145 FERC ¶ 61,160 UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
18 CFR Part 40
Docket No. RM13-5-000
Version 5 Critical Infrastructure Protection Reliability Standards
(Issued November 22, 2013) AGENCY: Federal Energy Regulatory Commission.
ACTION: Final rule.
SUMMARY: Pursuant to section 215 of the Federal Power Act, the Commission
approves the Version 5 Critical Infrastructure Protection Reliability Standards, CIP-002-5
through CIP-011-1, submitted by the North American Electric Reliability Corporation
(NERC), the Commission-certified Electric Reliability Organization. The CIP version 5
Standards address the cyber security of the bulk electric system and are an improvement
over the current Commission-approved CIP Reliability Standards. The CIP version 5
Standards adopt new cyber security controls and extend the scope of the systems that are
protected by the CIP Reliability Standards. The Commission also approves nineteen new
or revised definitions associated with the CIP version 5 Standards for inclusion in the
Glossary of Terms Used in NERC Reliability Standards. In addition, the Commission
directs NERC to develop modifications to the CIP version 5 Standards and submit
informational filings.
EFFECTIVE DATE: This rule will become effective [INSERT DATE 60 days after
publication in the FEDERAL REGISTER].
Docket No. RM13-5-000 - 2 -
FOR FURTHER INFORMATION CONTACT: Austin Rappeport (Technical Information) Office of Electric Reliability, Division of Reliability Standards and Security Federal Energy Regulatory Commission 1800 Dual Highway, Suite 201 Hagerstown, MD 21740 Telephone: (301) 665-1393 Daniel Phillips (Technical Information) Office of Electric Reliability, Division of Reliability Standards and Security Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Telephone: (202) 502-6387 Kevin Ryan (Legal Information) Office of the General Counsel Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Telephone: (202) 502-6840 Matthew Vlissides (Legal Information) Office of the General Counsel Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Telephone: (202) 502-8408 SUPPLEMENTARY INFORMATION:
145 FERC ¶ 61,160 UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. Version 5 Critical Infrastructure Protection Reliability Standards
Docket No. RM13-5-000
ORDER NO. 791
FINAL RULE
(Issued November 22, 2013)
1. Pursuant to section 215 of the Federal Power Act (FPA),1 the Commission
approves the Version 5 Critical Infrastructure Protection (CIP) Reliability Standards,
CIP-002-5 through CIP-011-1, submitted by the North American Electric Reliability
Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO).
The CIP version 5 Standards address the cyber security of the bulk electric system and
are an improvement over the current Commission-approved CIP Reliability Standards.
The CIP version 5 Standards adopt new cyber security controls and extend the scope of
the systems that are protected by the CIP Reliability Standards. The Commission also
approves nineteen new or revised definitions associated with the CIP version 5 Standards
for inclusion in the Glossary of Terms Used in NERC Reliability Standards (NERC
Glossary).
1 16 U.S.C. 824o (2012).
Docket No. RM13-5-000 - 2 -
2. The CIP version 5 Standards identify and categorize BES Cyber Systems using a
new methodology based on whether a BES Cyber System has a Low, Medium, or High
Impact on the reliable operation of the bulk electric system. At a minimum, a BES Cyber
System must be categorized as a Low Impact asset. Once a BES Cyber System is
categorized, a responsible entity must comply with the associated requirements of the
CIP version 5 Standards that apply to the impact category. The CIP version 5 Standards
also include 12 requirements with new cyber security controls, which address Electronic
Security Perimeters (CIP-005-5), Systems Security Management (CIP-007-5), Incident
Reporting and Response Planning (CIP-008-5), Recovery Plans for BES Cyber Systems
(CIP-009-5), and Configuration Change Management and Vulnerability Assessments
(CIP-010-1).
The CIP version 5 Standards are an improvement over the currently-approved CIP
Reliability Standards. The Commission determines that categorizing BES Cyber Systems
based on their Low, Medium, or High Impact on the reliable operation of the bulk electric
system, with all BES Cyber Systems being categorized as at least Low Impact, offers
more comprehensive protection of the bulk electric system. The Commission also finds
that the new cyber security controls improve the security posture of responsible entities.
Accordingly, the Commission approves the CIP version 5 Standards.
3. In addition to approving the CIP version 5 Standards, pursuant to section
215(d)(5) of the FPA, we direct NERC to develop modifications to the CIP version 5
Standards. As discussed below, we also direct NERC to submit informational filings
Docket No. RM13-5-000 - 3 -
regarding certain issues during and following implementation of the CIP version 5
Standards.2
4. First, pursuant to section 215(d)(5) of the FPA, the Commission directs NERC to
remove language found in 17 requirements in the CIP version 5 Standards that requires
responsible entities to implement the requirements in a manner to “identify, assess, and
correct” deficiencies.3 We support NERC’s move away from a “zero tolerance”
approach to compliance, the development of strong internal controls by responsible
entities, and NERC’s development of standards that focus on the activities that have the
greatest impact on Bulk-Power System reliability. However, the Commission is
concerned that the proposed language is overly-vague, lacking basic definition and
guidance that is needed, for example, to distinguish a successful internal control program
from one that is inadequate. Alternatively, NERC may propose modifications that
address the Commission concerns, discussed below, regarding the ambiguity and
enforceability of the “identify, assess, and correct” language. The Commission directs
NERC to submit a proposal for Commission approval within one year from the effective
date of this Final Rule.4
2 We note that the informational filings directed in this Final Rule are for
informational purposes only and will not be noticed, nor require Commission action.
3 See NERC Petition at 33.
4 The proposed one year deadline would pertain only to addressing the “identify, assess and correct” language and the directive concerning communication networks, not to the other proposed modifications discussed below.
Docket No. RM13-5-000 - 4 -
5. Second, pursuant to section 215(d)(5) of the FPA, the Commission directs NERC
to develop modifications that address security controls for Low Impact assets. As
discussed below, the adoption of the Low Impact BES Cyber Asset category will expand
the protections offered by the CIP version 5 Standards to additional assets that could
cause cyber security risks to the bulk electric system. Specifically, categorizing BES
Cyber Systems based on their Low, Medium, or High Impact on the reliable operation of
the bulk electric system, with all BES Cyber Systems being categorized as at least Low
Impact, offers more comprehensive protection of the bulk electric system. However, the
CIP version 5 Standards do not require specific controls for Low Impact assets nor do
they contain objective criteria from which to judge the sufficiency of the controls
ultimately adopted by responsible entities for Low Impact assets. As discussed below,
we direct that NERC develop modifications to the CIP version 5 Standards to address this
concern. While NERC may address this concern by developing specific controls for Low
Impact facilities, it has the flexibility to address it through other means, including those
discussed below.
6. Third, we approve the definition of BES Cyber Asset. In addition, we direct
NERC, pursuant to section 215(d)(5) of the FPA, to develop requirements that protect
transient electronic devices (e.g., thumb drives and laptop computers) that fall outside of
the BES Cyber Asset definition.5 While we are persuaded by NERC and others that it
5 As discussed below, NERC’s definition of BES Cyber Asset provides that a
“Cyber Asset is not a BES Cyber Asset if, for 30 consecutive calendar days or less, it is
(continued…)
Docket No. RM13-5-000 - 5 -
would be burdensome to include transient devices as BES Cyber Assets, we also believe
that further protections are needed in light of the potential vulnerabilities associated with
transient devices. Further, as discussed below, to better understand the scope and reach
of the term BES Cyber Asset, we direct NERC to conduct a survey of responsible entities
during the CIP version 5 Standards implementation periods to determine the number of
assets, by type, that fall outside the definition of BES Cyber Asset because the assets do
not satisfy the “15-minute” parameter.6 The Commission directs NERC to submit an
informational filing one year from the effective date of this Final Rule that assesses,
based on the survey results, whether the BES Cyber Asset definition will, with the 15-
minute parameter, cover the assets that are necessary to ensure the reliable operation of
the Bulk-Power System.
7. Fourth, the Commission approves the definition of Cyber Asset. In addition,
pursuant to section 215(d)(5) of the FPA, the Commission directs NERC to create a
definition of communication networks and to develop new or modified Reliability
Standards that address the protection of communication networks. The Commission also
directly connected to a network within an [Electronic Security Perimeter], a Cyber Asset within an [Electronic Security Perimeter], or to a BES Cyber Asset, and it is used for data transfer, vulnerability assessment, maintenance, or troubleshooting purposes.”
6 NERC’s BES Cyber Asset definition only includes Cyber Assets that “if rendered unavailable, degraded, or misused would, within 15 minutes of its required operation, misoperation, or non-operation, adversely impact one or more Facilities, systems, or equipment.…”
Docket No. RM13-5-000 - 6 -
directs its staff to include the issue of protecting the nonprogrammable components of
communications networks in the staff-led technical conference discussed herein.
8. The Commission approves 30 of the 32 Violation Risk Factors (VRF) proposed by
NERC. However, the Commission directs NERC to modify the VRF assignment for
Reliability Standard CIP-006-5, Requirement R3 from Lower to Medium and to modify
the VRF assigned to Reliability Standard CIP-004-5, Requirement R4 from Lower to
Medium. In addition, we direct NERC to modify eight of the Violation Severity Levels
(VSLs) for the CIP version 5 Standards.
9. The Commission approves NERC’s proposal to allow responsible entities to
transition from compliance with the currently-effective CIP version 3 Standards to
compliance with the CIP version 5 Standards. Thus, CIP-002-4 through CIP-009-4 will
not become effective, and CIP-002-3 through CIP-009-3 will remain in effect until the
effective date of the CIP version 5 Standards.7 The Commission also approves the
implementation plan and effective dates proposed by NERC.
I. Background
A. Section 215 of the FPA
10. Section 215 of the FPA requires the Commission-certified ERO to develop
mandatory and enforceable Reliability Standards, subject to Commission review and
7 On August 12, 2013, the Commission granted an extension of time to implement
the CIP version 4 Standards from April 1, 2014 to October 1, 2014. N. Am. Elec. Reliability Corp., 144 FERC ¶ 61,123 (2013).
Docket No. RM13-5-000 - 7 -
approval. Once approved, the Reliability Standards may be enforced in the United States
by the ERO, subject to Commission oversight, or by the Commission independently.8
Pursuant to the requirements of FPA section 215, the Commission established a process
to select and certify an ERO.9 The Commission subsequently certified NERC as the
ERO.10
B. Order Nos. 706 and 761
1. Order No. 706
11. On January 18, 2008, the Commission issued Order No. 706, which approved the
CIP version 1 Standards to address cyber security of the Bulk-Power System.11 In Order
No. 706, the Commission approved eight CIP Reliability Standards (CIP-002-1 through
CIP-009-1). While approving the CIP version 1 Standards, the Commission also directed
NERC to develop modifications to them to enhance the protection provided by the CIP
Reliability Standards. Subsequently, NERC filed the CIP version 2 and CIP version 3
8 16 U.S.C. 824o(e)(3) (2012). 9 Rules Concerning Certification of the Electric Reliability Organization; and
Procedures for the Establishment, Approval and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ¶ 31,204, order on reh’g, Order No. 672-A, FERC Stats. & Regs. ¶ 31,212 (2006).
10 N. Am. Elec. Reliability Corp., 116 FERC ¶ 61,062, order on reh’g and compliance, 117 FERC ¶ 61,126 (2006), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009).
11 Mandatory Reliability Standards for Critical Infrastructure Protection, Order No. 706, 122 FERC ¶ 61,040, order on reh’g, Order No. 706-A, 123 FERC ¶ 61,174 (2008), order on clarification, Order No. 706-B, 126 FERC ¶ 61,229 (2009), order on clarification, Order No. 706-C, 127 FERC ¶ 61,273 (2009).
Docket No. RM13-5-000 - 8 -
Standards in partial compliance with Order No. 706. The Commission approved these
Reliability Standards in September 200912 and March 2010,13 respectively.
2. Order No. 761
12. On April 19, 2012, the Commission issued Order No. 761, which approved the
CIP version 4 Standards (CIP-002-4 through CIP-009-4).14 Reliability Standard CIP-
002-4 (Critical Cyber Asset Identification) sets forth 17 uniform “bright line” criteria for
identifying Critical Assets. The Commission also accepted NERC’s proposed
implementation schedule for the CIP version 4 Standards, which are currently scheduled
to be fully implemented and enforceable beginning October 2014.15
C. NERC Petition and CIP Version 5 Standards
1. NERC Petition and Errata
13. In its January 31, 2013 petition, NERC seeks Commission approval of the CIP
version 5 Standards, nineteen new or revised NERC Glossary terms, VRF and VSL
12 N. Am. Elec. Reliability Corp., 128 FERC ¶ 61,291, order denying reh’g and
granting clarification, 129 FERC ¶ 61,236 (2009).
13 N. Am. Elec. Reliability Corp., 130 FERC ¶ 61,271 (2010).
14 Version 4 Critical Infrastructure Protection Reliability Standards, Order No. 761, 77 Fed. Reg. 24,594 (Apr. 25, 2012), 139 FERC ¶ 61,058 (2012), order denying reh’g, 140 FERC ¶ 61,109 (2012).
15 As noted above, the Commission extended the compliance deadline for the CIP version 4 Standards in Order No. 761 from April 2014 to October 2014.
Docket No. RM13-5-000 - 9 -
assignments, and an implementation plan.16 NERC maintains that the CIP version 5
Standards are just and reasonable, as they meet or exceed each of the guidelines that the
Commission identified in Order No. 672 for evaluating a proposed Reliability Standard.17
NERC asserts that the CIP version 5 Standards “serve the important reliability goal of
providing a cybersecurity framework for the identification and protection of BES Cyber
Systems … to support the reliable operation of the Bulk Power System.”18 In addition,
NERC states that the CIP version 5 Standards are “designed to be clear and
unambiguous” and the Commission should approve the CIP version 5 Standards as
“clearly enforceable.”19
14. Further, NERC maintains that the CIP version 5 Standards represent a significant
improvement to the currently-approved CIP Reliability Standards, as the CIP version 5
Standards require responsible entities to use a new approach to categorize all cyber
systems impacting the bulk electric system as having a Low, Medium, or High Impact.20
16 Reliability Standards CIP-002-5 through CIP-011-1 are not attached to this
Final Rule. The complete text of CIP version 5 Standards is available on the Commission’s eLibrary document retrieval system in Docket No. RM13-5-000 and is posted on the ERO’s web site, available at http://www.nerc.com.
17 See NERC Petition at 8 (citing Order No. 672, FERC Stats. & Regs. ¶ 31,204 at PP 320-337). See also NERC Petition, Exh. G (Order No. 672 Criteria for Approving Proposed Reliability Standards).
18 Id. at 10.
19 Id. at 27.
20 See id. at 15.
Docket No. RM13-5-000 - 10 -
NERC states that the new approach to classifying cyber systems “moves away from the
CIP version 4 ‘bright- line’ approach of only identifying Critical Assets (and applying CIP
requirements only to their associated Critical Cyber Assets), to requiring a minimum
classification of ‘Low Impact’ for all BES Cyber Systems.”21 NERC states that the
adoption of the Low-Medium-High Impact categorization “resulted from a review of the
National Institute of Standards and Technology (NIST) Risk Management Framework for
categorizing and applying security controls, a review that was directed by the
Commission in Order No. 706.”22
15. NERC also notes the adoption of new language within several of the CIP version 5
Standards in which the standard drafting team incorporated “a requirement that
Responsible Entities implement cyber policies in a manner to 'identify, assess, and
correct’ deficiencies.”23 NERC states that the “identify, assess, and correct” language is
“[c]onsistent with the NIST Risk Management Framework and the Commission’s
guidance in prior orders,” asserting that the “implementation of certain CIP version 5
requirements in a manner to ‘identify, assess, and correct’ deficiencies emulates the
FERC Policy Statement on Penalty Guidelines.”24 NERC further states that the “identify,
21 Id.
22 Id.
23 Id. at 33.
24 Id.
Docket No. RM13-5-000 - 11 -
assess, and correct” language “is included as a performance expectation in the
requirements, not as an enforcement component.”25
16. NERC asserts that the CIP version 5 Standards address “all applicable directives in
Order No. 706” while “eliminating unnecessary documentation requirements to allow
entities to focus on the reliability and security of the Bulk Power System.”26
Accordingly, NERC requests that the Commission approve the CIP version 5 Standards,
the new and revised definitions, the associated VRF and VSL assignments, and the
implementation plan. NERC requests that the CIP version 5 Standards become effective
on “the first day of the eighth calendar quarter after a Final Rule is issued in this
docket.”27
17. NERC requests prompt Commission action approving the CIP version 5 Standards
and associated implementation plan.28 With regard to the implementation plan, NERC
states that the proposed language “would allow entities to transition from CIP Version 3
to CIP Version 5, thereby bypassing implementation of CIP Version 4 completely upon
Commission approval.”29 NERC asserts that prompt approval of the CIP version 5
25 Id.
26 Id. at 5.
27 Id. at 2.
28 Id. at 5.
29 Id. at 4.
Docket No. RM13-5-000 - 12 -
Standards and implementation plan “would reduce uncertainty among Responsible
Entities regarding implementation of the CIP standards.”30
18. On September 30, 2013, NERC filed an errata with corrections to the VSLs for the
CIP version 5 Standards and revisions to the definitions of Electronic Access Control or
Monitoring Systems and Interactive Remote Access in which the term “Intermediate
Devices” is replaced with the term “Intermediate Systems.” On October 1, 2013, NERC
filed a supplemental errata to correct a formatting error in the September 30 errata.
2. CIP Version 5 Standards and NERC Explanation of Provisions
19. The CIP version 5 Standards include ten new or modified Reliability Standards.
20. CIP-002-5 – Cyber Security – BES Cyber System Categorization: CIP-002-5
is the first step in identifying BES Cyber Systems, which are assets which must be
protected by the cyber security standards. If a responsible entity does not identify any
BES Cyber Systems, it does not have compliance responsibility under the rest of the
proposed CIP Standards. However, a responsible entity that identifies BES Cyber
Systems must comply with CIP-003-5 to CIP-011-1, according to specific criteria that
characterize the impact of the identified BES Cyber Systems.
21. In particular, CIP-002-5 adds two new terms to the NERC Glossary that define the
assets subject to CIP protections. First, NERC defines a BES Cyber Asset as “[a] Cyber
Asset that if rendered unavailable, degraded, or misused would, within 15 minutes of its
30 Id. at 5.
Docket No. RM13-5-000 - 13 -
required operation, misoperation, or non-operation, adversely impact one or more
Facilities, systems, or equipment, which, if destroyed, degraded, or otherwise rendered
unavailable when needed, would affect the reliable operation of the Bulk Electric
System.”31 Second, NERC defines a BES Cyber System as “[o]ne or more BES Cyber
Assets logically grouped by a responsible entity to perform one or more reliability tasks
for a functional entity.”32
22. NERC states that Reliability Standard CIP-002-5 will require the identification
and categorization of BES Cyber Systems according to specific criteria that characterize
their impact for the application of cyber security requirements commensurate with the
adverse impact that loss, compromise, or misuse of those BES Cyber Systems could have
on the reliable operation of the bulk electric system.33
23. NERC states that CIP-002-5 “Attachment 1 – Impact Rating Criteria” identifies
three categories of BES Cyber Systems. The High Impact category covers large control
centers, similar to those control centers identified as Critical Assets in CIP-002-4. The
Medium Impact category covers generation and transmission facilities, similar to those
identified as Critical Assets in CIP-002-4, along with other control centers not identified
as Critical Assets in CIP-002-4. The Low Impact category covers all other BES Cyber
31 Id. at 14.
32 Id.
33 Id. at 11.
Docket No. RM13-5-000 - 14 -
Systems. NERC states that the Low Impact category provides protections for systems not
included in the CIP version 4 Standards.34
24. Once a responsible entity identifies a BES Cyber System under CIP-002-5, the
entity must comply with the controls included in Reliability Standards CIP-003-5 to CIP-
011-1 corresponding to its impact category.35
25. CIP-003-5 – Cyber Security – Security Management Controls: NERC states
that Reliability Standard CIP-003-5 will require approval by a CIP Senior Manager of the
documented cyber security policies related to CIP-004-5 through CIP-009-5, CIP-010-1,
and CIP-011-1. Reliability Standard CIP-003-5, Requirement R2, will require
implementation of policies related to cyber security awareness, physical security controls,
electronic access controls, and incident response to a Cyber Security Incident for those
assets that have Low Impact BES Cyber Systems under CIP-002-5’s categorization
process. According to NERC, a requirement that a Cyber Security Policy be “readily
available” was deleted because of general confusion around that term and because
training requirements in CIP-004-5 provide for knowledge of reliability policies.
NERC states that it moved several provisions of requirements related to information
34 Id.
35 Id.
Docket No. RM13-5-000 - 15 -
protection in previous CIP versions to CIP-011-1 and, therefore, deleted the requirements
from CIP-003-5.36
26. CIP-004-5 – Cyber Security – Personnel and Training: NERC states that
Reliability Standard CIP-004-5 will require documented processes or programs for
security awareness, cyber security training, personnel risk assessment, and access
management. Requirement R2 of CIP-004-5 adds specific training roles for visitor
control programs, electronic interconnectivity supporting the operation and control of
BES Cyber Systems, and storage media as part of the treatment of BES Cyber System
Information. NERC states that the drafting team modified the requirements pertaining to
personnel risk assessments and access management in response to lessons learned from
implementing previous versions. Reliability Standard CIP-004-5, Requirement R3, now
specifies that the seven year criminal history check covers all locations where the
individual has resided for six consecutive months or more without specifying school,
work, etc., and regardless of official residence. Reliability Standard CIP-004-5,
Requirement R4 now combines the access management requirements from CIP-003-4,
CIP-004-4, CIP-006-4, and CIP-007-4 into a single requirement. These requirements
from the CIP version 4 Standards, as incorporated in Requirement R4, remain largely
unchanged except to clarify certain terminology. NERC states that combining these
requirements improves consistency in the authorization and review process. Reliability
36 Id. at 11-12.
Docket No. RM13-5-000 - 16 -
Standard CIP-004-5 modifies Requirement R4 by removing the obligation to maintain a
list of authorized personnel. NERC explains that the removal is appropriate because the
list represents only one form of evidence to demonstrate compliance that only authorized
persons have access. Requirement R5 requires a registered entity to revoke a terminated
employee’s access concurrent with his or her termination, to be completed within 24
hours.37
27. CIP-005-5 – Cyber Security – Electronic Security Perimeter(s): NERC states
that Reliability Standard CIP-005-5, Requirement R1, focuses on the discrete Electronic
Access Points rather than the logical “perimeter,” which is the focus of currently-
effective CIP-005-3. Requirement R1.2 of the currently-effective CIP-005-3 has been
deleted from the CIP version 5 Standards. NERC explains that Requirement R1.2 is
definitional and was used to bring dial-up modems using non-routable protocols into the
scope of previous versions of CIP-005. According to NERC, the non-routable blanket
exemption included in the CIP version 1 through version 4 Standards was removed from
CIP-002-5.
