
Circulating Water Line
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
16/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M
M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on request
P P M M Repair on request
E E E E E
E E E E E
38
P P M M M
P P M M M
P P M M M
E E M M E
39
P P P P P Repair on request
Stand Change Car H11-H14
Stand Change Car Unit H11-H14
Track Roller Assembly
Guide Roller Assembly
Electrical Area Devices
Intermediate Stand Trough 3
Dummy Troughs
Tem core Coolin Line
Spindle Guard
Drive Spindles And Wobblers Assembly H14
Main Drive Gear Box H14
Motor Coupling For Main Drive H14
Motor, Stand 14,
Circulating Water Line
Electrical Area Devices
Instrumentation Devices
Spindle Retainer, Arrangement H14
Protective Covers
Bed Plate Clamping Device
Stand Shifting Device Assembly
Utility Coupling
Changing Rail-Long
Changing Rail-Short
Spindle Support H14
P P M M M Repair on request
P P M M M Repair on request
E E E E EP P M M Repair on request
M M M/E M Actuator under Electrical
M M M MPower up to sol.vlv connected/ terminal under
Electrical
E E E E E
E E E E E
41
P P P P Repair on request
42
M M M M M
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVEDAPPROVED REVISED DATE
Intermediate Cooling Line Trough
Dummy Troughs
Cooling Bed System
Cooling Bed System
Valves and actuators
Solenoid Valves
Electrical Area Devices
Instrumentation Devices
Tempcore Cooling Line Carriage 1
Tempcore Car Section 1,2,3
Tempcore Motor for tempcore car 1,2,3Cooling Water System
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
17/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
43
P P M M M
E E/M E E E Alignment, coupling etc by MECH on request
E E E E E
E E E E E
44
P M M M M
P P/M M P Repair on request
E E/M E E E Alignment, coupling etc by MECH on request
E E E E E
E E E E E
45P M M M M
P P/M M P Repair on request
E E/M E E E Alignment, coupling etc by MECH on request
E E E E E
E E E E E
46
P M M M M
E E E E E
E E E E E
47
P M M M M
Run In Roller Tables
Approach Roller Table Assembly Motors 1 to 11
Motor, Rot-Fish Motor,
Electrical Area Devices
Instrumentation Devices
Chopping Shear
Chopping Shear Assembly
Shear blades
Motor, Pinch Roll 30 Kw
Electrical Area Devices
Instrumentation Devices
Rotary Finishing Shear
Rotary Finishing Shear Assembly
Shear blades
Motor, Scrap Shear Motor,
Electrical Area Devices
Instrumentation Devices
Approach Roller Table
Approach Roller Table Assembly
Run In Roller Table 01
Electrical Area Devices
Instrumentation Devices
Pinch Roll Unit 2
Pinch Roll 2 Assembly
E E E E E
P M M M M
E E E E EP M M M M
E E E E E
P M M M M
E E E E E
P M M M M
E E E E E
P M M M M
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Run In Roller Table 06
APPROVED REVISED DATE APPROVED
Run In Roller Table 03
Run In Roller Table 03 Motors 1 to 14
Run In Roller Table 04
Run In Roller Table 04 Motors 1 to 14
Run In Roller Table 05
Run In Roller Table 05 Motors 1 to 14
Run In Roller Table 01 Motors 1 to 14
Run In Roller Table 02
Run In Roller Table 02 Motors 1 to 14
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
18/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
E E E E E
48
P M M M M
E E E E E
49
P M M M M
M M M M M
E E E E E
50
M M M M M
M M M M M
E E E E E
E E E E E
51
P M M M M
52
P M M M M
M M M M M
M M M M M
M M M M M
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
E E E E EElectrical Area Devices
Straightening Grid Arrangement
Rake Drive Arrangement
Fixed Rake
