SUMMER TRAINING AT Ultratech RMC
SUBMITTED BY:Abhimanyu Saraswat
![Page 2: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/2.jpg)
Truck washing
entry
Weighing area
quality store ticket
Yamuna sand/red
sand
20 mm
10 mm
hoppermixer
T.M repair
silo
silo
silo
pump
truck
LAYOUT OF THE PLANT
![Page 3: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/3.jpg)
MAIN THINGS DONE IN SUMMARY TRAINING
TESTING
1) SLUMP TEST2) SLIT TEST3) BULK DENSITY
WORKING OF A RMC PLANT
DESIGN MIX OF CONCRETE
![Page 4: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/4.jpg)
EQUPIMENTS OF MOST IMPORTANT TESTS
![Page 5: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/5.jpg)
TOTAL TEST DONE
Sieve analysis Air entrainment meter Consistency (normal, initial and final)- not done Fly ash content Specfic gravity of fine & coarse aggregates Aggregate impact test Speedy moisture test Flakiness and elongation
![Page 6: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/6.jpg)
WORKING PROCEDURE
![Page 7: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/7.jpg)
![Page 8: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/8.jpg)
FLOW CHART IN RMC
![Page 9: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/9.jpg)
PROCESS IN PICTURES
![Page 10: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/10.jpg)
STORAGE OF 10 MM AND 20 MM
![Page 11: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/11.jpg)
PUTTING AGGREGATES/SAND IN HOPPER
![Page 12: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/12.jpg)
BY CONVEYOUR BELT TO SKIP
![Page 13: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/13.jpg)
SKIP TO MIXER
![Page 14: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/14.jpg)
MIXER
![Page 15: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/15.jpg)
CONTROL PANEL
![Page 16: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/16.jpg)
READY TO MOVE
![Page 17: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/17.jpg)
POURING OF CONCRTE IN PUMP AT SITE
![Page 18: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/18.jpg)
DESIGN MIX BY IS 10262 AND 456
Step 1: f m=f ck+ 1.65σ.
Step 2 : selection of w/c from curves .
Step 3: Estimate water content & sand contents for concrete grades up to M35 up M35/ above M35
w/c curve Steps of design
![Page 19: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/19.jpg)
STEP 3 ADJUSTMENT IN WATER AND SAND CONTENT
Condition Adjustment
Sand zone 1,3 and 4 (for 2 no change)
No change in water content but sand -1.5% for zone 3,1.5 % for zone 1 -3% for zone 4
Increase / decrease of Compaction factor by 0.1
Water content increased by +_ 3%No change in sand
w/c ratio increased or decreased by 0.05
No change in water content but +_ 1% in sand content
For round aggregates -15kg/m3 for water and -7% for sand
![Page 20: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/20.jpg)
CONTD ….
Step 4: Calculate cement content, Aggregate contents,
10001*)*
)1(1(
ScCa
pScCWV
10001*)*1(
SfFa
pScCWV
![Page 21: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/21.jpg)
LAB CONCRETE MIXER
![Page 22: RMC Plant and its components, Testing and Design Mix](https://reader036.vdocument.in/reader036/viewer/2022081502/5881e85a1a28ab36088b689f/html5/thumbnails/22.jpg)
PROBLEMS EXPERIENCED Some sites are just too far away. Generation of road traffic. Concrete's limited time span between mixing and
going-off means that ready-mix should be placed within 10 minutes of batching at the plant.
Slump loss is also a major issue in RMC which result
in a loss to company as the buyer tends to reject the product.