28. CIP-006-5 – Cyber Security – Physical Security of BES Cyber Systems:
NERC states that Reliability Standard CIP-006-5 is intended to manage physical access
to BES Cyber Systems by specifying a physical security plan to protect BES Cyber
Systems against compromise that could lead to misoperation or instability. Reliability
37 Id. at 12.
Docket No. RM13-5-000 - 17 -
Standard CIP-006-5 reflects the retirement of Requirements R8.2 and R8.3 of
Commission-approved CIP-006-4, concerning the retention of testing records. According
to NERC, the retention period is now specified in the compliance section of Reliability
Standard CIP-006-5.38
29. CIP-007-5 – Cyber Security – Systems Security Management: NERC states
that Reliability Standard CIP-007-5 addresses system security by specifying technical,
operational, and procedural requirements in support of protecting BES Cyber Systems
against compromise that could lead to misoperation or instability of the bulk electric
system. NERC states that it modified CIP-007-5 to conform to the formatting approach
of the CIP version 5 Standards, along with changes to address several Commission
directives and to make the requirements less dependent on specific technology so that
they will remain relevant for future, yet-unknown developing technologies. For example,
according to NERC, Requirement R3 is a competency-based requirement, i.e., the
responsible entity must document how it addresses the malware risk for each BES Cyber
System, but the requirement does not prescribe a particular technical method in order to
account for potential technological advancement.39
30. CIP-008-5 – Cyber Security – Incident Reporting and Response Planning:
NERC states that Reliability Standard CIP-008-5 mitigates the risk to the reliable
38 Id.
39 Id. at 12-13.
Docket No. RM13-5-000 - 18 -
operation of the bulk electric system resulting from a Cyber Security Incident by
specifying incident response requirements. Proposed Requirement R1 requires
responsible entities to report Cyber Security Incidents within 1 hour of recognition.
Requirement R2 requires testing to verify response plan effectiveness and consistent
application in responding to a Cyber Security Incident. Requirement R3 provides for an
after-action review for tests or actual incidents, and requires an update to the Cyber
Security Incident response plan based on those lessons learned. Requirement R3 also
establishes a single timeline for a responsible entity to determine the lessons learned and
update recovery plans. Specifically, where previous CIP versions specified “30 calendar
days” for determining the lessons learned, followed by additional time for updating
recovery plans and notification, proposed Requirement R3 combines those activities into
a single 90-day timeframe.40
31. CIP-009-5 – Cyber Security – Recovery Plans for BES Cyber Systems: NERC
explains that Reliability Standard CIP-009-5 provides for the recovery of the reliability
functions performed by BES Cyber Systems by specifying a recovery plan to support the
continued stability, operability, and reliability of the bulk electric system. Requirement
R1 includes controls to protect data that would be useful in the investigation of an event
that results in the execution of a Cyber System recovery plan. NERC explains that
Requirement R2 includes operational testing to support the recovery of BES Cyber
40 Id. at 13.
Docket No. RM13-5-000 - 19 -
Systems. Requirement R3 establishes a single timeline for a responsible entity to
determine the lessons learned and update recovery plans, similar to CIP-008-5.41
32. CIP-010-1 – Cyber Security – Configuration Change Management and
Vulnerability Assessments: NERC states that Reliability Standard CIP-010-1 is a new
Reliability Standard consolidating the configuration change management and
vulnerability assessment-related requirements from previous versions of CIP-003, CIP-
005 and CIP-007. Requirement R1 specifies the configuration change management
requirements. Requirement R2 establishes the configuration monitoring requirements
intended to detect unauthorized modifications to BES Cyber Systems. NERC explains
that Requirement R3 establishes the vulnerability assessment requirements intended to
ensure proper implementation of cyber security controls while promoting continuous
improvement of a responsible entity’s cyber security posture.42
33. CIP-011-1 – Cyber Security – Information Protection: NERC states that
Reliability Standard CIP-011-1 is a new Reliability Standard consolidating the
information protection requirements from previous versions of CIP-003 and CIP-007.
Requirement R1 specifies information protection controls to prevent unauthorized access
41 Id.
42 Id.
Docket No. RM13-5-000 - 20 -
to BES Cyber System Information. Requirement R2 specifies reuse and disposal
provisions to prevent unauthorized dissemination of protected information.43
D. Notice of Proposed Rulemaking
34. On April 18, 2013, the Commission issued a Notice of Proposed Rulemaking
proposing to approve the CIP version 5 Standards, CIP-002-5 through CIP-011-1 as just,
reasonable, not unduly discriminatory or preferential, and in the public interest.44 The
NOPR stated that the CIP version 5 Standards adopt new cyber security controls that are
intended to safeguard physical and electronic access to BES Cyber Systems. Further, the
NOPR stated that NERC proposes a new approach to identifying and classifying BES
Cyber Systems that will require at least a minimum classification of Low Impact for all
BES Cyber Systems. The NOPR also proposed to approve the nineteen new or revised
definitions associated with the CIP version 5 Standards for inclusion in the NERC
Glossary.
35. While proposing to approve the CIP version 5 Standards, the Commission also
identified issues with the CIP version 5 Standards. The Commission stated in the NOPR
that NERC’s proposal to include language that requires entities to “identify, assess, and
correct” deficiencies is unclear with respect to the implementation and compliance
obligations that language imposes and that it is too vague to audit and enforce
43 Id. at 13-14.
44 Version 5 Critical Infrastructure Protection Reliability Standards, 78 FR 24,107 (Apr. 24, 2013), 143 FERC ¶ 61,055 (2013) (NOPRA).
Docket No. RM13-5-000 - 21 -
compliance. The NOPR sought comment on the “identify, assess, and correct” language
and stated that, depending on the comments, the Commission may direct NERC to
develop modifications or remove the “identify, assess, and correct” language. In
addition, the NOPR proposed to direct NERC to modify Reliability Standard CIP-003-5,
Requirement R2, to require responsible entities to adopt specific, technically-supported
cyber security controls for Low Impact BES Cyber Assets. The NOPR sought comment
on these proposals.
36. The NOPR identified issues with the proposed definitions of BES Cyber Asset,
Control Center, and Cyber Asset and use of the terms Reliability Tasks and Intermediate
Devices in the proposed definitions. In addition, the NOPR identified technical issues
involving improvements to the CIP version 5 Standards, including remote access,
communications security, and the NIST Risk Management Framework. The NOPR
stated that, depending on the comments received, the Commission may direct NERC to
develop modifications to certain definitions to eliminate ambiguities and ensure that BES
Cyber Assets are adequately protected. The NOPR sought comment on these proposals.
37. In the NOPR, the Commission proposed to approve 30 of the 32 VRFs. In
addition, the Commission proposed to direct NERC to modify the VSLs for the CIP
version 5 Standards.
38. The Commission proposed in the NOPR to approve NERC’s proposal to allow
responsible entities to transition from compliance with the currently-effective CIP version
3 Standards to compliance with the CIP version 5 Standards, essentially retiring the CIP
version 4 Standards prior to mandatory compliance. The NOPR also sought comment on
Docket No. RM13-5-000 - 22 -
whether the 24-month and 36-month implementation periods proposed by NERC for the
CIP version 5 Standards are necessary, and what activities are required to effect the
transition during the proposed implementation periods.
39. In response to the NOPR, interested entities filed 62 comments. The comments
have assisted us in better understanding the issues and developing this Final Rule. We
address below the issues raised in the NOPR and comments. The Appendix to this Final
Rule lists the entities that filed comments on the NOPR.
E. NERC Informational Filing
40. On October 11, 2013, NERC submitted an informational filing detailing a pilot
program to be conducted during the transition from the CIP version 3 Standards to the
CIP version 5 Standards. NERC explains that the implementation study is part of a larger
program that includes the development of guidance, outreach to industry, and training for
all responsible entities throughout the implementation period.45 NERC states that the
goals of the implementation study include: (1) improving industry’s understanding of the
technical security challenges that need to be addressed in order to comply with the CIP
version 5 Standards; (2) providing industry with a clear approach to transition from the
CIP version 3 Standards to the CIP version 5 Standards, including compliance and
enforcement expectations; and (3) providing industry with the knowledge to understand
the technical and compliance-related resources needed to transition to, and manage
45 NERC Informational Filing at 7.
Docket No. RM13-5-000 - 23 -
compliance with, the CIP version 5 Standards.46 NERC explains further that the study
participants will consist of seven representative responsible entities with a proven record
of success in compliance with the CIP version 3 Standards.47 NERC states that based on
participation in the implementation study, future compliance with the CIP version 3
Standards will be waived for these seven responsible entities.48 Finally, NERC concludes
that following the conclusion of the implementation study in April 2014, NERC and the
Regional Entities will prepare and publish a report that identifies the lessons learned and
recommendations for the transition to the CIP version 5 Standards resulting from the
implementation study.49
II. Discussion
41. Pursuant to section 215(d) of the FPA, the Commission approves the CIP version
5 Standards, CIP-002-5 through CIP-011-1 as just, reasonable, not unduly discriminatory
or preferential, and in the public interest. We find that the CIP version 5 Standards
represent an improvement over the currently-approved CIP Reliability Standards. In
particular, we find that the categorization of assets under CIP-002-5 based on their Low,
Medium, or High Impact on the reliable operation of the bulk electric system, with all
46 Id. at 7-8.
47 Id. at 8.
48 Id. at 12-13.
49 Id. at 3.
Docket No. RM13-5-000 - 24 -
BES Cyber Systems being categorized as at least Low Impact, offers more
comprehensive protection of the bulk electric system. In addition, the CIP version 5
Standards incorporate several new cyber security controls that will improve the overall
security posture of the responsible entities. Further, we approve nineteen new or revised
definitions associated with the CIP version 5 Standards for inclusion in the NERC
Glossary. We approve the implementation plan and, with modifications, VRFs and VSLs
proposed by NERC.
42. As discussed below, pursuant to section 215(d)(5) of the FPA, we direct NERC to
develop modifications to the CIP version 5 Standards to address our concerns regarding:
(1) the “identify, assess, and correct” language; (2) protections for Low Impact BES
Cyber Systems; (3) the risks posed by transient devices; and (4) the protection of
communication networks. Further, we direct that NERC survey responsible entities
during the CIP version 5 Standards implementation periods to gain a better understanding
of the BES Cyber Asset definition. In addition, the Commission directs staff to convene
a staff-led technical conference, within 180 days from the date of this Final Rule,
addressing the technical issues identified in the NOPR concerning communications
security, remote access, and the NIST Risk Management Framework.
43. Below we discuss the following matters: (A) the “identify, assess, and correct”
language; (B) BES Cyber Asset categorization; (C) new and revised NERC Glossary
definitions; (D) implementation plan; (E) VRF and VSL assignments; and (F) other
technical issues.
Docket No. RM13-5-000 - 25 -
A. “Identify, Assess, and Correct” Language
NERC Petition
44. The CIP version 5 Standards incorporate “a requirement that Responsible Entities
implement cyber policies in a manner to ‘identify, assess, and correct’ deficiencies” in 17
CIP requirements.50 NERC states that the “identify, assess, and correct” language is
“[c]onsistent with the NIST Risk Management Framework and the Commission’s
guidance in prior orders,” asserting that the “implementation of certain CIP version 5
requirements in a manner to ’identify, assess, and correct’ deficiencies emulates the
FERC Policy Statement on Penalty Guidelines.”51
NOPR
45. In the NOPR, the Commission stated that NERC has not explained the proposed
“identify, assess, and correct” language sufficiently. The NOPR expressed concern that
this language is unclear as to the implementation and compliance obligations it places on
responsible entities and is too vague to audit and enforce compliance. The NOPR sought
comment on the meaning of this language and on how it will be implemented and
enforced. The NOPR stated that, depending on the explanations provided in the
comments, the Commission may direct NERC to develop modifications, including
directing NERC to clarify both the implementation and compliance obligations created
50 NERC Petition at 33.
51 Id.
Docket No. RM13-5-000 - 26 -
by this language and the criteria by which auditors will be able to determine compliance,
or the Commission may direct NERC to remove this language if it results in requirements
that degrade the protections afforded by the CIP version 5 Standards and are difficult to
implement and enforce.
46. The NOPR questioned whether the “identify, assess, and correct” language
imposes one obligation on a responsible entity (i.e., to ensure the entity has a process in
place to “identify, assess, and correct” a violation or, alternatively, to ensure that the
underlying substantive requirement is not violated) or two obligations (i.e., to (1) ensure
the entity has a process in place to “identify, assess, and correct” a violation and (2) to
ensure that the underlying substantive requirement is not violated). The NOPR stated
that the proposed “identify, assess, and correct” language is ambiguous enough to support
both interpretations. The NOPR expressed concern that, under either interpretation, the
“identify, assess, and correct” language is too vague to be audited, and that NERC has not
explained what is expected of responsible entities or the intended meaning of the
individual terms “identify,” “assess,” “correct,” and “deficiencies” as they are used in the
CIP version 5 Standards.
47. With respect to the term “identify,” the NOPR observed that it is not clear whether
a responsible entity is expected to take steps to recognize past deficiencies, ongoing
deficiencies, or deficiencies that are likely to or may occur in the future. With respect to
the term “assess,” the NOPR stated that NERC does not explain the scope of activities
that are implied in the term “assess,” which could range from a cursory review of an
isolated “deficiency” to a detailed root-cause analysis. With respect to the term
Docket No. RM13-5-000 - 27 -
“correct,” the NOPR explained that NERC did not define what it means for a responsible
entity to “correct” a deficiency. The NOPR stated that this term may include ending a
deficiency, taking measures to address the effect of a deficiency, or taking steps to
prevent a deficiency from recurring. With respect to the term “deficiency,” the NOPR
noted that NERC does not explain, nor does the text of the CIP version 5 Standards
define, the term. The Commission observed that it is not clear whether “deficiencies”
means “possible violations,” as defined in NERC’s Compliance Monitoring and
Enforcement Program, or extends to a broader category of matters. The NOPR sought
comment on these concerns and on any modification that may be necessary to address
them.
48. The NOPR stated that the petition does not identify a reasonable timeframe for
identifying, assessing and correcting deficiencies. Without identifying a timeframe, the
NOPR explained that it is conceivable that, as long as the responsible entity identifies,
assesses and corrects a deficiency before, or perhaps even when, NERC, the Regional
Entities or the Commission discover the deficiency, there is no possible violation of the
CIP Reliability Standards, regardless of the seriousness of the deficiency, the duration of
the deficiency, or the length of time between the identification and correction of the
deficiency. The NOPR sought comment on this concern and on any modifications that
may be necessary to address it.
49. The NOPR stated that the proposed “identify, assess, and correct” language allows
a responsible entity to avoid audit risk. The NOPR explained that, without a required
timeframe for identifying, assessing and correcting a deficiency, a responsible entity
Docket No. RM13-5-000 - 28 -
could defer its required assessment of its CIP compliance program until just prior to a
scheduled audit or self-certification. The NOPR stated that NERC does not explain
whether a responsible entity is required to disclose the identified deficiencies in such
cases, and it is not clear whether the audit team can identify a potential violation if the
responsible entity identifies the deficiency and is in the process of assessing and
correcting it, even if the deficiency is identified long after it came into existence. The
NOPR observed that it is also not clear how prior deficiencies that are identified, assessed
and corrected are treated in assessing a responsible entity’s compliance history. The
NOPR sought comment on these concerns and on any modifications that may be
necessary to address them.
50. The NOPR stated that the petition does not explain how NERC will treat multiple
corrections of deficiencies concerning the same requirement, or the quality of the
mitigation. The NOPR explained that it is unclear whether previous corrections will be
reported or otherwise made known to NERC because they are not considered potential
violations of the CIP Reliability Standard. The NOPR sought comment on this concern
and on any modifications that may be necessary to address it.
51. In the NOPR, the Commission questioned how performance of the “identify,
assess, and correct” language can be uniform or consistent among responsible entities
absent clarification of Regional Entity and NERC compliance techniques.
52. The NOPR stated that neither the CIP version 5 Standards nor NERC’s petition
explain what is expected of responsible entities under the proposed “identify, assess, and
correct” language. The NOPR expressed concern that including the assess and monitor
Docket No. RM13-5-000 - 29 -
processes in the language of a requirement, as proposed by NERC, could render such
requirements unenforceable. The NOPR sought comment on this concern and on any
modifications that may be necessary to address them.
Comments
53. NERC comments that the Commission should approve the “identify, assess, and
correct” language without modification. NERC explains that the “identify, assess, and
correct” language is meant to address “frequently occurring security obligations (High
Frequency Security Obligations) that present a lesser risk to reliability that reduces the
administrative burden of the compliance process.”52 According to NERC, the intent of
the “identify, assess, and correct” language is not to eliminate accountability for
responsible entities or hinder Regional Entity, NERC or Commission oversight. NERC
states that, if the “identify, assess, and correct” language is approved, it will submit a
compliance filing by June 1, 2014 or six months from the date of the final rule in this
docket, whichever is later, that “further outlines the compliance and enforcement aspects
of this language, including when entities are expected to self-report or maintain
documentation of its self-correcting process for audit, what constitutes potential
noncompliance, and the necessary guidance for auditors.”53
52 NERC Comments at 5.
53 Id. at 14.
Docket No. RM13-5-000 - 30 -
54. NERC explains that the standard drafting team set out “to minimize the
compliance burdens associated with High Frequency Security Obligations.”54 NERC
contends that modifying or removing the “identify, assess, and correct” language through
the NERC standard development process could delay implementation of the CIP version
5 Standards because the standard drafting team will have to consider alternative
approaches. If the Commission directs removal or modifications to the “identify, assess,
and correct” language, NERC states that the Commission should allow a reasonable time
to develop changes through NERC’s standard development process.
55. According to NERC, the “identify, assess, and correct” language is “intended to
prescribe the manner in which entities must implement their policies and procedures for
specific areas of security protection.”55 NERC claims that the best approach to address
High Frequency Security Obligations is to “focus entities on correcting identified
deficiencies in [the] implementation of the Technical Parts of the proposed requirements
to promote continuous awareness in an entity’s cyber security program.”56
56. NERC distinguishes requirements containing the “identify, assess, and correct
language” from other requirements. For requirements lacking the “identify, assess, and
correct” language, NERC explains that responsible entities are “obligated to: (1) have the
54 Id. at 7.
55 Id. at 8.
56 Id.
Docket No. RM13-5-000 - 31 -
documented processes stated in the requirement, and (2) implement the documented
processes to achieve the Technical Parts.”57 NERC comments that “[h]ow the entity
chooses to implement the process would be documented for the Compliance Enforcement
Authority, as required by the associated Measure … [f]or these requirements, the entity
either has the process in place and the process achieves the Technical Parts or the entity
does not have a process in place and/or its process does not achieve the Technical
Parts.”58
57. For requirements including the “identify, assess, and correct” language, NERC
states that the “‘identify, assess, and correct language’ … mandates that the entity use a
self-correcting process in its implementation of its documented policies to achieve the
Technical Parts.” NERC opines that the “self-correcting language does not affect the
underlying obligation in the requirement to achieve the Technical Parts.”59 According to
NERC, the only difference is that the “identify, assess, and correct” language “set[s]
additional parameters for the manner in which an entity should implement the process.”60
NERC states, therefore, that the CIP version 5 Standards impose two obligations upon
responsible entities. According to NERC, the CIP version 5 Standards that require a
57 Id. at 9.
58 Id.
59 Id.
60 Id. at 9-10.
Docket No. RM13-5-000 - 32 -
documented process, regardless of whether such requirement includes the “identify,
assess and correct” language, contain two obligations. The first requirement is to have
the process mandated by the Reliability Standards and the second is the implementation
of that process.
58. NERC contends that specifying a uniform definition of ‘identify,’ ‘assess,’ and
‘correct’ is impracticable given the wide range of systems and the number of assets that
make up an entity’s systems. NERC explains that the standard drafting team did not
create specific definitions “because responsible entities are in the best position to define
their own internal compliance processes based on the particular characteristics and make-
up of their systems, including whether they will use internal controls or a different type of
compliance management process to meet their specific system design.”61 According to
NERC, if actual experience shows that an entity’s compliance program does not meet
compliance expectations, the “identify, assess, and correct” language mandates that the
entity’s processes and implementation be modified to correct any deficiencies. In
addition, NERC states that, depending on the circumstances, “there may be a potential
violation if actual performance does not meet the Technical Parts.”62
59. NERC contends that the “identify, assess, and correct” language does not remove
accountability for responsible entities, nor does it eliminate Regional Entity, NERC, and
61 Id. at 10.
62 Id. at 12.
Docket No. RM13-5-000 - 33 -
Commission oversight. NERC claims that, by requiring responsible entities to
demonstrate how their “identify, assess, and correct” process works, auditors will better
understand a responsible entity’s compliance program. NERC states that it is committed
to developing Reliability Standard Audit Worksheets (RSAWs) and other guidance to
support the adoption of the “identify, assess, and correct” language.
60. According to NERC, the term “deficiencies,” as used in the sample RSAW,
“referred to potential noncompliance with the proposed CIP Version 5 requirement;
however not all deficiencies would be treated as possible violations depending on the
specific facts and circumstances surrounding a deficiency.”63 NERC explains that a
responsible entity would be expected to document the identification, assessment, and
correction of lesser risk deficiencies for review by the Compliance Enforcement
Authority, but that responsible entities would still be expected to self-report higher risk
deficiencies. NERC comments that not requiring the individual reporting of lesser risk
deficiencies will result in resource savings and allow entities to focus on security as
opposed to the administrative aspects of the compliance process.
61. Regarding the timelines governing the “identify, assess, and correct” process,
NERC states that “an entity’s own internal processes would dictate the timing aspect.”64
NERC explains that a responsible entity would be required to explain the timing of its
63 Id.
64 Id. at 16.
Docket No. RM13-5-000 - 34 -
process as part of an audit, and timing would be one factor in the auditors review of the
entity’s “identify, assess, and correct” process. Comparing the “identify, assess, and
correct” language to the NIST Risk Management Framework, NERC opines that
“requiring entities to continuously demonstrate that they are implementing processes in a
manner that identifies, assesses, and corrects, is similar to the monitoring steps of the
NIST Framework.”65
62. Numerous commenters support the “identify, assess, and correct” language and do
not indicate that there is a need for clarification.66 These commenters assert that the
“identify, assess, and correct” language is an improvement over the “zero tolerance”
compliance approach in prior versions of the CIP Reliability Standards. The commenters
also note that the “identify, assess, and correct” language was only added to requirements
addressing lower risks to the reliability of the Bulk-Power System. For example,
NextEra comments that “identify, assess, and correct” language is only found in
requirements that “involve management of high volumes of information or data and those
that involve execution of regular, periodic tasks. These are areas where scale matters;
where, for example, one mistake out of thousands of non-mistakes does not necessarily
65 Id. at 17.
66 Alliant, AEP, APPA, Arkansas, SWP, Dominion, G&T Cooperatives, LADWP, MidAmerican, NARUC, OEVC, PG&E, PPL Companies, SCE, Tacoma, Tampa, TAPS, UI.
Docket No. RM13-5-000 - 35 -
warrant the time and attention that must, by law, be given to ‘potential violations’ of a
NERC reliability standard approved under Section 215 of the FPA.”67
63. Commenters, including LADWP and Tacoma Power, claim that the “identify,
assess, and correct” language is clear and creates incentives for responsible entities to
improve internal controls to discover, evaluate, and address deficiencies.68 The
commenters assert that the “identify, assess, and correct” language could result in
improved, more cost-effective reliability. The commenters generally disagree with the
NOPR’s concerns regarding the “identify, assess, and correct” language. For example, in
response to the NOPR’s concerns regarding timelines for completing “identify, assess,
and correct” activities, MidAmerican states that “[a]ny time constraint on entities’
remediation of discovered deficiencies would introduce another layer of required
monitoring in areas where the industry has determined that ministerial compliance tasks
are already unduly burdensome and counter-productive to the need to focus entities’
limited resources on the most critical risks.”69
64. Many commenters support retaining the “identify, assess, and correct” language in
the requirements, but acknowledge the need for greater clarity as to how the “identify,
67 NextEra Comments at 6.
68 LADWP Comments at 8-9; Tacoma Power Comments at 2.
69 MidAmerican Comments at 10.
Docket No. RM13-5-000 - 36 -
assess, and correct” language will work in practice. 70 EEI and other commenters support
NERC’s proposal to submit a compliance filing that provides more detail regarding the
“identify, assess, and correct” language. BPA, ISO New England and other commenters
support allowing NERC to clarify the “identify, assess, and correct” language in a
separate document in order not to delay implementation of the beneficial technical
requirements in the CIP version 5 Standards.