Electrical Area Devices
Bearing Assembly And Conveyor Of Moving And Fixed Rake
Motor, Rake Motor,
Compensation - Brake Slide Arrangement
Motor, Brake Slide Motor, 75Kw
Electrical Area Devices
Retention Ledges
Tilting Wall Arrangement
Cooling Bed
Cooling bed Rake
Separator Ledge - Arrangement
Drive - Brake Slide Arrangement
Run In Roller Table 06 Motors 1 to 14
Electrical Area Devices
Separating Switch
Separating Switch Assembly
Electrical Area Devices
Bottom Wall
Trough Side Walls
Brake Flap - Arrangement
M M M M M
M M M M M
P M M M ME E E E E
E E E E E
53
P M M M M
M M M M M
E E E E E
E E E E E
CHECKED CHECKED
Arrangement Axial Fans-Fan Pedestal
Cooling bed fan 1 to 42
Electrical Area Devices
Aligning Device Assembly
Aligning Roller Drive
Align Roller Table
Cooling Bed Fan Group
Cooling Bed Lifting Table Assembly
ESTABLISHED DATE : 21-09-2008
APPROVEDAPPROVED REVISED DATE
Align Roller Table Motors 1 to 24
Electrical Area Devices
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
19/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
54
M M M M M
E E E E E
E E E E E
55
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
M M M M M
E E/M E E E Alignment, coupling etc by MECH on
request
E E E E E
56
P M M M M
P M M M M
P M M M M
P M M M M
P M M M M
E E E E E
P M M M M
E E E E E
P M M M M
E E E E E
P M M M M
E E E E E
P M M M M
Transport Roller Tables
Trans ort Roller Table 06
Instrumentation Devices
Chain Type Transfer Device
Transport Roller Table 02
Transport Roller Table 02 Motor 1 to 10
Transport Roller Table 03
Transport Roller Table 03 Motor 1 to 8
Transport Roller Table 05
Transport Roller Table 05 Motor 1 to 4
Conveying Roller Table Assembly
Transport Roller Table 01Motor 1 to 35
Chain Type Transfer Device Assembly
Motor, Chain Type Transfer Device Motor,
Lifting Beam Assembly
Motor, Lifting/Lowering Device Motor,
Conveyor Roller Table Sub-Assembly 01
Conveyor Roller Table Sub-Assembly 02
Conveyor Roller Table Sub-Assembly 03
Transport Roller Table 01
Electrical Area Devices
Coolant Recirculation System pump motor 1 and 2
Recirculation Water System
Coolant Recirculation System
E E E E E
E E E E E
57P M M M M
P M M M M
E E E E E
58
M M M M M
M M M M M
M M M M M
M M M M M
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVED REVISED DATE APPROVED
Arrangement - Gear
Top Knife Slide (Arrangement)
Arrangement Knife Fixing Unit
Transport Roller Table 06 Motor 1 to 5
Electrical Area Devices
Disappearing Stopper Disappearing Stop Sub-Assembly 01
Electrical Area Devices
Cold Shear System
Arrangement Housing
Disappearing Stop Sub-Assembly 02
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
20/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M/E M/E
E E E E E
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
M M M M M
P P M P Repair on request
E E/M E E E Alignment, coupling etc by MECH on
request
E E E E E
E E E E E
E E E E E
59 M M M M M
E E E E E
E E E E E
Motor, Holding Down Roll
Electrical Area Devices
Instrumentation Devices
Electrical Area Devices
Oil Circulation Lubrication-
Length Gauge
Motor, Length Gauge Motor, 7.5Kw
Hydr.Release Device Of Knifes
Arrangement
Knife Changing Device
Scrap Chute With Switch
Compressed Air - Pipe Lines
Shear Blades
Motor, Cold Shear Motor,
Oil Circulation Package
Hydraulics Connection
Hold-Down Device, Arrangement
Main Drive, Arrangement
Arrangement Lifter Roll
Pneumatic - Pipe Line
Rating Plate
Drive For Grease Pump,
Detection Rollers