65. Some commenters support modifying or removing the “identify, assess, and
correct” language.71 These commenters question whether the “identify, assess, and
correct” language is auditable and enforceable due to a lack of clarity. While SPP RE
comments that the “zero-defect” compliance aspect of the CIP Version 3 Reliability
Standards is problematic, SPP RE also believes that the “identify, assess, and correct”
language is unclear, subject to multiple interpretations, and difficult to audit.72 TVA
believes that it is imperative that the CIP standards, whose violations must necessarily be
described generally at high levels, must be sufficiently clear in terms of what
requirements are being imposed on Registered Entities and the “identify, assess, and
70 Ameren, BPA, EEI, EPSA, Exelon, FirstEnergy, Idaho Power, ITC, ISO New
England, KCP&L, Luminant, MISO, NASUCA National Grid, NRECA, NextEra, NAGF, Northeast Utilities, NorthWestern, Portland, Southern Indiana, Wisconsin, Xcel.
71 Encari, GSOC, SPP Parties, SCE&G, SPP RE, and TVA.
72 SPP RE Comments at 2-3.
Docket No. RM13-5-000 - 37 -
correct” language is too vague to ascertain how compliance will be audited.73 While
SCE&G favors retaining the “identify, assess, and correct” concept, SCE&G also
contends that it is misplaced in NERC’s proposed CIP version 5 Standards where it is
embedded in the technical parts of the requirements.74
66. Commenters express differing views on the obligations imposed by the “identify,
assess, and correct” language irrespective of their position on whether that language
should be retained. For example, MISO indicates that the “identify, assess, and correct”
language could be interpreted as imposing a new obligation or not imposing a new
obligation on responsible entities.75 MidAmerican and Luminant assert that the “identify,
assess, and correct” language would not impose a new compliance obligation. However,
according to LADWP and OEVC, the “identify, assess, and correct” language would
impose a new obligation (i.e., to have an “identify, assess, and correct” process in place).
Other commenters, including GSOC and ITC, ask the Commission to clarify that the
“identify, assess, and correct” language cannot be separately violated and that only a
failure to comply with the underlying substantive requirement can result in a violation.
73 TVA Comments at 2-3.
74 SCE&G Comments at 2.
75 MISO Comments at 4.
Docket No. RM13-5-000 - 38 -
Commission Determination
67. For the reasons discussed below, the Commission concludes that the “identify,
assess, and correct” language, as currently proposed by NERC, is unclear with respect to
the obligations it imposes on responsible entities, how it would be implemented by
responsible entities, and how it would be enforced. Accordingly, we direct NERC,
pursuant to section 215(d)(5) of the FPA, to develop modifications to the CIP version 5
Standards that address our concerns. Preferably, NERC should remove the “identify,
assess, and correct” language from the 17 CIP version 5 requirements, while retaining the
substantive provisions of those requirements.76 Alternatively, NERC may propose
equally efficient and effective modifications that address the Commission’s concerns
regarding the “identify, assess, and correct” language.77 The Commission directs NERC
to submit the modifications to the CIP Reliability Standards within one year from the
effective date of this Final Rule.
68. In Order No. 672, the Commission provided general guidance on the conditions
under which a Reliability Standard would be approved under Section 215 of the Federal
76 The 17 requirements are: CIP-003-5, Requirements R2 and R4; CIP-004-5,
Requirements R2 through R5; CIP-006-5 Requirements R1 and R2; CIP-007-5, Requirements R1 through R5; CIP-009-5, Requirement R2; CIP-010-1, Requirements R1 and R2; and CIP-011-1, Requirement R1.
77 See Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ¶ 31,242, at P 186, order on reh’g, Order No. 693-A, 120 FERC ¶ 61,053 (2007).
Docket No. RM13-5-000 - 39 -
Power Act.78 Among other things, the Commission explained that proposed Reliability
Standards should be clear and unambiguous regarding what is required for compliance
and who is required to comply.79 Based on our experience with the ongoing development
and implementation of the Reliability Standards, including the CIP Reliability Standards,
we believe that clarity and certainty in the language of Reliability Standard requirements
is necessary to ensure consistent application by responsible entities, as well as consistent
enforcement by NERC and the Regional Entities.80 Language in a requirement that could
be subject to multiple interpretations raises the specter of inconsistent application and
enforcement, which could result in risks to Bulk-Power System reliability.81 Therefore,
as a fundamental expectation, NERC must strive to develop clear and unambiguous
Reliability Standards .
69. As we indicated in the NOPR, we support NERC’s move away from a “zero
tolerance” approach to compliance, the development of strong internal controls by
responsible entities, and NERC’s development of standards that focus on the activities
78 Order No. 672, FERC Stats. & Regs. ¶ 31,204 at PP 320-337.
79 Id. P 325.
80 See id. P 327 (stating that a proposed Reliability Standard should include “a clear criterion or measure of whether an entity is in compliance” and should “contain or be accompanied by an objective measure of compliance so that it can be enforced and so that enforcement can be applied in a consistent and non-preferential manner.”).
81 See Order No. 693, FERC Stats. & Regs. ¶ 31,242, at P 274 (finding that “it is essential that the Requirements for each Reliability Standard . . . are sufficiently clear and not subject to multiple interpretations.”).
Docket No. RM13-5-000 - 40 -
that have the greatest impact on Bulk-Power System reliability.82 Thus, we are
sympathetic to these underlying motives as described by NERC that resulted in the
incorporation of the “identify, assess, and correct” language within 17 provisions of the
CIP version 5 Standards. Nonetheless, as explained below, the language proposed by
NERC is ambiguous and results in an unacceptable amount of uncertainty with regard to
consistent application, responsible entities understanding their obligations, and NERC
and the regions providing consistent application in audits and other compliance settings.
70. The Commission raised concerns in the NOPR with the “identify, assess, and
correct” language and sought comment on the implementation and enforceability of the
“identify, assess, and correct” language. The commenters, however, do not clarify how
the “identify, assess, and correct” language would be implemented and enforced. Rather,
the diversity of explanations provided by commenters reinforces our concerns. In its
petition and comments, NERC does not clarify adequately the language and, instead,
indicates that it is willing to submit a future compliance filing that “further outlines the
compliance and enforcement aspects of this language, including when entities are
expected to self-report or maintain documentation of its self-correcting process for audit,
what constitutes potential noncompliance, and the necessary guidance for auditors.”83
NERC’s proposal that the Commission approve this language in numerous requirements
82 See NOPR, 143 FERC ¶ 61,055 at P 57.
83 NERC Comments at 14.
Docket No. RM13-5-000 - 41 -
of the CIP version 5 Standards, while postponing a detailed explanation regarding the
understanding, compliance implications and proper implementation of the proposed
language to a future time, is an inadequate approach.
71. Moreover, there is confusion among the commenters as to what the “identify,
assess, and correct” language requires of responsible entities. For example, commenters
differ on whether the “identify, assess, and correct” language imposes a new obligation
on responsible entities. The Commission raised questions in the NOPR concerning,
among other things, reasonable timeframes for identifying and correcting a deficiency,
whether the language could be used to avoid audit risk, and how the implementation and
performance of the language can be expected to be consistent across responsible entities
and regions, but did not receive adequate responses.84 We received inconsistent
explanations in response to these inquiries, which we take as another indication of the
vagueness of the “identify, assess, and correct” language.
72. Regarding the meaning of the terms “identify,” “assess,” “correct,” and
“deficiencies,” NERC states that it would be impracticable to develop uniform definitions
and that responsible entities are in the best position to define these terms in the context of
their internal compliance programs. While we understand NERC’s desire to allow for
flexibility as responsible entities develop their internal control programs, we are,
nonetheless, concerned that the NERC proposal lacks basic definition and guidance that
84 See NOPR, 143 FERC ¶ 61,055 at PP 51, 52, and 54.
Docket No. RM13-5-000 - 42 -
is needed, for example, to distinguish a successful internal control program from one that
is inadequate. As a result, we conclude that the “identify, assess, and correct” language,
as currently proposed, injects an unacceptable degree of ambiguity into the otherwise
reasonable substantive requirements of the CIP version 5 Standards.
73. As indicated earlier, we support the underlying concerns that prompted the
“identify, assess and correct” language, namely encouraging the development of strong
internal controls and focusing resources on activities that best promote reliability of the
Bulk-Power System. We believe, however, that it may be more appropriate for NERC to
achieve these goals by articulating defined goals in the compliance and enforcement
process and identifying clear expectations that would justify the exercise of enforcement
discretion. For example, the Reliability Assurance Initiative process when fully
developed may afford a consistent, informed approach that provides incentives for
entities to develop robust internal control programs.85
74. We emphasize that if NERC wishes to propose modifications other than, or in
addition to, removing the “identify, assess and correct” language from the CIP version 5
requirements, we will be open to consideration of various approaches for resolving the
High Frequency Security Obligations scenario NERC identifies. We understand the
concern to be that while it is necessary for Bulk-Power System reliability to identify,
85 The Reliability Assurance Initiative program is a NERC initiative to transform
the current compliance and enforcement program into one that focuses on high reliability risk areas and reduces the administrative burden on registered entities. See http://www.nerc.com/pa/comp/Pages/Reliability-Assurance-Initiative.aspx.
Docket No. RM13-5-000 - 43 -
control, and minimize violations of requirements addressing this scenario, responsible
entities may not be able to prevent all such violations. Moreover, while it is possible that
a single violation of such a requirement could result in significant harm to Bulk-Power
System reliability, or that multiple or repeated violations by an individual responsible
entity could indicate a reliability vulnerability or inadequate internal controls, individual
violations of such requirements likely pose a low risk. With respect to these types of
requirements, we are receptive to the concept that Bulk-Power System reliability may be
better served, at lower cost to responsible entities, for Regional Entities and NERC to
provide incentives for them to proactively identify and mitigate potential noncompliance
outside the enforcement context by enhancing their internal controls.
75. We would prefer approaches that would not involve the placement of compliance
language within the text of the Reliability Standards to address these issues. We
understand that NERC has inserted the "identify, assess, and correct" language into the
CIP Reliability Standard requirements to move its compliance processes towards a more
risk-based model. With this objective in mind, we believe that a more appropriate
balance might be struck to address the underlying concerns by developing compliance
and enforcement processes that would grant NERC and the Regional Entities the ability
to decline to pursue low risk violations of the Reliability Standards. Striking this balance
could be accomplished through a modification to the Compliance Monitoring and
Enforcement Program. We believe that such an approach would: (1) empower NERC
and the Regional Entities to implement risk-based compliance monitoring techniques that
avoid zero defect enforcement when appropriate; (2) allow the Commission to retain
Docket No. RM13-5-000 - 44 -
oversight over the enforcement of Reliability Standards; and (3) ensure that all Reliability
Standards are drafted to be sufficiently clear and enforceable.
76. Accordingly, the Commission directs NERC, pursuant to section 215(d)(5) of the
FPA, to develop modifications to the CIP version 5 Standards that address our concerns.
Preferably, NERC should remove the “identify, assess, and correct” language from the 17
CIP version 5 requirements. The Commission directs NERC to submit these
modifications for Commission approval within one year from the effective date of this
Final Rule. Alternatively, NERC may develop a proposal to enhance the enforcement
discretion afforded to itself and the Regional Entities, as discussed above.
B. BES Cyber Asset Categorization and Protection
1. Reliability Based Criteria
NERC Petition
77. Reliability Standard CIP-002-5 requires responsible entities to categorize BES
Cyber Systems as having a Low, Medium, or High Impact. NERC states that CIP-002-5
requires “the identification and categorization of BES Cyber Systems according to
specific criteria that characterize their impact for the application of cyber security
requirements commensurate with the adverse impact that loss, compromise, or misuse of
those BES Cyber Systems could have on the reliable operation of the [bulk electric
system].”86 NERC states that the new approach to classifying cyber systems, which
86 NERC Petition at 11.
Docket No. RM13-5-000 - 45 -
requires a minimum classification of “Low Impact” for all BES Cyber Systems, “resulted
from a review of the NIST Risk Management Framework for categorizing and applying
security controls, a review that was directed by the Commission in Order No. 706.”87
NOPR
78. In the NOPR, the Commission pointed out that NERC’s proposed categorization
process is based on facility ratings, such as generation capacity and voltage levels,
whereas the NIST Risk Management Framework categorizes systems based on cyber
security principles regarding the confidentiality, integrity, and availability of systems.88
The Commission stated in the NOPR that NERC’s new approach to categorizing BES
Cyber Systems, which requires at least a minimum classification of “Low Impact” for all
BES Cyber System, is a step closer to comprehensively protecting assets that could cause
cyber security risks to the bulk electric system.89 The Commission proposed to accept
NERC’s proposal, recognizing that the Commission may revisit the categorization of
assets under the CIP Reliability Standards at a later date should the need arise.90
87 Id. at 15.
88 NOPR, 143 FERC ¶ 61,055 at P 61.
89 Id. P 59.
90 Id. P 64.
Docket No. RM13-5-000 - 46 -
Comments
79. The commenters generally support the proposed bulk electric system
categorization process, with some commenters raisings discrete concerns with certain
aspects of the NOPR.
80. NERC, BPA, and CenterPoint support the proposed categorization process.
NERC states that the proposed Low, Medium, or High Impact categories were derived
from a review of the NIST Risk Management Framework conducted in response to the
Commission’s directive in Order No. 706.91 NERC explains that, based on the review of
the NIST Risk Management Framework, the standard drafting team determined that a
Low, Medium, or High Impact categorization based on facility ratings is appropriate
“because it (1) reflects the well understood and commonly used method for categorizing
assets within the electricity sector; (2) provides a clear and measurable method for
identifying assets; and (3) directly relates to a facility’s impact on the Bulk Electric
System, which is consistent with the NIST Framework approach to categorizing assets
based on risk.”92
81. NERC, BPA and CenterPoint comment that, although the proposed reliability-
based criteria put forth in CIP version 5 differ from the NIST Risk Management
Framework, where the categorization process is based on the loss of confidentiality,
91 BPA Comments at 6; CenterPoint Comments at 2-3; NERC Comments at 18-19.
92 NERC Comments at 18-19.
Docket No. RM13-5-000 - 47 -
integrity, and availability systems, the difference is reasonable. Specifically, NERC,
BPA and CenterPoint note that the NIST standards are information protection standards
whereas the CIP Standards are reliability standards, which require a slightly different
approach to categorization aimed more broadly at the reliability of the Bulk-Power
System across all entities rather than categorization by a single organization.93
82. TVA states that it “would be in favor of transitioning to a NIST categorization
model if the control scoping and implementation was conducted in accordance with
NIST-800-37, revision 1.”94 TVA asserts that the NIST Risk Management Framework, if
applied correctly, provides near real time management of risks, and establishes
responsibility and accountability for information system security. TVA concludes that
the NIST Risk Management Framework “has the potential to provide the utility industry
with a proven and effective security framework that includes targeted components
uniquely written for the control system environment.”95
83. ITC states that blackstart resources, which are designated as Low Impact under
proposed CIP-002-5, should be designated as Medium Impact assets to ensure sufficient
protection of the bulk electric system.96 ITC states that blackstart resources are of similar
93 NERC Comments at 19; BPA Comments at 6; CenterPoint Comments at 2-3.
94 TVA Comments at 4.
95 Id.
96 ITC Comments at 8.
Docket No. RM13-5-000 - 48 -
importance as other assets designated as Medium Impact and, therefore, blackstart
resources should be protected as such, including the appropriate VRF designation.97 ITC
avers that blackstart resources “are analogous to Criteria 2.3 generation resources because
they are necessary to avoid an Adverse Reliability Impact as defined by NERC, and
should therefore be classified as Medium Impact.”98 ITC contends that NERC’s rationale
for classifying blackstart resources as Low Impact assets is faulty. Specifically, ITC
argues that classifying blackstart resources as Low Impact “because of concerns over
additional compliance costs leading to withdrawal of Blackstart resources from the
market” is not an appropriate rationale for approving a reliability rule.99
84. SPP RE asserts that the proposed categorization process fails to address
connectivity as directed in Order No. 761. Specifically, SPP RE notes that the
Commission directed NERC to “address a cyber asset’s connectivity and its potential to
compromise the reliable operation of the Bulk-Power System with respect to the BES
Cyber Asset categorization criteria.”100 SPP RE recommends that the Commission direct
NERC to modify the BES Cyber Asset categorization process “to require control centers
performing the functional obligations of Balancing Authority or Generation Operator to
97 Id.
98 Id. at 9.
99 Id.
100 SPP RE Comments at 5 (citing Order No. 761, 139 FERC ¶ 61,058 at P 91).
Docket No. RM13-5-000 - 49 -
be categorized as medium impact at a minimum if the control center systems are network
interconnected” with other control center systems.101
85. Tampa seeks clarification concerning the CIP-002-5, Attachment 1 impact rating
criteria as they relate to certain generating units. Specifically, Tampa requests
clarification “whether individual units less that 20 MVA (gross nameplate rating) and
generating plants/facilities less than 75 MVA (gross aggregate nameplate rating) are
excluded from consideration as Low Impact assets.”102 Tampa questions whether there is
a criterion that would qualify a generation facility as Low Impact besides failing to meet
the two criteria that qualify a facility as Medium Impact, or are all remaining generation
facilities captured by the Low Impact definition. Tampa also questions whether the bulk
electric system definition acts as a floor for Low Impact facilities under which Low
Impact facilities would not include facilities that are excluded from the definition of the
bulk electric system. Tampa requests that the Commission clarify that only those
generation facilities equal to or greater than 1500 MW or that are designated by either a
planning coordinator or transmission planner will be considered Medium Impact, with all
remaining generating facilities considered Low Impact, subject to any bulk electric
system definition floor.103
101 Id at 6.
102 Tampa Comments at 4.
103 Id.
Docket No. RM13-5-000 - 50 -
86. Wisconsin questions the applicability section of the proposed CIP version 5
Standards. Specifically, Wisconsin asserts that the CIP version 5 Standards, as written,
could be read to exclude reliability coordinators and other entities from the CIP Standards
because section 4.2.2 in each of the CIP Standards limits applicability to a responsible
entity’s bulk electric system facilities. Wisconsin notes that neither reliability
coordinators nor interchange authorities have bulk electric system facilities. Wisconsin
requests that the Commission require NERC to remove section 4.2.2 from each of the
CIP Standards to ensure that the standards are clear and unambiguous with regard to
applicability.104
Commission Determination
87. The Commission finds reasonable the categorization of BES Cyber Systems set
forth in Reliability Standard CIP-002-5. The new approach to categorizing BES Cyber
Systems, which requires at least a minimum classification of Low Impact for BES Cyber
Systems, better assures the protection of assets that can cause cyber security risks to the
bulk electric system. The Commission may revisit the categorization of BES Cyber
Assets should experience gained from implementing and enforcing Reliability Standard
CIP-002-5 warrant such action.
88. With regard to ITC’s comments on blackstart resources, we are not persuaded that
blackstart resources should be designated as Medium Impact BES Cyber Assets. While
104 Wisconsin Comments at 4.
Docket No. RM13-5-000 - 51 -
we believe that system recovery is important to the reliable operation of the Bulk-Power
System, we accept the ERO’s approach on this matter as adequate. Further, since
blackstart resources are designated as Low Impact, entities may have discretion regarding
appropriate security controls that will apply. Although we determine not to direct
changes at this time, we may revisit this determination after implementation of the CIP
version 5 Standards if we determine that blackstart resources lack a sufficient level of
protection. ITC is also encouraged to raise its concerns regarding blackstart resources
through NERC’s standards development process.
89. With respect to SPP RE’s concerns on the issue of connectivity, the Commission
does not direct changes at this time. The majority of bulk electric system control centers
are designated as High Impact BES Cyber Assets under Reliability Standard CIP-002-5
because of the interconnected nature of these facilities. We share SPP RE’s concern,
however, that balancing authority and generation operator control centers are
interconnected and some of these facilities will likely fall into the Low Impact category.
The Commission may revisit this determination if we find that Low Impact control
centers lack a sufficient level of protection following implementation of the CIP version
5 Standards.
90. As noted above, Tampa requests clarification concerning the CIP-002-5 impact
rating criteria as it relates to certain generating units. The Commission clarifies that,
consistent with our determinations in Order No. 773, only those plants, facilities, and
assets that are covered under the bulk electric system definition, or included in the
definition under the exceptions process in Appendix 5C of the NERC rules of procedure,
Docket No. RM13-5-000 - 52 -
will be required to comply with the CIP Reliability Standards.105 Similarly, the Low
Impact category will not include assets that are not covered under the bulk electric system
definition or excluded from the definition under the exceptions process in Appendix 5C
of the NERC rules of procedure. The Commission understands that the Low Impact
category is intended to address all BES Cyber Systems on the bulk electric system that do
not meet the criteria for Medium or High Impact.
91. With respect to Wisconsin’s comments, we do not agree that section 4.2.2
excludes reliability coordinators and interchange authorities from the CIP Reliability
Standards as the facilities associated with both classes of entities can be accurately
described as BES Cyber Systems under the NERC glossary. Section 4.1 of the
applicability section of CIP-002-5 explicitly identifies reliability coordinators (section
4.1.6) and interchange authorities (section 4.1.5) as applicable entities. Section 4.2 of the
Reliability Standard identifies the “Facilities, systems and equipment” owned by
responsible entities “to which these requirements [of CIP-002-5] are applicable,” and
section 4.2.2 provides that for all entities other than distribution providers, the applicable
facilities are “[a]ll BES Facilities.” In Order No. 773, we determined that the term “bulk
electric system” incorporates “associated equipment” that broadly includes facilities such
105 Revisions to Electric Reliability Organization Definition of Bulk Electric
System and Rules of Procedure, Order No. 773, 141 FERC ¶ 61,236, at P 43 (2012) (noting that “[t]he [bulk electric system] definition, coupled with the exception process will ensure that facilities not necessary for the operation of the interconnected transmission network will be properly categorized.”), order on reh’g, Order No. 773-A, 143 FERC ¶ 61,053, order denying clarification, 144 FERC ¶ 61,174 (2013).
Docket No. RM13-5-000 - 53 -
as control centers and other assets.106 We are satisfied that the CIP version 5 Standards
explicitly apply to reliability coordinators and interchange authorities and that they are
not precluded from having applicable facilities based on the language of the standards.
92. According to NERC, development of the BES Cyber System categorization
process included a review of the NIST Risk Management Framework.107 There is a
significant distinction, however, between NERC’s categorization process and the NIST
Risk Management Framework. In particular, NERC’s categorization process is based on
facility ratings, such as generation capacity and voltage levels.108 In contrast, the NIST
Risk Management Framework categorizes systems based on cyber security principles
regarding the confidentiality, integrity, and availability of systems. Commenters such as
NERC and BPA aver that such differences are reasonable and justified because the NIST
standards are information protection standards whereas the CIP Standards are reliability
standards, aimed more broadly at the reliability of the Bulk-Power System across all
entities rather than categorization by a single organization. We find this explanation to
be reasonable and, therefore, we do not direct any modifications regarding the BES
Cyber System categorization process in Reliability Standard CIP-002-5 at this time.
106 Order No. 773, 141 FERC ¶ 61,236 at P 53 (noting that “core [bulk electric
system] definition also continues to capture equipment associated with the facilities included in the bulk electric system.”).
107 See NERC Petition at 31.
108 See NOPR at, 143 FERC ¶ 61,055 P 63.
Docket No. RM13-5-000 - 54 -
However, as discussed below, the NIST Risk Management Framework, as well as other
issues relating to the CIP Reliability Standards, will be the subject of a future staff-led
technical conference.