Arrangement Tail-End Pusher (Left-Hand Design)
60
P P G G Repair on request
G P G G Repair on request
G P M M Repair on request
G P M M Repair on request
G P M M Repair on request
G G/P G G
M M M M M
P P G/U G/U Repair on request
E E E E E
E E E E E
CHECKED CHECKEDAPPROVED
Electrical Area Devices
ESTABLISHED DATE : 21-09-2008
Auxiliary Steel Structure
Ladders
Instrumentation Devices
APPROVED REVISED DATE
Railings
Walk Ways
Concrete Structure Buildings
Product Bay General Area
Steel Structure
Steel Structure Cabins/Buildings
Potable Water Line
Common Bay Equipments
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
21/45
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
22/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
M M M M M
E E E E E
E E E E E
E E E E E
66
P M M M M
M M M M M
E E E E E
E E E E E
67
M M M M M
E E E E E
E E E E E
68
M M M M M
E E E E E
E E E E E
69
P P P IT IT
P P P P P
E E E E E
P P IT IT
70
P P G G Re air on re uestSteel Structure
Bundle Cross Chain Transport Motor, 5.5Kw
Tag Printing Machine
Tag Welding Machine
Electrical Area Devices
Bundle Weighing Mechanism
Instrumentation Devices
Tag Printer
Mill Work Shop General Area
Lifting Bundle Cross Chain Transport Motor, 9.2Kw
Electrical Area Devices
Bundle Cross Chain Transport
Bundle Cross Chain Mechanism
Electrical Area Devices
Tag Printing & Welding System
Lifting Bundle Cross Chain Transport
Bundle Cross Chain Mechanism
Loading Roller Table 03
Loading Roller Table Group 03, Motor 01 to 07
Electrical Area Devices
Instrumentation Devices
Bundle Weighing System
Stopper Width 500 Mm
Electrical Area Devices
P P G G Repair on request
P P M M Repair on request
P P M M Repair on request
P P M M Repair on request
G G/P G G
M M M M M
P P M M Repair on request
P P M M Repair on request
P P G/U G/U Repair on request
E E E E E
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Instrumentation Devices
APPROVED REVISED DATE APPROVED
Electrical Area Devices
Steel Structure Cabins/Buildings
Auxiliary Steel Structure
LaddersRailings
Walk Ways
Concrete Structure Buildings
Common Bay Equipments
Cooling Water System
Potable Water Line
Service Water Line
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
23/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
P P IT IT Repair on request
P G/P G G Repair on request
71 P P P P P
P P P P P
P P P P P
P P P P P
E E E E
P P P P P
E E E E
P P P P P
E E E E
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P PMovable Roll Chan e Unit
Column Drilling & Milling Machine Pf01
Schechtl Motorized Guillotine Shear
Metal Power Hacksaw Psb 280 U
Electrical Control system for CNC Lathe P 300/400 CNC X 2000
Double Wheel Pedestal Grinder Ds 12/200
Tilting Chair For Vertical Roll
Universal Lathe With Control System Knc5
Cutting Tool Grinder Sl 15 Hercules
Workshop Projector St 100-200 Hercules
Electrical Fork Lift Em 45
Erosion Marking Machine Gm 1800
Resitron Astro Ashlow Branding Machine
CNC 2 Axes Lathe Rnc4
CNC Lathe P 200/300 CNC X 2000 F Hercules
Electrical Control system for CNC Lathe P 200/300 CNC X 2000 F
IT Equipments
Furniture & Other Assets
Roll Shop Equipments
Concrete Structure Buildings
Roll Shop Office
CNC Lathe P 300/400 CNC X 2000 Hercules
Electrical Control system for CNC Lathe P 300/400 CNC X 2000
CNC Lathe P 300/400 CNC X 2000 Hercules
P P P P P
P P P P P
P P P P PP P P P P
P P P P PRepair on request by
maintenance.
P P P P PRepair on request by
maintenance.
P P P P PRepair on request by
maintenance.