2. Protection of Low Impact BES Cyber Assets
NERC Petition
93. Reliability Standard CIP-003-5, Requirement R2, which pertains to the obligations
for BES Cyber Systems identified as Low Impact, provides:
R2. Each Responsible Entity for its assets identified in CIP-002-5, Requirement R1, Part R1.3 [i.e., low impact systems], shall implement, in a manner that identifies, assesses, and corrects deficiencies, one or more documented cyber security policies that collectively address the following topics, and review and obtain CIP Senior Manager approval for those policies at least once every 15 calendar months: … 2.1 Cyber security awareness; 2.2 Physical security controls; 2.3 Electronic access controls for external routable protocol connections and Dial-up Connectivity; and 2.4 Incident response to a Cyber Security Incident. An inventory, list, or discrete identification of low impact BES Cyber Systems or their BES Cyber Assets is not required.
This is the only CIP version 5 requirement applicable to Low Impact systems.
NOPR
94. In the NOPR, the Commission expressed concern with Requirement R2 of
Reliability Standard CIP-003-5, which requires responsible entities to “implement …
documented cyber security policies” that address: (1) cyber security awareness, (2)
physical security controls, (3) electronic access controls and (4) incident response to a
cyber security incident. The NOPR explained that Requirement R2 sets forth the single
Docket No. RM13-5-000 - 55 -
compliance obligation for BES Cyber Systems categorized as Low Impact.109 The
Commission expressed concern that NERC’s proposal to limit the protections for Low
Impact BES Cyber Systems to documented policies, as opposed to requiring specific
cyber security protections, could result in ambiguities that lead to inconsistent and
inefficient implementation of the CIP Reliability Standards with regard to Low Impact
BES Cyber Systems and may not provide an adequate roadmap for responsible entities to
follow to ensure the reliable operation of the bulk electric system.110
95. The NOPR proposed to direct that NERC develop a modification to CIP-003-5,
Requirement R2, to require responsible entities to adopt specific, technically-supported
cyber security controls for Low Impact assets, as opposed to the proposed unspecified
policies.111 The NOPR sought comment on (1) the value of adopting specific controls for
Low Impact assets that reflect their cyber security risk level and (2) the lack of a
requirement to have an inventory, list or discrete identification of Low Impact BES Cyber
Systems.
109 NOPR, 143 FERC ¶ 61,055 at P 66.
110 Id. P 70.
111 Id.
Docket No. RM13-5-000 - 56 -
Comments
Low Impact Protections
96. The majority of commenters oppose the Commission proposal to require entities
to adopt specific cyber security controls for Low Impact assets and support CIP-003-5,
Requirement R2 as filed. Other commenters support NERC’s proposal, but also believe
that additional guidance regarding the protection of Low Impact assets would be
beneficial. Several commenters do not support NERC’s proposal on Low Impact assets,
but not based on the concerns raised in the NOPR.
97. The majority of commenters support proposed CIP-003-5, Requirement R2 as
filed and oppose the NOPR proposal to require specific, technically-supported controls
for Low Impact BES Cyber Assets.112 Generally, commenters state that the CIP-003-5,
Requirement R2 requirement for responsible entities to develop and implement
documented cyber security policies is appropriate for assets that will be categorized as
having a limited effect on the bulk electric system. NERC characterizes the requirement
to develop and implement cyber security policies for Low Impact assets as “a significant
112 See, e.g., Comments of Alliant, Ameren, AEP, APPA, Arkansas, BPA,
CenterPoint, Consumers Energy, Dominion, EEI, Holland, Idaho Power, ISO New England, Luminant, MidAmerican, NARUC, National Grid, NRECA, NextEra, NERC, NAGF, Northeast Utilities, NIPSCO, PG&E, Pepco, Portland, PPL Companies, Southern Indiana, SWP, Tacoma, Tampa, TVA, TAPS, UI, Xcel.
Docket No. RM13-5-000 - 57 -
step in more comprehensively protecting assets that could cause cyber security risks to
the bulk electric system.”113
98. EEI asserts that the proposed protections for Low Impact assets include basic
physical and electronic perimeter-type access controls for every bulk electric system
facility housing any BES Cyber Asset, including Low Impact assets.114 CenterPoint,
Consumers Energy, and Holland comment that CIP-003-5, Requirement R2 establishes
an auditable requirement that responsible entities develop and implement cyber security
policies covering the four areas identified in Requirement R2.
99. APPA, Holland and others, comment that requiring responsible entities to adopt
specific cyber security controls for Low Impact BES Cyber Systems would significantly
increase the cost and administrative burden associated with the protection of Low Impact
BES Cyber Systems with little to no increase in bulk electric system reliability.115
NextEra, among other commenters, asserts that a requirement to adopt specific,
technically-supported controls for Low Impact BES Cyber Systems would take time and
resources away from the protection of Medium and High Impact BES Cyber Systems.116
113 NERC Comments at 21.
114 EEI Comments at 13-14.
115 E.g., APPA Comments at 14; SWP Comments at 5; Consumers Energy Comments at 3; Idaho Power Comments at 2-3; NARUC Comments at 5-6; NRECA Comments at 8-9; PHI Comments at 4; SCE Comments at 4; TAPS Comments at 4.
116 NextEra Comments at 5; Alliant Comments at 5; EEI Comments at 14; KCP&L Comments at 4; NRECA Comments at 8-9.
Docket No. RM13-5-000 - 58 -
ISO New England raises a concern that adopting a new requirement for specific controls
for Low Impact assets could have unintended consequences, such as the withdrawal of
blackstart resources.117
100. Some comments oppose the NOPR proposal to require specific, technically-
supported controls for Low Impact BES Cyber Assets, but acknowledge that additional
guidance regarding the protection of Low Impact assets would be beneficial.118
Specifically, SPP Parties, LADWP and KCP&L posit that additional guidance would aid
responsible entities in understanding what security measures they should adopt for Low
Impact assets, as well as help ensure that audit requirements are clear. AEP suggests that,
if the Commission directs NERC to require prescriptive controls for Low Impact assets,
such requirements should include a caveat that the controls will only be implemented
where technically feasible.
101. OEVC and SPP RE do not support proposed CIP-003-5, Requirement R2, but for
different reasons. OEVC states that the category of Low Impact BES Cyber Assets is
flawed because it encompasses entities that do not have an impact on the bulk electric
system and, as such, exceeds the authority granted in FPA section 215.119 SPP RE claims
that only requiring documented policies that cover broadly-defined topics provides
117 ISO New England Comments at 9.
118 E.g., SPP Parties Comments at 3; LADWP Comments at 11; KCP&L Comments at 4.
119 OEVC Comments at 10.
Docket No. RM13-5-000 - 59 -
insufficient protection for Low Impact BES Cyber Assets.120 SPP RE comments that the
failure to require specific controls is problematic for auditors in that CIP-003-5,
Requirement R2 lacks specific control objectives with which to measure an entity’s
compliance. SPP RE recommends defining an appropriate set of control objectives as
opposed to defining the controls themselves.121
102. NARUC raises a concern that the breadth of the Low Impact category has the
potential to blur the clear jurisdictional lines in FPA section 215. NARUC concludes that
a “lighter touch,” such as NERC’s proposed documented policies under CIP-003-5,
Requirement R2, is the appropriate manner to address assets that by definition are low
priority.122
Inventory of Low Impact Assets
103. The majority of commenters oppose adopting a requirement for responsible
entities to develop and maintain an inventory, list or discrete identification of Low Impact
BES Cyber Assets.123 NERC, EEI, Idaho Power, NRECA, TVA, Xcel and others argue
that developing and maintaining an inventory or list of Low Impact assets would create
120 SPP RE Comments at 6. 121 Id. at 7-8.
122 NARUC Comments at 6.
123 See Comments of Ameren, Arkansas, BPA, Consumers Energy, Dominion, EEI, Idaho Power, LADWP, Luminant, MidAmerican, NRECA, NERC, NAGF, NIPSCO, PG&E, PEPCO, SCE, SPP Parties, Tampa, TVA, UI, and Xcel.
Docket No. RM13-5-000 - 60 -
an unnecessary administrative burden without any corresponding reliability benefit.124
Luminant comments that a requirement to develop and maintain an inventory or list of
Low Impact assets would be an administrative task that would create additional
intelligence source data that must be protected.125 EEI suggests that Low Impact assets
should be identified at the site facility level and not the individual device level.126
104. According to NERC, no added reliability benefit would result from a separate
requirement to create and continuously update a list of Low Impact assets. NERC notes,
however, that CIP-002-5 Part 1.3 requires responsible entities to identify each bulk
electric system asset that contains a Low Impact BES Cyber System and, therefore,
responsible entities should have a list of bulk electric system locations containing Low
Impact BES Cyber Systems that could be used for audit purposes.127 In contrast, SPP RE
states that the lack of a requirement for responsible entities to maintain an inventory of
Low Impact BES Cyber Assets poses an audit challenge because neither the responsible
124 See also Ameren Comments at 11; BPA Comments at 8; Consumers Energy
Comments at 4; Dominion Comments at 10; SCE Comments at 4; SPP Parties at 3; Luminant Comments at 4; NAGF Comments at 4; PG&E Comments at 7; PHI Comments at 4; SCE Comments at 4; Tampa Comments at 5-6; and UI Comments at 6.
125 Luminant Comments at 4.
126 EEI Comments at 14-15.
127 NERC Comments at 22-23.
Docket No. RM13-5-000 - 61 -
entity nor the auditor will have a reasonable assurance that every BES Cyber System or
BES Cyber Asset has been accounted for and properly categorized.128
105. LADWP supports removing the language from CIP-003-5, Requirement R2,
stating that an inventory or list of Low Impact BES Cyber Systems or BES Cyber Assets
is not required. LADWP agrees with the Commission that the process of identifying and
categorizing assets into Low, Medium, and High Impact categories will lend itself to
compiling a list or inventory of all BES Cyber Assets, including Low Impact assets.
LADWP suggests that, since entities will already be maintaining a list for internal
classification purposes, a requirement to maintain a list of Low Impact BES Cyber Assets
would not impose additional burdens.129
Commission Determination
Specific Controls for Low Impact BES Cyber Systems
106. Based on the explanations provided by NERC and other commenters, we adopt the
NOPR proposal with modifications. As we explain below, while we do not require
NERC to develop specific controls for Low Impact facilities, we do require NERC to
address the lack of objective criteria against which NERC and the Commission can
evaluate the sufficiency of an entity’s protections for Low Impact assets. While NERC
128 SPP RE Comments at 7-8.
129 LADWP Comments at 13.
Docket No. RM13-5-000 - 62 -
may address this concern by developing specific controls for Low Impact facilities, it has
the flexibility to address it through other means, including those discussed below.
107. As highlighted by commenters, the adoption of the Low Impact BES Cyber Asset
category will expand the protections offered by the CIP version 5 Standards to additional
assets that could cause cyber security risks to the bulk electric system. As discussed
above, categorizing BES Cyber Systems based on their Low, Medium, or High Impact on
the reliable operation of the bulk electric system, with all BES Cyber Systems being
categorized as at least Low Impact, offers more comprehensive protection of the bulk
electric system. The CIP version 5 Standards, however, do not require specific controls
for Low Impact assets nor do they contain clear, objective criteria from which to judge
the sufficiency of the controls ultimately adopted by responsible entities for Low Impact
BES Cyber Systems.
108. In addition, the absence of objective criteria to evaluate the controls chosen by
responsible entities for Low Impact assets introduces an unacceptable level of ambiguity
and potential inconsistency into the compliance process, and creates an unnecessary gap
in reliability. This ambiguity will make it difficult for registered entities to develop, and
NERC and the regions to objectively evaluate, the effectiveness of procedures developed
to implement Reliability Standard CIP-003-5, Requirement R2. Therefore, pursuant to
section 215(d)(5) of the FPA, we direct NERC to develop modifications to the CIP
version 5 Standards to address this concern. We believe that NERC can effectively
address this concern in a number of ways, including: (1) requiring specific controls for
Low Impact assets, including subdividing the assets into different categories with
Docket No. RM13-5-000 - 63 -
different defined controls applicable to each subcategory; (2) developing objective
criteria against which the controls adopted by responsible entities can be compared and
measured in order to evaluate their adequacy, including subdividing the assets into
different categories with different defined control objectives applicable to each
subcategory; (3) defining with greater specificity the processes that responsible entities
must have for Low Impact facilities under Reliability Standard CIP-003-5, Requirement
R2; or (4) another equally efficient and effective solution. We believe that this approach
allows NERC the flexibility to develop appropriate modification(s), while also
considering the stakeholder concerns expressed in NOPR comments regarding the
possible rigidity of requiring a “one-size-fits-all” set of controls.
109. We disagree with OEVC’s assertion that the Low Impact category is flawed
because it applies to responsible entities that do not have an impact on the bulk electric
system and, as such, exceeds the authority granted in FPA section 215. Reliability
Standard CIP-002-5 encompasses cyber assets that meet the definition of a BES Cyber
Asset and that are associated with facilities that are part of the bulk electric system.130
Further, only those cyber assets that meet the definition of a BES Cyber Asset and are a
part of a BES Cyber System must comply with the controls in the CIP Reliability
130 See Reliability Standard CIP-002-5 (Cyber Security – BES Cyber System
Categorization) at Section 3 (the stated purpose of CIP-002-5 is “[t]o identify and categorize BES Cyber Systems and their associated BES Cyber Assets for the application of cyber security requirements commensurate with the adverse impact that loss, compromise, or misuse of those BES Cyber Systems could have on the reliable operation of the [bulk electric system].”).
Docket No. RM13-5-000 - 64 -
Standards. Accordingly, Low Impact assets fall within the scope of FPA section 215.
While SPP RE raises concerns regarding the auditability of Reliability Standard CIP-003-
5, Requirement R2, in the absence of specific control objectives, other commenters such
as CenterPoint and Consumers Energy assert that Requirement R2 establishes an
auditable requirement that responsible entities both develop and implement cyber security
policies addressing the four identified areas. We believe that our directive to NERC will
address any concerns over the auditability of the protections adopted under CIP-003-5,
Requirement R2.
110. As discussed above, NERC has flexibility in how it addresses our concern. For
example, NERC could follow the recommendation of SPP RE and define an appropriate
set of control objectives for Low Impact assets, rather than define the specific controls
that would apply to Low Impact assets. Alternatively, NERC may propose specific
controls that apply to Low Impact assets, including subdividing the assets into different
categories with different defined controls or control objectives applicable to each
subcategory, or it could define with greater specificity the processes that responsible
entities must have for Low Impact facilities under CIP-003-5, Requirement R2. NERC
may also propose an alternative approach that addresses our concern in an equally
efficient and effective manner. Whatever approach NERC decides to take, we emphasize
that the criteria NERC proposes for evaluating a responsible entities’ protections for Low
Impact facilities should be clear, objective, commensurate with their impact on the
system, and technically justified.
Docket No. RM13-5-000 - 65 -
Inventories of Low Impact BES Cyber Systems
111. In the NOPR, the Commission sought comment on the benefit of requiring a list or
inventory of Low Impact BES Cyber Systems.131 Based on the comments, we are
persuaded that it would be unduly burdensome to require responsible entities to create
and maintain an inventory of Low Impact assets for audit purposes. Creating and
maintaining such a list could also divert resources away from the protection of Medium
and High Impact assets. Further, we note that NERC’s approach is consistent with its
move away from embedding documentation obligations in the substantive requirements
of Reliability Standards.
112. We agree with NERC’s comment that, while not requiring a list or inventory,
“NERC stresses that entities will need to be able to demonstrate compliance with CIP-
002-5, which requires such entities to identify the assets that are associated with its Low
Impact BES Cyber Systems.”132 Thus, NERC indicates that, while not necessarily in the
form of a discrete list, an entity must have the ability to identify the nature and location of
all Low Impact assets that it owns or controls for audit and compliance purposes.
Likewise, as explained by NERC, pursuant to Reliability Standard CIP-002-5,
Requirement R1, Part 1.3, auditors have the ability to ensure that Low Impact systems are
accounted for by confirming that a responsible entity has identified “each asset that
131 See NOPR, 143 FERC ¶ 61,055 at P 71.
132 NERC Comments at 22.
Docket No. RM13-5-000 - 66 -
contains a low impact BES Cyber System[.]”133 We find this explanation to be
reasonable.
C. Proposed Definitions
113. In its petition, NERC proposes nineteen CIP-related definitions for inclusion in the
NERC Glossary. This includes fifteen new definitions and four revised definitions, as
well as the retirement of two definitions.134 The NOPR proposed to approve the
definitions for inclusion in the NERC Glossary. The NOPR also sought comment on
certain aspects of the proposed definitions. The Commission stated in the NOPR that,
depending on the adequacy of the explanations provided in response to the NOPR
questions, the Commission may direct NERC to develop modifications to certain
proposed definitions to eliminate ambiguities and ensure that BES Cyber Assets are
adequately protected.
133 Reliability Standard CIP-002-5 (Cyber Security – BES Cyber System
Categorization), at Requirement 1, Part 1.3.
134 Newly proposed definitions include BES Cyber Asset, BES Cyber System, BES Cyber System Information, CIP Exceptional Circumstances, CIP Senior Manager, Control Center, Dial-up Connectivity, Electronic Access Control or Monitoring Systems (EACMS), Electronic Access Point (EAP), External Routable Connectivity, Interactive Remote Access, Intermediate System, Physical Access Control Systems (PACS), Protected Cyber Assets (PCA), and Reportable Cyber Security Incident. Revised definitions include Cyber Assets, Cyber Security Incident, Electronic Security Perimeter (ESP), and Physical Security Perimeter (PSP). Retired definitions include Critical Assets and Critical Cyber Assets.
Docket No. RM13-5-000 - 67 -
114. As discussed below, we approve the nineteen definitions. In addition, pursuant to
section 215(d)(5) of the FPA, the Commission directs NERC to develop requirements
that address issues raised by the definitions and to submit an informational filing.
1. Definition - BES Cyber Asset
NERC Petition
115. NERC proposes the following definition of a BES Cyber Asset:
A Cyber Asset that if rendered unavailable, degraded, or misused would,
within 15 minutes of its required operation, misoperation, or non-operation,
adversely impact one or more Facilities, systems, or equipment, which, if
destroyed, degraded, or otherwise rendered unavailable when needed,
would affect the reliable operation of the Bulk Electric System.
Redundancy of affected Facilities, systems, and equipment shall not be
considered when determining adverse impact. Each BES Cyber Asset is
included in one or more BES Cyber Systems. (A Cyber Asset is not a BES
Cyber Asset if, for 30 consecutive calendar days or less, it is directly
connected to a network within an ESP, a Cyber Asset within an ESP, or to a
BES Cyber Asset, and it is used for data transfer, vulnerability assessment,
maintenance, or troubleshooting purposes.)
Docket No. RM13-5-000 - 68 -
a. 15-Minute Parameter
NOPR
116. The NOPR sought comment on the purpose and effect of the 15-minute parameter
in the BES Cyber Asset definition. In particular, the NOPR sought comment on the types
of Cyber Assets that would meet the “within 15 minutes” parameter.135 Further, the
NOPR sought comment on the types of assets or devices that the 15-minute parameter
would exclude and, in particular, whether the “within 15 minutes” parameter excludes
devices that have an impact on the reliable operation of the bulk electric system.136 The
NOPR also sought comment on whether the use of a specified time period as a basis for
identifying assets for protection is consistent with the procedures adopted under other
cyber security standards, such as the NIST Risk Management Framework, that apply to
industrial control and Supervisory Control and Data Acquisition (SCADA) systems, as
well as traditional information technology systems.137
135 NOPR, 143 FERC ¶ 61,055 at P 77.
136 Id.
137 Id.
Docket No. RM13-5-000 - 69 -
Comments
117. Most commenters support the 15-minute parameter,138 stating that the 15-minute
parameter is consistent with existing Commission-approved Reliability Standards. Other
commenters contend that the 15-minute parameter is arbitrary and lacks justification.
118. NERC, AEP, EEI, Idaho Power and PPL state that the proposed 15-minute
parameter provides a level of consistency for the identification of BES Cyber Assets that
could have a real-time impact on the reliability of the bulk electric system.139 Similarly,
KCP&L and UI support the 15-minute parameter as a proxy for real-time operations, and
KCP&L explains that the proposed definition should not automatically exempt any assets
that have an impact on the reliable operation of the bulk electric system.140
119. NERC, Luminant, and MISO comment that the 15-minute parameter is consistent
with Commission-approved reliability standards.141 Luminant notes that 15-minute
parameter is consistent with the disturbance recovery period under Reliability Standard
BAL-002-1. NERC and MISO state that the Commission has previously approved the
138 E.g., Ameren, AEP, EEI, Idaho Power, KCP&L, Luminant, MidAmerican,
MISO, NERC, NAGF, PPL, Tampa, UI.
139 AEP Comments at 6; EEI Comments at 26; Idaho Power Comments at 3-4; NERC Comments at 24; PPL Comments at 6.
140 KCPL Comments at 4, UI Comments at 7-8.
141 Luminant Comments at 4; MISO Comments at 6; NERC Comments at 25.
Docket No. RM13-5-000 - 70 -
use of a 15-minute parameter to identify generation assets under the CIP version 4
Standards.142
120. According to NERC, the 15-minute parameter will typically include SCADA,
EMS systems transmission protection systems, and generation control systems. NERC
states that the 15-minute parameter will generally exclude systems that collect data for
engineering analysis and support, and maintenance, and generally includes systems that
provide input to an operator for real-time operations or trigger automated real-time
operations.143 Tampa asserts that Cyber Assets and BES Cyber Systems that actively and
directly support the reliable operation of the bulk electric system would be captured
under the proposed definition since such assets need to be available at all times.144
121. NIPSCO and OEVC contend that the 15-minute parameter is arbitrary and
unsupported. NIPSCO states that it is not clear how the 15-minute parameter should be
tested or determined under the proposed definition and questions whether responsible
entities should be running studies or analysis addressing the loss of cyber assets or
whether the 15-minute parameter should be attributed to a cyber asset based on the
associated facility.145 OEVC argues that NERC has not explained the 15-minute
142 NERC Comments at 24; MISO Comments at 6.
143 NERC Comments at 26-27. See also Tampa Comments at 9.
144 Tampa Comments at 9.
145 NIPSCO Comments at 5.
Docket No. RM13-5-000 - 71 -
parameter and opines that the 15-minute parameter is “unnecessary as it imposes an
arbitrary time period.”146 SPP RE states that it cannot comment on whether the 15-
minute parameter is appropriate to establish a distinction between real-time and non-real
time operations, but SPP RE is concerned with the audit implications raised by the 15-
minute parameter.147
Commission Determination
122. We approve NERC’s proposed definition of BES Cyber Asset. Based on the
comments, we understand that the 15-minute parameter is intended to capture assets
involved in real-time operations, such as systems that provide input to an operator for
real-time operations or trigger automated real-time operations. According to NERC, “the
15-minute parameter is not about detecting and responding to a Cybersecurity Incident
within 15 minutes; rather the 15-minute parameter is about identifying those assets that,
when called upon in real-time or rendered unavailable in real-time, could impact reliable
operations.”148 The 15-minute parameter is also not without precedent since the
146 OEVC Comments at 9.
147 SPP RE Comments at 8-9.
148 NERC Comments at 26. Further, NERC states that “[t]he 15-minute parameter is essentially used as a measurable proxy for real-time operations in the CIP context,” Id. at 25. NERC explains that the NERC Glossary defines the term “Real-Time” as “[p]resent time as opposed to future time.” The CIP drafting team chose not to use this definition in defining BES Cyber Asset in order to provide a more measurable time frame and avoid confusion during implementation. Id.