P P P P P
P P P P P
P P P P P
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVEDAPPROVED REVISED DATE
Shiftable Roll Change Unit
Sand Blasting Machine
Dorr Ecoclean Steam Cleaner
Pneumatic Pumps
Bolt Tensioning Device Schaff Ssv M120 X 10
Bolt Tensioning Device Schaff Ssv M100 X 8
Ehrle Etronic High Pressure Cleaner Hd 623
Welding Machine
Skf Induction Heater
Skf Induction Heater T1H 210
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
24/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
P P P P P
E E E E E
E E E E E
P P IT IT Repair on request
P P G G Repair on request
72
P P P P P
P P P P P
P P P P P
P P P P P
M M M M M
P P P P P
P P P P P
M M M M M
P P P P P
P P P P P
M M M M M
M M M M M
Semi Automatic Band Sawing Machine Sbl 320 G
Hydraulic Press Hpe 100-3
Pi e Threadin Machine - Tornado 2010
Double Wheel Pedestal Grinder Ds 12/200
Welding Machine
Mechanical Work Shop Area
CNC 2 Axes Lathe Rnc4
Universal Knee Type Milling Machine Uf 28
Universal Vertical Drilling Machine Sb 50 R
Combined Column & Drilling Machine Pf 01
Shear Blade Grinding Machine Ar21 U9
Universal Tool Grinding Machine S11
Guillotine Shear Ecocut1/10-31
Furniture & Other Assets
Skf Air Driven Pump Thap 300E
Roll Management
Sandwich Type Roll / Arbor Cs 560
Sandwich Type Roll / Arbor Cs 450
Tungsten Carbide Roll Assembly
Machine Tools
Guide System
Electrical Area Devices
Instrumentation Devices
IT Equipments
M M M M M
P P IT IT Repair on request
P P G G Repair on request
73
E E E E E
G G E E E
E E E G E Repair on request
E E E G E Repair on request
E E E G E Repair on request
G G/E E G E Repair on request
E E E E E
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Common Bay Equipments
Billet Bay Office Ground Floor
APPROVED REVISED DATE APPROVED
Steel Structure Cabins/Buildings
Auxiliary Steel Structure
Ladders
Railings
Walk Ways
Concrete Structure Buildings
Hydraulic Pipe Bending Machine - Mingori M60
IT Equipments
Furniture & Other AssetsQA/Electrical Building General Area
Steel Structure
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
25/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E M M Repair on request
E E M M Repair on request
E E G/U G/U Repair on request
E E E E E
E E E E E
E G/E IT IT Repair on request
E E G G Repair on request
74
E E E E E
E E IT IT Repair on request
E G/E G G Repair on request
75E E E E E
E E IT IT Repair on request
E G/E G G Repair on request
76
P P IT IT Repair on request
P G/P G G Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
A - Mechanical Testing Laboratory
Kn 600 Universal Testing Machine
Di ital Hardness Tester 713 - Sr - D
Kn 1000 Universal Testing Machine
Rib Area Measurement Device
Furniture & Other Assets
Electrical Work Shop Area
All electrical workshop equipments
IT Equipments
Furniture & Other Assets
Quality Assurance Laboratory/T.SERVICE
IT Equipments
Furniture & Other Assets
IT Equipments
Cooling Water System
Fresh Water Line
Potable Water Line
Electrical Area Devices
Instrumentation Devices
IT Equipments
Furniture & Other Assets
Electronic Work Shop Area
All instruments and calibrator
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
QC QC QC M/0 QC O = Outsourced / Repair on request
E E E E E
QC QC IT IT Repair on request
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Electrical Area Devices
APPROVED
Rotary Bending Fatigue Testing Machine
Cold Bending Test Machine type H 0065
Weighting Balance 12 Kg
Weighing Balance 8 Kg
IT Equipments
APPROVED REVISED DATE
Pendulum Impact Tester Cp 300
Test Bar Dividing Machine For Tension Test Bars
Test Bar Dividing Machine For Tension Test BarsManual Broching Machine For Charpy Specimens
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
26/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
QC GQC G G Repair on request
QC QC QC M/O QC O = Outsourced / Repair on request
QC QC QC M/O QC O = Outsourced / Repair on request
QC QC QC M/O QC O = Outsourced / Repair on request
E E E E E
E E E E E
QC QC IT IT Repair on request
QC GQC G G Repair on request
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
E E E E E
E E E E E
QC QC IT IT Repair on request
QC GQC G G Repair on request
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
Hot Mounting Press
Metallographic Cut-Off Machine
En raver
Ultrasonic Cleaning Unit Ec
Sample Drier Sd
Disc Grinder
Bench Grinder
Carbon & Sulphur Analyzer Cs 800
Instrumentation devices
Electrical Area Devices
IT Equipments
Furniture & Other Assets
D - Metallographic Laboratory
Vacuum Optical Emission Spectrometer
Furniture & Other Assets
B - Non-Destructive Testing
Crack Depth Meter X-Rt 804
Metallographic Microscope Mic 1062
Instrumentation devices
Electrical Area Devices
IT Equipments
Furniture & Other Assets
C - Analytical Laboratory
Portable Optical Emission Spectrometer
QC QC QC QC QC
QC QC QC QC QC
QC QC QC QC QCQC QC QC QC QC
E E E E E
E E E E E
QC QC IT IT Repair on request
QC GQC G G Repair on request
QC QC QC M/O QC O = Outsourced / Repair on request
QC QC QC M/O QC O = Outsourced / Repair on request
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Electrical Area Devices
APPROVED REVISED DATE APPROVED
Electrical Area Devices
IT Equipments
Furniture & Other Assets
E - Machining Devices
Floor Mounting Drilling Machine Mc 32
Power Hack Saw
Weigh Balance 61 Gm
Belt Grinder
Dessicator Single Wheel Polisher M 2B 1
Instrumentation devices
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
27/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
QC QC IT IT Repair on request
QC G/QC G G Repair on request
QC QC QC QC
QC QC QC QC QC
QC QC QC QC QC
E E E E E
E E E E E
QC QC IT IT Repair on request
QC G/QC G G Repair on request
77
U U G G Repair on request
U U G G Repair on request
U U M M Repair on request
U U M M Repair on request
U U M M Repair on request
U U M M Repair on request
U U G G Repair on request
78
U U IT IT Repair on request
U G/U G G Repair on request
79
U U M U Repair on request
U U M U Re air on re uest
WTP Plant Office and all rooms
IT Equipments
Furniture & Other Assets
Sea Water Line
IT Equipments
Yard Pipelines and equipments
Cooling Water System
Steel Structure
Steel Structure Cabins/Buildings
Auxiliary Steel Structure
Ladders
Railings
Walk Ways
Concrete Structure Buildings
Furniture & Other Assets
RM 1 Water Treatment Plant General
Instrumentation Devices
IT Equipments
Furniture & Other Assets
F - Measuring Tools
G - Other Equipments
All other laboratory equipments and instruments
Electrical Area Devices
Instrumentation Devices
U U M U Repair on request
U U M U Repair on request
U U G/U G/U Repair on request
E E E E E
E E E E E
80
80.1
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Instrumentation Devices
APPROVED REVISED DATE APPROVED
Electrical Area Devices
Instrumentation Devices
Motor, Pump 610 B
Main Pump House
Indirect Cooling Water System 1
Pump 610 A
Make up Water Line
Circulating Water Line
Service Water Line
Pump 610 B
Motor, Pump 610 A
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
28/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
80.2
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
80.3