Docket No. RM13-5-000 - 72 -
Commission approved similar language in the CIP version 4 Standards with respect to
generating units.149
123. As explained by NERC, the 15-minute parameter will typically result in the
identification of SCADA, Energy Management Systems, transmission protection
systems, and generation control systems as BES Cyber Assets.150 Further, according to
NERC, “[t]ypical systems that might be excluded by the 15-minute parameter are
systems that collect data for engineering analysis and support, and maintenance rather
than providing input to the operator for real-time operations or triggering automated real-
time operations. Such excluded systems would include those used to collect data for the
purpose of determining maintenance schedules for assets such as transformers or for
engineering analysis.”151 While NERC provides these generalized expectations, NERC
also explains that “whether a particular asset is included or excluded from the definition
of BES Cyber Asset is necessarily dependent upon the individual facts and circumstances
of how an entity uses that asset.”152 We also observe that some commenters express
concern over using a time period to determine the impact of a cyber system. Since the
identification of BES Cyber Assets is a critical step to applying the CIP version 5
149 See Order No. 761, 139 FERC ¶ 61,058 at P 35 (2012).
150 See NERC Comments at 26.
151 Id.
152 Id. at 27.
Docket No. RM13-5-000 - 73 -
Standards, we are interested in better understanding more fully the scope of assets that
will be identified as BES Cyber Assets as a result of the application of the 15-minute
parameter.
124. Accordingly, the Commission directs NERC to conduct a survey of Cyber Assets
that are included or excluded under the new BES Cyber Asset definition during the CIP
version 5 Standards implementation periods. Such data will help provide a better
understanding of the BES Cyber Asset definition. Based on the survey data, NERC
should explain in an informational filing the following: (1) specific ways in which
entities determine which Cyber Assets meet the 15 minute parameter; (2) types or
functions of Cyber Assets that are excluded from being designated as BES Cyber Assets
and the rationale as to why; (3) common problem areas with entities improperly
designating BES Cyber Assets; and (4) feedback from each region participating in the
implementation study on lessons learned with the application of the BES Cyber Asset
definition. The informational filing should not provide a level of detail that
divulges CEII data. This filing should also help other entities implementing CIP version
5 in identifying BES Cyber Assets.
125. The Commission directs NERC to submit the informational filing one year after
the effective date of this Final Rule. Based on the information in the informational filing,
the Commission may revisit whether the BES Cyber Asset definition should include the
15-minute parameter.
Docket No. RM13-5-000 - 74 -
b. 30-Day Exemption
NOPR
126. NERC’s proposed definition of BES Cyber Asset provides in part that “[a] Cyber
Asset is not a BES Cyber Asset if, for 30 consecutive calendar days or less, it is directly
connected to a network within an [Electronic Security Perimeter], a Cyber Asset within
an [Electronic Security Perimeter], or to a BES Cyber Asset, and it is used for data
transfer, vulnerability assessment, maintenance, or troubleshooting purposes.” In the
NOPR, the Commission sought comment on the purpose and anticipated effect of the 30-
day exemption language in the BES Cyber Asset definition. Specifically, the
Commission sought comment on whether the clause could result in the introduction of
malicious code or new attack vectors to an otherwise trusted and protected system, as
demonstrated in recent real-world incidents.153 In addition, the NOPR sought comment
on the types of Cyber Assets used for “data transfer, vulnerability assessment,
maintenance, or troubleshooting purposes,” as this language is used in the BES Cyber
Asset definition.154
153 NOPR, 143 FERC ¶ 61,055 at P 78.
154 Id.
Docket No. RM13-5-000 - 75 -
Comments
127. Most commenters support the proposed 30-day exemption.155 NERC and other
commenters state that the 30-day exemption is necessary because removing the language
would require responsible entities to implement the full set of CIP version 5 requirements
on transient systems,156 which they assert would be impractical and costly.157 EEI
supports the 30-day exemption and maintains that it would be “virtually impossible” for
entities to prove compliance with full-time physical security protections around portable
devices or programmable electronic devices that are briefly connected to a network and
then removed. EEI states that “to practically and auditably preserve the stringent
protections in place around BES Cyber Assets as currently defined, the temporarily
connected devices…exclusion must be preserved.”158
128. While some commenters acknowledge that connecting test equipment and other
transient systems to trusted networks introduces new attack vectors and potentially
malicious code, several commenters, such as MidAmerican, argue that BES Cyber
155 NERC, EEI, Ameren, AEP, Tacoma, CenterPoint, UI, Dominion, ISO New
England, MidAmerican, Exelon, National Grid, NextEra, NorthWestern, PPL Companies, and Wisconsin.
156 NERC states that “[a]n example of such a transient device is a laptop connected on a temporary basis to run vulnerability assessment software or to perform computer network traffic analysis.” NERC Comments at 28.
157 UI Comments at 8; G&T Cooperatives Comments at 14; NERC Comments at 28.
158 EEI Comments at 26.
Docket No. RM13-5-000 - 76 -
Systems will have adequate security protections by virtue of implementing the CIP
version 5 Standards as proposed.159 Specifically, NERC and others maintain that, since
CIP-007-5, Requirement R3 requires the prevention of malicious code, BES Cyber
Systems will be safeguarded from threats posed by transient systems.
129. Encari and KCP&L do not support the 30-day exemption in the BES Cyber Asset
definition. Encari states that the proposed BES Cyber Asset definition does not
adequately address risks posed by transient or temporarily connected systems, adding that
the 30-day exemption period appears “arbitrary.”160 Encari also states that this language
is prone to abuse, arguing that entities could briefly disconnect Cyber Assets regularly
used for used for data transfer, vulnerability assessment, maintenance, or troubleshooting
purposes in order to restart the 30-day qualification period, making it relatively easy to
circumvent CIP implementation on transient systems.
130. KCP&L remarks that “due to a lack of alternative protective measures,” it does not
support the 30-day language excluding temporarily connected systems.161 KCP&L
believes that implementation of the CIP version 5 standards on transient systems, while
burdensome, will prevent a gap in protective measures.162
159 CenterPoint Comments at 5; G&T Cooperatives Comments at 14-15; ISO-NE
Comments at 11; MidAmerican Comments at 18.
160 Encari Comments at 4.
161 KCP&L Comments at 5.
162 Id.
Docket No. RM13-5-000 - 77 -
131. Tacoma Power recommends that, since there is no clear guidance as to how
transient systems should be managed to ensure malicious code is not introduced into
protected environments, clarification is needed.163
Commission Determination
132. Based on the explanation provided by NERC and other commenters, we will not
direct modifications regarding the 30-day exemption in the definition of BES Cyber
Asset. While we are persuaded that it would be unduly burdensome for responsible
entities to treat all transient devices as BES Cyber Assets, we remain concerned whether
the CIP version 5 Standards provide adequately robust protection from the risks posed by
transient devices. Accordingly, as discussed below, we direct NERC to develop either
new or modified standards to address the reliability risks posed by connecting transient
devices to BES Cyber Assets and Systems.
133. As explained by NERC, the 30-day exemption is intended to remove transient
devices from the scope of the CIP version 5 Standards. We recognize that including
transient devices in the definition of BES Cyber Asset would subject transient devices to
the full suite of cyber security protections in the CIP version 5 Standards. We are
persuaded by commenters’ explanations that it would be unduly burdensome to protect
transient devices in the same manner as BES Cyber Assets because transient devices are
portable and frequently connected and disconnected from systems.
163 Tacoma Power Comments at 3-4.
Docket No. RM13-5-000 - 78 -
134. NERC and other commenters also assert that the CIP version 5 Standards require
the protection of BES Cyber Assets from malicious code, thus obviating the need to
include transient devices within the scope of the BES Cyber Asset definition. For
example, NERC avers that “responsible entities have an affirmative obligation pursuant
to CIP-007-5 to prevent malicious code from being introduced on the applicable BES
Cyber Systems, no matter where it might originate.”164 However, relying on a single
security control to protect information systems is contrary to the fundamental cyber
security concept of defense-in-depth, which the Commission continues to believe is the
most appropriate way to address cyber security. A transient device introduced directly
into a system bypasses most of the protection provided by the layers of security controls
provided by the CIP Reliability Standards. It cannot be assumed that anti-malware
programs are completely effective in detecting, removing, and blocking malware,
especially when they are commonly thwarted by the introduction of zero-day attacks.165
135. As the Commission highlighted in the NOPR, transient devices have been the
source of incidents where malware was introduced into electric generation industrial
control systems in real-world situations.166 Further, since these devices can move
164 NERC Comments at 29.
165 SANS defines a zero-day attack as a computer threat that tries to exploit computer application vulnerabilities that are unknown to others or undisclosed to the software developer.
166 See NOPR, 143 FERC ¶ 61,055 at n.69 (referencing Department of Homeland Security Industrial Control Systems Cyber Emergency Response Team (ICS-CERT)
(continued…)
Docket No. RM13-5-000 - 79 -
between electronic security perimeters, transient devices could spread malware across a
responsible entity’s BES Cyber Systems absent appropriate controls. While we agree
that it would be overly-burdensome to include transient devices in the BES Cyber Asset
definition, we agree with Encari and KCP&L that there is a gap in the CIP version 5
Standards regarding transient devices, and these devices pose a risk to BES Cyber Assets
that is not addressed in an adequately robust manner in the CIP version 5 Standards.
136. Accordingly, pursuant to section 215(d)(5) of the FPA, the Commission directs
NERC to develop either a new or modified Reliability Standard that addresses the risks
posed by transient devices. For example, the requirements should recognize that transient
devices, unlike BES Cyber Assets, are generally portable and frequently connected and
disconnected from systems. The Commission expects NERC to consider the following
security elements when designing a Reliability Standard for transient devices and
removable media: (1) device authorization as it relates to users and locations; (2)
software authorization; (3) security patch management; (4) malware prevention; (5)
detection controls for unauthorized physical access to a transient device and; (6)
processes and procedures for connecting transient devices to systems at different security
classification levels (i.e. High, Medium, Low Impact). We believe that NIST SP 800-53
Monthly Monitor (October-December 2012) at 1. Available at http://ics-cert.us-cert.gov/pdf/ICS-CERT_Monthly_Monitor_OctDec2012.pdf. The October-December 2012 ICS-CERT Monthly Monitor describes two recent situations where malware was introduced into two electric generation industrial control systems (ICS) through removable media (i.e., USB drive) that was being used to back-up a control system environment and updates.).
Docket No. RM13-5-000 - 80 -
Maintenance and Media Protection security control families, as well as the existing
Requirements in CIP-004-5, CIP-006-5, and CIP-007-5, can serve as a guide to NERC
and the industry in the development of appropriate reliability objectives for transient
devices. We believe that addressing transient devices in a new or modified Reliability
Standard as discussed above provides a balanced approach to addressing the risks
associated with transient devices without imposing unduly burdensome requirements on
responsible entities.
2. Definition - Control Center
NERC Petition
137. NERC proposes the following definition of a control center:
One or more facilities hosting operating personnel that monitor and control
the Bulk Electric System (BES) in real-time to perform the reliability tasks,
including their associated data centers, of: 1) a Reliability Coordinator, 2) a
Balancing Authority, 3) a Transmission Operator for transmission Facilities
at two or more locations, or 4) a Generator Operator for generation
Facilities at two or more locations.
NOPR
138. The Commission sought comment on the meaning of the phrase “generation
Facilities at two or more locations” and, specifically, whether the phrase includes two or
more units at one generation plant and/or two or more geographically dispersed units.
Docket No. RM13-5-000 - 81 -
Comments
139. Commenters generally explain that the phrase “generation Facilities at two or
more locations” is intended to capture control centers that control two or more
geographically dispersed generation units.167 NERC and other commenters state that the
definition is not intended to capture assets associated with two or more units at one
generation plant.168 Portland opines that an interpretation of the phrase that captures
multiple generating units at the same generating plant “could have the unintended
consequence of making what are clearly control rooms into control centers.”169
140. Ameren states that although it understands the term to refer to two or more
geographically dispersed units, it would support asking NERC to more clearly define the
term.170 Waterfall advocates for a risk-based definition of control center, noting that the
risk control centers pose to the bulk electric system is based on sabotage or mis-
operation. According to Waterfall, any set of equipment capable of nearly-
167 Ameren, Dominion, EEI, Idaho Power, KCP&L, Luminant, MidAmerican,
NERC, NAGF, Portland, SPP RE, Tampa, TVA.
168 Dominion Comments at 14; Idaho Power at 4; MidAmerican Comments at 18; NERC Comments at 30; SPP RE Comments at 10; Tampa Comments at 7.
169 Portland Comments at 5. See also TVA Comments at 6.
170 Ameren Comments at 17-18.
Docket No. RM13-5-000 - 82 -
simultaneously sabotaging a large amount of generating capacity should be classified as a
control center no matter where the generation is located.171
Commission Determination
141. We approve the definition of Control Center. Consistent with the comments, we
clarify that the phrase “generation Facilities at two or more locations” refers to control
centers that control two or more geographically dispersed generation units as opposed to
assets associated with two or more units at one generation plant. In response to the
comments raised by Ameren and Waterfall, we find that definition of Control Center is
sufficiently clear. However, entities may seek additional clarification or modification
through the NERC standards development process. We also find that the CIP version 5
Reliability Standards take a risk-based approach to Control Centers because, under
Reliability Standard CIP-002-5, responsible entities must categorize generation operator
Control Centers as High, Medium, or Low Impact based on facility ratings.
3. Definition - Cyber Asset
NERC Petition
142. NERC’s currently-effective Glossary definition of Cyber Asset provides:
Programmable electronic devices and communication networks including
hardware, software, and data.
171 Waterfall Comments at 7.
Docket No. RM13-5-000 - 83 -
NERC proposes the following definition of a Cyber Asset:
Programmable electronic devices, including the hardware, software, and
data in those devices.
Thus, NERC’s proposed definition of Cyber Asset removes the phrase “communication
networks.”
NOPR
143. The Commission stated in the NOPR that NERC’s proposed definition of Cyber
Asset removes the phrase “communication networks” from the currently-effective
Glossary definition of Cyber Asset, highlighting the fact that the FPA defines
“cybersecurity incident” as follows:
A malicious act or suspicious event that disrupts, or was an attempt to disrupt, the operation of those programmable electronic devices and communication networks, including hardware, software and data that are essential to the reliable operation of the bulk power system.[172]
144. The NOPR indicated that NERC’s revised definition of Cyber Asset appears to
remove a type of asset the statute defines as essential to the reliable operation of the
Bulk-Power System.173
145. In the NOPR, the Commission sought comment regarding the purpose and
intended effect of removing “communication networks” from the definition of a Cyber
172 NOPR, 143 FERC ¶ 61,055 at P 81 (citing 16 U.S.C. 824o(a)(8) (2012)
(emphasis added)).
173 NOPR, 143 FERC ¶ 61,055 at P 81.
Docket No. RM13-5-000 - 84 -
Asset.174 Further, the Commission sought comment on whether the removal of
“communication networks” from the definition could create a gap in cyber security and
the CIP Reliability Standards.175 In addition, the Commission sought an explanation as to
the purpose and intended effect of the phrase “data in those devices” and, in particular,
whether the phrase excludes data being transferred between devices.176
Comments
146. Most commenters support NERC’s proposal that removes the phrase
“communication networks” from the definition of Cyber Asset.177 NERC and other
commenters contend that the inclusion of communication networks in the currently-
effective definition of Cyber Asset has caused confusion in the implementation of the
CIP Reliability Standards since communication networks are generally outside the
control of responsible entities.178 NERC, KCP&L, MidAmerican, and Tampa comment
that communication networks include programmable electronic device components that
could still qualify as Cyber Assets, even though the nonprogrammable electronic
174 Id. P 82.
175 Id.
176 Id.
177 Ameren, AEP, BPA, Dominion, ISO New England, KCP&L, MidAmerican, MISO, NERC, EEI, Exelon, NAGF, National Grid, NextEra, NorthWestern, Portland, PPL Companies, Tacoma, Tampa, UI, and Wisconsin.
178 AEP Comments at 6-7; KCP&L Comments at 5; MISO Comments at 7-8; NERC Comments at 31-32; Portland Comments at 5-6.
Docket No. RM13-5-000 - 85 -
components of the communication networks, such as cabling, would not qualify.179
NAGF argues that, although it may be appropriate to address the physical protection of
communication cabling in the future, “the remainder of the NERC CIP standards, as
currently drafted, cannot be applied to communication cabling.”180
147. Other commenters claim that removing “communication networks” from the
definition of Cyber Asset could create security gaps.181 SPP RE comments that removing
communication networks is inconsistent with the Commission’s interpretation of CIP-
006-3, Requirement R1.1, which requires the protection of data being transmitted over
physical media by either physical or logical means.182 Idaho Power agrees with the
NOPR that excluding communication networks from the Cyber Asset definition could
lead to a gap in security; however Idaho Power is concerned about how the CIP version 5
Standards would apply to every component of a communication network.183 Idaho Power
notes that the term “communication network” itself is open to interpretation and creates
confusion as to what assets are covered by the CIP Reliability Standards. Therefore,
Idaho Power suggests that the Commission direct NERC to define “communication
179 KCP&L Comments at 5; MidAmerican at 19; NERC Comments at 31-32;
Tampa Comments at 8.
180 NAGF Comments at 6.
181 Idaho Power, SPP RE.
182 SPP RE Comments at 11.
183 Idaho Power Comments at 4.
Docket No. RM13-5-000 - 86 -
network” through the standard drafting process and direct NERC to more fully explain
how the CIP version 5 Standards would apply to communication networks.184
Commission Determination
148. We approve NERC’s revised Cyber Asset definition. After considering the
explanations provided by commenters, we are persuaded that it is not necessary to
maintain the phrase “communications network” within the text of the Cyber Asset
definition to ensure that the programmable electronic components of these networks
receive protection under the CIP Reliability Standards. We further recognize that
maintaining the phrase “communication networks” within the Cyber Asset definition
would likely cause confusion and possibly complicate the implementation of the CIP
version 5 Standards, as many communication network components, such as cabling,
cannot strictly comply with the CIP Reliability Standards. We anticipate that the removal
of this phrase from the Cyber Asset definition will minimize the number of technical
feasibility exceptions needed for strict compliance with the CIP version 5 Standards.
149. Nevertheless, we remain concerned that a gap in protection may exist, as the CIP
version 5 Standards do not address security controls needed to protect the
nonprogrammable components of communications networks. We observe that a number
of other information security standards, including NIST SP 800-53 and ISO 27001,
address the protection of communication mediums, for instance in NIST SP 800-53 Rev
184 Id. at 5.
Docket No. RM13-5-000 - 87 -
3, security control PE-4 includes examples of protecting communication medium
including: (i) locked wiring closets; (ii) disconnected or locked spare jacks; and/or (iii)
protection of cabling by conduit or cable trays.185 Similarly, ISO 27001 also emphasizes
the protection of telecommunications cabling from interception or damage in control
A.9.2.3.186
150. We direct NERC to create a definition of communication networks and to develop
new or modified Reliability Standards to address the reliability gap discussed above. The
definition of communications networks should define what equipment and components
should be protected, in light of the statutory inclusion of communication networks for the
reliable operation of the Bulk-Power System. The new or modified Reliability Standards
should require appropriate and reasonable controls to protect the nonprogrammable
aspects of communication networks. The Commission directs NERC to submit these
modifications for Commission approval within one year from the effective date of this
final rule. We also direct Commission staff to include this issue in the staff-led technical
conference discussed herein.187
185 See NIST SP 800-53 Revision 3, security control family Physical and
Environmental Protection, Annex 2, page 54.
186 BSI ISO/IEC (2005). Information technology – Security techniques – Information security management systems – Requirements (ISO/IEC 27001:2005).British Standards Institute
187 See infra P 223.
Docket No. RM13-5-000 - 88 -
4. Reliability Tasks
NERC Petition
151. NERC’s definitions of the terms BES Cyber System, Control Center, and
Reportable Cyber Security Incident include the undefined term “reliability tasks.” For
example, the proposed definition of BES Cyber System provides:
One or more BES Cyber Assets logically grouped by a responsible entity to perform one or more reliability tasks for a functional entity.
NOPR
152. The Commission raised the concern in the NOPR whether the use of the undefined
term “reliability tasks” will lead to confusion during implementation. Therefore, the
Commission sought comment on the meaning and scope of the phrase “reliability tasks”
and whether there is a common understanding of this phrase to assure accurate and
consistent implementation of the definitions and, hence, the CIP version 5 Standards.188
Comments
153. Most commenters state that “reliability tasks” has a well-understood meaning and
does not need further definition.189 NERC, EEI, NAGF and other commenters explain
that “reliability tasks” refers to the tasks associated with the functions defined in the
188 NOPR, 143 FERC ¶ 61,055 at P 84.
189 AEP, CenterPoint, Dominion, EEI, Exelon, Luminant, NERC, NAGF, National Grid, NextEra, NorthWestern, PPL Companies, SPP RE, Tampa, and Wisconsin.
Docket No. RM13-5-000 - 89 -
NERC Functional Model.190 NERC asserts that the use of the undefined term “should not
cause confusion in implementation or result in interpretation requests” since industry has
a common understanding of the term “reliability tasks.”191 SPP RE and UI explain their
understanding of the term “reliability tasks” as referring to the bulk electric system
reliability operating services listed in the Guidelines and Technical Basis section of CIP-
002-5.192
154. Other commenters advocate for defining the phrase “reliability tasks” either
because there is no commonly understood meaning or to clarify that the term refers to
tasks associated with functions listed in the NERC Functional Model.193 Ameren
suggests that a definition of the term “reliability tasks” reference the CIP-002-5 guidance
document to provide more clarity.194 MISO states that the term “reliability tasks” should
be defined in order to avoid ambiguity and to ensure consistent interpretation in
enforcement proceedings.195
190 AEP Comments at 8; Dominion Comments at 12; EEI Comments at 29; NAGF
Comments at 7; NERC Comments at 33-34; Tampa Comments at 8.
191 NERC Comments at 34.
192 SPP RE Comments at 11, UI Comments at 10.
193 Ameren, Idaho Power, KCP&L, and MISO.
194 Ameren Comments at 18.
195 MISO Comments at 8.
Docket No. RM13-5-000 - 90 -
Commission Determination
155. We are satisfied that responsible entities have a common understanding of
“reliability tasks” in the NERC definitions and, thus, we conclude that there is no need to
direct NERC to define the phrase. Consistent with the comments of NERC and others,
we understand that “reliability tasks” refers to the tasks associated with the functions
defined in the NERC Functional Model.
156. While some commenters suggest that the phrase “reliability tasks” is best
understood as referring to the bulk electric system reliability operating services listed in
the Guidelines and Technical Basis section of CIP-002-5, we believe that the NERC
Functional Model is the basis for the phrase “reliability task” while the Guidelines and
Technical Basis section provides clarity on how the term applies to the CIP version 5
Standards.
5. Intermediate Devices
NERC Petition
157. NERC proposes to define Electronic Access Control or Monitoring Systems
(EACMS) and Interactive Remote Access as follows:
EACMS - Cyber Assets that perform electronic access control or electronic access monitoring of the Electronic Security Perimeter(s) or BES Cyber Systems. This includes Intermediate Devices.
Interactive Remote Access – […] Remote access originates from a Cyber Asset that is not an Intermediate Device and not located within any of the Responsible Entity’s Electronic Security Perimeter(s) or at a defined Electronic Access Point (EAP). […]
Docket No. RM13-5-000 - 91 -
Both proposed definitions include the undefined term “Intermediate Device.”
NOPR
158. The Commission explained in the NOPR that the term “Intermediate Systems”
was originally referred to as “Intermediate Device” in previous draft versions of the CIP
version 5 Standards. The Commission raised the concern that this inconsistency may
lead to confusion in the application of the CIP version 5 Standards.196 Therefore, the
NOPR sought comment on whether the defined term “Intermediate Systems” is the
appropriate reference in the definitions of Electronic Access Control or Monitoring
Systems (EACMS) and Interactive Remote Access, as opposed to the undefined term
“intermediate devices.”197
Comments
159. NERC clarifies that “Intermediate Systems” is the appropriate term in the
definitions of EACMS and Interactive Remote Access and states that it will submit an
errata change to correct the oversight.198
160. In a September 30, 2013 errata filing in this proceeding (docket RM13-5-000),
NERC proposes to replace the undefined term “Intermediate Device” with the defined
term “Intermediate System” in the definitions of EACMS and Interactive Remote Access.
196 NOPR, 143 FERC ¶ 61,055 at P 85.
197 Id. P 86.
198 NERC Comments at 35.
Docket No. RM13-5-000 - 92 -
Commission Determination
161. The Commission approves the definitions of EACMS and Interactive Remote
Access, with the term Intermediate System, as proposed in NERC’s September 30, 2013
errata.
D. Implementation Plan
NERC Petition
162. NERC proposes an implementation plan for the CIP version 5 Standards that
addresses two distinct issues. First, NERC proposes language that would provide a
transition from CIP version 3 to CIP version 5, thereby bypassing implementation of CIP
version 4:
Notwithstanding any order to the contrary, CIP-002-4 through CIP-009-4 do not become effective, and CIP-002-3 through CIP-009-3 remain in effect and are not retired until the effective date of the Version 5 CIP Cyber Security Standards under this implementation plan.
NERC explains that the language is intended to alleviate uncertainty resulting from
“industry stakeholders not knowing whether the Commission will act on CIP Version 5
prior to the CIP Version 4 effective date, April 1, 2014….”199
163. Second, NERC proposes a 24-month implementation period for “High Impact”
and “Medium Impact” BES Cyber Systems, and a 36-month implementation period for
“Low Impact” BES Cyber Systems.
199 NERC Petition at 43.
Docket No. RM13-5-000 - 93 -
NOPR
164. In the NOPR, the Commission proposed to approve the implementation plan for
the CIP version 5 Standards to allow responsible entities to transition from compliance
with the currently-effective CIP version 3 Standards to compliance with the CIP version
5 Standards, essentially retiring the CIP version 4 Standards prior to mandatory
compliance.200 Thus, upon Commission approval in a Final Rule, the CIP version 5
Standards would supersede Reliability Standards CIP-002-4 through CIP-009-4, and CIP-
002-3 through CIP-009-3 would remain in effect and would not be retired until the
effective date of the CIP version 5 Standards.
165. With regard to the proposed implementation periods, the Commission sought in
the NOPR comment on the activities and any other considerations that justify 24-month
and 36-month implementation periods for the CIP version 5 Standards.201 In addition, the
Commission sought comment on whether responsible entities can achieve compliance
with the CIP version 5 Standards in a shorter period for those Cyber Assets that
responsible entities have identified to comply with the currently-effective CIP Reliability
Standards.202 Finally, the NOPR sought comment on the feasibility of a shorter
200 NOPR, 143 FERC ¶ 61,055 at P 89.
201 Id. P 90.
202 Id.
Docket No. RM13-5-000 - 94 -
implementation period and the reasonable time frame for a shorter implementation
period.203
Comments
166. While the majority of commenters support NERC’s implementation plan as-filed,
other commenters either request additional time to implement CIP version 5 or request
flexibility to transition to CIP version 5 prior to the proposed effective date.
167. The majority of comments support approval of NERC’s implementation plan as-
filed.204 NERC comments that bypassing CIP version 4 will allow entities to devote the
necessary resources and attention to implement the improved cyber security controls in
CIP version 5. NERC, APPA, CenterPoint, and EEI, among others, identify activities
that responsible entities are expected to undertake during the proposed 24- and 36-month
implementation periods, including re-evaluating cyber assets and systems based on the
new criteria, budget for and acquire resources required to implement the new controls,
203 Id.; see generally Version 5 Critical Infrastructure Protection Reliability
Standards, et al., 144 FERC ¶ 61,123 (2013) (granting a six-month extension of the compliance deadline for the CIP version 4 Reliability Standards to facilitate the transition from the CIP version 3 Reliability Standards to the CIP version 5 Reliability Standards).
204 E.g., Ameren, AEP, APPA, CenterPoint, Consumers Energy, Dominion, EPSA, G&T Cooperatives, Holland, ITC, ISO New England, KCP&L, LADPW, Luminant, MidAmerican, MISO, NASUCA, National Grid, NERC, NAGF, Northeast Utilities, PPL Companies, SCE, SWP, Southern Indiana, Tampa, TVA, UI, and Xcel.
Docket No. RM13-5-000 - 95 -
implement the new requirements and then assess implementation of each requirement for
compliance.205
168. In response to the Commission’s concerns about the implementation periods,
APPA, Dominion and SWP assert that the 24- and 36-month implementation periods are
reasonable, and provide time for entities to budget and acquire the necessary resources to
comply with CIP version 5.206 LADWP cautions that, because vendors of specialized
security equipment can require significant lead times and skilled contractors may not be
able to implement upgrades within a short period of time, the proposed 24- and 36-month
implementation periods are appropriate and necessary.207
169. SCE&G contends that the proposed 24-month implementation period for High and
Medium Impact assets “is aggressive and likely insufficient.”208 SCE&G proposes that
the Commission extend the implementation period for Medium and High Impact assets to
36-months. FirstEnergy supports the proposed implementation plan and notes that the
implementation periods “represent an ambitious, but reasonable, industry-vetted goal to
205 APPA Comments at 19; CenterPoint Comments at 7; EEI Comments at 17-19;
LADWP Comments at 15; NRECA Comments at 10; NERC Comments at 37-39; PHI Comments at 2-3; Tampa Comments at 11-12; UI Comments at 3-4.
206 APPA Comments at 17-19; Dominion Comments at 5-6; SWP Comments at 6.
207 LADWP Comments at 15.
208 SCE&G Comments at 6.
Docket No. RM13-5-000 - 96 -
achieve compliance with what is essentially a new cyber security framework.”209
Therefore, FirstEnergy asks the Commission to clarify that it will accept, on a case-by-
case basis, requests for time extensions to comply with the CIP version 5 Standards when
presented with extraordinary circumstances.
170. NRECA and SPP Parties support the proposed 24- and 36-month implementation
periods, but suggest that the Commission should permit responsible entities to shift to
compliance with the CIP version 5 Standards prior to the effective date.210 In addition,
SPP Parties notes that there is little guidance for entities to transition between the
different versions of the CIP Standards and, therefore, entities should not be penalized for
maintaining compliance with the prior version of the CIP Standards as they transition to
the new version of the standards. Finally, NERC indicates that it plans to develop
transition guidance documents and a pilot program to assist responsible entities as they
move from compliance with the CIP version 3 Standards to the CIP version 5
Standards.211
Commission Determination
171. The Commission adopts the NOPR proposal to approve the implementation plan
for the CIP version 5 Standards as proposed by NERC. Therefore, CIP-002-4 through
209 FirstEnergy Comments at 4.
210 NRECA Comments at 10-11, SPP Parties Comments at 4.
211 See NERC Comments at 39-40.
Docket No. RM13-5-000 - 97 -
CIP-009-4 will not become effective, and CIP-002-3 through CIP-009-3 will remain in
effect until the effective date of the CIP version 5 Standards. In addition, we are
persuaded by the majority of commenters that the 24-month implementation period for
High and Medium Impact BES Cyber Systems and the 36-month implementation period
for Low Impact BES Cyber Systems are reasonable. Commenters cite several potentially
resource-intensive tasks, including the hiring and training of new personnel, and activities
specific to newly affected BES Cyber Systems, as justification for the 24 and 36-month
implementation periods.
172. The Commission also supports NERC’s proposal to develop transition guidance
documents and a pilot program to assist responsible entities as they move from
compliance with the CIP version 3 Standards to the CIP version 5 Standards.212 The
Commission agrees that a pilot program will assist responsible entities by offering best
practices and lessons learned during this transition.
173. In response to SCE&G, we decline to extend the proposed 24-month
implementation period for Medium and High Impact assets. The overwhelming majority
of commenters, including NERC, indicate that the proposed implementation periods are
reasonable based on the investments and activities required to implement the CIP version
5 Standards. To the extent that extraordinary circumstances may hinder timely
212 See NERC Comments at 39-40.
Docket No. RM13-5-000 - 98 -
compliance, we suggest that responsible entities work with their relevant compliance
enforcement authority and NERC to address implementation issues.
174. Similarly, in response to NRECA and SPP Parties, we are not persuaded that there
is a need to entertain requests to shift to compliance with the CIP version 5 Standards
prior to the effective date of the standards. As NERC notes, the implementation periods
and associated pilot program are required, in part, to “allow the Regional Entities and
NERC to make adjustments in their systems and approach to compliance with proposed
CIP Version 5 while obtaining experience with entities in transition.”213 Issues of early
compliance can be addressed by NERC and Regional Entities as appropriate.
E. Violation Risk Factor/Violation Severity Level Assignments
175. NERC requests approval of the Violation Risk Factors (VRF) and Violation
Severity Levels (VSL) assigned to the CIP version 5 Standards. In particular, NERC
requests approval of 32 VRFs, one set for each requirement in the proposed CIP version 5
Standards.
176. We approve 30 VRFs and direct NERC to modify the VRF for CIP-006-5,
Requirement R3 from Lower to Medium and CIP-004-5, Requirement R4 from Lower to
Medium. In addition, we direct NERC to modify the VSLs for the CIP version 5
Standards, as discussed below.
213 NERC Comments at 40.
Docket No. RM13-5-000 - 99 -
1. Lower VRF for Maintenance and Testing of Physical Access Control Systems
NERC Petition
177. NERC assigns a Lower VRF to Reliability Standard CIP-006-5, Requirement R3,
which addresses the maintenance and testing of Physical Access Control Systems.
NOPR
178. In the NOPR, the Commission stated that the NERC mapping document
comparing the CIP version 4 and CIP version 5 Standards identifies Reliability Standard
CIP-006-4, Requirement R8, which addresses the maintenance and testing of all physical
security mechanisms, as the comparable Requirement in the CIP version 4 Standards.214
Reliability Standard CIP-006-4, Requirement R8 is assigned a VRF of Medium. The
NOPR stated that the Commission’s VRF guidelines require, among other things,
consistency within a Reliability Standard (guideline 2) and consistency between
requirements that have similar reliability objectives (guideline 3).215 The Commission
stated that the petition does not explain the change from a Medium VRF to a Lower VRF
for a comparable requirement. The Commission proposed to direct NERC to modify the
214 Mapping Document Showing Translation of CIP-002-4 to CIP-009-4 into CIP-002-5 to CIP-009-5, CIP-010-1, and CIP-011-1. Page 20-21. Accessible from: http://www.nerc.com/docs/standards/sar/Mapping_Document_012913.pdf.
215 See N. Amer. Elec. Reliability Corp., 119 FERC ¶ 61,145, order on reh’g and compliance filing, 120 FERC ¶ 61,145, at PP 8-13 (2007) (VRF Order). The guidelines are: (1) Consistency with the conclusions of the Blackout Report; (2) Consistency within a Reliability Standard; (3) Consistency among Reliability Standards; (4) Consistency with NERC’s Definition of the Violation Risk Factor Level; and (5) Treatment of Requirements that Co-mingle More Than One Obligation.
Docket No. RM13-5-000 - 100 -
VRF assigned to CIP-006-5, Requirement R3 from Lower to Medium, consistent with the
treatment of the comparable requirement in the CIP version 4 Standards, within 90 days
of the effective date of a final rule in this proceeding.
Comments
179. NERC and MISO argue that the Lower VRF for Reliability Standard CIP-006-5,
Requirement R3 appropriately reflects the reduced reliability risk in Requirement R3 as
compared to CIP-006-4, Requirement R8.216 NERC states that Requirement R8 requires
“[t]esting and maintenance period of all physical security mechanisms on a cycle no
longer than three years.” NERC states that CIP-006-5 now requires maintenance and
testing “at least once every 24 calendar months.” NERC asserts that, because
maintenance and testing of Physical Access Control Systems will occur more frequently
pursuant to the CIP version 5 Standards, the reliability risk is reduced and a Lower VRF
is appropriate.
180. Most commenters do not support modifying the VRF proposed by NERC.217
Commenters state that that the VRF for Requirement R3 should be Lower because
Requirement R3 is unlikely to pose a direct threat to reliability if violated. BPA supports
the Lower VRF for Requirement R3 because, although “testing and maintenance is an
important task, failure to test any single component will have minimal impact of the
216 NERC Comments at 41-42; MISO Comments at 10.
217 BPA, Idaho Power, KCP&L, MISO, and NERC.
Docket No. RM13-5-000 - 101 -
overall performance of the Physical Access Control System and the BES.”218 However,
AEP states that the modification proposed in the NOPR “ensure[s] consistency within a
Reliability Standard and consistency between requirements that have similar reliability
objectives.”219
Commission Determination
181. We adopt the NOPR proposal and direct NERC to modify the VRF assignment for
CIP-006-5, Requirement R3 from Lower to Medium. This modification will ensure that
the CIP version 5 Standards afford similar treatment to the testing and monitoring of
Physical Access Control Systems (PACS) as the CIP version 4 Standards. We are not
persuaded by commenters’ arguments that a Lower VRF assignment is appropriate for
CIP-006-5, Requirement R3.
182. First, we do not agree that the shortening of the review cycle from three years to
two years warrants changing the VRF categorization to Lower as suggested by NERC
and MISO. A medium risk requirement is defined as a requirement that, if violated,
could directly affect the electrical state or the capability of the bulk electric system, or the
ability to effectively monitor and control the bulk electric system.220 Physical Access
Control Systems are used to support the effective monitoring and control of the Bulk-
218 BPA Comment at 9.
219 AEP Comments at 8.
220 See Violation Risk Factors, accessible from: http://www.nerc.com/files/ violation_risk_factors.pdf.
Docket No. RM13-5-000 - 102 -
Power System facilities through the use of cameras, alarms, and other control
mechanisms. We are not convinced that shortening the required review period from three
years to two years ameliorates the potential impact of a violation of this requirement to
justify a Lower VRF. A failure to monitor or limit unauthorized access to critical plant
equipment or facilities due to an inoperable Physical Access Control System could result
in tampering, sabotage, or the unauthorized alteration of equipment associated with High
or Medium Impact BES Cyber Systems.
183. In addition, we disagree with BPA’s assertion that CIP-006-5, Requirement R3 is
administrative in nature and will have a minimal impact on the overall performance of
Physical Access Control Systems. As described above, the CIP-006-5, Requirement R3
control is a technical control that sets the minimum expectations for maintenance and
testing of Physical Access Control Systems at bulk electric system facilities. Thus, we
find that a Medium VRF designation is appropriate for CIP-006-5, Requirement R3.
184. Consistent with our discussion above, the Commission directs NERC to modify
the VRF assignment for CIP-006-5, Requirement R3 from Lower to Medium, within 90
days of the effective date of this Final Rule.
2. Lower VRF for Access Authorizations
NERC Petition
185. NERC assigns a VRF Factor to proposed CIP-004-5, Requirement R4, which
relates to access management programs addressing electronic access, unescorted physical
access, and access to BES Cyber System Information. Requirement R4 obligates a
responsible entity to have a process for authorizing access to BES Cyber System
Docket No. RM13-5-000 - 103 -
Information, including periodic verification that users and accounts are authorized and
necessary.
NOPR
186. The Commission stated in the NOPR that Recommendation 40 of the U.S. –
Canada Power System Blackout Task Force, Final Report on the August 14, 2003
Blackout in the United States and Canada: Causes and Recommendations (Blackout
Report) states that access to operationally sensitive computer equipment should be
“strictly limited to employees or contractors who utilize said equipment as part of their
job responsibilities.”221 In addition, the NOPR stated that Recommendation 44 of the
Blackout Report states that entities should “develop procedures to prevent or mitigate
inappropriate disclosure of information.”222 The NOPR stated that these two Blackout
Report recommendations relate to the protection of critical bulk electric system
equipment and information, and we believe these recommendations support assigning
access management programs, such as those required under CIP-004-5, Requirement R4,
a Medium VRF. The NOPR stated that the Commission’s VRF guidelines require,
among other things, consistency with the conclusions of the Blackout Report
(guideline 1).
221 See U.S. – Canada Power System Blackout Task Force, Final Report on the
August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations (April 2004) (Blackout Report) at 167. The Blackout Report is available at https://reports.energy.gov/BlackoutFinal-Web.pdf.
222 See id. p. 169.
Docket No. RM13-5-000 - 104 -
187. The NOPR stated that NERC proposes to assign a Medium VRF to CIP-004-5,
Requirement R5, which addresses access revocation. The NOPR stated that this
proposed assignment results in a potential inconsistency between VRFs within CIP-004-
5. The NOPR stated that Guideline 2 of the Commission’s VRF guidelines requires
consistency within a Reliability Standard. The NOPR stated that access authorization,
addressed in CIP-004-5, Requirement R4, is the companion to access revocation,
addressed in CIP-004-5, Requirement R5. The NOPR stated that this relationship is
demonstrated by the history of the CIP Reliability Standards; in the CIP version 1
through 4 Standards, access authorization and access revocation are two sub-
requirements of a main requirement addressing the maintenance of a list of persons with
authorized cyber or authorized unescorted physical access.223 The NOPR stated that the
petition does not explain the potential inconsistency between VRFs in CIP-004-5.
223 E.g., Reliability Standard CIP-004-4a, Requirement R4 states:
R4. Access —The Responsible Entity shall maintain list(s) of personnel with authorized cyber or authorized unescorted physical access to Critical Cyber Assets, including their specific electronic and physical access rights to Critical Cyber Assets.
R4.1. The Responsible Entity shall review the list(s) of its personnel who have such access to Critical Cyber Assets quarterly, and update the list(s) within seven calendar days of any change of personnel with such access to Critical Cyber Assets, or any change in the access rights of such personnel. The Responsible Entity shall ensure access list(s) for contractors and service vendors are properly maintained.
R4.2. The Responsible Entity shall revoke such access to Critical Cyber Assets within 24 hours for personnel terminated for cause and within seven
(continued…)
Docket No. RM13-5-000 - 105 -
188. The NOPR proposed to modify the VRF assigned to CIP-004-5, Requirement R4
from Lower to Medium, consistent with the Blackout Report and to ensure consistency
between VRFs within CIP-004-5, within 90 days of the effective date of a final rule in
this proceeding. The NOPR sought comment on the proposal.
Comments
189. NERC states that the Commission should not direct a modification to the VRF for
CIP-004-5, Requirement R4. NERC explains that, in developing the VRF for
Requirement R4, the drafting team adopted the Lower VRF used in CIP-003-4,
Requirement R5, which is the comparable requirement from the CIP version 4 Standards,
to provide for consistency. NERC explains further that the standard drafting team
concluded that, because Requirement R4 is largely administrative and violations of the
requirements do not pose a significant risk to the Bulk Electric System, a Lower VRF
was still appropriate. NERC states, by contrast, that the drafting team concluded that a
Medium VRF was appropriate for CIP-004-5, Requirement R5 to reflect the greater risk
to the bulk electric system in the event of a failure to revoke access. Finally, NERC notes
that the standard drafting team determined that failure to revoke access following
termination of an employee presents a greater risk to reliability and thus a Medium VRF
was appropriate for access revocation.
calendar days for personnel who no longer require such access to Critical Cyber Assets.
Docket No. RM13-5-000 - 106 -
190. Most comments do not support modifying the VRF proposed by NERC.224 BPA
supports the Lower VRF for CIP-004-5, Requirement R4, because Requirement R4
“concerns only documentation of risk assessment programs and regular performance of
background checks.”225 Ameren concurs that CIP-004-5, Requirement R4 is “an
administrative documentation requirement [that] does not warrant this heightened level of
protection.”226 In addition, Ameren and BPA question the Commission’s position that
the Blackout Report supports modifying the VRF associated with Requirement R4.227
Idaho Power opines that a failure to maintain an administrative requirement does not
necessarily expose the bulk electric system to a significant risk.228 MISO, for its part,
states that “it is unlikely that violations of [Requirement R4] would pose a direct threat to
the reliability of the BES.”229
191. SPP RE states that it supports the NOPR’s proposed modification because
“[a]ccess control, both physical and electronic, is a cornerstone to protecting Cyber
Assets from unauthorized access. While failure to revoke access is generally considered
224 Ameren, BPA, Idaho Power, KCP&L, MISO, and NERC.
225 BPA Comments at 9.
226 Ameren Comments at 13.
227 Id.
228 Idaho Power Comments at 7.
229 MISO Comments at 10.
Docket No. RM13-5-000 - 107 -
a greater risk, not properly authorizing access also poses a moderate risk.”230 AEP
supports the NOPR’s proposed modification to the VRF for Requirement R4 for the same
reason that it supports raising the VRF for Reliability Standard CIP-006-5, Requirement
R3; specifically, to “ensure consistency within a Reliability Standard and consistency
between requirements that have similar reliability objectives.”231
Commission Determination
192. The Commission adopts the NOPR proposal and directs NERC to modify the VRF
assignment for CIP-004-5, Requirement R4 from Lower to Medium. This modification is
necessary to reflect that access to operationally sensitive computer equipment should be
strictly limited to employees or contractors who utilize the equipment in performance of
their job responsibilities, and to prevent or mitigate disclosure of sensitive information
consistent with Recommendations 40 and 44 of the 2003 Blackout Report. In addition, a
Medium VRF assignment ensures consistency with the Commission’s VRF guidelines.
193. We disagree with NERC’s contention that the risk posed by a violation of CIP-
004-5, Requirement R5, which addresses authorization of physical and electronic access,
is minor in comparison to a violation of CIP-004-5, Requirement R5, which addresses
access revocation. NERC fails to address the concerns raised in the NOPR concerning
the inconsistency between the proposed VRF assignments for CIP-004-5, Requirement
230 SPP RE Comments at 12.
231 AEP Comments at 8.
Docket No. RM13-5-000 - 108 -
R4 and Requirement R5 or explain why we should ignore the Commission’s VRF
guidelines.
194. We do not agree with NERC, Ameren, and Idaho Power’s contention that
Requirement R4 warrants a Lower VRF categorization because it is administrative in
nature. While CIP-004-5, Requirement R4 mandates that entities must document access
and maintain access lists, the underlying control itself is technical in nature because the
documented access privileges must be implemented appropriately on the protected
devices and in the affected facilities in order to comply with the standard. With respect
to Ameren and BPA’s comments, the Blackout Report recommendations were intended
to address the risks posed by individual grants of access through the use of policies, as
the task force specifically recommended that entities develop policies and procedures to
control access ensuring that (1) access is strictly limited to employees or contractors who
utilize said equipment as part of their job responsibilities and (2) access of other staff
are strictly controlled via escort and monitored.232
195. We agree with SPP RE that the CIP-004-5, Requirement R4 access authorization
process is intended to serve as a preventive control that ensures access is granted on a
need to have basis with only the permissions required for job performance. We also
agree that the periodic review of access authorizations is a companion detective control
232 See U.S. – Canada Power System Blackout Task Force, Final Report on the
August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations (April 2004) (Blackout Report) at 167. The Blackout Report is available at https://reports.energy.gov/BlackoutFinal-Web.pdf.
Docket No. RM13-5-000 - 109 -
that is designed to ensure authorized access is still required, and there have been no errors
in the granting or revocation of access. When considered in context with the fact that
CIP-004-5, Requirement R5 is assigned a Medium VRF, we conclude that a Medium
VRF assignment is appropriate for CIP-004-5, Requirement R4.
196. Consistent with the discussion above, we direct NERC to modify the VRF
assignment for CIP-004-5, Requirement R4 from Lower to Medium, within 90 days of
the effective date of this Final Rule.
3. Violation Severity Levels
NERC Petition
197. NERC requests approval for 32 sets of VSLs – one set for each requirement in the
CIP version 5 Standards.233
NOPR
198. In the NOPR, the Commission proposed to direct that NERC file a modified
version of the VSLs due to inconsistencies with previous Commission orders and
typographical errors in the content of the VSLs. The Commission stated that certain
VSLs for the CIP version 5 Standards are inconsistent with Commission guidance.234
The NOPR stated, for example, that Reliability Standard CIP-007-5, Requirement R4.4
requires entities to “review a summation or sampling of logged events … at no greater
233 NERC Petition at 2.
234 N. Amer. Elec. Reliability Corp., 123 FERC ¶ 61,284 (Violation Severity Level Order), order on reh’g, 125 FERC ¶ 61,212 (2008).