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
80.4
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
80.5
U U U M U Re air on re uest
Pump 613 C
Motor, Pump 613 C
Pum 614 A
Instrumentation Devices
Filter Flushing System
Pump 612 C
Motor, Pump 612 C
Instrumentation Devices
Direct Cooling Water System 2
Pump 613 A
Motor, Pump 613 A
Pump 613 B
Motor, Pump 613 B
Motor, Pump 612 B
Indirect Cooling Water System 2
Pump 611 A
Motor, Pump 611 A
Pump 611 B
Motor, Pump 611 B
Instrumentation Devices
Direct Cooling Water System 1
Pump 612 A
Motor, Pump 612 A
Pump 612 B
E E E E E
U U U M U Repair on request
E E E E EU U U M U Repair on request
E E E E E
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Electrical Area Devices
Instrumentation Devices
APPROVED REVISED DATE APPROVED
Fan Motor Blower 640A
Blower V640B
Motor, Blower V640B
Fan Motor Blower 640B
Pump 640 Filter De Oiling
Motor, Pump 640 Filter De Oiling
Motor, Pump 614 A
Pump 614 B
Motor, Pump 614 BBlower V640A
Motor, Blower V640A
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
29/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
80.6
U U U M U Repair on request
E E E E E
U U U U U Repair on request
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
U U U M U Repair on request
U U U M U Repair on request
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
E E E E E
80.7
U U U U U
U U U U U
U U U U U
U U U U U
Heat Exchanger Area
Heat Exchanger 620 A
Heat Exchan er 621 B
Heat Exchanger 620 B
Heat Exchanger 621 A
Hydraulic grab A
Hydraulic grab B
Pump 651A
Motor, Pump 651A
Pump 651B
Motor, Pump 651B
Electrical Area Devices
Instrumentation Devices
Scrapper Car 650
Sedimentation Basin
Oil Skimmer 650
Motor, Oil Skimmer 650
Filter 650 Sludge Separator
Pump 650 A
Motor, Pump 650 A
Pump 650 B
Motor, Pump 650 B
Pump 650 C
Motor, Pump 650 C
U U U U U
U U U U U
U U U U UE E E E E
E E E E E
80.8
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Instrumentation Devices
Filter 640 D
APPROVED REVISED DATE APPROVED
Filter Station General
Filter 640 A
Instrumentation Devices
Filter 640 B
Instrumentation Devices
Filter 640 C
Heat Exchanger 622 A
Heat Exchanger 622 B
Heat Exchanger 622 CElectrical Area Devices
Instrumentation Devices
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
30/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
81
U U U M U Repair on request
E E E E E
U U U M U Repair on request
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
U U U M U Repair on request
U U U M U
U U U M U
U U U M U
U U U U U
U U U U U
E E E E E
E E E E E
Oil Separator 817-1A Blow Down
Oil Separator 817-1B Blow Down
Chemical Dozin Station
Electrical Area Devices
Instrumentation Devices
Motor, Pump 812-1C
Pump 812-1D
Motor, Pump 812-1D
Pump 812-2A Diesel Pump
Engine, Pump 812-2A
Filter 812-1A Sea Water Filter
Filter 812-1B Sea Water Filter
Tank 812-1A Sea Water Tank
Pump 812-1C
Instrumentation Devices
Filter 640 E
Instrumentation Devices
Filter 640 F
Instrumentation Devices
Sea Water Booster Pump Station
Pump 812-1A
Motor, Pump 812-1A
Pump 812-1B
Motor, Pump 812-1B
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Motor, Pump 633 B
Pump 634 Biocide Dosing
APPROVED REVISED DATE APPROVED
Motor, Pump 631 B
Pump 632-IC System Tank Feed
Motor, Pump 632-IC
Pump 633 A
Motor, Pump 633 A
Pump 633 B
Pump 630 Tank Feed DC Inhibitor
Motor, 630 Tank Feed DC Inhibitor
Pump 631 AMotor, Pump 631 A
Pump 631 B
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
31/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
E E E E E
83
U U U M U Repair on request