Docket No. RM13-5-000 - 110 -
than 15 days.” The NOPR stated that the High VSL gradation for Requirement R4.4
provides that an entity must miss “two or more intervals” for the violation to reach High
severity over the specified time period. In addition, the NOPR stated that CIP-003-5,
Requirement R4 provides the framework for a CIP Senior Manager to delegate
authorities and that the proposed VSL is based upon the number of incorrect delegations.
The NOPR stated that the Commission has previously indicated that VSL assignments
are to be based on “a single violation of a Reliability Standard, and not based on a
cumulative number of occasions of the same requirements over a period of time.”235 The
NOPR stated that these are two examples of proposed VSL assignments that are
inconsistent with the Commission’s VSL guidelines.236
199. The NOPR stated that certain VSLs are unclear or contain typographical errors.
The NOPR stated, as an example, that in the proposed VSL for CIP-004-5, Requirement
R4.2, the Moderate and High gradations are identical.237 The NOPR stated that the
235 Violation Severity Level Order, 123 FERC ¶ 61,284 at PP 35-36. 236 The NOPR cited other examples, including the Violation Severity Level
assignments for CIP-003-5, Requirement R3, CIP-004-5, Requirement R1, CIP-007-5, Requirement R4, CIP-009-5, Requirement R3.
237 See NERC Petition, Exh. E (Table of VRFs and VSLs Proposed for Approval and Analysis of how VRFs and VSLs Were Determined Using Commission Guidelines), at 21.
Docket No. RM13-5-000 - 111 -
typographical errors could create confusion and potentially hinder both compliance with
and enforcement of the CIP Reliability Standards.238
200. The NOPR stated that NERC also proposes VSLs that include the terms
“identify,” “assess,” “correct,” and “deficiencies” for the 16 CIP version 5 “identify,
assess, and correct” requirements.239 The NOPR stated that the Commission may direct
modifications to the “identify, assess, and correct” language based on the comments
received. The NOPR stated that if the Commission directs NERC to remove or modify
the “identify, assess, and correct” language in the requirements, the VSLs may no longer
be consistent with VSL Guideline 3, that VSLs use the same terminology as the
associated requirement.240
201. The NOPR sought comment on the proposal to direct NERC to file a modified
version of the VSLs within 90 days of the effective date of a final rule in this proceeding.
238 The NOPR cited the following Requirements: CIP-003-5, Requirements R1,
R2, R3; CIP-007-5, Requirement R5; CIP-008-5, Requirements R2, R3; CIP-009-5, Requirements R2, R3.
239 The NOPR stated that although NERC proposed 17 Requirements with the “identify, assess, and correct” language, the Violation Severity Level assignment for CIP-003-5, Requirement R4 does not refer to the “identify, assess, and correct” language.
240 See Automatic Underfrequency Load Shedding and Load Shedding Plans Reliability Standards, Order No. 763, 139 FERC ¶ 61,098, at PP 91, 95 (2012) (citing VSL Guideline 3, the Commission directed NERC to change a Violation Severity Level for Reliability Standard PRC-006-1, Requirement R8 to remove the phrase “more than 5 calendar days, but” because the Requirement did not contain a five-day grace period for providing data to planning coordinators that was included in the Violation Severity Level).
Docket No. RM13-5-000 - 112 -
Comments
202. NERC states that the proposed VSLs are based on a single violation and that “the
standard drafting team based its VSL assignment on how much time had passed before
the responsible entity complied with the requirement, if ever, not the number of
violations.”241 NERC states that it will submit an errata for the VSLs that were unclear or
contained typographical errors.242
203. BPA supports the VSLs proposed by NERC, stating that “basing the VSL on the
number of deficiencies is consistent with the concept of the ‘identify, assess, and correct’
requirement.”243 Encari supports removing the “identify, assess, and correct” language
from the VSLs.
204. Southern Indiana states that it takes no position on the NOPR’s proposed
modifications to the VSLs. Southern Indiana states that VRFs and VSLs are not
dispositive of the level of penalties associated with CIP violations (i.e., there are
numerous adjustment factors) and that the Commission should make clear that any
penalties for CIP violations should be tailored to each responsible entity’s effect on the
bulk electric system.
241 NERC Comments at 44.
242 On September 30, 2013, NERC filed an errata with, inter alia, corrections to the VSLs for the CIP version 5 Standards. On October 1, 2013, NERC filed a supplemental errata to correct a formatting error in the September 30 errata.
243 BPA Comments at 10; KCP&L Comments at 6.
Docket No. RM13-5-000 - 113 -
Commission Determination
205. Consistent with the NOPR proposal, we direct NERC to develop modifications to
the VSLs for certain CIP version 5 Standard requirements to: (1) remove the “identify,
assess, and correct” language from the text of the VSLs for the affected requirements; (2)
address typographical errors; and (3) clarify certain unexplained elements. For the VSLs
that include “identify, assess, and correct” language, we direct NERC to ensure that these
VSLs are modified to reflect any revisions to the requirement language in response to our
directives. We grant NERC the discretion to decide how best to address these
modifications be it through an errata filing to this proceeding or separate filing.
206. With respect to the VSL language for CIP-003-5, Requirements R1 and R2, the
Commission notes that the language “as required by R[1 or 2]” and “according to
Requirement R[1 or 2]” is redundant and potentially confusing and hereby directs NERC
to provide clarification to this language.
207. With respect to the VSL language for CIP-003-5, Requirement R4, the
Commission agrees with NERC that basing the VSL language on a timeline is
appropriate, but notes that the VSL language does not match the table and analysis
documents within Appendix E of the CIP version 5 Petition. After considering NERC’s
comments, the Commission understands that the correct VSL for this requirement
includes timeline gradations. We therefore direct NERC to clarify the VSL language for
this requirement to reflect this understanding.
208. We direct NERC to change the VSL gradation for CIP-004-5, Requirement R4 to
be percentage based, instead of using the number of BES Cyber Systems or sites for
Docket No. RM13-5-000 - 114 -
storing BES Cyber System information. This change will allow for fair treatment for
entities that may only have a single BES Cyber system or storage location.244
209. With respect to the VSL language for CIP-008-5, Requirement R2, the
Commission believes that NERC inserted a typographical error into the petition, creating
a gap between 18 months and 19 months in the VSLs. We therefore direct NERC to
clarify this language in a further filing.
210. With respect to the VSL language in CIP-009-5 Part 3.1, we believe that the
number of days listed in the VSLs is inconsistent. For example, the moderate VSL for
Part 3.1.2 has a timeframe of 90 – 210 calendar days, while the High VSL has a
timeframe of greater than 120 calendar days. The Commission believes that the 120 day
metric is appropriate for these time-based VSL gradations and directs NERC to change
the “210 calendar days” language to “120 calendar days” where appropriate. In short,
notwithstanding any changes the Commission requires for VRFs and VSLs, the
Commission clarifies that any penalties for violations of the CIP Standards must be
tailored to each responsible entity’s effect on the BES, with particular consideration
given to small utilities that individually pose less of a reliability and security risk.
F. Other Technical Issues
211. In the NOPR, the Commission stated that, “while we propose to approve the CIP
version 5 Standards based upon the improvements to the currently-approved CIP
244 In the September 30 errata, NERC addressed our concern regarding the VSL
assignment for CIP-004-5, Requirement R4.
Docket No. RM13-5-000 - 115 -
Reliability Standards, we believe that the cyber security protections proposed in the CIP
version 5 Standards could be enhanced in certain areas.”245 The NOPR sought comment
on the issues of communications security, remote access, and differences between the
CIP version 5 Standards and NIST. The Commission further stated in the NOPR that,
“depending on the adequacy of the explanations provided in response” to the NOPR
questions, the Commission may direct NERC to develop modifications to certain aspects
of the CIP Reliability Standards or, alternatively, conclude that while no changes are
necessary at this time, NERC must consider these issues in preparing the next version of
CIP Standards.246
1. Communications Security
NOPR
212. In the NOPR, the Commission stated that communications security, which is a
basic layer to any defense-in-depth security strategy for typical industrial control systems,
involves securing the data being transmitted across a network. The Commission
explained that a variety of cryptographic tools, such as encryption, integrity checks, and
multi- factor authentication, can enhance a responsible entity’s defense-in-depth security
strategies.247 In addition, the NOPR outlined the Commission’s concerns regarding the
245 NOPR, 143 FERC ¶ 61,055 at P 105.
246 Id.
247 Id. P 107.
Docket No. RM13-5-000 - 116 -
exemption of communication networks from protection based solely on specific types of
technology, such as non-routable communication systems. The Commission sought
comment on (1) whether the adoption of communications security protections, such as
cryptography and protections for non-routable protocol, would improve the CIP
Standards and (1) whether the CIP standards adequately protect non-routable
communication systems.
Comments
213. EEI, MISO, NAGF and other commenters support the concept of communications
security through the use of various forms of cryptography as part of a defense-in-depth
cyber security posture, although not necessarily as part of the CIP Reliability
Standards.248 NERC, KCP&L, Tacoma and others express concerns regarding potential
adverse effects that mandating cryptography for all BES Cyber Systems might have on
Bulk-Power System reliability.249 NERC, EEI, LAWDP and others comment that the
deployment of cryptographic protocols may: (1) prohibitively increase latency in
communications; (2) obfuscate data needed for testing and problem diagnosis; and (3)
introduce communication errors from complex key management across organizations.
With regard to the exemption of communication networks, most commenters, including
248 See also Idaho Power; Mid-American; SPP RE; Tampa; Venafi and Waterfall.
249 E.g., AEP; Idaho Power; PPL and TVA.
Docket No. RM13-5-000 - 117 -
NERC, contend that non-routable protocols and devices will be adequately protected
under the CIP version 5 Standards.250
214. SPP RE, Waterfall, and Venafi comment that protecting communication systems is
a critical concept in cyber security and that the use of cryptography under certain
circumstances will improve the confidentiality, availability, and integrity of essential
data. Thus, they recommend that the Commission require encryption of inter-site
communications for communication networks where such protections are readily
available and practical.
215. EEI, Dominion, Tacoma Power, TVA, and other commenters indicate that the
Commission should refrain from mandating specific technology solutions through
mandatory standards, and suggest that cryptography and other emerging technologies
should be thoroughly discussed throughout the electric industry. NERC, NAGF, and
MISO suggest addressing the NOPR questions on cryptography through a technical
conference or other guidance. NERC indicates that a technical conference would provide
the appropriate forum to begin discussing the issues associated with communications
security and cryptography.
216. With regard to the NOPR concerns regarding the exemption of communication
networks from the CIP standards, NERC and other commenters generally agree that
additional protections for non-routable protocols and the systems that use them are not
250 E.g., Dominion; Gist; LADWP; NAGF and Tampa.
Docket No. RM13-5-000 - 118 -
needed at this time.251 NERC explains that the external routable connectivity limitation
generally applies to requirements that either require or can take advantage of the high
speed connections that are typically associated with routable connectivity. Idaho Power
states that non-routable protocols are inherently more secure than routable protocols and
states that the CIP Standards provide adequate protection for devices that use non-
routable protocols.
2. Remote Access
NOPR
217. “Remote access” refers to the ability to access a non-public computer network
from external locations. The Commission explained in the NOPR that, while remote
access provides greater flexibility in accessing remote computer networks, this flexibility
creates new security risks by allowing a potentially unsecured device access into an
entity’s network. The Commission discussed the complexities and potential
vulnerabilities associated with remote access, including the need for an entity to verify
that an employee, vendor automated system initiating remote access to the entity’s
internal networks has the appropriate access permissions.252 The Commission requested
comment on whether the adoption of more stringent controls for remote access would
improve the CIP Reliability Standards.
251 See, e.g., Ameren; Dominion; Idaho Power; LADWP; NAGF and TVA.
252 NOPR, 143 FERC ¶ 61,055 at PP 110-111.
Docket No. RM13-5-000 - 119 -
Comments
218. Most commenters assert that the CIP version 5 Standards sufficiently address
protections for interactive remote access in CIP-004-5, Requirement R4 and CIP-005-5,
Requirement R2.253 MISO recommends that additional remote access protections beyond
those in CIP-005-5, Requirement R2 should be voluntary, due to the differences in entity
size and capabilities. EEI and KCP&L assert that remote access issues deserve a
thorough discussion and recommendations, not a piecemeal approach.
219. Waterfall comments that remote access mechanisms are among the most serious
strategic threats to reliability. Waterfall suggests that, when remote access is needed,
unidirectional gateways provide greater security than firewalls and should be mandated
by future standards.
3. Differences Between the CIP Version 5 Standards and NIST
NOPR
220. In the NOPR, the Commission expressed concern that the CIP version 5 Standards
do not address certain aspects of cyber security in as comprehensive a manner as the
NIST Risk Management Framework addresses the same topics. The NOPR provided
examples of differences between the CIP version 5 Standards and the NIST Risk
Management Framework. Such differences include (1) the absence of certain security
controls contained in NIST Special Publication 800-53’s Security Control Catalog and
253 See, e.g., Ameren; Dominion; KCP&L; Portland; SPP RE; Tacoma and UI.
Docket No. RM13-5-000 - 120 -
associated guidance documents from the CIP version 5 Standards, (2) the failure to
address the monitoring of information systems for new threats and vulnerabilities, and (3)
comprehensive asset categorization. The Commission sought comment on “whether, and
in what way, adoption of certain aspects of the NIST Risk Management Framework could
improve the security controls proposed in the CIP version 5 Standards.”254
Comments
221. NERC states that that the proposed CIP version 5 Standards generally cover the
same subject areas as the NIST Risk Management Framework.255 NERC adds that the
question of whether or how to incorporate additional elements of the NIST Risk
Management Framework in the CIP Reliability Standards is a discussion for a technical
forum inclusive of industry, NERC, and Commission staff.
222. Several commenters discuss the distinctions between the underlying missions of
the CIP Reliability Standards and the NIST Risk Management Framework. For example,
Waterfall states that the NIST Risk Management Framework, by and large, focuses on
securing the confidentiality of data and protecting information systems, not the industrial
control systems underlying the reliability of the bulk electric system. Arkansas
comments that the CIP Standards have an advantage over the NIST Risk Management
Framework in that they focus on a relatively small number of reliability services that
254 Id. P 117.
255 NERC Comments at 55. See also Idaho Power at 9; NAGF at 9-10.
Docket No. RM13-5-000 - 121 -
need to be protected as opposed to the NIST mission of establishing general standards for
many organizations (all U.S. Federal Agencies) with vastly different missions.
223. Commenters also address differences in the enforcement of the CIP Reliability
Standards versus the NIST Risk Management Framework. EEI, ISO-NE, MidAmerican,
and Gist state that the NIST Risk Management Framework is a voluntary guidance
document that includes control selection, tailoring and scoping of controls to the
individual situation, as well as the acceptance of residual risk that FERC has ruled cannot
be a part of a mandatory and enforceable Standard. MidAmerican notes further that the
CIP version 5 Standards do not allow responsible entities to exercise broad discretion in
tailoring their compliance programs and additionally argues that they are generally very
prescriptive.
Commission Determination
224. Based on the comments received in response to the NOPR questions, we recognize
the broad scope of opinions on the issues of communications security, remote access, and
differences between the CIP version 5 Standards and the NIST Risk Management
Framework. The NOPR comments indicate a range of views on whether the CIP version
5 Standards adequately address the technical issues discussed in the NOPR, as well as
whether and how to address such matters in a future version of the CIP Reliability
Standards. Further, we agree with EEI regarding the need to address matters such as
remote access, communications security and requiring additional controls in a
comprehensive, as opposed to piecemeal, fashion.
Docket No. RM13-5-000 - 122 -
225. Accordingly, we decline to direct any modifications to the CIP Reliability
Standards at this time to address the NOPR concerns regarding communications security,
remote access, and the NIST Risk Management Framework. Rather, we agree with
NERC and a number of commenters that suggest a technical conference discussing these
issues as an appropriate next step. Accordingly, the Commission directs its staff to
convene a staff-led technical conference, within 180 days from the date of this Final
Rule, to examine the technical issues identified in the NOPR concerning communications
security, remote access, and the NIST Risk Management Framework. While staff should
develop a detailed agenda, the conference should address such matters as the adequacy of
current coverage in the CIP Standards with regard to the technical issues identified, risks,
feasibility, alternative approaches, and a comprehensive approach to addressing defense-
in-depth and grid vulnerabilities.
III. Information Collection Statement
226. The FERC-725B information collection requirements contained in this Final Rule
are subject to review by the Office of Management and Budget (OMB) under section
3507(d) of the Paperwork Reduction Act of 1995.256 OMB regulations require approval
of certain information collection requirements imposed by agency rules.257 Upon
approval of a collection of information, OMB will assign an OMB control number and
256 44 U.S.C. 3507(d) (2012).
257 5 CFR 1320.11 (2012).
Docket No. RM13-5-000 - 123 -
expiration date. Respondents subject to the filing requirement of this rule will not be
penalized for failing to respond to these collections of information unless the collections
of information display a valid OMB control number.
NOPR
227. In the NOPR, the Commission estimated a total average annual paperwork cost
burden for the change in requirements contained in the CIP version 5 Standards of
approximately $56 million. The Commission based its paperwork burden estimate on the
difference between the latest Commission-approved version of the CIP Reliability
Standards, CIP version 4, and the estimated paperwork burden resulting from CIP version
5 because “the Commission has already imposed the burden of implementing the CIP
version 4 Standards” and addressed the incremental burden costs from CIP version 3 to
CIP version 4 in the analysis outlined in Order No. 761.258
228. In the NOPR, the Commission observed that the change in compliance tasks and
paperwork burden between the CIP version 4 Standards and the CIP version 5 Standards
varies among entities, depending upon the extent to which an entity was subject to
compliance with CIP version 4. Therefore, the Commission delineated three groupings
of registered entities for purposes of discussing and refining the burden estimate, and
provided separate analysis for each group. To estimate the change in paperwork burden
between the CIP version 4 Standards and the CIP version 5 Standards, the Commission
258 NOPR, 143 FERC ¶ 61,055 at P 119.
Docket No. RM13-5-000 - 124 -
identified paperwork-related tasks that all responsible entities will undertake, at least to
some extent.259
229. In addition, the Commission provided an average annual cost burden for each of
the three groups of entities. Referencing Bureau of Labor statistics for the estimated
hourly rates and average benefits data, the Commission estimated a total average annual
paperwork burden for the change in requirements of $56,112,000.
Comments
230. A number of commenters take issue with the Commission’s choice to evaluate the
paperwork burden imposed in this Final Rule on an incremental basis from the CIP
version 4 Standards to the CIP version 5 Standards, rather than estimate the paperwork
burden based on a transition from the CIP version 3 Standards. In addition, various
commenters assert that the Commission underestimates the paperwork and cost burdens
imposed by the CIP Version 5 Standards.
231. EEI argues that comparing CIP version 5 to CIP version 4 “vastly understates the
burden and biases any realistic evaluation,” and “strongly disagrees” with this basic
assumption of the estimated paperwork burden. EEI contends that a more realistic and
practical analysis would compare CIP version 3 and CIP version 5, but admits that such a
259 Specifically, the Commission determined that responsible entities would be
required to, at a minimum: (1) create or modify documentation of processes used to identify and classify the cyber assets to be protected under the CIP Reliability Standards; (2) create or modify policy, process and compliance documentation; and (3) continue documentation of compliance data collection.
Docket No. RM13-5-000 - 125 -
comparison would be problematic because the design of the two versions are so different.
Therefore, EEI urges the Commission to evaluate the CIP version 5 Standards on their
own merits.260 According to MidAmerican, the Commission’s comparison of the two
versions, and identification of the burden on responsible entities based on the classes of
facilities each group of entities owns, “misses the mark” and, therefore, the Commission
grossly underestimated the burden to successfully implement the CIP version 5
Standards.261 Similarly, NRECA is unclear why the Commission chose to assess the
paperwork burden by comparing CIP version 4 and CIP version 5, noting the differences
between the two versions and the fact that CIP version 4 will not be implemented.
NRECA submits that an appropriate analysis of burden should be based on the full cost
of implementing CIP version 5.262
232. Tampa states that the level of effort under the CIP version 5 Standards is
considerably higher than described in the NOPR due to the volume of new entities and
new facilities coming into scope. Tampa points out that entities newly subject to the CIP
Reliability Standards “will have a steep learning curve and will need to purchase and
260 EEI Comments at 24.
261 MidAmerican Comments at 24-25.
262 NRECA Comments at 11-12.
Docket No. RM13-5-000 - 126 -
install automated workflow and document management systems, which will require time
and funding.”263
233. LADWP states that it expects the impacts of implementing and complying with
the CIP version 5 Standards will be substantial, largely resulting from two changes: (1)
the elimination of the current blanket exemption for non-routable protocols, and (2) the
new requirements in CIP-005-5 that require the expanded use of electronic security
perimeters.264 LADWP estimates that it will make an initial investment of almost $33
million for equipment, materials, and labor. LADWP also estimates that it will spend $3
million annually for software licenses and staff to monitor and implement the CIP version
5 Standards.
Commission Determination
234. For the reasons discussed below, the Commission adopts the Information
Collection Statement outlined in the Docket No. RM13-5-000 NOPR.
235. The Paperwork Reduction Act only applies to the paperwork burden imposed by a
rule, it does not apply to the substantive requirements imposed by that rule.265
Commenters generally argue that the Commission underestimates the economic burden
of the CIP version 5. However, no commenter provides an analysis regarding the
263 Tampa Comments at 14-15.
264 LADWP at 18.
265 See 44 U.S.C. 3506(c)(1) (2012) (outlining the process for the evaluation of a collection of information under a proposed agency rule).
Docket No. RM13-5-000 - 127 -
paperwork burden resulting from the approval of the CIP version 5 Standards, as opposed
to the anticipated costs of full implementation. For example, NRECA states that its data
suggests that the costs associated with the CIP version 5 Standards are an order of
magnitude greater than the NOPR estimates. Likewise, LADWP provides a cost estimate
for full implantation including equipment, materials and labor, but does not segregate out
the paperwork burden relevant to the immediate analysis. Because the Paperwork
Reduction Act requires that the Commission estimate the total average annual paperwork
cost burden, not the total estimated cost burden of the rule, arguing that the cost of full
compliance with CIP version higher than the estimated paperwork burden does not
negate the Commission’s Paperwork Reduction Act estimate.
236. With regard to MidAmerican’s and Tampa’s comments regarding the costs
associated with the expanded scope of the CIP version 5 Standards, we recognize that the
CIP version 5 Standards offer a more comprehensive protection of the bulk electric
system, particularly due to the coverage of Low Impact assets. Statements regarding the
expanded scope of the CIP Reliability Standards alone, without additional data, do not
undermine the Commission’s approach to estimating the paperwork burden associated
with the CIP version 5 Standards or the resulting paperwork burden estimate. The
Commission included the cost of developing and modifying the documentation for the
required policies, plans, programs and procedures in the paperwork burden estimate, but
did not include the cost of substantive compliance with the CIP Reliability Standards.
Absent specific comments on the paperwork burden associated with the CIP version 5
Standards, the Commission has no basis to amend the NOPR estimate.