U U U M U Repair on request
U U U M U Repair on request
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U U/M U Repair on request
U U E E Repair on request
U U U M U Repair on request
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
U U U M U Re air on re uest
Motor, Pump 818-1A
Pump 818-2A Fire Water Main
En ine, Pum 818-3A
Motor, Pump 818-2A
Pump 818-3A Fire Water Diesel
Pump 817-1A Service Water
Motor, Pump 817-1A
Pump 817-1B Service Water
Motor, Pump 817-1B
Pressure Vessel 817-1A Service Water
Control Panel
Tank 818-1A Fire Water
Pump 818-1A Fire Water Jockey
Tank 817-1B Service Water
Motor, Pump 634
Pump 641 Tank Feed Emulgator
Motor 641 Tank Feed Emulgator
Pump 642 Dosing Emulgator
Motor 642 Dosing Emulgator
Electrical Area Devices
Instrumentation Devices
Fire-Service Water Pump Station
Tank 670-1A Service Water Main
Tank 817-1A Service Water
U U U U/M U Repair on request
E E E E E
E E E E E
84
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Motor, Air compressor 665 D
Tank - Storage 665 A
APPROVED REVISED DATE APPROVED
Motor, Air compressor 665 A
Compressor 665 B
Motor, Air compressor 665 B
Compressor 665 C
Motor, Air compressor 665 C
Compressor 665 D
,
Pressure Vessel 818-1A Fire Water
Electrical Area Devices
Instrumentation DevicesMain Compressor Station
Compressor 665 A
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
32/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
u U U M u Repair on request
u U U U/M u Repair on request
E E E E E
U U U U/M U Repair on request
U U U U/M U Repair on request
E E E E E
U U U U/M U Repair on request
U U U M U Repair on request
E E E E E
U U U U/M U Repair on request
U U U U/M U Repair on request
E E E E E
U U U U/M U Repair on request
U U U U U Repair on request
U U U U U Repair on request
E E E E E
E E E E E
85
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U U/M U Repair on request
E E E E E
Motor, Oxygen Facility Pump 853 A
Pump 870 B
Electrical Area Devices
Motor, Oxygen Facility Pump 853 B
Tank 853-1A Liquid Oxygen Storage
System, Air compressor Condenser Fan 665 D
Compressor Drier 665 D
Oil Separator Condensate 665 A
Oil Separator Condensate 665 B
Electrical Area Devices
Instrumentation Devices
Oxygen Facility
Pump 870 A
Dryer 665 D
Tank - Storage 665 B
Dryer 665 A
System, Air compressor Condenser Fan 665 A
Compressor Drier 665 A
Dryer 665 B
System, Air compressor Condenser Fan 665 B
Compressor Drier 665 B
Dryer 665 C
System, Air compressor Condenser Fan 665 C
Compressor Drier 665 C
E E E E E
86
U U U M U Repair on request
U U U M U Repair on request
U U U M U
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U U/M U Repair on request
U U U M U Repair on request
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
Pump - Fountain 670-2A
Motor, Pump 670-2A, Fountain Pump
APPROVED REVISED DATE APPROVED
Motor, Pump 670-1A
Pump 670-1B
Motor, Pump 670-1B
Pump 670-1C
Motor, Pump 670-1C
Pressure vessel 670 1A Irrigation Sys
Instrumentation Devices
Irrigation Pump Station
Tank 670-2A Irrigation Water Tank 670-2B Irrigation Water
Pump 670-1A
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
33/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
u U U M u Repair on request
E E E E E
U U U M U Repair on request
U U U U U Repair on request
E E E E E
E E E E E
87
U U IT IT Repair on request
U U G G Repair on request
87.1
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
E E E E E
87.2
U U U U/E U Repair on request
U U U M U Repair on request
E E E E E
Instrumentation Devices
Electrolyzer System
Motor, Pum 811-2A
Electrolyzer Cell
Pump 811-2A Electrolyzer Feed
Motor, Sea Water Intake Pump 811-1A
Pump 811-1B
Motor, Sea Water Intake Pump 811-1B
Pump 811-1C
Motor, Sea Water Intake Pump 811-1C
Pump 811-1D
Motor, Sea Water Intake Pump 811-1D
Electrical Area Devices
Pump 811-1A
Pump - Fountain 670-2B
Motor, Pump 670-2B, Fountain
Pump 670-3A Fountain filter feed
Pump 670-4A Fountain sump Pump
Electrical Area Devices
Instrumentation Devices
Sea Water Jetty Area
IT Equipments
Furniture & Other Assets
Sea Water Intake Pumps
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
U U U M U Repair on request
E E E E E
E E E E E
E E E E E
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVED REVISED DATE APPROVED
Motor, Blower 811 A
Blower 811 B
Motor, Blower 811 B
Electrical Area Devices
Instrumentation Devices
,
Pump 811-3A Secondary Dosing
Motor, Pump 811-3A
Pump 811-4A Cell CleaningMotor, Pump 811-4A
Blower 811 A
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
34/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
88
U U U M U Repair on request
E E E E E
E E E E E
E E E E E
89
P P G G Repair on request
P P G G Repair on request
P P M M Repair on request
P P M M Repair on request
P P M M Repair on request
P P M M Repair on request
P P G G Repair on request
P P M M Repair on request
P P M M Repair on request
P P G/U G/U Repair on request
E E E E E
E E E E E
P P IT IT Repair on request
P G/P G G Repair on request
89.1
P E E E
P E E E
Furniture & Other Assets
Control Pulpit 1, Furnace
HMI work stations Control Pulpit for LEVEL - 1 & LEVEL 2
Control Desk
Panel, Burner Control
Walk Ways
Concrete Structure Buildings
Cooling Water System
Circulating Water Line
Service Water Line
Electrical Area Devices
Instrumentation Devices
IT Equipments
Railings
Air Blast - Compressor Station
Compressor 811
Motor, Compressor 811
Electrical Area Devices
Instrumentation Devices
Mill Area Control Rooms And Panels General
Steel Structure
Steel Structure Cabins/Buildings
Auxiliary Steel Structure
Ladders
P/E E E E
IT IT IT IT
P/E P/E E E
IT IT IT IT Repair on request
P G/P G G Repair on request
89.2
P E E E
P/E E E E
IT IT IT IT
P/E P/E E E
IT IT IT IT Repair on request
P G/P G G Repair on request
CHECKED CHECKED
ESTABLISHED DATE : 21-09-2008
APPROVED REVISED DATE APPROVED
Control Desk
HMI work stations Control Pulpit for LEVEL - 1 & LEVEL 2
Networking of Level 2 Automation system
Printers connected to Level 1 & Level 2 HMI work stations in Control
Pulpit
IT Equipments related to ERP
Furniture & Other Assets
automation system
Networking of Level 2 Automation system
Printers connected to Level 1 & Level 2 HMI work stations in Control
PulpitIT Equipments related to ERP
Furniture & Other Assets
Control Pulpit 2, Mill
-
8/9/2019 RM1 Equipment Management List Final Rev-06 21-09-08
35/45
ESS E
I T E M
C L E
A N I N G
I N S P
/ A D J
L U B
R I C A T I O N
R E P
A I R
S P A
R E P A R T S
REMARKS
TITLE PARTIAL CHARGES OF ROLLING MILL 1 EQUIPMENT MANAGEMENT
PRIMARY CLASSIFICATION GENERAL RULE NAME OF EQUIPMENT
SECONDARY CLASSIFICATION PLANT UNIT RM-1
TERTIARY CLASSIFICATION SUB PLANT PLANT
EQUIPMENT NAME
89.3
P E E E
P E E E
P E E E
P E E E
P/E E E E
IT IT IT IT
P/E P/E E E
IT IT IT IT Repair on request
P P IT IT Repair on request
P P G G Repair on request
89.4
E E E E E
E E E E E
E E E E E
E E E E E
E E E E E
U IT IT IT Repair on request
U G/U G G Repair on request
89.5
E E E E E
E E E E E
E E E E E
IT IT IT IT Re air on re uest
Control Room, Seawater Booster Area
Transformer T11
IT E ui ments
Booster Pump A to D Panels
Booster Pump A to D PLCP