Docket No. RM13-5-000 - 128 -
237. In addition, multiple commenters argue that the Commission erred by relying on a
burden estimate based on a comparison of the CIP version 5 Standards to the CIP version
4 Standards since the CIP version 4 Standards will not take effect. We reiterate that, in
considering and approving the CIP version 4 Standards, the Commission already
compared and accounted for the incremental cost burden resulting from the change from
the CIP version 3 Standards to the CIP version 4 Standards. Therefore, any incremental
change in paperwork burden associated with the approval of the CIP version 5 Standards
will be relative to the burden imposed by the approval of the CIP version 4 Standards,
whether that change be positive or negative.266
238. In reply to concerns regarding potential cost increases associated with changes we
direct in this Final Rule, we clarify that any differences in cost will be evaluated at such
time as NERC files the directed changes with the Commission.267
239. After consideration of comments, the Commission adopts the NOPR proposal for
the information collection burden and cost, summarized as follows:
266 As discussed in the NOPR, we accounted for the provision that CIP version 4
would not go into effect by adjusting the paperwork burden estimate for blackstart facilities – the only facilities captured by the CIP-002-4 bright line criteria for full protection, but no longer subject to such protections under the CIP version 5 Standards. See NOPR, 143 FERC ¶ 61,055 at PP 123-124.
267 See Order No. 706, 122 FERC ¶ 61,040 at P 800.
Docket No. RM13-5-000 - 129 -
Groups of Registered Entities
Classes of Entity’s Facilities Requiring CIP Version 5 Protections
Number of Entities
Total Hours in Year 1 (hours)
Total Hours in Year 2 (hours)
Total Hours in Year 3 (hours)
Group A Low 61 0 3,804 3,804 Group B Low 1,089 0 570,636 570,636 Group B Medium 260 128,960 128,960 64,896 Group C Low 325 0 170,300 170,300 Group C Medium (New) 78 1,248 1,248 19,136 Group C Low (Blackstart) 283 22,640 22,640 -206,024 Group C Medium or High 325 265,200 265,200 135,200 Totals 418,048 1,162,788 757,948 240. The following shows the average annual cost burden for each group, based on the
burden hours in the table above:
• Group A: 61 unique entities * 41.5 hrs/entity * $72/hour = $182,000
• Group B: 1,089 unique entities * 448 hrs/entity * $72/hour = $35,127,000
• Group C: 325 unique entities * 889 hrs/entity * $72/hour = $20,803,000
241. Total average annual paperwork cost for the change in requirements contained in
the final rule in RM13-5 = $56,112,000. (i.e., $182,000 + $35,127,000 + $20,803,000).
242. The estimated hourly rate of $72 is the average loaded cost (wage plus benefits) of
legal services ($128.00 per hour), technical employees ($58.86 per hour) and
administrative support ($30.18 per hour), based on hourly rates and average benefits data
from the Bureau of Labor Statistics.268
268 See http://bls.gov/oes/current/naics2_22.htm and
http://www.bls.gov/news.release/ecec.nr0.htm.
(continued…)
Docket No. RM13-5-000 - 130 -
Title: Mandatory Reliability Standards, Critical Infrastructure Protection
Action: Proposed Collection FERC-725B.
OMB Control No.: 1902-0248.
Respondents: Businesses or other for-profit institutions; not-for-profit institutions.
Frequency of Responses: On Occasion.
Necessity of the Information: This final rule approves the requested modifications to
Reliability Standards pertaining to critical infrastructure protection. The approved
Reliability Standards help ensure the reliable operation of the Bulk-Power System by
providing a cyber security framework for the identification and protection of Critical
Assets and associated Critical Cyber Assets. As discussed above, the Commission
approves NERC’s proposed Version 5 CIP Standards pursuant to section 215(d)(2) of the
FPA because they represent an improvement to the currently-approved CIP Reliability
Standards.
Internal Review: The Commission has reviewed the proposed Reliability Standards and
made a determination that its action is necessary to implement section 215 of the FPA.
243. Interested persons may obtain information on the reporting requirements by
contacting the following: Federal Energy Regulatory Commission, 888 First Street, NE
Docket No. RM13-5-000 - 131 -
Washington, DC 20426 [Attention: Ellen Brown, Office of the Executive Director, e-
mail: [email protected], phone: (202) 502-8663, fax: (202) 273-0873].
244. Comments on the requirements of this rule may be sent to the Office of
Management and Budget, Office of Information and Regulatory Affairs, Washington, DC
20503 [Attention: Desk Officer for the Federal Energy Regulatory Commission, phone:
(202) 395-4638, fax: (202) 395-7285]. For security reasons, comments to OMB should
be submitted by e-mail to: [email protected]. Comments submitted to
OMB should include Docket Number RM13-5-000 and OMB Control Number 1902-
0248.
IV. Regulatory Flexibility Act Certification
245. The Regulatory Flexibility Act of 1980 (RFA)269 generally requires a description
and analysis of final rules that will have significant economic impact on a substantial
number of small entities. The RFA mandates consideration of regulatory alternatives that
accomplish the stated objectives of a proposed rule and that minimize any significant
economic impact on a substantial number of small entities. The Small Business
Administration’s (SBA) Office of Size Standards develops the numerical definition of a
small business.270 The SBA has established a size standard for electric utilities, stating
that a firm is small if, including its affiliates, it is primarily engaged in the transmission,
269 5 U.S.C. 601-612.
270 13 CFR 121.101 (2012).
Docket No. RM13-5-000 - 132 -
generation and/or distribution of electric energy for sale and its total electric output for
the preceding twelve months did not exceed four million megawatt hours.271
NOPR
246. In the NOPR, the Commission sought comment on the estimated economic impact
of implementing and complying with the CIP version 5 Standards. The Commission
specifically requested detailed and supported information to better estimate the potential
cost burden that small businesses could face under the CIP version 5 Standards.
247. In the NOPR, the Commission estimated that the proposed CIP version 5
Standards, as filed, will impact 536 small entities.272 The Commission based its estimate
of the potential economic impact to small entities according to functional registration and
the CIP-002-5 impact rating of assets an entity likely owns by function. Of the 536 total,
the Commission estimated that only 14 small entities may, on average, experience a
significant economic impact of $116,000 per entity in the first year, $145,000 in the
second year, and $88,000 in the third year, for a total of $349,000 per entity over the first
three years.273 The Commission explained that the significant costs in early years are
primarily due to initial implementation and, thereafter, the Commission expected the
271 13 CFR 121.201, Sector 22, Utilities & n.1.
272 See NOPR at P 132 & n.132.
273 See NOPR, 143 FERC ¶ 61,055 at P 132 (explaining the calculation as based on an estimated 4,600 hours of total work per entity over three years at $59/hour and $15,000 of non-labor costs. (Math correction: $72/hour and $18,000)).
Docket No. RM13-5-000 - 133 -
average annual cost per each of the 14 entities to be less than $64,000. The Commission
determined that, as 2.6 percent of the affected small entities, these 14 entities do not
represent a “substantial number” in terms of the total number of regulated small entities
subject to the Final Rule.
248. In addition, the Commission estimated that 222 out of the 536 small entities274 will
each experience an average economic impact of $29,000 per year during years two and
three.275 Finally, the Commission estimated that the remaining 300 out of the 536 small
entities will only experience a minimal economic impact.276 Therefore, the Commission
proposed to certify that the proposed Reliability Standards will not have a significant
economic impact on a substantial number of small entities, and, accordingly, stated that
no initial RFA analysis is required.
Comments
249. Several commenters raise concerns with the Commission’s RFA analysis and
proposed certification. APPA states that a Final Rule adopting NERC’s proposed CIP
version 5 Standards as filed will have a “significant economic impact” on all small
274 Id. P 133. The NOPR explained this figure as the number of small entities that
own assets covered by CIP version 5, and not including the 14 significantly impacted entities.
275 The NOPR explained this cost figure as based on an estimated 268 hours of total work per entity for each of years two and three combined at $72/hour, and $7,500 of non-labor costs for each of years two and three.
276 The NOPR explained this number of small Distribution Providers as those assumed to not own assets covered by CIP version 5.
Docket No. RM13-5-000 - 134 -
entities that are registered as transmission owners and transmission operators that own or
operate transmission control centers.277 APPA cautions that it will not condone any
Commission RFA certification that denies a “significant impact on a substantial number
of small entities.”278 Further, APPA asserts that if the Commission disregards APPA’s
analysis and adopts the changes proposed in the NOPR, it must conduct a full RFA
analysis. 279
250. APPA contests a number of estimates in the NOPR. APPA states that 327 out of
2,000 not-for-profit publicly owned electric utilities in the United States are on the NERC
compliance registry, and approximately 266 of these entities are designated as small
entities under the relevant SBA definition.280 In addition to the 14 small entity
transmission owners estimated in the NOPR, APPA identifies 31 small public power
transmission operators that it believes are likely to incur significant costs. APPA believes
these entities should be added to the 14 identified by the Commission for a total of 45
entities facing a potential significant economic impact.281 APPA states that the
compliance cost burden for High and Medium Impact Control Centers will pose
277 APPA Comments at 23.
278 Id. at 23.
279 Id. at 30-31.
280 Id. at 24.
281 Id.
Docket No. RM13-5-000 - 135 -
particular challenges to small public power entities in economically distressed areas of
the United States. On the basis that one of its surveyed members “budgeted $500,000 for
developing its CIP compliance program,” APPA advocates revising the NOPR estimate
upward from $334,000 to $500,000 across the first three years for all 45 entities it
believes should be designated as having significant costs.282
251. APPA also argues that the NOPR’s estimated ongoing economic burden of
$64,000 per year is not credible because it is “clearly insufficient to operate and maintain
cyber security controls for a bulk electric system-quality control center…and develop and
implement an enterprise-wide cyber security program” for Low Impact assets.283 Based
on a range of estimates derived from its survey, APPA arrived at a median annual
ongoing cost of $200,000 to maintain security and an additional $50,000 per entity to
maintain and carry out the programmatic controls for Low Impact facilities.284
252. APPA further identifies 35 discrete small transmission owners that sell less than 1
million megawatt hours a year, stating that “[a]ny increase in compliance costs will be a
significant burden to these entities relative to their revenue.”285 APPA states that
compliance will force rate increases for these entities that could lead to the loss of key
282 Id. at 28.
283 Id.
284 Id.
285 Id. at 27.
Docket No. RM13-5-000 - 136 -
industrial and commercial customers. For each of these entities, and for the remaining
entities without High or Medium Impact systems, APPA accepts the Commission
estimate of $58,000 for years 1-3, but revises the ongoing cost burden to $50,000.286
253. APPA concludes that the total economic burden resulting from the CIP version 5
Standards on all small entities will be $56,349,000.287 APPA requests that the
Commission correct its RFA calculations in the Final Rule and provide more detail on
how it arrived at the estimates in the RFA analysis. APPA explains that it requested, but
that NERC declined to send out an information request to gather data from small entities
on the standard’s regulatory impact. APPA requests that, to the extent the Final Rule
modifies the CIP version 5 Standards, the Commission direct NERC to provide detailed
and supported information regarding the impacts on small entities.288
254. NRECA questions the Commission’s RFA estimates and requests further
explanation of specific assumptions in a manner that would facilitate further comment
and analysis. NRECA states that it received estimates from several of its members and
concludes that the CIP version 5 Standards, as filed, for entities with only Low Impact
assets will cost approximately $100,000 for implementation and then $50,000 annually
286 Id. at 29.
287 Id. at 28.
288 Id. at 31.
Docket No. RM13-5-000 - 137 -
thereafter.289 NRECA states that the Commission provides too little information to
support its action of not performing a full regulatory flexibility act analysis.
255. PUCO states that compliance with the CIP version 5 Standards could place heavy
financial burdens on smaller utilities, municipalities, and coops. PUCO states further that
these entities may not have the same cost-benefit relationship as larger utilities, and that
this cost difference should be accounted for in the proposed standards. In addition,
PUCO states that investment must be made in a cost effective manner for each utility in a
way that protects their high risk vulnerabilities.290
Commission Determination
256. Upon consideration of the NOPR comments, we revise our estimate of the number
of potentially impacted small entities upwards, from 14 to 45, to reflect the 31 small
transmission operators identified by APPA.291 This number reflects 8.4 percent of the
total 536 small entities subject to the CIP version 5 Standards. Further, for the purpose of
RFA certification, we will also adopt APPA’s cost estimates for the 31 entities added to
our analysis, but will maintain our cost estimates for the 14 small entities discussed in the
289 NRECA Comments at 13.
290 PUCO Comments at 2-3.
291 While we question whether available data supports APPA’s proposed addition of the 31 small transmission operators discussed above, we will nevertheless adopt APPA’s number for the sake of our analysis.
Docket No. RM13-5-000 - 138 -
NOPR. Nonetheless, even assuming APPA’s cost estimates are correct, we adopt the
NOPR proposal and maintain that a full regulatory flexibility analysis is not required.
257. In the NOPR, the Commission estimated that 1.5 percent of the total 305 small
entities registered as distribution providers would own underfrequency or undervoltage
load shedding systems that were previously not subject to the CIP Reliability Standards,
and that 10 percent of the 94 total small entities registered as transmission owners would
own Medium Impact assets newly subject to CIP version 5, comprising a total of 14
potentially impacted small entities. The Commission considered the time and expertise
needed for an entity to document its asset evaluation process, policy and compliance
information, and policy implementation information, as well as install hardware and
software, and collect data, to arrive at our estimate of 4,600 hours of total work per entity
over three years at an averaged $72 per hour rate for a total $331,000 of labor costs and
$18,000 of non-labor costs per entity.
258. In the NOPR, the Commission did not count the small transmission operators
identified by APPA because the Commission’s analysis assumed that entities had secured
the control centers under the CIP version 3 Standards. As noted in Order No. 706, the
Commission finds it “difficult to envision a scenario in which a reliability coordinator,
transmission operator or transmission owner control center or backup control center
would not properly be identified as a critical asset.”292 We, therefore, accept APPA’s
292 Order No. 706, 122 FERC ¶ 61,040 at P 280.
Docket No. RM13-5-000 - 139 -
request to include small entity transmission operators having control centers in our total
of small entities significantly affected. We also adopt APPA’s suggested figures for costs
to secure small transmission operators with control centers, even though APPA provides
no detail or support for this figure, as we requested, other than one of its members’
planned budgeting for these amounts.
259. We reject APPA’s position that 35 small entity transmission owners that sell less
than 1 million megawatt hours per year should change our analysis. We understand
APPA’s argument to rest on the concept that the extra small size of these entities means
that they experience the agreed upon compliance cost figure in a proportionately higher
manner. Upon evaluating the EIA 2011 data concerning the total revenues for each of the
35 entities listed by APPA, we find that the highest single year cost of $29,000
approaches 0.6 percent of total revenues for only one entity, and is less than 0.3 percent
for nearly all of these entities.293 Viewed across the three-year implementation period,
the yearly implementation cost as a percent of total revenues amounts to 0.1 percent
when averaged across all 35 entities. Even if these expenses force such an organization
into a rate increase, a base of only 2,000 ratepayers would distribute the increase at less
than one dollar per month per customer for the three-year period including one year of
293 See Energy Information Administration Form 861 (available at
http://www.eia.gov/electricity/data/eia861/index.html). The highest year cost of $29,000, as estimated in the NOPR, divided by the total revenue listed in EIA data for a given entity. With the maximum total revenue of $5,021,000, the calculation for Sabine River Authority of TX/LA (Toledo Bend Project) results in 0.58 percent.
Docket No. RM13-5-000 - 140 -
on-going costs. For these reasons, APPA has not persuaded us that the 35 extra-small
entities will experience proportionately significant costs in the view of the RFA.
260. While APPA asserts that a full RFA analysis is required, we note that we have
incorporated relevant portions of APPA’s estimates, yet remain unconvinced that the
Final Rule will have a significant economic impact on a substantial number of small
entities necessitating a more extensive RFA analysis. In addition, we reject the argument
that the Commission must revise the NOPR RFA analysis to the extent that the
Commission directs modifications to an approved Reliability Standard. We reiterate the
Commission’s determination in Order No. 706 that until NERC files a revised Reliability
Standard, the Commission cannot estimate the burden on any user, owner or operator of
the Build-Power System, including small entities, and, therefore, it is not appropriate to
speculate on the cost of compliance with any directed modifications at this time.294
261. Finally, we reject APPA’s request that the Commission direct NERC to provide
detailed and supported information regarding the impacts on small entities resulting from
any modifications to the CIP version 5 Standards directed in this Final Rule. To the
extent that APPA has concerns regarding the cost resulting from a Commission directive,
the proper place to raise that concern in the first instance is in the NERC standards
development process. In addition, we note that the parties with the best information on
the potential impact on small entities resulting from the CIP Reliability Standards are the
294 See Order No. 706, 122 FERC ¶ 61,040 at P 800.
Docket No. RM13-5-000 - 141 -
small entities themselves, and we expect such entities to raise their concerns during the
standards development process. To the extent that entities provide NERC with such
information, we encourage NERC to submit the cost data along with the associated new
or revised Reliability Standard requirements.
262. In summary, the Commission estimates that the CIP version 5 Standards will have
an economic impact on 536 small entities. The Commission estimates that 14 small
entities, registered as transmission owners or distribution providers, and owning a
Medium Impact Assets, may experience a significant economic impact of, on average,
$116,000 per entity in the first year, $145,000 in the second year, and $88,000 in the third
year, for a total of $349,000 over the first three years. After the initial implementation
the Commission expects the average annual cost per each of these 14 entities to be less
than $64,000. For the sake of this analysis, the Commission expects an additional 31
small entities, registered as transmission operators and operating a Medium Impact
control center, to experience a significant economic impact of $518,000 over the first
three years and $250,000 ongoing costs per year thereafter. Because we expect the bulk
of the initial expense to occur in years two and three, we divide by two to estimate the
highest annual cost experienced at $259,000.
263. Together, these two classes of significantly impacted entities comprise 45, or 8.4
percent of the total 536 small entities. The Commission concludes that 8.4 percent of the
affected small entities does not represent a substantial number in terms of the total
number of regulated small entities, as defined by the RFA, that are subject to the Final
Rule. The Commission estimates that 191 out of the 536 small entities will each
Docket No. RM13-5-000 - 142 -
experience an average economic impact of $29,000 per year during years two and three,
and $13,000 annual ongoing costs thereafter. Finally, the Commission estimates that the
remaining 300 out of the 536 small entities will only experience a minimal economic
impact. In conclusion, the Commission certifies that this rule will not have a significant
economic impact on a substantial number of small entities. Accordingly, a full regulatory
flexibility analysis is not required.
V. Environmental Analysis
264. The Commission is required to prepare an Environmental Assessment or an
Environmental Impact Statement for any action that may have a significant adverse effect
on the human environment.295 The Commission has categorically excluded certain
actions from this requirement as not having a significant effect on the human
environment. Included in the exclusion are rules that are clarifying, corrective, or
procedural or that do not substantially change the effect of the regulations being
amended.296 The actions proposed here fall within this categorical exclusion in the
Commission’s regulations.
295 Regulations Implementing the National Environmental Policy Act of 1969,
Order No. 486, 52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs., Regulations Preambles 1986-1990 ¶ 30,783 (1987).
296 18 CFR 380.4(a)(2)(ii).
Docket No. RM13-5-000 - 143 -
VI. Document Availability
265. In addition to publishing the full text of this document in the Federal Register, the
Commission provides all interested persons an opportunity to view and/or print the
contents of this document via the Internet through the Commission's Home Page
(http://www.ferc.gov) and in the Commission's Public Reference Room during normal
business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street, NE, Room 2A,
Washington, DC 20426.
266. From the Commission's Home Page on the Internet, this information is available
on eLibrary. The full text of this document is available on eLibrary in PDF and
Microsoft Word format for viewing, printing, and/or downloading. To access this
document in eLibrary, type the docket number excluding the last three digits of this
document in the docket number field.
267. User assistance is available for eLibrary and the Commission’s website during
normal business hours from the Commission’s Online Support at (202) 502-6652 (toll
free at 1-866-208-3676) or email at [email protected], or the Public Reference
Room at (202) 502-8371, TTY (202) 502-8659. E-mail the Public Reference Room
VII. Effective Date and Congressional Notification
268. This Final Rule is effective [insert date 60 days from publication in Federal
Register].
269. The Commission has determined, with the concurrence of the Administrator of the
Office of Information and Regulatory Affairs of OMB, that this rule is a “major rule” as
Docket No. RM13-5-000 - 144 -
defined in section 351 of the Small Business Regulatory Enforcement Fairness Act of
1996.297 The Commission will submit the Final Rule to both houses of Congress and to
the General Accountability Office.
By the Commission. ( S E A L )
Nathaniel J. Davis, Sr., Deputy Secretary.
297 See 5 U.S.C. 804(2) (2007).
Docket No. RM13-5-000 - 145 -
Note: the following Appendix will not appear in the Code of Federal Regulations.
Appendix Commenters
Abbreviation Commenter AEP American Electric Power Service Corporation Alliant Alliant Energy Corporate Services Alrich Tom Alrich Ameren Ameren Service Company APPA American Public Power Association Arkansas Arkansas Electric Cooperative BPA Bonneville Power Administration CenterPoint CenterPoint Energy Houston Electric, LLC Consumers Energy Consumers Energy Company Dominion Dominion Resources Services, Inc. EEI Edison Electric Institute Encari Encari, L.L.C. EPSA Electric Power Supply Association Exelon Exelon Corporation FirstEnergy FirstEnergy Service Company G&T Cooperatives Associated Electric Cooperative, Inc., Basin Electric Power
Cooperative, and Tri-State Generation and Transmission Association, Inc.
Gist Thomas Gist GSOC Georgia Systems Operations Corp. Holland City of Holland, Michigan Idaho Power Idaho Power Company IRC ISO/RTO Council ISO New England ISO New England Inc. ITC ITC Companies KCP&L Kansas City Power & Light Company and KCP&L Greater
Missouri Operations Company LADWP City of Los Angeles Department of Water and Power Luminant Luminant Generation Company, LLC MidAmerican MidAmerican Energy Holdings Co. MISO Midcontinent Independent System Operator, Inc. NAGF North American Generator Forum NARUC National Association of Regulatory Utility Commissioners NASUCA National Association of State Utility Consumer Advocates National Grid National Grid USA NERC North American Electric Reliability Corporation
Docket No. RM13-5-000 - 146 -
NextEra NextEra Energy, Inc. NIPSCO Northern Indiana Public Service Co. Northeast Utilities Northeast Utilities Companies NorthWestern NorthWestern Energy NRECA National Rural Electric Cooperative Association NRG NRG Companies OEVC Occidental Energy Ventures Corp. Pepco Pepco Holdings, Inc. PG&E Pacific Gas and Electric Company Portland Portland General Electric Company PPL Companies Louisville Gas and Electric Company; Kentucky Utilities
Corporation; Lower Mount Bethel Energy, LLC; PPL Brunner Island, LLC; PPL Electric Utilities Corporation; PPL EnergyPlus, LLC; PPL Holtwood, LLC; PPL Ironwood, LLC; PPL Martins Creek, LLC; PPL Montana, LLC; PPL Montour, LLC; and PPL Susquehanna, LLC.
PUCO Public Utilities Commission of Ohio Reclamation Department of Interior Bureau of Reclamation SCE Southern California Edison Company SCE&G South Carolina Electric & Gas Company Southern Indiana Southern Indiana Gas and Electric Company Smart Grid Smart Grid Interoperability Panel Smart Grid Cybersecurity
Committee SPP Parties Kansas City Board of Public Utilities, Oklahoma Municipal
Power Authority, Rayburn Country Electric Cooperative, Southwest Power Pool, Inc., Westar Energy, Inc., and Western Farmers Electric Cooperative
SPP RE Southwest Power Pool Regional Entity SWP California Department of Water Resources State Water
Project Tacoma Tacoma Power Tampa Tampa Electric Company TAPS Transmission Access Policy Study Group TVA Tennessee Valley Authority UI United Illuminating Company Venafi Venafi Waterfall Waterfall Security Solutions, Ltd. Wisconsin Wisconsin Electric Power Company Xcel Xcel Energy Services, Inc.